JPH11350839A - Structure for fixing frame body to opening part of wall - Google Patents

Structure for fixing frame body to opening part of wall

Info

Publication number
JPH11350839A
JPH11350839A JP17058998A JP17058998A JPH11350839A JP H11350839 A JPH11350839 A JP H11350839A JP 17058998 A JP17058998 A JP 17058998A JP 17058998 A JP17058998 A JP 17058998A JP H11350839 A JPH11350839 A JP H11350839A
Authority
JP
Japan
Prior art keywords
frame
opening
fixing
wall
gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17058998A
Other languages
Japanese (ja)
Other versions
JP2909463B1 (en
Inventor
Eiji Takahashi
栄二 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIHON FLUSH CO Ltd
Original Assignee
NIHON FLUSH CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIHON FLUSH CO Ltd filed Critical NIHON FLUSH CO Ltd
Priority to JP17058998A priority Critical patent/JP2909463B1/en
Application granted granted Critical
Publication of JP2909463B1 publication Critical patent/JP2909463B1/en
Publication of JPH11350839A publication Critical patent/JPH11350839A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)

Abstract

PROBLEM TO BE SOLVED: To fix a frame body to a building dimply, easily, efficiently, and securely, and exchange the frame body simply as required. SOLUTION: In a structure in which a frame body is fixed to an opening part of a wall, a clearance adjusting tool 4 is nipped and fixed in a mounting clearance between the opening part of the wall and the frame body. The mounting clearance is blocked by a casing. The clearance adjusting tool 4 is provided with fixing part 8 fixing the casing blocking the mounting clearance, an adjusting screw 9 provided in the fixing part 8 so as to rotate, and a projecting part 10 connected with the fixing part 8 so as to rotate and protrude the adjusting screw 9. The clearance adjusting tool 4 arranged in the mounting clearance protrudes the projecting part 10 by the adjusting screw 9 and presses the opening part of the wall and the frame body in the mounting clearance. The frame body is fixed on a building through a set screw passing through the frame body. The casing blocking the mounting clearance is connected with the fixing part 8 of the clearance adjusting tool 4 through a connection screw.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、正確な方形状でな
い変形した壁の開口部に枠体を能率よく固定する構造に
関し、とくに、必要ならば枠体を簡単に取り替えできる
建物の構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for efficiently fixing a frame to an opening of a deformed wall which is not an accurate square shape, and more particularly to a structure of a building in which the frame can be easily replaced if necessary.

【0002】[0002]

【従来の技術】壁の開口部が正確な方形状であると、枠
体を簡単に固定できる。しかしながら、壁の開口部は、
必ずしも両側面を正確な垂直面としていない。また、開
口部の上面も、正確な水平面となっていないことがあ
る。このような歪んだ開口部に、枠体を固定するため
に、枠体と開口部との間の取付隙間に、所定の間隔でク
サビを押し込んで接着している。クサビで、枠体を壁の
開口部に仮止めした状態で、枠体から建物に向かって、
枠体を貫通して止ネジをねじ込み、止ネジの先端を建物
にねじ込んで枠体を建物に固定している。その後、建物
と枠体の隙間を、ケーシングで閉塞している。
2. Description of the Related Art A frame can be easily fixed if an opening in a wall has an accurate square shape. However, the openings in the wall
Both sides are not necessarily vertical. Also, the upper surface of the opening may not be an accurate horizontal plane. In order to fix the frame to such a distorted opening, a wedge is pressed into the mounting gap between the frame and the opening at a predetermined interval and bonded. With a wedge, the frame is temporarily fixed to the opening of the wall, and from the frame toward the building,
A set screw is screwed through the frame, and the tip of the set screw is screwed into the building to fix the frame to the building. After that, the gap between the building and the frame is closed with a casing.

【0003】[0003]

【発明が解決しようとする課題】以上のようにして、枠
体を建物に固定している従来の取付構造は、能率よく枠
体を建物に固定できない。クサビを接着して枠体を開口
部に仮止めするのに手間がかかるからである。
As described above, the conventional mounting structure for fixing the frame to the building cannot efficiently fix the frame to the building. This is because it takes time to bond the wedge and temporarily fix the frame to the opening.

【0004】この欠点を解消する構造が開発されてい
る。たとえば、実開平9−13805号公報には、図1
に示すように、枠体2と、建物である柱22との対向面
に連結片23を固定し、この連結片23をねじ止めして
枠体2を建物に仮止めする。これに類似する構造は特開
平6−146722号公報にも記載される。さらに、特
開平8−177322号公報には、枠体と建物との間に
発泡ポリウレタン接着剤を充填して、枠体を建物に仮止
めする構造が記載される。
[0004] Structures have been developed to overcome this drawback. For example, Japanese Utility Model Laid-Open No. 9-13805 discloses that FIG.
As shown in (2), the connecting piece 23 is fixed to the facing surface of the frame 2 and the pillar 22 as a building, and the connecting piece 23 is screwed to temporarily fix the frame 2 to the building. A similar structure is also described in Japanese Patent Application Laid-Open No. 6-146722. Further, Japanese Patent Application Laid-Open No. 8-177322 describes a structure in which a foamed polyurethane adhesive is filled between a frame and a building to temporarily fix the frame to the building.

【0005】これ等の公報に記載される構造は、クサビ
に比較すると能率よく枠体を建物に仮止めできる。しか
しながら、図1に示すように連結片23を介して枠体2
を建物に仮止めする構造は、枠体2と建物の柱22の両
方に連結片23を固定する必要がある。しかも、建物と
枠体の連結片23は、互いに連結できる位置に固定する
必要がある。このため、連結片23を固定するのに手間
がかかる欠点がある。さらに、この構造は、枠体2を建
物に固定するとき、枠体2が建物から突出したり、また
は、枠体2が建物の平面と同じように、正確な垂直面に
固定できないことがある。連結片23を固定する前後位
置のずれが、枠体2を傾かせるからである。
The structures described in these publications can temporarily fix the frame to the building more efficiently than wedges. However, as shown in FIG.
Is required to fix the connecting piece 23 to both the frame 2 and the pillars 22 of the building. In addition, the connecting pieces 23 of the building and the frame need to be fixed at positions where they can be connected to each other. Therefore, there is a disadvantage that it takes time and effort to fix the connecting piece 23. Furthermore, this structure may prevent the frame 2 from protruding from the building when the frame 2 is fixed to the building, or may not be able to fix the frame 2 to a precise vertical plane, as in the plane of the building. This is because the displacement of the front and rear positions at which the connecting piece 23 is fixed tilts the frame 2.

【0006】発泡ポリウレタン接着剤を使用する方法
は、ポリウレタンの発泡圧で、枠体を開口部に押圧して
連結するので、枠体を壁の開口部に正確に仮止めできな
いことがある。ウレタンの発泡圧を制御するのが難しい
からである。
In the method using a foamed polyurethane adhesive, the frame is pressed into the opening by the foaming pressure of polyurethane to connect the frame, so that the frame may not be temporarily temporarily fixed to the opening in the wall. This is because it is difficult to control the urethane foaming pressure.

