JPH11336078A - Coupling device for shore strut support - Google Patents

Coupling device for shore strut support

Info

Publication number
JPH11336078A
JPH11336078A JP14169898A JP14169898A JPH11336078A JP H11336078 A JPH11336078 A JP H11336078A JP 14169898 A JP14169898 A JP 14169898A JP 14169898 A JP14169898 A JP 14169898A JP H11336078 A JPH11336078 A JP H11336078A
Authority
JP
Japan
Prior art keywords
retaining panel
section
locking
connector
temporary fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14169898A
Other languages
Japanese (ja)
Other versions
JP2920761B1 (en
Inventor
Shoya Suzuki
鈴木捷也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NSP Corp
Original Assignee
NSP Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NSP Corp filed Critical NSP Corp
Priority to JP14169898A priority Critical patent/JP2920761B1/en
Application granted granted Critical
Publication of JP2920761B1 publication Critical patent/JP2920761B1/en
Publication of JPH11336078A publication Critical patent/JPH11336078A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a coupling device for a shore strut support, by which assembly and disassembly works can be conducted easily. SOLUTION: In the coupling device 50 for the shore strut support in a cut and cover tunneling method, etc., a locking section 25b, which is projected to the outside of a shaft section 25a and in which the center of an end face is retreated towards both sides in high height, is formed to a connector 25 installed to the shore strut support 20, the metal fitting 43 of an earth retaining panel 41 is inserted to the connector 25, and the locking section 25b is brought into press-contact with the metal fitting 43 by turning the connector 25, and the shore strut support 20 is coupled with the earth retaining panel 41. The metal fitting 43 of the earth retaining panel 41 is composed of an inserting hole, into which the connector 25 is inserted, a circular guide section, to which the outer circumferential section of the connector 25 is fitted, a temporary fixing section, which is formed in the circumferential direction while being continued to the inserting hole and to which the locking section 25b of the rotated connector 25 is abutted, and a clamping section, which is formed in the circumferential direction while being continued to the temporary fixing section and has thickness larger than the temporary fixing section and to which the locking section 25b is abutted.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、開削工法等におい
て土留めパネルを切梁サポートにより連結して、2枚の
土留めパネルを所定の間隔で保持するための切梁サポー
トの連結装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a connecting device for a girder support for connecting two earth retaining panels at predetermined intervals by connecting the earth retaining panels by a cut beam support in an open-cutting method or the like.

【0002】[0002]

【従来の技術】開削工法等においては、図11に示すよ
うに、2枚の土留めパネル1を切梁サポート2により連
結し、所定の間隔で保持した土留めパネル1,1を掘削
部位に設置している。
2. Description of the Related Art In a digging method or the like, as shown in FIG. 11, two earth retaining panels 1 are connected by a cutting beam support 2, and the earth retaining panels 1, 1 held at a predetermined interval are placed on an excavation site. Has been installed.

【0003】切梁サポート2は、外側パイプ3と、この
外側パイプ3に嵌合された内側パイプ4とから構成さ
れ、それぞれの端部にフランジ5が溶接され、フランジ
5と土留めパネル1との間には緩衝部材6が介装されて
いる。これらのパイプ3、4は相互に移動可能に構成さ
れており、これにより切梁サポート2の長さを調節して
いる。また、外側パイプ3及び内側パイプ4には、それ
ぞれ連結具7の一端(図示せず)が連結されており、こ
れの他端はフランジ5及び緩衝部材6を貫通して外側に
突出している。
[0003] The cutting beam support 2 is composed of an outer pipe 3 and an inner pipe 4 fitted to the outer pipe 3, and a flange 5 is welded to each end thereof, and the flange 5, the retaining panel 1, A cushioning member 6 is interposed therebetween. These pipes 3, 4 are configured to be movable with respect to each other, thereby adjusting the length of the girder support 2. Further, one end (not shown) of a connector 7 is connected to the outer pipe 3 and the inner pipe 4, respectively, and the other end thereof penetrates the flange 5 and the buffer member 6 and protrudes outward.

【0004】この連結具7は、図12(a),(b)に
示すように、軸部7aの外側に長方形の係止部7bが膨
出されて全体としてT字状をなしており、緩衝部材6側
の面は円弧状に形成されている。土留めパネル1は縦梁
11に複数個のコ字状の取付具12が取着され、この取
付具12に長方形の孔13が形成されている。
As shown in FIGS. 12 (a) and 12 (b), a rectangular locking portion 7b is bulged out of a shaft portion 7a to form a T-shape as a whole. The surface on the buffer member 6 side is formed in an arc shape. The retaining panel 1 has a plurality of U-shaped attachments 12 attached to a vertical beam 11, and a rectangular hole 13 is formed in the attachment 12.

