JPH11141156A - Assembling method of water section unit in building, and water section unit - Google Patents

Assembling method of water section unit in building, and water section unit

Info

Publication number
JPH11141156A
JPH11141156A JP9308233A JP30823397A JPH11141156A JP H11141156 A JPH11141156 A JP H11141156A JP 9308233 A JP9308233 A JP 9308233A JP 30823397 A JP30823397 A JP 30823397A JP H11141156 A JPH11141156 A JP H11141156A
Authority
JP
Japan
Prior art keywords
unit
water supply
building
formwork
plumbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9308233A
Other languages
Japanese (ja)
Other versions
JP3062810B2 (en
Inventor
Akihito Hizaki
哲仁 日崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HISAKI KENSETSU KK
Original Assignee
HISAKI KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HISAKI KENSETSU KK filed Critical HISAKI KENSETSU KK
Priority to JP9308233A priority Critical patent/JP3062810B2/en
Publication of JPH11141156A publication Critical patent/JPH11141156A/en
Application granted granted Critical
Publication of JP3062810B2 publication Critical patent/JP3062810B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Residential Or Office Buildings (AREA)
  • Bathtubs, Showers, And Their Attachments (AREA)

Abstract

PROBLEM TO BE SOLVED: To simplify the installation work and reduce the cost by integrally arranging a water section unit using external panels as forms in common and assembling forms on a foundation and placing concrete and assembling the water section unit to the constructed frame body. SOLUTION: A water section unit UW is fabricated from first to last in a separate factory from a building BU and transported to a construction site. The unit UW is hung up by wires engaged with a plurality of hanging rings. Then, the unit UW is installed on a foundation of the building BU assembled with reinforcements 44 and fixed with anchor bolts while leveling it. Then, a form F for placing concrete is assembled on the foundation and external panels Po used as the form F in common are used as a part of the form F. Subsequently, concrete is placed in the space of the form to integrally form the external panels Po. The form F is disassembled to integrally connect the external panels Po to the frame body S. In this way, the cost is reduced and the unit UW can be precisely fixed to a specified position of the building BU. And further, the assembling man-hours of the form F can be reduced.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、集合住宅、商業ビ
ル等の鉄筋コンクリート造の建物における、水回りユニ
ットの組付方法およびその水回りユニットに関するもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of assembling a plumbing unit in a reinforced concrete building such as an apartment house or a commercial building, and a plumbing unit therefor.

【0002】[0002]

【従来の技術】従来前記鉄筋コンクリート造りの建物で
は、基礎上に鉄筋工事、付帯設備を施工するとともに型
枠を組み立て、その型枠により画成される型枠空間に、
所定の工程に従ってコンクリートを打設し、所定の型枠
の存置期間をおいたのちその型枠を解体して建物の骨格
となる躯体を構成し、その後躯体内にユニットバス、ト
イレ等の水回り機器を搬入してその機器を躯体に取り付
け、さらにそれらへの給、排水管の配管工事、その他の
付帯工事を行なって水回り施設の躯体への取り付けを行
なうようにしている。
2. Description of the Related Art Conventionally, in a reinforced concrete building, reinforced concrete work and ancillary facilities are constructed on a foundation, a formwork is assembled, and a formwork space defined by the formwork is formed.
Pour concrete in accordance with the prescribed process, leave the prescribed formwork for a certain period of time, disassemble the formwork and construct the building that will be the skeleton of the building. The equipment is carried in, and the equipment is mounted on the skeleton, and then supplied to them, plumbing of drainage pipes, and other ancillary works are performed to install the plumbing facility on the skeleton.

【0003】[0003]

【発明が解決しようとする課題】ところが前記在来の水
回り施設の組付方法では、嵩の張るユニットバス、トイ
レ等の水回り機器、水回り室を仕切る壁体等の搬送作業
やそれらの躯体への取付工事、さらに配管工事、防水工
事その他の付帯工事も必要となるため、この水回り施設
の工事コストが嵩み、全体の建築工事コストを押し上げ
る原因となり、またその後のメンテナンスが厄介になる
という問題がある。
However, in the conventional method of assembling a plumbing facility, the conventional method of assembling a plumbing unit bath, a plumbing device such as a toilet, a wall work for partitioning a plumbing room, and the like. Installation work on the skeleton, plumbing work, waterproofing work, and other incidental work are also required, so the construction cost of this water supply facility increases, causing the overall construction work cost to rise, and subsequent maintenance is troublesome. Problem.