【0007】さらに、従来の枠体の取付構造は、ケーシ
ングを左右にバランスよく固定できない欠点もあった。
それは、ケーシングを枠体や建物に固定しているからで
ある。枠体や建物に固定されるケーシングは、固定され
る位置が一方に遍在して、バランスよく固定できない。
Further, the conventional frame mounting structure has a disadvantage that the casing cannot be fixed to the left and right in a well-balanced manner.
This is because the casing is fixed to the frame or the building. The fixed position of the casing fixed to the frame or the building is ubiquitous on one side and cannot be fixed in a well-balanced manner.

【0008】本発明は、このような欠点を解決すること
を目的に開発されたものである。本発明の重要な目的
は、枠体を簡単かつ容易に、しかも能率よく確実に建物
に固定できる壁の開口部に枠体を固定する構造を提供す
ることにある。
[0008] The present invention has been developed for the purpose of solving such disadvantages. An important object of the present invention is to provide a structure for fixing a frame to an opening in a wall, which can fix the frame simply, easily, and efficiently and reliably to a building.

【0009】さらにまた、本発明の他の大切な目的は、
必要ならば枠体を簡単に取り替えすることも可能である
壁の開口部に枠体を固定する構造を提供することにあ
る。
[0009] Still another important object of the present invention is that
An object of the present invention is to provide a structure for fixing a frame to an opening in a wall, which can be easily replaced if necessary.

【0010】[0010]

【課題を解決するための手段】本発明の壁の開口部に枠
体を固定する構造は、壁の開口部1と枠体2との間の取
付隙間3に、隙間調整具4を挟着している。取付隙間3
は、ケーシング5が固定されて閉塞される。隙間調整具
4は、取付隙間3を閉塞するケーシング5が固定される
固定部8と、固定部8に回転できるように設けられてい
る調整ネジ9と、調整ネジ9を回転して突出されるよう
に固定部8に連結されてなる突出部10とを備える。
According to the structure for fixing a frame to an opening of a wall according to the present invention, a gap adjuster 4 is sandwiched in a mounting gap 3 between an opening 1 of a wall and a frame 2. doing. Mounting gap 3
Is closed with the casing 5 fixed. The gap adjuster 4 is provided with a fixing portion 8 to which the casing 5 for closing the mounting gap 3 is fixed, an adjustment screw 9 provided to be rotatable on the fixing portion 8, and a rotation of the adjustment screw 9 to protrude. Protruding part 10 connected to the fixing part 8 as described above.

【0011】取付隙間3に配設された隙間調整具4は、
調整ネジ9で突出部10を突出させて、取付隙間3にあ
って、壁の開口部1と枠体2とを押圧している。枠体2
を貫通する止ネジ16を介して、枠体2は建物に固定さ
れている。さらに、ケーシング5は、取付隙間3を閉塞
するように、連結ネジ7を介して隙間調整具4の固定部
8に連結されている。
The clearance adjuster 4 provided in the mounting clearance 3 is
The protruding portion 10 is protruded by the adjusting screw 9 to press the opening 1 of the wall and the frame 2 in the mounting gap 3. Frame 2
The frame 2 is fixed to the building via a set screw 16 that penetrates the frame. Further, the casing 5 is connected to a fixing portion 8 of the gap adjuster 4 via a connection screw 7 so as to close the mounting gap 3.

【0012】さらに、本発明の請求項2の壁の開口部に
枠体を固定する構造は、隙間調整具4の固定部8に、止
ネジ16を貫通させる貫通孔17を設けている。止ネジ
16を、枠体2と貫通孔17に貫通させて、建物に連結
して、枠体2を建物に固定している。また、本発明の請
求項3の壁の開口部に枠体を固定する構造は、枠体2
を、ドア枠、窓枠、収納ボックスの枠体のいずれかとし
ている。
Further, in the structure for fixing the frame to the opening of the wall according to the second aspect of the present invention, the fixing portion 8 of the gap adjuster 4 is provided with a through hole 17 through which a set screw 16 passes. A set screw 16 is passed through the frame 2 and the through hole 17 and connected to the building to fix the frame 2 to the building. Further, the structure for fixing the frame to the opening of the wall according to claim 3 of the present invention is a frame 2
Is any one of a door frame, a window frame, and a storage box frame.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施例を図面に基
づいて説明する。ただし、以下に示す実施例は、本発明
の技術思想を具体化するための壁の開口部に枠体を固定
する構造を例示するものであって、本発明は壁の開口部
に枠体を固定する構造を下記のものに特定しない。
Embodiments of the present invention will be described below with reference to the drawings. However, the embodiments described below illustrate a structure in which a frame is fixed to an opening of a wall for embodying the technical idea of the present invention. The structure to be fixed is not specified below.

【0014】さらに、この明細書は、特許請求の範囲を
理解し易いように、実施例に示される部材に対応する番
号を、「特許請求の範囲の欄」、および「課題を解決す
るための手段の欄」に示される部材に付記している。た
だ、特許請求の範囲に示される部材を、実施例の部材に
特定するものでは決してない。
Further, in this specification, in order to make it easy to understand the claims, the numbers corresponding to the members shown in the embodiments will be referred to as “claims” and “ In the column of “means”. However, the members described in the claims are not limited to the members of the embodiments.

【0015】図2ないし図4示す壁の開口部に枠体を固
定する構造は、壁の開口部1と、この開口部1に配設さ
れて固定される枠体2との間にできる取付隙間3に、隙
間調整具4を挟着している。さらに、取付隙間3は、枠
体2を開口部1に取り付けた後に、両側にケーシング5
を固定して閉塞されている。
The structure for fixing the frame body to the opening of the wall shown in FIGS. 2 to 4 is based on the mounting between the opening 1 of the wall and the frame body 2 disposed and fixed in the opening 1. A gap adjuster 4 is sandwiched between the gaps 3. Further, after the frame 2 is attached to the opening 1, the mounting gap 3
Is fixed and closed.

【0016】これらの図に示す壁の開口部1とは、ドア
や窓を取り付けるために、建物の壁等を貫通して設けら
れた開口部である。開口部1は、図5に示すように、枠
体2を取り付けできるように、垂直に配設される柱等の
構造材6と、その上下に水平に配設される構造材6とを
連結して、方形状に仕切られている。
The opening 1 in the wall shown in these figures is an opening provided through a wall of a building or the like for mounting a door or a window. As shown in FIG. 5, the opening 1 connects a vertically disposed structural material 6 such as a column and a vertically disposed structural material 6 so that the frame 2 can be attached thereto. Then, it is partitioned into a square shape.

【0017】枠体2は、ドアや窓に扉を配設するための
外枠で、縦枠と横枠を連結して方形状に成形されてい
る。壁の開口部1と枠体2は、枠体2が壁の開口部1に
配設された状態で、枠体2の外周と開口部1との間に隙
間調整具4を介在させる取付隙間3を設けている。した
がって、壁の開口部1と枠体2は、取付隙間3を設ける
ことができるような大きさに設計されている。
The frame 2 is an outer frame for arranging a door on a door or a window, and is formed in a square shape by connecting a vertical frame and a horizontal frame. The mounting gap for interposing the gap adjuster 4 between the outer periphery of the frame 2 and the opening 1 in a state where the frame 2 is disposed in the opening 1 of the wall. 3 are provided. Therefore, the opening 1 of the wall and the frame 2 are designed to have such a size that the mounting gap 3 can be provided.