【0005】そして、土留めパネル1を切梁サポート2
により連結する場合には、2枚の土留めパネル1,1を
所定の間隔で保持し、図12(a),(b)に示すよう
に、連結具7を土留めパネル1の取付具12の孔13に
挿入する。そして、連結具7及びパイプ3,4を90度
回転させ、さらにくさびをパイプ3、4に打ち込むこと
により、図13(a),(b)に示すように、係止部7
bが緩衝部材6を圧縮して取付具12上に移動し、両者
が連結される。この作業を切梁サポート2の両側につい
て実施して、2枚の土留めパネル1,1を所定の間隔で
保持している。
Then, the retaining panel 1 is connected to the cutting beam support 2.
In the case of the connection by means of, the two retaining panels 1 and 1 are held at a predetermined interval, and as shown in FIGS. Into the hole 13. Then, the connecting member 7 and the pipes 3 and 4 are rotated by 90 degrees, and a wedge is further driven into the pipes 3 and 4, so that the locking portions 7 are formed as shown in FIGS.
b compresses the cushioning member 6 and moves onto the fixture 12, and the two are connected. This operation is performed on both sides of the girder support 2, and the two earth retaining panels 1, 1 are held at predetermined intervals.

【0006】尚、ここで、連結具7を図12(a)に示
す位置に挿入すると、当該連結具7は、切梁サポート2
の自重により、孔13の下端まで落ち込み、その後、く
さびを打ち込むことにより、その軸部7aが孔13の端
面に密着して、切梁サポート2と土留めパネル1とのず
れが防止されるようになっているのである。
When the connecting member 7 is inserted into the position shown in FIG. 12A, the connecting member 7
Due to its own weight, it falls down to the lower end of the hole 13, and then, by driving in a wedge, the shaft portion 7 a comes into close contact with the end surface of the hole 13 so that the gap between the cutting beam support 2 and the retaining panel 1 is prevented. It has become.

【0007】また、切梁サポート2を土留めパネル1か
ら取り外す場合には、連結具7及びパイプ3,4を90
度回転させて、係止部7bの向きを孔13に合わせ、さ
らに、連結具7の軸部7aを図13(a)に鎖線で示す
位置まで上昇させて、孔13と係止部7bの中心位置を
一致させる{図12(a)に示す位置に戻す}。その
後、切梁サポート2を土留めパネル1から引き抜いてい
る。
When the beam support 2 is to be detached from the retaining panel 1, the connecting member 7 and the pipes 3 and 4 must be connected to each other by 90 degrees.
13A, the direction of the locking portion 7b is aligned with the hole 13, and the shaft portion 7a of the connecting tool 7 is further raised to a position shown by a chain line in FIG. The center position is matched {return to the position shown in FIG. 12 (a)}. Thereafter, the girder support 2 is pulled out of the retaining panel 1.

【0008】[0008]

【発明が解決しようとする課題】上述の組立、分解作業
は、作業者が切梁サポート2を支えながら実施してい
る。ところで、切梁サポート2は重量が大であるので、
作業者が切梁サポート2を支えるだけでも大変な作業で
あるばかりでなく、この切梁サポート2を支えながら連
結具7の位置合わせを行うので、作業工数が増加すると
いう問題がある。
The above-mentioned assembling and disassembling operations are performed by an operator while supporting the girder support 2. By the way, since the girder support 2 is heavy,
It is not only a difficult task for the operator to support the girder support 2, but also there is a problem that the number of man-hours increases because the position of the connecting tool 7 is adjusted while supporting the girder support 2.

【0009】さらに、切梁サポート2の一方を土留めパ
ネル1に固定すると、緩衝部材6が圧縮されるので、切
梁サポート2の反対側の先端の関係位置が固定されるこ
ととなる。従って、反対側の端部は、その位置を調整す
るのが困難となるため、土留めパネル1に連結する際の
作業工数がさらに増加するという問題がある。
Further, when one of the cut beam supports 2 is fixed to the earth retaining panel 1, the cushioning member 6 is compressed, so that the relative position of the tip on the opposite side of the cut beam support 2 is fixed. Therefore, it is difficult to adjust the position of the opposite end, and thus there is a problem that the number of work steps for connecting to the retaining panel 1 is further increased.

【0010】また、分解作業においては、連結具7と孔
13の中心位置を合わせるため、軸部7aを図13
(a)に鎖線で示す位置まで上昇させなければならない
が、連結具7の係止部7bは取付具12の孔13の内側
にあって外から見ることができないので、位置合わせに
手間がかかるという問題がある。
In the disassembling operation, the shaft 7a is moved to the position shown in FIG.
(A) must be raised to the position shown by the dashed line, but since the locking portion 7b of the connecting tool 7 is inside the hole 13 of the mounting tool 12 and cannot be seen from the outside, it takes time to adjust the position. There is a problem.

【0011】本発明は、上記の事情に鑑みてなされたも
ので、その目的は、組立及び分解作業が容易にできる切
梁サポートの連結装置を提供するにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a connecting device for a girder support capable of easily assembling and disassembling operations.

【0012】[0012]

【課題を解決するための手段】請求項1の発明は、実施
例において使用する符号を付して説明すると、開削工法
等における土留めパネルの圧力を支える切梁サポートの
連結装置50であって、切梁サポート20に取着された
連結具25に、軸部25aの外側に突出するとともに端
面の中央が高く両側に向けて後退する係止部25bを設
け、この連結具25を土留めパネル41の取付具43に
挿入し該連結具25を回動させることにより係止部25
bを取付具43に圧接させて切梁サポート20を土留め
パネル41に連結する連結装置50において、土留めパ
ネル41の取付具43を、連結具25が挿入される挿入
孔44と、挿入された連結具25の外周部が嵌合する円
形状の案内部45と、挿入孔44に連続して円周方向に
形成され、回動された連結具25の係止部25bが当接
する仮留め部46と、この仮留め部46に連続して円周
方向に形成され該仮留め部46よりも厚さが大であって
係止部25bが圧接される締付部47とから構成したと
ころに特徴を有する。
According to the first aspect of the present invention, there is provided a connecting device 50 of a girder support for supporting a pressure of a retaining panel in an open-cutting method or the like, by attaching reference numerals used in the embodiments. A connecting part 25 attached to the cutting beam support 20 is provided with a locking part 25b which protrudes outside the shaft part 25a and has a high center of the end face and retreats to both sides. 41 is inserted into the mounting member 43 and the connecting member 25 is rotated so that the locking portion 25
In the connecting device 50 for connecting the cutting beam support 20 to the retaining panel 41 by pressing the b to the mounting tool 43, the mounting tool 43 of the retaining panel 41 is inserted into the insertion hole 44 into which the connecting tool 25 is inserted. Guide portion 45 into which the outer peripheral portion of the connecting member 25 is fitted, and a temporary fixing portion which is formed in the circumferential direction continuously with the insertion hole 44 and in which the engaging portion 25b of the rotated connecting member 25 abuts. A part 46 and a fastening part 47 formed in the circumferential direction to be continuous with the temporary fixing part 46 and having a larger thickness than the temporary fixing part 46 and to which the locking part 25b is pressed. It has features.

【0013】請求項2の発明の締付部うやは、中央に係
止部25bの先端が係止する溝部48が形成されている
ところに特徴を有する。
The fastening portion of the invention according to the second aspect is characterized in that a groove portion 48 is formed at the center for locking the tip of the locking portion 25b.

【0014】[0014]

【発明の実施の形態】以下、本発明の一実施例につき図
1〜図10を参照して説明する。開削工法等において
は、図3に示すように、2枚の土留めパネル41と切梁
サポート20とを後述する連結装置50により連結し、
所定の間隔で保持した土留めパネル41,41を掘削部
位に設置している。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS. In the open-cutting method or the like, as shown in FIG. 3, two earth retaining panels 41 and the girder support 20 are connected by a connecting device 50 described below.
Earth retaining panels 41, 41 held at predetermined intervals are installed at the excavation site.

【0015】切梁サポート20は、図1及び図2におい
て、外側パイプ21と、外側パイプ21に嵌合され軸心
方向に移動可能な内側パイプ22とから構成されてい
る。外側パイプ21には端部に回転金具23が取付けら
れ、回転金具23の側面には緩衝部材24が取付けられ
ている。
1 and 2, the cutting beam support 20 comprises an outer pipe 21 and an inner pipe 22 fitted to the outer pipe 21 and movable in the axial direction. A rotating fitting 23 is attached to an end of the outer pipe 21, and a buffer member 24 is attached to a side surface of the rotating fitting 23.

【0016】連結具25は、図4にも示すように、軸部
25aと、軸部25aの一端に両外側に突出した長方形
の係止部25bとから構成され、全体としてT字状をな
している。また、軸部25aの他端は(図示せず)、緩
衝部材24を貫通して回転金具23に固着されている。
係止部25bの緩衝部材24側の側面は、中央が高く両
側に向けて後退する山形をなしている。
As shown in FIG. 4, the connecting member 25 is composed of a shaft portion 25a and a rectangular locking portion 25b protruding outward on both ends at one end of the shaft portion 25a, and has a T-shape as a whole. ing. The other end of the shaft portion 25a (not shown) penetrates the cushioning member 24 and is fixed to the rotating bracket 23.
The side surface of the locking portion 25b on the buffer member 24 side has a mountain shape having a high center and retreating toward both sides.