【0004】本発明はかかる実状に鑑みてなされたもの
で、水回りユニットの外パネルの少なくとも一部を、コ
ンクリート打設用の型枠に兼用できるようして型枠空間
へのコンクリートの打設時に、躯体に水回りユニットを
一体に組み付けられるようにして、前記問題を解決でき
るようにした新規な建物における水回りユニットの組付
方法およびその水回りユニットを提供することを目的と
するものである。
The present invention has been made in view of the above circumstances, and at least a part of the outer panel of a water supply unit can be used also as a formwork for concrete placement to cast concrete into a formwork space. Sometimes, it is an object of the present invention to provide a method of assembling a plumbing unit in a new building and a plumbing unit thereof in a new building that can solve the above-described problem by allowing the plumbing unit to be integrally assembled to the skeleton. is there.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するため
に、請求項1記載の発明は、ユニットバス、トイレ等の
水回り施設を一纏めに備え、外パネルの少なくとも一部
が、コンクリート打設用の型枠に兼用できるようにした
水回りユニットを、建物とは別のところで予め製作する
行程と、この水回りユニットを搬送して未だ型枠を組み
立てていない、建物の基礎上に設置する行程と、その水
回りユニットを設置した基礎に型枠を組み立てる行程
と、水回りユニットの、型枠に兼用される外パネルと、
組み立てた型枠との間にコンクリートを打設して構成さ
れるコンクリート躯体に水回りユニットを一体に組み付
ける工程とを含むことを特徴としており、かかる特徴に
よれば、建物への水回りユニットの組付工事が大幅に簡
素化されて、その大幅なコストダウンを達成することが
でき、しかも水回りユニットを建物の所定の取付位置に
精度よく取り付けることができ、さらに型枠の組付工数
を低減することができる。
In order to achieve the above object, the invention according to claim 1 is provided with a plumbing facility such as a unit bath and a toilet, and at least a part of the outer panel is cast in concrete. The process of pre-fabricating a plumbing unit that can also be used as a formwork for a different place from the building, and transporting the plumbing unit and installing it on the foundation of the building where the formwork has not been assembled yet The process, the process of assembling the formwork on the foundation on which the water supply unit is installed, and the outer panel that also serves as the formwork of the water supply unit,
And a step of integrally assembling a plumbing unit to a concrete skeleton constructed by placing concrete between the assembled formwork. According to such a feature, the plumbing unit is installed in a building. The installation work has been greatly simplified, and the cost can be greatly reduced.Furthermore, the water supply unit can be accurately installed at a predetermined mounting position of the building, and the man-hour for assembling the formwork is reduced. Can be reduced.

【0006】また請求項2記載の発明は、前記請求項1
記載の建物における水回りユニットの取付方法に使用さ
れる水回りユニットであって、土台パネル上にユニット
バス、トイレ等の水回り施設を一体に取り付けると共に
その土台パネル上に、前記水回り施設の外周を囲繞する
囲い枠を一体に設け、この囲い枠の外面の少なくとも一
部に、コンクリート打設用の型枠に兼用される外パネル
が接合されていることを特徴としており、かかる特徴に
よれば、水回り施設のユニット化ができて、工場等での
一貫生産を可能にして、その精度向上とコストダウンを
達成することができる。
[0006] The second aspect of the present invention is the first aspect of the present invention.
A plumbing unit used in a method of mounting a plumbing unit in a building according to the above, wherein a plumbing facility such as a unit bath and a toilet is integrally mounted on a base panel, and the plumbing facility is provided on the base panel. An outer frame surrounding the outer periphery is integrally provided, and an outer panel that is also used as a concrete casting form is joined to at least a part of the outer surface of the outer frame. For example, the water supply facility can be unitized, and integrated production at a factory or the like can be performed, thereby improving accuracy and reducing costs.

【0007】さらに請求項3記載の発明は、前記請求項
2記載のものにおいて、前記水回り施設に接続される
給、排水管が一体的に配管されていることを特徴として
おり、かかる特徴によれば、給、排水管の配管は、水回
り施設と一体にユニット化されて、その配管工事を大幅
に簡素化することができ、しかも水漏れ事故の低減を可
能にして以後のメンテナンスも容易になる。
Further, the invention according to claim 3 is characterized in that, in the invention according to claim 2, the supply and drain pipes connected to the plumbing system are integrally piped. According to this, the plumbing of the supply and drainage pipes is integrated with the plumbing system, making it possible to greatly simplify the plumbing work and to reduce water leakage accidents and facilitate subsequent maintenance. become.

【0008】さらにまた請求項4記載の発明は、前記請
求項2記載のものにおいて、前記コンクリート打設用の
型枠に兼用される外パネルは、断熱ボードであることを
特徴としており、かかる特徴によれば、水回りユニット
の断熱工事を別途にしないで済む。
Further, according to a fourth aspect of the present invention, in the second aspect, the outer panel which is also used as the concrete casting formwork is a heat insulating board. According to this, it is not necessary to separately perform insulation work for the water supply unit.

【0009】[0009]

【発明の実施の形態】以下、本発明の実施の形態を、添
付図面に示した本発明の一実施例に基づいて説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The embodiments of the present invention will be described below based on one embodiment of the present invention shown in the accompanying drawings.

【0010】本発明建物における水回りユニットの組付
方法に使用される、水回りユニットUwは、建物とは別
の工場等で製作されてから、後に詳述する組付方法によ
り建物の骨格となる躯体に一体に組み付けられるもので
あり、まずこの水回りユニットUwの構造を図1〜8を
参照して説明する。
[0010] The water supply unit Uw used in the method of assembling the water supply unit in the building of the present invention is manufactured in a factory or the like separate from the building, and then attached to the skeleton of the building by an installation method described later in detail. The structure of the water supply unit Uw will be described first with reference to FIGS.

