JPH11350492A JP17402798A JP17402798A JPH11350492A JP H11350492 A JPH11350492 A JP H11350492A JP 17402798 A JP17402798 A JP 17402798A JP 17402798 A JP17402798 A JP 17402798A JP H11350492 A JPH11350492 A JP H11350492A
Authority
JP
Japan
Prior art keywords
earth retaining
retaining wall
wall material
wall
sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17402798A
Other languages
Japanese (ja)
Other versions
JP2912929B1 (en
Inventor
Susumu Kamei
進 亀井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHINKOO CORP KK
Original Assignee
SHINKOO CORP KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHINKOO CORP KK filed Critical SHINKOO CORP KK
Priority to JP17402798A priority Critical patent/JP2912929B1/en
Application granted granted Critical
Publication of JP2912929B1 publication Critical patent/JP2912929B1/en
Publication of JPH11350492A publication Critical patent/JPH11350492A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an earth retaining method capable of reinforcing the wall face of a ditch from the ground surface simply and safely without requiring a worker to enter the excavated ditch and to provide an earth retaining wall material used for it. SOLUTION: Multiple horizontal reinforcing members 1 arranged at the prescribed intervals are connected by a soft sheet 2 to form a series of sheet-like earth retaining wall materials A. The earth retaining wall materials A and an assembled frame body B in which a pair of right and left vertical columns 3 arranged in parallel are connected by pressure cylinders 4 expandably to the right and left and the junctions between the pressure cylinders 4 and the columns 3 are made rotatable via pivotal shafts 5 are prepared. The earth retaining wall materials A are suspended from above along the right and left wall faces D of an excavated ditch C to cover the wall faces D, then the assembled frame body B is lowered between the right and left earth retaining wall materials A, and the columns 3 are pressed toward the wall faces D by the pressure cylinders 4 for earth retaining.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、上下水道管や電力
線・電話線その他の各種通信用ケーブル保護管等を地中
に埋設するために溝を掘削する際、溝の左右の側壁面が
崩落する事故を防止するために使用される土留め用壁材
と、この土留め用壁材を使用して掘削溝の左右の側壁面
の土留めを行う方法に関するものである。
BACKGROUND OF THE INVENTION The present invention relates to the excavation of a trench for burying water and sewage pipes, power lines, telephone lines, and various other communication cable protection tubes in the ground, and the left and right side walls of the trench collapse. TECHNICAL FIELD The present invention relates to an earth retaining wall material used for preventing an accident to occur, and a method of earth retaining the left and right side wall surfaces of an excavation groove using the earth retaining wall material.

【0002】[0002]

【従来の技術】一般に、上下水道管や電力線保護管、通
信用ケーブル保護管等を地中に敷設する場合、道路等に
溝を掘削してこれに目的物を埋設している。この管路形
成時に掘削した溝の側壁の崩落を防止する為に従来では
矢板を打ち込んで壁面をカバーし、この矢板の対向表面
に縦横のバタ材を当てつけて、左右の側壁を構成するバ
タ材を押圧シリンダーで押しつけて溝の壁面を補強して
いる。
2. Description of the Related Art Generally, when water and sewer pipes, power line protection pipes, communication cable protection pipes and the like are laid underground, trenches are excavated in roads and the like, and objects are buried in the trenches. Conventionally, in order to prevent collapse of the side wall of the trench excavated at the time of forming the pipeline, a sheet pile is hit to cover the wall surface, and a vertical and horizontal flutter material is applied to an opposing surface of the sheet pile to form left and right side flap materials. Is pressed by a pressing cylinder to reinforce the wall of the groove.

【0003】[0003]

【発明が解決しようとする課題】しかし、このような従
来手段にあっては、矢板やバタ材等の部品点数が多くて
運搬や保管が面倒であると共に、狭い溝内でのバタ材等
の部材の組み付けや、解体作業が大変困難で時間と手間
を要し、且つ危険を伴うといった解決すべき課題を有す
るものであった。そこで本発明は従来のかかる欠点を解
消し、作業者が掘削溝内に入ることなく、地上から簡単
且つ安全に掘削溝の壁面を補強することのできる土留め
方法を提供することを主たる目的とする。また、本発明
は、簡単且つ効果的に掘削溝の壁面をカバーすることが
できる土留め用壁材を提供することも他の主要な目的と
する。
However, in such a conventional means, the number of parts such as sheet piles and fluttering materials is large, so that transportation and storage are troublesome. It is very difficult to assemble and disassemble the members, it takes time and effort, and has a problem to be solved such that it involves danger. SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to solve the conventional drawbacks, and to provide a soil retaining method that can easily and safely reinforce the wall of a digging groove from the ground without an operator entering the digging groove. I do. Another main object of the present invention is to provide an earth retaining wall material that can easily and effectively cover the wall surface of an excavation groove.

【0004】[0004]

【課題を解決するための手段】上記の目的を達成するた
めに、本発明では次のような技術的手段を講じた。即
ち、本発明に係る土留め方法にあっては、所定の間隔隔
てて配置された複数の水平な補強部材1が柔軟なシート
2によって連結されて一連のシート状に形成された土留
め用壁材Aと、平行に配設された左右一対の垂直な柱材
3,3が押圧シリンダー4によって左右伸縮可能に連結
され且つ該押圧シリンダー4と柱材3,3との連結部が
枢軸5を介して回動自在とした組付け枠体Bとを用意
し、掘削した溝Cの左右壁面D,Dに沿って上方から土
留め用壁材Aを垂下させて壁面をカバーした後、前記組
付け枠体Bを左右の土留め用壁材A,Aの間に降下させ
て押圧シリンダー4で柱材3,3を壁面に向かって押圧
することにより左右の壁面を補強するようにした。
In order to achieve the above object, the present invention takes the following technical measures. That is, in the earth retaining method according to the present invention, a plurality of horizontal reinforcing members 1 arranged at predetermined intervals are connected by a flexible sheet 2 to form an earth retaining wall formed in a series of sheets. The material A and a pair of right and left vertical column members 3, 3 arranged in parallel are connected to each other by a pressing cylinder 4 so as to be able to expand and contract left and right, and a connecting portion between the pressing cylinder 4 and the column members 3, 3 forms a pivot 5. And an assembling frame B rotatably interposed therebetween, and a wall material A for retaining the earth is hung from above along the left and right wall surfaces D, D of the excavated groove C to cover the wall surface. The left and right wall surfaces are reinforced by lowering the attachment frame B between the left and right earth retaining wall materials A, A and pressing the column members 3, 3 toward the wall surfaces by the pressing cylinder 4.

【0005】[0005]

【発明の実施の形態】また、本発明にいう土留め用壁材
は、所定の間隔を隔てて配置された複数の水平な補強部
材1…が柔軟なシート2によって連結されて一連のシー
ト状に形成されている構成とした。
BEST MODE FOR CARRYING OUT THE INVENTION A wall material for retaining according to the present invention comprises a plurality of horizontal reinforcing members 1... It was made into the composition formed in.

【0006】前記土留め用壁材Aにおけるシート2は織
布や不織布または合成樹脂シートによって形成できる
が、適度な強靱性と防水性に優れたものが好ましい。ま
た補強部材1はアルミや鉄・ステンレス等の金属で作ら
れた角形又は丸形のパイプ材が軽量である点で適切であ
るが、木材や強化プラスチック等の材料によって形成す
ることも可能である。
The sheet 2 of the retaining wall material A can be formed of a woven fabric, a nonwoven fabric, or a synthetic resin sheet, but it is preferable that the sheet 2 has moderate toughness and excellent waterproofness. The reinforcing member 1 is suitable in that a square or round pipe made of a metal such as aluminum, iron, or stainless steel is lightweight, but may be formed of a material such as wood or reinforced plastic. .

【0007】[0007]

【実施例】以下本発明の詳細を図に示した実施例に基づ
いて説明する。図において符号Aは本発明にかかる土留
め用壁材を示すものであって、所定の間隔をあけて配置
された複数の水平な補強部材1…が柔軟なシート2によ
って連結されて一枚のシート材に形成されている。この
土留め用壁材Aのサイズは施工現場の条件によって異な
るが、標準タイプとして横巾3000mm、縦巾2000
mmとし、5本の補強部材1…を500mmのピッチで平行
に配置した。また土留め用壁材Aの少なくとも上端側に
は図4に示すように引き上げ・吊り下げ用のクレーンフ
ックが係合する係合片7…が設けられている。この係合
片7は、紐状素材や帯状素材をループ状に形成したもの
や、フック形のもの等適宜の形状にして使用することが
できる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The details of the present invention will be described below based on an embodiment shown in the drawings. In the drawings, reference numeral A denotes a retaining wall material according to the present invention, and a plurality of horizontal reinforcing members 1 arranged at predetermined intervals are connected by a flexible sheet 2 to form one sheet. It is formed on a sheet material. The size of the retaining wall material A varies depending on the conditions of the construction site.
mm, and five reinforcing members 1 were arranged in parallel at a pitch of 500 mm. At least on the upper end side of the retaining wall material A, as shown in FIG. 4, there are provided engaging pieces 7 to which a lifting / suspending crane hook is engaged. The engaging piece 7 can be used in an appropriate shape such as a string-shaped material or a band-shaped material formed in a loop shape or a hook-shaped material.

【0008】上記土留め用壁材Aのシート2は織布や不
織布または合成樹脂シートによって形成できるが、1平
方メートルあたり5トンの側圧に耐える程度の強靱性と
適度な防水性に優れたものが好ましい。また補強部材1
はアルミやステンレス等の軽量金属で作られた角又は丸
パイプ材が適切であるが、木材や強化プラスチック等の
材料によって形成することも可能である。図に示した実
施例では、二枚のシート材を重ね合わせ、その間に角筒
形のアルミ型材を挟み込んで両シート材を接着すること
により土留め用壁材Aを形成してある。
The sheet 2 of the retaining wall material A can be formed of a woven fabric, a nonwoven fabric, or a synthetic resin sheet, but a material having excellent toughness enough to withstand a lateral pressure of 5 tons per square meter and moderate waterproofness. preferable. Reinforcing member 1
Although a square or round pipe made of a lightweight metal such as aluminum or stainless steel is suitable, it can also be made of a material such as wood or reinforced plastic. In the embodiment shown in the figure, a wall material A for earth retaining is formed by laminating two sheet materials, sandwiching a rectangular cylindrical aluminum material therebetween and bonding the two sheet materials.

【0009】符号Bは本発明の土留め方法において使用
される組付け枠体であって、平行に配設された左右一対
の垂直方向の柱材3,3が上下に配した押圧シリンダー
4,4によって左右方向に伸縮可能に連結され且つ該押
圧シリンダー4と柱材3,3との連結部が枢軸5を介し
て回動自在に形成され、これにより左右の柱材3,3が
4点リンクのように互いに隣接した状態に畳み込むこと
ができるように組成されている。本実施例においては、
上記押圧シリンダー4,4は流体圧シリンダーが使用さ
れている。符号6はこの押圧シリンダー4に流体パイプ
(図示せず)を接続するためのジョイント口である。こ
の押圧シリンダー4,4は、地上から回転操作する垂直
方向操作軸をもった回転操作シリンダー(図は省略)で
あってもよいことは言うまでもない。
Reference numeral B denotes an assembling frame used in the earth retaining method of the present invention, wherein a pair of left and right vertical column members 3, 3 arranged in parallel are vertically arranged on a pressing cylinder 4, 4, the connecting portion between the pressing cylinder 4 and the column members 3, 3 is formed rotatably via a pivot 5, so that the left and right column members 3, 3 have four points. It is configured so that it can be folded adjacent to each other like a link. In this embodiment,
The press cylinders 4, 4 are fluid pressure cylinders. Reference numeral 6 denotes a joint port for connecting a fluid pipe (not shown) to the pressing cylinder 4. Needless to say, the pressing cylinders 4 and 4 may be rotary operating cylinders (not shown) having a vertical operating axis for rotating from the ground.

【0010】本発明にいう土留め方法は、先ず図1に示
すように、掘削した溝Cの左右壁面D,Dに沿って上方
から土留め用壁材A,Aを垂下させて壁面をカバーした
後、図2に示すように、折り込まれた組付け枠体Bをク
レーン等で吊り下げて左右の土留め用壁材A,Aの間に
降下させ、押圧シリンダー4,4が水平な姿勢になるよ
うに柱材3,3の下端を溝底面に接地させる。次いで図
3に示すように、押圧シリンダー4を動作させて柱材
3,3を壁面D,Dに向かって押しつけて土留め用壁材
Aを壁面に定着させる。これにより溝上方から簡単に且
つ安全に、土留め作業を行うことができるものである。
As shown in FIG. 1, the earth retaining method according to the present invention first covers the wall surface by hanging earth retaining wall materials A, A from above along the left and right wall surfaces D, D of the excavated groove C. After that, as shown in FIG. 2, the folded assembly frame B is suspended with a crane or the like and lowered between the left and right earth retaining wall materials A, A, and the pressing cylinders 4, 4 are in a horizontal posture. The lower ends of the pillars 3 and 3 are grounded to the groove bottom so that Next, as shown in FIG. 3, the pressing cylinder 4 is operated to press the column members 3, 3 against the wall surfaces D, D to fix the retaining wall material A to the wall surface. Thus, the earth retaining work can be easily and safely performed from above the groove.

【0011】また目的のケーブル保護管等を溝内に敷設
した後は、シリンダー4を収縮させて組付け枠体Bを上
方に引き上げ、その後、掘削溝内に埋め戻しを行いなが
ら、前記引き上げ・吊り下げ用のフック係合片7…を利
用して土留め用壁材Aを上方に引き出すだけで簡単に分
解除去することができる。言うまでもなく、掘削溝の埋
め戻し作業は、この土留め用壁材Aを引き上げた後に行
ってもよいことは容易に理解できるであろう。
After the desired cable protection tube or the like is laid in the groove, the cylinder 4 is contracted to raise the assembly frame B upward, and then, while the backing is performed in the excavation groove, the mounting frame B is raised. The earth retaining wall material A can be easily disassembled and removed simply by pulling the retaining wall material A upward using the hook engaging pieces 7 for hanging. Needless to say, it will be easily understood that the work of backfilling the excavation trench may be performed after the retaining wall material A is pulled up.

【0012】以上の実施例では、土留め用壁材Aの補強
部材1として、四角パイプ材で形成したものを示した
が、図5に示すような上下に斜面を持つ六角形に形成し
たり、或いは図6で示すような円形のものとして形成し
てもよい。これにより土留め用壁材Aの引き出し作業時
に、埋め戻し土との抵抗を小さくすることができる。
In the above embodiment, the reinforcing member 1 of the retaining wall material A is formed of a square pipe material. However, the reinforcing member 1 may be formed in a hexagon having a vertical slope as shown in FIG. Alternatively, it may be formed as a circular shape as shown in FIG. Thereby, at the time of pulling out the retaining wall material A, the resistance to the backfill soil can be reduced.

【0013】以上本発明の代表的な実施例について説明
したが、本発明は必ずしも上記の実施例構造のみの特定
されるものではなく、例えば、隣り合う前記土留め用壁
材A,Aの両側を突き合わせ状に配置したり、隣り合う
土留め用壁材A,Aの補強部材1の位置を上下にずらせ
て両者の側縁部分の一部を重ね合わせて配置したり、任
意に行うことができるものであって、前記の構成要件を
備え、且つ効果を有する範囲内で適宜変更して実施でき
ることは勿論である。
Although the representative embodiment of the present invention has been described above, the present invention is not necessarily limited to the structure of the above-described embodiment. For example, both sides of the adjacent retaining wall materials A, A may be used. Arranging the reinforcing members 1 of the adjoining earth retaining wall materials A, A up and down so as to partially overlap the side edge portions of the both, or arbitrarily perform the operation. As a matter of course, the present invention can be implemented by appropriately changing the range within the range that has the above-mentioned constituent requirements and has an effect.

【0014】[0014]

【発明の効果】以上のように本発明にあっては、地上か
ら左右の土留め用壁材をそれぞれ落とし込み、その間に
組付け枠体と押圧シリンダーとを落とし込み、その後に
押圧シリンダーを操作して組付け枠体の垂直方向柱材を
土留め用壁に向けて押しつけることにより、作業者が狭
い溝内に入ることなく地上から簡単に且つ安全に土留め
作業を行うことができ、また配管作業後の解体除去作業
も地上から容易に迅速に行うことができて作業時間の短
縮とトータルコストの低減化を図ることができる。
As described above, according to the present invention, the left and right earth retaining wall materials are dropped from the ground, the mounting frame and the pressing cylinder are dropped between them, and then the pressing cylinder is operated. By pressing the vertical pillars of the assembly frame against the retaining wall, the worker can easily and safely perform the retaining work from the ground without entering the narrow groove, and also perform the piping work. Subsequent disassembly and removal operations can be easily and quickly performed from the ground, so that the operation time can be reduced and the total cost can be reduced.

【0015】また、土留め用壁材は実質的な横バタ材と
なる補強部材としての複数本の横柱材がシート材の構成
部材として一体的に組み込まれているから、バタ材の散
乱を防止すると共に土留め構築に必要な部材の数を減少
し、且つ不必要な時にはコンパクトに巻き取ることがで
きて、矢板に代わる壁面覆い材でありながら搬送や格納
に便利であるといった効果がある。
[0015] Further, since the plurality of horizontal pillars as a reinforcing member which is a substantial horizontal fluttering material is integrally incorporated into the earth retaining wall material as a constituent member of the sheet material, scattering of the fluttering material is prevented. Prevention and reduction of the number of members necessary for earth retaining construction, and when unnecessary, it can be wound up compactly, which is an advantage that it is convenient for transportation and storage even though it is a wall covering material instead of sheet pile. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る土留め方法の第1過程を示す断面
図。
FIG. 1 is a sectional view showing a first step of an earth retaining method according to the present invention.

【図2】上記土留め方法の第2過程を示す断面図FIG. 2 is a sectional view showing a second step of the earth retaining method.

【図3】上記土留め方法の第3過程を示す断面図。FIG. 3 is a sectional view showing a third step of the earth retaining method.

【図4】本発明における土留め用壁材の正面図。FIG. 4 is a front view of a retaining wall material according to the present invention.

【図5】本発明のおける土留め用壁材の他の実施例の一
部分を示す断面図。
FIG. 5 is a sectional view showing a part of another embodiment of the retaining wall material according to the present invention.

【図6】本発明のおける土留め用壁材の更に他の実施例
の一部分を示す断面図。
FIG. 6 is a sectional view showing a part of still another embodiment of a retaining wall material according to the present invention.

【符号の説明】[Explanation of symbols]

A 土留め用壁材 B 組付け枠体 C 溝 D 溝の側壁面 1 土留め用壁材の柱材 2 シート 3 組付け枠体の柱材 4 流体圧シリンダー 5 枢軸 A Wall material for retaining wall B Assembly frame C groove D Side wall surface of groove 1 Column material of wall material for retaining 2 Sheet 3 Column material of mounting frame 4 Fluid pressure cylinder 5 Axis

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成10年8月7日[Submission date] August 7, 1998

【手続補正1】[Procedure amendment 1]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図5[Correction target item name] Fig. 5

【補正方法】追加[Correction method] Added

【補正内容】[Correction contents]

【図5】 FIG. 5

【手続補正2】[Procedure amendment 2]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図6[Correction target item name] Fig. 6

【補正方法】追加[Correction method] Added

【補正内容】[Correction contents]

【図6】 FIG. 6

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 所定の間隔を隔てて配置された複数の水
平な補強部材(1)…が柔軟なシート(2)によって連結され
て一連のシート状に形成された土留め用壁材(A)と、平
行に配設された左右一対の垂直な柱材(3),(3)が押圧シ
リンダー(4)によって左右伸縮可能に連結され且つ該押
圧シリンダー(4)と柱材(3),(3)との連結部が枢軸(5)を
介して回動自在とした組付け枠体(B)とを用意し、掘削
した溝(C)の左右壁面(D),(D)に沿って上方から土留め
用壁材(A)を垂下させて壁面をカバーした後、前記組付
け枠体(B)を左右の土留め用壁材(A),(A)の間に降下さ
せて押圧シリンダー(4)で柱材(3),(3)を壁面に向かっ
て押圧することにより土留めを行うようにした掘削溝側
壁面の土留め方法。
A plurality of horizontal reinforcing members (1) arranged at predetermined intervals are connected by a flexible sheet (2) to form a series of sheet-like retaining wall materials (A). ), And a pair of left and right vertical column members (3), (3) arranged in parallel are connected to each other by a pressing cylinder (4) so as to be able to expand and contract left and right, and the pressing cylinder (4) and the column members (3), An assembly frame (B) whose connection part with (3) is rotatable via a pivot (5) is prepared, and along the left and right wall surfaces (D) and (D) of the excavated groove (C). After hanging the retaining wall material (A) from above and covering the wall surface, the assembly frame (B) is lowered between the left and right retaining wall materials (A) and (A). An earth retaining method for an excavation groove side wall surface in which an earth retaining is performed by pressing a column material (3), (3) toward a wall surface with a pressing cylinder (4).
【請求項2】 前記土留め用壁材(A)が、水平方向に沿
った一側に、複数の吊り下げ用係合片(7)…を備えてい
るものである請求項1に記載の掘削溝側壁面の土留め方
法。
2. The retaining wall material (A) according to claim 1, wherein the retaining wall material (A) is provided with a plurality of hanging engaging pieces (7) on one side along a horizontal direction. How to retain the excavation trench side wall.
【請求項3】 所定の間隔を隔てて配置された複数の水
平な補強部材(1)が柔軟なシート(2)によって連結されて
一連のシート状に形成されている土留め用壁材。
3. An earth retaining wall member formed of a series of sheets formed by connecting a plurality of horizontal reinforcing members (1) arranged at predetermined intervals with a flexible sheet (2).
【請求項4】 水平方向に沿った一側に、複数の吊り下
げ用係合片(7)…が形成されている請求項3に記載の土
留め用壁材。
4. The earth retaining wall material according to claim 3, wherein a plurality of hanging engagement pieces are formed on one side along the horizontal direction.
JP17402798A 1998-06-04 1998-06-04 Retaining method and wall material for excavation trench side wall surface Expired - Fee Related JP2912929B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17402798A JP2912929B1 (en) 1998-06-04 1998-06-04 Retaining method and wall material for excavation trench side wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17402798A JP2912929B1 (en) 1998-06-04 1998-06-04 Retaining method and wall material for excavation trench side wall surface

Publications (2)

Publication Number Publication Date
JP2912929B1 JP2912929B1 (en) 1999-06-28
JPH11350492A true JPH11350492A (en) 1999-12-21

Family

ID=15971362

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17402798A Expired - Fee Related JP2912929B1 (en) 1998-06-04 1998-06-04 Retaining method and wall material for excavation trench side wall surface

Country Status (1)

Country Link
JP (1) JP2912929B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956390A (en) * 2010-09-27 2011-01-26 攀钢集团冶金工程技术有限公司 Bored pile channel partition method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956390A (en) * 2010-09-27 2011-01-26 攀钢集团冶金工程技术有限公司 Bored pile channel partition method

Also Published As

Publication number Publication date
JP2912929B1 (en) 1999-06-28

Similar Documents

Publication Publication Date Title
US5551807A (en) In-ground barrier system
US4877358A (en) Method and apparatus of constructing a novel underground impervious barrier
KR20150143997A (en) The moving type shoring apparatus
KR101677236B1 (en) Double-layered steel plate cutoff wall structure and construction method of cutoff wall of temporary facility using the same
JP2912929B1 (en) Retaining method and wall material for excavation trench side wall surface
CN215486037U (en) Water-rich sand layer sand flow-proof water burst working well
USRE30185E (en) Trench shoring assembly
JP6993384B2 (en) Starting reaction force structure and method of concrete box or open shield machine
US4019329A (en) Trench shoring assembly
JPS5815566B2 (en) Method to prevent lifting of lightweight pipes
CN110792103A (en) Underground pipeline with integrated supporting piles and pipeline wall and construction method
JPS6078016A (en) Sheathig work
CN219547813U (en) Enclosing purlin shearing-resistant piece suitable for front-support grouting steel pipe foundation pit supporting system
JP3183635U (en) Square frame for earth retaining
CN113338947B (en) Water-rich sand layer anti-flowing sand water-surge working well and construction method thereof
JP4488724B2 (en) Protective structure of internal pressure buried pipe deformation site
JP3011093U (en) Sheet pile connecting device
JPH07127051A (en) Construction and erecting method for reinforcement cage for continuous underground wall execution
JPS6235695Y2 (en)
JP3314299B2 (en) Earth retaining device
CA1126234A (en) Trench shoring assembly
JP3834119B2 (en) Packer type continuous underground wall joint and its construction method
CA1126232A (en) Trench shoring assembly
CA1126231A (en) Trench shoring assembly
JP3240394B2 (en) Construction method of impermeable wall

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees