JPS51148905A - Method of controlling excavation of ditch and hole for continuous wall and foundation pile - Google Patents
Method of controlling excavation of ditch and hole for continuous wall and foundation pileInfo
- Publication number
- JPS51148905A JPS51148905A JP7291075A JP7291075A JPS51148905A JP S51148905 A JPS51148905 A JP S51148905A JP 7291075 A JP7291075 A JP 7291075A JP 7291075 A JP7291075 A JP 7291075A JP S51148905 A JPS51148905 A JP S51148905A
- Authority
- JP
- Japan
- Prior art keywords
- ditch
- hole
- foundation pile
- continuous wall
- controlling excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009412 basement excavation Methods 0.000 title 1
- 238000000034 method Methods 0.000 title 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7291075A JPS51148905A (en) | 1975-06-16 | 1975-06-16 | Method of controlling excavation of ditch and hole for continuous wall and foundation pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7291075A JPS51148905A (en) | 1975-06-16 | 1975-06-16 | Method of controlling excavation of ditch and hole for continuous wall and foundation pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS51148905A true JPS51148905A (en) | 1976-12-21 |
Family
ID=13502964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP7291075A Pending JPS51148905A (en) | 1975-06-16 | 1975-06-16 | Method of controlling excavation of ditch and hole for continuous wall and foundation pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS51148905A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5385902A (en) * | 1976-12-30 | 1978-07-28 | Kajima Corp | Method of controlling excavation by vertical excavator |
JPS60181420A (en) * | 1984-02-24 | 1985-09-17 | Shimizu Constr Co Ltd | Excavating device |
JP4718050B2 (en) * | 2001-07-04 | 2011-07-06 | 株式会社ソーキ | Excavator position measurement method |
-
1975
- 1975-06-16 JP JP7291075A patent/JPS51148905A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5385902A (en) * | 1976-12-30 | 1978-07-28 | Kajima Corp | Method of controlling excavation by vertical excavator |
JPS5745878B2 (en) * | 1976-12-30 | 1982-09-30 | ||
JPS60181420A (en) * | 1984-02-24 | 1985-09-17 | Shimizu Constr Co Ltd | Excavating device |
JPH0415850B2 (en) * | 1984-02-24 | 1992-03-19 | Shimizu Construction Co Ltd | |
JP4718050B2 (en) * | 2001-07-04 | 2011-07-06 | 株式会社ソーキ | Excavator position measurement method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5346113A (en) | Method of chipping foundation pile | |
JPS51148905A (en) | Method of controlling excavation of ditch and hole for continuous wall and foundation pile | |
JPS51148906A (en) | Method of controlling excavation of ditch and hole for continuous walls and foundation pile | |
JPS5436012A (en) | Method of excavating ditch hole of continuous underground wall | |
JPS5338101A (en) | Method of excavating inside of steel pipe pile | |
JPS5385902A (en) | Method of controlling excavation by vertical excavator | |
JPS5426003A (en) | Method of controlling excavation of groove and hole of continuous wall* foundation pile* etc* and controller of executing this method | |
JPS5334310A (en) | Method of installing pile with horizontal anchor on foundation | |
JPS5416807A (en) | Method of foundation pile construction | |
JPS53609A (en) | Method of driving steellpipe foundation pile | |
JPS51148213A (en) | Method of excavating ditch for wall of large thickness in continuous underground wall construction | |
JPS5359210A (en) | Foundation pile and method of building same | |
JPS527109A (en) | Method of driving enlargeddhead foundation piles | |
JPS5348310A (en) | Method of excavating ditch | |
JPS5214004A (en) | Method of driving concrete pile into excavated hole | |
JPS5298303A (en) | Method of forming casttin place concrete pile | |
JPS569582A (en) | Method of excavating bottommexpanded pile hole | |
JPS5343905A (en) | Method of building side wall for basement and pile for side wall | |
JPS5321805A (en) | Method of forming casttin place concrete foundation pile | |
JPS54105810A (en) | Method of excavation construction of foundation pillar | |
JPS54407A (en) | Method of strengthening supporting force of foundation pile by method of intermediate excavation construction | |
JPS52124702A (en) | Method of and device for excavating ditches for underground continuous walls | |
JPS5251711A (en) | Method of excavating corner section for forming continuous underground wall | |
JPS5256706A (en) | Method of checking sinking of concrete pile | |
JPS52107108A (en) | Method of building foundation pile |