【0011】図1は、水回りユニットの斜視図、図2
は、図1の2−2線に沿う水回りユニットの横断面図、
図3は、図2の3線矢視側面図、図4は、図3の4−4
線に沿う水回りユニットの部分断面図、図5は、図4の
5−5線に沿う水回りユニットの部分断面図、図6は、
図3の6−6線に沿う水回りユニットの部分断面図、図
7は、図3の7−7線に沿う部分断面図、図8は、図2
の8−8線に沿う水回りユニットの部分断面図である。
FIG. 1 is a perspective view of a plumbing unit, and FIG.
Is a cross-sectional view of the plumbing unit along the line 2-2 in FIG. 1,
FIG. 3 is a side view taken along line 3 of FIG. 2, and FIG.
FIG. 5 is a partial sectional view of the water supply unit along the line, FIG. 5 is a partial sectional view of the water supply unit along the line 5-5 in FIG. 4, and FIG.
FIG. 7 is a partial cross-sectional view taken along line 6-6 of FIG. 3, FIG. 7 is a partial cross-sectional view taken along line 7-7 of FIG. 3, and FIG.
FIG. 8 is a partial sectional view of the water supply unit taken along line 8-8 of FIG.

【0012】この水回りユニットUwは、土台パネルP
f上に水回り施設Ewを一体に設置し、この水回り施設
Ewの外側面および天井面を、囲い枠Fsを以て囲繞
し、さらにその囲い枠Fsの外側面および天井面の外面
に、型枠に兼用される石膏ボード等の断熱性の外パネル
Poを一体に接合して構成されている。
The water supply unit Uw includes a base panel P
f, a plumbing facility Ew is installed integrally, and an outer surface and a ceiling surface of the plumbing facility Ew are surrounded by an enclosing frame Fs. Further, a mold is formed on the outer surface of the enclosing frame Fs and the outer surface of the ceiling surface. A heat-insulating outer panel Po such as a gypsum board is also integrally joined.

【0013】前記土台パネルPfは、木材等の桁材によ
りなり、方形状の外枠1の内側に、縦桁2と横桁3を縦
横に結合して構成されている。この土台パネルPfは、
建物Buの基礎(スラブ)4上に堅固に固定されるもの
であって、すなわち図3,7に明瞭に示すように、前記
土台パネルPfの外枠1外面のコーナー部および中間部
には、複数の、断面L字状の金属製のアングル部材5が
ボルト・ナット6により固着されており、これらのアン
グル部材5は、建物Buの基礎(スラブ)4上にアンカ
ボルト7により固定される。さらに図3,6に明瞭に示
すように土台パネルPfの外枠1の対向する外側面の左
右には、合計4つの吊り環8がそれぞれボルト・ナット
6により固着されており、これらの吊り環8にクレーン
等により吊り上げられるワイヤーを結着することによ
り、水回りユニットUwを土台パネルPfとともに吊り
上げられるようになっている。
The base panel Pf is made of a girder material such as wood, and is formed by connecting a vertical girder 2 and a horizontal girder 3 vertically and horizontally inside a rectangular outer frame 1. This base panel Pf
It is firmly fixed on the foundation (slab) 4 of the building Bu, that is, as clearly shown in FIGS. 3 and 7, at the corners and intermediate portions of the outer surface of the outer frame 1 of the base panel Pf, A plurality of metal angle members 5 having an L-shaped cross section are fixed by bolts and nuts 6, and these angle members 5 are fixed by anchor bolts 7 on the foundation (slab) 4 of the building Bu. Further, as clearly shown in FIGS. 3 and 6, a total of four suspension rings 8 are fixed to the left and right sides of the outer side of the outer frame 1 of the base panel Pf by bolts and nuts 6, respectively. By connecting a wire suspended by a crane or the like to the 8, the water supply unit Uw can be suspended together with the base panel Pf.