【0018】ケーシング5は、壁の開口部1と、枠体2
との間にできる取付隙間3を閉塞するための枠材で、木
材やプラスチック等で成形されている。ケーシング5
は、直線状の枠材を連結して、全体の形状を枠体2の外
周に沿う形状としている。ケーシング5は、図3と図4
に示すように、取付隙間3の両側に配設されて、この部
分を閉塞している。ケーシング5は、取付隙間3の幅よ
りも広い幅を有し、建物の内面と枠体2の正面、およ
び、建物の外面と枠体2の背面に密着して配設されて取
付隙間3を閉塞している。ケーシング5は、壁の開口部
1に枠体2を固定した後に、この位置に配設されて、連
結ネジ7がねじ込まれて隙間調整具4に固定される。ケ
ーシング5は、開口部1と枠体2の間の取付隙間3を閉
塞し、この部分の外観を良くしている。
The casing 5 comprises a wall opening 1 and a frame 2
This is a frame material for closing the mounting gap 3 formed therebetween, and is formed of wood, plastic, or the like. Casing 5
Is formed by connecting linear frame members to form an entire shape along the outer periphery of the frame body 2. 3 and FIG.
As shown in (2), it is arranged on both sides of the mounting gap 3 and closes this portion. The casing 5 has a width wider than the width of the mounting gap 3 and is disposed in close contact with the inner surface of the building and the front of the frame 2 and the outer surface of the building and the back of the frame 2 so that the mounting gap 3 is formed. It is closed. After fixing the frame body 2 to the opening 1 of the wall, the casing 5 is disposed at this position, and the connection screw 7 is screwed in and fixed to the gap adjuster 4. The casing 5 closes the mounting gap 3 between the opening 1 and the frame 2 to improve the appearance of this portion.

【0019】隙間調整具4は、図5に示すように、開口
部1と枠体2の間の取付隙間3に一定の間隔で配設され
て枠体2の位置を調整する。隙間調整具4は、開口部1
に配設される枠体2に取り付けられて、取付隙間3に配
設される。ただ、隙間調整具は、必ずしも枠体に取り付
ける必要はない。固定部は、枠体ではなく開口部を形成
する柱等の構造材に取り付けることもできる。
As shown in FIG. 5, the gap adjusters 4 are arranged at regular intervals in the mounting gap 3 between the opening 1 and the frame 2 to adjust the position of the frame 2. The gap adjuster 4 includes the opening 1
And is disposed in the mounting gap 3. However, the gap adjuster does not necessarily need to be attached to the frame. The fixing portion can be attached to a structural material such as a pillar forming an opening instead of the frame.

【0020】隙間調整具4は、図4と図6に示すよう
に、取付隙間3の両側に固定されるケーシング5を固定
する固定部8と、固定部8に回転できるように設けられ
ている調整ネジ9と、調整ネジ9を回転して突出するよ
うに固定部8に連結されている突出部10とを備える。
As shown in FIGS. 4 and 6, the gap adjuster 4 is provided with a fixing portion 8 for fixing the casing 5 fixed on both sides of the mounting gap 3 and a rotatable component. An adjusting screw 9 and a protrusion 10 connected to the fixing portion 8 so as to rotate and project the adjusting screw 9 are provided.

【0021】固定部8は、金属製で、ネジ止めによって
枠体2に固定される。固定部8は、4隅にネジ孔11を
貫通して設けており、このネジ孔11を通して枠体2に
ネジ止めされる。ただ、枠体が金属製の場合は、溶着に
よって固定部を枠体の所定の位置に固定することもでき
る。
The fixing portion 8 is made of metal and is fixed to the frame 2 by screwing. The fixing portion 8 is provided through four screw holes 11 at four corners, and is screwed to the frame 2 through the screw holes 11. However, when the frame is made of metal, the fixing portion can be fixed to a predetermined position of the frame by welding.

【0022】固定部8は、ケーシング5を固定する連結
ネジ7がねじ込まれるケーシング固定部8Aと、突出部
10の突出量を調整する突出量調整部8Bとを備える。
図に示す固定部8は、中央部にケーシング固定部8Aを
設け、その両側に突出量調整部8Bを配設している。た
だ、固定部は、中央部に突出量調整部を設け、その外側
にケーシング固定部を配設することも、ケーシング固定
部の上面に突出量調整部を配設することもできる。
The fixing portion 8 includes a casing fixing portion 8A into which the connecting screw 7 for fixing the casing 5 is screwed, and a protrusion amount adjusting portion 8B for adjusting the protrusion amount of the protrusion portion 10.
The fixing part 8 shown in the figure has a casing fixing part 8A at the center part, and a protrusion amount adjusting part 8B on both sides thereof. However, the fixing portion may be provided with a protrusion amount adjusting portion in the center portion, and the casing fixing portion may be provided outside the fixing portion, or the protrusion amount adjusting portion may be provided on the upper surface of the casing fixing portion.

【0023】ケーシング固定部8Aは、ケーシング5が
固定される側の面、図6において前面と背面とにスリッ
ト12を設けている。このスリット12は、取付隙間3
の両側にケーシング5を固定するときに、連結ネジ7が
ねじ込まれる部分である。したがって、スリット12の
間隔は、連結ネジ7の太さよりもやや小さく設計され、
スリット12の深さは、連結ネジ7をねじ込んでケーシ
ング5を固定できる十分な深さに設計される。さらに、
スリット12は、内面に微細な溝を設けたり、内面をす
りガラスのような粗い面として、連結ネジ7をねじ込み
やすくすることもできる。
The casing fixing portion 8A is provided with slits 12 on the surface to which the casing 5 is fixed, that is, on the front and back surfaces in FIG. This slit 12 is attached to the mounting gap 3
When the casing 5 is fixed to both sides of the connecting screw 7, the connecting screw 7 is screwed into this portion. Therefore, the interval between the slits 12 is designed to be slightly smaller than the thickness of the connecting screw 7,
The depth of the slit 12 is designed to be sufficient to fix the casing 5 by screwing the connection screw 7. further,
The slit 12 may be provided with a fine groove on the inner surface or a rough surface such as frosted glass on the inner surface so that the connection screw 7 can be easily screwed.

【0024】突出量調整部8Bは、図6と図7に示すよ
うに、長方形の枠状に成形されて内部に空間を設けてい
る。この空間に突出部10を配設すると共に、この空間
を貫通して調整ネジ9を配設している。
As shown in FIGS. 6 and 7, the protrusion amount adjusting portion 8B is formed in a rectangular frame shape and has a space therein. The protrusion 10 is provided in this space, and the adjusting screw 9 is provided through the space.

