JPH1162227A - Trench work execution method - Google Patents

Trench work execution method

Info

Publication number
JPH1162227A
JPH1162227A JP22453497A JP22453497A JPH1162227A JP H1162227 A JPH1162227 A JP H1162227A JP 22453497 A JP22453497 A JP 22453497A JP 22453497 A JP22453497 A JP 22453497A JP H1162227 A JPH1162227 A JP H1162227A
Authority
JP
Japan
Prior art keywords
trench
concrete
rails
elevating
ground surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22453497A
Other languages
Japanese (ja)
Inventor
Yoshihiro Oishi
善啓 大石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP22453497A priority Critical patent/JPH1162227A/en
Publication of JPH1162227A publication Critical patent/JPH1162227A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To enhance the workability and effectiveness in a mobile concrete form construction method. SOLUTION: A trench 51 is formed by excavating the ground surface 52, and the surfaces are graded, and rails 21 and 22 are laid at the bottom 51a of the trench 51 and on the ground surface on both sides of trench 51, and reinforcing bars are installed in the bottom part 51a of the trench 51 and the wall parts 51b on both sides, and a mobile concrete form 10 having an elevating/ sinking element 16 is supported movably on the rails 21 and 22. Concrete is placed in voides between the bottom plate 13 and side plates 14 and 15 of the elevating/sinking element 16 and the bottom 51a and side walls 51b of the trench 51, and when the concrete is hardened after a specified period of time, the elevating/sinking element 16 is raised and the form 10 is moved along the rails 21 and 22 so that form is separated, and a lining is constructed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、オープントレンチ
やピットなどを施工するトレンチ施工法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a trench forming method for forming an open trench or a pit.

【0002】[0002]

【従来の技術】図6に従来のトレンチ施工法による作業
手順の概略を示す。
2. Description of the Related Art FIG. 6 shows an outline of a work procedure by a conventional trench construction method.

【0003】従来のトレンチ施工法において、まず、図
6(a)に示すように、地表面101を開削工法によって掘
削してトレンチ102を形成し、その表面部を整地してか
ら表層部に土間コンクリート103を打設する。次に、図
6(b)に示すように、トレンチ102の底部104に鉄筋105
を配設し、コンクリート106を締め固めながら打設し、
表面をこて仕上げした後、マット養生を施す。そして、
図6(c)に示すように、トレンチ102の側壁部107に鉄筋
108を配設し、底部104の鉄筋105と連結した後、型枠部
材109を設置する。そして、図6(d)に示すように、型
枠部材109の側壁型枠110と側壁部107との空間にコンク
リート111を締め固めながら打設する。所定期間が経過
してコンクリート111が固まると、型枠部材109を取り外
して脱枠し、表面仕上げを行う。すると、図6(e)に示
すように、ライニング112が形成されてトレンチ113が構
築される。
In a conventional trench construction method, first, as shown in FIG. 6A, a ground surface 101 is excavated by an open-cutting method to form a trench 102, the surface of which is leveled, and a soil layer is formed on a surface layer. Cast concrete 103. Next, as shown in FIG. 6B, a reinforcing bar 105 is formed on the bottom 104 of the trench 102.
Is placed and poured while compacting the concrete 106,
After trowel finishing, mat curing is applied. And
As shown in FIG. 6C, a reinforcing bar is provided on the side wall 107 of the trench 102.
After arranging 108 and connecting it to the reinforcing bar 105 on the bottom 104, the form member 109 is installed. Then, as shown in FIG. 6D, the concrete 111 is poured into the space between the side wall form 110 and the side wall 107 of the form member 109 while compacting. When the concrete 111 hardens after a predetermined period, the form member 109 is removed and removed from the frame, and the surface is finished. Then, as shown in FIG. 6E, the lining 112 is formed, and the trench 113 is constructed.

【0004】[0004]

【発明が解決しようとする課題】上述した従来のトレン
チ施工法には、以下に示すような問題がある。即ち、ラ
イニング112の底部(コンクリート106)と側壁部(コン
クリート111)とが分割して形成されるため、型枠の組
み立て、コンクリート打設、養生等が2段階作業とな
り、施工期間が長くなってしまう。また、分割施工され
た底部(コンクリート106)と側壁部(コンクリート11
1)との間に打継ぎ目が生じて止水性が低下してしま
う。そして、型枠部材109の組立作業や解体作業を所定
の施工区間ごとに、全施工区間で繰り返し行うこととな
り、作業性が良くない。
The above-mentioned conventional trenching method has the following problems. That is, since the bottom portion (concrete 106) and the side wall portion (concrete 111) of the lining 112 are formed separately, the assembling of the formwork, the casting of the concrete, the curing, and the like are performed in two steps, and the construction period becomes longer. I will. The bottom (concrete 106) and side wall (concrete 11)
A seam is formed between 1) and the water stoppage is reduced. Then, the assembling work and the dismantling work of the form member 109 are repeatedly performed for every predetermined construction section in all the construction sections, and the workability is not good.

【0005】また、トレンチ102にコンクリート106,11
1を打設した後、表面をこて仕上げする必要があり、作
業が面倒である。そして、このコンクリート106,111を
打設する場合、締め固めながら行う必要があるが、トレ
ンチ102の側壁部107にコンクリート111を締め固めなが
ら打設する場合、高さがあって狭い空間であるため、コ
ールジョイントやジャンカなどの施工不良箇所が生じや
すいという問題がある。
[0005] Concrete 106, 11
After casting 1, the surface needs to be trowel-finished, which is troublesome. When placing the concretes 106 and 111, it is necessary to compact the concrete 111. However, when placing the concrete 111 on the side wall 107 of the trench 102 while compacting the concrete, the space is high and narrow. In addition, there is a problem that construction failure points such as call joints and junkers are likely to occur.

【0006】本発明はこのような問題を解決するもので
あって、作業性及び作業効率の向上を図ったトレンチ施
工法を提供することを目的とする。
An object of the present invention is to solve such a problem, and an object of the present invention is to provide a trench construction method which improves workability and work efficiency.

【0007】[0007]

【課題を解決するための手段】上述の目的を達成するた
めの本発明のトレンチ施工法は、地表面を掘削すること
でトレンチを形成して表面部を整地し、掘削形成された
前記トレンチの底部及び該トレンチの両側の地表面にレ
ールを敷設すると共に、該トレンチの底部及び両側壁部
に鉄筋を配設し、前記各レール上に昇降部を有する移動
型枠を移動自在に支持し、該昇降部の底面部及び側面部
と前記トレンチの底部及び両側壁部との空間部にコンク
リートを打設充填し、所定期間が経過して前記コンクリ
ートの固化後、前記昇降部を上昇させてから前記各レー
ルに沿って前記移動型枠を移動することで脱枠してトレ
ンチを構築することを特徴とするものである。
According to the present invention, there is provided a method for forming a trench, comprising the steps of: excavating a ground surface to form a trench to level a surface portion; Rails are laid on the ground surface on both sides of the bottom and the trench, and reinforcing bars are arranged on the bottom and both side walls of the trench, and movably support a movable form having an elevating part on each of the rails, After casting and filling concrete in the space between the bottom part and the side part of the elevating part and the bottom part and both side walls of the trench, and after elapse of a predetermined period, the concrete is solidified, and then the elevating part is raised. The trench is constructed by removing the frame by moving the movable mold along the rails.

【0008】[0008]

【発明の実施の形態】以下、図面に基づき、本発明の実
施の形態を詳細に説明する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0009】図1に本発明の一実施形態に係るトレンチ
施工法を実施するための移動型枠の正面視、図2に本実
施形態の移動型枠の平面視、図3に本実施形態の移動型
枠の側面視、図4に本実施形態の移動型枠を用いたトレ
ンチ施工法による作業手順の概略、図5に図4のV−V
断面を示す。
FIG. 1 is a front view of a movable mold for carrying out a trench forming method according to an embodiment of the present invention, FIG. 2 is a plan view of the movable mold of the present embodiment, and FIG. FIG. 4 is a side view of the movable formwork, FIG. 4 is a schematic diagram showing an operation procedure by the trench construction method using the movable formwork of the present embodiment, and FIG.
3 shows a cross section.

【0010】図1乃至図3に示すように、本実施形態の
トレンチ施工法を実施するための移動型枠10におい
て、本体フレーム11は形成されるトレンチ51の幅よ
り大きく構成された枠状をなし、下部にトレンチ51内
に進入するガイドフレーム12が一体に形成されてい
る。この本体フレーム11内には底板部13と左右の側
板部14,15とで構成された昇降体16が昇降自在に
支持されており、多数の昇降ジャッキ17によって昇降
可能となっている。そして、昇降体16の底板部13及
び側板部14,15にはコンクリートを打設するための
複数の打設孔18が形成されている。
As shown in FIGS. 1 to 3, in a movable mold 10 for carrying out the trench construction method of the present embodiment, a main body frame 11 has a frame shape configured to be larger than a width of a trench 51 to be formed. None, a guide frame 12 that enters the trench 51 is integrally formed below. An elevating body 16 composed of a bottom plate portion 13 and left and right side plate portions 14 and 15 is supported in the main body frame 11 so as to be able to move up and down freely. A plurality of casting holes 18 for casting concrete are formed in the bottom plate 13 and the side plates 14 and 15 of the elevating body 16.

【0011】また、ガイドフレーム12の下部には複数
の移動用ローラ19,20が装着される一方、トレンチ
51の底部51a及びトレンチ51の両側の地表面52
には、トレンチ51の長手方向に沿って複数のレール2
1,22が敷設されており、移動用ローラ19,20が
このレール21,22上を転動自在に支持されること
で、本体フレーム11がトレンチ51の長手方向に沿っ
て移動自在となっている。
A plurality of transfer rollers 19 and 20 are mounted on the lower portion of the guide frame 12, while a bottom 51 a of the trench 51 and a ground surface 52 on both sides of the trench 51 are provided.
Have a plurality of rails 2 along the longitudinal direction of the trench 51.
The main body frame 11 is movable along the longitudinal direction of the trench 51 because the moving rollers 19 and 20 are supported on the rails 21 and 22 so as to roll freely. I have.

【0012】なお、移動型枠10は、図示しないウイン
チによってレール21,22上を移動することができる
ものである。また、この移動型枠10は、トレンチ51
のコンクリート打設圧よりも大きな自重を有しており、
各昇降ジャッキ17は昇降体16の重量とコンクリート
の付着力を上回る駆動力を有している。
The movable mold 10 can be moved on the rails 21 and 22 by a winch (not shown). The movable mold 10 is provided with a trench 51.
Own weight greater than the concrete casting pressure of
Each lifting jack 17 has a driving force that exceeds the weight of the lifting body 16 and the adhesive force of concrete.

【0013】ここで、このように構成された移動型枠1
0によるトレンチ施工法を説明する。
Here, the movable mold 1 constructed as described above is used.
The trench construction method using 0 will be described.

【0014】まず、図4(a)に示すように、所定位置の
地表面52を掘削することで、底部51aと左右に側壁
部51bとからなるトレンチ51を形成し、このトレン
チ51の表面部を整地する。次に、図4(b)に示すよう
に、このトレンチ51の底部51aとトレンチ51の両
側の地表面52にそれぞれレール21,22を敷設す
る。また、トレンチ51の底部51a及び両側壁部51
bに鉄筋31,32を配設する。
First, as shown in FIG. 4A, a trench 51 having a bottom 51a and side walls 51b is formed by excavating a ground surface 52 at a predetermined position. Level the ground. Next, as shown in FIG. 4B, rails 21 and 22 are laid on the bottom 51a of the trench 51 and the ground surface 52 on both sides of the trench 51, respectively. In addition, the bottom 51 a and both side walls 51 of the trench 51 are formed.
The reinforcing bars 31 and 32 are arranged in b.

【0015】そして、図4(c)に示すように、この各レ
ール21,22上に昇降体16を有する移動型枠10の
本体フレーム11を載置し、ローラ19,20を介して
移動自在に支持する。この状態で、本体フレーム11及
び昇降体16(底板部13、側板部14,15)を位置
決めし、底板部13及び側板部14,15とトレンチ5
1の底部51a及び両側壁部51bとの空間部に各打設
孔18からコンクリートを打設充填する。このコンクリ
ートは高流動性を有して自己充填が可能となっており、
昇降体16とトレンチ51の空間部に隙間なく充填され
る。
Then, as shown in FIG. 4C, the main body frame 11 of the movable mold 10 having the elevating body 16 is placed on each of the rails 21 and 22, and is movable via rollers 19 and 20. To support. In this state, the main body frame 11 and the elevating body 16 (the bottom plate 13, the side plates 14, 15) are positioned, and the bottom plate 13, the side plates 14, 15 and the trench 5 are positioned.
Concrete is cast and filled from each casting hole 18 into the space between the bottom 51a and the side walls 51b. This concrete has a high fluidity and is capable of self-filling,
The space between the lifting body 16 and the trench 51 is filled without gaps.

【0016】その後、所定期間(通常、半日〜1日)が
経過してコンクリートが固化して所定の強度となると、
各昇降ジャッキ17を収縮駆動することで、昇降体16
を上昇させて固化されたコンクリートから離間する。そ
して、移動型枠10をウインチによって牽引して各レー
ル21,22に沿って移動し、コンクリートから脱枠す
ることで、トレンチ51のライニング53が構築され
る。
After that, when a predetermined period (usually half a day to one day) elapses and the concrete solidifies to a predetermined strength,
By driving each lifting jack 17 to contract, the lifting body 16 is moved.
To separate it from the solidified concrete. Then, the movable formwork 10 is pulled by the winch and moved along each of the rails 21 and 22 to remove the frame from the concrete, whereby the lining 53 of the trench 51 is constructed.

【0017】このように移動型枠10を用いてトレンチ
51の長手方向に連続してライニング53を構築してい
く。なお、図5に示すように、トレンチ51の長手方向
における所定間隔(移動型枠10の長さ)ごとに目地3
3を配置し、この目地33をコンクリート打設時のシー
ル部材として利用する。そして、この目地33には鉄筋
31が貫通するため、この鉄筋31を配設する前に、予
め、配置しておく。また、昇降体16の底板部13、側
板部14,15の下面に、予め、剥離剤を塗布しておく
ことで、脱枠が容易となる。
As described above, the lining 53 is continuously formed in the longitudinal direction of the trench 51 using the movable mold 10. As shown in FIG. 5, joints 3 are provided at predetermined intervals (length of the movable mold 10) in the longitudinal direction of the trench 51.
The joint 3 is used as a seal member when concrete is poured. Since the reinforcing bar 31 penetrates the joint 33, the reinforcing bar 31 is arranged in advance before the reinforcing bar 31 is provided. In addition, by applying a release agent in advance to the bottom surface of the bottom plate 13 and the lower surfaces of the side plates 14 and 15 of the elevating body 16, removal of the frame is facilitated.

【0018】このように移動型枠10を用いた本実施形
態のトレンチ施工法にあっては、以下に示す効果があ
る。
The trench construction method of this embodiment using the movable mold 10 has the following effects.

【0019】 移動型枠10がレール21,22に沿
って移動自在であるため、コンクリート打設ごとのこの
移動型枠10の組立や解体が不要となる。 高流動性のコンクリートの適用によって自己充填が
可能となり、締固めが不要となり、堅実なライニング5
3の構築が可能となる。 トレンチ51の底部51aと両側壁部51bに同時
にコンクリートを打設するため、施工速度が早くなって
打継ぎが発生しない。 トレンチ51の底部51aに一対のレール21を敷
設したことで、トレンチ51の各側壁部51bのコンク
リート打設圧が底部51aに作用せず、この底部51a
のコンクリートを加圧する必要がなくなると共に、浮力
が軽減される。また、この底部51aのレール21はコ
ンクリート中に残置されるため、ライニング53の長手
方向の引張り強度が向上する。 トレンチ施工地盤が良好であれば、土間コンクリー
トを省略してトレンチ51の表面部に直接コンクリート
を打設できる。 コンクリート打設面の表面仕上げを不要にできる。
Since the movable form 10 is freely movable along the rails 21 and 22, there is no need to assemble or disassemble the movable form 10 for each concrete casting. Self-filling becomes possible by the application of high-fluidity concrete, compaction becomes unnecessary, and a solid lining 5
3 can be constructed. Since concrete is poured into the bottom 51a and both side walls 51b of the trench 51 at the same time, the construction speed is increased and no splicing occurs. Since the pair of rails 21 is laid on the bottom 51 a of the trench 51, the concrete placing pressure of each side wall 51 b of the trench 51 does not act on the bottom 51 a, and this bottom 51 a
This eliminates the need to pressurize the concrete and reduces buoyancy. Further, since the rail 21 of the bottom 51a is left in the concrete, the tensile strength of the lining 53 in the longitudinal direction is improved. If the ground on which the trench is constructed is good, the concrete can be poured directly into the surface of the trench 51 without using the soil concrete. The surface finish of the concrete casting surface can be eliminated.

【0020】[0020]

【発明の効果】以上、実施形態において詳細に説明した
ように本発明のトレンチ施工法によれば、地表面を掘削
することでトレンチを形成して表面部を整地し、このト
レンチの底部とトレンチの両側の地表面にレールを敷設
すると共に、トレンチの底部と両側壁部に鉄筋を配設
し、各レール上に昇降部を有する移動型枠を移動自在に
支持し、この昇降部の底面部及び側面部とトレンチの底
部及び両側壁部との空間部にコンクリートを打設充填
し、所定期間が経過してコンクリートの固化後、昇降部
を上昇させてから各レールに沿って移動型枠を移動する
ことで脱枠してトレンチを構築するようにしたので、コ
ンクリート打設ごとに移動型枠を移動して作業を行うこ
ととなり、この移動型枠の組立や解体が不要とすること
ができると共に、トレンチの底部と両側壁部を同時にコ
ンクリート打設することとなり、施工速度が早くなって
打継ぎが発生せが、堅実なライニングとすることがで
き、トレンチ施工作業の作業性及び作業効率の向上を図
ることができる。
As described above in detail in the embodiments, according to the trench construction method of the present invention, a trench is formed by excavating the ground surface to level the surface, and the bottom of the trench and the trench are formed. A rail is laid on the ground surface on both sides of the rail, and reinforcing bars are arranged on the bottom and both side walls of the trench, and a movable form having a lifting part on each rail is movably supported, and a bottom part of the lifting part is provided. And concrete is poured and filled in the space between the side surface and the bottom of the trench and both side walls, and after a predetermined period of time, after the concrete has solidified, the elevating part is raised, and then the movable formwork is moved along each rail. Since the trench is constructed by removing the frame by moving, the work is performed by moving the movable form every time concrete is cast, and the assembly and dismantling of the movable form can be unnecessary. Along with The concrete bottom and the side walls are cast at the same time, and the construction speed is increased and splicing occurs.However, a solid lining can be achieved, improving the workability and work efficiency of trench construction work. Can be planned.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係るトレンチ施工法を実
施するための移動型枠の正面図である。
FIG. 1 is a front view of a movable mold for carrying out a trench construction method according to an embodiment of the present invention.

【図2】本実施形態の移動型枠の平面図である。FIG. 2 is a plan view of the movable formwork of the present embodiment.

【図3】本実施形態の移動型枠の側面図である。FIG. 3 is a side view of the movable formwork of the present embodiment.

【図4】本実施形態の移動型枠を用いたトレンチ施工法
による作業手順の概略図である。
FIG. 4 is a schematic view of an operation procedure by a trench construction method using a movable mold according to the present embodiment.

【図5】図4のV−V断面図である。FIG. 5 is a sectional view taken along line VV of FIG. 4;

【図6】従来のトレンチ施工法による作業手順の概略図
である。
FIG. 6 is a schematic view of an operation procedure according to a conventional trench construction method.

【符号の説明】[Explanation of symbols]

10 移動型枠 11 本体フレーム 12 ガイドフレーム 13 底板部 14,15 側板部 16 昇降体 17 昇降ジャッキ 18 打設孔 19,20 ローラ 21,22 レール 31,32 鉄筋 33 目地 51 トレンチ 51a 底部 51b 側壁部 52 地表面 53 ライニング REFERENCE SIGNS LIST 10 movable mold 11 main body frame 12 guide frame 13 bottom plate portion 14, 15 side plate portion 16 elevating body 17 elevating jack 18 driving hole 19, 20 roller 21, 22 rail 31, 32 reinforcing bar 33 joint 51 51 trench 51 a bottom 51 b side wall 52 Ground surface 53 lining

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 地表面を掘削することでトレンチを形成
して表面部を整地し、掘削形成された前記トレンチの底
部及び該トレンチの両側の地表面にレールを敷設すると
共に、該トレンチの底部及び両側壁部に鉄筋を配設し、
前記各レール上に昇降部を有する移動型枠を移動自在に
支持し、該昇降部の底面部及び側面部と前記トレンチの
底部及び両側壁部との空間部にコンクリートを打設充填
し、所定期間が経過して前記コンクリートの固化後、前
記昇降部を上昇させてから前記各レールに沿って前記移
動型枠を移動することで脱枠してトレンチを構築するこ
とを特徴とするトレンチ施工法。
A trench is formed by excavating the ground surface to level the surface, a rail is laid on the bottom of the excavated trench and on the ground surface on both sides of the trench, and the bottom of the trench is formed. And arranging reinforcing bars on both side walls,
A movable form having an elevating part is movably supported on each of the rails, and concrete is poured and filled into a space between a bottom part and a side part of the elevating part and a bottom part and both side walls of the trench. After a period of time, after the concrete is solidified, the elevating section is raised, and then the movable form is moved along each of the rails to remove the frame to form a trench. .
JP22453497A 1997-08-21 1997-08-21 Trench work execution method Pending JPH1162227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22453497A JPH1162227A (en) 1997-08-21 1997-08-21 Trench work execution method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22453497A JPH1162227A (en) 1997-08-21 1997-08-21 Trench work execution method

Publications (1)

Publication Number Publication Date
JPH1162227A true JPH1162227A (en) 1999-03-05

Family

ID=16815315

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22453497A Pending JPH1162227A (en) 1997-08-21 1997-08-21 Trench work execution method

Country Status (1)

Country Link
JP (1) JPH1162227A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424332A (en) * 2019-06-20 2019-11-08 中国十七冶集团有限公司 A kind of three track support device of packaged type and its construction method
CN114481855A (en) * 2022-03-10 2022-05-13 袁自娟 Support base capable of stably transferring bridge construction formwork

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424332A (en) * 2019-06-20 2019-11-08 中国十七冶集团有限公司 A kind of three track support device of packaged type and its construction method
CN110424332B (en) * 2019-06-20 2024-05-14 中国十七冶集团有限公司 Movable three-track support device and construction method thereof
CN114481855A (en) * 2022-03-10 2022-05-13 袁自娟 Support base capable of stably transferring bridge construction formwork

Similar Documents

Publication Publication Date Title
JP4881555B2 (en) Construction method of underground structure
JP2008308835A (en) Construction method for sidewall pilot tunnel type tunnel and its structure
KR20150043913A (en) Biased soil pressure reinforcement rigid-frame bridge and construction method of the same
KR20040012295A (en) Method and apparatus for changing steel bridge of supporting rail into concrete bridge using temporary bent
JP2003232196A (en) Tunnel invert construction method and device for the same
JPH1162227A (en) Trench work execution method
JPH0579049A (en) Constructing method for beam and slab in underground body construction work
JP2023042601A (en) Construction device for concrete structure
JP3707006B2 (en) New method for opening openings in existing masonry walls
CN211849593U (en) Anti device and anti system that floats of immersed tube lumen template
JP2000064794A (en) Receiving block for shield-tunnel partition, partition using receiving block, and construction method thereof
JP4915291B2 (en) Construction method and structure of concrete side wall
JP3773734B2 (en) Staircase construction method and apparatus
JP4037004B2 (en) Construction method of underground structure
JP3936435B2 (en) Construction method of wall-like concrete structure
JP2001164559A (en) Construction method of continuous underground wall guide wall making use of l-type precast member
JP7361576B2 (en) Formwork system and method for constructing concrete structures using this formwork system
CN215948100U (en) Underdrain reinforcing combination system
CN218580421U (en) Concrete moving formwork for side wall of cast road drainage ditch
CN219710492U (en) Can dismantle prefabricated drain ditch of assembling
JP2725572B2 (en) Small beam construction method in reinforced concrete construction
JPH07300867A (en) Method for constructing reinforced concrete retaining wall
JP2000356041A (en) Method for placing concrete
JP2019120003A (en) Filling construction method for joint part
JP3793634B2 (en) Stress buffering method using ultra-delay concrete

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20010703