JPH11176550A JP34261297A JP34261297A JPH11176550A JP H11176550 A JPH11176550 A JP H11176550A JP 34261297 A JP34261297 A JP 34261297A JP 34261297 A JP34261297 A JP 34261297A JP H11176550 A JPH11176550 A JP H11176550A
Authority
JP
Japan
Prior art keywords
rail
clamp
bond
welding
clamp device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP34261297A
Other languages
Japanese (ja)
Other versions
JP4022840B2 (en
Inventor
Yoshiaki Moriasa
嘉明 森麻
Yoshiaki Masukami
義明 増神
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
West Japan Railway Co
Original Assignee
West Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by West Japan Railway Co filed Critical West Japan Railway Co
Priority to JP34261297A priority Critical patent/JP4022840B2/en
Publication of JPH11176550A publication Critical patent/JPH11176550A/en
Application granted granted Critical
Publication of JP4022840B2 publication Critical patent/JP4022840B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a rail bond welding clamp device for enabling the passing. of a train in the condition that a device is set in a rail and for enabling the efficient welding work. SOLUTION: A rail bond welding clamp device 10 is formed of a clamp means 11 for pinching a rail bottom part 1c, a pushing means 12 fitted to the clamp means 11 to be freely moved forward and backward in relation to a rail side surface 1c, and a heating agent holding means 13 of a rail bond 7 fitted to a tip of the pushing means 12. The clamp device 10 can be fixed to the rail bottom part 1c, and a member to be a cause of hindrance of traveling of a train is eliminated from a rail head part 1b so that a train can travel on the rail in the condition that the clamp device 10 is fitted to the rail. Namely, rail bond 7 welding work can be safely and quickly performed while passing the train. Since plural heating agent holding means 13 are provided in parallel with each other, two rail bonds 7, 7, for example, can be simultaneously clamped for welding work, and the welding work can be remarkably efficiently performed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、レールボンドをレ
ールとレールの継目へ溶接するに際し、列車の走行に支
障を来すことなく、レールボンド及び加熱剤を保持する
ことのできるクランプ装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a clamp device which can hold a rail bond and a heating agent without hindering the running of a train when welding a rail bond to a rail joint. It is.

【0002】[0002]

【従来の技術】鉄道事業の電気部門では、信号設備を制
御するための信号電流を流す信号線としてレールを利用
しており、また電車を走行させるための電車電流を変電
所へ返すための電気線としてレールを利用している。そ
のため、レールとレールを電気的に接続するものとして
レールボンドが使用されている。レールボンドは、軟銅
線を右撚りの方向で同心円に撚り合わせ、両端に端子を
取り付けたものであり、両端の端子をそれぞれレール側
面部へ溶接ボンドをもって溶接するようにしている。
2. Description of the Related Art In the electric sector of the railway business, rails are used as signal lines for passing signal current for controlling signal equipment, and electric power for returning a train current for running a train to a substation. Rails are used as lines. Therefore, rail bonds are used to electrically connect the rails. The rail bond is formed by twisting a soft copper wire concentrically in a right-handed direction and attaching terminals to both ends, and the terminals at both ends are welded to the side surfaces of the rail by welding bonds.

【0003】従来のレールボンドの溶接作業は、図7に
示すように、レール1を上方から跨いで内外のレール側
面部1aどうしを挟持するクランプ部材2を用いて行っ
ていた。クランプ部材2は、二本のアーム3a及び3b
の中間点を支点4として開閉自在とし、支点4よりも後
端側に圧縮スプリング5を装着することにより、先端の
挟持部6でレール側面部1aどうしを挟持するようにし
ている。このクランプ部材2によるレールボンド7の溶
接作業は、次のようにして行っている。
As shown in FIG. 7, a conventional rail bond welding operation has been performed by using a clamp member 2 which straddles a rail 1 from above and clamps inner and outer rail side surfaces 1a. The clamp member 2 includes two arms 3a and 3b
The intermediate point of the rails can be freely opened and closed as a fulcrum 4 and a compression spring 5 is mounted on the rear end side of the fulcrum 4 so that the rail side surface portions 1a are held between the holding portions 6 at the front end. The welding work of the rail bond 7 by the clamp member 2 is performed as follows.

