JPH11247217A - Working machine control device for construction machine - Google Patents

Working machine control device for construction machine

Info

Publication number
JPH11247217A
JPH11247217A JP5381998A JP5381998A JPH11247217A JP H11247217 A JPH11247217 A JP H11247217A JP 5381998 A JP5381998 A JP 5381998A JP 5381998 A JP5381998 A JP 5381998A JP H11247217 A JPH11247217 A JP H11247217A
Authority
JP
Japan
Prior art keywords
boom
speed
front member
work
height position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5381998A
Other languages
Japanese (ja)
Other versions
JP3821260B2 (en
Inventor
Hiroshi Imai
寛 今井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP05381998A priority Critical patent/JP3821260B2/en
Publication of JPH11247217A publication Critical patent/JPH11247217A/en
Application granted granted Critical
Publication of JP3821260B2 publication Critical patent/JP3821260B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To perform fine operation work without imposing a burden on an operator by detecting the height position of a working machine, and limiting the maximum rotating speed of a second front member to the specified value or less in the case of the detected height position being a specified height position or lower. SOLUTION: The height position of a working machine is detected by detecting the rotating angle of a first boom 5. In case of the detected height position of the working machine being a specified height position or lower, the maximum rotating speed of a second front member 11 is limited to the specified value or less. The working speed of a front member 7 to be a second boom is therefore limited to low speed of the specified value or less without fine adjustment of a second boom operating pedal 47 by a foot. An operator is therefore liberated from fine operation work of the second boom, while the working speed of the second boom is not limited to low speed when the working machine is in a high position, so that work efficiency can be heightened.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建設機械の作業機
制御装置に関し、特に、ブーム、アーム、バケット等の
各フロント部材からなる作業機を車体前方に設けてなる
建設機械において、その作業機の駆動を制御する装置に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work machine control device for a construction machine, and more particularly, to a work machine having a work machine including front members such as a boom, an arm, and a bucket provided in front of a vehicle body. The present invention relates to a device for controlling the driving of a vehicle.

【0002】[0002]

【従来の技術】油圧ショベルなどの建設機械では、複数
のフロント部材から構成された多関節構造体の作業機が
車体前方に設けられている。たとえば、図2に示すよう
な油圧ショベル1であれば、車体3に対して第1ブーム
5、第2ブーム7、オフセットブーム11、アーム1
2、バケット14が順次、回動自在に連結されており、
これら作業機を、オペレータの操作レバー等による操作
に応じて駆動することにより、掘削作業等が行われる。
2. Description of the Related Art In a construction machine such as a hydraulic shovel, a multi-joint structure working machine including a plurality of front members is provided in front of a vehicle body. For example, in the case of a hydraulic excavator 1 as shown in FIG. 2, the first boom 5, the second boom 7, the offset boom 11, the arm 1
2. The buckets 14 are sequentially rotatably connected,
Excavation work and the like are performed by driving these work machines in accordance with operations performed by an operator using an operation lever or the like.

【0003】こうした構造の油圧ショベル1では、第2
ブーム7用の操作ペダルあるいはス操作用スイッチを操
作することで、第2ブーム7を回動させ、側溝掘り作
業、マス掘り作業等を行わせるようにしている。
In the hydraulic excavator 1 having such a structure, the second
By operating the operation pedal or switch for the boom 7, the second boom 7 is rotated to perform a trench excavation operation, a mass excavation operation, and the like.

【0004】ところで、側溝掘り作業等を行うときに
は、バケット14が溝の中で比較的低速度で移動するよ
うに、第2ブーム7の動作を微操作にて行う必要があ
る。第2ブームの動作を微操作で行うことで作業性が向
上する。
[0004] By the way, when performing a trench excavation work or the like, it is necessary to finely operate the second boom 7 so that the bucket 14 moves at a relatively low speed in the groove. Workability is improved by performing the operation of the second boom by a fine operation.

【0005】そこで、従来は、オペレータとしては、第
2ブーム用操作ペダル等の操作量を微調整することで、
第2ブーム7の動作の速度を抑えつつ、溝の中でバケッ
ト14を低速度で移動させるようにしていた。
Therefore, conventionally, as an operator, by finely adjusting the operation amount of an operation pedal or the like for the second boom,
The bucket 14 is moved at a low speed in the groove while suppressing the operation speed of the second boom 7.

【0006】[0006]

【発明が解決しようとする課題】しかし、第2ブーム用
操作ペダルを足によって微調整して、溝の中でバケット
14を低速度で移動させるという微操作作業は高度の技
術を必要とし、熟練を要する。しかも、第2ブーム用操
作ペダル以外にもバケット用操作レバー等他の操作レバ
ーを同時に複合操作しなければならない状況下では、な
おさらのことである。
However, the fine operation of moving the bucket 14 at a low speed in the groove by finely adjusting the operation pedal for the second boom with the foot requires a high level of skill, and Cost. In addition, this is all the more necessary in a situation where other operation levers such as an operation lever for a bucket other than the operation pedal for the second boom must be simultaneously operated.

【0007】このため、未熟練なオペレータにとっては
もちろんのこと、熟練したオペレータといえども、仕事
の負担が大きく、疲労が大きいものとなっていた。
[0007] For this reason, not only unskilled operators but also skilled operators have a heavy work load and large fatigue.

【0008】一方、作業機が高い位置にあるときには、
微操作は必要とせず、むしろ迅速に第2ブーム7を動作
させたいとの要請がある。
On the other hand, when the working machine is at a high position,
There is a demand for operating the second boom 7 quickly without requiring fine operation.

【0009】本発明はこうした実状に鑑みてなされたも
のであり、作業機が高い位置にあるときの作業性を損な
うことなく、側溝掘り作業等を行っている場合の微操作
作業を、オペレータに負担なく行えるようにすることを
解決課題とするものである。
The present invention has been made in view of the above situation, and allows the operator to perform fine operation work such as digging work without losing workability when the working machine is at a high position. It is an object of the present invention to be able to perform the operation without burden.

【0010】[0010]

【課題を解決するための手段および効果】本発明の第1
発明では、上記解決課題達成のために、車体前方に、上
下方向に回動自在に配設した第1のフロント部材と、こ
の第1のフロント部材に対して上下方向に回動自在に連
結した第2のフロント部材とを少なくとも有した作業機
を具え、操作手段の操作量に応じて前記第2のフロント
部材の回動速度を制御する建設機械の作業機制御装置に
おいて、前記作業機の高さ位置を検出する高さ位置検出
手段と、前記高さ位置検出手段で検出された作業機の高
さ位置が所定の高さ位置以下である場合に、前記第2の
フロント部材の最大回動速度を所定値以下に制限する制
御手段とを具えるようにしている。
Means and Effects for Solving the Problems The first aspect of the present invention.
According to the present invention, in order to achieve the above-described solution, a first front member is disposed at the front of the vehicle body so as to be rotatable in the vertical direction, and is connected to the first front member so as to be rotatable in the vertical direction. A work machine control device for a construction machine, comprising: a work machine having at least a second front member; and controlling a rotation speed of the second front member according to an operation amount of an operation means. A height position detecting means for detecting a height position, and a maximum rotation of the second front member when the height position of the work implement detected by the height position detecting means is equal to or less than a predetermined height position. Control means for limiting the speed to a predetermined value or less.

【0011】第1発明によれば、作業機の高さ位置が、
具体的には、第1ブーム5の回動角θ1を検出すること
によって、検出される。
According to the first invention, the height position of the working machine is
Specifically, it is detected by detecting the rotation angle θ1 of the first boom 5.

【0012】そして、図24に示すように、検出された
作業機の高さ位置(第1ブーム回動角θ1)が所定の高
さ位置Ha以下(所定の角度θ1a以下)である場合に、
第2のフロント部材11の最大動作速度が所定値以下に
制限される。
Then, as shown in FIG. 24, when the detected height position (first boom rotation angle θ1) of the working machine is below a predetermined height position Ha (not more than a predetermined angle θ1a),
The maximum operation speed of the second front member 11 is limited to a predetermined value or less.

【0013】したがって、第2ブーム用操作ペダルを足
によって微調整しなくても、たとえペダルをフルストロ
ーク位置まで操作しても、第2ブームたる第2のフロン
ト部材7の動作速度は、所定値以下の低速度に制限され
る。
Therefore, even if the second boom operation pedal is not finely adjusted by the foot, and even if the pedal is operated to the full stroke position, the operation speed of the second front member 7 as the second boom is maintained at a predetermined value. Limited to the following low speeds:

【0014】よって、オペレータとしては第2ブーム用
操作ペダルあるいは操作スイッチを微操作する作業から
解放され、仕事の負担、疲労が軽減される。一方、作業
機が高い位置にあるときには、第2ブーム7の動作速度
は低速度に制限されることはないので、作業効率を高め
ることができる。
Therefore, the operator is freed from the work of finely operating the second boom operation pedal or the operation switch, and the work load and fatigue are reduced. On the other hand, when the work implement is at a high position, the operation speed of the second boom 7 is not limited to a low speed, so that work efficiency can be improved.

【0015】また、第2発明では、車体前方に、上下方
向に回動自在に配設した第1のフロント部材と、この第
1のフロント部材に対して上下方向に回動自在に連結し
た第2のフロント部材とを少なくとも有した作業機を具
え、操作手段の操作量に応じて前記第2のフロント部材
の回動速度を制御する建設機械の作業機制御装置におい
て、前記作業機の高さ位置を検出する高さ位置検出手段
と、前記作業機の高さ位置が所定の高さ位置以下である
場合における前記第2のフロント部材の最大回動速度
が、前記作業機の高さ位置が前記所定の高さ位置よりも
大きい場合における前記第2のフロント部材の最大回動
速度よりも小さくなるように、前記作業機の高さ位置に
対する前記第2のフロント部材の最大回動速度の対応関
係を設定する設定手段と、前記高さ位置検出手段で検出
された作業機の高さ位置に対応する前記第2のフロント
部材の最大回動速度を、前記設定手段で設定された内容
から求め、この求めた最大回動速度以下の範囲内で、前
記第2のフロント部材の回動速度を制御する制御手段と
を具えるようにしている。
According to the second aspect of the present invention, the first front member is disposed at the front of the vehicle body so as to be rotatable in the vertical direction, and the first front member is rotatably connected to the first front member in the vertical direction. A work machine control device for a construction machine, comprising: a work machine having at least a second front member, and controlling a rotation speed of the second front member according to an operation amount of an operation means. A height position detecting means for detecting a position, and a maximum rotation speed of the second front member when the height position of the work implement is equal to or less than a predetermined height position, wherein the height position of the work implement is Correspondence of the maximum rotation speed of the second front member to the height position of the work implement so as to be smaller than the maximum rotation speed of the second front member when it is larger than the predetermined height position Set hands to set relationships And a maximum rotation speed of the second front member corresponding to the height position of the work implement detected by the height position detection means is obtained from the content set by the setting means, and the obtained maximum rotation speed is obtained. Control means for controlling the rotation speed of the second front member within a range not higher than the dynamic speed.

【0016】第2発明によれば、第1発明と同様の効果
が得られる。
According to the second aspect, the same effects as those of the first aspect can be obtained.

【0017】ただし、第2発明では、図24に示すよう
に、作業機の高さ位置が所定の高さ位置以下(第1ブー
ム回動角θ1がθ1a以下)である場合における第2のフ
ロント部材7の最大動作速度(100%未満から60%
までの速度)が、作業機の高さ位置が所定の高さ位置よ
りも大きい場合(第1ブーム回動角θ1がθ1aよりも大
きい場合)における第2のフロント部材7の最大動作速
度(100%の速度)よりも小さくなるように、作業機
の高さ位置(第1ブーム回動角θ1)に対する第2のフ
ロント部材7の最大動作速度の対応関係が設定されてお
かれる。
However, in the second invention, as shown in FIG. 24, the second front when the height position of the work implement is equal to or less than a predetermined height position (the first boom rotation angle θ1 is equal to or less than θ1a). Maximum operating speed of the member 7 (from less than 100% to 60%
The maximum operating speed of the second front member 7 when the height position of the work implement is larger than the predetermined height position (when the first boom rotation angle θ1 is larger than θ1a) (100). % Speed), the maximum operating speed of the second front member 7 corresponding to the height position of the work implement (first boom rotation angle θ1) is set.

【0018】そこで、検出された作業機の高さ位置(第
1ブーム回動角θ1)に対応する第2のフロント部材7
の最大動作速度が、上記設定された内容から求められ、
この求めた最大動作速度以下の範囲内で、第2のフロン
ト部材7がオフセット動作される。
Therefore, the second front member 7 corresponding to the detected height position of the working machine (the first boom rotation angle θ1).
The maximum operation speed of is obtained from the above set contents,
The offset operation of the second front member 7 is performed within a range equal to or less than the obtained maximum operation speed.

【0019】また、第3発明では、車体前方に、上下方
向に回動自在に配設した第1のフロント部材と、この第
1のフロント部材に対して上下方向に回動自在に連結し
た第2のフロント部材とを少なくとも有した作業機を具
え、操作手段の操作量に応じて前記第2のフロント部材
の回動速度を制御する建設機械の作業機制御装置におい
て、前記作業機の高さ位置を検出する高さ位置検出手段
と、前記操作手段の操作量を検出する操作量検出手段
と、前記作業機の高さ位置が所定の高さ位置以下である
場合における前記第2のフロント部材の最大回動速度
が、前記作業機の高さ位置が前記所定の高さ位置よりも
大きい場合における前記第2のフロント部材の最大回動
速度よりも小さくなるように、前記作業機の高さ位置に
対する前記第2のフロント部材の最大回動速度の第1の
対応関係を設定する第1の設定手段と、前記操作手段の
操作量に対する前記第2のフロント部材の回動速度の第
2の対応関係を設定する第2の設定手段と、前記高さ位
置検出手段で検出された作業機の現在の高さ位置に対応
する前記第2のフロント部材の最大回動速度を、前記第
1の対応関係から求めるとともに、前記操作量検出手段
で検出された操作手段の現在の操作量に対応する前記第
2のフロント部材の回動速度を、前記第2の対応関係か
ら求め、これら求めた回動速度のうちで小さい方の回動
速度が得られるように、前記第2のフロント部材の回動
速度を制御する制御手段とを具えるようにしている。
According to the third aspect of the present invention, the first front member is disposed at the front of the vehicle body so as to be rotatable in the vertical direction, and the first front member is rotatably connected to the first front member so as to be rotatable in the vertical direction. A work machine control device for a construction machine, comprising: a work machine having at least a second front member, and controlling a rotation speed of the second front member according to an operation amount of an operation means. Height position detection means for detecting a position, operation amount detection means for detecting the operation amount of the operation means, and the second front member when the height position of the work implement is equal to or less than a predetermined height position Height of the work implement so that the maximum rotational speed of the work implement is smaller than the maximum rotational speed of the second front member when the height position of the work implement is higher than the predetermined height position. Said second flow to a position First setting means for setting a first correspondence between the maximum rotation speeds of the first member and second setting for setting a second correspondence between the rotation speed of the second front member and the operation amount of the operation means. 2 setting means, and the maximum rotation speed of the second front member corresponding to the current height position of the work implement detected by the height position detection means is obtained from the first correspondence, A rotation speed of the second front member corresponding to a current operation amount of the operation means detected by the operation amount detection means is obtained from the second correspondence, and a smaller one of the obtained rotation speeds. Control means for controlling the rotation speed of the second front member so that the rotation speed of the second front member can be obtained.

【0020】第3発明では、図24に示すように、作業
機の高さ位置が所定の高さ位置以下(第1ブーム回動角
θ1がθ1a以下)である場合における第2のフロント部
材7の最大動作速度(100%未満から60%までの速
度)が、作業機の高さ位置が所定の高さ位置よりも大き
い場合(第1ブーム回動角θ1がθ1aよりも大きい場
合)における第2のフロント部材7の最大動作速度(1
00%の速度)よりも小さくなるように、作業機の高さ
位置(第1ブーム回動角θ1)に対する第2のフロント
部材7の最大動作速度の第1の対応関係が設定されてお
かれる。
In the third aspect of the present invention, as shown in FIG. 24, the second front member 7 when the height position of the work implement is equal to or less than a predetermined height position (the first boom rotation angle θ1 is equal to or less than θ1a). The maximum operating speed (speed from less than 100% to 60%) of the work machine when the height position of the work implement is larger than the predetermined height position (when the first boom rotation angle θ1 is larger than θ1a) 2 the maximum operating speed of the front member 7 (1
(A speed of 00%), a first correspondence relationship between the maximum operating speed of the second front member 7 and the height position (first boom rotation angle θ1) of the work implement is set. .

【0021】一方において、図25(a)、(b)に示
すように、第2のフロント部材7の操作手段45U、4
5Dの操作量Stに対する第2のフロント部材7の動作
速度(流量指令)の第2の対応関係が設定されておかれ
る。また、この操作手段45U、45Dの操作量Stが
検出される。
On the other hand, as shown in FIGS. 25A and 25B, the operating means 45U,
A second correspondence relationship between the operation amount St of 5D and the operation speed (flow rate command) of the second front member 7 is set. The operation amount St of the operation means 45U and 45D is detected.

【0022】そこで、上記検出された作業機の現在の高
さ位置(第1ブーム回動角θ1)に対応する第2のフロ
ント部材7の最大動作速度が、上記記第1の対応関係
(図24)から求められるとともに、上記検出された現
在の操作量Stに対応する第2のフロント部材7の動作
速度が、上記第2の対応関係(図25(a)、(b))
から求められ、これら求められた動作速度のうちで小さ
い方の動作速度が得られるように、第2のフロント部材
7が動作される(図26(a)、(b))。
Therefore, the maximum operating speed of the second front member 7 corresponding to the detected current height position of the working machine (first boom rotation angle θ1) is determined by the first correspondence (see FIG. 24), the operation speed of the second front member 7 corresponding to the detected current operation amount St is determined by the second correspondence (FIGS. 25A and 25B).
The second front member 7 is operated such that the smaller one of the obtained operation speeds is obtained (FIGS. 26A and 26B).

【0023】このため、第2ブームたる第2のフロント
部材7は、図27に示すように、作業機の高さ位置が低
く、側溝掘り差作業等を行っている場合には、操作手段
45U、45Dの操作量Stいかんにかかわらずに、そ
の動作速度は低くなるとともに(速度veD)、作業機の
高さ位置が高い場合には、操作手段45U、45Dの操
作量Stに応じた速度(速度veU(>veD))で第2ブ
ーム7が高速に作動される。
For this reason, as shown in FIG. 27, the second front member 7 serving as the second boom is provided with the operating means 45U when the height position of the working machine is low and the digging work is performed. , 45D, regardless of the operation amount St of the operation device, the operation speed is reduced (speed veD), and when the height position of the work implement is high, the speed (speed v) corresponding to the operation amount St of the operation means 45U, 45D ( The second boom 7 is operated at a high speed at a speed veU (> veD).

【0024】[0024]

【発明の実施の形態】以下、本発明の実施の形態につい
て説明する。
Embodiments of the present invention will be described below.

【0025】図1は、本実施形態の建設機械の作業機制
御装置の全体構成を示している。また、図2は、本実施
形態で建設機械として想定している油圧ショベルの外観
を示している。
FIG. 1 shows the overall configuration of a working machine control device for a construction machine according to this embodiment. FIG. 2 shows the appearance of a hydraulic shovel assumed as a construction machine in the present embodiment.

【0026】図2(a)は、オフセットブームを備えた
油圧ショベルの側面図であり、図2(b)は図2(a)
の矢視A図である。
FIG. 2A is a side view of a hydraulic excavator provided with an offset boom, and FIG. 2B is a side view of FIG.
FIG.

【0027】同図2に示すように、この油圧ショベル1
は、大きくは、図示しない走行モータにより履帯が回転
することにより走行する下部走行体2と、この下部走行
体2の上部にスイングサークル4を介して配置され、図
示しない旋回モータにより旋回される上部旋回体3(車
体3)と、この車体3に前方に装着され、第1ブーム
5、第2ブーム7、オフセットブーム11、アーム1
2、バケット14の各フロント部材からなる作業機とか
ら構成されている。上部旋回体3の運転室内には、図1
に示すように、操作内容を指示するとともに、車両運行
状況を表示するモニタを備えた操作盤25と、作業機の
各フロント部材の駆動を操作する左右操作レバー45、
46、操作スイッチ46U、46D、オフセットブーム
操作用ペダル(オフセットペダル)47とが配置されて
いる。
As shown in FIG. 2, this excavator 1
A lower traveling body 2 that travels by rotating a crawler belt by a traveling motor (not shown) and an upper part that is disposed above the lower traveling body 2 via a swing circle 4 and that is turned by a turning motor (not shown) Revolving superstructure 3 (vehicle body 3), first boom 5, second boom 7, offset boom 11, arm 1
2, a work machine comprising the front members of the bucket 14. In the cab of the upper revolving superstructure 3, FIG.
As shown in the figure, an operation panel 25 having a monitor for instructing the operation content and displaying the vehicle operation status, a left and right operation lever 45 for operating the driving of each front member of the work machine,
46, operation switches 46U and 46D, and an offset boom operation pedal (offset pedal) 47 are arranged.

【0028】この作業機は、車体3に対して第1ブーム
5、第2ブーム7、オフセットブーム11、アーム1
2、バケット14が順次連結されるよう構成されてい
る。
This work machine is configured such that a first boom 5, a second boom 7, an offset boom 11, an arm 1
2. The bucket 14 is configured to be sequentially connected.

【0029】第1ブーム5は、車体3の車体旋回フレー
ムに、ブームフート5aを回動中心にして上下方向に回
動自在に配設されている。第2ブーム7は、第1ブーム
5の先端に、第1ブームトップピンを回動中心にして上
下方向に回動自在に配設されている。同様に、アーム1
2は、第2ブーム7、オフセットブーム11、ブラケッ
ト9を介して、このブラケット9に、上下方向に回動自
在に配設されており、バケット14は、アーム12に、
上下方向に回動自在に配設されている。
The first boom 5 is disposed on a vehicle body turning frame of the vehicle body 3 so as to be vertically rotatable about a boom foot 5a. The second boom 7 is disposed at the tip of the first boom 5 so as to be rotatable up and down around the first boom top pin. Similarly, arm 1
2 is disposed on the bracket 9 via a second boom 7, an offset boom 11 and a bracket 9 so as to be rotatable in a vertical direction.
It is arranged so as to be rotatable in the vertical direction.

【0030】第1ブーム用油圧シリンダ6は、第1ブー
ム5を駆動する油圧アクチュエータであり、この第1ブ
ーム用油圧シリンダ6のボトム側は車体3に配設され、
そのロッド先端は第1ブーム5の上端部に配設されてい
る。したがって、第1ブーム用油圧シリンダ6のボトム
室に圧油が供給されると、ロッドが伸張され、またヘッ
ド室に圧油が供給されると、ロッドが縮退され、これに
応じて第1ブーム5が上方向、または下方向に回動され
る。
The first boom hydraulic cylinder 6 is a hydraulic actuator for driving the first boom 5, and the bottom side of the first boom hydraulic cylinder 6 is disposed on the vehicle body 3.
The rod tip is disposed on the upper end of the first boom 5. Therefore, when pressure oil is supplied to the bottom chamber of the first boom hydraulic cylinder 6, the rod is extended, and when pressure oil is supplied to the head chamber, the rod is retracted. 5 is turned upward or downward.

【0031】第2ブーム7を駆動する第2ブーム用油圧
シリンダ8についても同様に、この第2ブーム用油圧シ
リンダ8のボトム側が第1ブーム5に配設され、そのロ
ッド先端が第2ブーム7の端部に配設されており、第2
ブーム用油圧シリンダ8のボトム室またはヘッド室に圧
油が供給されることで、ロッドが伸張または縮退され、
これに応じて第2ブーム7が下方向または上方向に回動
される。
Similarly, with respect to the second boom hydraulic cylinder 8 for driving the second boom 7, the bottom side of the second boom hydraulic cylinder 8 is disposed on the first boom 5, and the rod end thereof is connected to the second boom 7. At the end of the second
By supplying pressure oil to the bottom chamber or the head chamber of the boom hydraulic cylinder 8, the rod is extended or retracted,
In response, the second boom 7 is rotated downward or upward.

【0032】図1に示すように、第1ブーム用油圧シリ
ンダ6のヘッド室内の圧油の圧力P1hは、圧力センサ2
1により検出され、コントローラ50に入力される。同
様に、第1ブーム用油圧シリンダ6のボトム室内圧力、
第2ブーム用油圧シリンダ8のヘッド室内圧力、ボトム
室内圧力は、それぞれ圧力センサ22、23、243で
検出され、コントローラ50に入力される。
As shown in FIG. 1, the pressure P1h of the pressure oil in the head chamber of the first boom hydraulic cylinder 6 is
1 and input to the controller 50. Similarly, the bottom chamber pressure of the first boom hydraulic cylinder 6,
The pressure in the head chamber and the pressure in the bottom chamber of the second boom hydraulic cylinder 8 are detected by pressure sensors 22, 23, and 243, respectively, and input to the controller 50.

【0033】さて、アーム12を駆動するアーム用油圧
シリンダ13は、オフセットブーム11先端に設けられ
たブラケット9に支承され、そのロッド先端がアーム1
2に配設されており、アーム用油圧シリンダ13のロッ
ドが伸張駆動または縮退駆動されることにより、アーム
12は掘削方向またはダンプ方向に回動される。
The arm hydraulic cylinder 13 for driving the arm 12 is supported by a bracket 9 provided at the tip of the offset boom 11, and its rod tip is connected to the arm 1.
The arm 12 is turned in the excavation direction or the dumping direction when the rod of the arm hydraulic cylinder 13 is driven to extend or retract.

