JPS51150813A - Method of improving subsoil - Google Patents

Method of improving subsoil

Info

Publication number
JPS51150813A
JPS51150813A JP7636275A JP7636275A JPS51150813A JP S51150813 A JPS51150813 A JP S51150813A JP 7636275 A JP7636275 A JP 7636275A JP 7636275 A JP7636275 A JP 7636275A JP S51150813 A JPS51150813 A JP S51150813A
Authority
JP
Japan
Prior art keywords
subsoil
improving
improving subsoil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7636275A
Other languages
Japanese (ja)
Inventor
Motoo Nei
Hidetomo Akutsu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Fudo Tetra Corp
Original Assignee
Fudo Construction Co Ltd
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Construction Co Ltd, Kawasaki Steel Corp filed Critical Fudo Construction Co Ltd
Priority to JP7636275A priority Critical patent/JPS51150813A/en
Publication of JPS51150813A publication Critical patent/JPS51150813A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
JP7636275A 1975-06-17 1975-06-17 Method of improving subsoil Pending JPS51150813A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7636275A JPS51150813A (en) 1975-06-17 1975-06-17 Method of improving subsoil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7636275A JPS51150813A (en) 1975-06-17 1975-06-17 Method of improving subsoil

Publications (1)

Publication Number Publication Date
JPS51150813A true JPS51150813A (en) 1976-12-24

Family

ID=13603235

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7636275A Pending JPS51150813A (en) 1975-06-17 1975-06-17 Method of improving subsoil

Country Status (1)

Country Link
JP (1) JPS51150813A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04297613A (en) * 1991-03-27 1992-10-21 Eiji Shimizu Prevention of liquefaction of soft sandy ground

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04297613A (en) * 1991-03-27 1992-10-21 Eiji Shimizu Prevention of liquefaction of soft sandy ground

Similar Documents

Publication Publication Date Title
JPS5234509A (en) Subsoil improving method
JPS5293110A (en) Method of improving subsoil
JPS5235413A (en) Method of improving poor bedrock
JPS5256708A (en) Method of stabilizing poor subsoil
JPS51131116A (en) Method of improving subsoil
JPS5245115A (en) Method of stabilizing poor subsoil
JPS5221161A (en) Method of improving polluted soil
JPS51128109A (en) Method of stabilizing subsoil
JPS51117404A (en) Method of stabilizing subsoil
JPS5219411A (en) Method of stabilizing subsoil
JPS51111715A (en) Method of stabilizing poor subsoil
JPS5245120A (en) Method of improving poor subsoil
JPS51133910A (en) Method of improving subsoil
JPS51150813A (en) Method of improving subsoil
JPS51128110A (en) Method of improving subsoil
JPS51121913A (en) Method of hardening poor subsoil
JPS51148921A (en) Method of improving poor subsoil
JPS5261312A (en) Method of improving poor subsoil
JPS51148918A (en) Method of improving poor subsoil
JPS5225409A (en) Method of improving poor subsoil
JPS51148211A (en) Method of improving poor subsoil
JPS5261311A (en) Method of improving poor subsoil
JPS5214009A (en) Method of improving poor subsoil
JPS51132613A (en) Method of stabilizing poor subsoil
JPS5267111A (en) Method of stabilizing poor subsoil