【0025】突出部10は、直方体の金属片を切削して
所定の形状に成形したものである。突出部10は、先端
の下部を斜めに切断して、先端方向が薄くなる形状とし
ている。さらに、突出部10は、下面に溝10Aを設け
て、この溝10Aに調整ネジ9を収納できる構造として
いる。
The protrusion 10 is formed by cutting a rectangular parallelepiped metal piece into a predetermined shape. The protruding part 10 has a shape in which the lower part of the tip is cut obliquely so that the tip direction becomes thinner. Further, the protrusion 10 has a structure in which a groove 10A is provided on the lower surface, and the adjusting screw 9 can be housed in the groove 10A.

【0026】突出部10は、固定部8に、傾動できるよ
うに連結されている。図に示す突出部10は、後端縁に
設けた連結凹部13と、固定部8に設けた連結凸部14
とを当接させて連結している。連結凹部13は、突出部
10の後端の上隅部を鋭角に切欠して設けている。連結
凸部14は、突出部10が配設される固定部8の上端縁
であって、連結凹部13に当接する部分を内側に突出さ
せて設けている。突出部10は、連結凸部14に連結凹
部13を位置させて、連結凹部13の後端縁を支点とし
て傾動できる構造となっている。ただ、突出部は、回転
軸を介して固定部に連結し、この回転軸を中心として傾
動させることもできる。
The protruding portion 10 is connected to the fixing portion 8 so as to be tiltable. The projecting portion 10 shown in the figure includes a connecting concave portion 13 provided on the rear end edge and a connecting convex portion 14 provided on the fixed portion 8.
Are connected to each other. The connecting recess 13 is formed by cutting the upper corner of the rear end of the protruding portion 10 at an acute angle. The connection protrusion 14 is provided at the upper end edge of the fixing portion 8 on which the protrusion 10 is disposed, and protrudes inward at a portion that contacts the connection recess 13. The projecting portion 10 has a structure in which the connecting concave portion 13 is positioned on the connecting convex portion 14, and can be tilted with the rear end edge of the connecting concave portion 13 as a fulcrum. However, the protruding portion may be connected to the fixed portion via a rotating shaft and tilted about the rotating shaft.

【0027】調整ネジ9は、スリット12を設けた2つ
の面を連結する状態で、固定部8を貫通して設けられて
いる。調整ネジ9は、ネジ棒の両端にネジ頭を連結して
いる。この構造の調整ネジ9は、隙間調整具4の両側か
ら調整ネジ9を回して調整できる特長がある。ただ、調
整ネジは、一端にネジ頭を設けて、他端を回転できるよ
うに固定部に連結して配設することもできる。この隙間
調整具は、調整ネジのネジ頭を固定部の同じ面に配設し
て便利に使用できる。
The adjusting screw 9 is provided through the fixing portion 8 in a state where the two surfaces provided with the slits 12 are connected. The adjusting screw 9 has screw heads connected to both ends of the screw rod. The adjusting screw 9 having this structure has a feature that the adjusting screw 9 can be adjusted by turning the adjusting screw 9 from both sides of the gap adjuster 4. However, the adjusting screw may be provided with a screw head at one end and connected to the fixed portion so that the other end can rotate. This clearance adjuster can be conveniently used by disposing the screw head of the adjustment screw on the same surface of the fixing portion.

【0028】さらに、調整ネジ9のネジ棒には、突出部
10を昇降させるための移動ブロック15が配設されて
いる。移動ブロック15は、ネジ棒が貫通しており、突
出部10の下方に配設されている。移動ブロック15
は、ネジ棒が貫通する部分に雌ネジを設けている。この
移動ブロック15は、調整ネジ9を回転させるとネジ棒
に沿って移動する。移動ブロック15が図7の矢印で示
す方向に移動すると、移動ブロック15は突出部10の
下面を押し上げて、図の鎖線で示すように、突出部10
を固定部8から突出させる。さらに、移動ブロック15
は、突出部10の下面に当接する面を湾曲面として、突
出部10を滑らかに押し上げできる構造としている。
Further, a moving block 15 for raising and lowering the protrusion 10 is provided on the screw rod of the adjusting screw 9. The moving block 15 has a threaded rod penetrating therethrough and is disposed below the protrusion 10. Moving block 15
Is provided with a female screw in a portion through which the screw rod penetrates. The moving block 15 moves along the screw rod when the adjusting screw 9 is rotated. When the moving block 15 moves in the direction indicated by the arrow in FIG. 7, the moving block 15 pushes up the lower surface of the protruding portion 10, and the protruding portion 10
From the fixing portion 8. Further, the moving block 15
Has a structure in which the surface abutting on the lower surface of the protrusion 10 is a curved surface and the protrusion 10 can be pushed up smoothly.

【0029】さらに、固定部8は、枠体2を建物に固定
するための止ネジ16を貫通させる貫通孔17を中央部
に設けている。枠体2は、図4に示すように、開口部1
に仮止めされた状態で、内側から止ネジ16がねじ込ま
れて建物に固定される。止ネジ16は、枠体2と貫通孔
17とを貫通して建物に連結されて、枠体2を建物に固
定する。したがって、貫通孔17は、止ネジ16が貫通
できる十分な大きさに開口される。さらに、貫通孔は、
図示しないが、楕円形あるいは長円形に開口して、止ネ
ジが位置ずれしてねじ込まれても、確実に固定部を貫通
できる構造とすることもできる。
Further, the fixing portion 8 has a through hole 17 at the center thereof through which a set screw 16 for fixing the frame body 2 to the building passes. As shown in FIG.
In the state temporarily fixed, the set screw 16 is screwed from the inside and fixed to the building. The set screw 16 is connected to the building through the frame 2 and the through hole 17 and fixes the frame 2 to the building. Therefore, the through hole 17 is opened to a size large enough to allow the set screw 16 to pass therethrough. In addition, the through hole is
Although not shown, a structure may be adopted in which the opening is formed in an elliptical shape or an elliptical shape and the fixing portion can be securely penetrated even if the set screw is displaced and screwed in.

【0030】以上の構造の隙間調整具4は、壁の開口部
1と枠体2との間にできる取付隙間3に配設できるよう
に、全体の高さを取付隙間3の間隔よりも小さく設計さ
れる。さらに、隙間調整具4は、突出部10を突出させ
た状態での高さが、取付隙間3の間隔よりも大きく、い
いかえると、開口部1の構造材6と枠体2とが突出部1
0に押圧される高さとなるように、突出部10の最大突
出量を設計している。隙間調整具4は、取付隙間3に配
設されて、調整ネジ9を回転させて突出部10を突出さ
せると、壁の開口部1と枠体2とを押圧して枠体2を正
確な位置に固定する。
The clearance adjuster 4 having the above structure has an overall height smaller than the distance between the mounting gaps 3 so that it can be disposed in the mounting gap 3 formed between the opening 1 of the wall and the frame 2. Designed. Further, the clearance adjuster 4 has a height in a state where the protruding portion 10 is protruded, which is larger than the interval of the mounting gap 3. In other words, the structural material 6 of the opening 1 and the frame 2 are connected to the protruding portion 1.
The maximum projecting amount of the projecting portion 10 is designed so that the height is pressed to zero. The gap adjuster 4 is disposed in the mounting gap 3 and presses the opening 1 of the wall and the frame 2 by rotating the adjustment screw 9 to project the projection 10, thereby accurately positioning the frame 2. Secure in position.

