JPH11259128A - Load monitoring and control system - Google Patents

Load monitoring and control system

Info

Publication number
JPH11259128A
JPH11259128A JP5633998A JP5633998A JPH11259128A JP H11259128 A JPH11259128 A JP H11259128A JP 5633998 A JP5633998 A JP 5633998A JP 5633998 A JP5633998 A JP 5633998A JP H11259128 A JPH11259128 A JP H11259128A
Authority
JP
Japan
Prior art keywords
control
load
data
terminal
storage means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP5633998A
Other languages
Japanese (ja)
Inventor
Yasumasa Hashimoto
育昌 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP5633998A priority Critical patent/JPH11259128A/en
Publication of JPH11259128A publication Critical patent/JPH11259128A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/40Control techniques providing energy savings, e.g. smart controller or presence detection

Landscapes

  • Circuit Arrangement For Electric Light Sources In General (AREA)
  • Alarm Systems (AREA)
  • Small-Scale Networks (AREA)
  • Selective Calling Equipment (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a load monitoring and control system capable of automati cally discriminating abnormality in the control of a load equipment by previous ly storing various data related to the control of the load equipment and easily reading out these data in the maintenance/inspection of the system. SOLUTION: A load controller 1 is provided with an operation data storing means 14A for storing operation data transmitted from a load operation terminal equipment 2, a controlled result data storing means 14B for storing controlled result data returned from the equipment 3 at the time of completing the control of a load equipment 4, a comparing/discriminating means 11 for mutually comparing/discriminating data stored in respective means 14A, 14B, and a control abnormality data storing means 14C for storing control abnormality data when the operation data of the same load controlling terminal equipment compared/discriminated by the means 11 does not correctly correspond to the controlled result data.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ビル等における照
明機器や空調機器の制御等に好適に使用される負荷監視
制御システムの改良に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement of a load monitoring control system suitably used for controlling lighting equipment and air conditioning equipment in a building or the like.

【0002】[0002]

【従来の技術】近時、ビル等において、照明機器や空調
機器などの負荷機器を制御するために、負荷監視制御シ
ステムが広く使用されてきている。このシステムでは、
図7に示すように、負荷制御装置100には、多重伝送
線L1を介して、負荷操作端末器200と複数の負荷制
御端末器300とが接続されており、負荷制御端末器3
00には、照明機器や空調機器などの負荷機器400が
接続され、それぞれ固有のアドレスが割り付けられてい
る。
2. Description of the Related Art Recently, load monitoring and control systems have been widely used in buildings and the like to control load devices such as lighting devices and air conditioners. In this system,
As shown in FIG. 7, a load operation terminal 200 and a plurality of load control terminals 300 are connected to the load control device 100 via a multiplex transmission line L1.
A load device 400 such as a lighting device or an air conditioner is connected to 00, and a unique address is assigned to each.

【0003】ここに、負荷制御装置100は、データ処
理を行うメインCPU101、伝送信号の監視制御処理
を行うサブCPU102、伝送線への送信、受信を行う
伝送ドライバ/レシーバ103、処理プログラムやデー
タ処理結果を記憶する記憶部104を備えており、これ
らはCPUバス105を介して接続されている。また、
負荷操作端末器200には、それぞれの負荷制御端末器
300に対応したスイッチ201,201が設けられて
おり、操作者がいずれかのスイッチ201,201を操
作すれば、そのスイッチに対応した負荷制御端末器30
0のアドレスを指定した操作データが、多重伝送線L
1、伝送ドライバ/レシーバ103を介して、負荷制御
装置100のサブCPU102に送信される。
The load control device 100 includes a main CPU 101 for performing data processing, a sub-CPU 102 for monitoring and controlling transmission signals, a transmission driver / receiver 103 for transmitting and receiving signals to and from a transmission line, a processing program and data processing. A storage unit 104 for storing results is provided, and these are connected via a CPU bus 105. Also,
The load operation terminal 200 is provided with switches 201, 201 corresponding to the respective load control terminals 300. When an operator operates any of the switches 201, 201, the load control corresponding to the switch is performed. Terminal 30
The operation data designating the address 0 is the multiplex transmission line L
1. The data is transmitted to the sub CPU 102 of the load control device 100 via the transmission driver / receiver 103.

【0004】サブCPU102は、操作データを受信す
れば、この操作データによって指定された負荷制御端末
器300を制御するための制御データを生成し、伝送ド
ライバ/レシーバ103、多重伝送線L1を介して、そ
の制御データを対応した負荷制御端末器300に送信す
るので、制御データを受信した負荷制御端末器300で
は、この制御データに従って負荷機器400を制御し、
制御が完了すれば制御結果データを多重伝送線L1、伝
送ドライバ/レシーバ103を介して、サブCPU10
2に返信し、その後、サブCPU102は、この制御結
果データを確認後、クリアする。
[0004] Upon receiving the operation data, the sub CPU 102 generates control data for controlling the load control terminal 300 specified by the operation data, and transmits the control data via the transmission driver / receiver 103 and the multiplex transmission line L1. Since the control data is transmitted to the corresponding load control terminal 300, the load control terminal 300 receiving the control data controls the load device 400 according to the control data,
When the control is completed, the control result data is transmitted to the sub CPU 10 via the multiplex transmission line L1 and the transmission driver / receiver 103.
Then, the sub CPU 102 confirms this control result data and clears it.

【0005】[0005]

【発明が解決しようとする課題】このような負荷監視制
御システムにおいては、付近に設置された機器から発生
する電気的ノイズが、多重伝送線に重畳したり、多重伝
送線の接続異常などが原因となって、負荷機器の制御異
常が発生することがよくある。しかしながら、上記従来
の負荷監視制御システムでは、負荷機器の制御異常が発
生した際における操作データや、制御結果データは負荷
制御装置で管理されていないため、オペレーターがシス
テムの保守点検時などにおいて、これらのデータを参照
して、早期に制御異常の原因を解析したり、制御異常の
発生を防止するための対策が実施できていないのが現状
である。
In such a load monitoring and control system, electrical noise generated from equipment installed in the vicinity may be superimposed on the multiplex transmission line or may be caused by abnormal connection of the multiplex transmission line. As a result, a control abnormality of the load device often occurs. However, in the above-described conventional load monitoring and control system, operation data and control result data when a load device control abnormality occurs are not managed by the load control device. At present, it is impossible to analyze the cause of the control abnormality at an early stage by referring to the above data, and to take measures for preventing the occurrence of the control abnormality.

【0006】本発明は、上記事情に鑑みて提案されるも
ので、負荷制御装置側に、負荷操作端末器から送出され
て来る操作データ、負荷機器の制御を完了した後、負荷
制御端末器から返信されて来る制御結果データを記憶
し、これらの間で一致、不一致を判別して、不一致な対
応が検出されたときには、制御異常データとして記憶す
ることの出来る負荷監視制御システムを提供することに
よって、システムの保守点検時やトラブルを生じたとき
などに、容易にこれらのデータを読み出し、異常原因を
解析することが出来る負荷監視制御システムを提供する
ことを目的としている。
[0006] The present invention is proposed in view of the above circumstances. After the operation data transmitted from the load operation terminal and the control of the load device are completed, the load control terminal transmits the operation to the load control device. By storing the returned control result data, determining a match or mismatch between them, and providing a load monitoring control system capable of storing as a control abnormal data when a mismatch is detected, It is an object of the present invention to provide a load monitoring and control system that can easily read out these data and analyze the cause of an abnormality at the time of system maintenance and inspection or when a trouble occurs.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、請求項1に記載の負荷監視制御システムでは、負荷
制御装置に、多重伝送線を介して、負荷機器を接続した
負荷制御端末器と、負荷操作端末器とを接続し、負荷操
作端末器の操作を負荷制御装置で監視して、負荷制御端
末器に接続された負荷機器を制御する構成とした負荷制
御システムにおいて、負荷制御装置は、負荷操作端末器
より送信されてくる操作データを記憶する操作データ記
憶手段と、負荷機器の制御が完了したときに、上記負荷
制御端末器より返信されてくる制御結果データを記憶す
る制御結果データ記憶手段と、操作データ記憶手段、制
御結果データ記憶手段のそれぞれに記憶されたデータを
比較判別する比較判別手段と、この比較判別手段によっ
て、同一の負荷制御端末器に対して比較判別された操作
データと制御結果データとが正しく対応していないとき
に、制御異常データを記憶する制御異常データ記憶手段
とを設けた構成としている。
According to a first aspect of the present invention, there is provided a load monitoring and control system, comprising: a load control device having a load control device connected to a load device via a multiplex transmission line; And a load control terminal connected to the load control terminal, the operation of the load control terminal is monitored by the load control device, and the load control system is configured to control the load device connected to the load control terminal. Is operation data storage means for storing operation data transmitted from the load operation terminal, and a control result for storing control result data returned from the load control terminal when the control of the load device is completed. The same load control is performed by the data storage means, the comparison determination means for comparing and determining the data stored in the operation data storage means and the data stored in the control result data storage means, respectively. When the control result data and comparing the determined operation data to the terminal device does not correspond correctly or has a configuration in which a control abnormality data storage means for storing control abnormal data.

【0008】ここに、操作データ記憶手段と、制御結果
データ記憶手段と、制御異常データ記憶手段は、記憶部
を構成するRAMの一部を分割して構成している。ま
た、これらのデータ記憶手段は、1つのリングバッファ
を複数のメモリボックスに区分して構成してもよい。請
求項2に記載の負荷監視制御システムでは、負荷制御装
置は、計時手段を設けており、負荷操作端末器から送信
されて来た操作データに、そのときの時刻データを付加
させて、操作データ記憶手段に記憶させる構成としてい
る。
Here, the operation data storage means, the control result data storage means, and the control abnormal data storage means are configured by dividing a part of the RAM constituting the storage section. Further, these data storage means may be configured by dividing one ring buffer into a plurality of memory boxes. 3. The load monitoring and control system according to claim 2, wherein the load control device includes a timing unit, and adds the time data at that time to the operation data transmitted from the load operation terminal device. It is configured to be stored in the storage means.

【0009】請求項3に記載の負荷監視制御システムで
は、負荷制御装置は、計時手段を設けており、いずれか
の負荷制御端末器から、制御完了を示す制御結果データ
を受けたときには、その制御結果データに、そのときの
時刻データを付加させて、制御結果データ記憶手段に記
憶させる構成としている。請求項4に記載の負荷監視制
御システムでは、負荷制御装置は、所定の操作がなされ
たときには、操作データ記憶手段、制御結果データ記憶
手段、制御異常データ記憶手段に記憶されたデータ内容
を選択的に表示および/又は記録する記録表示手段を更
に設けた構成としている。
In the load monitoring control system according to the third aspect, the load control device is provided with a time measuring means, and when receiving control result data indicating control completion from any one of the load control terminals, the control is performed. The time data at that time is added to the result data, and the result data is stored in the control result data storage means. In the load monitoring and control system according to the fourth aspect, when a predetermined operation is performed, the load control device selectively selects the data contents stored in the operation data storage unit, the control result data storage unit, and the control abnormal data storage unit. And / or recording and displaying means for displaying and / or recording.

【0010】請求項5に記載の負荷監視制御システムで
は、負荷制御装置は、外部装置よりデータ転送要求を受
けたときには、操作データ、制御結果データ、制御異常
データのうち、少なくとも1以上のデータを外部装置に
転送する通信手段を更に設けた構成としている。ここ
に、外部装置として、パーソナルコンピュータなどのデ
ータ伝送機能を有した装置が適用でき、データ伝送路と
して公衆回線を利用、あるいはデータ伝送線を利用、更
に赤外線や電波信号などのワイヤレス方式を利用してデ
ータ伝送を行うことができる。
In the load monitoring control system according to the present invention, when the load control device receives a data transfer request from an external device, the load control device transmits at least one of the operation data, the control result data, and the control abnormality data. Communication means for transferring the data to an external device is further provided. Here, as the external device, a device having a data transmission function such as a personal computer can be applied, and a public line or a data transmission line is used as a data transmission line, and a wireless system such as an infrared ray or a radio signal is used. Data transmission.

【0011】請求項6に記載の負荷監視制御システムで
は、負荷機器が照明器具であり、上記負荷操作端末器が
照明スイッチとして構成されている。
In the load monitoring control system according to the present invention, the load device is a lighting fixture, and the load operation terminal is configured as a lighting switch.

【0012】[0012]

【発明の実施の形態】以下に、本発明の実施の形態につ
いて、図面を用いて説明する。図1は、本発明の負荷監
視制御システムの構成の一例を示すシステム構成図であ
る。この例では、負荷制御装置1には、多重伝送線L1
を介して、負荷操作端末器2と、複数の負荷制御端末器
3とが接続されており、負荷制御端末器3には、照明機
器や空調機器などの負荷機器4が接続され、それぞれ固
有のアドレスが割り付けられている。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a system configuration diagram showing an example of the configuration of the load monitoring control system of the present invention. In this example, the load control device 1 includes a multiplex transmission line L1
, A load operation terminal 2 and a plurality of load control terminals 3 are connected, and the load control terminal 3 is connected to load devices 4 such as lighting devices and air conditioning devices, each of which has its own unique device. Address is assigned.

【0013】ここに、負荷制御装置1は、データ処理を
行い各部を制御するメインCPU11、多重伝送線L1
を介して、負荷制御端末器3との間で各種データの送受
信の制御を行うサブCPU12、多重伝送線L1を介し
て各種データを送受信するための伝送ドライバ/レシー
バ13、RAMやROMなどで構成され、負荷制御装置
1が動作するのに必要な各種プログラムなどを記憶する
記憶部14を、CPUバス15で接続した構成になって
おり、比較判別手段はメインCPU11によって構成さ
れ、操作データ記憶手段、制御結果データ記憶手段、制
御異常データ記憶手段は、記憶部14を構成するRAM
の一部を分割し、データバッファとして構成されてい
る。
Here, the load control device 1 includes a main CPU 11 which performs data processing and controls each unit, and a multiplex transmission line L1.
, A sub-CPU 12 for controlling transmission and reception of various data to and from the load control terminal 3, a transmission driver / receiver 13 for transmitting and receiving various data via the multiplex transmission line L1, a RAM and a ROM, etc. A storage unit 14 for storing various programs necessary for the operation of the load control device 1 is connected by a CPU bus 15. The comparison and determination unit is configured by the main CPU 11, and the operation data storage unit. The control result data storage means and the control abnormality data storage means
Is divided and configured as a data buffer.

【0014】なお、これらのデータバッファは、リング
バッファを用いて構成できるが、1つのリングバッファ
を複数のメモリボックスに区分して構成することもでき
る。また、負荷制御装置1は、計時手段を構成する時計
部16、プリンタなどで構成される記録部17、LCD
や各種スイッチ手段などで構成される表示操作部18を
備えている。
Although these data buffers can be configured using a ring buffer, a single ring buffer can also be configured by being divided into a plurality of memory boxes. Further, the load control device 1 includes a clock unit 16 that constitutes a clock unit, a recording unit 17 that includes a printer,
And a display operation unit 18 including various switch means.

【0015】なお、記録部17と表示操作部18は、本
発明の記録表示手段を構成し、表示操作部18の操作に
よって選択された操作データ,制御結果データ,制御異
常データを、記録紙などに印字出力したり、LCDなど
に表示できるようになっている。また、19は本発明の
通信手段を構成する通信部で、データ伝送線L2を介し
て、パーソナルコンピュータなどの外部装置に接続され
ており、オペレーターが外部装置より所定のコマンドを
用いて、データを選択し要求コマンドを送れば、負荷制
御装置1は、データ伝送線L2を介して、記憶部14に
記憶された操作データ,制御結果データ,制御異常デー
タを転送する。
The recording section 17 and the display / operation section 18 constitute recording / display means of the present invention, and the operation data, control result data, and control abnormal data selected by the operation of the display / operation section 18 are recorded on recording paper or the like. It can be printed out or displayed on an LCD or the like. Reference numeral 19 denotes a communication unit constituting communication means of the present invention, which is connected to an external device such as a personal computer via a data transmission line L2, and allows an operator to transmit data using a predetermined command from the external device. When the selected command is transmitted, the load control device 1 transfers the operation data, control result data, and control abnormal data stored in the storage unit 14 via the data transmission line L2.

【0016】なお、この例では、通信部19と外部装置
とをデータ伝送線L2で接続して、このデータ伝送線L
2を介して、データを転送する構成について示している
が、本発明はこれに限られず、公衆回線を介して転送、
あるいは赤外線や電波信号などでワイヤレス転送する構
成にしてもよい。一方の負荷操作端末器2には、それぞ
れの負荷制御端末器3に対応して、複数のスイッチ手段
21,21が設けられており、操作者がスイッチ手段2
1,21を操作すれば、対応する負荷制御端末器3のア
ドレスを指定した操作データが多重伝送線L1を介して
制御監視装置1に送信される。
In this example, the communication unit 19 and the external device are connected by a data transmission line L2, and the data transmission line L2
2 shows a configuration for transferring data, the present invention is not limited to this.
Alternatively, a configuration may be adopted in which wireless transfer is performed using infrared rays, radio signals, or the like. One load operation terminal 2 is provided with a plurality of switch means 21 and 21 corresponding to each load control terminal 3, and the operator operates the switch means 2.
By operating the terminals 1 and 21, the operation data specifying the address of the corresponding load control terminal 3 is transmitted to the control and monitoring device 1 via the multiplex transmission line L1.

【0017】以下、負荷監視制御システムの動作につい
て説明する。図2は、本発明の負荷制御監視システムの
基本動作を示すフローチャートである。(ステップ10
0〜112)。まず、操作者が負荷操作端末器2を操作
すれば、負荷操作端末器2は、対応する負荷制御端末器
3のアドレスを指定した操作データを、多重伝送線L1
に送信し(100)、負荷制御装置1のサブCPU12
は、伝送ドライバ/レシーバ13を介して、この操作デ
ータを受信する(101)。
Hereinafter, the operation of the load monitoring and control system will be described. FIG. 2 is a flowchart showing the basic operation of the load control monitoring system of the present invention. (Step 10
0-112). First, when the operator operates the load operation terminal 2, the load operation terminal 2 transmits the operation data specifying the address of the corresponding load control terminal 3 to the multiplex transmission line L1.
To the sub CPU 12 of the load control device 1 (100).
Receives the operation data via the transmission driver / receiver 13 (101).

【0018】この操作データは、図3に示すように、デ
ータを識別するための連番と、負荷制御端末器3のアド
レスと、負荷機器4の制御内容とで構成されている。こ
こで、連番とは、負荷操作端末器3を操作した順番を示
している。図中では、連番として「00AF」、アドレ
スとして「0F」、制御内容として「A0」がそれぞれ
16進数を用いて示されている。
As shown in FIG. 3, the operation data includes a serial number for identifying the data, the address of the load control terminal 3, and the control content of the load device 4. Here, the serial number indicates the order in which the load operation terminals 3 were operated. In the drawing, “00AF” is shown as a serial number, “0F” as an address, and “A0” as a control content using hexadecimal numbers.

【0019】サブCPU12は、操作データを受信する
と、受信した操作データをメインCPU11に転送する
(102)。すると、メインCPU11は、時計部16
より時刻データを読み出して、時刻データを転送された
操作データに付加して操作データバッファ14Aに格納
する(103)。図4には、操作データバッファ14A
に記憶された、時刻データと操作データとが示されてい
る。
When receiving the operation data, the sub CPU 12 transfers the received operation data to the main CPU 11 (102). Then, the main CPU 11 sets the clock 16
The time data is read out, added to the transferred operation data, and stored in the operation data buffer 14A (103). FIG. 4 shows the operation data buffer 14A.
, The time data and the operation data stored therein are shown.

【0020】図中では、時刻データとして、「1028
0120」が示されており、負荷操作端末器2が操作さ
れた日時が、「10月28日1時20分」であることを
表している。次に、サブCPU12は、負荷操作端末器
2から受信した操作データを解読し、予め記憶部14に
準備された制御テーブルを参照するなどして、その操作
データが指定する負荷制御端末器3を制御するための制
御データ(制御コマンド)を生成し、伝送ドライバ/レ
シーバ13を介して、多重伝送線L1に送信する(10
4)。
In the figure, "1028" is used as time data.
“0120” is shown, indicating that the date and time when the load operation terminal device 2 was operated is “October 28, 1:20”. Next, the sub CPU 12 decodes the operation data received from the load operation terminal 2 and refers to the control table prepared in the storage unit 14 in advance to change the load control terminal 3 designated by the operation data. Control data (control command) for control is generated and transmitted to the multiplex transmission line L1 via the transmission driver / receiver 13 (10).
4).

【0021】これに対して、制御データを受信した負荷
制御端末器3では、制御データを解読して、指定された
負荷機器4を制御し(105)、負荷機器4を制御した
後、制御結果データを多重伝送線L1に返信し(10
6)、負荷制御装置1のサブCPU12は、伝送ドライ
バ/レシーバ13を介して、この制御結果データを受信
する(107)。
On the other hand, the load control terminal 3 receiving the control data decodes the control data, controls the specified load device 4 (105), controls the load device 4, and returns the control result. The data is returned to the multiplex transmission line L1 (10
6), the sub CPU 12 of the load control device 1 receives the control result data via the transmission driver / receiver 13 (107).

【0022】この制御結果データは、制御完了を通知す
るもので、図5に示すように、負荷操作端末器2を操作
した連番と、負荷制御端末器3のアドレスと、負荷機器
4の制御結果とで構成されている。なお、図中では、連
番として「00AF」、アドレスとして「0F」、制御
結果として「A0」がそれぞれ16進数を用いて示され
ている。
The control result data notifies the completion of the control. As shown in FIG. 5, the serial number for operating the load operation terminal 2, the address of the load control terminal 3, the control of the load The result is composed of: In the drawing, “00AF” is used as a serial number, “0F” is used as an address, and “A0” is used as a control result, using hexadecimal numbers.

【0023】負荷制御端末器3から制御結果データを受
信した負荷制御装置1のサブCPU12は、制御結果デ
ータをメインCPU11に転送する(108)。する
と、メインCPU11は、時計部16より時刻データを
読み出し、時刻データを転送された制御結果データに付
加して、制御結果データバッファ14Bに格納する(1
09)。
The sub CPU 12 of the load control device 1 having received the control result data from the load control terminal 3 transfers the control result data to the main CPU 11 (108). Then, the main CPU 11 reads the time data from the clock unit 16, adds the time data to the transferred control result data, and stores it in the control result data buffer 14B (1).
09).

【0024】図6には、制御結果データバッファ14A
に記憶された、時刻データと制御結果データとが示され
ている。図中には、時刻データとして、「102801
20」が示されており、負荷機器4が制御された日時
が、「10月28日1時20分」であることを表してい
る。
FIG. 6 shows a control result data buffer 14A.
2 shows the time data and the control result data stored in FIG. In the figure, “102801” is used as time data.
20 "is shown, indicating that the date and time when the load device 4 was controlled is" October 28, 1:20 ".

【0025】続いて、メインCPU11は、操作データ
バッファ14Aと制御結果データバッファ14Bから、
同一連番の操作データと制御結果データとを読みだし、
操作データに含まれる制御内容と、制御結果データに含
まれる制御結果とを比較することによって、誤りなく制
御が行われているかどうかを判別する。(110)メイ
ンCPU11による比較の結果、制御が正常に行われた
ことが確認された場合には、メインCPU11は、操作
データと制御結果データをクリア、あるいは残してお
き、制御異常と判別された場合には、メインCPU11
は、制御異常データを生成して、制御異常データを制御
異常データバッファ14Cに格納する。(111,11
2)
Subsequently, the main CPU 11 outputs the data from the operation data buffer 14A and the control result data buffer 14B.
Read operation data and control result data of the same serial number,
By comparing the control content included in the operation data with the control result included in the control result data, it is determined whether the control is performed without error. (110) As a result of the comparison by the main CPU 11, when it is confirmed that the control is performed normally, the main CPU 11 clears or leaves the operation data and the control result data, and determines that the control is abnormal. In the case, the main CPU 11
Generates control abnormal data and stores the control abnormal data in the control abnormal data buffer 14C. (111, 11
2)

【0026】[0026]

【発明の効果】以上の説明から理解できるように、請求
項1に記載の負荷監視制御システムでは、負荷制御装置
は、操作データ記憶手段、制御結果データ記憶手段、制
御異常を判別するデータ比較手段、制御異常データ記憶
手段を設けているので、負荷制御装置側では、負荷操作
端末器を操作する毎に、対応した負荷機器が正しく制御
されたかどうかを判断し、制御異常を生じた場合には、
制御異常データを記憶するので、システムにトラブルが
生じたときや、保守点検時などにおいて、オペレーター
がこれらのデータを読み出すことによって、負荷機器の
制御異常の原因などを容易に解析することができる。
As can be understood from the above description, in the load monitoring and control system according to the first aspect, the load control device includes an operation data storage unit, a control result data storage unit, and a data comparison unit for determining a control abnormality. Since the control abnormality data storage means is provided, the load control device determines whether or not the corresponding load device is correctly controlled every time the load operation terminal is operated, and when a control abnormality occurs, ,
Since the control abnormality data is stored, the operator can easily analyze the cause of the control abnormality of the load device by reading the data when a trouble occurs in the system or during maintenance and inspection.

【0027】請求項2,3に記載の負荷監視制御システ
ムでは、負荷制御装置は、負荷操作端末器から操作デー
タを受信した実時刻や、負荷制御端末器から制御結果デ
ータが送信されてきた実時刻を確認することができる。
また、実時刻は、負荷制御装置のメインCPU側で、そ
れぞれ、操作データと制御結果データに付加されるの
で、負荷操作端末器側および負荷制御端末器側で実時刻
を付加させる必要がないので、負荷操作端末器および負
荷制御端末器は、従来の構成のものが使用できる。
[0027] In the load monitoring and control system according to the second and third aspects, the load control device may control the actual time when the operation data is received from the load operation terminal or the actual time when the control result data is transmitted from the load control terminal. You can check the time.
Also, since the real time is added to the operation data and the control result data on the main CPU side of the load control device, it is not necessary to add the real time on the load operation terminal side and the load control terminal side. As the load operation terminal and the load control terminal, those having conventional configurations can be used.

【0028】請求項4に記載の負荷監視制御システムで
は、負荷制御装置は、所定の操作がなされたときには、
操作データ、制御結果データ、制御異常データに記憶さ
れたデータ内容を選択的に表示および/又は記録する記
録表示手段を設けているので、オペレーターがシステム
の保守点検時などにおいて、これらのデータ内容を、表
示部に表示したり、記録紙に印字するなどして、容易に
確認できる。
[0028] In the load monitoring and control system according to the fourth aspect, the load control device, when a predetermined operation is performed,
Record display means for selectively displaying and / or recording the data contents stored in the operation data, the control result data, and the control abnormality data is provided. It can be easily confirmed by displaying it on a display unit or printing it on recording paper.

【0029】請求項5に記載の負荷監視制御システムで
は、負荷制御装置は、外部装置よりデータ転送要求を受
けたときには、操作データ、制御結果データ、制御異常
データのうち、少なくともそのいずれか1以上のデータ
を外部装置に転送する通信手段を設けているので、オペ
レーターが、負荷制御装置から離れたところからでも、
これらのデータ内容を確認することができ、利便性がよ
い。
In the load monitoring control system according to the fifth aspect, when the load control device receives a data transfer request from an external device, at least one of operation data, control result data, and control abnormality data is provided. Communication means to transfer the data from the external device to the external device, even if the operator is away from the load control device,
These data contents can be confirmed, which is convenient.

【0030】請求項6に記載の負荷監視制御システムで
は、負荷機器が照明器具であり、負荷操作端末器が照明
スイッチとして構成されているので、本発明の効果を発
揮する照明監視制御システムを提供することができる。
In the load monitoring control system according to the sixth aspect, the load equipment is a lighting fixture, and the load operation terminal is configured as a lighting switch, so that a lighting monitoring control system exhibiting the effects of the present invention is provided. can do.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の負荷監視制御システムの構成の一例を
示すシステム構成図である。
FIG. 1 is a system configuration diagram showing an example of a configuration of a load monitoring control system of the present invention.

【図2】本発明の負荷監視制御システムの基本動作を示
すフローチャートである。
FIG. 2 is a flowchart showing a basic operation of the load monitoring control system of the present invention.

【図3】操作データの一例を示す図である。FIG. 3 is a diagram illustrating an example of operation data.

【図4】時刻データを付加した操作データの一例を示す
図である。
FIG. 4 is a diagram showing an example of operation data to which time data is added.

【図5】制御結果データの一例を示す図である。FIG. 5 is a diagram illustrating an example of control result data.

【図6】時刻データを付加した制御結果データの一例を
示す図である。
FIG. 6 is a diagram illustrating an example of control result data to which time data is added.

【図7】従来の負荷監視制御システムを示すシステム構
成図である。
FIG. 7 is a system configuration diagram showing a conventional load monitoring and control system.

【符号の説明】[Explanation of symbols]

1・・・負荷制御装置 2・・・負荷操作端末器 3・・・負荷制御端末器 4・・・負荷機器 11・・・メインCPU 14・・・記憶部 14A・・・操作データ記憶手段 14B・・・制御結果データ記憶手段 14C・・・制御異常データ記憶手段 16・・・時計部 17・・・記録部 18・・・表示操作部 19・・・通信部 L1・・・多重伝送線 DESCRIPTION OF SYMBOLS 1 ... Load control device 2 ... Load operation terminal device 3 ... Load control terminal device 4 ... Load device 11 ... Main CPU 14 ... Storage part 14A ... Operation data storage means 14B ... control result data storage means 14C ... control abnormal data storage means 16 ... clock section 17 ... recording section 18 ... display operation section 19 ... communication section L1 ... multiplex transmission line

フロントページの続き (51)Int.Cl.6 識別記号 FI H04Q 9/02 H05B 37/02 G H05B 37/02 H04L 11/00 310D Continued on the front page (51) Int.Cl. 6 Identification code FI H04Q 9/02 H05B 37/02 G H05B 37/02 H04L 11/00 310D

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】負荷制御装置に、多重伝送線を介して、負
荷機器を接続した負荷制御端末器と、負荷操作端末器と
を接続し、負荷操作端末器の操作を上記負荷制御装置で
監視して、上記負荷制御端末器に接続された負荷機器を
制御する構成とした負荷監視制御システムにおいて、 上記負荷制御装置は、上記負荷操作端末器より送信され
てくる操作データを記憶する操作データ記憶手段と、 上記負荷機器の制御が完了したときに、上記負荷制御端
末器より返信されてくる制御結果データを記憶する制御
結果データ記憶手段と、 上記操作データ記憶手段、上記制御結果データ記憶手段
のそれぞれに記憶され、対応したデータを比較判別する
比較判別手段と、 この比較判別手段によって、同一の負荷制御端末器に対
して比較判別された操作データと制御結果データとが正
しく対応していないときに、制御異常データを記憶する
制御異常データ記憶手段とを設けた構成としている負荷
監視制御システム。
A load control terminal connected to a load control device via a multiplex transmission line and a load control terminal, and operation of the load control terminal is monitored by the load control device. And a load monitoring control system configured to control a load device connected to the load control terminal, wherein the load control device stores operation data transmitted from the load operation terminal. Means, control result data storage means for storing control result data returned from the load control terminal device when control of the load device is completed, and operation data storage means, control result data storage means. A comparison discriminating means for comparing and discriminating the corresponding data stored in each of them; and an operation data which is compared and discriminated against the same load control terminal by the comparison discriminating means. A load monitoring and control system having a control abnormal data storage unit for storing control abnormal data when the control result data does not correspond correctly.
【請求項2】請求項1において、 上記負荷制御装置は、計時手段を設けており、 上記負荷操作端末器から送信されてくる操作データに、
そのときの時刻データを付加させて、上記操作データ記
憶手段に記憶させる構成としている負荷監視制御システ
ム。
2. The load control device according to claim 1, wherein the load control device includes a timing unit, and the operation data transmitted from the load operation terminal device includes:
A load monitoring control system configured to add time data at that time and store the data in the operation data storage means.
【請求項3】請求項1において、 上記負荷制御装置は、計時手段を設けており、 いずれかの負荷制御端末器から、制御完了を示す制御結
果データを受けたときには、その制御結果データに、そ
のときの時刻データを付加させて、上記制御結果データ
記憶手段に記憶させる構成としている負荷監視制御シス
テム。
3. The load control device according to claim 1, wherein the load control device includes a timing unit. When control result data indicating control completion is received from one of the load control terminals, the control result data is included in the load control device. A load monitoring control system configured to add time data at that time and store the data in the control result data storage means.
【請求項4】請求項1〜3のいずれかにおいて、 上記負荷制御装置は、所定の操作がなされたときには、
上記操作データ記憶手段、上記制御結果データ記憶手
段、上記制御異常データ記憶手段に記憶されたデータ内
容を選択的に表示および/又は記録する記録表示手段を
更に設けた構成としている負荷監視制御システム。
4. The load control device according to claim 1, wherein when a predetermined operation is performed,
A load monitoring control system further comprising a record display means for selectively displaying and / or recording data contents stored in the operation data storage means, the control result data storage means, and the control abnormal data storage means.
【請求項5】請求項1〜4のいずれかにおいて、 上記負荷制御装置は、外部装置よりデータ転送要求を受
けたときには、上記操作データ、上記制御結果データ、
上記制御異常データのうち、少なくとも1以上のデータ
を上記外部装置に転送する通信手段を更に設けた構成と
している負荷監視制御システム。
5. The load control device according to claim 1, wherein the load control device receives the operation data, the control result data, and the control data when receiving a data transfer request from an external device.
A load monitoring and control system further comprising a communication unit for transferring at least one of the control abnormal data to the external device.
【請求項6】請求項1〜5のいずれかにおいて、 上記負荷機器が照明器具であり、上記負荷操作端末器が
照明スイッチとして構成されている負荷監視制御システ
ム。
6. The load monitoring and control system according to claim 1, wherein the load device is a lighting device, and the load operation terminal device is configured as a lighting switch.
JP5633998A 1998-03-09 1998-03-09 Load monitoring and control system Withdrawn JPH11259128A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5633998A JPH11259128A (en) 1998-03-09 1998-03-09 Load monitoring and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5633998A JPH11259128A (en) 1998-03-09 1998-03-09 Load monitoring and control system

Publications (1)

Publication Number Publication Date
JPH11259128A true JPH11259128A (en) 1999-09-24

Family

ID=13024472

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5633998A Withdrawn JPH11259128A (en) 1998-03-09 1998-03-09 Load monitoring and control system

Country Status (1)

Country Link
JP (1) JPH11259128A (en)

Similar Documents

Publication Publication Date Title
KR100220539B1 (en) Identification of hvac systems in a communication network
CA1338639C (en) Communication control device
US5153874A (en) Redundancy data transmission device
RU2101224C1 (en) System of remote control of lifts in separate buildings
JP4042790B2 (en) Electrical device and method for determining normal communication function in electrical device
JP3205209B2 (en) Air conditioner
JPH11259128A (en) Load monitoring and control system
JPH02146449A (en) Inspection method for air conditioner
JP2823710B2 (en) Building management system
JPH10246497A (en) Home control system
JPH0776633B2 (en) Data transmission method for thermal equipment
JPH0326095A (en) Signal transmission method for elevator
WO1997026635A1 (en) A networked, distributed fire alarm system
JP3122682B2 (en) Data transceiver
JP2638917B2 (en) Home control device
JPS62238940A (en) Remote controller of air conditioner
JP2616398B2 (en) Command execution device
JPH0875230A (en) Air-conditioning controller
JPH0755238A (en) Control device for air conditioner
JPH02123893A (en) Home control system
JPH02176339A (en) Serial line inspection system for air conditioner
JPH05260563A (en) Centralized automatic metering device
JP3903298B2 (en) Fire alarm system
JPH09252355A (en) Terminal network controller
JPH07193587A (en) Communication system

Legal Events

Date Code Title Description
A300 Application deemed to be withdrawn because no request for examination was validly filed

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20050510