【0017】また、内側パイプ22にも、外側パイプ2
1とは反対の端部に回転金具23、緩衝部材24及び連
結具25が取付けられている。
The inner pipe 22 is also connected to the outer pipe 2.
The rotating bracket 23, the cushioning member 24, and the connecting tool 25 are attached to the end opposite to 1.

【0018】外側パイプ21の端部には、回転金具23
に接してベース26が取付けられており、これの内部に
一対の傘歯車27が取付けられている。傘歯車27を構
成するハンドル側ギヤ28は、外側パイプ21に挿入さ
れたハンドル29により回転されるもので、このハンド
ル側ギヤ28により駆動されるねじ側ギヤ30は、ベー
ス26に回転可能に支承された回転軸31に固定されて
いる。
At the end of the outer pipe 21, a rotating fitting 23 is provided.
, A base 26 is mounted, and a pair of bevel gears 27 is mounted inside the base 26. The handle-side gear 28 constituting the bevel gear 27 is rotated by a handle 29 inserted into the outer pipe 21, and the screw-side gear 30 driven by the handle-side gear 28 is rotatably supported on the base 26. Is fixed to the rotating shaft 31.

【0019】この回転軸31にはねじ32が形成されて
おり、このねじ32に螺合するナット33が内側パイプ
22に取着されている。そして、ハンドル29を回転操
作すると、ハンドル側ギヤ28及びねじ側ギヤ30が回
転されて、ねじ32に螺合するナット33を介して内側
パイプ22が左右に移動され、これにより切梁サポート
20の長さが調節できる。尚、ベース26とナット33
との間にはスラストベアリング34が介装されている。
A screw 32 is formed on the rotating shaft 31, and a nut 33 screwed to the screw 32 is attached to the inner pipe 22. When the handle 29 is rotated, the handle-side gear 28 and the screw-side gear 30 are rotated, and the inner pipe 22 is moved right and left via a nut 33 screwed into the screw 32, whereby the cutting beam support 20 is The length can be adjusted. The base 26 and the nut 33
And a thrust bearing 34 is interposed between them.

【0020】図5において、土留めパネル41は、両側
部に縦梁42が取付けられ、ここにそれぞれ複数個の取
付具43が取着されている。
In FIG. 5, a vertical beam 42 is attached to both sides of the earth retaining panel 41, and a plurality of attachments 43 are attached to each of them.

【0021】つぎに、図6〜図7を参照して取付具43
について説明する。挿入孔44は、連結具25の係止部
25bに対応した形状を有しており、これを囲むように
円形状の案内部45が突設されている。案内部45の内
側には、円周方向に挿入孔44に連続して薄肉の仮留め
部46が形成され、さらに仮留め部46に挟まれるよう
にその中間の位置に厚肉の締付部47が形成されてい
る。この締付部47の中央には溝部48が形成されてい
る。締付部47の側面には傾斜面が形成されている。そ
して、切梁サポート20に取着された連結具25と、土
留めパネル41に取着された取付具43により連結装置
50を構成している。
Next, with reference to FIGS.
Will be described. The insertion hole 44 has a shape corresponding to the locking portion 25b of the connecting tool 25, and a circular guide portion 45 is provided so as to surround the insertion hole 44. On the inner side of the guide portion 45, a thin temporary fixing portion 46 is formed continuously in the circumferential direction to the insertion hole 44, and a thick tightening portion is provided at an intermediate position therebetween so as to be sandwiched by the temporary fixing portion 46. 47 are formed. A groove 48 is formed at the center of the fastening portion 47. An inclined surface is formed on a side surface of the fastening portion 47. The connection device 50 is constituted by the connection tool 25 attached to the cutting beam support 20 and the attachment tool 43 attached to the earth retaining panel 41.

【0022】つぎに、切梁サポート20を土留めパネル
41に連結装置50により連結する手順について図8〜
図10を参照して説明する。
Next, the procedure for connecting the cutting beam support 20 to the earth retaining panel 41 by the connecting device 50 will be described with reference to FIGS.
This will be described with reference to FIG.

【0023】(1)2枚の土留めパネル41,41を所
定の間隔に保持する。切梁サポート20は土留めパネル
41の両側に例えば各2本連結される。各切梁サポート
20について、それぞれハンドル29を回転操作してそ
の長さを、土留めパネル41,41の間隔に合わせる。
(1) The two retaining panels 41 are held at a predetermined interval. For example, two cutting beam supports 20 are connected to both sides of the earth retaining panel 41, respectively. For each of the beam supports 20, the handle 29 is rotated to adjust the length to the interval between the retaining panels 41, 41.

【0024】(2)切梁サポート20の連結具25の向
きを、土留めパネル41の取付具43の挿入孔44に合
わせ、係止部25bを挿入孔44に挿入する{図8
(a)参照}。係止部25bの外周部は、案内部45の
内面に嵌合される{図8(b)参照}。
(2) The orientation of the connecting member 25 of the cutting beam support 20 is aligned with the insertion hole 44 of the attachment 43 of the earth retaining panel 41, and the locking portion 25b is inserted into the insertion hole 44 {FIG.
See (a). The outer peripheral portion of the locking portion 25b is fitted to the inner surface of the guide portion 45 (see FIG. 8B).

【0025】(3)回転金具23を持って、係止部25
b及び外側パイプ21または内側パイプ22を約30度
回転させると{図9(a)参照}、係止部25bが仮留
め部46上に移動して、切梁サポート20が土留めパネ
ル41に仮留めされる{図9(b)参照}。
(3) Holding the rotating bracket 23, the locking portion 25
When the b and the outer pipe 21 or the inner pipe 22 are rotated by about 30 degrees (see FIG. 9A), the locking portion 25b moves onto the temporary fixing portion 46, and the cut beam support 20 is attached to the earth retaining panel 41. Temporarily fixed (see FIG. 9B).

【0026】この場合、仮留め部46の厚さは小であ
り、緩衝部材24はそれ程強く圧縮されていないので、
切梁サポート20の反対側の端部は、ある程度自由に動
き、位置が変え易くなるのである。
In this case, the thickness of the temporary fixing portion 46 is small, and the cushioning member 24 is not so strongly compressed.
The opposite end of the girder support 20 moves to some extent freely, and its position is easily changed.

【0027】(4)ついで反対側の連結具25に対して
も上記した(2),(3)の工程を繰り返し、土留めパ
ネル41を切梁サポート20により仮留めする。これら
の工程を全ての切梁サポート20の各端部について行
い、全部の切梁サポート20の両端部を仮留めする。
(4) Next, the steps (2) and (3) described above are repeated for the connecting member 25 on the opposite side, and the retaining panel 41 is temporarily fixed by the cutting beam support 20. These steps are performed for each end of all the beam supports 20, and both ends of all the beam supports 20 are temporarily fixed.

【0028】(5)そこで、切梁サポート20の各端部
について回転金具23を持って、係止部25b及び外側
パイプ21または内側パイプ22をさらに約60度回転
させると{図10(a)参照}、係止部25bが傾斜面
に沿って締付部47に乗り上げ、その先端が溝部48に
係止する{図10(b),(c)参照}。締付部47は
仮留め部46よりも厚さが大であるので、緩衝部材24
は強く圧縮されて、切梁サポート20が土留めパネル4
1に確実に固定される。
(5) Then, holding the rotating fitting 23 at each end of the cutting beam support 20, and further rotating the locking portion 25b and the outer pipe 21 or the inner pipe 22 by about 60 degrees {FIG. 10 (a) Referring to FIG. 10, the locking portion 25b rides on the fastening portion 47 along the inclined surface, and the tip thereof is locked in the groove portion 48 (see FIGS. 10B and 10C). Since the fastening portion 47 is thicker than the temporary fastening portion 46, the buffer member 24
Is strongly compressed, and the girder support 20 is
1 is securely fixed.

【0029】尚、切梁サポート20の他端部は、既に土
留めパネル41に仮留めされているので、移動すること
はない。また、係止部25bの外周部が案内部45の内
面に嵌合され密着されているので、軸部25aと挿入孔
44との間に隙間があっても、切梁サポート20が土留
めパネル41に対してずれることはない。
Since the other end of the beam support 20 is already temporarily fixed to the earth retaining panel 41, it does not move. Further, since the outer peripheral portion of the locking portion 25b is fitted and closely attached to the inner surface of the guide portion 45, even if there is a gap between the shaft portion 25a and the insertion hole 44, the cut beam support 20 can be used as the retaining panel. There is no deviation from 41.

【0030】(7)切梁サポート20を土留めパネル4
1から取り外す場合には、回転金具23を持って上述と
は反対方向に90度回転させると、係止部25bの向き
が挿入孔44と一致する。また、係止部25bは、案内
部45に嵌合されているので、係止部25bの中心は、
挿入孔44の中心と一致している。そこで、切梁サポー
ト20を引き抜けば、切梁サポート20を土留めパネル
41から取り外すことができる。
(7) Connect the beam support 20 to the retaining panel 4
When detaching from the bracket 1, if the user holds the rotating bracket 23 and rotates it 90 degrees in the direction opposite to the above, the direction of the locking portion 25 b matches the insertion hole 44. Further, since the locking portion 25b is fitted to the guide portion 45, the center of the locking portion 25b is
It matches the center of the insertion hole 44. Then, by pulling out the girder support 20, the girder support 20 can be removed from the retaining panel 41.

【0031】上記実施例によれば、つぎの効果を奏す
る。
According to the above embodiment, the following effects can be obtained.

【0032】(a)取付具43に案内部45を設け、係
止部25bの外周部を案内するようにしたので、連結具
25を回す作業が容易にできる。
(A) Since the guide portion 45 is provided on the mounting member 43 to guide the outer peripheral portion of the locking portion 25b, the operation of turning the connecting member 25 can be easily performed.

【0033】(b)取付具43に薄肉の仮留め部46を
形成したので、一方の端部を仮留めしたときに反対側の
切梁サポート20の端部がある程度自由に動くので、位
置調整がしやすく、2枚の土留めパネル41を容易に連
結することができる。
(B) Since the thin temporary fixing portion 46 is formed on the mounting member 43, when one end is temporarily fixed, the opposite end of the cutting beam support 20 moves to some extent freely, so that the position is adjusted. The two earth retaining panels 41 can be easily connected.

【0034】(c)係止部25bが案内部45に案内さ
れるので、連結具25の中心は常に挿入孔44に一致し
ており、回転金具23を90度回転させれば直ちに切梁
サポート20を取り外すことができて、切梁サポート2
0の取り外しが極めて容易にできる。
(C) Since the locking portion 25b is guided by the guide portion 45, the center of the connecting member 25 always coincides with the insertion hole 44. If the rotating metal member 23 is rotated 90 degrees, the cutting beam support is immediately performed. 20 can be removed and the girder support 2
0 can be removed very easily.

【0035】(d)切梁サポート20の土留めパネル4
1に対するずれを発生させないために、従来のように連
結具が挿入孔内に落ち込むことがないので、連結、分解
作業が一層容易になる。
(D) Retaining panel 4 of cutting beam support 20
In order not to cause the displacement with respect to 1, since the connecting tool does not fall into the insertion hole unlike the related art, the connecting and disassembling work is further facilitated.

【0036】(e)締付時に係止部25bの先端が溝部
48に係止するので、連結具25が円周方向にずれるこ
とがない。
(E) Since the tip of the locking portion 25b is locked in the groove 48 at the time of tightening, the connecting member 25 does not shift in the circumferential direction.

【0037】[0037]

【発明の効果】請求項1の発明は、開削工法等における
土留めパネルの圧力を支える切梁サポートの連結装置で
あって、切梁サポートに取着された連結具に軸部の外側
に突出するとともに端面の中央が高く両側に向けて後退
する係止部を設け、この連結具を土留めパネルの取付具
に挿入し該連結具を回動させることにより前記係止部を
前記取付具に圧接させて前記切梁サポートを土留めパネ
ルに連結する連結装置において、前記土留めパネルの取
付具を、前記連結具が挿入される挿入孔と、挿入された
連結具の外周部が嵌合する円形状の案内部と、前記挿入
孔に連続して円周方向に形成され、回動された前記連結
具の係止部が当接する仮留め部と、この仮留め部に連続
して円周方向に形成され該仮留め部よりも厚さが大であ
って前記係止部が圧接される締付部とから構成したの
で、全ての切梁サポートの両端を土留めパネルに仮留め
した後、締付作業ができるので、組立作業が容易にでき
るという効果を奏するものである。また、連結具の中心
が常に挿入孔の中心と一致しているので、連結具を所定
角度回転させれば、直ちに分解できるので、分解作業も
極めて容易にできるという効果を奏するものである。
According to the first aspect of the present invention, there is provided a connecting device for a girder support for supporting the pressure of an earth retaining panel in an open-cutting method or the like, wherein a connecting member attached to the girder support protrudes outside a shaft portion. And a locking portion in which the center of the end face is high and retreats toward both sides is provided, and the connecting portion is inserted into the mounting device of the earth retaining panel, and the connecting device is rotated to thereby connect the locking portion to the mounting device. In the connecting device for connecting the cut-off beam support to the retaining panel by press-contacting, a fitting of the retaining panel is fitted with an insertion hole into which the coupling is inserted and an outer peripheral portion of the inserted coupling. A circular guide portion, a temporary fixing portion formed in the circumferential direction continuously with the insertion hole, and abutting with the rotating locking portion of the connecting tool; Direction, the thickness is larger than the temporary fastening portion, and the locking portion is Since it is configured and a fastening portion to be contact, after fastening provisionally both ends of all Setsuhari support braced panel, since it is the tightening operation, in which an effect that assembling work can be easily. Further, since the center of the connector always coincides with the center of the insertion hole, if the connector is rotated by a predetermined angle, the connector can be disassembled immediately, so that the disassembling operation can be extremely easily performed.

【0038】請求項2の発明の締付部は、中央に係止部
の先端が係止する溝部が形成されているので、締付が確
実に行われ連結具が円周方向にずれることがないという
効果を奏するものである。
In the fastening portion of the second aspect of the present invention, a groove is formed at the center for locking the tip of the locking portion, so that the fastening is securely performed and the connecting tool is displaced in the circumferential direction. There is an effect that there is no.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 切梁サポートの縦断正面図である。FIG. 1 is a longitudinal sectional front view of a girder support.

【図2】 切梁サポートの横断平面図である。FIG. 2 is a cross-sectional plan view of a cutting beam support.

【図3】 土留めパネルを切梁サポートにより連結した
斜視図である。
FIG. 3 is a perspective view in which the retaining panels are connected by cutting beam supports.

【図4】 切梁サポートの端部の斜視図である。FIG. 4 is a perspective view of an end of a cutting beam support.

【図5】 土留めパネルの正面図である。FIG. 5 is a front view of the retaining panel.

【図6】 取付具の斜視図である。FIG. 6 is a perspective view of a fixture.

【図7】 図6における各破断線に沿った断面図であ
り、(a)はa線に沿った断面図、(b)はb線に沿っ
た断面図、(c)はc線に沿った断面図、(d)はd線
に沿った破断展開図である。
FIGS. 7A and 7B are cross-sectional views taken along each break line in FIG. 6, wherein FIG. 7A is a cross-sectional view taken along a line a, FIG. 7B is a cross-sectional view taken along a b line, and FIG. (D) is a cutaway development view along the d-line.

【図8】 土留めパネルを切梁サポートにより連結する
第1の工程を示す図であり、(a)は正面図、(b)は
一部を破断した側面図である。
FIGS. 8A and 8B are diagrams showing a first step of connecting the retaining panel with a cutting beam support, wherein FIG. 8A is a front view and FIG. 8B is a partially cutaway side view.

【図9】 第2の工程を示す図であり、(a)は正面
図、(b)はb線に沿った断面図である。
9A and 9B are diagrams showing a second step, in which FIG. 9A is a front view, and FIG. 9B is a cross-sectional view along line b.

【図10】 第3の工程を示す図であり、(a)は正面
図、(b)はb線に沿った断面図、(c)はc線に沿っ
た断面図である。
FIGS. 10A and 10B are diagrams showing a third step, in which FIG. 10A is a front view, FIG. 10B is a cross-sectional view along line b, and FIG. 10C is a cross-sectional view along line c.

【図11】 従来例における土留めパネルを切梁サポー
トにより連結する斜視図である。
FIG. 11 is a perspective view of connecting a retaining panel in a conventional example with a cutting beam support.

【図12】 土留めパネルを切梁サポートにより連結す
る第1の工程を示す図であり、(a)は縦断正面図、
(b)は横断平面図である。
FIG. 12 is a view showing a first step of connecting the earth retaining panel with a cutting beam support, wherein (a) is a longitudinal sectional front view,
(B) is a cross-sectional plan view.

【図13】 土留めパネルを切梁サポートにより連結す
る最終工程を示す図であり、(a)は縦断正面図、
(b)は横断平面図である。
13A and 13B are diagrams showing a final step of connecting the retaining panel with a cutting beam support, wherein FIG.
(B) is a cross-sectional plan view.

【符号の説明】[Explanation of symbols]

20 切梁サポート 25 連結具 25a軸部 25b係止部 41 土留めパネル 43 取付具 44 挿入孔 45 案内部 46 仮留め部 47 締付部 48 溝部 50 連結装置 Reference Signs List 20 cutting beam support 25 connecting tool 25a shaft section 25b locking section 41 earth retaining panel 43 mounting tool 44 insertion hole 45 guide section 46 temporary fixing section 47 fastening section 48 groove section 50 connecting device

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 開削工法等における土留めパネルの圧力
を支える切梁サポートの連結装置であって、 切梁サポートに取着された連結具に、軸部の外側に突出
するとともに端面の中央が高く両側に向けて後退する係
止部を設け、この連結具を土留めパネルの取付具に挿入
し該連結具を回動させることにより前記係止部を前記取
付具に圧接させて前記切梁サポートを土留めパネルに連
結する連結装置において、 前記土留めパネルの取付具を、 前記連結具が挿入される挿入孔と、 挿入された連結具の外周部が嵌合する円形状の案内部
と、 前記挿入孔に連続して円周方向に形成され、回動された
前記連結具の係止部が当接する仮留め部と、 この仮留め部に連続して円周方向に形成され該仮留め部
よりも厚さが大であって前記係止部が圧接される締付部
とから構成したことを特徴とする切梁サポートの連結装
置。
1. A connecting device for a girder support for supporting pressure of an earth retaining panel in an open-cutting method or the like, wherein a connecting tool attached to the girder support protrudes outside a shaft portion and has a center of an end face. A locking portion that retreats high toward both sides is provided, and the connecting member is inserted into a mounting member of a retaining panel, and the connecting member is rotated to press the locking portion against the mounting member, thereby forming the cutting beam. In a connection device for connecting a support to a retaining panel, a mounting tool for the retaining panel is provided with an insertion hole into which the coupling tool is inserted, and a circular guide portion into which an outer peripheral portion of the inserted coupling tool is fitted. A temporary fixing portion formed in the circumferential direction continuously with the insertion hole and contacting with the rotated locking portion of the connecting tool; and a temporary fixing portion formed in the circumferential direction continuously with the temporary fixing portion. Tightening in which the thickness is larger than the fastening portion and the locking portion is pressed against the fastening portion And a connecting device for the girder support.
【請求項2】 前記締付部は、中央に前記係止部の先端
が係止する溝部が形成されていることを特徴とする請求
項1記載の切梁サポートの連結装置。
2. The connecting device for a girder support according to claim 1, wherein the fastening portion is formed at the center thereof with a groove for locking the tip of the locking portion.
JP14169898A 1998-05-22 1998-05-22 Girder support coupling device Expired - Lifetime JP2920761B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14169898A JP2920761B1 (en) 1998-05-22 1998-05-22 Girder support coupling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14169898A JP2920761B1 (en) 1998-05-22 1998-05-22 Girder support coupling device

Publications (2)

Publication Number Publication Date
JP2920761B1 JP2920761B1 (en) 1999-07-19
JPH11336078A true JPH11336078A (en) 1999-12-07

Family

ID=15298137

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14169898A Expired - Lifetime JP2920761B1 (en) 1998-05-22 1998-05-22 Girder support coupling device

Country Status (1)

Country Link
JP (1) JP2920761B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000080652A (en) * 1998-06-22 2000-03-21 Nsp Corp Whirl-stop device for strut support
CN111441362A (en) * 2020-03-12 2020-07-24 中铁六局集团有限公司 Steel support hydraulic loading and angle adjusting device for irregular foundation pit

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114908763B (en) * 2022-03-19 2023-09-26 四川玖壹建设工程有限公司 Foundation pit temporary support structure capable of preventing foundation of adjacent building from deforming and construction method
CN115262581B (en) * 2022-08-26 2023-09-08 江苏环盛建设工程有限公司 Foundation pit supporting system using beam string

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000080652A (en) * 1998-06-22 2000-03-21 Nsp Corp Whirl-stop device for strut support
CN111441362A (en) * 2020-03-12 2020-07-24 中铁六局集团有限公司 Steel support hydraulic loading and angle adjusting device for irregular foundation pit

Also Published As

Publication number Publication date
JP2920761B1 (en) 1999-07-19

Similar Documents

Publication Publication Date Title
JP2001058290A (en) Jig for fitting flange at right angle to tube end part
JP2920761B1 (en) Girder support coupling device
JP3336430B2 (en) Vertical joints for steel pipe sheet piles
JP2007032159A (en) Connecting structure of steel plate concrete structural body
JP7190383B2 (en) Steel pipe connection structure
WO1998022694A1 (en) Jointing construction
JPH0425611A (en) Gap adjusting device
JPH11344012A (en) Joint structure
JPH02229339A (en) Rigid joining structure for column and beam
JP4190096B2 (en) Fixing structure of pipe support band
JP3146295B2 (en) Beam installation tool
JP7512549B2 (en) Method for fixing metal parts and fixing hardware
JPH07100563A (en) Clamping band for pipe joint and its production
JPH1051201A (en) Joint metallic fixture for waveguide with flange
JP2000035018A (en) Joint fitting for steel framed column and steel framed beam, and one-side bolt
JP4139875B2 (en) Cable receiving tube cutting device
JP3252160B2 (en) Detent device for girder support
JPH0518490A (en) Rubber cylinder fixing ring for connection of manhole branch pipe
JP3172676B2 (en) Concrete structure joint structure
JP4521069B2 (en) Rod connector
JP3141788B2 (en) Piping cover
JP3947724B2 (en) Method of fixing steel sheet pile in protective fence and steel sheet pile fixing tool
JP2006118306A (en) Construction method of shield tunnel, and bent bolt joint for use in the method
JP3497696B2 (en) Split unit structure of pipe propulsion tip device
JPH08105209A (en) Position adjuster of both connection and intermediate beams of steel building

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080430

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110430

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140430

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term