【0034】バケット14を駆動するバケット用油圧シ
リンダ15のボトム側は、アーム12に配設され、その
ロッド先端はリンク15a、リンク15bを介してバケ
ット14に配設されている。バケット用油圧シリンダ1
5が伸縮駆動または縮退駆動されることにより、バケッ
ト14は掘削方向またはダンプ方向に回動される。
The bottom side of a bucket hydraulic cylinder 15 for driving the bucket 14 is disposed on the arm 12, and the rod tip is disposed on the bucket 14 via links 15a and 15b. Hydraulic cylinder for bucket 1
The bucket 14 is rotated in the digging direction or the dumping direction by driving the telescopic drive 5 or the retractable drive.

【0035】図2(b)はオフセットブーム11が左右
に回動(オフセット動作という)されることにより、第
2ブーム7に対してアーム12が、車体3の左右方向に
オフセットされる様子を示している。
FIG. 2B shows a state in which the arm 12 is offset in the left-right direction of the vehicle body 3 with respect to the second boom 7 by rotating the offset boom 11 right and left (referred to as an offset operation). ing.

【0036】すなわち、オフセットブーム11の一端
は、第2ブーム7に、回動自在に配設されており、他端
はブラケット9を介してアーム12に連結している。こ
のオフセットブーム11を駆動するオフセットブーム用
油圧シリンダ10のボトム側は第2ブーム7に配設さ
れ、そのロッド先端はブラケット9に配設されている。
ロッド11aは、オフセット動作に伴い第2ブーム7に
対するブラケット9(アーム12)の姿勢が変化しない
ように設けられたロッドであり、このロッド11aの一
端は第2ブーム7に配設され、他端はブラケット9に配
設されている。したがって、オフセットブーム用油圧シ
リンダ10が伸張駆動または縮退駆動されると、オフセ
ットブーム11は右方向または左方向に回動され、アー
ム12は、第2ブーム7に対して右方向または左方向
に、回動量に応じたオフセット量だけオフセットされ
る。図2(b)の2点鎖線は、オフセットブーム11が
右方向にオフセット動作されたときの様子を示してい
る。オフセットブーム11の第2ブーム7に対する回転
角度θ3はオフセット角θ3として、オフセットブーム用
回転角センサ16により検出され、コントローラ50に
入力される。
That is, one end of the offset boom 11 is rotatably disposed on the second boom 7, and the other end is connected to the arm 12 via the bracket 9. The bottom side of the offset boom hydraulic cylinder 10 that drives the offset boom 11 is disposed on the second boom 7, and the rod end thereof is disposed on the bracket 9.
The rod 11a is a rod provided so that the posture of the bracket 9 (arm 12) with respect to the second boom 7 does not change with the offset operation, and one end of the rod 11a is disposed on the second boom 7 and the other end. Are disposed on the bracket 9. Therefore, when the offset boom hydraulic cylinder 10 is driven to extend or retract, the offset boom 11 is rotated rightward or leftward, and the arm 12 is moved rightward or leftward with respect to the second boom 7. It is offset by an offset amount corresponding to the rotation amount. A two-dot chain line in FIG. 2B shows a state when the offset boom 11 is offset rightward. The rotation angle θ3 of the offset boom 11 with respect to the second boom 7 is detected by the offset boom rotation angle sensor 16 as the offset angle θ3, and is input to the controller 50.

【0037】図3は、図2に示す油圧ショベル1の作業
機のみを取り出して、その幾何的関係を示している。図
3(a)、(b)は図2(a)、(b)にそれぞれ対応
している。
FIG. 3 shows only the working machine of the hydraulic excavator 1 shown in FIG. 2 and shows its geometric relationship. FIGS. 3A and 3B correspond to FIGS. 2A and 2B, respectively.

【0038】X−Y−Z座標系の原点Oは、ブームフー
ト5aの位置に定められている。また、第1ブーム5の
車体3に対する回転角度θ1(第1ブーム回転角θ1)の
極性は、第1ブーム5が上方向に回動されたときを+、
下方向に回動されたときを−と定めている。この第1ブ
ーム回転角θ1は、第1ブーム用回転角センサ17によ
り検出される。同様に、第1ブーム5に対する第2ブー
ム7の回転角度θ2(第2ブーム回転角θ2)は、第2ブ
ーム用回転角センサ18により検出され、オフセットブ
ーム11に対するアーム12の回転角度θ4(アーム回
転角θ4)は、アーム用回転角センサ19により検出さ
れる。これら各回転角センサ17、18、19の検出回
転角は、コントローラ50に入力される。なお、回転角
センサ16〜19は、たとえばポテンショメータが使用
される。
The origin O of the XYZ coordinate system is set at the position of the boom foot 5a. The polarity of the rotation angle θ1 of the first boom 5 with respect to the vehicle body 3 (the first boom rotation angle θ1) is + when the first boom 5 is turned upward,
It is defined as-when turned downward. The first boom rotation angle θ1 is detected by the first boom rotation angle sensor 17. Similarly, the rotation angle θ2 of the second boom 7 with respect to the first boom 5 (second boom rotation angle θ2) is detected by the rotation angle sensor 18 for the second boom, and the rotation angle θ4 of the arm 12 with respect to the offset boom 11 (arm The rotation angle θ 4) is detected by the arm rotation angle sensor 19. The detected rotation angles of these rotation angle sensors 17, 18, 19 are input to the controller 50. The rotation angle sensors 16 to 19 are, for example, potentiometers.

【0039】図3において、aは、第2ブーム7と第1
ブーム5を連結する第1ブームトップピンの配設位置で
あり、bは、オフセットブーム11と第2ブーム7を連
結する第2ブームトップピンの配設位置であり、cは、
ブラケット9とオフセットブーム11を連結するオフセ
ットブームトップピンの位置であり、dは、アーム12
とブラケット9を連結するブラケットトップピン(アー
ムボトムピン)の配設位置であり、eは、バケット14
のアーム12を連結するアームトップピン12a(単に
アームトップ12aという)の配設位置である。
In FIG. 3, a represents the second boom 7 and the first boom.
B is the position of the first boom top pin connecting the boom 5; b is the position of the second boom top pin connecting the offset boom 11 and the second boom 7;
The position of the offset boom top pin connecting the bracket 9 and the offset boom 11 is indicated by d.
Is a position where a bracket top pin (arm bottom pin) for connecting the bracket 14 and the bracket 9 is provided.
This is a position where an arm top pin 12a (hereinafter simply referred to as an arm top 12a) for connecting the arm 12 is disposed.

【0040】そこで、第1ブーム5の長さL1を、ブー
ムフート5aとa点を結ぶ線分の長さで表し、第2ブー
ム7の鉛直方向の長さL22(第2ブーム長2)を、a点
とb点の鉛直方向距離で表し、第2ブーム7の水平方向
の長さL21(第2ブーム長1)を、a点とb点の水平方
向距離で表し、オフセットブーム11の長さL3を、b
点とc点を結ぶ線分の長さで表し、ブラケット9の長さ
L4(第3ブラケット長)を、c点とd点を結ぶ線分の
長さで表し、アーム12の長さL5を、d点とe点を結
ぶ線分の長さで表すものとする。なお、バケット刃先位
置14aが、作業機全体の先端の位置となる(図1参
照)。
Therefore, the length L1 of the first boom 5 is represented by the length of a line connecting the boom foot 5a and the point a, and the length L22 (second boom length 2) of the second boom 7 in the vertical direction is calculated as follows. The horizontal length L21 of the second boom 7 (the second boom length 1) is represented by the horizontal distance between the points a and b, and the length of the offset boom 11 is represented by the vertical distance between the points a and b. L3 is b
The length L4 (third bracket length) of the bracket 9 is represented by the length of a line segment connecting the point and the point c, the length of the line segment connecting the point c and the point d, and the length L5 of the arm 12 is represented by , D, and e. The bucket blade position 14a is the position of the tip of the entire work machine (see FIG. 1).

【0041】また、アームボトムd点から垂直におろし
た線分に対して線分de(アーム12)がなす角γを、
アーム対地角γと定める。このアーム対地角γは、アー
ム12の姿勢を表す。
The angle γ formed by the line segment de (arm 12) with respect to the line segment perpendicular to the arm bottom d point is
The arm-to-ground angle γ is defined. The arm-ground angle γ indicates the posture of the arm 12.

【0042】すると、これらアームトップ12aの座標
位置e(X5、Y5、Z5)は、各回転角度θ1、θ2、θ
3、θ4が与えられると、既知の各長さL1、L21、L2
2、L3、L4、L5を用いて、下記演算式(1)〜(1
1)に示すように、一義的に定まる。
Then, the coordinate position e (X5, Y5, Z5) of these arm tops 12a is determined by the rotation angles θ1, θ2, θ
3, given θ4, each known length L1, L21, L2
Using L2, L3, L4, and L5, the following arithmetic expressions (1) to (1)
As shown in 1), it is uniquely determined.

【0043】また、アーム対地角γについても、各回転
角度θ1、θ2、θ4が与えられると、下記演算式(1
2)に示すように、一義的に定まる。
For the arm-to-ground angle γ, given the rotation angles θ1, θ2, θ4, the following equation (1)
As shown in 2), it is uniquely determined.

【0044】また、バケット14のバケット巾l、床面
距離s、リスト半径rについても既知であり、バケット
14の回転角がさらに与えられると、上記アームトップ
12aの座標位置e(X5、Y5、Z5)を用いて、作業
機先端14aの座標位置(X6、Y6、Z6)が一義的に
定まる。なお、バケット14の回転角を無視して(バケ
ット14は固定状態にあるものと仮定して)、アームト
ップ12aの座標位置e(X5、Y5、Z5)から作業機
先端14aの座標位置(X6、Y6、Z6)を求めること
もできる。
The bucket width l, floor distance s, and wrist radius r of the bucket 14 are also known. When the rotation angle of the bucket 14 is further given, the coordinate position e (X5, Y5, By using Z5), the coordinate position (X6, Y6, Z6) of the working machine tip 14a is uniquely determined. In addition, ignoring the rotation angle of the bucket 14 (assuming that the bucket 14 is in a fixed state), the coordinate position e (X5, Y5, Z5) of the arm top 12a and the coordinate position (X6 , Y6, Z6).

【0045】以下、図3の各点a〜eの座標位置、アー
ム対地角γを求める演算式について、図4に示す表を併
せ参照して説明する。
An arithmetic expression for calculating the coordinate positions of the points a to e and the arm-to-ground angle γ in FIG. 3 will be described below with reference to the table shown in FIG.

【0046】まず、第1ブーム5のフート5a(原点
0)の座標位置を、X0=0,Y0=0,Z0=0とす
る。
First, the coordinate position of the foot 5a (origin 0) of the first boom 5 is set to X0 = 0, Y0 = 0, and Z0 = 0.

【0047】すると、第1ブーム5のトップ(a点)の
X,Y,Z座標位置は、 X1=L1× Cos θ1 … (1) Y1=L1× Sin θ1 … (2) Z1=0となる。
Then, the X, Y, Z coordinate positions of the top (point a) of the first boom 5 are as follows: X1 = L1 × Cos θ1 (1) Y1 = L1 × Sin θ1 (2) Z1 = 0 .

【0048】すると、第2ブーム7のトップ(b点)の
X,Y,Z座標位置は、 X2=X1+L22×Sin(θ1+θ2)−L21×Cos(θ1+θ2)…(3) Y2=Y1−L22×Cos(θ1+θ2)−L21×Sin(θ1+θ2)…(4) Z2=0となる。
Then, the X, Y and Z coordinate positions of the top (point b) of the second boom 7 are as follows: X2 = X1 + L22 × Sin (θ1 + θ2) −L21 × Cos (θ1 + θ2) (3) Y2 = Y1−L22 × Cos (θ1 + θ2) −L21 × Sin (θ1 + θ2) (4) Z2 = 0.

【0049】 すると、オフセットブーム11のトップ(c点)のX,Y,Z座標位置は、 X3=X2−L3 Cos θ3×Cos(θ1+θ2) …(5) Y3=Y2−L3 Cos θ3×Sin(θ1+θ2) …(6) Z3=L3×Sin θ3 …(7) となる。Then, the X, Y, and Z coordinate positions of the top (point c) of the offset boom 11 are as follows: X3 = X2-L3 Cos θ3 × Cos (θ1 + θ2) (5) Y3 = Y2-L3 Cos θ3 × Sin ( θ1 + θ2) (6) Z3 = L3 × Sin θ3 (7)

【0050】すると、ブラケット9のトップ(アームボ
トムd点)のX,Y,Z座標位置は、 X4=X3−L4×Cos(θ1+θ2) …(8) Y4=Y3−L4×Sin(θ1+θ2) …(9) Z4=Z3となる。
Then, the X, Y, Z coordinate positions of the top (point d of the arm bottom) of the bracket 9 are as follows: X4 = X3−L4 × Cos (θ1 + θ2) (8) Y4 = Y3−L4 × Sin (θ1 + θ2) (9) Z4 = Z3.

【0051】すると、アーム12のトップ12a(e
点)のX,Y,Z座標位置は、 X5=X4+L5×Cos(θ1+θ2+θ4) … (10) Y5=Y4+L5×Sin(θ1+θ2+θ4) … (11) Z5=Z3となる。
Then, the top 12a (e) of the arm 12
The X, Y, and Z coordinate positions of the point) are as follows: X5 = X4 + L5 × Cos (θ1 + θ2 + θ4) (10) Y5 = Y4 + L5 × Sin (θ1 + θ2 + θ4) (11) Z5 = Z3

【0052】一方、アーム対地角γは、 γ=θ1+θ2+θ4−270゜… (12) と表される。On the other hand, the arm-to-ground angle γ is expressed as follows: γ = θ1 + θ2 + θ4-270 ((12)

【0053】このように、作業機の回転角θ1〜θ4が与
えられると、既知の各長さを用いて上記(1)〜(11)式に
より、油圧ショベル1のアームトップ12aの座標位置
(X5、Y5、Z5)を一義的に求めることができ、これ
より作業機先端14aの座標位置(X6、Y6、Z6)を
一義的に求めることができる。また、作業機の回転角θ
1、θ2、θ4が与えられると、アーム対地角γを一義的
に求めることができる。θ1〜θ4は、各回転角センサ1
7、18、16、19の検出値として与えられる。
As described above, when the rotation angles θ1 to θ4 of the working machine are given, the coordinate positions of the arm top 12a of the excavator 1 are calculated by using the known lengths and the above equations (1) to (11). X5, Y5, Z5) can be uniquely obtained, and from this, the coordinate position (X6, Y6, Z6) of the work implement tip 14a can be uniquely obtained. In addition, the rotation angle θ of the working machine
Given 1, θ2 and θ4, the arm-to-ground angle γ can be uniquely obtained. θ1 to θ4 are the rotation angle sensors 1
7, 18, 16, and 19 are provided as detection values.

【0054】本実施形態では、上記演算式を用いて、第
1ブーム5の回転角θ1が操作レバーの操作により変化
した場合に、作業機先端14aの座標位置(X6、Y6、
Z6) (アームトップ12aの座標位置(X5、Y5、Z5))
が、目標とするライン上にのるように、第2ブーム7の
回転角θ2を制御するものである。
In this embodiment, when the rotation angle θ1 of the first boom 5 is changed by operating the operation lever, the coordinate position (X6, Y6,
Z6) (Coordinate position of arm top 12a (X5, Y5, Z5))
Is to control the rotation angle θ2 of the second boom 7 so as to be on the target line.

【0055】すなわち、図1に示すコントローラ50の
メモリに、第1ブーム5の長さL1、第2ブーム7の長
さL21,L22、オフセットブーム11の長さL3、
ブラケット9の長さL4、アーム12の長さL5等既知
の値が記憶されているとともに、各ポイントa〜eの座
標位置を求める演算式およびアーム対地角γの関数式が
記憶されており、これら記憶した内容に基づきコントロ
ーラ50は、作業機先端14aが所望のラインに沿って
移動するように、第2ブーム回転角θ2を制御する。
That is, in the memory of the controller 50 shown in FIG. 1, the length L1 of the first boom 5, the length L21, L22 of the second boom 7, the length L3 of the offset boom 11,
Known values such as the length L4 of the bracket 9 and the length L5 of the arm 12 are stored, and an arithmetic expression for calculating the coordinate position of each of the points a to e and a functional expression of the arm-to-ground angle γ are stored. Based on these stored contents, the controller 50 controls the second boom rotation angle θ2 so that the work implement tip 14a moves along a desired line.

【0056】なお、本実施形態では、オフセットブーム
11を有した油圧ショベル1を想定しているが、オフセ
ットブーム11を備えていない図5に示す油圧ショベル
1に対しても適用可能である。
In this embodiment, the hydraulic excavator 1 having the offset boom 11 is assumed, but the present invention is also applicable to the hydraulic excavator 1 shown in FIG.

【0057】この油圧ショベル1も、図2と同様に、大
きくは、図示しない走行モータにより履帯が回転するこ
とにより走行する下部走行体2と、この下部走行体2の
上部にスイングサークル4を介して配置され、図示しな
い旋回モータにより旋回される上部旋回体3(車体3)
と、この車体3に前方に装着され、第1ブーム5A、第
2ブーム7A、アーム12A、バケット14の各フロン
ト部材からなる作業機とから構成されている。
The hydraulic excavator 1 also has a lower traveling body 2 that travels when a crawler belt is rotated by a traveling motor (not shown), and a swing circle 4 above the lower traveling body 2, similarly to FIG. 2. Revolving superstructure 3 (vehicle body 3) which is arranged in a horizontal position and is revolved by a revolving motor (not shown)
And a working machine which is mounted on the front of the vehicle body 3 and includes front members of a first boom 5A, a second boom 7A, an arm 12A and a bucket 14.

【0058】この作業機は、車体3に対して第1ブーム
5A、第2ブーム7A、固定の作業機リンク7B、アー
ム12A、バケット14が順次連結されるよう構成され
ている。図2と異なるのは、オフセットブーム11の代
わりに、固定の作業機リンク7Bを使用している点であ
る。したがって、第2ブーム7Aとアーム12Aは作業
機リンク7Bを介して連結されているが、第2ブーム7
Aに対してアーム12Aは左右方向にオフセットされる
ことはない。
This work machine is configured such that a first boom 5A, a second boom 7A, a fixed work machine link 7B, an arm 12A, and a bucket 14 are sequentially connected to the vehicle body 3. The difference from FIG. 2 is that a fixed work implement link 7B is used instead of the offset boom 11. Therefore, the second boom 7A and the arm 12A are connected via the work implement link 7B.
The arm 12A is not offset in the left-right direction with respect to A.

【0059】第1ブーム用油圧シリンダ6Aにより第1
ブーム5Aが駆動され、第2ブーム用油圧シリンダ8A
により第2ブーム7Aが駆動され、アーム用油圧シリン
ダ13Aによりアーム12Aが駆動され、第1ブーム5
Aが回転角θ1をもって、第2ブーム7Aが回転角θ2を
もって、アーム12Aが回転角θ4をもって、それぞれ
回動される点は、図2に示す油圧ショベルと同じであ
る。
The first boom hydraulic cylinder 6A allows the first
The boom 5A is driven, and the second boom hydraulic cylinder 8A
Drives the second boom 7A, the arm hydraulic cylinder 13A drives the arm 12A, and the first boom 5A
The point that A is rotated at a rotation angle θ1, the second boom 7A is rotated at a rotation angle θ2, and the arm 12A is rotated at a rotation angle θ4 is the same as the hydraulic excavator shown in FIG.

【0060】したがって、図3、図4と同様にして、各
回転角θ1、θ2、θ4を与えることにより、作業機先端
14aの座標位置を演算により、求めることができ、コ
ントローラ50によって、作業機先端14aが所望のラ
インに沿って移動するように、第2ブーム回転角θ2を
制御することができる。
Therefore, by giving the rotation angles θ1, θ2 and θ4 in the same manner as in FIGS. 3 and 4, the coordinate position of the working machine tip 14a can be obtained by calculation. The second boom rotation angle θ2 can be controlled so that the tip 14a moves along a desired line.

【0061】つぎに、かかる作業機制御装置の構成につ
いて、図1を参照して説明する。
Next, the configuration of the work machine control device will be described with reference to FIG.

【0062】すなわち、同図1に示すように、この作業
機制御装置は、大きくは、エンジン31と、このエンジ
ン31によって駆動され、各油圧シリンダ6、8、1
0、13駆動用の圧油を吐出する可変容量型の油圧ポン
プ1と、同エンジン31によって駆動され、パイロット
用の圧油を吐出するパイロットポンプ33と、操作レバ
ー46、操作釦46U、46D、操作ペダル47、操作
レバー45の操作に応じて開口面積が変化され、それに
より油圧ポンプ32から吐出される圧油の流量を制御し
て、この流量が制御された圧油を各油圧アクチュエータ
6、8、10、13にそれぞれ供給する流量制御弁3
4、35、36、37と、エンジン31の回転数Ne
(r/min)を検出するエンジン回転数センサ27
と、制御内容を指示するスイッチ26等が配置されると
ともに、機器の状態が画面上に表示されるモニタ機能を
備えた操作盤25と、各回転角センサ17、18、1
6、19の各検出回転角θ1、θ2、θ3、θ4を示す信
号、各圧力センサ21〜24の各検出圧力P1h等を示す
信号、エンジン回転数センサ27の検出回転数Neを示
す信号および操作レバー46、操作釦46U、46D、
操作ペダル47、操作レバー45の各操作量(操作スト
ローク)を示す信号V1、V2、V3、V4が入力され、こ
れらに基づき、各流量制御弁34、35、36、37を
それぞれ駆動制御するための指令電流I1、I2、I3、
I4を出力するとともに、警報器28を鳴動(あるいは
点灯)させるための指令電流を出力するコントローラ5
0とから構成されている。このコントローラ50の機能
ブロック図は、後述するように図13のように表され
る。なお、図面では、バケット14を駆動させるための
機構、上部旋回体3を旋回させるための機構、下部走行
体2を走行させるための機構は、本発明の趣旨と直接関
係しないので省略している。
That is, as shown in FIG. 1, the work machine control device is mainly composed of an engine 31 and driven by the engine 31, and each of the hydraulic cylinders 6, 8, 1
A variable displacement hydraulic pump 1 that discharges pressure oil for driving 0 and 13; a pilot pump 33 that is driven by the engine 31 and discharges pressure oil for a pilot; an operation lever 46; operation buttons 46U and 46D; The opening area is changed in accordance with the operation of the operation pedal 47 and the operation lever 45, whereby the flow rate of the hydraulic oil discharged from the hydraulic pump 32 is controlled, and the hydraulic oil whose flow rate is controlled is supplied to each hydraulic actuator 6, Flow control valves 3 to be supplied to 8, 10 and 13, respectively
4, 35, 36, 37 and the rotation speed Ne of the engine 31
(R / min) engine speed sensor 27
And an operation panel 25 having a monitor function for displaying the state of the device on a screen, and the rotation angle sensors 17, 18, and 1.
6, 19 indicating the detected rotational angles θ1, θ2, θ3, θ4, signals indicating the detected pressures P1h of the pressure sensors 21 to 24, signals indicating the detected rotational speed Ne of the engine rotational speed sensor 27, and operations Lever 46, operation buttons 46U, 46D,
Signals V1, V2, V3, and V4 indicating the operation amounts (operation strokes) of the operation pedal 47 and the operation lever 45 are input, and based on these signals, the flow control valves 34, 35, 36, and 37 are respectively driven and controlled. Command currents I1, I2, I3,
Controller 5 that outputs I4 and outputs a command current for sounding (or lighting) alarm 28
0. A functional block diagram of the controller 50 is shown in FIG. 13 as described later. In the drawings, a mechanism for driving the bucket 14, a mechanism for turning the upper swing body 3, and a mechanism for running the lower running body 2 are omitted because they are not directly related to the gist of the present invention. .

【0063】さらに、具体的に説明する。A more specific description will be given.

【0064】図6(a)は、油圧ショベル1の運転室内
における操作レバー45、46の配置態様を示してい
る。オペレータが着座するシート48の前部には、左右
の操作レバー45、46が設けられており、1本の操作
レバーで異なるフロント部材を作動できるようになって
いる。
FIG. 6A shows the arrangement of the operation levers 45 and 46 in the cab of the excavator 1. Left and right operation levers 45 and 46 are provided at the front of the seat 48 on which the operator sits, and different front members can be operated by one operation lever.

【0065】すなわち、図6(a)に矢印で示すよう
に、左操作レバー45の前方向操作または後方向操作に
応じて、アーム12がダンプ方向に作動され、またアー
ム12が掘削方向に作動される。そして同じ左操作レバ
ー45の左方向操作または右方向操作に応じて上部旋回
体3が左旋回方向に作動され、また上部旋回体3が右旋
回方向に作動される。同様に、右操作レバー46の前方
向操作または後方向操作に応じて第1ブーム5が上げ方
向に作動され、また下げ方向に作動され、同じ右操作レ
バー46の左方向操作または右方向操作に応じてバケッ
ト14が掘削方向、ダンプ方向に作動される(図6
(b)参照)。
That is, as shown by arrows in FIG. 6A, the arm 12 is operated in the dumping direction and the arm 12 is operated in the excavation direction in response to the forward operation or the backward operation of the left operation lever 45. Is done. Then, in response to the leftward operation or the rightward operation of the same left operation lever 45, the upper swing body 3 is operated in the left swing direction, and the upper swing body 3 is operated in the right swing direction. Similarly, the first boom 5 is operated in the upward direction and in the downward direction in response to the forward operation or the backward operation of the right operation lever 46, so that the same right operation lever 46 can be operated leftward or rightward. Accordingly, the bucket 14 is operated in the digging direction and the dumping direction (FIG. 6).
(B)).

【0066】図6(b)に示すように、右操作レバー4
6のノブ46Nの上部には、操作釦46U、46Dが配
設されている。これら操作釦46U、46Dは、第2ブ
ーム7の上方向への回動、下方向への回動を指示するス
イッチであり、操作釦46Uが押操作されると、その押
操作量(押した回数、押されている時間)に応じた分だ
け、第2ブーム7が上方向へ作動される。同様に、操作
釦46Dが押操作されると、その押操作量に応じた分だ
け、第2ブーム7が下方向へ作動される。
As shown in FIG. 6B, the right operation lever 4
Operation buttons 46U and 46D are arranged above the knob 46N of No. 6. These operation buttons 46U and 46D are switches for instructing the second boom 7 to rotate upward and downward, and when the operation button 46U is pressed, the amount of the press operation (pressed amount) The second boom 7 is actuated upward by an amount corresponding to the number of times and the time of pressing. Similarly, when the operation button 46D is pressed, the second boom 7 is operated downward by an amount corresponding to the amount of the pressing operation.

【0067】第2ブーム7を操作する釦を、第1ブーム
5を操作する操作レバー46の上部に設けるようにして
いるので、第1ブーム5を操作しながら、第2ブーム7
を操作する作業が迅速かつ容易に行われ、操作性が向上
する。なお、右操作レバー46には、上記操作釦46
U、46D以外に他の操作を指示する釦が配設されてい
る。左操作レバー45についても同様である。
Since the button for operating the second boom 7 is provided above the operation lever 46 for operating the first boom 5, the second boom 7 is operated while operating the first boom 5.
Is quickly and easily performed, and operability is improved. The right operation lever 46 has the operation buttons 46
In addition to the buttons U and 46D, buttons for instructing other operations are provided. The same applies to the left operation lever 45.

【0068】オフセットペダルとしての操作ペダル47
は、運転席48の左右に設けられており、それぞれの操
作量(踏込み量)に応じて、オフセットブーム11が左
右に作動される。
Operation pedal 47 as offset pedal
Are provided on the left and right sides of the driver's seat 48, and the offset boom 11 is operated left and right according to the respective operation amounts (stepping amounts).

【0069】操作レバー46は、電気レバーであり、操
作レバー46で第1ブーム5を操作したときの操作スト
ローク量は、電気信号V1としてコントローラ50に入
力される。同様に、操作釦46U、46Dの押操作量を
示す電気信号V2、操作ペダル47の踏込量を示す電気
信号V3、操作レバー45でアーム12を操作したとき
の操作量を示す電気信号V4が、それぞれコントローラ
50に入力される。
The operation lever 46 is an electric lever, and the operation stroke amount when the first boom 5 is operated by the operation lever 46 is input to the controller 50 as an electric signal V1. Similarly, an electric signal V2 indicating the operation amount of the operation buttons 46U and 46D, an electric signal V3 indicating the depression amount of the operation pedal 47, and an electric signal V4 indicating the operation amount when the arm 12 is operated by the operation lever 45 are: Each is input to the controller 50.

【0070】操作レバー46の操作量を示す信号V1
は、コントローラ50で、流量制御弁34に対する指令
電流I1に変換されて、これが電磁比例制御弁38また
は39に加えられる。これら電磁比例弁38、39に
は、パイロットポンプ33から吐出されるパイロット圧
油がパイロット管路41を介して供給されている。そし
て、電磁比例弁38または39により制御されたパイロ
ット圧油は、パイロット管路41または42を介して流
量制御弁34の入力ポート34aまたは34bに、パイ
ロット信号として加えられる。
A signal V1 indicating the operation amount of the operation lever 46
Is converted by the controller 50 into a command current I1 for the flow control valve 34, which is applied to the electromagnetic proportional control valve 38 or 39. Pilot pressure oil discharged from the pilot pump 33 is supplied to these electromagnetic proportional valves 38 and 39 via a pilot line 41. The pilot pressure oil controlled by the electromagnetic proportional valve 38 or 39 is applied as a pilot signal to the input port 34a or 34b of the flow control valve 34 via the pilot line 41 or 42.

【0071】操作量V1が第1ブーム5の上げ方向を示
す極性(+)を示しているときには、指令電流I1が電
磁比例制御弁38に加えられ、操作量V1が第1ブーム
5の下げ方向を示す極性(−)を示しているときには、
指令電流I1が電磁比例制御弁39に加えられる。
When the operation amount V1 indicates the polarity (+) indicating the upward direction of the first boom 5, the command current I1 is applied to the electromagnetic proportional control valve 38, and the operation amount V1 is decreased in the downward direction of the first boom 5. When the polarity (-) indicating
The command current I1 is applied to the electromagnetic proportional control valve 39.

【0072】たとえば、操作レバー46が、第1ブーム
5を上げる方向に操作されているときには、指令電流I
1が電磁比例制御弁38に加えられる。電磁比例制御弁
38では指令電流I1がパイロット圧に変換されて、指
令電流I1に応じたパイロット圧のパイロット圧油が流
量制御弁34の入力ポート34aに加えられる。これに
より、流量制御弁34のスプールが左方向に駆動され、
油圧シリンダ6のボトム室側に圧油が供給されること
で、第1ブーム5は、操作レバー46の操作量に応じた
速度で上方向に回動される。同様にして、操作レバー4
6が、第1ブーム5を下げる方向に操作されているとき
には、電磁比例制御弁39で指令電流I1がパイロット
圧に変換されて、操作レバー46の操作量に応じた速度
で第1ブーム5が下方向に回動される。
For example, when the operation lever 46 is operated in the direction of raising the first boom 5, the command current I
1 is added to the electromagnetic proportional control valve 38. At the electromagnetic proportional control valve 38, the command current I1 is converted into a pilot pressure, and pilot pressure oil having a pilot pressure corresponding to the command current I1 is applied to the input port 34a of the flow control valve 34. As a result, the spool of the flow control valve 34 is driven leftward,
When the pressure oil is supplied to the bottom chamber side of the hydraulic cylinder 6, the first boom 5 is rotated upward at a speed corresponding to the operation amount of the operation lever 46. Similarly, the operation lever 4
When the first boom 5 is operated to lower the first boom 5, the command current I 1 is converted into a pilot pressure by the electromagnetic proportional control valve 39, and the first boom 5 is moved at a speed corresponding to the operation amount of the operation lever 46. It is turned downward.

【0073】同様にして、操作釦46U、46Dの押操
作量を示す電気信号V2はコントローラ50で指令電流
I2に変換され、図示せぬ電磁比例制御弁を介して流量
制御弁35を駆動し、油圧シリンダ8を介して第2ブー
ム7を上下方向に回動する。同様に、操作ペダル47の
踏込量を示す電気信号V3はコントローラ50で指令電
流I3に変換され、図示せぬ電磁比例制御弁を介して流
量制御弁36を駆動し、油圧シリンダ10を介してオフ
セットブーム11を左右方向に回動する。
Similarly, an electric signal V2 indicating the amount of operation of the operation buttons 46U and 46D is converted into a command current I2 by the controller 50, and the flow control valve 35 is driven via an electromagnetic proportional control valve (not shown). The second boom 7 is turned up and down via the hydraulic cylinder 8. Similarly, an electric signal V3 indicating the depression amount of the operation pedal 47 is converted into a command current I3 by the controller 50, the flow control valve 36 is driven via an electromagnetic proportional control valve (not shown), and the offset is output via the hydraulic cylinder 10. The boom 11 is rotated left and right.

【0074】同様に、操作レバー45でアーム12を操
作したときの操作量を示す電気信号V4はコントローラ
50で指令電流I4に変換され、図示せぬ電磁比例制御
弁を介して流量制御弁37を駆動し、油圧シリンダ13
を介してアーム12を上下方向に回動する。
Similarly, an electric signal V4 indicating an operation amount when the arm 12 is operated by the operation lever 45 is converted into a command current I4 by the controller 50, and the electric current V4 is supplied to the flow control valve 37 via an electromagnetic proportional control valve (not shown). Drive the hydraulic cylinder 13
The arm 12 is turned up and down via the.

【0075】操作盤25には、第2ブーム7の駆動を、
第1ブーム5の回転角θ1の大きさに応じて自動的に制
御する「自動モード」と、第2ブーム7の駆動を、第1
ブーム5の回転角θ1如何にかかわらずに、手動で制御
する「手動モード」のいずれかを選択し、切換える自動
/手動モード切換スイッチ26が配設されている。この
スイッチ26は、「自動モード」を含む各種作業モード
を選択するモード切換スイッチ26aと、スイッチ26
aで選択した内容を設定し、また解除するモード設定/
解除スイッチ26bとから構成されている。モード切換
スイッチ26aで「自動モード」が選択され、モード設
定/解除スイッチ26bで「設定」が選択されると、
「自動モード」を指示する信号がコントローラ50に入
力される。モード切換スイッチ26aで「自動モード」
が選択され、モード設定/解除スイッチ26bで「解
除」が選択されると、「自動モード」が解除され、「手
動モード」を指示する信号がコントローラ50に入力さ
れる。コントローラ50は、これら入力された「自動モ
ード」指示信号、「手動モード」指示信号のいずれかに
応じた制御を実行する。
The operation panel 25 controls the driving of the second boom 7
The “auto mode” for automatically controlling the first boom 5 in accordance with the rotation angle θ1 and the driving of the second boom 7
Automatically selects and switches to "manual mode" to control manually regardless of the rotation angle θ1 of the boom 5
A / manual mode changeover switch 26 is provided. The switch 26 includes a mode changeover switch 26 a for selecting various operation modes including “auto mode”, and a switch 26.
Set the mode selected / released in a /
And a release switch 26b. When "automatic mode" is selected by the mode switch 26a and "setting" is selected by the mode setting / cancellation switch 26b,
A signal instructing the “auto mode” is input to the controller 50. "Automatic mode" with the mode switch 26a
Is selected and "release" is selected by the mode setting / release switch 26b, "auto mode" is released, and a signal instructing "manual mode" is input to the controller 50. The controller 50 executes control according to either the input “auto mode” instruction signal or the “manual mode” instruction signal.

【0076】つぎに、コントローラ50で行われる「自
動モード」の制御内容について説明する。
Next, the control contents of the "auto mode" performed by the controller 50 will be described.

【0077】・第1の制御(第1ブーム回転角θ1に応
じた第2ブーム回転角θ2の自動制御) 図7は、油圧ショベル1の作業半径を示す側面図であ
る。
First Control (Automatic Control of Second Boom Rotation Angle θ2 According to First Boom Rotation Angle θ1) FIG. 7 is a side view showing a working radius of the excavator 1.

【0078】同図7において、曲線aは、第2ブーム回
転角θ2が最大角度になっているとき(第1ブーム回転
角θ1、アーム回転角θ4についても最大角度)の作業機
先端14a(バケット刃先)の移動軌跡を示している。
このとき、軌跡aは弧状の軌跡を描き、油圧ショベル1
の作業半径は最大となり、作業範囲は最大となる。
In FIG. 7, the curve a represents the working machine tip 14a (bucket) when the second boom rotation angle θ2 is the maximum angle (the first boom rotation angle θ1 and the arm rotation angle θ4 are also the maximum angles). 2 shows the movement locus of the cutting edge.
At this time, the locus a draws an arc-shaped locus, and the excavator 1
Has the largest working radius and the largest working range.

【0079】曲線bは、作業機先端14aが最大作業半
径の軌跡aを描くときに、アームトップ12aが移動す
る軌跡を示している。このとき、軌跡bは弧状の軌跡を
描く。
A curve b indicates the locus of the movement of the arm top 12a when the tip 14a of the working machine draws the locus a of the maximum working radius. At this time, the locus b draws an arc-shaped locus.

【0080】ただし、作業機先端14a、アームトップ
12aが上記軌跡a、bに沿って移動した場合には、油
圧ショベル1の転倒モーメントが大きく、転倒する可能
性が大きい。
However, when the working machine tip 14a and the arm top 12a move along the trajectories a and b, the hydraulic excavator 1 has a large overturning moment, and is highly likely to overturn.

【0081】曲線cは、油圧ショベル1が転倒しない限
界のアームトップ12aの移動軌跡を示している。アー
ムトップ12aがこの軌跡cよりも前方に位置される
と、転倒モーメントの増大により油圧ショベル1が転倒
する虞がある。
A curve c indicates the movement locus of the arm top 12a at the limit where the excavator 1 does not fall. If the arm top 12a is positioned ahead of the locus c, the excavator 1 may fall down due to an increase in the overturning moment.

【0082】点Cから点Bまでの曲線dは、アームトッ
プ12aが上記軌跡cを描くときに、作業機先端14a
が移動する軌跡を示している。このとき、軌跡dは弧状
の軌跡を描く。なお、点Cは、第1ブーム用油圧シリン
ダ6がロッド伸張側でストロークエンドに達する位置で
ある。
The curve d from the point C to the point B represents the working machine tip 14a when the arm top 12a draws the locus c.
Indicates the trajectory of the movement. At this time, the locus d draws an arc-shaped locus. The point C is a position where the first boom hydraulic cylinder 6 reaches the stroke end on the rod extension side.

【0083】作業機先端14aが上記軌跡dに沿って移
動した場合には、油圧ショベル1が安定する範囲で最大
の作業範囲をもって、高所掘削作業等の作業を行うこと
ができる。
When the working machine tip 14a moves along the trajectory d, work such as excavation at a high place can be performed with a maximum working range within a range where the excavator 1 is stable.

【0084】さて、油圧ショベル1では、作業機を前方
に伸張させて、側溝掘り作業、マス掘り作業等を行う場
合がある。こうした作業は、油圧ショベル1を安定させ
転倒させないようにして行うことはもちろんのこと、作
業機先端14aを車体3の前方において上下に直線移動
させる必要がある。
In the hydraulic excavator 1, there is a case where a work machine is extended forward to perform a trench excavation operation, a mass excavation operation, or the like. Such work must be performed not only to stabilize the hydraulic excavator 1 so that it does not fall over, but also to linearly move the work implement tip 14a vertically in front of the vehicle body 3.

【0085】曲線dに連続する点Bから点Aまでの直線
eは、側溝掘り作業、マス掘り作業等を行う際の作業機
先端14aの移動軌跡を示している。
A straight line e from the point B to the point A, which is continuous with the curve d, shows the movement locus of the working machine tip 14a when performing a trench excavation operation, a mass excavation operation, or the like.

【0086】作業機先端14aが上記軌跡eに沿って移
動した場合には、油圧ショベル1が安定する範囲で最大
の作業範囲をもって、作業を行うことができる。
When the working machine tip 14a moves along the trajectory e, the work can be performed with a maximum working range within a range where the hydraulic excavator 1 is stable.

【0087】直線eに連続する点Aから点Dまでの曲線
gは、側溝掘り作業、マス掘り作業等を行う際の作業機
先端14aの移動軌跡を示している。この軌跡gは弧状
の軌跡を描く。地表面GLよりも下面で穴等を掘削する
場合に、作業機先端14aはこの軌跡gを描く。なお、
点Dは、第1ブーム用油圧シリンダ6がロッド縮退側で
ストロークエンドに達する位置である。
A curve g from the point A to the point D, which is continuous with the straight line e, indicates the movement locus of the working machine tip 14a when performing a trench excavation work, a mass excavation work, or the like. This locus g draws an arc-shaped locus. When excavating a hole or the like below the ground surface GL, the working machine tip 14a draws this locus g. In addition,
Point D is a position where the first boom hydraulic cylinder 6 reaches the stroke end on the rod retracting side.

【0088】作業機先端14aが上記軌跡gに沿って移
動した場合には、油圧ショベル1が安定する範囲で最大
の作業範囲をもって、作業を行うことができる。
When the working machine tip 14a moves along the trajectory g, the work can be performed with the maximum working range within which the hydraulic excavator 1 is stable.

【0089】本実施形態では、こうした曲線d、直線
e、曲線gからなる軌跡(これを基準線R1という)に
沿って作業機先端14aが移動するように、第2ブーム
回転角θ2を制御するものである。
In the present embodiment, the second boom rotation angle θ2 is controlled so that the working machine tip 14a moves along a locus including such a curve d, a straight line e, and a curve g (referred to as a reference line R1). Things.

【0090】図8は作業現場を例示した図である。作業
機先端14aが上記基準線R1に沿って移動すること
で、溝HLを形成する作業を容易に行うことができる。
なお、作業形態に応じて、作業機先端14aを、別のラ
インR2、R3に沿って移動させた方が好ましい場合があ
る。ただし、車体の転倒防止のため、いずれのラインR
2、R3についても、基準線R1よりも前方(車体からみ
て)に位置しないことが必要である。
FIG. 8 is a diagram exemplifying a work site. The work for forming the groove HL can be easily performed by moving the working machine tip 14a along the reference line R1.
In some cases, it may be preferable to move the working machine tip 14a along different lines R2 and R3 depending on the working mode. However, to prevent the vehicle from tipping over,
2 and R3 also need not be located ahead (as viewed from the vehicle body) of the reference line R1.

【0091】図9は、図7ないしは図8に示す基準線R
1を作業機先端14aが移動するときの、第1ブーム回
転角θ1と第2ブーム回転角θ2の対応関係を示すグラフ
である。
FIG. 9 shows the reference line R shown in FIG. 7 or FIG.
6 is a graph showing the correspondence between the first boom rotation angle θ1 and the second boom rotation angle θ2 when the work implement tip 14a moves in FIG.

【0092】この対応関係を示すラインS1は、前述し
た演算式(1)〜(11)により求めることができる。
The line S1 indicating the correspondence can be obtained by the above-mentioned arithmetic expressions (1) to (11).

【0093】すなわち、基準線R1が定まると、作業機
先端14aの座標位置(X6、Y6、Z6)が定まり、こ
れによりアームトップ12aの座標位置(X5、Y5、Z
5)が定まる。そこで、アーム回転角θ4、オフセットブ
ーム回転角θ3を固定すれば、第1ブーム回転角θ1に対
応する第2ブーム回転角θ2が一義的に求められる。こ
のようにして第1ブーム回転角θ1と第2ブーム回転角
θ2の対応関係S1が得られる。コントローラ50は、記
憶した既知の第1ブーム長L1等のデータに基づき、こ
の対応関係S1の作成処理を行い、この作成された対応
関係S1を、基準線図S1として、コントローラ50の
「第1ブーム角に対する目標第2ブーム角基準線図メモ
リ58」(第13図)に記憶、格納する。
That is, when the reference line R1 is determined, the coordinate position (X6, Y6, Z6) of the tip 14a of the working machine is determined, whereby the coordinate position (X5, Y5, Z5) of the arm top 12a is determined.
5) is determined. Therefore, if the arm rotation angle θ4 and the offset boom rotation angle θ3 are fixed, the second boom rotation angle θ2 corresponding to the first boom rotation angle θ1 can be uniquely obtained. In this manner, the correspondence S1 between the first boom rotation angle θ1 and the second boom rotation angle θ2 is obtained. The controller 50 performs a process of creating the correspondence S1 based on the stored data of the known first boom length L1 and the like, and uses the created correspondence S1 as a reference line diagram S1 of the “first” of the controller 50. Target second boom angle reference diagram memory 58 for boom angle "(FIG. 13).

【0094】この場合、対応関係S1を、θ1が与えら
れるとθ2を即時に読み出すことができるように記憶テ
ーブルの形式で記憶させてもよく、θ2=f(θ1)なる
関数を用いて、与えられたθ1からθ2を演算にて求める
ことができるように関数θ2=f(θ1)を記憶させてお
いてもよい。
In this case, the correspondence S1 may be stored in the form of a storage table so that θ2 can be immediately read out when θ1 is given, and the correspondence S1 is given using the function θ2 = f (θ1). The function θ2 = f (θ1) may be stored so that θ2 can be calculated from the obtained θ1.

【0095】コントローラ50では、後述するように、
回転角センサ17で検出した現在の第1ブーム回転角θ
1に対応する第2ブーム目標回転角θ2を、記憶した対応
関係S1から読み出すか、演算することによって求め、
この目標回転角θ2が得られるように、回転角センサ1
7で検出した現在の第2ブーム回転角θ2をフィードバ
ック量として、駆動制御する。すなわち、目標回転角θ
2rと現在回転角θ2との偏差θdが零となるように、電
流指令I2を出力し、第2ブーム7の回動を制御する。
In the controller 50, as described later,
Current first boom rotation angle θ detected by rotation angle sensor 17
The second boom target rotation angle θ2 corresponding to 1 is obtained by reading out or calculating from the stored correspondence S1,
The rotation angle sensor 1 is set so that the target rotation angle θ2 is obtained.
Drive control is performed using the current second boom rotation angle θ2 detected in step 7 as a feedback amount. That is, the target rotation angle θ
The current command I2 is output so that the deviation θd between 2r and the current rotation angle θ2 becomes zero, and the rotation of the second boom 7 is controlled.

【0096】よって、オペレータとしては、アーム回転
角θ4を最大角度に固定し、オフセットブーム回転角θ3
を所定のオフセット角度θ3に固定しておけば、後は、
操作レバー46で第1ブーム5の駆動を手動操作するだ
けで、自動的に第2ブーム7が駆動され(対応関係S1
に従って駆動され)、作業機先端14aを基準線R1に
沿って移動させることができる。これにより、側溝掘り
作業、マス掘り作業等を、容易に行うことができる。
Therefore, as an operator, the arm rotation angle θ4 is fixed to the maximum angle, and the offset boom rotation angle θ3
Is fixed at a predetermined offset angle θ3,
Only by manually operating the drive of the first boom 5 with the operation lever 46, the second boom 7 is automatically driven.
), The working machine tip 14a can be moved along the reference line R1. Thereby, a trench excavation work, a mass excavation work, and the like can be easily performed.

【0097】図9における第1ブーム回転角θ1の区間
θD〜θAは、図7における作業機先端14aの軌跡gの
区間D〜Aに対応し、また図9における第1ブーム回転
角θ1の区間θA〜θBは、図7における作業機先端14
aの軌跡eの区間A〜Bに対応し、また図9における第
1ブーム回転角θ1の区間θB〜θCは、図7における作
業機先端14aの軌跡dの区間B〜Cに対応している。
The sections θD to θA of the first boom rotation angle θ1 in FIG. 9 correspond to the sections D to A of the trajectory g of the working machine tip 14a in FIG. 7, and the sections of the first boom rotation angle θ1 in FIG. θA to θB are the working machine tip 14 in FIG.
9 corresponds to the sections A to B of the trajectory e of FIG. 9, and the sections θB to θC of the first boom rotation angle θ1 in FIG. 9 correspond to the sections B to C of the trajectory d of the work implement tip 14a in FIG. .

【0098】図9の区間θD〜θAでは、第2ブーム回転
角θ2が最大値θ2max(第2ブーム用油圧シリンダ8の
ロッド縮退側ストロークエンド位置)となっており、図
7に示すように、作業機先端14aは車体3に対して最
も遠くなり、最も遠い位置、最も深い位置を掘削するこ
とが可能となる。
In the sections θD to θA of FIG. 9, the second boom rotation angle θ2 is the maximum value θ2max (the rod retraction-side stroke end position of the second boom hydraulic cylinder 8), as shown in FIG. The working machine tip 14a is farthest from the vehicle body 3, and it is possible to excavate the farthest position and the deepest position.

【0099】つぎに、図9の区間θA〜θBでは、第1ブ
ーム回転角θ1の増加に伴い第2ブーム回転角θ2が徐々
に減少しており、図7に示すように、作業機先端14a
は上下方向の直線eに沿って移動し、溝HLの壁を直線
状に形成することができる(図8参照)。仮に、第1ブ
ーム回転角θ1の増加にかかわらずに第2ブーム回転角
θ2を最大値θ2maxにしたままとすると、作業機先端1
4aは、曲線aに沿って移動してしまうことになり、車
体の安定性が確保されないとともに、作業効率も低下し
てしまうからである。
Next, in the section θA to θB of FIG. 9, the second boom rotation angle θ2 gradually decreases as the first boom rotation angle θ1 increases, and as shown in FIG.
Can move along the vertical straight line e to form the wall of the groove HL in a straight line (see FIG. 8). If the second boom rotation angle θ2 is kept at the maximum value θ2max irrespective of the increase of the first boom rotation angle θ1, the work implement tip 1
This is because 4a moves along the curve a, so that the stability of the vehicle body is not ensured and the working efficiency is reduced.

【0100】つぎに、図9の区間θB〜θCでは、第1ブ
ーム回転角θ1の増加に伴い第2ブーム回転角θ2が徐々
に増加しており、図7に示すように、作業機先端14a
は、車体が安定する範囲で、最も遠い位置を高所掘削す
ることが可能となる。仮に、第1ブーム回転角θ1が増
加したとしても第2ブーム回転角θ2を増加させないと
すると、作業機先端14aは、曲線fに沿って移動して
しまうことになり、作業範囲が狭くなり、高所で掘削を
行う際の作業効率が低下してしまうからである。
Next, in the section θB to θC of FIG. 9, the second boom rotation angle θ2 gradually increases with the increase of the first boom rotation angle θ1, and as shown in FIG.
Can excavate the most distant position within a range in which the vehicle body is stable. If the second boom rotation angle θ2 is not increased even if the first boom rotation angle θ1 increases, the working machine tip 14a will move along the curve f, and the working range will be narrowed, This is because the work efficiency when excavating at a high place is reduced.

【0101】このように、対応関係S1に沿って、第2
ブーム回転角θ2を制御することにより、車体が安定す
る範囲内で最大の作業範囲を確保でき、安全にしかも作
業効率よく作業をすすめることができるようになる。
As described above, along with the correspondence S1, the second
By controlling the boom rotation angle θ2, a maximum working range can be secured within a range where the vehicle body is stabilized, and work can be performed safely and efficiently.

