JPH1181648A - H-shaped frame scaffold - Google Patents

H-shaped frame scaffold

Info

Publication number
JPH1181648A
JPH1181648A JP23790597A JP23790597A JPH1181648A JP H1181648 A JPH1181648 A JP H1181648A JP 23790597 A JP23790597 A JP 23790597A JP 23790597 A JP23790597 A JP 23790597A JP H1181648 A JPH1181648 A JP H1181648A
Authority
JP
Japan
Prior art keywords
frame
scaffold
side frame
horizontal
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23790597A
Other languages
Japanese (ja)
Other versions
JP3638761B2 (en
Inventor
Minoru Ida
実 井田
Yasumi Miyazaki
安美 宮崎
Satoru Koiwai
悟 小岩井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIMAMURA KOGYO KK
JFE Kizai Forming Co Ltd
Original Assignee
SHIMAMURA KOGYO KK
Kawatetsu Kizai Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIMAMURA KOGYO KK, Kawatetsu Kizai Kogyo Co Ltd filed Critical SHIMAMURA KOGYO KK
Priority to JP23790597A priority Critical patent/JP3638761B2/en
Publication of JPH1181648A publication Critical patent/JPH1181648A/en
Application granted granted Critical
Publication of JP3638761B2 publication Critical patent/JP3638761B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PROBLEM TO BE SOLVED: To safely install a handrail by providing lock fittings of a designated form in two, upper and lower places each inside the upper pedestal of an H-shaped scaffold and outside the right and left vertical sides of a side frame. SOLUTION: A building frame 1 is formed by connecting the middle parts of a pair of pedestals by a horizontal cross beam to be H-shaped, and a U-shaped fitting 15 and a pin joint 14 are provided inward in two, upper and lower places of each pedestal 11 above the cross beam. A horizontal intermediate bridge is provided on the middle parts of the upper and lower sides of a rectangular frame, and the intermediate bridge and the lower side are connected to each other in two lateral middle parts in the vertical direction by two connecting materials to form a side frame 3. Further a horizontal pin-like projection 37 and a wing part 36 having an elongated hole are provided outward in two upper and lower places of the right and left vertical sides 34 of the side frame 3. In assembling a scaffold, when the frame 1 is lifted up from the lower work floor with the connecting materials of the side frame 3 held and the projection 37 is dropped in the fitting 15, the side frame 3 is hung down, taking the projection as a fulcrum, and the pin 14 is inserted in the elongated hole of the wing 36 to be substantially automatically engaged with each other. Thus, the scaffold can be constructed safely and easily by one worker.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、土木、建築等の工
事現場において、型枠等を支持する支保工や、建築物の
外壁に沿って設置して高所における作業足場として使用
する枠組み足場に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a scaffold for supporting a formwork or the like at a construction site such as civil engineering or a building, and a framework scaffold which is installed along an outer wall of a building and used as a work scaffold at a high place. About.

【0002】[0002]

【従来の技術】土木、建築等の工事現場において、建築
物の外壁に沿って設置する高所における作業足場とし
て、わが国では古来より全国的に豊富に産出する杉材を
用いた丸太足場が使用されてきた。また、東南アジア諸
国では竹材が現在も使用されている。これら丸太、足場
板等は1回毎の使い捨てではないものの、使用や保管に
伴う腐食、折損等の損耗が著しく、資源保護や地球環境
保全が叫ばれる今日、使用は次第に好ましいものではな
くなってきている。
2. Description of the Related Art In Japan, a log scaffold made of cedar wood, which has been produced abundantly nationwide since ancient times, has been used as a work scaffold at high places installed along the outer walls of buildings at construction sites such as civil engineering and construction. It has been. Bamboo is still used in Southeast Asian countries. Although these logs and scaffolding boards are not disposable each time, their use and storage are accompanied by significant wear and tear such as breakage, and the use of these resources is becoming less and more desirable today, when resource conservation and global environmental conservation are called for. I have.

【0003】一方、鋼管を素材とする鋼管枠組み足場
は、足場材として好適な森林資源に乏しい欧州で早くか
ら開発され、米国を経て昭和20年代にわが国にも紹介
されたもので、繰り返し使用することを原則としてお
り、現在ではわが国でもほとんどの工事現場において一
般的に使用されている。この鋼管枠組み足場は、型枠等
を支持する支保工としても使用される。
[0003] On the other hand, steel pipe frame scaffolds made of steel pipes have been developed from early on in Europe where forest resources are scarce and suitable for use as scaffolds. They have been introduced to Japan in the 1950s through the United States, and can be used repeatedly. It is generally used in most construction sites in Japan. This steel pipe frame scaffold is also used as a support for supporting a formwork or the like.

【0004】鋼管枠組み足場は、一対の鋼管製の「建
枠」と呼ばれるものを所定間隔で向かい合わせて立設
し、相対する建枠の横梁間に板付き布枠をかけ渡し、相
対する建枠の脚柱間に側面枠を取り付けてなる構成単位
を上下方向ならびに水平方向に所定単位接続して枠組み
足場を構成するものであって、当初わが国に導入された
ものは、基本構成部品である建枠として2本の鋼管製脚
柱と、その上端を水平に結ぶ横梁ならびにこれらを連結
する補剛材により「門」の字型に組立てられた鋼管枠体
が使用され、その形状から「鳥居形枠組足場」と称され
るものであった。
[0004] A steel pipe frame scaffold is constructed by standing a pair of steel pipes called "building frames" facing each other at a predetermined interval, crossing a cloth frame with a plate between the cross beams of the opposing building frames, and connecting the opposing building frames. A frame scaffold is constructed by connecting predetermined units in the vertical and horizontal directions to a structural unit formed by attaching a side frame between the pillars of the frame, and the frame structural scaffold initially introduced in Japan is a basic component. As the building frame, a steel pipe frame assembled into a "gate" shape by two steel pipe pillars, a horizontal beam connecting the upper ends thereof horizontally, and a stiffener connecting the two pillars is used. "Framework scaffolding".

【0005】このような鳥居形枠組足場は、下段の足場
ができた時点でその上段の枠組足場を組み立て、解体の
ときも同様に上段から順次解体して行くのであるが、組
み立て、あるいは解体の作業は最上段の頂部にある板付
き布枠の上に立って行うことになるので周囲に安全のた
めの柱や手すりがなく、転落等の危険が大きいという問
題点があった。
In such a torii frame scaffold, when a lower scaffold is formed, an upper frame scaffold is assembled, and when disassembling, the scaffold is similarly sequentially disassembled from the upper stage. Since the work is performed while standing on the cloth frame with the plate at the top of the uppermost step, there are no pillars or handrails for safety around, and there is a problem that the danger of falling down is large.

【0006】そこで、こうした危険を解消する枠組足場
として、たとえば実公平1-18753 号公報に示されるよう
なものが提案された。図4によりこれを説明する。この
枠組足場に使用される建枠1は、2本の脚柱11と、その
中間付近を水平方向に結ぶ横梁12ならびに補剛材13によ
りH字形に組立てられた鋼管枠体であり、その形状から
この建枠を使用した枠組足場を「H形枠組足場」と称す
る。
Therefore, as a framework scaffold for solving such a danger, for example, one disclosed in Japanese Utility Model Publication No. 1-18753 has been proposed. This will be described with reference to FIG. The building frame 1 used for this scaffolding scaffold is a steel pipe frame assembled into an H-shape by two pillars 11, a cross beam 12 connecting the middle portion in the horizontal direction and a stiffener 13, and Therefore, a framework scaffold using this building frame is referred to as an “H-frame scaffold”.

【0007】このH形枠組足場を組み立てる手順は、基
本的にはそれまでの鳥居形枠組足場と同様であり、建枠
1、1を所定間隔で向かい合わせて立設し、相対する建
枠1、1の脚柱11、11の横梁12より下方の部分にクロス
ブレース4を取り付けて水平方向に安定させた上、相対
する建枠1、1の横梁12、12の間に足場板である板付き
の板付き布枠2をかけ渡して構成単位とする。これを1
段目として記号Iで示す。
The procedure for assembling this H-shaped scaffolding scaffold is basically the same as that of the conventional torii-shaped scaffolding scaffolding. A cross brace 4 is attached to a portion of the pillars 11 below the horizontal beams 12 below the horizontal beams 12 to stabilize the horizontal direction, and a plate serving as a scaffold between the opposing building frames 1 and 1 is provided. A cloth frame 2 with a plate is attached to form a structural unit. This one
It is indicated by the symbol I as a step.