【0031】さらに、本発明の壁の開口部に枠体を固定
する構造は、隙間調整具を図8と図9に示す構造とする
こともできる。これらの図に示す隙間調整具4は、ケー
シング固定部8Aの上面に一対の突出量調整部8Bを設
けている。突出量調整部8Bは、ケーシング固定部8A
の両端部に対向して設けられている。
Further, in the structure for fixing the frame body to the opening of the wall according to the present invention, the gap adjuster may have the structure shown in FIGS. The gap adjuster 4 shown in these figures has a pair of protrusion amount adjusters 8B provided on the upper surface of the casing fixing part 8A. The protrusion adjusting section 8B is provided with a casing fixing section 8A.
Are provided opposite to both ends.

【0032】図に示す突出量調整部8Bは、金属板18
をコ字状に折曲して成形されており、下端から外側に折
曲された連結片18Aを介してケーシング固定部8Aに
連結されている。突出量調整部8Bは、向かい合う金属
板18の間に、回転軸19を介して突出部10を回転で
きるように連結している。さらに、突出量調整部8B
は、突出部10の後端面に対向する位置に、金属板18
を貫通して調整ネジ9を配設している。突出部10の回
転軸19と調整ネジ9の軸は、上下に位置をずらせて配
設している。調整ネジ9で突出部10を押圧して回転さ
せるためである。調整ネジ9が金属板18を貫通する部
分には、ナット20が連結されており、調整ネジ9を回
して出し入れできる構造となっている。突出部10の後
端は湾曲されてカム面10Bを形成している。
The protrusion adjusting section 8B shown in FIG.
Is bent into a U-shape, and is connected to the casing fixing portion 8A via a connecting piece 18A bent outward from the lower end. The protruding amount adjusting portion 8B is connected between the metal plates 18 facing each other via a rotating shaft 19 so that the protruding portion 10 can be rotated. Further, the protrusion amount adjusting unit 8B
The metal plate 18 is located at a position facing the rear end face of the protrusion 10.
And an adjusting screw 9 is provided therethrough. The rotation shaft 19 of the projection 10 and the axis of the adjustment screw 9 are arranged so as to be shifted vertically. This is because the protrusion 10 is pressed and rotated by the adjusting screw 9. A nut 20 is connected to a portion where the adjusting screw 9 penetrates the metal plate 18 so that the adjusting screw 9 can be turned in and out. The rear end of the protrusion 10 is curved to form a cam surface 10B.

【0033】この構造の隙間調整具4は、調整ネジ9を
回すと、図9の矢印で示すように、調整ネジ9が前進し
て、ネジ棒の先端が突出部10のカム面10Bを押圧す
る。突出部10は、後端が押圧されて回転軸19を中心
に回転し、図9の鎖線で示すように、先端を上昇させて
固定部8から突出する。このように、後端に湾曲された
カム面10Bを設ける構造は、調整ネジ9で、突出部1
0を滑らかに傾動できる特長がある。
When the adjusting screw 9 is turned, the adjusting screw 9 advances, and the tip of the screw rod presses the cam surface 10B of the protrusion 10 as shown by the arrow in FIG. I do. The protruding portion 10 rotates around the rotation shaft 19 when the rear end thereof is pressed, and as shown by a chain line in FIG. As described above, in the structure in which the curved cam surface 10B is provided at the rear end, the adjustment screw 9 is used to adjust the protrusion 1
There is a feature that 0 can be tilted smoothly.

【0034】さらに、隙間調整具は、図10と図11に
示す構造とすることもできる。これらの図に示す隙間調
整具4は、ケーシング固定部8Aの上面に一対の突出量
調整部8Bを並設している。この隙間調整具4は、突出
部10の後端部の側面に傾斜面10Cを設けて、この傾
斜面10Cを調整ネジ9の先端で押圧して突出部10の
先端を突出させる構造としている。
Further, the gap adjuster may have a structure shown in FIGS. In the gap adjuster 4 shown in these figures, a pair of protrusion amount adjusters 8B are juxtaposed on the upper surface of the casing fixing part 8A. The clearance adjuster 4 has a structure in which an inclined surface 10C is provided on the side surface of the rear end of the protruding portion 10 and the inclined surface 10C is pressed by the tip of the adjusting screw 9 to project the tip of the protruding portion 10.

【0035】図に示す突出量調整部8Bは、金属板18
をコ字状に折曲して成形されており、向かい合う金属板
18の間に、回転軸19を介して突出部10を回転でき
るように連結している。突出部10は、後端部の側面
に、図11に示すように、上方に向かって薄くなるよう
に傾斜して傾斜面10Cを設けている。さらに、突出量
調整部8Bは、突出部10の後端部の傾斜面10Cに対
向する側面に、金属板18を貫通して調整ネジ9を配設
している。すなわち、調整ネジ9は、突出部10が傾動
する面に対して垂直に配設されている。調整ネジ9が金
属板18を貫通する部分には、ナット20が連結されて
おり、調整ネジ9を回して出し入れできるようにしてい
る。
The protrusion adjusting section 8B shown in FIG.
Is formed into a U-shape, and the protruding portion 10 is rotatably connected via a rotation shaft 19 between the metal plates 18 facing each other. As shown in FIG. 11, the protruding portion 10 is provided with an inclined surface 10 </ b> C on the side surface of the rear end portion so as to become thinner upward. Further, the protrusion amount adjusting portion 8B has an adjusting screw 9 disposed on a side surface of the rear end portion of the projecting portion 10 facing the inclined surface 10C so as to penetrate the metal plate 18. That is, the adjusting screw 9 is disposed perpendicularly to the plane on which the protrusion 10 tilts. A nut 20 is connected to a portion where the adjusting screw 9 passes through the metal plate 18 so that the adjusting screw 9 can be turned in and out.

【0036】この構造の隙間調整具4は、調整ネジ9を
回すと、調整ネジ9が前進して、ネジ棒の先端が突出部
10の傾斜面10Cを押圧する。突出部10は、傾斜面
10Cが押圧されて、回転軸19を中心に回転し、先端
を上昇させて固定部8から突出する。この構造の隙間調
整具4は、突出部10が傾動する面に対して垂直に調整
ネジ9を配設しているので、調整ネジ9の軸方向に対す
る固定部8の長さを短く、いいかえると幅を狭くして幅
の狭い枠体2に便利に使用できる特長がある。
When the adjusting screw 9 is turned, the adjusting screw 9 advances, and the tip of the screw rod presses the inclined surface 10 C of the projection 10. When the inclined surface 10C is pressed, the protruding portion 10 rotates about the rotation shaft 19, raises the tip, and protrudes from the fixed portion 8. In the gap adjuster 4 having this structure, since the adjusting screw 9 is disposed perpendicularly to the surface on which the protruding portion 10 is tilted, the length of the fixing portion 8 in the axial direction of the adjusting screw 9 is shortened. There is a feature that the width can be reduced and the frame 2 can be conveniently used for the narrow frame 2.

【0037】本発明の壁の開口部に枠体を固定する構造
は、以下のようにして壁の開口部に枠体を固定する。 図5に示すように、枠体2の両側面と上面に、複数
個の隙間調整具4を所定の間隔で取り付けて、壁の開口
部1にはめ込む。隙間調整具4は、ネジ止によって、枠
体2の外周面に固定される。枠体が金属製の場合は、溶
着等によって隙間調整具を固定することもできる。
According to the structure for fixing the frame to the opening of the wall of the present invention, the frame is fixed to the opening of the wall as follows. As shown in FIG. 5, a plurality of gap adjusters 4 are attached at predetermined intervals to both side surfaces and the upper surface of the frame 2, and fitted into the opening 1 of the wall. The gap adjuster 4 is fixed to the outer peripheral surface of the frame 2 by screwing. When the frame is made of metal, the gap adjuster can be fixed by welding or the like.

【0038】 隙間調整具4の調整ネジ9を回転させ
て、枠体2の水平、垂直を調整する。調整ネジ9を回転
させると、突出部10が突出して、壁の開口部1の構造
材6と枠体2とを押圧する。隙間調整具4は、取付隙間
3が狭い部分では突出部10の突出量を小さくし、取付
隙間3が広い部分では突出部10の突出量を大きくし
て、枠体2の縦枠が垂直に、横枠が水平になるように突
出部10の突出量を調整する。枠体2は、隙間調整具4
で正確な姿勢に保持されて、壁の開口部1に仮止めされ
る。
The horizontal and vertical of the frame 2 are adjusted by rotating the adjusting screw 9 of the gap adjuster 4. When the adjusting screw 9 is rotated, the protrusion 10 protrudes and presses the structural member 6 and the frame 2 of the opening 1 of the wall. The gap adjuster 4 reduces the amount of protrusion of the protruding portion 10 in a portion where the mounting gap 3 is narrow, and increases the amount of protrusion of the protruding portion 10 in a portion where the mounting gap 3 is wide. The protrusion amount of the protrusion 10 is adjusted so that the horizontal frame is horizontal. The frame 2 includes a gap adjuster 4
And is temporarily fixed to the opening 1 of the wall.

【0039】 図2の矢印で示すように、仮止めされ
た枠体2の内面から止ネジ16をねじ込む。止ネジ16
は、図4に示すように、枠体2と、隙間調整具4の固定
部8に設けた貫通孔17を貫通して建物の構造材6にね
じ込まれて、枠体2を開口部1に固定する。 図3に示すように、ケーシング5で取付隙間3を閉
塞する。ケーシング5は、取付隙間3の両側に配設され
ると共に、外側から連結ネジ7がねじ込まれて固定され
る。連結ネジ7は、隙間調整具4の固定部8にねじ込ま
れてケーシング5を正確な位置に配設する。
As shown by the arrow in FIG. 2, a set screw 16 is screwed from the inner surface of the temporarily fixed frame 2. Set screw 16
As shown in FIG. 4, the frame 2 is screwed into the structural material 6 of the building through a through hole 17 provided in the fixing portion 8 of the gap adjuster 4 and the frame 2 is inserted into the opening 1. Fix it. As shown in FIG. 3, the casing 5 closes the mounting gap 3. The casing 5 is provided on both sides of the mounting gap 3 and is fixed by screwing a connection screw 7 from the outside. The connection screw 7 is screwed into the fixing portion 8 of the gap adjuster 4 to dispose the casing 5 at a correct position.

【0040】以上の実施例は、建物の壁等を貫通して設
けられた開口部に、ドアや窓等の枠体を固定する構造を
示している。ただ本発明は、壁の開口部に枠体を固定す
る構造を上記の実施例に特定しない。本発明は、たとえ
ば、図12に示すように、建物に開口して設けられた収
納スペース21に、収納ボックスや収納タンス等を配設
して、これ等の枠体2を開口部1に固定することもでき
る。
The above embodiment shows a structure in which a frame such as a door or a window is fixed to an opening provided through a wall or the like of a building. However, the present invention does not specify the structure for fixing the frame to the opening of the wall in the above-described embodiment. According to the present invention, for example, as shown in FIG. 12, a storage box, a storage closet, and the like are disposed in a storage space 21 provided in an opening in a building, and these frame bodies 2 are fixed to the opening 1. You can also.

【0041】この図に示す枠体2は、隙間調整具4を介
して収納スペース21に固定されると共に、止ネジ16
で開口部1に固定されている。さらに、取付隙間3の前
面に、連結ネジ7を介してケーシング5を取り付けて外
観を良くしている。この構造も、開口部1の壁面が垂直
に仕上がっていなくても、収納ボックスを垂直に取り付
けできる特長がある。さらに、収納スペース21と枠体
2とを、正確に嵌合できるように精密に製作することな
く、収納ボックス等を簡単に製作できる特長がある。
The frame 2 shown in this figure is fixed to the storage space 21 via the gap adjuster 4 and the set screw 16
At the opening 1. Further, a casing 5 is attached to the front surface of the attachment gap 3 via a connecting screw 7 to improve the appearance. This structure also has a feature that the storage box can be mounted vertically even if the wall surface of the opening 1 is not finished vertically. Further, there is a feature that a storage box or the like can be easily manufactured without precisely manufacturing the storage space 21 and the frame body 2 so that they can be fitted accurately.

【0042】以上の実施例は、両側の枠体を、隙間調整
具を介して壁の開口部に配設している。枠体の両側に隙
間調整具を設けて、枠体を壁の開口部に装着する構造
は、両側の枠体を正確に垂直な姿勢として、開口部に装
着できる。ただ、本発明の枠体を固定する構造は、図示
しないが、片側の枠体のみを隙間調整具を介して開口部
に装着することもできる。この構造は、片側の枠体を、
隙間調整具を介して開口部に装着して、他方の枠体を、
直接に、あるいは、スペーサー等を使用して開口部に装
着する。枠体の片側を、隙間調整具で開口部を装着する
構造は、ドア枠の場合には、ドアを連結する蝶番を固定
する枠体を、隙間調整具を介して開口部に装着する。蝶
番を固定する枠体を正確に垂直に固定できないと、ドア
をスムーズに開閉できなくなるからである。
In the embodiment described above, the frames on both sides are arranged in the opening of the wall via the gap adjuster. In the structure in which the gap adjusters are provided on both sides of the frame body and the frame body is mounted on the opening of the wall, the frame bodies on both sides can be mounted in the opening with an accurate vertical posture. However, although the structure for fixing the frame of the present invention is not shown, only the frame on one side can be attached to the opening via the gap adjuster. This structure, one side frame,
Attached to the opening via the gap adjuster, the other frame,
It is attached to the opening directly or by using a spacer or the like. In a structure in which an opening is mounted on one side of the frame using a gap adjuster, in the case of a door frame, a frame for fixing a hinge connecting the door is mounted on the opening via the gap adjuster. If the frame for fixing the hinge cannot be accurately and vertically fixed, the door cannot be opened and closed smoothly.