【0102】以上のように、油圧ショベル1の作業機を
前方に伸張させて側溝掘り作業、マス掘り作業等を行う
場合に、一つの操作レバー46を操作するだけで、作業
機先端14aを、車体が安定する範囲で、直線状の軌跡
eに沿って自動的に移動させるようにしたので、油圧シ
ョベル1を安定させ転倒させないことができるのはもち
ろんのこと、作業機先端14aを車体前方において上下
に直線移動させるという複雑な複合操作が要求される作
業であっても、熟練を必要とせずに、オペレータにかか
る負担、労力が飛躍的に軽減される。また、狭小地で作
業を行うときに、前方に電柱、建物の壁等の障害物があ
ったとしても、ひとたび作業機先端14aをこれら障害
物の手前に位置させれば、その位置より作業機先端14
aを上下方向に直線状の軌跡eに沿って自動的に移動さ
せることができるので、作業機先端14aが障害物に干
渉することに常に注意を払い、作業機先端の移動を操作
する必要はなくなる。このため、障害物に注意を払うこ
となく、作業機の操作に専念でき、作業効率が向上する
とともに、作業機先端14aが障害物に干渉することが
なく、安全に作業が行われる。
As described above, when the working machine of the excavator 1 is extended forward to perform a trench excavation work, a mass digging work, or the like, the operating machine tip 14a can be moved only by operating one operating lever 46. Since the excavator 1 is automatically moved along the linear trajectory e within a range in which the vehicle body is stabilized, the hydraulic excavator 1 can be stabilized and not fall down. Even if the operation requires a complicated complex operation of moving up and down linearly, the operator's burden and labor are dramatically reduced without requiring skill. Also, when working on a narrow land, even if there are obstacles such as telephone poles and building walls in the front, once the working machine tip 14a is located in front of these obstacles, the working machine will be moved from that position. Tip 14
a can be automatically moved along a linear trajectory e in the vertical direction. Therefore, it is necessary to always pay attention to the work implement tip 14a interfering with obstacles and operate the movement of the work implement tip. Disappears. For this reason, it is possible to concentrate on the operation of the work machine without paying attention to the obstacle, and the work efficiency is improved, and the work is safely performed without the work machine tip 14a interfering with the obstacle.

【0103】なお、図8の基準線R1に対応するライン
S1以外に、図8のラインR2に対応するラインS2、図
8のラインR3に対応するラインS3を、作成しておき、
コントローラ50のメモリ58に記憶、格納させておい
てもよい。
In addition to the line S1 corresponding to the reference line R1 in FIG. 8, a line S2 corresponding to the line R2 in FIG. 8 and a line S3 corresponding to the line R3 in FIG.
It may be stored and stored in the memory 58 of the controller 50.

【0104】図9におけるラインS2の区間θE〜θF
は、図8におけるラインR2の区間E〜Fに対応し、ま
た図9におけるラインS2の区間θF〜θC´は、図8に
おけるラインR2の区間F〜C´に対応している。
Sections θE to θF of line S2 in FIG.
Correspond to the sections EF of the line R2 in FIG. 8, and the sections θF to θC ′ of the line S2 in FIG. 9 correspond to the sections FC to C ′ of the line R2 in FIG.

【0105】また、図9におけるラインS3の区間θG〜
θFは、図8におけるラインR3の区間G〜Fに対応し、
また図9におけるラインS3の区間θF〜θC´は、図8
におけるラインR3の区間F〜C´に対応している。
In the section θG of the line S3 in FIG.
θF corresponds to the sections GF of the line R3 in FIG.
The sections θF to θC ′ of the line S3 in FIG.
Corresponds to the sections F to C 'of the line R3.

【0106】メモリ58にラインS1、S2、S3を記憶
しておき、これらラインの中から作業機先端14aの現
在位置に最も近いラインを選択して、この選択したライ
ンに沿って第2ブーム回転角θ2を制御してもよく、メ
モリ58にラインS2、S3のいずれかを記憶しておき、
この記憶したラインに沿って第2ブーム回転角θ2を制
御してもよい。
The lines S1, S2, and S3 are stored in the memory 58, and the line closest to the current position of the tip 14a of the work machine is selected from these lines, and the second boom rotation is performed along the selected line. The angle θ2 may be controlled, and one of the lines S2 and S3 is stored in the memory 58,
The second boom rotation angle θ2 may be controlled along the stored line.

【0107】また、異なる形状の作業機先端ラインR
1、R2、R3に対応するラインS1、S2、S3を設定して
おくのではなく、図12に示すような基準線R1と同一
形状の作業機先端ラインR1、R4、R5、R6にそれぞれ
対応するラインS1、S4、S5、S6を図10に示すよう
にメモリ58に記憶させておいてもよい。作業機先端ラ
インR4、R5、R6は、図12に示すように基準線R1を
車体3側に順次平行移動させて得られるラインであり、
図10に示す各ラインS4、S5、S6は、基準となるラ
インS1を順次下方に平行移動させることにより求める
ことができる。ただし、第2ブーム回転角θ2が最小角
度θ2min(第2ブーム用油圧シリンダ8のロッドの伸張
側ストロークエンド位置)より下にはラインSを設定す
ることはできない。
Further, the working machine tip line R having a different shape is used.
Instead of setting the lines S1, S2, S3 corresponding to 1, R2, R3, respectively, they correspond to the working machine tip lines R1, R4, R5, R6 having the same shape as the reference line R1 as shown in FIG. The lines S1, S4, S5, and S6 to be used may be stored in the memory 58 as shown in FIG. The working machine tip lines R4, R5, and R6 are lines obtained by sequentially moving the reference line R1 in parallel to the vehicle body 3 as shown in FIG.
The lines S4, S5, and S6 shown in FIG. 10 can be obtained by sequentially translating the reference line S1 downward in parallel. However, the line S cannot be set when the second boom rotation angle θ2 is lower than the minimum angle θ2min (stroke end position of the rod of the second boom hydraulic cylinder 8 on the extension side).

【0108】この場合、メモリ58にラインS1、S4、
S5、S6を記憶しておき、これらラインの中から作業機
先端14aの現在位置に最も近いラインを選択して、こ
の選択したラインに沿って第2ブーム回転角θ2を制御
してもよく、メモリ58にラインS4、S5、S6のいず
れかを記憶しておき、この記憶したラインに沿って第2
ブーム回転角θ2を制御してもよい。
In this case, lines S1, S4,
S5 and S6 may be stored, a line closest to the current position of the work implement tip 14a may be selected from these lines, and the second boom rotation angle θ2 may be controlled along the selected line. Any one of the lines S4, S5 and S6 is stored in the memory 58, and the second line is stored along the stored line.
The boom rotation angle θ2 may be controlled.

【0109】図11は、メモリ58に、作業機先端14
aの基準線R1に対応する基準ラインS1を記憶させてお
き、この基準ラインS1を下方に平行移動させること
で、作業機先端14aの現在位置を通過する作業機先端
ラインRに対応するラインSを作成する様子を示してい
る。
FIG. 11 shows that the working machine tip 14 is stored in the memory 58.
The reference line S1 corresponding to the reference line R1 of the work machine a is stored, and the reference line S1 is translated downward, so that the line S1 corresponding to the work machine tip line R passing the current position of the work machine tip 14a is stored. Is shown.

【0110】以下、かかる処理の内容を、図13に示す
コントローラ50の機能ブロック図、図16に示すフロ
ーチャートを併せ参照して説明する。
Hereinafter, the contents of the processing will be described with reference to the functional block diagram of the controller 50 shown in FIG. 13 and the flowchart shown in FIG.

【0111】図16に示すステップ101では、まず、
自動/手動モード切換スイッチ26の切換操作により、
「自動モード」が選択されたか「手動モード」が選択さ
れたかが判断される。「自動モード」が選択されたと判
断されると(ステップ101の判断YES)、つぎに操
作釦46U、46Dが操作されたか否か、つまり第2ブ
ーム7が手動操作されているか否かが判断される(ステ
ップ102)。
In step 101 shown in FIG. 16, first,
By switching operation of the automatic / manual mode switch 26,
It is determined whether "automatic mode" or "manual mode" has been selected. If it is determined that the "auto mode" has been selected (determination YES in step 101), then it is determined whether or not the operation buttons 46U and 46D have been operated, that is, whether or not the second boom 7 has been manually operated. (Step 102).

【0112】ここで、第2ブーム7が手動操作されてい
ないと判断されると(ステップ102の判断NO)、つ
ぎに操作釦46U、46Dが操作された直後であるか否
か、つまり第2ブーム7が手動操作された直後であるか
否かが判断される(ステップ103)。
If it is determined that the second boom 7 has not been manually operated (NO in step 102), then it is determined whether or not the operation buttons 46U and 46D have just been operated, that is, the second operation has been completed. It is determined whether or not the boom 7 has just been manually operated (step 103).

【0113】ここで、「自動モード」開始時には、第1
ブーム5、第2ブーム7の回転角θ1、θ2の初期値を求
めるために、コントローラ50は立ち上がり時にステッ
プ107〜109の処理を実行する。
Here, at the start of the "auto mode", the first
In order to obtain the initial values of the rotation angles θ1 and θ2 of the boom 5 and the second boom 7, the controller 50 executes steps 107 to 109 at the time of startup.

【0114】以後、第1ブーム5を手動操作しており、
第2ブーム7を未だ手動操作していない状況の場合に
は、ステップ103の判断はNOとなり、手順はステッ
プ106に移行される。
After that, the first boom 5 is manually operated.
If the second boom 7 has not been manually operated yet, the determination in step 103 is NO, and the procedure proceeds to step 106.

【0115】たとえば、第1ブーム5、第2ブーム7の
回転角θ1、θ2の初期値が、基準ラインS1上の角度θ1
s、θ2sであるならば、図13に示すメモリ58に記憶
された基準ラインS1に従って第2ブーム7を自動制御
する処理が実行される。
For example, the initial values of the rotation angles θ1 and θ2 of the first boom 5 and the second boom 7 are changed to the angle θ1 on the reference line S1.
If s and θ2s, the process of automatically controlling the second boom 7 is executed according to the reference line S1 stored in the memory 58 shown in FIG.

【0116】すなわち、図13において、コントローラ
50には、回転角センサ17、18から第1ブーム回転
角検出信号、第2ブーム回転角検出信号が、電圧値とし
て入力されており、第1、第2ブーム角度演算部51で
は、この電圧値を工学単位変換する等の処理を施すこと
で、第1ブーム回転角θ1、第2ブーム回転角θ2を演算
する。
That is, in FIG. 13, the controller 50 receives the first boom rotation angle detection signal and the second boom rotation angle detection signal from the rotation angle sensors 17 and 18 as voltage values. The 2 boom angle calculation unit 51 calculates the first boom rotation angle θ1 and the second boom rotation angle θ2 by performing processing such as converting the voltage value into engineering units.

【0117】いま、操作レバー46が中立位置から所定
量操作されており、操作量信号V1がコントローラ50
に入力されているので、第1ブーム操作弁指令演算部5
4では、この操作量V1に応じた指令I1を演算し、電流
出力部57から、指令電流I1を、第1ブーム用流量制
御弁34に対応する電磁比例制御弁38または39に対
し出力する。この結果、第1ブーム5としては、操作レ
バー46の操作量V1に応じた速度で、上方向または下
方向に回動される。
Now, the operation lever 46 is operated by a predetermined amount from the neutral position, and the operation amount signal V1 is output from the controller 50.
, The first boom operation valve command calculation unit 5
In step 4, a command I1 corresponding to the manipulated variable V1 is calculated, and the current output unit 57 outputs the command current I1 to the electromagnetic proportional control valve 38 or 39 corresponding to the first boom flow control valve 34. As a result, the first boom 5 is rotated upward or downward at a speed corresponding to the operation amount V1 of the operation lever 46.

【0118】一方、第2ブーム角と目標第2ブーム角の
差演算部52では、演算部51にて上記センサ17の検
出結果から求められた現在の第1ブーム回転角θ1に対
応する第2ブーム目標回転角θ2rを、メモリ58に記憶
された対応関係S1から求める処理が実行される。
On the other hand, the difference calculation section 52 between the second boom angle and the target second boom angle calculates the second boom rotation angle θ1 corresponding to the current first boom rotation angle θ1 obtained from the detection result of the sensor 17 by the calculation section 51. A process for obtaining the boom target rotation angle θ2r from the correspondence S1 stored in the memory 58 is executed.

【0119】すなわち、図11に示すように、現在の第
1ブーム回転角θ1がθ1sであった場合には、この第1
ブーム角θ1sに対応する第2ブーム角θ2sが、対応関係
S1の記憶テーブルから第2ブーム目標回転角θ2rとし
て読み出される。
That is, as shown in FIG. 11, when the current first boom rotation angle θ1 is θ1s, the first
The second boom angle θ2s corresponding to the boom angle θ1s is read from the storage table of the correspondence S1 as the second boom target rotation angle θ2r.

【0120】そこで、補償要素演算部53では、上記読
み出された第2ブーム目標回転角θ2rと現在の第2ブー
ム目標回転角θ2との偏差θdを、整定性よく迅速に零に
もっていくための補償要素rdを演算する。
Therefore, the compensation element calculating section 53 quickly sets the deviation θd between the read second boom target rotation angle θ2r and the current second boom target rotation angle θ2 to zero with good settling property. Is calculated.

【0121】すなわち、図11に示すように、オペレー
タが操作レバー46を操作することで第1ブーム7が回
動され、第1ブーム回転角θ1がθ1Nからθ1Mへと変化
したとする。このとき第2ブーム7は元の回転角θ2N
(第1ブーム角θ1Nに対応する回転角)に回動停止され
たままであり、目標回転角θ2M(第1ブーム角θ1Mに対
応する回転角)との間に偏差θd=θ2M(目標回転角)
−θ2N(現在回転角)を生じる。
That is, as shown in FIG. 11, it is assumed that the first boom 7 is rotated by the operator operating the operation lever 46, and the first boom rotation angle θ1 changes from θ1N to θ1M. At this time, the second boom 7 has the original rotation angle θ2N.
(Rotational angle corresponding to the first boom angle θ1N), and is kept at a deviation from the target rotation angle θ2M (the rotation angle corresponding to the first boom angle θ1M) by θd = θ2M (target rotation angle).
−θ2N (current rotation angle).

【0122】そこで、この偏差θdに対して比例要素、
微分要素、積分要素等による補償が以下のようにしてな
される。
Therefore, a proportional element to this deviation θd,
Compensation by the differential element, the integral element, and the like is performed as follows.

【0123】rd=F1(θd) …(13) ここで、関数F1は、θdを補償するための演算式であ
る。補償要素演算部53で、上記処理が実行されると、
第2ブーム操作弁指令演算部56では、上記演算された
補償要素演算値rdに対して、第2ブーム用流量制御弁
35の不感帯の大きさに応じた補正値Isを用いて補正
を施し、第2ブーム用流量制御弁35に対する指令I2
を以下のように演算する。
Rd = F1 (θd) (13) Here, the function F1 is an arithmetic expression for compensating θd. When the above processing is executed by the compensation element calculation unit 53,
The second boom operation valve command calculation unit 56 corrects the calculated compensation element calculation value rd using a correction value Is corresponding to the size of the dead zone of the second boom flow control valve 35, Command I2 for the second boom flow control valve 35
Is calculated as follows.

【0124】I2=Is+rd …(14) 第2ブーム操作弁指令演算部56で、上記指令I2が演
算されると、電流出力部59では、これを指令電流I2
に変換して、これを第2ブーム用流量制御弁35に対応
する電磁比例制御弁に出力する。
I2 = Is + rd (14) When the command I2 is calculated by the second boom operation valve command calculating section 56, the current output section 59 outputs the command current I2.
And outputs this to the electromagnetic proportional control valve corresponding to the second boom flow control valve 35.

【0125】ただし、第2ブーム操作弁指令演算部56
では、制御偏差θdの大きさを監視しており、制御偏差
θdが、ほぼ零になったと判断される範囲(−θd1<θd
<θdh)にあるときには、指令I2を、 I2=0 …(15) として演算し、電流出力部59から出力される指令電流
I2をオフにし(I2=0)、第2ブーム7の回動を停止
させる。
However, the second boom operation valve command calculation unit 56
Is monitoring the magnitude of the control deviation θd, and the range in which the control deviation θd is determined to be substantially zero (−θd1 <θd
<Θdh), the command I2 is calculated as I2 = 0 (15), the command current I2 output from the current output unit 59 is turned off (I2 = 0), and the rotation of the second boom 7 is stopped. Stop.

【0126】この結果、第2ブーム7の現在角度θ2
は、常に目標回転角θ2rに一致する(制御偏差θdが零
になる)。
As a result, the current angle θ2 of the second boom 7
Always coincides with the target rotation angle θ2r (the control deviation θd becomes zero).

【0127】上記補償要素演算部53における補償要素
演算処理、第2ブーム操作弁指令演算部56における指
令演算処理は、第1ブーム用操作レバー46が中立位置
より所定量だけ操作され、操作量信号V1が入力されて
いる場合にのみ実行される。操作量信号V1が入力され
ていないとき(V1=0)には、第1ブーム5は停止し
たままであるので、これに応じて第2ブーム7の回動を
停止させるべく、上記補償要素演算部53における補償
要素演算処理、第2ブーム操作弁指令演算部56におけ
る指令演算処理は、実行されない。つまり、コントロー
ラ50から出力される電流指令I2はオフされ(I2=
0)、第2ブーム7を現在の回動位置に停止させたまま
とする。
The compensation element calculation processing in the compensation element calculation section 53 and the command calculation processing in the second boom operation valve command calculation section 56 are performed by operating the first boom operation lever 46 by a predetermined amount from the neutral position. Executed only when V1 is input. When the operation amount signal V1 is not input (V1 = 0), the first boom 5 remains stopped. Therefore, in order to stop the rotation of the second boom 7, the compensation element calculation is performed. The compensation element calculation processing in the section 53 and the command calculation processing in the second boom operation valve command calculation section 56 are not executed. That is, the current command I2 output from the controller 50 is turned off (I2 =
0), the second boom 7 is kept stopped at the current rotation position.

【0128】以上のようにして、基準ラインS1に従っ
て第2ブーム7が制御されることで、作業機先端14a
は、図7ないしは図8に示す基準線R1に沿って移動す
ることになる。
As described above, by controlling the second boom 7 in accordance with the reference line S1, the working machine tip 14a
Moves along the reference line R1 shown in FIG. 7 or FIG.

【0129】ところで、オペレータとしては、作業の形
態によって、基準線R1に対して、より車体3に近いラ
イン上に沿って作業機先端14aを移動させたい場合が
ある。例えば、車体3の前方に迫った壁等の障害物があ
り、この壁の手前で上下方向に作業機先端14aを移動
させたい場合である。
By the way, the operator sometimes wants to move the work implement tip 14a along a line closer to the vehicle body 3 with respect to the reference line R1, depending on the form of work. For example, there is a case where there is an obstacle such as a wall approaching in front of the vehicle body 3 and it is desired to move the working machine tip 14a in the vertical direction just before this wall.

【0130】こうした状況下で、操作釦46Dが操作さ
れ、作業機が車体3寄りに引き寄せられ、作業機先端1
4aが車体3寄りに位置決めされたとする。
Under these circumstances, the operation button 46D is operated, and the work machine is pulled toward the vehicle body 3, and the work machine
Assume that 4a is positioned closer to the vehicle body 3.

【0131】すると、ステップ102の判断結果はYE
Sとなり、「自動モード」実行中であっても、ステップ
106の「自動制御」の処理は禁止され、手順は、ステ
ップ105に移行される。ステップ105では、作業釦
46Dの押操作量に応じた速度で、第2ブーム7が回動
されることになる。すなわち、第1ブーム5の操作とは
独立して、第2ブーム7が手動操作される(ステップ1
05)。
Then, the judgment result of step 102 is YE
In S, even if the “automatic mode” is being executed, the “automatic control” process of step 106 is prohibited, and the procedure shifts to step 105. In step 105, the second boom 7 is rotated at a speed corresponding to the amount of pressing operation of the work button 46D. That is, the second boom 7 is manually operated independently of the operation of the first boom 5 (step 1).
05).

【0132】そして、操作釦46Dの操作が終了する
と、ステップ102の判断結果がNO、ステップ103
の判断結果がYESとなり、手順はステップ107に移
行される。
When the operation of the operation button 46D is completed, the determination result of step 102 is NO, and
Is YES, and the procedure moves to step 107.

【0133】以下、第1ブーム角に対する目標第2ブー
ム角線図作成部55では、操作釦46Dの操作によって
位置決めされた作業機先端位置を通る作業機先端ライン
Rに対応するラインSを、基準ラインS1を下方に平行
移動させることにより作成する処理を実行する(ステッ
プ107、108、109)。
In the following, the target second boom angle diagram creating section 55 for the first boom angle sets the line S corresponding to the work implement tip line R passing through the work implement tip position positioned by operating the operation button 46D as a reference. The process of creating by shifting the line S1 downward is executed (steps 107, 108, 109).

【0134】すなわち、図11に示すように、現在、第
1、第2ブーム角度演算部51で演算されている第1ブ
ーム回転角θ1が、θ1Jであるとすると、この第1ブー
ム角θ1Jに対応する第2ブーム角θ2Jが、基準ラインS
1の記憶テーブルから読み出し、求められる(ステップ
107)。
That is, as shown in FIG. 11, if the first boom rotation angle θ1 currently calculated by the first and second boom angle calculation units 51 is θ1J, the first boom angle θ1J The corresponding second boom angle θ2J is equal to the reference line S
It is read from the storage table of No. 1 and obtained (step 107).

【0135】つぎに、現在、第1、第2ブーム角度演算
部51で演算された第2ブーム回転角θ2kが取得され
る。図12に示すように、作業釦46Dの操作により、
作業機先端14aは、現在、基準線R1上の点Jに対し
て、より車体3寄りの点Kに位置されているものとする
(ステップ108)。
Next, the second boom rotation angle θ2k currently calculated by the first and second boom angle calculation units 51 is obtained. As shown in FIG. 12, by operating the work button 46D,
It is assumed that the working machine tip 14a is currently located at a point K closer to the vehicle body 3 than a point J on the reference line R1 (step 108).

【0136】つぎに、上記求められた基準ラインS1上
の第2ブーム角θ2Jと現在の第2ブーム角θ2kとの偏差
Δθ2が演算され、この偏差Δθ2(=θ2J−θ2k)が一
旦記憶され、この偏差Δθ2に応じた分だけ基準ライン
S1を下方に平行移動させることで、ラインS4を作成す
る(ステップ109)。
Next, a deviation Δθ2 between the obtained second boom angle θ2J on the reference line S1 and the current second boom angle θ2k is calculated, and this deviation Δθ2 (= θ2J−θ2k) is temporarily stored. The reference line S1 is translated downward by an amount corresponding to the deviation Δθ2, thereby creating a line S4 (step 109).

【0137】以下、ステップ106では、こうして作成
されたラインS4に従って第2ブーム7が自動制御され
る。よって、作業機先端14aは、図12に示すよう
に、基準線R1に対して、より車体3寄りにずれた作業
機先端ラインR4に沿って移動することになる。
Hereinafter, in step 106, the second boom 7 is automatically controlled according to the line S4 thus created. Therefore, as shown in FIG. 12, the work implement tip 14a moves along the work implement tip line R4, which is further deviated toward the vehicle body 3 with respect to the reference line R1.

【0138】さらに、ステップ106における「自動制
御」中に、オペレータが操作釦46Dを操作して、図1
1に示すように第2ブーム回転角をθ2Pからθ2Qに変化
させれば、同様にして、「自動制御」の処理が一旦禁止
され、このときの偏差θ2P−θ2Qだけ、さらにずらした
ラインS5が、線図作成部55で作成されることになる
(ステップ107、108、109)。よって、作業機
先端14aは、図12に示すように、ラインR4に対し
て、さらに車体3寄りにずれた作業機先端ラインR5に
沿って移動することになる。
Further, during the “automatic control” in step 106, the operator operates the operation button 46D to
If the second boom rotation angle is changed from θ2P to θ2Q as shown in FIG. 1, similarly, the process of “automatic control” is temporarily inhibited, and the line S5 further shifted by the deviation θ2P−θ2Q at this time is obtained. Are created by the diagram creation unit 55 (steps 107, 108, 109). Therefore, as shown in FIG. 12, the work implement distal end 14a moves along the work implement distal end line R5 further shifted toward the vehicle body 3 with respect to the line R4.

【0139】以上のように、本実施形態によれば、基準
ラインS1を予め記憶しておくだけで、第2ブーム7を
手動操作することによって位置決めされた作業機先端位
置を通る作業機先端ラインRに対応するラインSを、自
動的に作成することができる。 もちろん、車体が安定
する範囲内であれば、第2ブーム下降用の操作釦46D
を操作するだけでなく、第2ブーム上昇用の操作釦46
Uを操作することによって、基準ラインS1からずれた
各ラインS4、S5、S6を任意に作成して、作業機先端
14aを、各作業機先端ラインR4、R5、R6に沿って
移動させることができる。
As described above, according to the present embodiment, only by storing the reference line S1 in advance, the working machine tip line that passes through the working machine tip position positioned by manually operating the second boom 7 can be used. The line S corresponding to R can be automatically created. Of course, if the vehicle body is within the stable range, the second boom lowering operation button 46D
Operation button 46 for raising the second boom.
By operating U, it is possible to arbitrarily create the lines S4, S5, S6 deviated from the reference line S1, and move the working machine tip 14a along the respective working machine tip lines R4, R5, R6. it can.

【0140】なお、基準ラインS1をずらして各ライン
S4、S5、S6を作成する処理は、作業の途中のみなら
ず、作業の開始に行うようにしてもよい。作業開始時に
は、作業機がコンパクトに格納されており、作業に適し
た姿勢になっていないこともあるからである。作業開始
時に、第1ブーム5と共に第2ブーム7を手動操作する
ことで、オペレータが望む作業機姿勢となるように作業
機先端14aを位置決めすれば(ステップ103の判断
NO)、以後、その位置決めした作業機先端位置を通る
ラインR1、R4、R5、R6に沿って作業機先端14aを
移動させることができる(ステップ107、108、1
09)。
The process of creating the lines S4, S5, S6 by shifting the reference line S1 may be performed not only during the work but also at the start of the work. This is because the work implement is stored compactly at the start of the work, and may not be in a posture suitable for the work. At the start of the operation, the operator manually operates the second boom 7 together with the first boom 5 to position the working machine tip 14a so as to have the desired working machine posture (NO in step 103). The working machine tip 14a can be moved along the lines R1, R4, R5, R6 passing through the working machine tip position (steps 107, 108, 1).
09).