【0008】最下段の建枠1の脚柱11の下部にはジャッ
キベース6を挿入してあり、各脚柱11ごとに高さを調整
できる。さらに、建枠1を上下方向に接続する際には、
上下の脚柱11、11の間に接続用のジョイント5を挿入し
て連結する。ジョイント5は、上下部分は脚柱11の鋼管
内に嵌合する細径、中間部分はこれより太く、脚柱11の
鋼管の外径とほぼ等しい径となっており、適宜外れ防止
のためのピンクリップ等を挿入するための小孔を設けて
ある。
A jack base 6 is inserted below the pillar 11 of the lowermost building frame 1 so that the height of each pillar 11 can be adjusted. Furthermore, when connecting the building frame 1 vertically,
The connection joint 5 is inserted between the upper and lower pillars 11 and 11 and connected. The upper and lower portions of the joint 5 have a small diameter that fits into the steel pipe of the pillar 11, the middle portion is thicker, and have a diameter substantially equal to the outer diameter of the steel pipe of the pillar 11. A small hole for inserting a pin clip or the like is provided.

【0009】この1段目の上に同様の構成単位で記号II
で示すように2段目を設置し、これを所要段数くり返し
て所定高さの枠組足場とする。水平方向にも構成単位を
所要数接続する。この図からも明らかなように、H形枠
組足場では板付き布枠2は各段のほぼ中間の高さに設置
され、板付き布枠2をかけ渡した後直ちに脚柱丈夫に対
して側面枠3を取り付けることができるから、上段の枠
組足場を組み立てる段階でも安全に作業を行うことがで
きる。このように、H形枠組足場は上段の枠組足場の組
み立てに先立って手すりが設置されていることから「手
すり先行形」とも呼ばれ、作業者からも歓迎されて需要
が増加しつつある。
On the first stage, a similar structural unit is denoted by the symbol II.
The second step is installed as shown by, and this is repeated a required number of times to form a framed scaffold having a predetermined height. Connect the required number of structural units in the horizontal direction. As is apparent from this figure, in the H-shaped scaffold scaffold, the cloth frame 2 with a plate is installed at almost the middle height of each step, and immediately after the cloth frame 2 with the plate is stretched over, the side surface against the pillar is strong. Since the frame 3 can be attached, work can be performed safely even at the stage of assembling the upper framed scaffold. As described above, since the handrail is installed on the H-shaped framework scaffold prior to the assembling of the upper framework scaffold, it is also referred to as a "handrail precedent type", and is being welcomed by workers and the demand is increasing.

【0010】また、本出願人もさきにこのようなH形枠
組み足場を発明し、特公平7-30616号公報により公告さ
れている。これは基本的には上記のH形枠組足場と同様
の手すり先行形枠組み足場であり、各構成部品および符
号は図4とほぼ同様であるからあらためて図示しない
が、この発明においては側面枠3の建枠1への取り付け
構造に特徴を有し、取り付け作業をきわめて容易とした
ものである。
[0010] The present applicant has also invented such an H-shaped scaffold, which has been disclosed in Japanese Patent Publication No. 7-30616. This is basically a handrail leading type frame scaffold similar to the above-described H-shaped frame scaffold, and each component and reference numeral are substantially the same as those in FIG. It has a feature in the mounting structure to the building frame 1 and makes the mounting work extremely easy.

【0011】特公平7-30616号公報に記載の側面枠3を
図5に示す。側面枠3は鋼管製の長方形の枠体で、上下
辺31、32の中間に水平方向の中桟33を設け、左右垂直辺
34の上下2か所に、建枠への取り付け用の係止金具が外
側を向けて設けられている。図6(a)は上側のものを
示し、36は水平方向の長孔を設けた翼部である。また
(b)は下側のものを示し、37は水平方向に突出したピ
ン状突起である。
FIG. 5 shows a side frame 3 described in Japanese Patent Publication No. 7-30616. The side frame 3 is a rectangular frame made of steel pipe, having a horizontal middle rail 33 provided between the upper and lower sides 31 and 32,
At two locations above and below 34, locking metal fittings for attachment to the building frame are provided facing outward. FIG. 6 (a) shows the upper one, and 36 is a wing provided with a horizontal elongated hole. Also, (b) shows the lower one, and 37 is a pin-like projection projecting in the horizontal direction.

【0012】一方、図4に示す建枠1の上部脚柱11の上
下2か所に、側面枠3取り付け用の係止金具14、15が内
側を向けて設けられており、図7(a)に示すのは上側
のもので、14は前記の側面枠3端部上側に設けられた翼
部36に設けられた長孔に挿通するピンジョイント、
(b)に示すのは下側のもので15は側面枠3端部下側に
設けられた水平方向のピン状突起37を受けるU形金具で
ある。
On the other hand, locking metal fittings 14 and 15 for attaching the side frame 3 are provided at two places above and below the upper leg 11 of the building frame 1 shown in FIG. ) Is the upper one, 14 is a pin joint inserted into a long hole provided in the wing part 36 provided above the end of the side frame 3;
(B) is a U-shaped metal fitting which receives a horizontal pin-like projection 37 provided below the end of the side frame 3 at the lower side.

【0013】側面枠3の取り付け作業は、作業者が板付
き布枠2に乗り、側面枠3の下側にあるピン状突起37を
脚柱11の下側にあるU形金具15に差し込み、これを支点
にして側面枠3を引き上げ、側面枠3の上側にある翼部
36の長孔を脚柱11の上側にあるピンジョイント14に挿通
すれば取り付けが完了する。ここにピン状突起37は通常
「ダボ」と呼ばれるもので、先端部分をやや大径として
U形金具15の溝からの脱落を防止し、また翼部36の長孔
は水平方向に自由度をもたせて嵌合を容易としている。
ピンジョイント14はグラビティロックと呼ばれる重力式
の外れ止め爪を有し、枠組み足場においてごく一般的に
使用されるものである。
The worker mounts the side frame 3 on the cloth frame 2 with a plate, inserts the pin-like projection 37 on the lower side of the side frame 3 into the U-shaped bracket 15 on the lower side of the pillar 11, and With this as a fulcrum, the side frame 3 is pulled up, and the wing on the upper side of the side frame 3
The attachment is completed by inserting the long hole of 36 into the pin joint 14 above the pillar 11. Here, the pin-shaped projection 37 is usually called a "dove", and has a slightly larger tip portion to prevent the U-shaped bracket 15 from dropping out of the groove, and the long hole of the wing portion 36 has a degree of freedom in the horizontal direction. This makes it easy to fit.
The pin joint 14 has a gravity type locking claw called a gravity lock, and is generally used in a frame scaffold.

【0014】[0014]

【発明が解決しようとする課題】ところで、特公平7-3
0616号公報に記載の枠組み足場において、側面枠3の取
り付け、取り外しがきわめて容易になったとはいえ、こ
れを行うためには、まだ手すりに相当する側面枠3のな
い状態で上段の板付き布枠2の上に乗り、側面枠3を取
り付け位置まで持ち上げ、そして取り付けるという作業
を行わなければならないから、脚柱11に墜落防止の安全
ロープを係止するなどの安全対策が必要であり、さらな
る改善が望まれていた。
[Problems to be Solved by the Invention] By the way, Tokiko 7-3
In the framework scaffold described in Japanese Patent No. 0616, although the attachment and detachment of the side frames 3 has become extremely easy, in order to do this, the upper plated cloth without the side frames 3 equivalent to handrails is still required. Since it is necessary to ride on the frame 2, lift the side frame 3 to the mounting position, and mount the side frame 3, safety measures such as locking a fall prevention safety rope to the pillar 11 are necessary. Improvement was desired.

【0015】本発明は、この側面枠3の取り付け作業
を、安全な状態となっている一段下の作業床から行える
ようにして、安全性を一層向上させることを目的とす
る。
An object of the present invention is to further improve the safety by allowing the work of attaching the side frame 3 to be performed from a safe work floor one step below.