【0004】すなわち、レール1,1どうしの継目にレ
ールボンド7を準備し、その両端側の端子にそれぞれ予
め溶接しておいた加熱剤8をレール側面部1aへ押し当
て、この状態で前記クランプ部材2により、加熱剤8を
レール側面部1aへ挟持して固定している。加熱剤8
は、溶接ボンド8aを溶かし、レールボンド7の溶接を
し易くするための簡易加熱炉である。そして、次に加熱
剤8を外部からバーナー(図示せず)で加熱して溶接ボ
ンド8aを溶かし、また新たに溶接ボンドを加熱剤8の
凹部8bへ加えて撹拌し、所要形状に盛り上げて行って
いる。
That is, a rail bond 7 is prepared at the joint between the rails 1 and 1, and a heating agent 8 welded in advance to terminals at both ends thereof is pressed against the rail side surface portion 1a. The heating agent 8 is sandwiched and fixed by the member 2 to the rail side surface portion 1a. Heating agent 8
Is a simple heating furnace for melting the welding bond 8a and facilitating the welding of the rail bond 7. Then, the heating agent 8 is externally heated by a burner (not shown) to melt the welding bond 8a, and a new welding bond is added to the concave portion 8b of the heating agent 8 and stirred to build up to a required shape. ing.

【0005】[0005]

【発明が解決しようとする課題】ところが、前記従来の
クランプ部材2を用いる溶接作業では、クランプ部材2
をレール頭部1bの上方からこれを跨いで配設し、内外
のレール側面部1a,1aどうしを挟持することでレー
ルボンド7及び加熱剤8をレール側面部1aへ当接固定
している。そのため、列車の走行に支障を来し、非常に
危険である。また列車の往来がある度に、クランプ部材
2を取り外してレールボンド7及び加熱剤8のセット状
態を解除し、溶接作業を中断する必要がある。しかも、
溶接作業は最初からやり直す必要があるので、極めて非
能率的であり、列車が通過する時間間隔が短い場合は、
溶接作業自体が行えないという不都合もあった。
However, in the welding operation using the conventional clamping member 2, the clamping member 2
Are arranged from above the rail head 1b, and the rail bond 7 and the heating agent 8 are abutted and fixed to the rail side surface 1a by sandwiching the inner and outer rail side surfaces 1a. Therefore, it hinders the running of the train and is very dangerous. Further, every time a train comes and goes, it is necessary to remove the clamp member 2 to release the set state of the rail bond 7 and the heating agent 8, and to interrupt the welding work. Moreover,
The welding work has to be restarted from the beginning, so it is very inefficient and if the time interval between trains is short,
There was also a disadvantage that the welding operation itself could not be performed.

【0006】更に、レール1どうしを斜めに切断して重
ね合わせた伸縮継目の部分にあっては、レール頭部の全
体の幅が通常のレール頭部1bの幅よりも大きく、前記
クランプ部材2ではクランプすることができないという
問題があった。更にまた、加熱剤8を加熱して溶融状態
の溶接ボンド8aはこれを撹拌しながら盛り上げる必要
があるが、クランプ部材2のアーム3aの先端挟持部6
が撹拌作業の邪魔になり、溶接作業自体が円滑に行えな
いという問題もあった。それに加えて、列車往来の度に
クランプ部材2の解除をしなければならず、放置できな
いので、一度に一か所の溶接作業しか行えないという欠
点もあった。
Further, at the joints where the rails 1 are cut obliquely and overlapped, the entire width of the rail head is larger than the width of the normal rail head 1b, and the clamp member 2 Then, there was a problem that it was not possible to clamp. Furthermore, it is necessary to heat the heating agent 8 to raise the weld bond 8a in a molten state while stirring the same, but the tip holding portion 6 of the arm 3a of the clamp member 2 needs to be raised.
However, there is also a problem that the welding operation itself cannot be performed smoothly because it hinders the stirring operation. In addition, the clamp member 2 must be released each time a train arrives and cannot be left, so that there is a disadvantage that only one welding operation can be performed at a time.

【0007】[0007]

【課題を解決するための手段】本発明は従来の前記課題
に鑑みてこれを改良除去したものであって、レールへセ
ットしたままの状態で列車を通過させることができ、し
かも効率の良い溶接作業が可能なレールボンド溶接用の
クランプ装置を提供せんとするものである。
DISCLOSURE OF THE INVENTION The present invention has been improved and eliminated in view of the above-mentioned problems, and allows a train to pass while being set on a rail, and has an efficient welding method. An object of the present invention is to provide a clamp device for rail bond welding that can be operated.