【0141】ただし、ステップ106で「自動制御」を
実行している最中や作業開始時に、オペレータが、誤っ
て第2ブーム上昇用の操作釦46Uを操作することで、
作業機先端14aを、図12に仮想的に示すラインRe
上に位置させてしまうことがある。
However, during the execution of the “automatic control” in step 106 or at the start of the work, the operator erroneously operates the second boom raising operation button 46U.
The working machine tip 14a is indicated by a line Re virtually shown in FIG.
It may be positioned above.

【0142】ここで、仮にこのラインReに沿って作業
機先端14aを移動させた場合には、転倒モーメントの
増大により車体を転倒させかねない。
Here, if the working machine tip 14a is moved along this line Re, the vehicle body may be overturned due to an increase in the overturning moment.

【0143】そこで、図11に示すように、誤って第2
ブーム上昇用操作釦46Uが操作され、基準ラインS1
上の第2ブーム回転角θ2Lよりも大きな角度θ2eを指示
する信号が入力された場合には、コントローラ50は、
警報器28に対して警報指令信号を出力する。これによ
り、警報器28が作動され、鳴動あるいは点灯によりオ
ペレータに注意を喚起する。また、この場合、安全のた
め、第2ブーム上昇用操作釦46Uによる操作信号V3
がコントローラ50に入力されていたとしても、コント
ローラ50は、第2ブーム用流量制御弁35に対する指
令電流I3をオフするものとする(I3=0)。
Therefore, as shown in FIG.
The boom raising operation button 46U is operated, and the reference line S1
When a signal indicating an angle θ2e larger than the second boom rotation angle θ2L is input, the controller 50
An alarm command signal is output to the alarm 28. As a result, the alarm 28 is actuated to alert the operator by sounding or lighting. In this case, for safety, the operation signal V3 from the second boom raising operation button 46U is used.
Is input to the controller 50, the controller 50 turns off the command current I3 to the second boom flow control valve 35 (I3 = 0).

【0144】オペレータは警報器28による警報を認識
することにより、車体が安定する方向に、操作釦46
U、46Dを操作することが可能となる。
By recognizing the alarm from the alarm 28, the operator operates the operation button 46 in a direction to stabilize the vehicle body.
U and 46D can be operated.

【0145】なお、図16において、自動/手動モード
切換スイッチ26で、「手動モード」が選択されている
場合には(ステップ101の判断NO)、ステップ10
4に移行され、作業釦46U、46Dの押操作量に応じ
た速度で、第2ブーム7が回動されることになる。すな
わち、第1ブーム5の操作とは独立して、第2ブーム7
が手動操作される(ステップ104)。
In FIG. 16, if "manual mode" is selected by the automatic / manual mode switch 26 (NO in step 101), step 10 is executed.
4 and the second boom 7 is rotated at a speed corresponding to the amount of pressing operation of the work buttons 46U and 46D. That is, independently of the operation of the first boom 5, the second boom 7
Is manually operated (step 104).

【0146】なお、本実施形態では、図13のメモリ5
8に、基準ラインS1のみを記憶させ、他のラインを基
準ラインS1をずれ量分だけ補正することで求めるよう
にしているが、図10に示すように、メモリ58に、最
初から各ラインS1、S4S5、S6を複数記憶させておく
実施も可能である。
In this embodiment, the memory 5 shown in FIG.
8, only the reference line S1 is stored, and the other lines are obtained by correcting the reference line S1 by an amount corresponding to the shift amount. However, as shown in FIG. , S4, S5, and S6 are also stored.

【0147】たとえば、操作釦46U、46Dの操作直
後の第2ブーム7の回転角θ2がθ2Rであったとすれ
ば、この現在の回転角θ2Rをライン上の目標角度とする
ラインS4が、複数のラインS1、S4、S5、S6の中か
ら選択されることになる。そして、図12に示すよう
に、上記選択されたラインS4に応じた作業機先端ライ
ンR4に沿って作業機先端14aが移動される。他のラ
インS1、S5、S6を選択する場合も同様である。
For example, if the rotation angle θ2 of the second boom 7 immediately after the operation of the operation buttons 46U and 46D is θ2R, a plurality of lines S4 having the current rotation angle θ2R as a target angle on the line are provided. The line is selected from among the lines S1, S4, S5 and S6. Then, as shown in FIG. 12, the working machine tip 14a is moved along the working machine tip line R4 corresponding to the selected line S4. The same applies when other lines S1, S5 and S6 are selected.

【0148】図9に示すように、形状が異なる作業機先
端ラインR1、R2、R3に対応する各ラインS1、S2、
S3を、メモリ58に記憶させて、同様にして複数のラ
インS1、S2、S3の中から、現在の第2ブーム回転角
をライン上の角度とするラインを選択してもよい。
As shown in FIG. 9, each line S1, S2, corresponding to the working machine tip line R1, R2, R3 having a different shape.
S3 may be stored in the memory 58, and a line having the current second boom rotation angle on the line may be selected from a plurality of lines S1, S2, and S3 in the same manner.

【0149】ところで、以上説明した実施形態では、作
業機先端14aが、軌跡g、軌跡e、軌跡dから成る弧
と直線が組み合わせられたラインR1(あるいはR2、R
3、R4、R5、R6)に沿って移動するように、第2ブー
ム7の回動を自動制御する場合について説明したが、自
動制御すべき作業機先端ラインは、必ずしも弧状の軌跡
gまたはdを含まなくてもよい。すなわち、少なくとも
作業機先端14aが、直線状の軌跡eを含む作業機ライ
ンに沿って移動するように、第2ブーム7の回動を自動
制御するものであればよい。たとえば、図9において、
全体の区間θD〜θCについて基準ラインS1を記憶する
代わりに、区間θA〜θBのみについて基準ラインS1を
記憶しておくような実施も可能である。
By the way, in the embodiment described above, the working machine tip 14a is connected to the line R1 (or R2, R2) in which the arc composed of the trajectory g, the trajectory e and the trajectory d is combined with a straight line.
3, R4, R5, R6), the rotation of the second boom 7 is automatically controlled so as to move along, but the tip end line of the working machine to be automatically controlled is not necessarily the arc-shaped trajectory g or d. May not be included. That is, it is only necessary to automatically control the rotation of the second boom 7 so that at least the working machine tip 14a moves along the working machine line including the linear trajectory e. For example, in FIG.
Instead of storing the reference line S1 for the entire sections θD to θC, it is also possible to store the reference line S1 only for the sections θA to θB.

【0150】また、本実施形態では、オフセットブーム
回転角θ3が固定の角度であると想定し、X−Y2次元
座標系上で、作業機先端14aを所望の作業機先端ライ
ン(たとえば基準線R1)上に維持する制御を行うよう
にしているが、作業中に、オフセットブーム11が操作
され、角度θ3が変化したとしても、これに対応して、
X−Y−Z3次元座標系上で、作業機先端14aを所望
の作業機先端平面(たとえば基準線R1をZ軸方向に延
長させた平面)上に維持する制御を行うようにしてもよ
い。かかる制御がなされた場合には、たとえば、図12
において、オフセットブーム11が操作され、角度θ3
が変化したとしても、作業機先端14aの軌跡は、基準
線R1(X−Y2次元座標系上のライン)を紙面に対し
て垂直に(Z軸方向に)延長させた平面(X−Y−Z3
次元座標系上の平面)上を移動することになる。
Further, in the present embodiment, it is assumed that the offset boom rotation angle θ3 is a fixed angle, and the working machine tip 14a is moved to a desired working machine tip line (for example, the reference line R1) on the XY two-dimensional coordinate system. Although the control to maintain the above is performed, even if the offset boom 11 is operated during the work and the angle θ3 is changed, in response to this,
In the XYZ three-dimensional coordinate system, control may be performed to maintain the working machine tip 14a on a desired working machine tip plane (for example, a plane obtained by extending the reference line R1 in the Z-axis direction). When such control is performed, for example, FIG.
, The offset boom 11 is operated and the angle θ3
Is changed, the trajectory of the working machine tip 14a is defined by a plane (XY-Y) in which the reference line R1 (line on the XY two-dimensional coordinate system) is extended perpendicularly (in the Z-axis direction) to the paper surface. Z3
(A plane on a dimensional coordinate system).

【0151】また、本実施形態では、第1ブーム5の操
作に応じて第2ブーム7を自動制御する場合を想定して
いるが、作業機を構成するフロント部材であれば、手動
操作されるべきフロント部材と、この手動操作に応じて
自動制御されるべきフロント部材の組合せは任意に設定
可能である。たとえば、油圧ショベル1のアーム12の
手動操作に応じて第1ブーム5を自動制御してもよく、
アーム12の手動操作に応じて第2ブーム7を自動制御
してもよい。
In the present embodiment, it is assumed that the second boom 7 is automatically controlled in accordance with the operation of the first boom 5, but if the front member is a work implement, it is manually operated. The combination of the front member to be controlled and the front member to be automatically controlled in response to the manual operation can be arbitrarily set. For example, the first boom 5 may be automatically controlled according to the manual operation of the arm 12 of the excavator 1,
The second boom 7 may be automatically controlled according to a manual operation of the arm 12.

【0152】以上が「第1の制御」の内容である。The above is the content of the “first control”.

【0153】・第2の制御(第2ブームの角度偏差が大
きくなる場合(予測される場合)に、第1ブームの速度
最大値を制限する制御) 上述した第1の制御が実行され、線図作成部55で作成
された線図、たとえばS1に追従して第2ブーム7が回
動され、作業機先端14aが図12に示すように、この
線図S1に応じた軌跡R1に沿って精度よく移動されたな
らば、理想的な制御がなされたことになる。
Second control (control for limiting the maximum value of the speed of the first boom when the angular deviation of the second boom becomes large (predicted)) The first control described above is executed, and The second boom 7 is rotated following the diagram created by the diagram creating unit 55, for example, S1, and the working machine tip 14a moves along the locus R1 corresponding to the diagram S1 as shown in FIG. If it is moved with high accuracy, ideal control has been performed.

【0154】しかし、実際には、操作レバー46によっ
て第1ブーム5が急激に操作されるなどして、第1ブー
ム5の角度変化が大きくなると、第2ブーム7を駆動す
る油圧シリンダ8の速度が飽和してしまい、上記線図S
1に沿って制御することが困難となる。
However, in practice, when the angle of the first boom 5 changes greatly due to the sudden operation of the first boom 5 by the operating lever 46, the speed of the hydraulic cylinder 8 driving the second boom 7 is increased. Is saturated, and the above diagram S
Control along 1 becomes difficult.

【0155】すなわち、第1ブーム5の単位時間あたり
の角度変化が小さいときには、第2ブーム7の目標回転
角θ2rと現在の回転角θ2(フィードバック量)との制
御偏差θdは小さいか零なので、第2ブーム7は、上記
線図S1に追従して理想的に駆動制御される。
That is, when the angle change of the first boom 5 per unit time is small, the control deviation θd between the target rotation angle θ2r of the second boom 7 and the current rotation angle θ2 (feedback amount) is small or zero. The drive of the second boom 7 is ideally controlled following the above-mentioned diagram S1.

【0156】しかし、第1ブーム5の単位時間当たりの
角度変化が大きくなると、この大きな角度変化に第2ブ
ーム用油圧シリンダ8の速度が追従していけずに、上記
制御偏差θdは増大してしまう。このため、第2ブーム
7の回転角θ2は上記線図S1から外れてしまい、作業機
先端14aは、所望する軌跡R1から外れてしまうこと
になる。このため、作業を精度よく行うことができない
ことがある。
However, when the angle change of the first boom 5 per unit time increases, the speed of the second boom hydraulic cylinder 8 cannot follow the large angle change, and the control deviation θd increases. . For this reason, the rotation angle θ2 of the second boom 7 deviates from the diagram S1, and the work implement tip 14a deviates from the desired trajectory R1. For this reason, work may not be able to be performed accurately.

【0157】とりわけ、第1ブーム5を下方向に回動さ
せる場合には、作業機に重力が加わることになり、第1
ブーム5の角加速度は大きくなり、作業機先端14aの
軌跡が所望する軌跡R1から外れてしまう場合が多い。
In particular, when the first boom 5 is turned downward, gravity is applied to the working machine, and
In many cases, the angular acceleration of the boom 5 increases, and the trajectory of the working machine tip 14a deviates from a desired trajectory R1.

【0158】この第2の制御では、第1ブーム5が急激
に操作されたとしても(特に下方に第1ブーム5が回動
されたとしても)、第2ブーム7の回転角θ2を常に目
標回転角θ2rに一致させるようにして、作業機先端14
aの軌跡を所望の軌跡R1(ないしはR2、R3、R3、R
4、R5、R6)に沿って移動させ、作業を精度よく行え
るようにするものである。
In the second control, even if the first boom 5 is suddenly operated (especially, even if the first boom 5 is turned downward), the rotation angle θ2 of the second boom 7 is always set to the target. In order to match the rotation angle θ2r,
The trajectory a is changed to a desired trajectory R1 (or R2, R3, R3, R
(4, R5, R6) so that the work can be performed accurately.

【0159】また、油圧ショベル1では、図1に示すよ
うに、エンジン31によって油圧ポンプ32が駆動され
ており、この油圧ポンプ32から吐出される圧油が、各
油圧シリンダ6、7等に供給される。そして、これら各
油圧シリンダ6、7等が供給された圧油の流量に応じた
速度で駆動されることによって、第1ブーム5、第2ブ
ーム7等、作業機の各フロント部材が、その駆動速度に
応じた回動速度で回動される。
In the excavator 1, as shown in FIG. 1, a hydraulic pump 32 is driven by an engine 31, and hydraulic oil discharged from the hydraulic pump 32 is supplied to each of the hydraulic cylinders 6, 7, and the like. Is done. When each of the hydraulic cylinders 6, 7 and the like is driven at a speed corresponding to the flow rate of the supplied pressure oil, each of the front members of the working machine, such as the first boom 5, the second boom 7, and the like, is driven. It is rotated at a rotation speed according to the speed.

【0160】ここに、エンジン31の回転数Ne(re
v/min)が、小さくなるということは、油圧ポンプ
32から吐出される流量Q(l/min)が小さくなる
ことを意味する。これは、流量Qは、エンジン31の回
転数をNe(rev/min)、油圧ポンプ32の押し退
け容積をq(cc/rev)として、Q=q・Neなる関
係で表されるからである。そして、流量Qが小さくなれ
ば、各油圧シリンダ6、8の駆動速度は小さくなり、第
1ブーム5、第2ブーム7の回動速度は小さくなる。
Here, the rotation speed Ne (re
v / min) means that the flow rate Q (l / min) discharged from the hydraulic pump 32 is reduced. This is because the flow rate Q is expressed as Q = q · Ne, where Ne (rev / min) is the rotation speed of the engine 31 and q is the displacement volume of the hydraulic pump 32 (cc / rev). When the flow rate Q decreases, the driving speed of each of the hydraulic cylinders 6 and 8 decreases, and the rotation speed of the first boom 5 and the second boom 7 decreases.

【0161】このため、エンジン31の回転数Neが小
さくなった場合には、油圧ポンプ32から吐出される流
量Qが小さくなり、これに応じて第2ブーム7を駆動す
る油圧シリンダ8に供給される流量も小さくなるので、
この油圧シリンダ8の駆動速度が飽和されやすくなる。
すなわち、エンジン回転数Neが小さくなった場合に
は、第1ブーム用操作レバー46を急激に操作したとき
と同様にして、第2ブーム駆動用油圧シリンダ8の速度
の飽和が生じ、第2ブーム7は上記線図S1から外れて
しまい、作業機先端14aは所望する軌跡R1から外れ
ることになる。
Therefore, when the rotation speed Ne of the engine 31 decreases, the flow rate Q discharged from the hydraulic pump 32 decreases, and the flow rate Q is supplied to the hydraulic cylinder 8 for driving the second boom 7 accordingly. Flow rate is also small,
The drive speed of the hydraulic cylinder 8 is likely to be saturated.
In other words, when the engine speed Ne decreases, the speed of the second boom drive hydraulic cylinder 8 is saturated in the same manner as when the first boom operation lever 46 is rapidly operated, and the second boom is operated. 7 deviates from the diagram S1, and the working machine tip 14a deviates from the desired locus R1.

【0162】ひいては、油圧ポンプ32の吐出量Qその
ものが小さくなった場合にも、同様にして、第2ブーム
駆動用油圧シリンダ8の速度の飽和が生じ、第2ブーム
7は上記線図S1から外れてしまい、作業機先端14a
は所望する軌跡R1から外れることになる。
Furthermore, even when the discharge amount Q of the hydraulic pump 32 itself becomes small, the speed of the second boom driving hydraulic cylinder 8 is similarly saturated, and the second boom 7 is shifted from the above-mentioned diagram S1. The work machine tip 14a
Deviates from the desired trajectory R1.

【0163】この第2の制御では、エンジン回転数Ne
が低下した場合ひいては油圧ポンプ32の吐出量Qが低
下した場合であったとしても、第2ブーム7の回転角θ
2を常に目標回転角θ2rに一致させるようにして、作業
機先端14aの軌跡を所望の軌跡R1(ないしはR2、R
3、R3、R4、R5、R6)に沿って移動させるように
し、作業を精度よく行えるようにするものである。
In the second control, the engine speed Ne
Of the second boom 7 even when the discharge amount Q of the hydraulic pump 32 decreases.
2 always coincides with the target rotation angle θ2r, and the trajectory of the working machine tip 14a is changed to a desired trajectory R1 (or R2, R2).
(3, R3, R4, R5, R6) so that the work can be performed accurately.

【0164】この第2の制御の実施形態では、図17に
示すような偏差θdと第1ブーム下げ速度最大値I1max
との対応関係が、コントローラ50に記憶テーブルとし
て記憶されておかれる。なお、θdからI1maxを求める
演算式を記憶させておいてもよい。
In the second control embodiment, the deviation θd and the first boom lowering speed maximum value I1max as shown in FIG.
Is stored in the controller 50 as a storage table. Note that an arithmetic expression for obtaining I1max from θd may be stored.

【0165】ここで、図17の縦軸のI1maxは、第1ブ
ーム用流量制御弁34に対応する電磁比例制御弁39
(ブーム下げ方向)に対する電流指令I1の上限値を示
している。すなわち、第1ブーム下げ方向の電流指令I
1の最大値I1maxを設定することで、第1ブーム下げ方
向の最大回動速度を制限することができる。
Here, I1max on the vertical axis in FIG. 17 is an electromagnetic proportional control valve 39 corresponding to the first boom flow control valve.
(Boom lowering direction) indicates the upper limit value of the current command I1. That is, the current command I in the first boom lowering direction
By setting the maximum value I1max of 1, the maximum rotation speed in the first boom lowering direction can be limited.

【0166】図17に示す対応関係では、偏差θdが所
定のしきい値θdaよりも小さい場合には、第1ブーム下
げ速度最大値I1maxが100%に設定されている。そし
て、偏差θdがしきい値θda以上の場合には、θdの増加
に応じて、第1ブーム下げ速度最大値I1maxが100%
より漸次減少するように設定されている。ここで、しき
い値θdaは、基準ラインS1に追従して第2ブーム7を
制御することができないと判断される大きさに、予め設
定しておかれる。
In the correspondence shown in FIG. 17, when the deviation θd is smaller than a predetermined threshold value θda, the first boom lowering speed maximum value I1max is set to 100%. When the deviation θd is equal to or larger than the threshold value θda, the first boom lowering speed maximum value I1max is increased by 100% according to the increase of θd.
It is set to decrease gradually. Here, the threshold value θda is set in advance to a size at which it is determined that the second boom 7 cannot be controlled following the reference line S1.

【0167】そこで、図13に示すように、第2ブーム
角と目標第2ブーム角の差演算部52で演算された現在
の偏差θdが、第1ブーム操作弁指令演算部54に入力
される。
Therefore, as shown in FIG. 13, the current deviation θd calculated by the difference calculator 52 between the second boom angle and the target second boom angle is input to the first boom operation valve command calculator 54. .

【0168】すると、この現在の偏差θdに対応する第
1ブーム下げ速度最大値I1maxが、上記図17に示す対
応関係から求められる。そして、この求められた第1ブ
ーム下げ速度最大値I1maxを超えない範囲で、指令I1
が生成され、電流出力部57を介して第1ブーム用流量
制御弁34に対応する電磁比例制御弁39に対して出力
される。このため、第1ブーム5の下げ方向回動速度
は、第1ブーム下げ速度最大値I1maxに応じた最大回動
速度の範囲内に抑制される。
Then, the first boom lowering speed maximum value I1max corresponding to the current deviation θd is obtained from the correspondence shown in FIG. Then, the command I1 is set within a range not exceeding the obtained first boom lowering speed maximum value I1max.
Is generated and output to the electromagnetic proportional control valve 39 corresponding to the first boom flow control valve 34 via the current output unit 57. For this reason, the lowering rotation speed of the first boom 5 is suppressed within the range of the maximum rotation speed corresponding to the first boom lowering speed maximum value I1max.

【0169】すなわち、今、θdがしきい値θdaよりも
小さく、これに応じてI1maxが100%である場合に
は、第1ブーム下げ方向の回動速度の制限がないという
ことであり、操作レバー46の操作量V1に応じた指令
I1が生成され、指令電流I1としてそのまま第1ブーム
用流量制御弁34に対応する電磁比例制御弁39(ブー
ム下げ方向)に対して加えられる。
That is, if θd is now smaller than the threshold value θda, and accordingly I1max is 100%, there is no restriction on the rotation speed in the first boom lowering direction. A command I1 corresponding to the operation amount V1 of the lever 46 is generated and directly applied as a command current I1 to the electromagnetic proportional control valve 39 (boom lowering direction) corresponding to the first boom flow control valve 34.

【0170】しかし、今、θdがしきい値θda以上であ
り、これに応じてI1maxが100%よりも下回った値で
ある場合には、第1ブーム下げ方向の回動速度が制限さ
れるということであり、操作レバー46の操作量V1に
応じた指令I1は、I1maxにより制限される。そして、
その制限の度合いは、偏差θdが大きくなるほど大きく
なる。たとえば、I1≦I1maxの場合には、I1がそのま
ま、第1ブーム用流量制御弁34に対応する電磁比例制
御弁39(ブーム下げ方向)に対して加えられるが、I
1>I1maxの場合には、I1maxが第1ブーム用流量制御
弁34に対応する電磁比例制御弁39(ブーム下げ方
向)に対して加えられる。
However, if θd is equal to or larger than the threshold value θda and I1max is smaller than 100%, the rotation speed in the first boom lowering direction is limited. That is, the command I1 corresponding to the operation amount V1 of the operation lever 46 is limited by I1max. And
The degree of the restriction increases as the deviation θd increases. For example, when I1≤I1max, I1 is directly added to the electromagnetic proportional control valve 39 (boom lowering direction) corresponding to the first boom flow control valve 34, but I1
When 1> I1max, I1max is added to the electromagnetic proportional control valve 39 (boom lowering direction) corresponding to the first boom flow control valve 34.

【0171】このようにして、この第2の制御によれ
ば、第1ブーム用操作レバー46が下方に急激に操作さ
れ、第2ブーム7の角度偏差θdが実際に大きくなった
場合には、第1ブーム5に対する速度指令I1に制限を
加えるようにしたので、第1ブーム5の下げ方向の回動
速度を抑制でき、これによって偏差θdを小さくさせる
ことができる。これにより作業機先端14aの軌跡は所
望の軌跡R1に移動し、作業を精度よく行うことができ
る。なお、本実施形態では、基準線R1を想定している
が、他のラインR2、R3、R3、R4、R5、R6に沿って
作業機先端14aを移動させる場合についても同様であ
る。
As described above, according to the second control, when the operation lever 46 for the first boom is suddenly operated downward and the angular deviation θd of the second boom 7 actually becomes large, Since the speed command I1 for the first boom 5 is limited, the rotation speed of the first boom 5 in the lowering direction can be suppressed, and the deviation θd can be reduced. As a result, the trajectory of the working machine tip 14a moves to the desired trajectory R1, and the work can be performed with high accuracy. In the present embodiment, the reference line R1 is assumed, but the same applies to the case where the work implement tip 14a is moved along other lines R2, R3, R3, R4, R5, and R6.

【0172】また、本実施形態では、第1ブーム5が下
げ方向に回動された場合に、第1ブームの下げ方向回動
速度を制限するようにしているが、第1ブーム5が上げ
方向に回動された場合に、第1ブームの上げ方向回動速
度を制限するようにしてもよい。
In the present embodiment, when the first boom 5 is rotated in the lowering direction, the rotation speed of the first boom in the lowering direction is limited. When the first boom is turned, the turning speed of the first boom in the raising direction may be limited.

【0173】つぎに、偏差θdの代わりに、エンジン回
転数Neを使用する実施形態について説明する。エンジ
ン回転数Neの目標回転数を設定する設定ダイヤルが、
低回転に設定されて、低速作業が行われる場合に、この
実施形態は有用である。
Next, an embodiment in which the engine speed Ne is used instead of the deviation θd will be described. The setting dial for setting the target engine speed of the engine speed Ne
This embodiment is useful when a low-speed operation is performed with the rotation speed set to low.

【0174】この実施形態では、図18に示すようなエ
ンジン回転数Neと第1ブーム下げ速度最大値I1maxと
の対応関係が、コントローラ50に記憶テーブルとして
記憶されておかれる。なお、NeからI1maxを求める演
算式を記憶させておいてもよい。
In this embodiment, the correspondence between the engine speed Ne and the first boom lowering speed maximum value I1max as shown in FIG. 18 is stored in the controller 50 as a storage table. Note that an arithmetic expression for calculating I1max from Ne may be stored.

【0175】ここで、図18の縦軸のI1maxは、第1ブ
ーム用流量制御弁34に対応する電磁比例制御弁39
(ブーム下げ方向)に対する電流指令I1の上限値を示
している。すなわち、第1ブーム下げ方向の電流指令I
1の最大値I1maxを設定することで、第1ブーム下げ方
向の最大回動速度を制限することができる。
Here, I1max on the vertical axis in FIG. 18 is an electromagnetic proportional control valve 39 corresponding to the first boom flow control valve 34.
(Boom lowering direction) indicates the upper limit value of the current command I1. That is, the current command I in the first boom lowering direction
By setting the maximum value I1max of 1, the maximum rotation speed in the first boom lowering direction can be limited.