【0016】[0016]

【課題を解決するための手段】本発明の枠組足場は、一
対の建枠を所定間隔で向かい合わせて立設し、相対する
建枠の横梁間に板付き布枠をかけ渡し、相対する建枠の
脚柱間に側面枠を取り付けてなる構成単位を上下方向な
らびに水平方向に所定単位接続して枠組み足場を構成す
るH形枠組み足場であって、前記建枠が、一対の鋼管製
脚柱の中間付近を水平方向に横梁で連結してH形とし、
前記横梁より上方の上部脚柱の上下2か所に、側面枠取
り付け用の係止金具が内側を向けて設けられており、上
側のものは側面枠端部上側に設けられた水平方向のピン
状突起を受けるU形金具であり、下側のものは側面枠端
部下側に設けられた翼部の長孔に挿通するピンジョイン
トであるとともに、前記側面枠が、長方形の枠体の上下
辺の中間に水平方向の中桟を設け、左右方向の中間2か
所でこの中桟と下辺とを連結材により垂直方向に連結
し、さらに左右垂直辺の上下2か所に、建枠への取り付
け用の係止金具が外側を向けて設けられており、上側の
ものは水平方向のピン状突起であり、下側のものは長孔
を設けた翼部であることを特徴とする。
A frame scaffold according to the present invention comprises a pair of building frames which are erected at a predetermined distance from each other, and a cloth frame with a plate is bridged between cross beams of the opposing building frames. An H-shaped frame scaffold comprising a frame scaffold constituted by connecting a structural unit formed by attaching a side frame between pillars of a frame in a vertical direction and a horizontal direction to form a frame scaffold, wherein the building frame includes a pair of steel pipe pillars. The middle part of is connected horizontally by a horizontal beam to form an H shape,
At the upper and lower portions of the upper pedestal above the cross beam, locking metal fittings for attaching the side frame are provided facing inward, and the upper one is provided with a horizontal pin provided at the upper end of the side frame. A U-shaped bracket for receiving the projections, the lower one being a pin joint inserted into a long hole of a wing provided on the lower side of the end of the side frame, and the side frame being the upper and lower sides of a rectangular frame body The middle crosspiece is provided in the middle of the center, and the middle crosspiece and the lower side are vertically connected by a connecting material at two middle places in the left-right direction. An attachment metal fitting is provided facing outward, the upper one is a horizontal pin-like projection, and the lower one is a wing provided with a long hole.

【0017】[0017]

【発明の実施の形態】本発明によれば、上段の側面枠を
1段下の作業床から取り付けることができ、手すりに相
当する側面枠が取り付けられていない段階で上段の作業
床に上がり、前記の側面枠取り付け作業を行う必要がな
くなるから、枠組み足場における組立、解体等の作業に
おける安全性が向上する。
According to the present invention, the upper side frame can be mounted from the lower work floor one step below, and when the side frame corresponding to the handrail is not mounted, the upper frame is raised to the upper work floor. Since there is no need to perform the above-described side frame mounting operation, safety in operations such as assembly and disassembly on the frame scaffold is improved.

【0018】[0018]

【実施例】図1ないし図3により本発明の一実施例を詳
細に説明する。本発明のH形枠組み足場の全体構成はさ
きに説明した図4とほぼ同様であるからあらためて図示
しない。図1は本実施例の建枠を示す正面図、図2は同
じく側面枠を示す正面図、図3は本実施例における建枠
と側面枠との係止部分を示す部分斜視図で、各符号はこ
れまでに説明したものと同一である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described in detail with reference to FIGS. The overall configuration of the H-frame scaffold of the present invention is substantially the same as that of FIG. 4 described above, and is not shown again. FIG. 1 is a front view showing a building frame of this embodiment, FIG. 2 is a front view showing the same side frame, and FIG. 3 is a partial perspective view showing a locking portion between the building frame and the side frame in this embodiment. The reference numerals are the same as those described above.

【0019】図1に示すように、本発明の建枠1は、一
対の鋼管製脚柱11の中間付近を水平方向に横梁12で連結
してH形とし、脚柱11と横梁12とを適宜補剛材13で連結
した上、横梁12より上方の上部脚柱の上下2か所に、側
面枠取り付け用の係止金具が内側を向けて設けてある。
上側のものは側面枠3端部上側に設けられた水平方向の
突起を受けるU形金具15であり、さきに図7(b)にお
いて示したものと同様のものである。下側のものは側面
枠3端部下側に設けられた翼部に設けられた長孔に挿通
するピンジョイント14で、これはさきに図7(a)にお
いて示したものと同様のものである。つまり、前記の特
公平7-30616号公報に記載の枠組み足場における建枠
と、側面枠取り付け用の係止金具が上下逆の位置に取り
付けられている。
As shown in FIG. 1, the construction frame 1 of the present invention has an H-shape by connecting a middle portion between a pair of steel pipe pillars 11 in a horizontal direction with a transverse beam 12, and connecting the pillar 11 and the transverse beam 12. After being appropriately connected by stiffeners 13, locking metal fittings for attaching a side frame are provided at two locations above and below the upper beam above the cross beam 12 with the inside facing toward the inside.
The upper one is a U-shaped bracket 15 provided on the upper end of the side frame 3 for receiving a horizontal projection, and is similar to the one shown in FIG. 7B earlier. The lower one is a pin joint 14 inserted into a long hole provided in the wing provided below the end of the side frame 3, which is the same as that shown in FIG. 7A earlier. . In other words, the building frame and the side wall frame mounting fastener in the frame scaffold described in Japanese Patent Publication No. Hei 7-30616 are mounted upside down.