【0008】而して、前記課題を解決するために本発明
が採用した請求項1の手段は、レール底部を挟持するク
ランプ手段と、該クランプ手段に取り付けられ、レール
側面部に対して前進後退可能な押圧手段と、該押圧手段
の先端に取り付けられたレールボンドの加熱剤保持手段
とからなることを特徴とするレールボンド溶接用のクラ
ンプ装置である。クランプ装置は、レール底部に取り付
けられるので、レール頭部には列車の走行に支障を来す
ような部材は存在せず、クランプ装置を取り付けたまま
で列車の走行が可能である。つまり、レールボンドの溶
接作業を列車を通過させながら安全且つ迅速に行うこと
が可能である。
According to the first aspect of the present invention, there is provided a clamp means for clamping a rail bottom portion, the clamp means being attached to the clamp means, and moving forward and backward with respect to the rail side surface. A clamping device for rail bond welding, comprising a pressing means capable of holding and a heating agent holding means for a rail bond attached to a tip of the pressing means. Since the clamp device is attached to the bottom of the rail, there is no member at the rail head that hinders the running of the train, and the train can run with the clamp device attached. That is, it is possible to perform the welding work of the rail bond safely and quickly while passing the train.

【0009】また本発明が採用した請求項2の手段は、
加熱剤保持手段が複数個並列に設けられていることを特
徴とする請求項1に記載のレールボンド溶接用のクラン
プ装置である。例えば、二本のレールボンドを同時にク
ランプして溶接作業を行うことが可能であり、極めて効
率良く行うことが可能である。
Further, the means of claim 2 adopted by the present invention is as follows.
The clamp device for rail bond welding according to claim 1, wherein a plurality of heating agent holding means are provided in parallel. For example, a welding operation can be performed by clamping two rail bonds at the same time, and it is possible to perform the welding operation extremely efficiently.

【0010】[0010]

【発明の実施の形態】以下に、本発明の構成を図面に示
す発明の実施の形態に基づいて説明すると次の通りであ
る。なお、従来の場合と同一符号は同一部材である。図
1〜図4は本発明の第1の実施の形態に係るクランプ装
置10を示すものであり、図1は使用状態を示すクラン
プ装置10の側面図、図2は同装置10の平面図、図3
は押圧手段12と加熱剤保持手段13とを示す側面図、
図4の図(A)は押圧手段12の高さ調節機構14を示
す背面図であり、図(B)は高さ調節機構14の側面図
である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The configuration of the present invention will be described below with reference to the embodiments of the invention shown in the drawings. The same reference numerals as those in the conventional case denote the same members. 1 to 4 show a clamp device 10 according to a first embodiment of the present invention. FIG. 1 is a side view of the clamp device 10 showing a use state, FIG. 2 is a plan view of the clamp device 10, FIG.
Is a side view showing the pressing means 12 and the heating agent holding means 13,
FIG. 4A is a rear view showing the height adjusting mechanism 14 of the pressing means 12, and FIG. 4B is a side view of the height adjusting mechanism 14.

【0011】このクランプ装置10にあっては、クラン
プ手段11としてバイスプライヤー15を用いている。
バイスプライヤー15は、レバー15a及び15bを一
体で閉操作するか、又はレバー15aのみを単独で開操
作することにより、ワンタッチ式でクランプの脱着が可
能ないわゆる万力の一種である。先端側に設けられた上
下のクランプ歯16a及び16bの間隔は、クランプ取
付調整ネジ15cを回動操作することで任意に変更する
ことが可能である。また上側のクランプ歯16aには、
レール底部1cのエッジ端面17に当接して横揺れを防
止するための揺動防止板18が取り付けられている。
In this clamping device 10, a vice pliers 15 is used as the clamping means 11.
The vice pliers 15 are a type of so-called vise in which the levers 15a and 15b can be integrally closed or the lever 15a alone can be independently opened to detach and attach the clamp in a one-touch manner. The distance between the upper and lower clamp teeth 16a and 16b provided on the distal end side can be arbitrarily changed by rotating the clamp mounting adjusting screw 15c. Also, the upper clamp tooth 16a has
An anti-swing plate 18 is mounted on the rail bottom 1c to abut against the edge end face 17 of the rail to prevent the rail from rolling.

【0012】バイスプライヤー15の上部には二つの支
柱19a及び19bから成る高さ調節機構14が取り付
けられている。支柱19aは長孔20を有し、支柱19
bにはこの長孔20に貫通するボルト21が取り付けら
れている。両者は、ボルト21及びナット22の螺合状
態を調節することにより、前記押圧手段12の高さ位置
を調節することが可能である。つまり、ボルト21が長
孔20の上端側に係止した状態で締結された場合(図4
で示す状態)は、押圧手段12は最も高い高さ位置とな
り、ボルト21が長孔20の下端側に係止した状態で締
結された場合は、押圧手段12は最も低い高さ位置とな
る。この高さ位置は、対象となるレール1の種類に応じ
て決定すればよい。
A height adjusting mechanism 14 comprising two columns 19a and 19b is mounted on the upper portion of the vice pliers 15. The support 19a has a long hole 20 and the support 19
A bolt 21 penetrating through the elongated hole 20 is attached to b. Both can adjust the height position of the pressing means 12 by adjusting the screwing state of the bolt 21 and the nut 22. That is, when the bolt 21 is fastened while being locked to the upper end side of the long hole 20 (FIG. 4).
State), the pressing means 12 is at the highest height position, and when the bolt 21 is fastened in a state of being locked to the lower end side of the long hole 20, the pressing means 12 is at the lowest height position. The height position may be determined according to the type of the target rail 1.

【0013】この実施の形態にあっては、高さ調節機構
14の支柱19bの上端側でこれにT字状となるように
取り付けられた水平フレーム23の両端側に、それぞれ
押圧手段12を合計二つ設けるようにしている(図2参
照)。各押圧手段12は、図3に示すように、筒状本体
24を貫通する軸25を有し、筒状本体24内にスプリ
ング26が装着されている。スプリング26は、貫通軸
25に固定された円板27を付勢することによって貫通
軸25を常に同図の左側方向へ付勢している。貫通軸2
5の後端側には摘み28が取り付けられており、先端側
には圧力調整螺子29を介して加熱剤8の保持手段13
が取り付けられている。保持手段13は、板状材をL字
状に折曲形成した係合部30を有し、該係合部30が加
熱剤8の側面及び下面側に係合してこれを押圧付勢する
ようになされている。つまり、このクランプ装置10
は、レールボンド7を二つ並列的に設置する場合に対応
するものである。
In this embodiment, the pressing means 12 are respectively added to both ends of a horizontal frame 23 attached to the upper end of the column 19b of the height adjusting mechanism 14 so as to form a T-shape. Two are provided (see FIG. 2). As shown in FIG. 3, each pressing means 12 has a shaft 25 that penetrates the cylindrical main body 24, and a spring 26 is mounted in the cylindrical main body 24. The spring 26 always urges the through shaft 25 to the left side in the drawing by urging the disk 27 fixed to the through shaft 25. Through shaft 2
A knob 28 is attached to the rear end side of the heating agent 5, and the holding means 13 for the heating agent 8 is connected to the front end side via a pressure adjusting screw 29.
Is attached. The holding means 13 has an engaging portion 30 formed by bending a plate-like material into an L-shape, and the engaging portion 30 engages with the side surface and the lower surface side of the heating agent 8 to urge it. It has been made like that. That is, this clamping device 10
Corresponds to a case where two rail bonds 7 are installed in parallel.

【0014】次に、このように構成されたクランプ装置
10による二つのレールボンド7,7の溶接作業要領を
説明する。先ず、図1及び図2に示すように、レール継
目において、レールボンド7の端末を溶接しようとする
箇所に対応してクランプ装置10を準備する。そして、
該当する箇所のレール底部1cにクランプ手段11とし
てのバイスプライヤー15のクランプ歯16a及び16
bを差し込み、レバー15a及び15bを一体的に押し
下げると、クランプ歯16a及び16bがレール底部1
cを上下から強く噛み込んで挟持し、これに固定され
る。なお、クランプした後は、むやみにクランプ状態が
解放されないように、図1に示す安全キャップ39をレ
バー部へ被せておけばよい。安全キャップ39は、レバ
ー15a及び15bに外嵌装着される筒状キャップ40
とクランプ調整ネジ15cに係止されるU字状等の抜止
環41とから成る。
Next, the procedure for welding the two rail bonds 7 by the clamping device 10 having the above-described structure will be described. First, as shown in FIGS. 1 and 2, a clamp device 10 is prepared at a rail joint at a position where an end of a rail bond 7 is to be welded. And
Clamp teeth 16a and 16 of vice pliers 15 as clamp means 11 are provided on the corresponding rail bottom 1c.
b, and the levers 15a and 15b are pressed down together, the clamping teeth 16a and 16b are moved to the rail bottom 1
c is firmly gripped from above and below, and is fixed thereto. After the clamping, the safety cap 39 shown in FIG. 1 may be put on the lever so that the clamped state is not released unnecessarily. The safety cap 39 is a cylindrical cap 40 fitted over the levers 15a and 15b.
And a U-shaped retaining ring 41 locked by the clamp adjusting screw 15c.

【0015】然る後は、高さ調節機構14の支柱19b
の上下位置を調節して二つの押圧手段12,12の先端
側に取り付けられた加熱剤の保持手段13,13の高さ
位置を調節する。これは、レールボンド7,7を溶接す
るに際し、加熱剤の保持手段13,13の上下位置が、
レール1の種類(特に高さ方向の大きさ)に応じた適切
な高さ位置となるようにするためのものである。つま
り、レール1の種類に応じてレールボンド7,7の溶接
高さ位置を調節するようにしている。また加熱剤保持手
段13の係合部30を回転させて圧力調整螺子29の螺
合状態を調節し、レール側面1aと係合部30との間の
間隙寸法を調整する。これは、加熱剤8を保持したとき
に、レール側面1aへ押し付ける力が適切となるように
するためである。
After that, the column 19b of the height adjusting mechanism 14
The height position of the heating agent holding means 13 attached to the tip of the two pressing means 12 is adjusted by adjusting the vertical position of the two pressing means 12. This means that when welding the rail bonds 7, the upper and lower positions of the heating agent holding means 13, 13 are
The height of the rail 1 is set to be appropriate according to the type (particularly, the size in the height direction) of the rail 1. That is, the welding height position of the rail bonds 7 is adjusted according to the type of the rail 1. Further, the engaging portion 30 of the heating agent holding means 13 is rotated to adjust the screwing state of the pressure adjusting screw 29, and the gap between the rail side surface 1a and the engaging portion 30 is adjusted. This is to ensure that when the heating agent 8 is held, the pressing force against the rail side surface 1a is appropriate.

【0016】高さ調節及び圧力調整が済んだ後は、両端
の端末に加熱剤8を溶接ボンド8aで一体的に融着して
なるレールボンド7を二つ準備する。そして、以下の手
順で各レールボンド7を固定し、溶接作業を順次行う。
すなわち、押圧手段12の摘み28を引いて加熱剤保持
手段13の係合部30を、レール側面1cから後退移動
させ、レール側面1cと係合部30との間に大きな空間
を形成する。次に、この状態で、レールボンド7の加熱
剤8を前記係合部30へ載置し、摘み28を放置する。
これにより、係合部30はスプリング26の付勢力によ
り、レール側面1cに対して前進移動し、加熱手段8を
所望する圧力でレール側面1cに対して押圧付勢するよ
うになる。つまり、加熱手段8及びレールボンド7を、
レール側面1cに対して固定するようになる。
After the height adjustment and the pressure adjustment are completed, two rail bonds 7 are prepared by integrally fusing the heating agent 8 to the terminals at both ends by welding bonds 8a. Then, each rail bond 7 is fixed in the following procedure, and welding work is sequentially performed.
That is, the knob 28 of the pressing means 12 is pulled to move the engaging portion 30 of the heating agent holding means 13 backward from the rail side surface 1c, thereby forming a large space between the rail side surface 1c and the engaging portion 30. Next, in this state, the heating agent 8 of the rail bond 7 is placed on the engaging portion 30 and the knob 28 is left.
Thus, the engaging portion 30 moves forward with respect to the rail side surface 1c by the urging force of the spring 26, and presses and urges the heating means 8 against the rail side surface 1c at a desired pressure. That is, the heating means 8 and the rail bond 7 are
It is fixed to the rail side surface 1c.

【0017】このようにして加熱剤8及びレールボンド
7が固定された後は、加熱剤8を外部からバーナー(図
示せず)で加熱し、内部の炉材8cを通じて溶接ボンド
8aを溶かし、凹部8bへ新たな溶接ボンド8aを追加
しながら撹拌し、所要形状に盛り上げるようにしてい
る。溶接ボンド8aの盛り上げが終了した後は、溶融ボ
ンド8aを冷却固化させる。そして、バイスプライヤー
15のレバー15aのみを単独で開動作させることによ
り、ワンタッチ式でクランプ歯16a及び16bをレー
ル底部1cから解放することができ、クランプ装置10
の全体を取り外すことが可能である。最後に、加熱材8
の外部金属ケーシング8d及び炉材8cを溶接ボンド8
aから分離させればよい。両者の分離は、材質が異なる
ため容易に行うことが可能である。
After the heating agent 8 and the rail bond 7 are fixed in this way, the heating agent 8 is heated from the outside by a burner (not shown), and the welding bond 8a is melted through the internal furnace material 8c to form a recess. Stirring is performed while adding a new welding bond 8a to 8b, so that a desired shape is formed. After the welding bond 8a has been raised, the molten bond 8a is cooled and solidified. The clamp teeth 16a and 16b can be released from the rail bottom 1c in a one-touch manner by opening only the lever 15a of the vice plier 15 alone.
Can be removed entirely. Finally, heating material 8
The outer metal casing 8d and the furnace material 8c
What is necessary is just to separate from a. The two can be easily separated because of their different materials.

【0018】このようなレールボンド7の溶接作業であ
れば、クランプ装置10の全体がレール頭部1bよりも
低い位置にあり、しかも列車走行に支障を来すことのな
い位置にあるので、列車を通過させながら溶接作業を行
うことが可能である。なお、列車の通過に際しては、安
全上、クランプ状態をそのままにして溶接作業を一旦中
止し、列車通過後に溶接作業を続けるようにしている。
またクランプ装置10は、レール底部1cのエッジ部を
上下方向から挟持するものであり、バラスト軌道の場合
でも、コンクリートスラブ軌道の場合であってもその取
り付けは簡単である。更に、レールボンド7を同時に二
つ並列的に接続することが可能であり、極めて作業性に
優れている。
In the case of such a welding work of the rail bond 7, the whole of the clamp device 10 is located at a position lower than the rail head 1b and at a position where the running of the train is not hindered. It is possible to perform the welding operation while passing through. When passing through the train, the welding operation is temporarily stopped while keeping the clamped state for safety, and the welding operation is continued after passing through the train.
The clamp device 10 clamps the edge of the rail bottom 1c from above and below, and can be easily attached to a ballast track or a concrete slab track. Furthermore, two rail bonds 7 can be connected in parallel at the same time, which is extremely excellent in workability.

【0019】図5は、本発明の第2の実施の形態に係る
クランプ装置31を示す装着状態の側面図である。同図
に示す如く、このクランプ装置31は、クランプ手段1
1としてレール底部1cに装着されるコ字状のクランプ
本体32と、これに立設されたボルト33とからなるも
のを用いている。クランプ本体32の別な位置には、高
さ調節機構14を介して押圧手段12が取り付けられて
いる。クランプに際しては、ボルト33の締結動作が必
要であり、第1の実施の形態のようにワンタッチ式で行
うことはできない。その他の構成並びに作用効果は、前
記第1の実施の形態の場合と同じである。
FIG. 5 is a side view of the clamp device 31 according to the second embodiment of the present invention in a mounted state. As shown in FIG.
The reference numeral 1 denotes a U-shaped clamp body 32 attached to the rail bottom 1c and a bolt 33 standing upright. The pressing means 12 is attached to another position of the clamp body 32 via a height adjusting mechanism 14. At the time of clamping, a fastening operation of the bolt 33 is required, and cannot be performed by a one-touch method as in the first embodiment. The other configuration and operation and effect are the same as those of the first embodiment.

【0020】図6は、本発明の第3の実施の形態に係る
クランプ装置34を示す装着状態の側面図である。この
クランプ装置34は、コンクリートスラブ等のようにレ
ール1の下方に自由な空間が形成される場合に有効なも
のである。このクランプ装置34のクランプ手段11
は、先端側にフック部35が形成されたクランプ螺子棒
36と、これを挿通するクランプ本体37と、クランプ
螺子棒36に螺合するナット38とで形成されている。
クランプ本体37には、高さ調節機構14を介して押圧
手段12が取り付けられている。クランプ動作は、クラ
ンプ螺子棒36のフック部35をレール1の下方から例
えば内側のレール底部1cの端面側へ係止させ、この状
態でナット38を締め込んで外側のレール底部1cの端
面側へクランプ本体37を当接させて緊締すればよい。
その他の構成並びに作用効果は、前記第1の実施の形態
の場合と同じである。
FIG. 6 is a side view of a mounted state showing a clamp device 34 according to a third embodiment of the present invention. The clamp device 34 is effective when a free space is formed below the rail 1 like a concrete slab or the like. Clamping means 11 of this clamping device 34
Is formed by a clamp screw bar 36 having a hook portion 35 formed on the distal end side, a clamp body 37 inserted therethrough, and a nut 38 screwed to the clamp screw bar 36.
The pressing means 12 is attached to the clamp body 37 via a height adjusting mechanism 14. In the clamping operation, the hook portion 35 of the clamp screw bar 36 is locked from below the rail 1 to, for example, the end surface side of the inner rail bottom 1c, and in this state, the nut 38 is tightened to move to the end surface side of the outer rail bottom 1c. What is necessary is just to make the clamp main body 37 contact, and to tighten it.
The other configuration and operation and effect are the same as those of the first embodiment.

【0021】[0021]

【発明の効果】以上説明したように本発明にあっては、
レール底部を挟持するクランプ手段と、該クランプ手段
に取り付けられ、レール側面部に対して前進後退可能な
押圧手段と、該押圧手段の先端に取り付けられたレール
ボンドの加熱剤保持手段とでレールボンド溶接用のクラ
ンプ装置を構成したから、クランプ装置をレール底部へ
固定することができる。そのため、レール頭部には列車
の走行に支障を来すような部材が存在しなくなり、クラ
ンプ装置を取り付けたままで列車の走行が可能である。
つまり、レールボンドの溶接作業を列車を通過させなが
ら安全且つ迅速に行うことが可能である。
As described above, in the present invention,
A rail bond comprising clamp means for clamping the rail bottom, pressing means attached to the clamp means and capable of moving forward and backward with respect to the rail side surface, and heating agent holding means for the rail bond attached to the tip of the pressing means Since the clamping device for welding is configured, the clamping device can be fixed to the bottom of the rail. Therefore, there is no member in the rail head that interferes with the running of the train, and the running of the train is possible with the clamp device attached.
That is, it is possible to perform the welding work of the rail bond safely and quickly while passing the train.

【0022】また本発明にあっては、加熱剤保持手段を
複数個並列に設けたから、例えば、二本のレールボンド
を同時にクランプして溶接作業を行うことが可能であ
り、極めて効率良く行うことが可能である。
In the present invention, since a plurality of heating agent holding means are provided in parallel, it is possible to perform a welding operation by simultaneously clamping two rail bonds, for example, and to perform the operation very efficiently. Is possible.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施の形態に係るクランプ装置
の装着状態を示す側面図である。
FIG. 1 is a side view showing a mounted state of a clamp device according to a first embodiment of the present invention.

【図2】本発明の第1の実施の形態に係るクランプ装置
の装着状態を示す平面図である。
FIG. 2 is a plan view showing a mounted state of the clamp device according to the first embodiment of the present invention.

【図3】本発明の第1の実施の形態に係るクランプ装置
の押圧手段と加熱剤保持手段とを示す側面図である。
FIG. 3 is a side view showing a pressing unit and a heating agent holding unit of the clamp device according to the first embodiment of the present invention.

【図4】本発明の第1の実施の形態に係るクランプ装置
の高さ調節機構を示すものであり、図(A)は背面図、
図(B)は側面図である。
FIG. 4 shows a height adjusting mechanism of the clamp device according to the first embodiment of the present invention, in which FIG.
FIG. (B) is a side view.

【図5】本発明の第2の実施の形態に係るクランプ装置
の装着状態を示す側面図である。
FIG. 5 is a side view showing a mounted state of a clamp device according to a second embodiment of the present invention.

【図6】本発明の第3の実施の形態に係るクランプ装置
の装着状態を示す側面図である。
FIG. 6 is a side view showing a mounted state of a clamp device according to a third embodiment of the present invention.

【図7】従来技術に関するものであり、クランプ部材の
装着状態を示す斜視図である。
FIG. 7 relates to the prior art, and is a perspective view showing a mounted state of a clamp member.

【符号の説明】[Explanation of symbols]

1…レール、1a…レール側面、1b…レール頭部、1
c…レール側面、7…レールボンド、8…加熱剤、8a
…溶接ボンド、8b…凹部、8c…炉材、8d…金属ケ
ーシング、10…クランプ装置、11…クランプ手段、
12…押圧手段、13…加熱材保持手段、14…高さ調
節手段、31…クランプ装置、34…クランプ装置
DESCRIPTION OF SYMBOLS 1 ... Rail, 1a ... Rail side surface, 1b ... Rail head, 1
c: rail side surface, 7: rail bond, 8: heating agent, 8a
... welding bond, 8b ... recess, 8c ... furnace material, 8d ... metal casing, 10 ... clamping device, 11 ... clamping means,
12: pressing means, 13: heating material holding means, 14: height adjusting means, 31: clamping device, 34: clamping device

