JPH11172670A - Steel pipe, steel pipe pile and preparation method of steel pipe pile - Google Patents
Steel pipe, steel pipe pile and preparation method of steel pipe pileInfo
- Publication number
- JPH11172670A JPH11172670A JP36169597A JP36169597A JPH11172670A JP H11172670 A JPH11172670 A JP H11172670A JP 36169597 A JP36169597 A JP 36169597A JP 36169597 A JP36169597 A JP 36169597A JP H11172670 A JPH11172670 A JP H11172670A
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pile
- reinforcing bar
- pile head
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、特に場所打ち鋼管
コンクリート杭に用いて好適な鋼管、鋼管杭及び鋼管杭
の造成方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel pipe, a steel pipe pile, and a method for forming a steel pipe pile which are particularly suitable for a cast-in-place steel pipe concrete pile.
【0002】[0002]
【従来の技術】従来、場所打ち鋼管コンクリート杭の杭
頭部に鉄筋コンクリートのフーチング、基礎スラブを構
築する場合、場所打ち鋼管コンクリート杭を造成後、杭
頭部の余盛りコンクリート(不良コンクリート部)を除
去した後、杭頭部の鋼管に多数本の鉄筋の下端部を溶接
し接続し、杭の頭部と、この頭部の外周に接続して起立
した鉄筋を囲う型枠を組立て、型枠内にコンクリートを
打設する。2. Description of the Related Art Conventionally, when a footing of reinforced concrete and a foundation slab are constructed on a pile head of a cast-in-place steel pipe concrete pile, after constructing a cast-in-place steel pipe concrete pile, the excess concrete (defective concrete portion) of the pile head is formed. After removal, weld the lower ends of many rebars to the steel pipe at the pile head and connect them, assemble the pile head and the formwork connected to the outer periphery of this head and surrounding the standing rebar, and formwork Cast concrete inside.
【0003】杭頭部の鋼管に多数本の鉄筋の下端部を溶
接接合する方法としては、一般的には図17に示すよう
に鋼管Sの外周面に鉄筋Rを溶接接合する方法が用いら
れている。As a method of welding and joining the lower ends of a large number of rebars to a steel pipe at the head of a pile, a method of welding and rebar R to the outer peripheral surface of a steel pipe S is generally used as shown in FIG. ing.
【0004】さらに、図18のように鋼管Sの上端面に
リングプレート100をあらかじめ溶接しておき、この
リングプレート100に鉄筋Rを溶接する方法(特開平
9−71948号公報記載の発明)も提供されている。Further, as shown in FIG. 18, a method of welding a ring plate 100 to an upper end surface of a steel pipe S in advance and welding a reinforcing bar R to the ring plate 100 (the invention described in Japanese Patent Application Laid-Open No. Hei 9-71948) is also available. Provided.
【0005】さらに、杭頭に鉄筋R下端部を溶接する作
業は、溶接作業が困難であるため、場所打ち鋼管コンク
リート杭では、あらかじめ鋼管Sの外面あるいは鋼管S
の上端面のリングプレート100に鉄筋Rを溶接してお
くか、図19,図20に示すように鉄筋Rを接続するた
めの中空のカプラー200を鋼管Sの外面に溶接してお
く方法が採用されている。[0005] Further, since it is difficult to weld the lower end of the reinforcing steel R to the pile head, in the cast-in-place steel pipe concrete pile, the outer surface of the steel pipe S or the steel pipe S is required.
19 or 20, a hollow coupler 200 for connecting the reinforcing bar R is welded to the outer surface of the steel pipe S as shown in FIGS. Have been.
【0006】また、一般の鋼管杭では、特開昭62−1
53418号公報に示されるような鉄筋接続具300付
きの杭(鋼管S)が提供されている(図21,図2
2)。In a general steel pipe pile, Japanese Patent Laid-Open No.
A pile (steel pipe S) with a reinforcing bar connector 300 as shown in JP-A-53418 is provided (FIGS. 21 and 2).
2).
【0007】[0007]
【発明が解決しようとする課題】しかしながら、従来技
術には以下に掲げる問題点があった。However, the prior art has the following problems.
【0008】場所打ち鋼管コンクリート杭で杭頭接合に
用いる鉄筋Rをあらかじめ鋼管Sの外周(図17)や、
鋼管Sの上端面にリングプレート100を介して溶接し
て設置する場合(図18)では、杭頭コンクリート部の
余盛りコンクリートを除去する際に、鉄筋Rを大きく変
形させ、時には鉄筋Rを破断させる場合があった。[0008] In the cast-in-place steel pipe concrete pile, the reinforcing steel R used for the pile head joint is previously set on the outer periphery of the steel pipe S (Fig. 17),
In the case where the steel pipe S is welded to the upper end face via the ring plate 100 and installed (FIG. 18), when the excess concrete in the pile head concrete portion is removed, the reinforcing steel R is largely deformed, and sometimes the reinforcing steel R is broken. There was a case.
【0009】また、場所打ち鋼管コンクリート杭で鋼管
外周部に中空のカプラー200を溶接する場合(図1
9,図20)や、特開昭62−153418号公報に示
されるような鉄筋接続具300付きの杭の場合(図2
1、図22)には、鉄筋Rの配筋径が大きくなり、これ
を囲うフーチングの寸法を大きくせざるを得なかった。When a hollow coupler 200 is welded to the outer periphery of a steel pipe with a cast-in-place steel pipe concrete pile (FIG. 1).
9, FIG. 20) and a pile with a reinforcing bar connector 300 as shown in JP-A-62-153418 (FIG. 2).
1, (FIG. 22), the diameter of the reinforcing bar R was increased, and the footing dimension surrounding the reinforcing bar had to be increased.
【0010】本発明は斯かる問題点を鑑みてなされたも
のであり、その目的とするところは、鉄筋を変形・破断
させず、且つフーチング寸法を大きくすることのない鋼
管、鋼管杭及び鋼管杭の造成方法を提供する点にある。The present invention has been made in view of the above problems, and an object of the present invention is to provide a steel pipe, a steel pipe pile, and a steel pipe pile which do not deform or break a reinforcing bar and do not increase a footing dimension. The point is to provide a method for constructing.
【0011】[0011]
【課題を解決するための手段】請求項1記載の発明の要
旨は、地盤中に可塑性硬化材料により固着され、地上に
露出した上端面に鉄筋を固定することにより杭体として
用いられる鋼管杭用の鋼管であって、建て込まれた状態
で杭頭となる端部に鉄筋固定穴が設けられたことを特徴
とする鋼管に存する。請求項2記載の発明の要旨は、建
て込まれた状態で杭頭となる端部が増肉されて増肉部が
形成されたことを特徴とする請求項1記載の鋼管に存す
る。請求項3記載の発明の要旨は、前記鉄筋固定穴の内
側面には、雌ねじが切られていることを特徴とする請求
項1又は2記載の鋼管に存する。請求項4記載の発明の
要旨は、前記鉄筋固定穴の中心軸は、胴部の肉厚内にあ
ることを特徴とする請求項1,2又は3記載の鋼管に存
する。請求項5記載の発明の要旨は、請求項1,2,3
又は4のいずれかに記載の鋼管を具備する、地盤中に造
成された鋼管杭に存する。請求項6記載の発明の要旨
は、地盤中に鋼管を固着し、該鋼管の上端面に鉄筋を固
定することにより杭体として用いる鋼管杭の造成方法で
あって、地盤中の穴に鋼管を建て込む工程と、該穴に可
塑性硬化材料を打設する工程と、前記鋼管に付着した前
記可塑性硬化材料の不良部分を除去する工程と、前記鋼
管の杭頭の上端面に加工された鉄筋固定穴を、前記可塑
性硬化材料を打設する前から閉塞している蓋体を取り去
る工程と、前記鉄筋固定穴に鉄筋を固定する工程とを備
えたことを特徴とする鋼管杭の造成方法に存する。The gist of the present invention is to provide a steel pipe pile fixed to the ground by a plastic hardening material and used as a pile by fixing a reinforcing bar to an upper end surface exposed above the ground. The steel pipe according to claim 1, wherein a reinforcing bar fixing hole is provided at an end portion which becomes a pile head in a built state. The gist of the invention according to claim 2 resides in the steel pipe according to claim 1, wherein an end portion serving as a pile head is thickened in a built-in state to form a thickened portion. The gist of the invention according to claim 3 resides in the steel pipe according to claim 1 or 2, wherein a female screw is formed on an inner surface of the reinforcing bar fixing hole. The gist of the invention according to claim 4 resides in the steel pipe according to claim 1, wherein the central axis of the reinforcing-bar fixing hole is within the thickness of the body. The gist of the invention described in claim 5 is that
Or a steel pipe pile formed in the ground, comprising the steel pipe according to any one of (4) and (4). The gist of the invention according to claim 6 is a method for forming a steel pipe pile used as a pile by fixing a steel pipe in the ground and fixing a reinforcing bar to an upper end surface of the steel pipe, wherein the steel pipe is inserted into a hole in the ground. A step of erection, a step of casting a plastic hardening material into the hole, a step of removing a defective portion of the plastic hardening material adhered to the steel pipe, and a fixing of a reinforcing steel bar formed on an upper end face of a pile head of the steel pipe. A method for forming a steel pipe pile, comprising a step of removing a cover closing a hole before casting the plastic hardening material, and a step of fixing a reinforcing bar in the reinforcing bar fixing hole. .
【0012】本発明において「可塑性硬化材料」とは、
コンクリート、モルタル等、本発明を実施する上で好適
な硬化材料をいう。In the present invention, “plastically hardened material” means
A hardened material suitable for practicing the present invention, such as concrete and mortar.
【0013】[0013]
【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて詳細に説明する。本実施の形態に係る鋼管
は、場所打ち鋼管コンクリート杭の造成に用いられるも
のである。図1に示すように、鋼管1は、胴部10と、
胴部10の一端に設けられた杭頭20とから概略構成さ
れている。Embodiments of the present invention will be described below in detail with reference to the drawings. The steel pipe according to the present embodiment is used for forming a cast-in-place steel pipe concrete pile. As shown in FIG. 1, the steel pipe 1 includes a body 10,
And a pile head 20 provided at one end of the body 10.
【0014】胴部10は、断面環状の一般の丸鋼管であ
る。The body 10 is a general round steel pipe having an annular cross section.
【0015】杭頭20は、図2に示すように、一端面
(地盤中に設置された状態における上端面)に、周方向
に所要間隔を介して鉄筋固定穴21が設けられている。
図3に示すように、鉄筋固定穴21の内周面には雌ねじ
21aが切られている。鉄筋固定穴21の中心軸は、胴
部10の板厚の中心に一致している。また、上部の板厚
は、径方向内側及び外側に増肉されている。下部は、上
にいくにつれ板厚が漸増するようにテーパーが付けられ
ている。杭頭20の増肉部22は胴部10の板厚の3倍
以上であり、杭頭20の増肉部22の長さは胴部10の
板厚の4倍以上である。下端を胴部10(一般鋼管1)
の上端に外側から溶接されて固定されている。As shown in FIG. 2, the pile head 20 has a reinforcing bar fixing hole 21 at one end surface (the upper end surface in a state where the pile head is installed in the ground) at a required interval in the circumferential direction.
As shown in FIG. 3, a female screw 21 a is cut on the inner peripheral surface of the reinforcing bar fixing hole 21. The central axis of the reinforcing bar fixing hole 21 coincides with the center of the thickness of the body 10. The thickness of the upper plate is increased inward and outward in the radial direction. The lower part is tapered so that the plate thickness gradually increases as going upward. The thickened portion 22 of the pile head 20 is at least three times the plate thickness of the trunk 10, and the length of the thickened portion 22 of the pile head 20 is at least four times the plate thickness of the trunk 10. Lower end at trunk 10 (general steel pipe 1)
Is fixed to the upper end by welding from the outside.
【0016】次に、上記鋼管1を用いて場所打ち鋼管コ
ンクリート杭の造成方法を図8乃至図16を参考に以下
に示す。Next, a method of forming a cast-in-place steel pipe concrete pile using the steel pipe 1 will be described below with reference to FIGS.
【0017】まず、図8及び図9に示すように、地盤G
を掘削しつつ、ケーシング(図示略)を建て込む。First, as shown in FIG. 8 and FIG.
While digging, a casing (not shown) is built.
【0018】次いで、地盤G上において本実施の形態に
係る鋼管1と鉄筋篭4(図10に示す)とを結合する。こ
のとき鉄筋固定穴21には、図4及び図5に示すように
ボルト3(蓋体)で蓋をしておき鉄筋固定穴21への生
コンクリートの侵入を防止しておく。図4の円は、図5
の拡大部分を示している。なお、鋼管1と鉄筋篭4との
結合は、工場、現場ヤード等において、掘削・ケーシン
グの建て込みの前にすることも可能である。Next, the steel pipe 1 according to the present embodiment and the steel cage 4 (shown in FIG. 10) are connected on the ground G. At this time, as shown in FIGS. 4 and 5, the reinforcing rod fixing hole 21 is covered with a bolt 3 (lid) to prevent the ready concrete from entering the reinforcing rod fixing hole 21. The circle in FIG.
The enlarged part of is shown. The connection between the steel pipe 1 and the reinforcing bar 4 can be made in a factory, a site yard, etc., before excavation and installation of a casing.
【0019】次いで、図10に示すように掘削された穴
に互いに結合された鋼管1及び鉄筋篭4を挿入する。Next, as shown in FIG. 10, the steel pipe 1 and the reinforcing bar 4 which are connected to each other are inserted into the drilled holes.
【0020】次いで、図11に示すように鉄筋篭4内に
トレミー管Tを挿入する。Next, as shown in FIG. 11, a tremy tube T is inserted into the reinforcing bar 4.
【0021】次いで、図12に示すように生コンクリー
トL(可塑性硬化材料)を打設する。Next, as shown in FIG. 12, ready-mixed concrete L (plastically hardened material) is poured.
【0022】次いで、ケーシングを引き抜き、コンクリ
ートの硬化の後図13に点線で示すように表層地盤G´
を掘削する。Next, the casing is pulled out, and after the concrete is hardened, as shown by a dotted line in FIG.
Drilling.
【0023】次いで、図14に点線で示すように杭頭上
部の余盛コンクリートZを除去する。Next, as shown by the dotted line in FIG. 14, the excess concrete Z on the upper part of the pile head is removed.
【0024】次いで、図4及び図5に示された鉄筋固定
穴21の蓋になっているボルト3を取り除き、図15に
示すように下端に雄ねじが切られたねじ鉄筋2を鉄筋固
定穴21に螺着する。ねじ鉄筋2が螺着された状態を図
6及び図7に示す。図6の円は、図7の拡大部分を示し
ている。Next, the bolts 3 serving as the lids of the reinforcing bar fixing holes 21 shown in FIGS. 4 and 5 are removed, and as shown in FIG. Screw. 6 and 7 show a state in which the screw reinforcing bar 2 is screwed. The circle in FIG. 6 shows an enlarged portion of FIG.
【0025】以上の工程により場所打ち鋼管コンクリー
ト杭Pを造成することができる。その後は、通常の工程
と同様に図16に示すようにフーチング型枠設置後、フ
ーチングF、基礎梁、柱C等を造成する。Through the above steps, the cast-in-place steel pipe concrete pile P can be formed. After that, as shown in FIG. 16, the footing formwork is installed, and then the footing F, the foundation beam, the column C, and the like are formed as in the normal process.
【0026】実施の形態に係る鋼管1は上記の如く構成
されているので、以下に掲げる効果を奏する。さらに、
ボルト3を中空の接続部を用いるため、中空部にコンク
リートがつまるおそれがあった。またコンクリート打設
時には、鉄筋穴を上方からのみボルト3をすれば、コン
クリートの滲入が防げるため、ねじ穴の保護が容易とな
る。Since the steel pipe 1 according to the embodiment is configured as described above, the following effects can be obtained. further,
Since a hollow connection portion is used for the bolt 3, there is a possibility that concrete is clogged in the hollow portion. In addition, at the time of concrete casting, if the bolt 3 is screwed only from above the reinforcing hole, concrete infiltration can be prevented, so that the screw hole can be easily protected.
【0027】上記の如く余盛りコンクリートを除去した
後に鉄筋を杭頭20上面に固定することができるので、
鉄筋の変形・破断を防止することができる。After the excess concrete is removed as described above, the reinforcing steel can be fixed to the upper surface of the pile head 20.
Deformation and breakage of the rebar can be prevented.
【0028】また、カプラーや鉄筋接続具等が不要なの
で、フーチング寸法を小さくすることができる。Further, since a coupler, a rebar connection tool or the like is not required, the footing size can be reduced.
【0029】また、鉄筋Rと鋼管1の板厚の軸線とが一
致しているので、鉄筋Rに付加モーメントが加わること
がなく、鉄筋Rの引張強度が低下するという減少を防止
することができる。Further, since the reinforcing rod R and the axis of the plate thickness of the steel pipe 1 coincide with each other, no additional moment is applied to the reinforcing rod R, and a decrease in the tensile strength of the reinforcing rod R can be prevented. .
【0030】また、鉄筋固定穴21にねじ鉄筋2を螺着
するだけで固定することができるので、無溶接で行うこ
とができる。作業労力の低減、作業時間の短縮、さらに
は工費の低廉化することができる。Further, since the screw rebar 2 can be fixed only by screwing the screw rebar 2 into the rebar fixing hole 21, the welding can be performed without welding. Work labor can be reduced, work time can be reduced, and construction costs can be reduced.
【0031】なお、本実施の形態においては場所打ち鋼
管コンクリート杭に適用したが、本発明においてはそれ
に限定されず、例えば通常の鋼管杭等、本発明を実施す
る上で好適なものに適用することができる。In this embodiment, the present invention is applied to a cast-in-place steel pipe concrete pile. However, the present invention is not limited to this. For example, the present invention is applied to an ordinary steel pipe pile or the like suitable for carrying out the present invention. be able to.
【0032】また、場所打ち鋼管コンクリート杭への適
用の一形態として、杭頭のねじ孔を利用して免震支承を
取り付けることも容易となる。Further, as one form of application to a cast-in-place steel pipe concrete pile, it becomes easy to attach a seismic isolation bearing using a screw hole of a pile head.
【0033】また、鋼管矢板にも適用することができ
る。The present invention can also be applied to steel pipe sheet piles.
【0034】また、鋼管としては円形のものだけではな
く、例えば角形鋼管等、本発明を実施する上で好適な断
面形状の鋼管を用いることができる。The steel pipe is not limited to a circular steel pipe, and a steel pipe having a cross section suitable for carrying out the present invention, such as a square steel pipe, can be used.
【0035】また、上記実施の形態においては胴部10
(一般鋼管1)に厚肉の杭頭20を溶接して固定してい
るが、例えば、本発明においては差厚鋼板を用いて一体
として製作したり、胴部上端及び杭頭下端にフランジを
もうけてボルト接合したり、本発明を実施する上で好適
な方法で制作することができる。In the above embodiment, the body 10
The thick pile head 20 is welded and fixed to the (general steel pipe 1). For example, in the present invention, the pile head 20 is manufactured integrally using a thick steel plate, or a flange is formed at the upper end of the trunk and the lower end of the pile head. It can be made by bolting or by a method suitable for carrying out the present invention.
【0036】また、増肉部の制作方法としては、たとえ
一般鋼管の端部をアップセットして増肉したり、遠心力
鋳造で端部鋼管の増肉部を形成することができる。Further, as a method of producing the thickened portion, for example, the thickened portion of the end steel tube can be formed by upsetting the end portion of the general steel pipe or by centrifugal casting.
【0037】また、上記実施の形態においては杭頭の管
径方向打ちが及び外側に増肉したが、本発明はそれに限
定されることなく、管径方向外側のみを増肉したり、内
側のみを増肉することもできる。Further, in the above embodiment, the pile head was struck in the pipe radial direction and the wall thickness was increased outward. However, the present invention is not limited to this. You can also increase the meat.
【0038】また、杭頭に管軸直角方向に貫通孔を設
け、この貫通孔を利用し基礎梁やフーチングの下端筋を
配筋することもできる。It is also possible to provide a through hole in the pile head in a direction perpendicular to the pipe axis, and to arrange the lower reinforcement of the foundation beam or footing using this through hole.
【0039】また、溶接面は鋼管の外側面、内側面を問
わない。The welding surface is not limited to the outer surface and the inner surface of the steel pipe.
【0040】また、上記鉄筋穴の数、位置、形状等は上
記実施の形態に限定されず、本発明を実施する上で好適
な数、位置、形状等にすることができる。The number, position, shape, and the like of the reinforcing hole are not limited to the above-described embodiment, but can be set to a number, position, shape, and the like suitable for carrying out the present invention.
【0041】また、鉄筋固定穴の中心軸の延長線が、胴
部の肉厚内にあれば、上記実施の形態と同様の効果を得
ることができる。If the extension of the central axis of the reinforcing-bar fixing hole is within the thickness of the body, the same effect as in the above embodiment can be obtained.
【0042】また、鉄筋固定穴21の一部が鋼管の側面
に開口しているときは、予め、鉄筋の挿設範囲までボル
トを設置しておいても良い。When a part of the reinforcing-bar fixing hole 21 is open on the side surface of the steel pipe, bolts may be installed in advance to the reinforcing-bar insertion range.
【0043】なお、各図において、同一構成要素には同
一符号を付している。In the drawings, the same components are denoted by the same reference numerals.
【0044】[0044]
【発明の効果】本発明は、以上の如く構成されているの
で、以下に掲げる効果を奏する。余盛りコンクリートを
除去した後に鉄筋を杭頭上面に固定することができるの
で、鉄筋の変形・破断を防止することができる。また、
従来技術に係るカプラーや鉄筋接続具等が不要なので、
フーチング寸法を小さくすることができる。Since the present invention is configured as described above, it has the following effects. After the excess concrete is removed, the reinforcing bar can be fixed to the upper surface of the pile head, so that deformation and breakage of the reinforcing bar can be prevented. Also,
Since couplers and rebar connectors etc. according to the prior art are unnecessary,
The footing size can be reduced.
【図1】本発明の実施の形態に係る鋼管の側面図であ
る。FIG. 1 is a side view of a steel pipe according to an embodiment of the present invention.
【図2】図1に示す鋼管の平面図である。FIG. 2 is a plan view of the steel pipe shown in FIG.
【図3】図2のA―A断面図である。FIG. 3 is a sectional view taken along line AA of FIG. 2;
【図4】ボルトを蓋をした状態の鋼管杭の杭頭の側面図
である。FIG. 4 is a side view of a pile head of a steel pipe pile with a bolt covered.
【図5】図4の円で囲まれた部分の拡大縦断面図であ
る。FIG. 5 is an enlarged vertical sectional view of a portion surrounded by a circle in FIG. 4;
【図6】ねじ鉄筋を鉄筋穴に螺着した状態の鋼管杭の杭
頭の側面図である。FIG. 6 is a side view of a pile head of a steel pipe pile in a state where a screw reinforcement is screwed into a reinforcement hole.
【図7】図6の円で囲まれた部分の拡大縦断面図であ
る。FIG. 7 is an enlarged vertical sectional view of a portion surrounded by a circle in FIG. 6;
【図8】図1に示す鋼管を用いた杭造成の工程図であ
る。8 is a process chart of pile formation using the steel pipe shown in FIG.
【図9】図1に示す鋼管を用いた杭造成の工程図であ
る。FIG. 9 is a process chart of pile formation using the steel pipe shown in FIG. 1;
【図10】図1に示す鋼管を用いた杭造成の工程図であ
る。FIG. 10 is a process diagram of pile formation using the steel pipe shown in FIG.
【図11】図1に示す鋼管を用いた杭造成の工程図であ
る。FIG. 11 is a process chart of pile formation using the steel pipe shown in FIG. 1;
【図12】図1に示す鋼管を用いた杭造成の工程図であ
る。FIG. 12 is a process chart of pile formation using the steel pipe shown in FIG. 1;
【図13】図1に示す鋼管を用いた杭造成の工程図であ
る。13 is a process chart of pile formation using the steel pipe shown in FIG.
【図14】図1に示す鋼管を用いた杭造成の工程図であ
る。14 is a process chart of pile formation using the steel pipe shown in FIG.
【図15】図1に示す鋼管を用いた杭造成の工程図であ
る。FIG. 15 is a process chart of pile formation using the steel pipe shown in FIG. 1;
【図16】図1に示す鋼管を用いた杭造成の工程図であ
る。FIG. 16 is a process chart of pile formation using the steel pipe shown in FIG. 1;
【図17】従来技術を示す縦断面図である。FIG. 17 is a longitudinal sectional view showing a conventional technique.
【図18】従来技術を示す斜視図である。FIG. 18 is a perspective view showing a conventional technique.
【図19】従来技術を示す一部破断の平面図である。FIG. 19 is a partially broken plan view showing a conventional technique.
【図20】従来技術を示す縦断面図である。FIG. 20 is a longitudinal sectional view showing a conventional technique.
【図21】従来技術を示す平面図である。FIG. 21 is a plan view showing a conventional technique.
【図22】従来技術を示す縦断面図である。FIG. 22 is a longitudinal sectional view showing a conventional technique.
G 地盤 G´ 表層地盤 R 鉄筋 S 鋼管 P 鋼管コンクリート杭 T トレミー管 L 生コンクリート(可塑性硬化材料) Z 余盛コンクリート F フーチング C 柱 1 鋼管 2 ねじ鉄筋 3 ボルト 4 鉄筋篭 10 胴部 20 杭頭 21 鉄筋固定穴 21a 雌ねじ 22 増肉部 100 リングプレート 200 カプラー 300 鉄筋接続具 G Ground G 'Surface ground R Reinforcement S Steel pipe P Steel pipe concrete pile T Tremy pipe L Fresh concrete (plastically hardened material) Z Extra concrete F Footing C Column 1 Steel pipe 2 Screw reinforcing rod 3 Bolt 4 Reinforcing cage 10 Body 20 Pile head 21 Reinforcing bar fixing hole 21a Female screw 22 Thickening part 100 Ring plate 200 Coupler 300 Reinforcing bar fitting
───────────────────────────────────────────────────── フロントページの続き (72)発明者 上村 治男 神奈川県川崎市川崎区小島町4番6号 エ ヌケー金属加工株式会社内 ──────────────────────────────────────────────────の Continuing from the front page (72) Inventor Haruo Uemura 4-6 Kojimacho, Kawasaki-ku, Kawasaki-shi, Kanagawa Prefecture
Claims (6)
れ、地上に露出した上端面に鉄筋を固定することにより
杭体として用いられる鋼管杭用の鋼管であって、建て込
まれた状態で杭頭となる端部に鉄筋固定穴が設けられた
ことを特徴とする鋼管。1. A steel pipe for a steel pipe pile fixed in a ground by a plastic hardening material and used as a pile body by fixing a reinforcing bar to an upper end surface exposed above the ground, wherein the pile head is installed in a piled state. A steel pipe characterized by having a reinforcing bar fixing hole at an end portion.
肉されて増肉部が形成されたことを特徴とする請求項1
記載の鋼管。2. The thickened portion is formed by increasing the thickness of the end serving as the pile head in the built-in state.
The described steel pipe.
切られていることを特徴とする請求項1又は2記載の鋼
管。3. The steel pipe according to claim 1, wherein a female screw is formed on an inner surface of the reinforcing bar fixing hole.
内にあることを特徴とする請求項1,2又は3記載の鋼
管。4. The steel pipe according to claim 1, wherein the central axis of the reinforcing-bar fixing hole is within the thickness of the body.
載の鋼管を具備する、地盤中に造成された鋼管杭。5. A steel pipe pile formed in the ground, comprising the steel pipe according to claim 1, 2, 3, or 4.
に鉄筋を固定することにより杭体として用いる鋼管杭の
造成方法であって、地盤中の穴に鋼管を建て込む工程
と、該穴に可塑性硬化材料を打設する工程と、前記鋼管
に付着した前記可塑性硬化材料の不良部分を除去する工
程と、前記鋼管の杭頭の上端面に加工された鉄筋固定穴
を、前記可塑性硬化材料を打設する前から閉塞している
蓋体を取り去る工程と、前記鉄筋固定穴に鉄筋を固定す
る工程とを備えたことを特徴とする鋼管杭の造成方法。6. A method of forming a steel pipe pile used as a pile body by fixing a steel pipe in a ground and fixing a reinforcing bar to an upper end surface of the steel pipe, wherein a steel pipe is erected in a hole in the ground. Casting a plastic hardening material into the hole, removing a defective portion of the plastic hardening material adhered to the steel pipe, and rebar fixing holes machined on an upper end surface of a pile head of the steel pipe, A method for forming a steel pipe pile, comprising: a step of removing a closed lid before casting a hardening material; and a step of fixing a reinforcing bar in the reinforcing bar fixing hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP36169597A JPH11172670A (en) | 1997-12-11 | 1997-12-11 | Steel pipe, steel pipe pile and preparation method of steel pipe pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP36169597A JPH11172670A (en) | 1997-12-11 | 1997-12-11 | Steel pipe, steel pipe pile and preparation method of steel pipe pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH11172670A true JPH11172670A (en) | 1999-06-29 |
Family
ID=18474571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP36169597A Pending JPH11172670A (en) | 1997-12-11 | 1997-12-11 | Steel pipe, steel pipe pile and preparation method of steel pipe pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH11172670A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002256570A (en) * | 2001-03-05 | 2002-09-11 | Nippon Steel Corp | Position adjustable joining structure of steel pipe pile and anchor reinforcement |
JP2003049436A (en) * | 2001-08-03 | 2003-02-21 | Okabe Co Ltd | Pile head structure of foundation pillar and method of constructing pile head of foundation pillar |
CN104452745A (en) * | 2014-12-03 | 2015-03-25 | 福建省大地管桩有限公司 | Method for repairing deformed end head plate of pipe pile |
JP2021036115A (en) * | 2019-08-30 | 2021-03-04 | 清水建設株式会社 | Joint structure of pile head and pile head joint method |
-
1997
- 1997-12-11 JP JP36169597A patent/JPH11172670A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002256570A (en) * | 2001-03-05 | 2002-09-11 | Nippon Steel Corp | Position adjustable joining structure of steel pipe pile and anchor reinforcement |
JP2003049436A (en) * | 2001-08-03 | 2003-02-21 | Okabe Co Ltd | Pile head structure of foundation pillar and method of constructing pile head of foundation pillar |
CN104452745A (en) * | 2014-12-03 | 2015-03-25 | 福建省大地管桩有限公司 | Method for repairing deformed end head plate of pipe pile |
CN104452745B (en) * | 2014-12-03 | 2016-07-06 | 福建省大地管桩有限公司 | A kind of method carrying out after tubular pile end head plate deformation repairing |
JP2021036115A (en) * | 2019-08-30 | 2021-03-04 | 清水建設株式会社 | Joint structure of pile head and pile head joint method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3258549B2 (en) | Connection structure between pier reinforcement and footing | |
JP2004108034A (en) | Foundation structure, construction method and steel-pipe-mounted precast concrete pile for steel-framed building | |
JPH11172670A (en) | Steel pipe, steel pipe pile and preparation method of steel pipe pile | |
JP3776330B2 (en) | Seismic walls of existing buildings and construction methods | |
JP2002021096A (en) | Building and constructing method therefor | |
JPH11236713A (en) | Method of connecting column and pile and connecting structure | |
JP2006207306A (en) | Frame body, and connection structure of frame body and pile | |
US5351277A (en) | Method of constructing top slab of nuclear reactor container and nuclear reactor container constructed by the method | |
JP2620103B2 (en) | Construction method of trussed pillar | |
JPH07292857A (en) | Pc member with irregular-shaped steel pipe for joint, and connecting method thereof | |
JP2000064314A (en) | Construction of structural foundation building frame | |
JP4517228B2 (en) | Steel pipe concrete pile head structure, steel pipe concrete pile head joining method, unit for joining | |
JP2903873B2 (en) | Beam joint structure of centrifugally formed hollow PC column | |
JPH07292858A (en) | Structure for connecting pc member | |
JP2004270416A (en) | Pile with large-diameter bearing plate, and structure for joining pile head thereof | |
JP2712023B2 (en) | Structure of beam-to-column joints of steel tubular concrete columns with X-shaped reinforcement | |
JPH08100432A (en) | Footing device | |
JP2669305B2 (en) | Structure using covered steel tube concrete columns | |
JPH06280271A (en) | Cast-in-place steel pipe concrete pile-column construction and construction method thereof | |
JPH108482A (en) | Joined structure between construction center column and pile and posteriorly constructing method for construction center column | |
JP2000303465A (en) | Method for retaining earth by low strength underground wall | |
JPH0332591Y2 (en) | ||
JP3119117B2 (en) | PC version driving formwork and formwork method | |
JPH02256800A (en) | Composite segment | |
JP2001011874A (en) | Construction method for structural stud using precast pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051227 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060214 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20060704 |