【0020】一方、図2に示すように、本発明の側面枠
3は、長方形の枠体の上下辺31、32の中間に水平方向の
中桟33を設け、左右方向の中間2か所でこの中桟33と下
辺32とを2本の連結材35により垂直方向に連結して構成
される。連結材35は、中桟33、あるいは側面枠3全体の
補強にもなるから、中桟33を通って上辺31に到達してい
てもよい。
On the other hand, as shown in FIG. 2, the side frame 3 of the present invention is provided with a horizontal center beam 33 between the upper and lower sides 31 and 32 of a rectangular frame, and at two intermediate positions in the left and right direction. The middle rail 33 and the lower side 32 are vertically connected by two connecting members 35. Since the connecting member 35 also reinforces the middle rail 33 or the entire side frame 3, the connecting member 35 may reach the upper side 31 through the middle rail 33.

【0021】さらに左右垂直辺34の上下2か所に、建枠
への取り付け用の係止金具が外側を向けて設けられてい
る。上側のものは水平方向のピン状突起37であり、下側
のものは長孔を設けた翼部36で、図5に示した特公平7
-30616号公報に記載の枠組み足場における側面枠と、側
面枠取り付け用の係止金具が上下逆の位置に取り付けら
れていることは建枠1と同様である。
Further, locking metal fittings for attachment to the building frame are provided at two locations above and below the left and right vertical sides 34 so as to face outward. The upper one is a horizontal pin-like projection 37, and the lower one is a wing part 36 provided with a long hole, as shown in FIG.
As in the case of the building frame 1, the side frames and the locking metal fittings for mounting the side frames in the frame scaffold described in JP-A-30616 are mounted upside down.

【0022】側面枠3の左右間隔、すなわち建枠1を立
設する所定間隔は一応基準値が定められていて、1500m
mまたは1800mmである。これに対して、側面枠3の重
量はそれぞれ 6.7kg、 7.6kg程度であるから、元来
1人で十分持ち上げることのできる重量であるが、2本
の連結材35を設けたことによって、これの下部付近を把
持すれば既に完成している下段の作業床から、この側面
枠3を上段の板付き布枠の上方までさし上げることがで
きるようになる。ちなみに上下の作業床の距離、すなわ
ち単位の枠組み足場における建枠の高さは通常1800mm
である。
A reference value is temporarily set for the left-right space of the side frame 3, that is, the predetermined space for erecting the building frame 1, and is 1500 m.
m or 1800 mm. On the other hand, since the weight of the side frame 3 is about 6.7 kg and 7.6 kg, respectively, it is originally a weight that can be sufficiently lifted by one person. By gripping the vicinity of the lower part, the side frame 3 can be lifted up from the already completed lower working floor to above the upper plate-mounted cloth frame. By the way, the distance between the upper and lower working floors, that is, the height of the building frame on the unit scaffold is usually 1800 mm
It is.

【0023】下段の作業床から側面枠3をさし上げ、先
ず上側のピン状突起37を脚柱11のU形金具15に落とし込
んでやれば、これを支点として側面枠3が吊り下がり、
下側の翼部36がピンジョイント14に重なって長孔にピン
が挿通され自動的にグラビティロックが働くから、ほと
んど自動的に係合が完結し、この作業を1人の作業者で
安全かつ容易に行うことができる。
The side frame 3 is lifted from the lower work floor, and the upper pin-shaped projection 37 is first dropped into the U-shaped bracket 15 of the pillar 11, and the side frame 3 is hung with this as a fulcrum.
Since the lower wing portion 36 overlaps the pin joint 14 and the pin is inserted into the long hole and the gravity lock is automatically activated, the engagement is almost automatically completed, and this operation can be performed safely and safely by one worker. It can be done easily.