【0176】図18に示す対応関係では、エンジン回転
数Neが所定のしきい値Neaよりも大きい場合には、第
1ブーム下げ速度最大値I1maxが100%に設定されて
いる。そして、エンジン回転数Neがしきい値Nea以下
の場合には、Neの増加に応じて、第1ブーム下げ速度
最大値I1maxが漸次増加し、100%に至るように設定
されている。
In the correspondence shown in FIG. 18, when the engine speed Ne is larger than a predetermined threshold value Nea, the first boom lowering speed maximum value I1max is set to 100%. When the engine speed Ne is equal to or smaller than the threshold Ne, the first boom lowering speed maximum value I1max is set to gradually increase to 100% in accordance with the increase of Ne.

【0177】そこで、図14に示すように、エンジン回
転数センサ27で検出された現在のエンジン回転数Ne
が、第1ブーム操作弁指令演算部54に入力される。
Thus, as shown in FIG. 14, the current engine speed Ne detected by the engine speed sensor 27 is
Is input to the first boom operation valve command calculation unit 54.

【0178】すると、この現在のエンジン回転数Neに
対応する第1ブーム下げ速度最大値I1maxが、上記図1
8に示す対応関係から求められる。そして、この求めら
れた第1ブーム下げ速度最大値I1maxを超えない範囲
で、指令I1が生成され、電流出力部57を介して第1
ブーム用流量制御弁34に対応する電磁比例制御弁39
に対して出力される。このため、第1ブーム5の回動速
度は、第1ブーム下げ速度最大値I1maxに応じた最大回
動速度の範囲内に抑制される。
Then, the first boom lowering speed maximum value I1max corresponding to the current engine speed Ne is calculated as shown in FIG.
8 is obtained from the correspondence shown in FIG. Then, the command I1 is generated within a range not exceeding the obtained first boom lowering speed maximum value I1max, and the first command is output via the current output unit 57.
Electromagnetic proportional control valve 39 corresponding to boom flow control valve 34
Is output to For this reason, the rotation speed of the first boom 5 is suppressed within the range of the maximum rotation speed corresponding to the first boom lowering speed maximum value I1max.

【0179】すなわち、今、Neがしきい値Neaよりも
大きく、これに応じてI1maxが100%である場合に
は、第1ブーム下げ方向の回動速度の制限がないという
ことであり、操作レバー46の操作量V1に応じた指令
I1が生成され、指令電流I1としてそのまま第1ブーム
用流量制御弁34に対応する電磁比例制御弁39(ブー
ム下げ方向)に対して加えられる。
That is, if Ne is now larger than the threshold value Nea and accordingly I1max is 100%, there is no limitation on the rotation speed in the first boom lowering direction. A command I1 corresponding to the operation amount V1 of the lever 46 is generated and directly applied as a command current I1 to the electromagnetic proportional control valve 39 (boom lowering direction) corresponding to the first boom flow control valve 34.

【0180】しかし、今、低速作業が行われている場合
など、Neがしきい値Nea以下であり、これに応じてI1
maxが100%よりも下回った値である場合には、第1
ブーム下げ方向の回動速度が制限されるということであ
り、操作レバー46の操作量V1に応じた指令I1は、I
1maxにより制限される。そして、その制限の度合いは、
回転数Neが小さくなるほど大きくなる。たとえば、I1
≦I1maxの場合には、I1がそのまま、第1ブーム用流
量制御弁34に対応する電磁比例制御弁39(ブーム下
げ方向)に対して加えられるが、I1>I1maxの場合に
は、I1maxが第1ブーム用流量制御弁34に対応する電
磁比例制御弁39(ブーム下げ方向)に対して加えられ
る。
However, when the low-speed work is being performed, Ne is equal to or smaller than the threshold value Ne.
If max is less than 100%, the first
The rotation speed in the boom lowering direction is limited, and the command I1 corresponding to the operation amount V1 of the operation lever 46 is I
Limited by 1max. And the degree of the restriction is
It increases as the rotation speed Ne decreases. For example, I1
If ≤I1max, I1 is directly added to the electromagnetic proportional control valve 39 (boom lowering direction) corresponding to the first boom flow control valve 34, but if I1> I1max, I1max is It is added to the electromagnetic proportional control valve 39 (boom lowering direction) corresponding to the flow control valve 34 for one boom.

【0181】このようにして、本実施形態によれば、低
速作業が行われる場合に、エンジン回転数Neを検出す
ることにより、第2ブーム7の角度偏差θdが大きくな
ることを予測して、第1ブーム5に対する速度指令I1
に制限を加えるようにしたので、第1ブーム5の下げ方
向の回動速度を抑制でき、これによって偏差θdを小さ
くさせることができる。これにより作業機先端14aの
軌跡は所望の軌跡R1に移動し、作業を精度よく行うこ
とができる。なお、本実施形態では、基準線R1を想定
しているが、他のラインR2、R3、R3、R4、R5、R6
に沿って作業機先端14aを移動させる場合についても
同様である。
As described above, according to the present embodiment, when low-speed work is performed, by detecting the engine speed Ne, it is predicted that the angular deviation θd of the second boom 7 will increase. Speed command I1 for first boom 5
, The rotation speed of the first boom 5 in the lowering direction can be suppressed, and thereby the deviation θd can be reduced. As a result, the trajectory of the working machine tip 14a moves to the desired trajectory R1, and the work can be performed with high accuracy. In this embodiment, the reference line R1 is assumed, but the other lines R2, R3, R3, R4, R5, R6
The same applies to the case where the work implement tip 14a is moved along.

【0182】また、この図14、図18に示す実施形態
では、第1ブーム5が下げ方向に回動された場合に、第
1ブームの下げ方向回動速度を制限するようにしている
が、第1ブーム5が上げ方向に回動された場合に、第1
ブームの上げ方向回動速度を制限するようにしてもよ
い。
In the embodiment shown in FIGS. 14 and 18, when the first boom 5 is rotated in the lowering direction, the rotation speed of the first boom in the lowering direction is limited. When the first boom 5 is turned in the raising direction, the first
The rotation speed of the boom in the raising direction may be limited.

【0183】さらに、図18において、横軸のエンジン
回転数Neを、油圧ポンプ32の吐出量Qとしてもよ
い。
In FIG. 18, the engine speed Ne on the horizontal axis may be used as the discharge amount Q of the hydraulic pump 32.

【0184】また、以上説明した実施形態では、第1ブ
ーム5の操作に応じて第2ブーム7を自動制御する場合
を想定し、第1ブーム5の最大速度を制限するようにし
ているが、作業機を構成するフロント部材であれば、手
動操作されるべきフロント部材と、この手動操作に応じ
て自動制御されるべきフロント部材の組合せは任意に設
定可能であり、それに応じて最大速度を制限すべきフロ
ント部材を任意に設定することができる。たとえば、油
圧ショベル1のアーム12の手動操作に応じて第1ブー
ム5または第2ブーム7を自動制御する場合において、
アーム12の最大速度を制限してもよい。
In the above-described embodiment, the maximum speed of the first boom 5 is limited by assuming a case where the second boom 7 is automatically controlled according to the operation of the first boom 5. For the front members that make up the working machine, the combination of the front members that should be manually operated and the front members that should be automatically controlled in response to this manual operation can be set arbitrarily, and the maximum speed is limited accordingly. The front member to be set can be set arbitrarily. For example, when automatically controlling the first boom 5 or the second boom 7 in response to a manual operation of the arm 12 of the excavator 1,
The maximum speed of the arm 12 may be limited.

【0185】なお、図17、図18では、しきい値を境
にしてI1maxを漸次減少ないしは増加させるような対応
関係を設定しているが、しきい値の前後でI1maxの値が
二値的に変化するような対応関係を設定する実施も可能
である。
In FIGS. 17 and 18, the correspondence is set such that I1max gradually decreases or increases at the threshold, but the value of I1max is binary before and after the threshold. It is also possible to set a correspondence that changes to.

【0186】以上が「第2の制御」の内容である。The above is the content of the “second control”.

【0187】・第3の制御(第1ブームの負荷圧が大き
くなる場合に、第1ブームの速度最大値を制限する制
御)) 前述した第1の制御では、たとえば図11のS1のごと
く、第1ブーム5の回転角θ1に対する第2ブーム7の
目標回転角θ2の対応関係を示す線図S1を設定し、この
線図S1に追従するように、第1ブーム5の操作に応じ
て第2ブーム7を駆動制御するようにしている。
Third control (control for limiting the maximum value of the speed of the first boom when the load pressure of the first boom increases) In the first control described above, for example, as shown in S1 of FIG. A diagram S1 showing the correspondence between the rotation angle θ1 of the first boom 5 and the target rotation angle θ2 of the second boom 7 is set, and the first boom 5 is operated in accordance with the operation of the first boom 5 so as to follow this diagram S1. The drive control of the two booms 7 is performed.

【0188】すなわち、第2ブーム7は、第1ブーム5
に対する操作量に応じて駆動される。
That is, the second boom 7 is connected to the first boom 5
Is driven in accordance with the operation amount with respect to.

【0189】第1ブーム5に対する操作量が大きけれ
ば、それに応じて線図S1に追従するように第2ブーム
7は大きく回動される。
[0189] If the operation amount for the first boom 5 is large, the second boom 7 is rotated greatly so as to follow the diagram S1.

【0190】ところで、オペレータとしては、作業機に
大きな負荷がかかっている場合には、この負荷を除去す
べく第1ブーム5を操作する操作レバーを大きく急操作
することが多い。
By the way, when a heavy load is applied to the work machine, the operator often operates the operating lever for operating the first boom 5 largely and suddenly in order to remove the load.

【0191】たとえば、作業現場では、第1ブーム5を
下げ方向に操作して、バケット14を大地に接地させ、
油圧ショベル1の履体を接地面から浮き上がらせる状態
にして、上部旋回体3を旋回させ、旋回方向を変えると
いう旋回操作が行われる。
For example, at the work site, the first boom 5 is operated in the downward direction to bring the bucket 14 into contact with the ground,
The turning operation of turning the upper turning body 3 and changing the turning direction is performed with the footwear of the hydraulic shovel 1 being lifted off the ground contact surface.

【0192】この場合、作業機先端14aが大地に接地
しており、作業機が「アウトリガ」の機能を果たしてい
るため、作業機には大きな負荷がかかっている。
In this case, since the working machine tip 14a is grounded and the working machine fulfills the function of "outrigger", a large load is applied to the working machine.

【0193】そこで、上記旋回操作が終了すると、上記
作業機にかかっている負荷を除去して、通常の掘削作業
等を行わせるべく、オペレータとしては、第1ブーム5
を上げ方向に大きく急操作することになる。
When the turning operation is completed, the operator operates the first boom 5 in order to remove the load on the work machine and to perform a normal excavation work or the like.
Will be operated suddenly in the upward direction.

【0194】すると、作業機が大地に接地していたた
め、それまで停止していた第2ブーム7は、作業機にか
かる負荷が急激に除去されることによって、第1ブーム
用操作レバーの大きな急操作に応じて急激に作動してし
まうことになる。
Then, since the work implement was grounded to the ground, the load on the second boom 7 which had been stopped until then was suddenly removed. It will suddenly operate according to the operation.

【0195】これは、オペレータの意思に反した予期せ
ぬ動作であり、作業効率の低下を招来する。また、急激
に第2ブーム7が作動されることによってバケット14
が地面と激しく摺動し、バケット接地面、バケット本体
に損傷を与えかねない。さらに、場合によっては急激な
第2ブーム7の作動によって思わぬ事故を招きかねな
い。
This is an unexpected operation contrary to the intention of the operator, and causes a reduction in work efficiency. Also, when the second boom 7 is suddenly operated, the bucket 14
May violently slide on the ground, damaging the bucket contact surface and the bucket body. Further, in some cases, sudden operation of the second boom 7 may cause an unexpected accident.

【0196】この第3の制御では、作業機に大きな負荷
がかかっている場合に、オペレータがこの大きな負荷を
除去すべく、フロント部材を大きく急操作した場合であ
っても、このフロント部材の動きに応じて駆動される他
のフロント部材が急激に作動されてしまうことによって
生じる不都合を除去するようにするものである。
In the third control, when a large load is applied to the work machine, even if the operator operates the front member greatly suddenly to remove the large load, the movement of the front member is not affected. The inconvenience caused by the sudden actuation of another front member driven in response to the above is eliminated.

【0197】この第3の制御の実施形態では、負荷検出
手段としての圧力センサ21により、作業機にかかる負
荷P1h、つまり第1ブーム5を駆動する油圧シリンダ6
のヘッド側圧力P1hが検出される。
In the third embodiment, the load P1h applied to the work machine, that is, the hydraulic cylinder 6 for driving the first boom 5, is detected by the pressure sensor 21 as load detecting means.
Is detected on the head side pressure P1h.

【0198】そこで、図19に示す対応関係に従い、こ
の検出された負荷P1hが所定のしきい値P1ha以上であ
る場合には、第1ブーム5の上げ方向最大回動速度が所
定値以下に制限される。以下、具体的に説明する。
Therefore, according to the correspondence shown in FIG. 19, when the detected load P1h is equal to or greater than the predetermined threshold value P1ha, the maximum rotation speed of the first boom 5 in the raising direction is limited to a predetermined value or less. Is done. Hereinafter, a specific description will be given.

【0199】この第3の制御の実施形態では、図19に
示すような第1ブーム用油圧シリンダ6のヘッド側圧力
P1hと第1ブーム上げ速度最大値I1maxとの対応関係
が、コントローラ50に記憶テーブルとして記憶されて
おかれる。なお、P1hからI1maxを求める演算式を記憶
させておいてもよい。
In the third control embodiment, the correspondence between the head side pressure P1h of the first boom hydraulic cylinder 6 and the first boom raising speed maximum value I1max as shown in FIG. It is stored as a table. Note that an arithmetic expression for calculating I1max from P1h may be stored.

【0200】ここで、図19の縦軸のI1maxは、第1ブ
ーム用流量制御弁34に対応する電磁比例制御弁38
(ブーム上げ方向)に対する電流指令I1の上限値を示
している。すなわち、第1ブーム上げ方向の電流指令I
1の最大値I1maxを設定することで、第1ブーム上げ方
向の最大回動速度を制限することができる。
Here, I1max on the vertical axis in FIG. 19 is an electromagnetic proportional control valve 38 corresponding to the first boom flow control valve 34.
The upper limit value of the current command I1 with respect to (boom raising direction) is shown. That is, the current command I in the first boom raising direction
By setting the maximum value I1max of 1, the maximum rotation speed in the first boom raising direction can be limited.

【0201】図19に示す対応関係では、圧力P1hが所
定のしきい値P1haよりも小さい場合には、第1ブーム
上げ速度最大値I1maxが100%に設定されている。そ
して、圧力P1hが所定のしきい値P1ha以上の場合に
は、第1ブーム上げ速度最大値I1maxが100%よりも
小さな値に設定されている。ここで、しきい値P1ha
は、たとえば100kg/cm2であり、第1ブーム5が
急操作されると判断される負荷の大きさに、予め設定さ
れておかれる。
In the correspondence shown in FIG. 19, when the pressure P1h is smaller than a predetermined threshold value P1ha, the first boom raising speed maximum value I1max is set to 100%. When the pressure P1h is equal to or higher than the predetermined threshold value P1ha, the first boom raising speed maximum value I1max is set to a value smaller than 100%. Here, the threshold value P1ha
Is 100 kg / cm 2, for example, and is set in advance to the magnitude of the load at which it is determined that the first boom 5 is suddenly operated.

【0202】そこで、図15に示すように、圧力センサ
21で検出された第1ブーム用油圧シリンダ6のヘッド
側圧力P1hが、第1ブーム操作弁指令演算部54に入力
される。
Therefore, as shown in FIG. 15, the head side pressure P1h of the first boom hydraulic cylinder 6 detected by the pressure sensor 21 is input to the first boom operation valve command calculation section 54.

【0203】すると、この現在の圧力P1hに対応する第
1ブーム上げ速度最大値I1maxが、上記図19に示す対
応関係から求められる。そして、この求められた第1ブ
ーム上げ速度最大値I1maxを超えない範囲で、指令I1
が生成され、電流出力部57を介して第1ブーム用流量
制御弁34に対応する電磁比例制御弁38に対して出力
される。このため、第1ブーム5の上げ方向回動速度
は、第1ブーム上げ速度最大値I1maxに応じた最大回動
速度の範囲内に抑制される。
Then, the first boom raising speed maximum value I1max corresponding to the current pressure P1h is obtained from the correspondence shown in FIG. Then, the command I1 is set within a range not exceeding the obtained first boom raising speed maximum value I1max.
Is generated and output to the electromagnetic proportional control valve 38 corresponding to the first boom flow control valve 34 via the current output unit 57. For this reason, the rotation speed in the raising direction of the first boom 5 is suppressed within the range of the maximum rotation speed corresponding to the first boom raising speed maximum value I1max.

【0204】すなわち、今、P1hがしきい値P1haより
も小さく、これに応じてI1maxが100%である場合に
は、第1ブーム上げ方向の回動速度の制限がないという
ことであり、操作レバー46の操作量V1に応じた指令
I1が生成され、指令電流I1としてそのまま第1ブーム
用流量制御弁34に対応する電磁比例制御弁38(ブー
ム上げ方向)に対して加えられる。
That is, if P1h is now smaller than the threshold value P1ha, and accordingly I1max is 100%, there is no limitation on the rotation speed in the first boom raising direction. A command I1 corresponding to the operation amount V1 of the lever 46 is generated and directly applied to the electromagnetic proportional control valve 38 (boom raising direction) corresponding to the first boom flow control valve 34 as the command current I1.

【0205】しかし、今、P1hがしきい値P1ha以上で
あり、これに応じてI1maxが100%よりも下回った値
である場合には、第1ブーム上げ方向の回動速度が制限
されるということであり、操作レバー46の操作量V1
に応じた指令I1は、I1maxにより制限される。たとえ
ば、I1≦I1maxの場合には、I1がそのまま、第1ブー
ム用流量制御弁34に対応する電磁比例制御弁38(ブ
ーム上げ方向)に対して加えられるが、I1>I1maxの
場合には、I1maxが第1ブーム用流量制御弁34に対応
する電磁比例制御弁38(ブーム上げ方向)に対して加
えられる。
However, if P1h is equal to or larger than the threshold value P1ha and I1max is accordingly smaller than 100%, the rotation speed in the first boom raising direction is limited. That is, the operation amount V1 of the operation lever 46 is
Is limited by I1max. For example, when I1 ≦ I1max, I1 is directly added to the electromagnetic proportional control valve 38 (boom raising direction) corresponding to the first boom flow control valve 34. However, when I1> I1max, I1max is added to an electromagnetic proportional control valve 38 (boom raising direction) corresponding to the first boom flow control valve 34.

【0206】このようにして、この第2の制御によれ
ば、第1ブーム用操作レバー46が大きく急操作された
としても、作業機にかかる負荷P1hが大きな場合には、
第1ブーム5に対する速度指令I1に制限を加えるよう
にしたので、その後作業機にかかる負荷が急激に除去さ
れた場合に、操作レバー46の大きな急操作に応じて第
2ブーム7が急激に作動してしまうことはなくなる。
As described above, according to the second control, even if the first boom operation lever 46 is greatly operated suddenly, if the load P1h applied to the work machine is large,
Since the speed command I1 for the first boom 5 is limited, the second boom 7 is suddenly operated in response to a large sudden operation of the operation lever 46 when the load applied to the working machine is suddenly removed thereafter. Will not be done.

【0207】このため、オペレータの意思に反した予期
せぬ動作が生じることがないので、作業効率が向上す
る。また、急激に第2ブーム7が作動されることによっ
てバケット14が地面と激しく摺動し、バケット接地
面、バケット本体に損傷が生じることが防止される。さ
らに、急激な第2ブーム7の作動によって思わぬ事故が
招来することもない。
[0207] For this reason, there is no possibility that an unexpected operation contrary to the intention of the operator occurs, so that the work efficiency is improved. In addition, the bucket 14 slides violently on the ground due to the sudden operation of the second boom 7, thereby preventing the bucket ground surface and the bucket body from being damaged. Further, an unexpected accident does not occur due to the sudden operation of the second boom 7.

【0208】なお、本実施形態では、作業機先端を大地
に接地させ、作業機を「アウトリガ」として機能させた
状態から、負荷を除去すべく、第1ブーム5を上方に操
作するような状況下を想定しており、第1ブーム5が、
上方に回動されている場合に、第1ブーム5の上げ速度
最大値を制限するようにしているが、これに限定される
ことなく、負荷を除去すべく、第1ブーム5を大きく急
操作するような状況下であれば、第1ブーム5が、下方
に回動されている場合に、第1ブーム5の下方の速度最
大値を制限するような実施も可能である。
In the present embodiment, the state in which the first boom 5 is operated upward to remove the load from a state in which the tip of the working machine is grounded to the ground and the working machine functions as an “outrigger” is used. Assuming below, the first boom 5 is
The maximum lifting speed of the first boom 5 is limited when it is pivoted upward, but is not limited to this, and the first boom 5 is largely suddenly operated to remove the load. In such a situation, when the first boom 5 is pivoted downward, it is also possible to limit the maximum speed below the first boom 5.

【0209】また、本実施形態では、作業機にかかる負
荷を、油圧シリンダに設けた圧力センサにより検出して
いるが、圧力以外に負荷を検出できるものであれば、そ
の検出方法、センサの種類は任意である。
In this embodiment, the load applied to the working machine is detected by the pressure sensor provided in the hydraulic cylinder. However, if the load can be detected other than the pressure, the detection method and the type of the sensor are used. Is optional.

【0210】また、本実施形態では、第1ブーム5にか
かる負荷P1hにより、作業機にかかる負荷を検出してい
るが、作業機にかかる負荷を検出できるのであれば、第
1ブーム5に限定されることなく、第2ブーム7等、他
のフロント部材にかかる負荷を検出することにより、作
業機にかかる負荷を検出するようにしてもよい。
In this embodiment, the load applied to the work equipment is detected by the load P1h applied to the first boom 5. However, if the load applied to the work equipment can be detected, the load is limited to the first boom 5. Instead, the load on the work implement may be detected by detecting the load on another front member such as the second boom 7.

【0211】また、以上説明した実施形態では、第1ブ
ーム5の操作に応じて第2ブーム7を自動制御する場合
を想定し、第1ブーム5の最大速度を制限するようにし
ているが、作業機を構成するフロント部材であれば、手
動操作されるべきフロント部材と、この手動操作に応じ
て自動制御されるべきフロント部材の組合せは任意に設
定可能であり、それに応じて最大速度を制限すべきフロ
ント部材を任意に設定することができる。たとえば、油
圧ショベル1のアーム12の手動操作に応じて第1ブー
ム5または第2ブーム7を自動制御する場合において、
アーム12の最大速度を制限してもよい。
In the above-described embodiment, the maximum speed of the first boom 5 is limited by assuming that the second boom 7 is automatically controlled in accordance with the operation of the first boom 5. For the front members that make up the working machine, the combination of the front members that should be manually operated and the front members that should be automatically controlled in response to this manual operation can be set arbitrarily, and the maximum speed is limited accordingly. The front member to be set can be set arbitrarily. For example, when automatically controlling the first boom 5 or the second boom 7 in response to a manual operation of the arm 12 of the excavator 1,
The maximum speed of the arm 12 may be limited.

【0212】なお、図19では、しきい値の前後でI1m
axの値を二値的に変化させるような対応関係を設定して
いるが、しきい値を境にしてI1max値を漸次減少させる
ような対応関係を設定する実施も可能である。
In FIG. 19, I1m before and after the threshold value
Although the correspondence that changes the value of ax in a binary manner is set, it is also possible to set a correspondence that gradually reduces the I1max value at the threshold.

【0213】以上が「第3の制御」の内容である。The above is the contents of the “third control”.

【0214】・第4の制御(作業機高さ位置に応じてオ
フセット速度を制限する制御) 図2に示す構造の油圧ショベル1では、オフセットブー
ム用操作ペダル47を操作することで、図2(b)に示
すように、オフセットブーム11を車体3に対して左右
方向にオフセット動作させ、第2ブーム7に対してアー
ム12、バケット14をオフセットさせて、側溝掘り作
業、マス掘り作業等を行わせるようにしている。
Fourth Control (Control for Limiting Offset Speed According to Work Machine Height Position) In the hydraulic excavator 1 having the structure shown in FIG. 2, by operating the offset boom operation pedal 47, the control shown in FIG. As shown in b), the offset boom 11 is offset from the vehicle body 3 in the left-right direction, and the arm 12 and the bucket 14 are offset with respect to the second boom 7 to perform a trench excavation operation, a mass excavation operation and the like. I try to make it.

【0215】ところで、側溝掘り作業等を行うときに
は、バケット14が溝の中で左右に比較的低速度で移動
するように、オフセットブーム11を微操作でオフセッ
ト動作させる必要がある。オフセット動作を微操作で行
うことで、作業性が向上する。
[0215] By the way, when performing a trench excavation work or the like, the offset boom 11 needs to be offset by a fine operation so that the bucket 14 moves left and right in the groove at a relatively low speed. By performing the offset operation with a fine operation, workability is improved.

【0216】この場合、オペレータとしては、オフセッ
トペダル47の操作量を微調整することで、オフセット
動作の速度を抑えつつ、溝の中でバケット14を低速度
で左右に移動させるようにしていた。
In this case, the operator moves the bucket 14 left and right at a low speed in the groove while suppressing the speed of the offset operation by finely adjusting the operation amount of the offset pedal 47.

【0217】しかし、オフセットペダル47を足によっ
て微調整して、溝の中でバケット14を低速度で左右に
移動させるという微操作作業は高度の技術を必要とし、
熟練を要する。しかも、オフセットペダル47以外にも
アーム用操作レバー45等他の操作レバーを同時に複合
操作しなければならない状況下では、なおさらのことで
ある。
However, the fine operation of finely adjusting the offset pedal 47 with the foot and moving the bucket 14 left and right in the groove at a low speed requires a high level of skill.
Requires skill. This is even more so in a situation in which other operation levers such as the arm operation lever 45 in addition to the offset pedal 47 must be simultaneously operated.

【0218】このため、未熟練なオペレータにとっては
もちろんのこと、熟練したオペレータといえども、仕事
の負担が大きく、疲労が大きいものとなっていた。
For this reason, not only unskilled operators but also skilled operators have a heavy work load and large fatigue.

【0219】一方、作業機が高い位置にあるときには、
微操作は必要とせず、むしろ迅速に左右にオフセット動
作させ、高所掘削作業等を行いたいとの要請がある。
On the other hand, when the working machine is at a high position,
There is a demand that a fine operation is not required, but rather a quick offset operation from side to side is performed to perform excavation work at a high place.

【0220】この第4の制御では、作業機が高い位置に
あるときの作業性を損なうことなく、側溝掘り作業等を
行っている場合の微操作作業を、オペレータに負担なく
行えるようにするものである。
In the fourth control, the operator can perform a fine operation in the case of performing a trench excavation work without impairing the workability when the working machine is at a high position. It is.

【0221】この第4の制御の実施形態では、まず、作
業機の高さ位置、具体的にはアームトップ12aの高さ
Hが検出される。このアームトップ高さHは、前述した
(1)〜(11)からアームトップ12aの座標位置
(X5、Y5、Z5)を求め、求めたY5に、地表面GLか
らブームフート5aまでの既知の長さを加えることで、
取得される。
In the fourth control embodiment, first, the height position of the work implement, specifically, the height H of the arm top 12a is detected. The arm top height H is obtained by calculating the coordinate position (X5, Y5, Z5) of the armtop 12a from the above (1) to (11), and adding the known length from the ground surface GL to the boom foot 5a to the obtained Y5. By adding
Is obtained.

【0222】そして、図20に示すように、検出された
作業機の高さ位置Hが所定のしきい値Ha以下である場
合に、オフセットブーム11のオフセット最大動作速度
が制限される。以下、具体的に説明する。
Then, as shown in FIG. 20, when the detected height position H of the work implement is equal to or less than a predetermined threshold value Ha, the offset maximum operation speed of the offset boom 11 is limited. Hereinafter, a specific description will be given.

【0223】この第4の制御の実施形態では、図20に
示すようなアームトップ高さHとオフセットブーム11
のオフセット最大速度ve3(Q3)との対応関係が、コ
ントローラ50に記憶テーブルとして記憶されておかれ
る。なお、Hからve3(Q3)を求める演算式を記憶さ
せておいてもよい。
In the fourth embodiment, the arm top height H and the offset boom 11 as shown in FIG.
The corresponding relationship with the maximum offset speed ve3 (Q3) is stored in the controller 50 as a storage table. Note that an arithmetic expression for obtaining ve3 (Q3) from H may be stored.

【0224】ここで、図20の縦軸のve3は、オフセッ
トブーム11の回動速度であり、これはオフセットブー
ム用流量制御弁36からオフセットブーム用油圧シリン
ダ10に供給される流量Q3に比例し、オフセットブー
ム用流量制御弁36に対する電流指令I3に比例してい
る。
Here, ve3 on the vertical axis in FIG. 20 is the rotation speed of the offset boom 11, which is proportional to the flow rate Q3 supplied from the offset boom flow control valve 36 to the offset boom hydraulic cylinder 10. Is proportional to the current command I3 for the offset boom flow control valve 36.

【0225】図19に示す対応関係では、アームトップ
高さHが所定のしきい値Ha(たとえば1mに設定され
る)よりも大きい場合には、オフセット速度最大値ve3
(Q3)は100%に設定されている。そして、アーム
トップ高さHが所定のしきい値Ha以下では、オフセッ
ト速度最大値ve3(Q3)は漸次減少し、地表面GL以
下では70%になるように設定されている。ここで、し
きい値Haは、その高さ以下ではオフセットブーム11
を微操作すると判断される大きさに、予め設定されてお
かれる。
In the correspondence shown in FIG. 19, when the arm top height H is larger than a predetermined threshold value Ha (for example, set to 1 m), the offset speed maximum value ve3
(Q3) is set to 100%. When the arm top height H is equal to or less than the predetermined threshold value Ha, the offset speed maximum value ve3 (Q3) is gradually reduced, and is set to 70% when the arm top height H is equal to or less than the ground surface GL. Here, the threshold value Ha is less than the height of the offset boom 11.
Is set in advance to a size determined to be finely operated.

【0226】一方において、図21(a)、(b)に示
すように、オフセットペダル47の操作量Stに対する
オフセットブーム11のオフセット動作速度(流量指
令)Q3Pの対応関係が設定されておかれる。
On the other hand, as shown in FIGS. 21 (a) and 21 (b), the correspondence between the operation amount St of the offset pedal 47 and the offset operation speed (flow rate command) Q3P of the offset boom 11 is set.

【0227】すなわち、オフセットペダル47の操作ス
トローク量Stと、この操作ストローク量を示す電気信
号たるオフセット電圧V3とは比例関係にあり(図21
(a))、このオフセット電圧V3と、オフセット動作
速度(流量指令)Q3Pとは比例関係にある(図21
(b))。
That is, the operation stroke St of the offset pedal 47 is proportional to the offset voltage V3 which is an electric signal indicating the operation stroke (FIG. 21).
(A)) The offset voltage V3 is proportional to the offset operation speed (flow rate command) Q3P (FIG. 21).
(B)).

【0228】そこで、現在のアームトップ高さHが演算
され、これに対応するオフセットブーム11のオフセッ
ト速度最大値Q3が、図20の対応関係から求められ
る。
Therefore, the current arm top height H is calculated, and the corresponding maximum offset speed Q3 of the offset boom 11 is obtained from the correspondence shown in FIG.

【0229】一方、オペレータがオフセットペダル47
を操作すると、その操作量V3がコントローラ50に入
力され、この現在の操作量V1に対応するオフセットブ
ーム11の速度Q3Pが、図21(b)に示す対応関係か
ら求められる。
On the other hand, when the operator
Is operated, the operation amount V3 is input to the controller 50, and the speed Q3P of the offset boom 11 corresponding to the current operation amount V1 is obtained from the correspondence shown in FIG.

【0230】そして、これら求められたオフセットブー
ム11の速度Q3、Q3Pのうちで小さい方のオフセット
ブーム11の速度Q0が選択される。
Then, the speed Q0 of the smaller offset boom 11 is selected from the obtained speeds Q3 and Q3P of the offset boom 11.

【0231】そして、図22(a)に示す比例関係に従
い、上記選択されたオフセットブーム11の速度Q0に
比例した電流指令I3が生成され、これがオフセットブ
ーム用流量制御弁36に対して加えられる。この結果、
図22(b)に示す比例関係に従い、オフセットブーム
11は、電流指令I3に比例した速度ve3で左右に回動
される。
In accordance with the proportional relationship shown in FIG. 22A, a current command I3 proportional to the speed Q0 of the selected offset boom 11 is generated and applied to the offset boom flow control valve 36. As a result,
According to the proportional relationship shown in FIG. 22B, the offset boom 11 is rotated right and left at a speed ve3 proportional to the current command I3.

【0232】図23は、オフセットペダル47の操作ス
トローク量Stとオフセットブーム11の回動速度ve3
の対応関係を示している。
FIG. 23 shows the operation stroke amount St of the offset pedal 47 and the rotation speed ve3 of the offset boom 11.
Are shown.

【0233】今、アームトップ高さHが、しきい値Ha
以下であったとする。
Now, the arm top height H is equal to the threshold value Ha.
Suppose that

【0234】すると、図23に示すように、オフセット
ペダル47の操作ストローク量Stが微操作領域(〜St
1)にある場合には、ペダルの踏み込み量に比例してオ
フセットブーム11の速度が上昇する。やがて、オフセ
ットペダル47の操作ストローク量Stがフル操作領域
(St1〜St2)に達すると、ペダルを踏込んだとして
も、オフセットブーム11の速度は、一定値veDのまま
となり、それ以上上昇しない。この一定値veDはアーム
トップ高さHが低いほど小さい値とする。たとえば、H
が地表面GL以下ではveDを70%とする。
Then, as shown in FIG. 23, the operation stroke amount St of the offset pedal 47 becomes smaller in the fine operation region (〜St).
In the case of (1), the speed of the offset boom 11 increases in proportion to the amount of depression of the pedal. Eventually, when the operation stroke amount St of the offset pedal 47 reaches the full operation area (St1 to St2), even if the pedal is depressed, the speed of the offset boom 11 remains at the constant value veD and does not increase further. This constant value veD is set to a smaller value as the arm top height H is lower. For example, H
However, below ground surface GL, veD is set to 70%.

【0235】このため、アームトップ12aが低い位置
にあり、側溝掘り作業等を行っている場合には、オフセ
ットペダル47の操作ストローク量Stいかんにかかわ
らずに、オフセットブーム11の動作速度ve3は低く抑
えられることになる(速度veD以下)。
For this reason, when the arm top 12a is at a low position and digging a trench is performed, the operating speed ve3 of the offset boom 11 is low regardless of the operation stroke amount St of the offset pedal 47. (Speed veD or less).

【0236】今、アームトップ高さHが、しきい値Ha
よりも大きい値であったとする。
Now, the arm top height H is equal to the threshold value Ha.
It is assumed that the value is larger than.

【0237】すると、図23に示すように、オフセット
ペダル47の操作ストローク量Stが微操作領域(〜St
1)にある場合には、ペダルの踏み込み量に比例してオ
フセットブーム11の速度が上昇する。やがて、オフセ
ットペダル47の操作ストローク量Stがフル操作領域
(St1〜St2)に達しても、ペダルの踏み込み量に比例
してオフセットブーム11の速度が上昇して、最大速度
veUに達する。
Then, as shown in FIG. 23, the operation stroke amount St of the offset pedal 47 becomes smaller in the fine operation region (〜St).
In the case of (1), the speed of the offset boom 11 increases in proportion to the amount of depression of the pedal. Eventually, even when the operation stroke amount St of the offset pedal 47 reaches the full operation area (St1 to St2), the speed of the offset boom 11 increases in proportion to the pedal depression amount, and reaches the maximum speed veU.

【0238】よって、アームトップ12aが高い位置に
あり、高所掘削作業等を行っている場合には、オフセッ
トペダル47の操作ストローク量Stに応じた速度ve3
でオフセットブーム11が高速に作動される。
Therefore, when the arm top 12a is at a high position and excavation work at a high place or the like is performed, the speed ve3 according to the operation stroke amount St of the offset pedal 47 is used.
, The offset boom 11 is operated at high speed.

【0239】よって、オペレータとしては作業機が低い
位置にあり側溝掘り作業等を行う場合にオフセットペダ
ル47を微操作する作業から解放され、仕事の負担、疲
労が軽減される。一方、作業機が高い位置にあり高所掘
削作業等を行うときには、オフセットブーム11の動作
速度は低速度に制限されることはないので、作業効率を
高めることができる。
Therefore, when the work machine is at a low position as an operator and a side ditch digging operation or the like is performed, the operation of finely operating the offset pedal 47 is released, and the work load and fatigue are reduced. On the other hand, when the work implement is at a high position and performs excavation work at a high place, the operation speed of the offset boom 11 is not limited to a low speed, so that work efficiency can be improved.

【0240】なお、本実施形態では、アームトップ12
aの高さHを検出することで、作業機の高さを検出する
ようにしているが、これに限定されることなく、バケッ
ト刃先位置14a等、作業機の高さを示す場所であれ
ば、高さを検出すべき部位は任意に設定可能である。
In this embodiment, the arm top 12
The height H of the working machine is detected to detect the height of the working machine. However, the present invention is not limited to this. Any location indicating the height of the working machine, such as the bucket blade position 14a, is used. The position at which the height is to be detected can be set arbitrarily.

【0241】なお、オフセットブーム11を操作する手
段は、ペダルを想定しているが、操作レバー、操作スイ
ッチ等任意の操作手段を用いることができる。
[0241] The means for operating the offset boom 11 is assumed to be a pedal, but any operating means such as an operating lever and an operating switch can be used.

【0242】なお、図20では、しきい値を境にしてオ
フセット速度を漸次変化させるような対応関係を設定し
ているが、しきい値の前後でオフセット速度の値を二値
的に変化させるような対応関係を設定する実施も可能で
ある。
In FIG. 20, the correspondence is set such that the offset speed is gradually changed at the threshold, but the value of the offset speed is changed binary before and after the threshold. It is also possible to set such correspondence.

【0243】なお、本実施形態では、オフセットペダル
47の踏み込み操作量に比例したオフセット電圧V3が
出力される場合(図21(a))を想定しているが、ペ
ダルの操作のオン/オフによりオフセット電圧V3を二値
的に変化させる場合にも適用可能である。この場合のペ
ダルストロークSt(オン/オフ信号)とオフセット速度
ve3の関係は図23に2点鎖線で表される。
In the present embodiment, it is assumed that the offset voltage V3 is output in proportion to the amount of depression of the offset pedal 47 (FIG. 21 (a)). The present invention is also applicable to a case where the offset voltage V3 is changed in a binary manner. The relationship between the pedal stroke St (on / off signal) and the offset speed ve3 in this case is represented by a two-dot chain line in FIG.

【0244】ペダルがオフされている場合(〜St1)に
は、オフセットブーム11の速度は零となる。ペダルが
オンされているとき(St1〜St2)であって、アームト
ップ位置12aが低い位置(Hが地表面GLの上方1m
より下方)にあり側溝掘り作業等を行っている場合に
は、オフセットブーム11の動作速度ve3は低い速度v
eDとなる。ペダルがオンされているとき(St1〜St2)
であって、アームトップ12aが高い位置(Hが地表面
GLの上方1m以上)にあり高所掘削作業等を行ってい
る場合には、オフセットブーム11の動作速度ve3は高
い速度veUとなる。
When the pedal is off (~ St1), the speed of the offset boom 11 becomes zero. When the pedal is turned on (St1 to St2), the arm top position 12a is at a low position (H is 1 m above the ground surface GL).
(Below), when the side ditch work is being performed, the operation speed v e3 of the offset boom 11 is lower than the lower speed v
eD. When the pedal is on (St1 to St2)
When the arm top 12a is located at a high position (H is 1 m or more above the ground surface GL) and excavation work is performed at a high place, the operation speed ve3 of the offset boom 11 becomes a high speed veU.

【0245】以上が第4の制御の内容である。The above is the contents of the fourth control.

【0246】・第5の制御(作業機の高さ位置に応じて
第2ブームの回動速度を制限する制御) 図2に示す構造の油圧ショベル1では、第2ブーム用操
作釦46U、46Dを操作することで、第2ブーム7を
回動させ、側溝掘り作業、マス掘り作業等を行わせるよ
うにしている。
Fifth control (control for restricting the rotation speed of the second boom according to the height position of the work implement) In the hydraulic excavator 1 having the structure shown in FIG. 2, the second boom operation buttons 46U and 46D By operating, the second boom 7 is rotated to perform a trench excavation operation, a mass excavation operation, and the like.

【0247】ところで、側溝掘り作業等を行うときに
は、バケット14が溝の中で比較的低速度で移動するよ
うに、第2ブーム7の動作を微操作にて行う必要があ
る。第2ブーム7の動作を微操作で行うことで作業性が
向上する。
By the way, when performing a trench excavation work or the like, it is necessary to finely operate the second boom 7 so that the bucket 14 moves at a relatively low speed in the trench. Workability is improved by performing the operation of the second boom 7 by a fine operation.

【0248】そこで、従来は、オペレータとしては、第
2ブーム用操作釦46U、46Dの操作を微調整するこ
とで、第2ブーム7の動作の速度を抑えつつ、溝の中で
バケット14を低速度で移動させるようにしていた。
Therefore, conventionally, as an operator, by finely adjusting the operation of the second boom operation buttons 46U and 46D, the operator can lower the bucket 14 in the groove while suppressing the operation speed of the second boom 7. It was moving at speed.

【0249】しかし、第2ブーム用操作釦46U、46
Dの操作を微調整して、溝の中でバケット14を低速度
で移動させるという微操作作業は高度の技術を必要と
し、熟練を要する。しかも、第2ブーム用操作釦46
U、46D以外にもバケット用操作レバー等他の操作レ
バーを同時に複合操作しなければならない状況下では、
なおさらのことである。
However, the second boom operation buttons 46U, 46
The fine operation of finely adjusting the operation of D and moving the bucket 14 at a low speed in the groove requires a high level of skill and skill. Moreover, the second boom operation button 46
Under the situation where other operation levers such as bucket operation levers other than U and 46D must be simultaneously operated simultaneously,
Even more so.

【0250】このため、未熟練なオペレータにとっては
もちろんのこと、熟練したオペレータといえども、仕事
の負担が大きく、疲労が大きいものとなっていた。
For this reason, not only unskilled operators but also skilled operators have a heavy work load and heavy fatigue.

【0251】一方、作業機が高い位置にあるときには、
微操作は必要とせず、むしろ高所掘削作業を効率よく行
うべく第2ブーム7を迅速に動作させたいとの要請があ
る。
On the other hand, when the working machine is at a high position,
There is a demand that the second boom 7 be operated promptly in order to efficiently perform the excavation work at a high altitude without requiring fine operation.

【0252】この第5の制御では、作業機が高い位置に
あるときの作業性を損なうことなく、側溝掘り作業等を
行っている場合の微操作作業を、オペレータに負担なく
行えるようにするものである。
In the fifth control, the operator can perform fine operation work such as digging work without burdening the operator without impairing the workability when the work machine is at a high position. It is.

【0253】この第5の制御の実施形態では、まず、作
業機の高さ位置が検出される。具体的には、第1ブーム
の回転角θ1が、作業機の高さ位置を示す値として、回
転角検出センサ17により検出される。
In the fifth control embodiment, first, the height position of the working machine is detected. Specifically, the rotation angle θ1 of the first boom is detected by the rotation angle detection sensor 17 as a value indicating the height position of the work implement.

【0254】そして、図24に示すように、検出された
第1ブーム回転角θ1が所定のしきいθ1a以下である場
合に、第2ブーム7の速度最大値が制限される。以下、
具体的に説明する。
Then, as shown in FIG. 24, when the detected first boom rotation angle θ1 is equal to or smaller than a predetermined threshold θ1a, the maximum speed value of the second boom 7 is limited. Less than,
This will be specifically described.

【0255】この第5の制御の実施形態では、図24に
示すような第1ブーム回転角θ1と第2ブーム7の最大
速度ve2(Q2)との対応関係が、コントローラ50に
記憶テーブルとして記憶されておかれる。なお、θ1か
らve2(Q2)を求める演算式を記憶させておいてもよ
い。
In the fifth embodiment, the correspondence between the first boom rotation angle θ1 and the maximum speed ve2 (Q2) of the second boom 7 as shown in FIG. 24 is stored in the controller 50 as a storage table. Have been done. Note that an arithmetic expression for obtaining ve2 (Q2) from θ1 may be stored.

【0256】ここで、図24の縦軸のve2は、第2ブー
ム7の回動速度であり、これは第2ブーム用流量制御弁
35から第2ブーム用油圧シリンダ8に供給される流量
Q2に比例し、第2ブーム用流量制御弁35に対する電
流指令I2に比例している。
Here, ve2 on the vertical axis in FIG. 24 is the rotation speed of the second boom 7, which is the flow rate Q2 supplied from the second boom flow control valve 35 to the second boom hydraulic cylinder 8. , And is proportional to the current command I2 for the second boom flow control valve 35.

【0257】図24に示す対応関係では、第1ブーム回
転角θ1が所定のしきい値θ1a(たとえば40°に設定
される)よりも大きい場合には、第2ブーム速度最大値
ve2(Q2)は100%に設定されている。そして、第
1ブーム回転角θ1が所定のしきい値θ1a以下では、第
2ブーム速度最大値ve2(Q2)は漸次減少し、所定の
角度θ1b(たとえば10°)で60%に達し、それ以下
では60%を維持するように設定されている。ここで、
しきい値θ1aは、その角度以下では第2ブーム7を微操
作すると判断される大きさに、予め設定されておかれ
る。
In the correspondence shown in FIG. 24, when the first boom rotation angle θ1 is larger than a predetermined threshold value θ1a (for example, set to 40 °), the second boom speed maximum value ve2 (Q2) Is set to 100%. When the first boom rotation angle θ1 is equal to or less than a predetermined threshold value θ1a, the second boom speed maximum value ve2 (Q2) gradually decreases and reaches 60% at a predetermined angle θ1b (for example, 10 °). Is set to maintain 60%. here,
The threshold value θ1a is set in advance to a size at which it is determined that the second boom 7 is finely operated below the angle.

【0258】一方において、図25(a)、(b)に示
すように、第2ブーム用操作釦(スイッチ)46U、4
6Dの操作量Stに対する第2ブーム7の動作速度(流
量指令)Q2Pの対応関係が設定されておかれる。
On the other hand, as shown in FIGS. 25A and 25B, the second boom operation buttons (switches) 46U,
The correspondence between the operation speed (flow rate command) Q2P of the second boom 7 and the 6D operation amount St is set.

【0259】すなわち、操作釦46U、46Dの操作量
Stと、この操作量を示す電気信号たる第2ブーム電圧
V2とは比例関係にあり(図25(a))、この第2ブ
ーム電圧V2と、第2ブーム動作速度(流量指令)Q2P
とは比例関係にある(図25(b))。
That is, the operation amount St of the operation buttons 46U and 46D is proportional to the second boom voltage V2 which is an electric signal indicating the operation amount (FIG. 25 (a)). , 2nd boom operation speed (flow command) Q2P
Is in a proportional relationship (FIG. 25B).

【0260】そこで、現在の第1ブーム回転角θ1が検
出され、これに対応する第2ブーム7の速度最大値Q2
が、図24の対応関係から求められる。
Then, the current first boom rotation angle θ1 is detected, and the speed maximum value Q2 of the second boom 7 corresponding thereto is detected.
Are obtained from the correspondence shown in FIG.

【0261】一方、オペレータが操作釦46U、46D
を操作すると、その操作量V2がコントローラ50に入
力され、この現在の操作量V2に対応する第2ブーム7
の速度Q2Pが、図25(b)に示す対応関係から求めら
れる。
On the other hand, the operator operates the operation buttons 46U and 46D.
Is operated, the operation amount V2 is input to the controller 50, and the second boom 7 corresponding to the current operation amount V2 is operated.
Is obtained from the correspondence shown in FIG. 25 (b).

【0262】そして、これら求められた第2ブーム7の
速度Q2、Q2Pのうちで小さい方の第2ブーム7の速度
QBが選択される。
Then, the speed QB of the second boom 7 which is smaller among the obtained speeds Q2 and Q2P of the second boom 7 is selected.

【0263】そして、図26(a)に示す比例関係に従
い、上記選択された第2ブーム7の速度QBに比例した
電流指令I2が生成され、これが第2ブーム用流量制御
弁35に対して加えられる。この結果、図26(b)に
示す比例関係に従い、第2ブーム7は、電流指令I2に
比例した速度ve2で回動される。
Then, in accordance with the proportional relationship shown in FIG. 26A, a current command I2 proportional to the selected speed QB of the second boom 7 is generated, and this is added to the second boom flow control valve 35. Can be As a result, the second boom 7 is rotated at a speed ve2 proportional to the current command I2 according to the proportional relationship shown in FIG.

【0264】図27は、第2ブーム用操作釦(スイッ
チ)46U、46Dの操作量Stと第2ブーム7の回動
速度ve2の対応関係を示している。
FIG. 27 shows the correspondence between the operation amounts St of the second boom operation buttons (switches) 46U and 46D and the rotation speed ve2 of the second boom 7.

【0265】今、第1ブーム回転角θ1が、しきい値θ1
a以下であったとする。
Now, the first boom rotation angle θ1 is equal to the threshold θ1
a

【0266】すると、図27に示すように、操作釦46
U、46Dの操作量Stが微操作領域(〜St1)にある
場合には、操作釦の押操作量に比例して第2ブーム7の
速度が上昇する。やがて、操作釦46U、46Dの操作
量Stがフル操作領域(St1〜St2)に達すると、操作
釦を押操作しても、第2ブーム7の速度は、一定値veD
のままとなり、それ以上上昇しない。この一定値veDは
第1ブーム回転角θ1が小さくほど低い値をとる。θ1が
θ1b以下ではveDは60%となる。
Then, as shown in FIG.
When the operation amount St of U, 46D is in the fine operation area (〜St1), the speed of the second boom 7 increases in proportion to the operation amount of the operation button. Eventually, when the operation amount St of the operation buttons 46U and 46D reaches the full operation area (St1 to St2), even if the operation button is pressed, the speed of the second boom 7 is kept at a constant value veD.
And will not rise any further. This constant value veD has a lower value as the first boom rotation angle θ1 is smaller. When θ1 is equal to or smaller than θ1b, veD is 60%.

【0267】このため、第1ブーム回転角θ1が小さ
く、側溝掘り作業等を行っている場合には、操作釦46
U、46Dの操作量Stいかんにかかわらずに、第2ブ
ーム7の動作速度ve2は低く抑えられることになる(速
度veD以下)。
For this reason, when the first boom rotation angle θ1 is small and the digging work is performed, the operation button 46
Regardless of the operation amount St of the U and 46D, the operation speed ve2 of the second boom 7 can be kept low (the speed veD or less).

【0268】今、第1ブーム回転角θ1が、しきい値θ1
aよりも大きい値であったとする。
Now, the first boom rotation angle θ1 is equal to the threshold θ1
Assume that the value is larger than a.