【0014】前記水回り施設Ewは、図2,8に示すよ
うに通常の、ユニットバス11、トイレ12、洗面脱衣
室13等を備えており、土台パネルPfの一方の半部上
には、ユニットバス11と、トイレ12とが並列して一
体に設置され、また土台パネルPfの他の半部には、洗
面脱衣室13が一体に設置されている。ユニットバス1
1は、通常のようにバスタブ14と洗い場15とが一体
に形成されその外周は防水壁16により水密状に囲繞さ
れてユニット化されており、洗面脱衣室13側の壁面
に、扉18により開閉される出入口17が開口されてい
る。また前記トイレ12も前記土台パネルPf上に一体
に設置されており、通常のように便器20が設けられそ
の外周は防水壁21により水密状に囲繞されており、洗
面脱衣室13側の壁面に、扉23により開閉される出入
口22が開口されている。洗面脱衣室13は、土台パネ
ルPf上に防水を施した床板25が敷設され、その床板
25の周囲および上部を、防水壁26により囲繞して構
成され、また前記ユニットバス11とトイレ12とに対
面する壁面に、出入口27が開口される。そしてこの出
入口27は、水回りユニットUwの内部と外部すなわち
他の室とを連通する開口部となっている。洗面脱衣室1
3の一側には通常のように洗面化粧台28と洗濯機置場
29が設けられる。そして前記ユニットバス11、トイ
レ12および洗面脱衣室13とが一纏めとなって前記水
回り施設Ewを構成している。
As shown in FIGS. 2 and 8, the water supply facility Ew includes a normal unit bath 11, a toilet 12, a washroom 13 and the like, and on one half of the base panel Pf, A unit bath 11 and a toilet 12 are installed in parallel and integrally, and a washroom 13 is integrally installed in the other half of the base panel Pf. Unit bus 1
1, a bathtub 14 and a washing place 15 are integrally formed as usual, and the outer periphery thereof is united by being surrounded by a waterproof wall 16 in a watertight manner. The entrance 17 is opened. The toilet 12 is also integrally installed on the base panel Pf. A toilet 20 is provided as usual, and the outer periphery thereof is surrounded by a waterproof wall 21 in a watertight manner. The entrance 22 is opened and closed by a door 23. The washroom 13 is provided with a waterproof floor panel 25 laid on a base panel Pf, and the periphery and the upper part of the floor panel 25 are surrounded by a waterproof wall 26. An entrance 27 is opened in the facing wall surface. The entrance 27 is an opening communicating the inside of the water supply unit Uw with the outside, that is, with another chamber. Washing room 1
On one side of 3 is provided a vanity table 28 and a washing machine yard 29 as usual. The unit bath 11, the toilet 12, and the washroom 13 are integrated to constitute the water supply facility Ew.

【0015】また前記囲い枠Fsは、木材等の角柱材よ
りなり、水回り施設Ewの外側面および天井面の外縁に
沿うように枠組みされる外枠31の内側に、縦桟32と
横桟33とを一体に結合して箱枠状に形成され、前記水
回り施設Ewの側面および上面を取り囲んでいる。そし
てこの囲い枠Fsの一部が開放されて、前記洗面脱衣室
13の出入口27が形成される。
The surrounding frame Fs is made of a prism material such as wood, and has a vertical crosspiece 32 and a horizontal crosspiece inside an outer frame 31 which is framed along the outer surface of the water supply facility Ew and the outer edge of the ceiling surface. 33 are integrally formed to form a box frame, and surround the side and top surfaces of the water supply facility Ew. Then, a part of the surrounding frame Fs is opened, and an entrance 27 of the washroom 13 is formed.

【0016】またコンクリート打設用の型枠Fの一部に
兼用される前記外パネルPoは、複数枚の外パネル単体
35を一平面上に並列して構成されるものであり、各外
パネル単体35は、石膏ボート等の硬質の断熱材によ
り、所定の大きさの長方形に形成されてモジュール化さ
れており、複数本の合成樹脂製の補強骨36の埋設によ
り補強されている。複数枚の外パネル単体35は、前記
囲い枠Fsの出入口27の開口される一側壁を除いて他
の三側壁および上壁に、並列して一体に接合されて型枠
Fに兼用される外パネルPoとなるもので、すなわち図
4に示すように各外パネル単体35には、それぞれ多数
の取付孔37が点設されており、これらの取付孔37
を、前記囲い枠Fsに植設されるスタッドボルト38に
挿通したのち、そのスタッドボルト38の端部にナット
39が螺締される。そして囲い枠Fsの外面に並列して
一平面上に複数枚の外パネル単体35を接合して外パネ
ルPoが構成される。
The outer panel Po, which is also used as a part of the concrete casting formwork F, is formed by arranging a plurality of outer panel units 35 in parallel on one plane. The single body 35 is formed into a rectangular shape having a predetermined size by a hard heat insulating material such as a gypsum boat and is modularized, and is reinforced by embedding a plurality of reinforcing bones 36 made of synthetic resin. The plurality of outer panels alone 35 are joined in parallel and integrally to the other three side walls and the upper wall except for one side wall where the entrance 27 of the enclosure frame Fs is opened, and are also used as the formwork F. As shown in FIG. 4, each of the outer panels 35 is provided with a number of mounting holes 37, and these mounting holes 37 are provided.
Is inserted into a stud bolt 38 implanted in the surrounding frame Fs, and a nut 39 is screwed to an end of the stud bolt 38. An outer panel Po is formed by joining a plurality of outer panel units 35 on one plane in parallel with the outer surface of the surrounding frame Fs.

【0017】而してこの外パネルPoは、後に述べるよ
うにコンクリートの打設用に組み付けられる型枠Fに兼
用されるもので、スタッドボルト38の頭部およびナッ
ト39が、その打設コンクリートとのアンカー機能を有
する。なお、外パネルPoの外面には、凹凸を形成して
打設コンクリートとのアンカー効果を高めるようにして
もよい。
The outer panel Po is also used as a formwork F which is assembled for placing concrete as described later, and the head of the stud bolt 38 and the nut 39 are combined with the cast concrete. It has an anchor function. In addition, you may make it the unevenness | corrugation be formed in the outer surface of the outer panel Po to enhance the anchor effect with the cast concrete.