【0024】[0024]

【発明の効果】本発明によれば、手すりの取り付けられ
ていない状態で上段の足場に上がって作業を行う必要が
なくなるから、枠組み足場の組立、解体作業における安
全性が著しく向上するというすぐれた効果を奏する。
According to the present invention, there is no need to work on the upper scaffold without the handrail attached, and the safety in assembling and disassembling the framework scaffold is greatly improved. It works.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明実施例の建枠を示す正面図である。FIG. 1 is a front view showing a building frame according to an embodiment of the present invention.

【図2】本発明実施例の側面枠を示す正面図である。FIG. 2 is a front view showing a side frame according to the embodiment of the present invention.

【図3】本発明実施例における建枠と側面枠との係止部
分を示す斜視図である。
FIG. 3 is a perspective view showing a locking portion between the building frame and the side frame in the embodiment of the present invention.

【図4】従来の技術を示すH形枠組足場の斜視図であ
る。
FIG. 4 is a perspective view of an H-frame scaffold showing a conventional technique.

【図5】従来の技術における側面枠を示す正面図であ
る。
FIG. 5 is a front view showing a side frame according to the related art.

【図6】従来の技術における側面枠に設けられた係止金
具を示す正面図である。
FIG. 6 is a front view showing a lock provided on a side frame according to the related art.

【図7】従来の技術における建枠に設けられた係止金具
を示す正面図である。
FIG. 7 is a front view showing a lock provided on a building frame according to a conventional technique.

【符号の説明】[Explanation of symbols]

1 建枠 2 板付き布枠 3 側面枠 4 クロスブレース 5 ジョイント 6 ジャッキベース 11 脚柱 12 横梁 13 補剛材 14 ピンジョイント 15 U形金具 31 上辺 32 下辺 33 中桟 34 垂直辺 35 連結材 36 翼部 37 ピン状突起 DESCRIPTION OF SYMBOLS 1 Building frame 2 Cloth frame with board 3 Side frame 4 Cross brace 5 Joint 6 Jack base 11 Pillar 12 Cross beam 13 Stiffener 14 Pin joint 15 U-shaped bracket 31 Upper side 32 Lower side 33 Middle rail 34 Vertical side 35 Connecting material 36 Wings Part 37 Pin-shaped protrusion

フロントページの続き (72)発明者 小岩井 悟 埼玉県上尾市緑丘3丁目4番25号 株式会 社島村工業内Continued on the front page (72) Inventor Satoru Koiwai 3-4-2, Midorioka, Ageo-shi, Saitama Pref.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 一対の建枠(1)を所定間隔で向かい合
わせて立設し、相対する建枠(1)の横梁(12)間に板
付き布枠(2)をかけ渡し、相対する建枠(1)の脚柱
間に側面枠(3)を取り付けてなる構成単位を上下方向
ならびに水平方向に所定単位接続して枠組み足場を構成
するH形枠組み足場であって、前記建枠(1)は、一対
の鋼管製脚柱(11)の中間付近を水平方向に横梁(12)
で連結してH形とし、前記横梁(12)より上方の上部脚
柱の上下2か所に、側面枠取り付け用の係止金具が内側
を向けて設けられており、上側のものは側面枠(3)端
部上側に設けられた水平方向のピン状突起(37)を受け
るU形金具(15)であり、下側のものは側面枠(3)端
部下側に設けられた翼部(36)の長孔に挿通するピンジ
ョイント(14)であるとともに、前記側面枠(3)は、
長方形の枠体の上下辺(31、32)の中間に水平方向の中
桟(33)を設け、左右方向の中間2か所でこの中桟(3
3)と下辺(32)とを連結材(35)により垂直方向に連
結し、さらに左右垂直辺(34)の上下2か所に、建枠へ
の取り付け用の係止金具が外側を向けて設けられてお
り、上側のものは水平方向のピン状突起(37)であり、
下側のものは長孔を設けた翼部(36)であることを特徴
とするH形枠組み足場。
1. A pair of building frames (1) are erected at predetermined intervals to face each other, and a cloth frame with a plate (2) is bridged between cross beams (12) of the opposing building frames (1). An H-shaped frame scaffold comprising a frame scaffold formed by connecting predetermined units in a vertical direction and a horizontal direction with structural units each having a side frame (3) attached between pillars of the frame (1), 1) Horizontally cross beam (12) near the middle of a pair of steel pipe pillars (11)
To form an H-shape, and upper and lower pedestals above the cross beam (12) are provided with locking metal fittings for mounting the side frame at two locations above and below the upper pedestal. (3) A U-shaped bracket (15) for receiving a horizontal pin-like projection (37) provided on the upper side of the end, and the lower one is a wing section (3) provided on the lower side of the side frame (3). 36) The pin joint (14) inserted into the long hole, and the side frame (3)
A horizontal center rail (33) is provided in the middle of the upper and lower sides (31, 32) of the rectangular frame.
3) and the lower side (32) are connected vertically by a connecting material (35), and furthermore, at two places above and below the left and right vertical sides (34), locking metal fittings for attachment to the building frame face outward. The upper one is a horizontal pin-like projection (37),
An H-shaped scaffold, characterized in that the lower one is a wing (36) provided with a long hole.
JP23790597A 1997-09-03 1997-09-03 H-framework scaffold Expired - Fee Related JP3638761B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23790597A JP3638761B2 (en) 1997-09-03 1997-09-03 H-framework scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23790597A JP3638761B2 (en) 1997-09-03 1997-09-03 H-framework scaffold

Publications (2)

Publication Number Publication Date
JPH1181648A true JPH1181648A (en) 1999-03-26
JP3638761B2 JP3638761B2 (en) 2005-04-13

Family

ID=17022179

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23790597A Expired - Fee Related JP3638761B2 (en) 1997-09-03 1997-09-03 H-framework scaffold

Country Status (1)

Country Link
JP (1) JP3638761B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008163740A (en) * 2008-01-28 2008-07-17 Nippon Steel & Sumikin Metal Products Co Ltd Standard frame for scaffolding
EP3006648B1 (en) * 2014-10-10 2017-07-26 ULSTRUPSMEDEN ApS Guard rail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008163740A (en) * 2008-01-28 2008-07-17 Nippon Steel & Sumikin Metal Products Co Ltd Standard frame for scaffolding
EP3006648B1 (en) * 2014-10-10 2017-07-26 ULSTRUPSMEDEN ApS Guard rail

Also Published As

Publication number Publication date
JP3638761B2 (en) 2005-04-13

Similar Documents

Publication Publication Date Title
JP2002317552A (en) Construction method of temporary structure and handrail bracing used therefor
JP3907367B2 (en) Construction method of temporary structure
JPH1181648A (en) H-shaped frame scaffold
JPH0754480A (en) Prefabricated scaffolding and assembling and disassembling method thereof
JP2007309044A (en) Prefabricated scaffolding
CN103958801A (en) Temporary scaffold
CN219411759U (en) Assembled lower hanging operation platform based on sliding mode lifting system
CN219343967U (en) Externally hung scaffold mounting device
GB1568355A (en) Building platform structures
CN218843732U (en) Suspension device and creeping formwork
JPH02305785A (en) Elevator installation process and working floor device for elevator installation
KR102708024B1 (en) Footrest All-in-one Fixture
JPH08429Y2 (en) Sliding brace handrail frame for temporary scaffolding
JPH06229113A (en) One side scaffold
JPH0623651Y2 (en) Sash assembly device for curtain wall
KR200184793Y1 (en) Prefabricated steel pipe scaffold frame
JPS6322269Y2 (en)
JP3892240B2 (en) Working scaffold and assembly method thereof
JPH11200479A (en) Verandah handrail wall mounting structure and lightweight cellular concrete panel
JPH0541151Y2 (en)
JPS6137426B2 (en)
JP2572353Y2 (en) Temporary scaffolding for construction
JP3013456U (en) Building equipment for scaffolding for construction
JPH0116840Y2 (en)
CN118582036A (en) Combined hanging basket for high-altitude bottom hanging decoration and construction method thereof

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040414

A131 Notification of reasons for refusal

Effective date: 20040427

Free format text: JAPANESE INTERMEDIATE CODE: A131

A521 Written amendment

Effective date: 20040622

Free format text: JAPANESE INTERMEDIATE CODE: A523

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Effective date: 20050111

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050112

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees