JPS5294611A - Method of laying pipe or providing open ditch into poor soil - Google Patents
Method of laying pipe or providing open ditch into poor soilInfo
- Publication number
- JPS5294611A JPS5294611A JP1174276A JP1174276A JPS5294611A JP S5294611 A JPS5294611 A JP S5294611A JP 1174276 A JP1174276 A JP 1174276A JP 1174276 A JP1174276 A JP 1174276A JP S5294611 A JPS5294611 A JP S5294611A
- Authority
- JP
- Japan
- Prior art keywords
- laying pipe
- providing open
- poor soil
- open ditch
- ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1174276A JPS5294611A (en) | 1976-02-04 | 1976-02-04 | Method of laying pipe or providing open ditch into poor soil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1174276A JPS5294611A (en) | 1976-02-04 | 1976-02-04 | Method of laying pipe or providing open ditch into poor soil |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP59216535A Division JPS60181426A (en) | 1984-10-15 | 1984-10-15 | Method of burying pipe in soft soil layer |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5294611A true JPS5294611A (en) | 1977-08-09 |
JPS6160209B2 JPS6160209B2 (en) | 1986-12-19 |
Family
ID=11786467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1174276A Granted JPS5294611A (en) | 1976-02-04 | 1976-02-04 | Method of laying pipe or providing open ditch into poor soil |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5294611A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58204230A (en) * | 1977-01-26 | 1983-11-28 | ソ−ルタンシユ | Construction of underground tunnel |
JP2018017104A (en) * | 2016-07-29 | 2018-02-01 | 大成建設株式会社 | Composite body of earth structure and concrete structure and construction method thereof |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS48101711A (en) * | 1972-04-07 | 1973-12-21 |
-
1976
- 1976-02-04 JP JP1174276A patent/JPS5294611A/en active Granted
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS48101711A (en) * | 1972-04-07 | 1973-12-21 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58204230A (en) * | 1977-01-26 | 1983-11-28 | ソ−ルタンシユ | Construction of underground tunnel |
JPH0118216B2 (en) * | 1977-01-26 | 1989-04-04 | Soletanche | |
JP2018017104A (en) * | 2016-07-29 | 2018-02-01 | 大成建設株式会社 | Composite body of earth structure and concrete structure and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
JPS6160209B2 (en) | 1986-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5394408A (en) | Method of laying underground conduit | |
AU2616977A (en) | Offshore pipe laying | |
JPS5441517A (en) | Plough for trenching and method of laying pipe that use this plough | |
JPS5294611A (en) | Method of laying pipe or providing open ditch into poor soil | |
JPS5362313A (en) | Method of laying inner pipe in sheath pipe | |
JPS537356A (en) | Method of locating buried nonnmetal pipe | |
JPS52146913A (en) | Method of laying large diameter pipe | |
JPS5332908A (en) | Method of laying pipe body into spring water subsurface | |
JPS5338101A (en) | Method of excavating inside of steel pipe pile | |
JPS5342410A (en) | Method of connecting piles underground | |
JPS5399609A (en) | Method of laying smallldiameter pipe | |
JPS5348310A (en) | Method of excavating ditch | |
AU2607177A (en) | Offshore pipe laying | |
JPS533693A (en) | Method of laying subaqueous cable | |
JPS531913A (en) | Method of laying pipe line on water bottom | |
JPS5287854A (en) | Leakkpreventive method of branched joint portion of sewage pipe | |
JPS5314916A (en) | Pipe laying method | |
JPS53111612A (en) | Method of laying underground pipe | |
JPS5410511A (en) | Method of construction of burying pipe | |
JPS52137116A (en) | Method of laying plural pipes by excavating | |
JPS55139777A (en) | Method of laying pipe earth | |
JPS52128615A (en) | Complete control method of pipe laid underground and complete control method of pipe laid underground for inclined land | |
JPS52137111A (en) | Method of improving excavated soil | |
JPS5317368A (en) | Method of surveying advancing position of buried pipe | |
JPS52137117A (en) | Method of laying plural pipes by excavating |