【0018】前記外パネルPoの内側には、前記水回り
施設Ewの複数の給水口411 ,412 …414 と、複
数の排水口421 ,422 …425 にそれぞれ接続され
る給水管Psおよび排水管Pdが纏めて配管されてい
る。図2,には、2点鎖線にて給水管Psの配管レイア
ウトが、また実線にて排水管Pdの配管レイアウトが示
されている。
The water supply to the inside of the outer panel Po, the said water around facility plurality of water supply ports 41 1 of Ew, 41 2 ... 41 4, are connected to a plurality of drainage ports 42 1, 42 2 ... 42 5 The pipe Ps and the drain pipe Pd are collectively piped. In FIG. 2, the piping layout of the water supply pipe Ps is shown by a two-dot chain line, and the piping layout of the drain pipe Pd is shown by a solid line.

【0019】次に前述したように製作される水回りユニ
ットUwを建物に組み付ける工程について、図9〜14
を参照して説明する。
Next, the process of assembling the water supply unit Uw manufactured as described above to the building will be described with reference to FIGS.
This will be described with reference to FIG.

【0020】図9は、完成した水回りユニットの吊り上
げた状態の斜視図、図10は、建物の基礎の斜視図、図
11は、水回りユニットを基礎に設置し、型枠を組み立
てた状態を示す一部破断斜視図、図12は、コンクリー
トを打設して躯体に水回りユニットが組み込まれた状態
を示す斜視図、図13は、図12の13−13線に沿う
横断面図、図14は、図13の14−14線に沿う縦断
面図である。
FIG. 9 is a perspective view of the completed water supply unit in a hung state, FIG. 10 is a perspective view of the foundation of the building, and FIG. 11 is a state in which the water supply unit is installed on the foundation and the formwork is assembled. 12 is a perspective view showing a state in which a plumbing unit is installed in a skeleton by casting concrete, FIG. 13 is a cross-sectional view taken along line 13-13 of FIG. 12, FIG. 14 is a longitudinal sectional view taken along the line 14-14 in FIG.

【0021】.前記水回りユニットUwは、建物とは
別の工場で製作しておく。この場合この水回りユニット
Uwは、各構成部材をモジュール化し、また工場にての
一貫製作が可能なので精度よく、しかも従来の水回り施
設に比べて可及的に廉価に製作することが可能になる。
[0021] The water supply unit Uw is manufactured in a factory different from the building. In this case, the plumbing unit Uw can modularize each component and can be manufactured in a factory, so that it can be manufactured with high accuracy and as low cost as possible compared with conventional plumbing facilities. Become.

【0022】.工場にて完成した水回りユニットUw
は、トラック等の搬送手段により建築現場へと搬送され
る。建築現場では、図9に示すように、複数の吊り環8
に吊り上げ用のワイヤ9を係合してそれらのワイヤ9を
水回りユニットUwに巡らして、荷役機械のフックを引
っかけてこれを吊り上げる。
[0022] Water supply unit Uw completed at the factory
Is transported to the building site by transport means such as a truck. At the construction site, as shown in FIG.
, The lifting wires 9 are engaged, the wires 9 are routed around the water supply unit Uw, and the hooks of the loading and unloading machine are hooked and lifted.

【0023】.鉄筋44の組み立てられている、建物
の基礎(スラブ)4(図10参照)上に、その鉄筋44
に沿って水回りユニットUwを設置して、その水回りユ
ニットUwは、図7に示すように、アンカーボルト7を
以て基礎4上に堅固に固定される。この場合基礎4上に
は、レベル調整手段Lが設けられており、これにより水
回りユニットUwのレベル調整を行なう。
[0023] On the foundation (slab) 4 (see FIG. 10) of the building where the reinforcing bar 44 is assembled,
Is installed along the water supply unit Uw, and the water supply unit Uw is firmly fixed on the foundation 4 with anchor bolts 7 as shown in FIG. In this case, a level adjusting means L is provided on the foundation 4 to adjust the level of the water supply unit Uw.

【0024】.水回りユニットUwが基礎4上に固
定、設置されたら、その基礎4上にコンクリート打設用
の型枠Fを組み立てる。このとき型枠4に兼用される外
パネルPoは、その型枠4の一部となる。
[0024] When the water supply unit Uw is fixed and installed on the foundation 4, a formwork F for placing concrete is assembled on the foundation 4. At this time, the outer panel Po also used as the mold 4 becomes a part of the mold 4.

【0025】.次に図11矢印aで示すように、型枠
空間にコンクリートを打設する。このとき、型枠Fの一
部となっている外パネルPoは、その打設コンクリート
の凝固とともに一体化される。
[0025] Next, as shown by arrow a in FIG. 11, concrete is poured into the formwork space. At this time, the outer panel Po that is a part of the formwork F is integrated with the solidification of the cast concrete.

