JPS496037B1 - - Google Patents

Info

Publication number
JPS496037B1
JPS496037B1 JP8063269A JP8063269A JPS496037B1 JP S496037 B1 JPS496037 B1 JP S496037B1 JP 8063269 A JP8063269 A JP 8063269A JP 8063269 A JP8063269 A JP 8063269A JP S496037 B1 JPS496037 B1 JP S496037B1
Authority
JP
Japan
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8063269A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP8063269A priority Critical patent/JPS496037B1/ja
Publication of JPS496037B1 publication Critical patent/JPS496037B1/ja
Pending legal-status Critical Current

Links

Landscapes

  • Metal Extraction Processes (AREA)
JP8063269A 1969-10-08 1969-10-08 Pending JPS496037B1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8063269A JPS496037B1 (ja) 1969-10-08 1969-10-08

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8063269A JPS496037B1 (ja) 1969-10-08 1969-10-08

Publications (1)

Publication Number Publication Date
JPS496037B1 true JPS496037B1 (ja) 1974-02-12

Family

ID=13723722

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8063269A Pending JPS496037B1 (ja) 1969-10-08 1969-10-08

Country Status (1)

Country Link
JP (1) JPS496037B1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013047650A1 (ja) * 2011-09-30 2013-04-04 日新製鋼株式会社 段差付き角パイプの製造方法
US9757789B2 (en) 2011-09-30 2017-09-12 Nisshin Steel Co., Ltd. Method of manufacturing rectangular tube having stepped portion
JP2018171642A (ja) * 2017-03-31 2018-11-08 日鐵住金建材株式会社 金属管の凹溝加工方法、及び装置
JP2019042752A (ja) * 2017-08-30 2019-03-22 日鐵住金建材株式会社 金属管の凹溝加工装置、及び方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013047650A1 (ja) * 2011-09-30 2013-04-04 日新製鋼株式会社 段差付き角パイプの製造方法
JP2013075323A (ja) * 2011-09-30 2013-04-25 Nisshin Steel Co Ltd 段差付き角パイプの製造方法
US9757789B2 (en) 2011-09-30 2017-09-12 Nisshin Steel Co., Ltd. Method of manufacturing rectangular tube having stepped portion
US9821355B2 (en) 2011-09-30 2017-11-21 Nisshin Steel Co., Ltd. Method of manufacturing rectangular tube having stepped portion
JP2018171642A (ja) * 2017-03-31 2018-11-08 日鐵住金建材株式会社 金属管の凹溝加工方法、及び装置
JP2019042752A (ja) * 2017-08-30 2019-03-22 日鐵住金建材株式会社 金属管の凹溝加工装置、及び方法

Similar Documents

Publication Publication Date Title
AU465413B2 (ja)
AU429630B2 (ja)
AU450150B2 (ja)
JPS496037B1 (ja)
AU442375B2 (ja)
AU470301B1 (ja)
AU5113869A (ja)
AU442285B2 (ja)
AU438128B2 (ja)
AU442535B2 (ja)
AU442380B2 (ja)
AU442554B2 (ja)
AU442357B2 (ja)
AU442322B2 (ja)
AU470661B1 (ja)
AU442538B2 (ja)
AU6132869A (ja)
AU4540468A (ja)
CS148384B1 (ja)
AU5077469A (ja)
AU5079269A (ja)
AU5109569A (ja)
AU4949169A (ja)
AU5228269A (ja)
BG18852A3 (ja)