【0043】[0043]

【発明の効果】本発明の壁の開口部に枠体を固定する構
造は、枠体を簡単かつ容易に、しかも能率よく確実に建
物に固定できる特長がある。それは、本発明の壁の開口
部に枠体を固定する構造が、壁の開口部と枠体との間の
取付隙間に隙間調整具を挟着しており、この隙間調整具
に、取付隙間を閉塞するケーシングを固定すると共に、
隙間調整具の調整ネジを回転して突出される突出部で壁
の開口部と枠体とを押圧して、枠体を固定しているから
である。このようにして固定された枠体は、簡単かつ容
易に、開口部の正確な位置に配設されると共に、枠体を
貫通する止ネジを介して、確実に建物に固定できる。し
たがって、本発明の構造は、枠体の前後左右のずれを極
減し、枠体を建物から突出させることなく、正確に垂直
面に固定できる特長がある。しかも、調整ネジを回転し
て突出部の突出量を調整できるので、固定位置を簡単に
微調整して能率よく固定できる特長も備える。
The structure for fixing the frame to the opening of the wall according to the present invention has a feature that the frame can be fixed to a building simply, easily, efficiently and reliably. The structure for fixing the frame body to the opening of the wall according to the present invention is such that a gap adjusting tool is sandwiched between the mounting gap between the opening of the wall and the frame body. While fixing the casing that closes the
This is because the adjusting screw of the gap adjusting tool is rotated to press the opening of the wall and the frame with the protruding portion, thereby fixing the frame. The frame fixed in this way can be simply and easily arranged at the correct position of the opening, and can be securely fixed to the building via a set screw penetrating the frame. Therefore, the structure of the present invention has a feature that the displacement of the frame body in the front-rear and left-right directions can be minimized, and the frame body can be accurately fixed to a vertical plane without projecting from the building. In addition, since the amount of protrusion of the protruding portion can be adjusted by rotating the adjusting screw, there is also provided a feature that the fixing position can be easily fine-adjusted and fixed efficiently.

【0044】さらに、本発明の枠体を固定する構造は、
取付隙間を閉塞するケーシングを所定の位置に、バラン
スよく配設できる特長がある。それは、本発明の枠体を
固定する構造が、ケーシングを、従来のように建物や枠
体に固定することなく、連結ネジで隙間調整具の固定部
に連結しているからである。このため、ケーシングは、
固定される位置が一方に遍在することなく、バランスよ
く固定されて、外観を良くできる特長がある。
Further, the structure for fixing the frame of the present invention is as follows.
There is a feature that the casing for closing the mounting gap can be arranged at a predetermined position in a well-balanced manner. This is because the structure for fixing the frame of the present invention connects the casing to the fixing portion of the gap adjuster with the connecting screw without fixing the casing to the building or the frame as in the related art. For this reason, the casing
There is a feature that the fixed position is not ubiquitous on one side, but is fixed in a well-balanced manner, and the appearance can be improved.

【0045】さらに、本発明の壁の開口部に枠体を固定
する構造は、必要に応じて、枠体を簡単に取り替えでき
る特長も備える。それは、本発明の構造が、隙間調整具
の突出部を突出させて開口部に固定すると共に、枠体や
ケーシングを、接着剤を使用することなく、ネジ止めし
て所定の位置に固定しているからである。このようにし
て固定される枠体は、連結ネジを緩めてケーシングを取
り外し、止ネジを緩めて、さらに、隙間調整具の調整ネ
ジを回転して開口部と枠体との押圧状態を解除して、枠
体を開口部から取り外すことができる。したがって、極
めて簡単に、しかも開口部等を傷つけることなく枠体を
取り外して、必要に応じて取り替えできる。
Further, the structure for fixing the frame body to the opening of the wall according to the present invention also has a feature that the frame body can be easily replaced as needed. That is, the structure of the present invention is such that the projecting portion of the gap adjuster is projected and fixed to the opening, and the frame and the casing are screwed and fixed in place without using an adhesive. Because there is. With the frame fixed in this way, loosen the connecting screw, remove the casing, loosen the set screw, and further rotate the adjusting screw of the gap adjuster to release the pressed state between the opening and the frame. Thus, the frame can be removed from the opening. Therefore, the frame can be removed very easily and without damaging the opening and the like, and can be replaced as needed.

【0046】さらに、本発明の請求項2の壁の開口部に
枠体を固定する構造は、隙間調整具の固定部に、止ネジ
を貫通させる貫通孔を設けているので、止ネジを枠体と
貫通孔とに貫通させて、枠体を建物に固定できる特長が
ある。この構造は、隙間調整具を固定する位置に止ネジ
をねじ込むことができるので、止ネジを強固にねじ込ん
でも、枠体を変形させることなく、確実に枠体を固定で
きる特長がある。
Further, in the structure for fixing the frame body to the opening of the wall according to the second aspect of the present invention, since the fixing portion of the gap adjuster is provided with a through hole through which the set screw is inserted, the set screw is connected to the frame. There is a feature that the frame can be fixed to the building by penetrating through the body and the through hole. This structure has the advantage that the frame can be securely fixed without deforming the frame even if the set screw is screwed firmly, since the set screw can be screwed into the position where the gap adjuster is fixed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】従来の枠体を固定する構造を示す断面図FIG. 1 is a sectional view showing a structure for fixing a conventional frame body.

【図2】本発明の実施例の壁の開口部に枠体を固定する
構造を示す正面図
FIG. 2 is a front view showing a structure for fixing a frame body to an opening of a wall according to the embodiment of the present invention.

【図3】図2に示す枠体を固定する構造のA−A線断面
FIG. 3 is a sectional view taken along line AA of the structure for fixing the frame shown in FIG. 2;

【図4】図2に示す枠体を固定する構造のB−B線拡大
断面図
FIG. 4 is an enlarged sectional view taken along line BB of the structure for fixing the frame body shown in FIG. 2;

【図5】壁の開口部に枠体を挿入した状態を示す正面図FIG. 5 is a front view showing a state where a frame is inserted into an opening of a wall.

【図6】本発明の実施例の枠体を固定する構造に使用す
る隙間調整具の斜視図
FIG. 6 is a perspective view of a gap adjuster used in the structure for fixing the frame according to the embodiment of the present invention.

【図7】図6に示す隙間調整具の断面図FIG. 7 is a sectional view of the gap adjuster shown in FIG. 6;

【図8】隙間調整具の他の一例を示す斜視図FIG. 8 is a perspective view showing another example of the gap adjuster.

【図9】図8に示す隙間調整具の断面図FIG. 9 is a sectional view of the gap adjuster shown in FIG. 8;

【図10】隙間調整具の他の一例を示す斜視図FIG. 10 is a perspective view showing another example of the gap adjuster.

【図11】図10に示す隙間調整具の断面図FIG. 11 is a sectional view of the gap adjuster shown in FIG. 10;

【図12】本発明の他の実施例の壁の開口部に枠体を固
定する構造を示す断面図
FIG. 12 is a sectional view showing a structure for fixing a frame body to an opening of a wall according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1…開口部 2…枠体 3…取付隙間 4…隙間調整具 5…ケーシング 6…構造材 7…連結ネジ 8…固定部 8A…ケーシング固定部 8B
…突出量調整部 9…調整ネジ 10…突出部 10A…溝 10
B…カム面 10C…傾斜面 11…ネジ孔 12…スリット 13…連結凹部 14…連結凸部 15…移動ブロック 16…止ネジ 17…貫通孔 18…金属板 18A…連結片 19…回転軸 20…ナット 21…収納スペース 22…柱 23…連結片
DESCRIPTION OF SYMBOLS 1 ... Opening part 2 ... Frame 3 ... Mounting gap 4 ... Gap adjuster 5 ... Casing 6 ... Structural material 7 ... Connection screw 8 ... Fixing part 8A ... Casing fixing part 8B
... Projection amount adjustment section 9 ... Adjustment screw 10 ... Projection section 10A ... Groove 10
B: cam surface 10C: inclined surface 11: screw hole 12: slit 13: connecting concave portion 14: connecting convex portion 15: moving block 16: set screw 17: through hole 18: metal plate 18A: connecting piece 19: rotating shaft 20 ... Nut 21 ... storage space 22 ... pillar 23 ... connecting piece

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 壁の開口部(1)と枠体(2)との間の取付隙
間(3)に隙間調整具(4)を挟着しており、この取付隙間
(3)が、ケーシング(5)で閉塞されてなる壁の開口部に枠
体を固定する構造において、 隙間調整具(4)は、取付隙間(3)を閉塞するケーシング
(5)が固定される固定部(8)と、固定部(8)に回転できる
ように設けられている調整ネジ(9)と、調整ネジ(9)を回
転して突出されるように固定部(8)に連結されてなる突
出部(10)とを有し、 取付隙間(3)に配設された隙間調整具(4)が、調整ネジ
(9)で突出部(10)を突出させて、取付隙間(3)にあって、
壁の開口部(1)と枠体(2)とを押圧しており、枠体(2)を
貫通する止ネジ(16)を介して枠体(2)が建物に固定され
ており、さらに、ケーシング(5)が、取付隙間(3)を閉塞
するように連結ネジ(7)を介して隙間調整具(4)の固定部
(8)に連結されてなることを特徴とする壁の開口部に枠
体を固定する構造。
A gap adjuster (4) is sandwiched between a mounting gap (3) between an opening (1) of a wall and a frame (2).
(3) In the structure in which the frame is fixed to the opening of the wall closed by the casing (5), the gap adjuster (4) is a casing for closing the mounting gap (3).
Fixing part (8) to which (5) is fixed, adjusting screw (9) provided to be able to rotate on fixing part (8), and fixing so that adjusting screw (9) rotates and protrudes A protrusion (10) connected to the mounting portion (8), and a gap adjusting tool (4) provided in the mounting gap (3) is provided with an adjusting screw.
Protrude the protruding part (10) in (9), and in the mounting gap (3),
The opening (1) of the wall and the frame (2) are pressed, and the frame (2) is fixed to the building via a set screw (16) penetrating the frame (2). The casing (5) is fixed to the gap adjuster (4) via the connecting screw (7) so as to close the mounting gap (3).
(8) A structure for fixing a frame to an opening of a wall, which is connected to (8).
【請求項2】 隙間調整具(4)の固定部(8)に、止ネジ(1
6)を貫通させる貫通孔(17)を設けており、止ネジ(16)が
枠体(2)と貫通孔(17)を貫通して、建物に連結されてな
る請求項1に記載される壁の開口部に枠体を固定する構
造。
2. A fixing screw (1) is attached to a fixing portion (8) of the gap adjusting tool (4).
The through-hole (17) which penetrates 6) is provided, The set screw (16) penetrates the frame (2) and the through-hole (17) and is connected to the building according to claim 1. A structure that fixes the frame to the opening in the wall.
【請求項3】 枠体(2)が、ドア枠、窓枠、収納ボック
スの枠体のいずれかである請求項1に記載される壁の開
口部に枠体を固定する構造。
3. The structure for fixing a frame to an opening in a wall according to claim 1, wherein the frame is one of a door frame, a window frame, and a storage box frame.
JP17058998A 1998-06-02 1998-06-02 Structure to fix the frame to the opening in the wall Expired - Lifetime JP2909463B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17058998A JP2909463B1 (en) 1998-06-02 1998-06-02 Structure to fix the frame to the opening in the wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17058998A JP2909463B1 (en) 1998-06-02 1998-06-02 Structure to fix the frame to the opening in the wall

Publications (2)

Publication Number Publication Date
JP2909463B1 JP2909463B1 (en) 1999-06-23
JPH11350839A true JPH11350839A (en) 1999-12-21

Family

ID=15907647

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17058998A Expired - Lifetime JP2909463B1 (en) 1998-06-02 1998-06-02 Structure to fix the frame to the opening in the wall

Country Status (1)

Country Link
JP (1) JP2909463B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010222886A (en) * 2009-03-24 2010-10-07 Daiken Corp Door frame structure
KR101024933B1 (en) 2008-12-11 2011-03-31 선창아이티에스 주식회사 Holder for constructing of door or window frame

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11305860B2 (en) 2018-02-08 2022-04-19 The Boeing Company Aircraft privacy door and door frame assembly
US10766596B2 (en) 2018-02-08 2020-09-08 The Boeing Company Aircraft privacy door and door frame assembly
EP3524513B1 (en) * 2018-02-08 2020-07-15 The Boeing Company Aircraft privacy door and door frame assembly
US11299250B2 (en) 2018-02-08 2022-04-12 The Boeing Company Aircraft privacy door and door frame assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101024933B1 (en) 2008-12-11 2011-03-31 선창아이티에스 주식회사 Holder for constructing of door or window frame
JP2010222886A (en) * 2009-03-24 2010-10-07 Daiken Corp Door frame structure

Also Published As

Publication number Publication date
JP2909463B1 (en) 1999-06-23

Similar Documents

Publication Publication Date Title
JP2909463B1 (en) Structure to fix the frame to the opening in the wall
JPH09209621A (en) Attaching method for cremorne bolt for stile and reinforcing member
US4982475A (en) Arrangement in a door hinge with two hinge flaps and an attaching plate for one of said hinge flaps
JP3378488B2 (en) Wall inspection door
JP3669955B2 (en) Door hinge
JP3058709U (en) Adjustment structure of door latch receiving bracket
JPH0821143A (en) Hinge
JP2002084081A (en) Plate containing frame
JP3011655B2 (en) Bran
JPH0248622Y2 (en)
JP3444341B2 (en) Gate-end structure at the end of the door
JP2918846B2 (en) Lock receiving device
JPH0310312Y2 (en)
JP3496935B2 (en) Parent and child door
JP2889496B2 (en) Hinge
KR200332648Y1 (en) A hinge
JP3406274B2 (en) Adjustable hinge
JPH0721172Y2 (en) Doll case
JPS6013985Y2 (en) Rim mounting structure
JPH08193453A (en) Hinge
JP2007146490A (en) Fittings&#39; door head hardware
JPH0222478Y2 (en)
JPH10153037A (en) Hinge
KR200246016Y1 (en) Hinge with Bending Portion
JP3008975U (en) Panel member holding structure