【0026】.型枠Fの存置期間を置いた後、その型
枠Fの解体を行なう、このとき前記外パネルPoはコン
クリート躯体Scに一体に接合される。したがって水回
りユニットUwは、コンクリートの打設により、躯体S
cと一体化され、該躯体Scへの水回りユニットUwの
組み付けが完了する。
[0026] After leaving the form F for a certain period, the form F is dismantled. At this time, the outer panel Po is integrally joined to the concrete frame Sc. Therefore, the water supply unit Uw is constructed by the concrete
and the assembly of the water supply unit Uw to the frame Sc is completed.

【0027】.以上のようにして建物Buの基礎4上
には、コンクリートの打設による躯体Scの形成と同時
に水回りユニットUwを、その躯体Scに一体に組み付
けることができる。
[0027] As described above, on the foundation 4 of the building Bu, the water supply unit Uw can be integrally attached to the skeleton Sc at the same time as the formation of the skeleton Sc by casting concrete.

【0028】以上、本発明の一実施例について説明した
が、本発明はその実施例に限定されることなく、本発明
の範囲内で種々の実施例が可能である。たとえば水回り
ユニットの外パネルはその全部を型枠に,あるいはその
一部を型枠に兼用することができ、また外パネルの一部
となる別のパネルを水回りユニットとは別に、基礎上に
組み立てられた鉄筋に予め取り付けておき、コンクリー
トの打設により、その別のパネルを躯体と一体化し、水
回りユニットの外パネルの一部としてもよい。
Although one embodiment of the present invention has been described above, the present invention is not limited to the embodiment, and various embodiments are possible within the scope of the present invention. For example, the outer panel of the water unit can be used as a whole or part of the formwork, and another panel that is a part of the outer panel can be used separately from the water unit on the foundation. Another panel may be integrated with the skeleton by casting concrete in advance, and may be formed as a part of the outer panel of the water supply unit.

【0029】[0029]

【発明の効果】以上のように本請求項1項記載の発明に
よれば、ユニットバス、トイレ等の水回り施設を一纏め
に備え、外パネルの少なくとも一部が、コンクリート打
設用の型枠に兼用できるようにした水回りユニットを、
建物とは別のところで予め製作する行程と、この水回り
ユニットを搬送して未だ型枠を組み立てていない、建物
の基礎上に設置する行程と、その水回りユニットを設置
した基礎に型枠を組み立てる行程と、水回りユニット
の、型枠に兼用される外パネルと、組み立てた型枠との
間にコンクリートを打設して構成されるコンクリート躯
体に水回りユニットを一体に組み付ける工程とを含むの
で、建物への水回りユニットの組付工事が大幅に簡素化
されて、その大幅なコストダウンを達成することがで
き、しかも水回りユニットを建物の所定の取付位置に精
度よく取り付けることができ、さらに型枠の組付工数を
低減することができる。
As described above, according to the first aspect of the present invention, a plumbing facility such as a unit bath and a toilet is integrally provided, and at least a part of the outer panel is provided with a formwork for concrete casting. The plumbing unit that can also be used for
The process of pre-fabricating the building at a location separate from the building, the process of installing this plumbing unit on the foundation where the plumbing unit has been installed and the process of transporting this plumbing unit and not yet assembling the formwork Assembling, and a step of integrally assembling the plumbing unit with a concrete frame formed by casting concrete between the outer panel also serving as the formwork and the assembled formwork of the plumbing unit. Therefore, the work of assembling the plumbing unit to the building is greatly simplified, and a significant cost reduction can be achieved. In addition, the plumbing unit can be accurately mounted at a predetermined mounting position of the building. Further, the man-hour for assembling the mold can be further reduced.

【0030】また請求項2記載の発明は、土台パネル上
にユニットバス、トイレ等の水回り施設を一体に取り付
けると共にその土台パネル上に、前記水回り施設の外周
を囲繞する囲い枠を一体に設け、この囲い枠の外面の少
なくとも一部に、コンクリート打設用の型枠に兼用され
る外パネルが接合されているので、水回り施設のユニッ
ト化ができて、工場等での一貫生産を可能にして、その
精度向上とコストダウンを達成することができる。
According to a second aspect of the present invention, a plumbing facility such as a unit bath and a toilet is integrally mounted on a base panel, and an enclosure surrounding the outer periphery of the plumbing facility is integrally formed on the base panel. The outer panel, which is also used as a concrete casting form, is joined to at least a part of the outer surface of this enclosure, so that the water supply facilities can be unitized and integrated production at factories, etc. As a result, the accuracy can be improved and the cost can be reduced.

【0031】さらに請求項3記載の発明は、前記請求項
2記載のものにおいて、前記水回り施設に接続される
給、排水管が一体的に配管されているので、給、排水管
の配管は、水回り施設と一体にユニット化されて、その
配管工事を大幅に簡素化することができ、しかも水漏れ
事故の低減を可能にして以後のメンテナンスも容易にな
る。
According to a third aspect of the present invention, in the second aspect, the supply and drain pipes connected to the plumbing system are integrally formed. Since the unit is integrated with the water supply facility, the piping work can be greatly simplified, and water leakage accidents can be reduced, and subsequent maintenance becomes easy.

【0032】さらにまた請求項4記載の発明は、前記コ
ンクリート打設用の型枠に兼用される外パネルは、断熱
ボードであるので、水回りユニットの断熱工事を別途に
しないで済む。
Further, in the invention according to claim 4, since the outer panel used also as the concrete casting form is a heat insulating board, it is not necessary to separately perform heat insulating work for the water supply unit.

【図面の簡単な説明】[Brief description of the drawings]

【図1】水回りユニットの斜視図FIG. 1 is a perspective view of a water supply unit.

【図2】図1の2−2線に沿う水回りユニットの横断面
FIG. 2 is a cross-sectional view of the water supply unit taken along line 2-2 in FIG.

【図3】図2の3線矢視側面図FIG. 3 is a side view taken along line 3 of FIG. 2;

【図4】図3の4−4線に沿う水回りユニットの部分断
面図
FIG. 4 is a partial cross-sectional view of the water supply unit taken along line 4-4 in FIG. 3;

【図5】図4の5−5線に沿う水回りユニットの部分断
面図
FIG. 5 is a partial sectional view of the water supply unit taken along line 5-5 in FIG. 4;

【図6】図3の6−6線に沿う水回りユニットの部分断
面図
FIG. 6 is a partial cross-sectional view of the water supply unit taken along line 6-6 in FIG. 3;

【図7】図3の7−7線に沿う部分断面図FIG. 7 is a partial sectional view taken along the line 7-7 in FIG. 3;

【図8】図2の8−8線に沿う水回りユニットの部分断
面図
FIG. 8 is a partial cross-sectional view of the water supply unit taken along line 8-8 in FIG. 2;

【図9】完成した水回りユニットの吊り上げた状態の斜
視図
FIG. 9 is a perspective view of the completed water supply unit in a suspended state.

【図10】建物の基礎の斜視図FIG. 10 is a perspective view of a building foundation.

【図11】水回りユニットを基礎に設置し、型枠を組み
立てた状態を示す一部破断斜視図
FIG. 11 is a partially broken perspective view showing a state where a water supply unit is installed on a foundation and a formwork is assembled.

【図12】コンクリートを打設して躯体に水回りユニッ
トが組み込まれた状態を示す斜視図
FIG. 12 is a perspective view showing a state in which concrete is cast and a water supply unit is incorporated in a skeleton.

【図13】図12の13−13線に沿う横断面図FIG. 13 is a cross-sectional view taken along line 13-13 of FIG.

【図14】図13の14−14線に沿う縦断面図FIG. 14 is a longitudinal sectional view taken along the line 14-14 in FIG. 13;

【符号の説明】[Explanation of symbols]

4・・・・・・・・・基礎 11・・・・・・・・ユニットバス 12・・・・・・・・トイレ Bu・・・・・・・・建物 Ew・・・・・・・・水回り施設 F・・・・・・・・・型枠 Fs・・・・・・・・囲い枠 Pf・・・・・・・・土台パネル Po・・・・・・・・外パネル Ps・・・・・・・・給水管 Pd・・・・・・・・排水管 Sc・・・・・・・・躯体(コンクリート躯体) Uw・・・・・・・・水回りユニット 4 Basics 11 Unit bath 12 Toilet Bu Building Ew・ Plumbing facilities F ・ ・ ・ ・ ・ ・ ・ ・ ・ Form Fs ・ ・ ・ ・ ・ ・ ・ ・ ・ Enclosure Pf ・ ・ ・ ・ ・ ・ ・ ・ ・ Base panel Po ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ Outer panel Ps ······· Water supply pipe Pd ····· Drainage pipe Sc ····· Frame (concrete frame) Uw ····· Plumbing unit

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 ユニットバス(11)、トイレ(12)
等の水回り施設(Ew)を一纏めに備え、外パネル(P
o)の少なくとも一部が、コンクリート打設用の型枠
(F)に兼用できるようにした水回りユニット(Uw)
を、建物(Bu)とは別のところで予め製作する行程
と、この水回りユニット(Uw)を搬送して未だ型枠
(F)を組み立てていない、建物(Bu)の基礎(4)
上に設置する行程と、その水回りユニット(Uw)を設
置した基礎(4)に型枠(F)を組み立てる行程と、水
回りユニット(Uw)の、型枠(F)に兼用される外パ
ネル(Po)と、組み立てた型枠(F)との間にコンク
リートを打設して構成されるコンクリート躯体(Sc)
に水回りユニット(Uw)を一体に組み付ける工程とを
含むことを特徴とする、建物における水回りユニットの
組付方法。
1. A unit bath (11) and a toilet (12)
And other facilities around the water (Ew), and the outer panel (P
o) A water supply unit (Uw) in which at least a portion of o) can be used also as a formwork (F) for placing concrete.
Is manufactured in advance in a place different from the building (Bu), and the foundation (4) of the building (Bu) in which the water supply unit (Uw) is transported and the formwork (F) is not yet assembled.
The process of installing the above, the process of assembling the formwork (F) on the foundation (4) on which the water supply unit (Uw) is installed, and the outside of the water supply unit (Uw) which is also used for the formwork (F) Concrete frame (Sc) constructed by casting concrete between panel (Po) and assembled formwork (F)
Assembling a water supply unit (Uw) integrally with the water supply unit (Uw).
【請求項2】 前記請求項1記載の建物における水回り
ユニットの取付方法に使用される水回りユニットであっ
て、土台パネル(Pf)上にユニットバス(11)、ト
イレ(12)等の水回り施設(Ew)を一体に取り付け
ると共にその土台パネル(Pf)上に、前記水回り施設
(Ew)の外周を囲繞する囲い枠(Fs)を一体に設
け、この囲い枠(Fs)の外面の少なくとも一部に、コ
ンクリート打設用の型枠(F)に兼用される外パネル
(Po)が接合されていることを特徴とする、水回りユ
ニット。
2. A plumbing unit used in the method of mounting a plumbing unit in a building according to claim 1, wherein water such as a unit bath (11) and a toilet (12) is provided on a base panel (Pf). The surrounding facility (Ew) is integrally mounted, and a surrounding frame (Fs) surrounding the outer periphery of the water surrounding facility (Ew) is integrally provided on the base panel (Pf), and an outer surface of the surrounding frame (Fs) is provided. An outer panel (Po), which is also used at least partially as a formwork (F) for concrete casting, is joined to the plumbing unit.
【請求項3】 前記水回り施設(Ew)に接続される
給、排水管(Ps,Pd)が一体的に配管されているこ
とを特徴とする、前記請求項2記載の建物における水回
りユニット。
3. A water supply unit in a building according to claim 2, wherein supply and drain pipes (Ps, Pd) connected to the water supply facility (Ew) are integrally piped. .
【請求項4】 前記コンクリート打設用の型枠(F)に
兼用される外パネル(Po)は、断熱ボードであること
を特徴とする、前記請求項2記載の建物における水回り
ユニット。
4. The plumbing unit according to claim 2, wherein the outer panel (Po) used also as the concrete casting formwork (F) is a heat insulating board.
JP9308233A 1997-11-11 1997-11-11 Assembling method of plumbing unit in building and plumbing unit Expired - Lifetime JP3062810B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9308233A JP3062810B2 (en) 1997-11-11 1997-11-11 Assembling method of plumbing unit in building and plumbing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9308233A JP3062810B2 (en) 1997-11-11 1997-11-11 Assembling method of plumbing unit in building and plumbing unit

Publications (2)

Publication Number Publication Date
JPH11141156A true JPH11141156A (en) 1999-05-25
JP3062810B2 JP3062810B2 (en) 2000-07-12

Family

ID=17978543

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9308233A Expired - Lifetime JP3062810B2 (en) 1997-11-11 1997-11-11 Assembling method of plumbing unit in building and plumbing unit

Country Status (1)

Country Link
JP (1) JP3062810B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014079421A (en) * 2012-10-17 2014-05-08 Minoru Kasei Kk Hoistable temporary toilet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014079421A (en) * 2012-10-17 2014-05-08 Minoru Kasei Kk Hoistable temporary toilet

Also Published As

Publication number Publication date
JP3062810B2 (en) 2000-07-12

Similar Documents

Publication Publication Date Title
US3514910A (en) Modular building construction
JPS5996346A (en) Fabricated core of building
EP3670774B1 (en) Prefabricated bathroom and methods for constructing and installing the same
US20110023383A1 (en) Prefabricated concrete building module and a method for the production thereof
JP2002004610A (en) Prefabricated bathroom
JPH07122340B2 (en) Building equipment for multi-storey buildings
CN102230338A (en) Prefabricated toilet and construction method and installation method thereof
CN102230339A (en) Prefabricated kitchen and construction and installation method thereof
CN108312308A (en) Interior trim formed by integrally casting prefabricated toilet and molding die and production method
JP3062810B2 (en) Assembling method of plumbing unit in building and plumbing unit
JP2990434B1 (en) How to assemble the plumbing unit of the building to the frame by the frame wall method
KR101086058B1 (en) Floor unit and floor construction method thereby
JP3016633B2 (en) Construction method of prefab toilet
JP2928002B2 (en) Column formwork structure
CN210507974U (en) Prefabricated folded plate for same-layer drainage of toilet
CN117738374A (en) Building component manufacturing method and building construction method
JP3086366B2 (en) Installation method of floor-mounted fan coil unit for perimeter of high-rise building
JP3961116B2 (en) Floor structure in steel-frame building
JP2915655B2 (en) Bathroom unit construction method
JP2727263B2 (en) Formwork unit construction method
KR950009611B1 (en) Assembling high apartments joining structure
JP2002194892A (en) Construction method of building
JP2733507B2 (en) Industrialization of racks for piping and wiring
JP2529445B2 (en) Construction method of bus unit in unit housing
JPH0711711A (en) Medium multistory housing

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090512

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100512

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110512

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120512

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130512

Year of fee payment: 13

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term