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】レール底部を挟持するクランプ手段と、該
クランプ手段に取り付けられ、レール側面部に対して前
進後退可能な押圧手段と、該押圧手段の先端に取り付け
られたレールボンドの加熱剤保持手段とからなることを
特徴とするレールボンド溶接用のクランプ装置。
1. Clamping means for clamping a rail bottom, pressing means attached to the clamping means and capable of moving forward and backward with respect to a rail side face, and holding a heating agent on a rail bond attached to the tip of the pressing means. Means for rail bond welding.
【請求項2】加熱剤保持手段が複数個並列に設けられて
いることを特徴とする請求項1に記載のレールボンド溶
接用のクランプ装置。
2. The clamp apparatus for rail bond welding according to claim 1, wherein a plurality of heating agent holding means are provided in parallel.
JP34261297A 1997-12-12 1997-12-12 Clamping device for rail bond welding Expired - Fee Related JP4022840B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34261297A JP4022840B2 (en) 1997-12-12 1997-12-12 Clamping device for rail bond welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34261297A JP4022840B2 (en) 1997-12-12 1997-12-12 Clamping device for rail bond welding

Publications (2)

Publication Number Publication Date
JPH11176550A true JPH11176550A (en) 1999-07-02
JP4022840B2 JP4022840B2 (en) 2007-12-19

Family

ID=18355129

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34261297A Expired - Fee Related JP4022840B2 (en) 1997-12-12 1997-12-12 Clamping device for rail bond welding

Country Status (1)

Country Link
JP (1) JP4022840B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006112473A1 (en) * 2005-04-20 2006-10-26 Showa Tecs Co., Ltd. Bond and joining method for bond
WO2008047437A1 (en) * 2006-10-19 2008-04-24 Showa Tecs Co., Ltd Bond and method of joining bond
JP2013108262A (en) * 2011-11-18 2013-06-06 West Japan Railway Co Rail bond falling-off preventing tool
JP2015089688A (en) * 2013-11-05 2015-05-11 株式会社砂▲崎▼製作所 Ground metal fitting for rail construction
JP2015204234A (en) * 2014-04-15 2015-11-16 春日電機株式会社 Terminal pressure-contacting fastener, and explosion-protection type ground confirmation device comprising the same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006112473A1 (en) * 2005-04-20 2006-10-26 Showa Tecs Co., Ltd. Bond and joining method for bond
WO2008047437A1 (en) * 2006-10-19 2008-04-24 Showa Tecs Co., Ltd Bond and method of joining bond
JP2013108262A (en) * 2011-11-18 2013-06-06 West Japan Railway Co Rail bond falling-off preventing tool
JP2015089688A (en) * 2013-11-05 2015-05-11 株式会社砂▲崎▼製作所 Ground metal fitting for rail construction
JP2015204234A (en) * 2014-04-15 2015-11-16 春日電機株式会社 Terminal pressure-contacting fastener, and explosion-protection type ground confirmation device comprising the same

Also Published As

Publication number Publication date
JP4022840B2 (en) 2007-12-19

Similar Documents

Publication Publication Date Title
US5324913A (en) Method and apparatus for laser welding
JP2851175B2 (en) Rail pulling device
JPH11176550A (en) Rail bond welding clamp device
US5099097A (en) Mobile electric flash-butt welding unit
US5279455A (en) Method of attaching a metal element to a metal supporting surface by brazing and apparatus for its implementation
TWI289518B (en) Bond and joining method for bond
EP0550217A1 (en) Apparatus and method for preparing metal rods for brazing
JPH09302602A (en) Gage regulating device for roadway
JPH07124782A (en) Welding equipment for steel sheet
JP4524324B2 (en) Bond and bond bonding method
JP2787838B2 (en) Brazing method and apparatus
JP2003062691A (en) Rail bond welding clamp device
US6827253B2 (en) Method and means for rapid heat-sink soldering
WO2008047437A1 (en) Bond and method of joining bond
JP2004273403A (en) Rail bond terminal, method of mounting it, and fixture for mounting it
JP4968911B2 (en) Train line support device in the tunnel
JP4124349B2 (en) Rail tensioner and rail joining method
JP3046718U (en) Rail fixing base plate
JPH0582187A (en) Jumper cable connecting device for railway line
JP2561283Y2 (en) Rigid train wire frame connection
JPS5929814Y2 (en) Rail gas pressure welding machine
US1045948A (en) Electrode for welding.
JP2003117667A (en) Ultrasonic welding equipment of tube
JPH0622545Y2 (en) Guide jig for plasma arc cutting of shaped steel
JP2575398Y2 (en) Laser welding jig

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041209

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070220

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070423

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070821

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070920

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101012

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131012

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D03

LAPS Cancellation because of no payment of annual fees