【0269】すると、図27に示すように、操作釦46
U、46Dの操作量Stが微操作領域(〜St1)にある
場合には、操作釦の押操作量に比例して第2ブーム7の
速度が上昇する。やがて、操作釦46U、46Dの操作
量Stがフル操作領域(St1〜St2)に達しても、操作
釦の押操作量に比例して、第2ブーム7の速度が上昇し
て、最大速度veUに達する。
Then, as shown in FIG.
When the operation amount St of U, 46D is in the fine operation area (〜St1), the speed of the second boom 7 increases in proportion to the operation amount of the operation button. Eventually, even if the operation amount St of the operation buttons 46U and 46D reaches the full operation area (St1 to St2), the speed of the second boom 7 increases in proportion to the operation amount of the operation buttons, and the maximum speed veU Reach

【0270】よって、第1ブーム回転角θ1が大きく、
高所掘削作業等を行っている場合には、操作釦46U、
46Dの操作量Stに応じた速度ve2で第2ブーム7が
高速に作動される。
Thus, the first boom rotation angle θ1 is large,
When performing high-altitude excavation work, the operation button 46U,
The second boom 7 is operated at a high speed at a speed ve2 corresponding to the operation amount St of 46D.

【0271】この結果、オペレータとしては作業機が低
い位置にあり側溝掘り作業等を行う場合に操作釦46
U、46Dを微操作する作業から解放され、仕事の負
担、疲労が軽減される。一方、作業機が高い位置にあり
高所掘削作業等を行うときには、第2ブーム7の動作速
度は低速度に制限されることはないので、作業効率を高
めることができる。
As a result, when the work machine is in a low position as an operator and a side digging operation or the like is performed, the operation button 46 is used.
The work of finely operating the U and 46D is released, and the work load and fatigue are reduced. On the other hand, when the work implement is at a high position and performs excavation work at a high place, the operation speed of the second boom 7 is not limited to a low speed, so that work efficiency can be improved.

【0272】なお、本実施形態では、第1ブーム回転角
θ1を検出することにより、作業機の高さを検出してい
るが、これに限定されることなく、アームトップ12a
の高さH、第1ブーム5または第2ブーム7の高さ等、
作業機の高さを示す値であれば、角度以外に高さを用い
てもよく、またその高さを検出すべき部位は任意に設定
可能である。
In the present embodiment, the height of the work implement is detected by detecting the first boom rotation angle θ1, but the present invention is not limited to this.
Height H, the height of the first boom 5 or the second boom 7, etc.
As long as the value indicates the height of the working machine, a height other than the angle may be used, and a portion where the height is to be detected can be set arbitrarily.

【0273】なお、第2ブーム7を操作する手段は、操
作量に応じてコントローラ50に入力される電気信号V
2が比例的に変化する釦46U、46Dを想定している
が、操作レバー、操作ペダル、操作スイッチ等任意の操
作手段を用いることができる。
The means for operating the second boom 7 is controlled by an electric signal V input to the controller 50 in accordance with the operation amount.
Although buttons 46U and 46D in which 2 changes proportionally are assumed, any operation means such as an operation lever, an operation pedal, and an operation switch can be used.

【0274】なお、図24では、しきい値を境にして第
2ブーム速度を漸次変化させるような対応関係を設定し
ているが、しきい値の前後で第2ブーム速度の値を二値
的に変化させるような対応関係を設定する実施も可能で
ある。
In FIG. 24, the correspondence is set such that the second boom speed is gradually changed on the basis of the threshold value. It is also possible to set a correspondence relationship that changes dynamically.

【0275】なお、本実施形態では、操作釦46U、4
6Dの操作量に比例した第2ブーム電圧V2が出力され
る場合(図25(a))を想定しているが、スイッチの
オン、オフにより二値的にオフセット電圧V2を変化さ
せる場合にも適用可能である。この場合の第2ブーム操
作用スイッチの操作量(オン/オフ信号)Stと第2ブー
ム速度ve2の関係は図27に2点鎖線で表される。
In this embodiment, the operation buttons 46U, 4U
It is assumed that the second boom voltage V2 is output in proportion to the 6D operation amount (FIG. 25 (a)). However, the case where the offset voltage V2 is changed in a binary manner by turning on and off the switch is also assumed. Applicable. In this case, the relationship between the operation amount (on / off signal) St of the second boom operation switch St and the second boom speed ve2 is represented by a two-dot chain line in FIG.

【0276】第2ブーム操作用スイッチがオフされてい
る場合(〜St1)には、第2ブーム7の速度は零とな
る。第2ブーム操作用スイッチがオンされているとき
(St1〜St2)であって、第1ブーム角度が小さい角度
(θ1が40°よりも小さい)であり側溝掘り作業等を
行っている場合には、第2ブーム7の動作速度ve2は低
い速度veDとなる。第2ブーム操作用スイッチがオンさ
れているとき(St1〜St2)であって、第1ブーム角度
が大きい角度(θ1が40°以上)であり高所掘削作業
等を行っている場合には、第2ブーム7の動作速度ve2
は高い速度veUとなる。
When the second boom operation switch is turned off (to St1), the speed of the second boom 7 becomes zero. When the second boom operation switch is turned on (St1 to St2), the first boom angle is a small angle (θ1 is smaller than 40 °), and the side ditch digging operation is performed. , The operating speed ve2 of the second boom 7 becomes a low speed veD. When the second boom operation switch is turned on (St1 to St2) and the first boom angle is a large angle (θ1 is 40 ° or more) and high-altitude excavation work or the like is performed, Operating speed ve2 of the second boom 7
Becomes a high speed v eU.

【0277】以上が第5の制御の内容である。The above is the contents of the fifth control.

【0278】なお、上記第5の制御は、第1の制御、第
2の制御、第3の制御、第4の制御と組み合わせてもよ
く、単独で実施してもよい。
The fifth control may be combined with the first control, the second control, the third control, and the fourth control, or may be performed independently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は本発明に係る建設機械の制御装置の実施
の形態を示す全体構成図である。
FIG. 1 is an overall configuration diagram showing an embodiment of a control device for a construction machine according to the present invention.

【図2】図2(a)はオフセットブームを備えた油圧シ
ョベルの側面図で、図2(b)は図2(a)の矢視A図
である。
FIG. 2A is a side view of a hydraulic shovel provided with an offset boom, and FIG. 2B is an A view of FIG. 2A.

【図3】図3は図2に示す油圧ショベルの作業機の幾何
的関係を示す図で、図3(b)は側面図で、図3(a)
は上面図である。
3 is a diagram showing a geometric relationship of a working machine of the hydraulic shovel shown in FIG. 2, FIG. 3 (b) is a side view, and FIG. 3 (a).
Is a top view.

【図4】図4は図3に示す油圧ショベルの作業機の各ポ
イントの座標位置、アーム対地角の関数式を示した表で
ある。
FIG. 4 is a table showing a coordinate position of each point of the working machine of the hydraulic shovel shown in FIG. 3 and a functional expression of an arm-to-ground angle.

【図5】図5はブームを2つ備えた油圧ショベルの側面
図である。
FIG. 5 is a side view of a hydraulic excavator provided with two booms.

【図6】図6(a)は左右のレバーの配置態様を示す図
であり、図6(b)は図6(a)に示す左レバーの上部
を示す斜視図である。
6 (a) is a diagram showing an arrangement of left and right levers, and FIG. 6 (b) is a perspective view showing an upper portion of a left lever shown in FIG. 6 (a).

【図7】図7は油圧ショベルの作業機先端が描く軌跡を
示す側面図である。
FIG. 7 is a side view showing a locus drawn by the tip of the working machine of the hydraulic shovel.

【図8】図8は油圧ショベルが作業現場において作業機
先端が描く軌跡を示す側面図である。
FIG. 8 is a side view showing a locus drawn by the tip of the work machine at the work site by the hydraulic shovel.

【図9】図9は図1に示すコントローラに記憶されてい
る第1ブーム角度と第2ブーム目標角度との対応関係を
示す図である。
FIG. 9 is a diagram showing a correspondence relationship between a first boom angle and a second boom target angle stored in the controller shown in FIG. 1;

【図10】図10は図1に示すコントローラに記憶され
ている第1ブーム角度と第2ブーム目標角度との別の対
応関係を示す図である。
FIG. 10 is a diagram showing another correspondence between the first boom angle and the second boom target angle stored in the controller shown in FIG. 1;

【図11】図11は図1に示すコントローラに記憶され
ている第1ブーム角度と第2ブーム目標角度とのさらに
また別の対応関係を示す図である。
FIG. 11 is a diagram showing still another correspondence between the first boom angle and the second boom target angle stored in the controller shown in FIG. 1;

【図12】図12は作業機先端が描く軌跡を例示した側
面図である。
FIG. 12 is a side view illustrating a trajectory drawn by the tip of the work machine;

【図13】図13は図1に示すコントローラの機能ブロ
ック図を例示した図である。
FIG. 13 is a diagram exemplifying a functional block diagram of a controller shown in FIG. 1;

【図14】図14は図1に示すコントローラの機能ブロ
ック図を例示した図である。
FIG. 14 is a diagram illustrating a functional block diagram of a controller shown in FIG. 1;

【図15】図15は図1に示すコントローラの機能ブロ
ック図を例示した図である。
FIG. 15 is a diagram exemplifying a functional block diagram of a controller shown in FIG. 1;

【図16】図16は図1に示すコントローラで実行され
る処理の手順を例示したフローチャートである。
FIG. 16 is a flowchart illustrating a procedure of processing executed by the controller shown in FIG. 1;

【図17】図17は、第2ブームの目標角度と現在角度
との偏差と、第1ブームの下げ方向速度の最大値との対
応関係を示すグラフである。
FIG. 17 is a graph showing the correspondence between the deviation between the target angle of the second boom and the current angle and the maximum value of the speed in the lowering direction of the first boom.

【図18】図18はエンジン回転数と、第1ブームの下
げ方向速度の最大値との対応関係を示すグラフである。
FIG. 18 is a graph showing the correspondence between the engine speed and the maximum value of the speed in the lowering direction of the first boom.

【図19】図19は第1ブームシリンダのヘッド側圧力
と、第1ブームの下げ方向速度の最大値との対応関係を
示すグラフである。
FIG. 19 is a graph showing the correspondence between the head side pressure of the first boom cylinder and the maximum value of the speed of the first boom in the lowering direction.

【図20】図20はアームトップ高さと、オフセットブ
ーム速度(流量指令)との対応関係を示すグラフであ
る。
FIG. 20 is a graph showing a correspondence between an arm top height and an offset boom speed (flow rate command).

【図21】図21(a)はオフセットブーム用ペダルの
ストロークと、オフセットペダルの操作量に対応するオ
フセット電圧との対応関係を示すグラフであり、図21
(b)はオフセット電圧と、オフセットブームに対する
流量指令との対応関係を示すグラフである。
FIG. 21A is a graph showing a correspondence relationship between a stroke of an offset boom pedal and an offset voltage corresponding to an operation amount of the offset pedal;
(B) is a graph showing the correspondence between the offset voltage and the flow rate command for the offset boom.

【図22】図22(a)はオフセットブームに対する流
量指令と、オフセットブーム用流量制御弁に対する電流
指令との対応関係を示すグラフであり、図22(b)は
オフセットブーム用流量制御弁に対する電流指令と、オ
フセットブームの駆動速度との対応関係を示すグラフで
ある。
FIG. 22 (a) is a graph showing a correspondence relationship between a flow command for the offset boom and a current command for the offset boom flow control valve, and FIG. 22 (b) is a graph showing the current for the offset boom flow control valve. It is a graph which shows the correspondence of a command and the drive speed of an offset boom.

【図23】図23は実施形態におけるオフセットブーム
用ペダルのストロークと、オフセットブームの駆動速度
との対応関係を示すグラフである。
FIG. 23 is a graph showing the correspondence between the stroke of the offset boom pedal and the drive speed of the offset boom in the embodiment.

【図24】図24は第1ブームの角度と、第2ブームの
速度(流量指令)との対応関係を示すグラフである。
FIG. 24 is a graph showing the correspondence between the angle of the first boom and the speed (flow rate command) of the second boom.

【図25】図25(a)は第2ブーム用スイッチの操作
量と、第2ブーム用スイッチの操作量に対応する第2ブ
ーム電圧との対応関係を示すグラフであり、図25
(b)は第2ブーム電圧と、第2ブームに対する流量指
令との対応関係を示すグラフである。
FIG. 25A is a graph showing the correspondence between the operation amount of the second boom switch and the second boom voltage corresponding to the operation amount of the second boom switch;
(B) is a graph showing the correspondence between the second boom voltage and the flow rate command for the second boom.

【図26】図26(a)は第2ブームに対する流量指令
と、第2ブーム用流量制御弁に対する電流指令との対応
関係を示すグラフであり、図26(b)は第2ブーム用
流量制御弁に対する電流指令と、第2ブームの駆動速度
との対応関係を示すグラフである。
26 (a) is a graph showing a correspondence between a flow command for the second boom and a current command for the flow control valve for the second boom, and FIG. 26 (b) is a flow control for the second boom. It is a graph which shows the correspondence of the current command with respect to a valve, and the drive speed of a 2nd boom.

【図27】図27は実施形態における第2ブーム用スイ
ッチの操作量と、第2ブームの駆動速度との対応関係を
示すグラフである。
FIG. 27 is a graph showing the correspondence between the operation amount of the second boom switch and the driving speed of the second boom in the embodiment.

【符号の説明】[Explanation of symbols]

1 油圧ショベル 3 車体(上部旋回体) 5、5A 第1ブーム 6、6A 第1ブーム用油圧シリンダ 7、7A 第2ブーム 7B 作業機リンク 8、8A 第2ブーム用油圧シリンダ 9、9A ブラケット 10 オフセット用油圧シリンダ 11 オフセットブーム 12、12A アーム 12a アームトップ位置 13、13A アーム用油圧シリンダ 12a アームトップ位置 14 バケット 14a バケット先端位置(作業機先端位置) 17 第1ブーム角度センサ 18 第2ブーム角度センサ 16 オフセット角度センサ 19 アーム角度センサ 21 第1ブーム用油圧シリンダヘッド圧センサ 22 第1ブーム用油圧シリンダボトム圧センサ 23 第2ブーム用油圧シリンダヘッド圧センサ 24 第2ブーム用油圧シリンダボトム圧センサ 25 操作盤(モニタ) 26 自動/手動モード切換スイッチ 27 エンジン回転数センサ 28 警報器 31 エンジン 32 油圧ポンプ 33 パイロットポンプ 34 第1ブーム用流量制御弁 35 第2ブーム用流量制御弁 36 オフセットブーム用流量制御弁 37 アーム用流量制御弁 45 左操作レバー 46 右操作レバー 46U、46D 第2ブーム用手動操作スイッチ 47 オフセットペダル用操作ペダル 50 コントローラ 51 第1、第2ブーム角度演算部 52 第1のブーム角と目標第2ブーム角の差演算部 53 補償要素演算部 54 第1ブーム操作弁指令演算部 55 第1ブーム角に対する目標第2ブーム角線図作成
部 56 第2ブーム操作弁指令演算部 57、59 電流出力部 58 第1ブーム角に対する目標第2ブーム角基準線図
メモリ
DESCRIPTION OF SYMBOLS 1 Hydraulic excavator 3 Body (upper revolving superstructure) 5, 5A First boom 6, 6A First boom hydraulic cylinder 7, 7A Second boom 7B Work implement link 8, 8A Second boom hydraulic cylinder 9, 9A Bracket 10 Offset Hydraulic cylinder for offset 11 Offset boom 12, 12A arm 12a Arm top position 13, 13A Hydraulic cylinder for arm 12a Arm top position 14 Bucket 14a Bucket tip position (work implement tip position) 17 First boom angle sensor 18 Second boom angle sensor 16 Offset angle sensor 19 Arm angle sensor 21 Hydraulic cylinder head pressure sensor for first boom 22 Hydraulic cylinder bottom pressure sensor for first boom 23 Hydraulic cylinder head pressure sensor for second boom 24 Hydraulic cylinder bottom pressure sensor for second boom 25 Operation panel ( Monitor) 26 Automatic / Manual mode switch 27 Engine speed sensor 28 Alarm 31 Engine 32 Hydraulic pump 33 Pilot pump 34 First boom flow control valve 35 Second boom flow control valve 36 Offset boom flow control valve 37 Arm Flow control valve 45 left operation lever 46 right operation lever 46U, 46D second boom manual operation switch 47 offset pedal operation pedal 50 controller 51 first and second boom angle calculation unit 52 first boom angle and target second Boom angle difference calculation unit 53 Compensation element calculation unit 54 First boom operation valve command calculation unit 55 Target second boom angle diagram creation unit for first boom angle 56 Second boom control valve command calculation unit 57, 59 Current output unit 58 Target Second Boom Angle Reference Diagram Memory for First Boom Angle

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 車体前方に、上下方向に回動自在に
配設した第1のフロント部材と、この第1のフロント部
材に対して上下方向に回動自在に連結した第2のフロン
ト部材とを少なくとも有した作業機を具え、操作手段の
操作量に応じて前記第2のフロント部材の回動速度を制
御する建設機械の作業機制御装置において、 前記作業機の高さ位置を検出する高さ位置検出手段と、 前記高さ位置検出手段で検出された作業機の高さ位置が
所定の高さ位置以下である場合に、前記第2のフロント
部材の最大回動速度を所定値以下に制限する制御手段と
を具えた建設機械の作業機制御装置。
A first front member disposed in front of the vehicle body so as to be rotatable in a vertical direction; and a second front member connected to the first front member so as to be rotatable in a vertical direction. A work machine control device for a construction machine, comprising: a work machine having at least a height of the work machine, wherein the work machine control device controls a rotation speed of the second front member according to an operation amount of an operation means. The height position of the work implement detected by the height position detection means is equal to or less than a predetermined height position, the maximum rotation speed of the second front member to a predetermined value or less A work machine control device for a construction machine, comprising a control means for limiting.
【請求項2】 車体前方に、上下方向に回動自在に
配設した第1のフロント部材と、この第1のフロント部
材に対して上下方向に回動自在に連結した第2のフロン
ト部材とを少なくとも有した作業機を具え、操作手段の
操作量に応じて前記第2のフロント部材の回動速度を制
御する建設機械の作業機制御装置において、 前記作業機の高さ位置を検出する高さ位置検出手段と、 前記作業機の高さ位置が所定の高さ位置以下である場合
における前記第2のフロント部材の最大回動速度が、前
記作業機の高さ位置が前記所定の高さ位置よりも大きい
場合における前記第2のフロント部材の最大回動速度よ
りも小さくなるように、前記作業機の高さ位置に対する
前記第2のフロント部材の最大回動速度の対応関係を設
定する設定手段と、 前記高さ位置検出手段で検出された作業機の高さ位置に
対応する前記第2のフロント部材の最大回動速度を、前
記設定手段で設定された内容から求め、この求めた最大
回動速度以下の範囲内で、前記第2のフロント部材の回
動速度を制御する制御手段とを具えた建設機械の作業機
制御装置。
2. A first front member disposed in front of a vehicle body so as to be rotatable in a vertical direction, and a second front member connected to the first front member so as to be rotatable in a vertical direction. A work machine control device for a construction machine, comprising: a work machine having at least a height of the work machine, wherein the work machine control device controls a rotation speed of the second front member according to an operation amount of an operation means. Position detecting means, the maximum rotation speed of the second front member when the height position of the work implement is equal to or less than a predetermined height position, the height position of the work implement is the predetermined height A setting for setting a correspondence relationship between the height position of the work implement and the maximum rotation speed of the second front member so as to be smaller than the maximum rotation speed of the second front member when the position is larger than the position. Means, the height position A maximum rotation speed of the second front member corresponding to the height position of the work implement detected by the detection means is obtained from the content set by the setting means, and is within a range not more than the obtained maximum rotation speed. And a control means for controlling a rotation speed of the second front member.
【請求項3】 車体前方に、上下方向に回動自在に
配設した第1のフロント部材と、この第1のフロント部
材に対して上下方向に回動自在に連結した第2のフロン
ト部材とを少なくとも有した作業機を具え、操作手段の
操作量に応じて前記第2のフロント部材の回動速度を制
御する建設機械の作業機制御装置において、 前記作業機の高さ位置を検出する高さ位置検出手段と、 前記操作手段の操作量を検出する操作量検出手段と、 前記作業機の高さ位置が所定の高さ位置以下である場合
における前記第2のフロント部材の最大回動速度が、前
記作業機の高さ位置が前記所定の高さ位置よりも大きい
場合における前記第2のフロント部材の最大回動速度よ
りも小さくなるように、前記作業機の高さ位置に対する
前記第2のフロント部材の最大回動速度の第1の対応関
係を設定する第1の設定手段と、 前記操作手段の操作量に対する前記第2のフロント部材
の回動速度の第2の対応関係を設定する第2の設定手段
と、 前記高さ位置検出手段で検出された作業機の現在の高さ
位置に対応する前記第2のフロント部材の最大回動速度
を、前記第1の対応関係から求めるとともに、前記操作
量検出手段で検出された操作手段の現在の操作量に対応
する前記第2のフロント部材の回動速度を、前記第2の
対応関係から求め、これら求めた回動速度のうちで小さ
い方の回動速度が得られるように、前記第2のフロント
部材の回動速度を制御する制御手段とを具えた建設機械
の作業機制御装置。
3. A first front member disposed in front of the vehicle body so as to be rotatable in the vertical direction, and a second front member connected to the first front member so as to be rotatable in the vertical direction. A work machine control device for a construction machine, comprising: a work machine having at least a height of the work machine, wherein the work machine control device controls a rotation speed of the second front member according to an operation amount of an operation means. Position detection means, operation amount detection means for detecting the operation amount of the operation means, maximum rotation speed of the second front member when the height position of the work implement is equal to or less than a predetermined height position However, the second position with respect to the height position of the work implement is smaller than the maximum rotation speed of the second front member when the height position of the work implement is larger than the predetermined height position. Maximum rotation of front member First setting means for setting a first correspondence between speeds; second setting means for setting a second correspondence between a rotation speed of the second front member and an operation amount of the operation means; The maximum rotation speed of the second front member corresponding to the current height position of the working machine detected by the height position detection means is obtained from the first correspondence, and the operation amount detection means The rotation speed of the second front member corresponding to the detected current operation amount of the operation means is obtained from the second correspondence relationship, and the smaller rotation speed among the obtained rotation speeds is obtained. A work machine control device for a construction machine, comprising: a control unit configured to control a rotation speed of the second front member.
JP05381998A 1998-03-05 1998-03-05 Construction machine work equipment controller Expired - Fee Related JP3821260B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05381998A JP3821260B2 (en) 1998-03-05 1998-03-05 Construction machine work equipment controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP05381998A JP3821260B2 (en) 1998-03-05 1998-03-05 Construction machine work equipment controller

Publications (2)

Publication Number Publication Date
JPH11247217A true JPH11247217A (en) 1999-09-14
JP3821260B2 JP3821260B2 (en) 2006-09-13

Family

ID=12953409

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05381998A Expired - Fee Related JP3821260B2 (en) 1998-03-05 1998-03-05 Construction machine work equipment controller

Country Status (1)

Country Link
JP (1) JP3821260B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150016933A (en) * 2012-06-08 2015-02-13 스미도모쥬기가이고교 가부시키가이샤 Excavator control method and control device
CN113874584A (en) * 2019-06-19 2021-12-31 株式会社久保田 Working machine
WO2023159913A1 (en) * 2022-02-25 2023-08-31 三一重型装备有限公司 Header machine control method and device, readable storage medium, and header machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150016933A (en) * 2012-06-08 2015-02-13 스미도모쥬기가이고교 가부시키가이샤 Excavator control method and control device
KR20190110650A (en) * 2012-06-08 2019-09-30 스미도모쥬기가이고교 가부시키가이샤 Excavator control method and control device
CN113874584A (en) * 2019-06-19 2021-12-31 株式会社久保田 Working machine
WO2023159913A1 (en) * 2022-02-25 2023-08-31 三一重型装备有限公司 Header machine control method and device, readable storage medium, and header machine

Also Published As

Publication number Publication date
JP3821260B2 (en) 2006-09-13

Similar Documents

Publication Publication Date Title
JP3929039B2 (en) Swing control device for swing hydraulic excavator
WO2019124520A1 (en) Work machine
KR19990081852A (en) Control device of construction machinery
JPH07197485A (en) Working machine control device for construction machine
WO1999058771A1 (en) Construction machinery
US6079131A (en) Operation control device for three-joint type excavator
US6101437A (en) Operation control device for three-joint excavator
JPS6286234A (en) Controller for working machine in power shovel
JP3821260B2 (en) Construction machine work equipment controller
JP3461281B2 (en) Work machine control device for construction machinery
JPH11247220A (en) Work machine controller of construction machinery
JP3831795B2 (en) Construction machine work equipment controller
WO2021193321A1 (en) Operating machine and method for controlling operating machine
JPH11247219A (en) Work machine controller of construction machinery
KR100547203B1 (en) Automatic flat work device and method of construction machinery
JP3794771B2 (en) Hydraulic excavator work machine control device
JP3682352B2 (en) Front control device for construction machinery
WO1998003738A1 (en) Method and apparatus for linear control of working machine of construction equipment
JPH10292417A (en) Front control device for construction machine
JPH0734483A (en) Bucket leveller device for industrial vehicle
EP4317596A1 (en) Excavator and excavator control device
US20230151582A1 (en) Apparatus for facilitating bucket movement
JP2000336690A (en) Area restricted excavation control device for construction machine
JPH10259618A (en) Control device for construction machine
JP2871890B2 (en) Excavator excavation control device

Legal Events

Date Code Title Description
A977 Report on retrieval

Effective date: 20050530

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Effective date: 20050607

Free format text: JAPANESE INTERMEDIATE CODE: A131

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050805

A131 Notification of reasons for refusal

Effective date: 20060214

Free format text: JAPANESE INTERMEDIATE CODE: A131

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060405

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Effective date: 20060613

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060614

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090630

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 4

Free format text: PAYMENT UNTIL: 20100630

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100630

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20110630

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120630

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120630

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130630

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees