JPH11117231A - Protective device for tensing transverse prestressing pc steel in pc bridge girder - Google Patents
Protective device for tensing transverse prestressing pc steel in pc bridge girderInfo
- Publication number
- JPH11117231A JPH11117231A JP31779897A JP31779897A JPH11117231A JP H11117231 A JPH11117231 A JP H11117231A JP 31779897 A JP31779897 A JP 31779897A JP 31779897 A JP31779897 A JP 31779897A JP H11117231 A JPH11117231 A JP H11117231A
- Authority
- JP
- Japan
- Prior art keywords
- steel
- bridge girder
- protective sheet
- bridge
- rectangular frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、PC鋼材が導入さ
れている橋桁(以下PC橋桁という)の構築時におい
て、PC鋼材を横締め緊張する際にPC鋼材の切断によ
る橋桁側方への飛出しを防止するための、PC鋼材横締
め緊張用防護装置に関するものである。BACKGROUND OF THE INVENTION The present invention relates to a bridge girder into which PC steel is introduced (hereinafter referred to as a PC girder). The present invention relates to a protection device for preventing lateral tension of a PC steel material in order to prevent it from being pulled out.
【0002】[0002]
【従来の技術】PC構造物の1つであるポストテンショ
ン方式単純桁橋では、橋を架ける付近でポストテンショ
ン方式によって製作されたPC主桁を橋脚(と橋台)上
に架設して建設される。この場合、PC主桁長手方向に
PC鋼材と鉄筋が配置されると共に、横組工程におい
て、横に並設した複数の主桁間もPC鋼材で横締め緊張
されて強固に一体化される。2. Description of the Related Art In a post-tension type simple girder bridge, which is one of the PC structures, a PC main girder manufactured by a post-tension type is built on a pier (and an abutment) near a bridge. . In this case, the PC steel material and the rebar are arranged in the longitudinal direction of the PC main girder, and in the horizontal assembling process, the plurality of main girders arranged side by side are also tightened by the PC steel material and tightly integrated.
【0003】[0003]
【発明が解決しようとする課題】前記主桁間をPC鋼材
で横締め緊張する際、その強大な引張力(例えば50ト
ン程度)のため、横締め用PC鋼材が破断し、その切断
線が側方に激しい勢いで飛び出すことがある。PC橋は
広い道路を跨ぐ高架橋として構築され、または、下方を
鉄道が走っている状況の下で構築されることが多く、こ
の場合、前記破断したPC鋼材の切断線が下方に落下
し、道路を通行している人や自動車、列車に当りこれら
を傷付ける危険性があった。When the main girder is laterally tightened with a PC steel material, the PC steel material for the horizontal tightening is broken due to the strong tensile force (for example, about 50 tons), and the cutting line is cut off. May jump out to the side with intense momentum. PC bridges are often constructed as viaducts that span a wide road, or under conditions where a railway is running below, in which case the cut line of the broken PC steel falls down and the road There was a danger of hitting people, cars and trains passing by and damaging them.
【0004】本発明は、前記の課題を解決したPC橋桁
におけるPC鋼材横締め緊張用防護装置を提供すること
を目的とする。[0004] It is an object of the present invention to provide a protection device for lateral tightening of PC steel in a PC bridge girder which has solved the above-mentioned problems.
【0005】[0005]
【課題を解決するための手段】前記の目的を達成するた
め、本発明に係るPC橋桁におけるPC鋼材横締め緊張
防護装置は、複数の主桁を横方向に連結するため、この
主桁を貫通する横締め用PC鋼材の両端部がPC橋桁の
両側部に定着されている構造において、前記PC橋桁の
上面に防護シート取付け枠を着脱自在に設け、この取付
け枠に、PC橋桁の両側から所定の間隔を隔てた位置
で、かつ前記PC鋼材の軸延長線がシート面と交わるよ
うに位置させて防護シートを取付けた構成を特徴とす
る。In order to achieve the above-mentioned object, in the PC bridge girder according to the present invention, a PC steel horizontal tightening and protection device is provided. In the structure in which both ends of the laterally tightened PC steel material are fixed to both sides of the PC bridge girder, a protective sheet mounting frame is detachably provided on the upper surface of the PC bridge girder. The protective sheet is attached at a position separated by a distance from the above and at such a position that the axial extension of the PC steel material intersects the sheet surface.
【0006】また、前記防護シート取付け枠は、PC橋
桁の上面に配設する水平矩形枠と、この水平矩形枠に設
けられる垂直矩形枠とから構成し、前記防護シートは、
アラド繊維からなるシート単体を複数枚重ねて構成し、
この防護シートの周縁部を前記垂直矩形枠に取付けると
よい。The protective sheet mounting frame comprises a horizontal rectangular frame provided on the upper surface of the PC bridge girder and a vertical rectangular frame provided on the horizontal rectangular frame.
It is composed by stacking multiple sheets of arad fiber alone,
It is preferable to attach the peripheral portion of the protective sheet to the vertical rectangular frame.
【0007】本発明によると、PC橋桁における横締め
用PC鋼材に緊張ジャッキにより大きな引張力で緊張を
与える際に、万一このPC鋼材が破断し、切断したPC
鋼材がPC橋桁の側方に飛び出したとき、このPC鋼材
は防護装置における防護シートに当って円滑に受止めら
れて、その飛び出しをコントロールでき、作業用足場で
確実に受けられるので、下方の道路や鉄道などに落下す
る危険性がない。According to the present invention, when the PC steel for lateral tightening in the PC bridge girder is tensioned by a tension jack with a large tensile force, the PC steel is broken and cut.
When the steel protrudes to the side of the PC bridge girder, the PC steel hits the protective sheet of the protective device and is smoothly received, the protruding can be controlled, and the PC steel can be reliably received on the work scaffold. There is no danger of falling on trains and railways.
【0008】[0008]
【発明の実施の形態】以下本発明の実施形態を図を参照
して説明する。図1はポストテンション方式単純桁橋
(PC橋)の横締め用PC鋼材の緊張時の状態を示す断
面図、図2(A)は防護シート取付け枠の拡大平面図、
図3(A)は、図2(A)の正面右側部の図、図3
(B)は同図(A)の垂直短形枠を示す右側面図、図4
は防護シートの斜視図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a cross-sectional view showing a state where a PC steel material for lateral tightening of a post-tension type simple girder bridge (PC bridge) is tensioned, FIG. 2 (A) is an enlarged plan view of a protective sheet mounting frame,
FIG. 3A is a view of the right front part of FIG.
FIG. 4B is a right side view showing the vertical rectangular frame of FIG.
FIG. 3 is a perspective view of a protective sheet.
【0009】図1において、複数の主桁1が横に並設さ
れてPC橋桁2が構築されており、上部3は舗装面とな
る。各主桁1間の上部間隙には床版コンクリート4が打
設されている。主桁1間の下部の間隙にも横桁コンクリ
ートが打設されるが、図示省略する。また、各主桁1に
は橋長手方向に伸長するPC鋼材と鉄筋が配設される
が、これも図示省略する。また、PC橋桁2の両側に位
置する主桁1aには、橋長手方向に所定の間隔をあけて
地覆鉄筋5が設けられている。In FIG. 1, a PC bridge girder 2 is constructed by arranging a plurality of main girder 1 side by side, and the upper part 3 is a pavement surface. Floor slab concrete 4 is cast in the upper gap between the main girders 1. Horizontal girder concrete is also cast in the lower gap between the main girders 1, but is not shown. Further, a PC steel material and a reinforcing bar extending in the longitudinal direction of the bridge are provided on each main girder 1, but these are also not shown. The main girder 1a located on both sides of the PC bridge girder 2 is provided with ground covering reinforcing bars 5 at predetermined intervals in the bridge longitudinal direction.
【0010】図1において、複数の主桁1を連結するた
め、この主桁1を横方向に貫通して横締め用PC鋼材6
が導入されており、このPC鋼材6の先端(左端)は、
一側部の主桁1aの外側に突出していて、第1定着具7
により定着されており、基端(右端)は他側部の主桁1
aの外側に突出しており、この突出した基端部に第2定
着具8が設けられると共に、PC鋼材端部は主桁外側に
配設した緊張ジャッキ9の引張ロッドに連結されてい
る。In FIG. 1, in order to connect a plurality of main girders 1, the main girders 1 are penetrated in the lateral direction and PC steel members 6 for lateral tightening are used.
The tip (left end) of this PC steel material 6 is
The first fixing member 7 protrudes outside the main girder 1a on one side.
The base end (right end) is the main girder 1 on the other side.
A second fixing device 8 is provided at the protruding base end, and a PC steel material end is connected to a tension rod of a tension jack 9 disposed outside the main girder.
【0011】したがって、図示右側の主桁1aに反力を
とり、緊張ジャッキ9を駆動して引張ロッドにより横締
め用PC鋼材6を緊張させ、その状態で第2定着具8を
緊締し、その後、横締め用PC鋼材6の外周のシース内
にグラウトを充填する。そして、グラウトが硬化するこ
とで緊張ジャッキ9を取外した後も主桁1間を横締め
し、強固に連結することができる。Accordingly, a reaction force is applied to the main girder 1a on the right side in the figure, and the tension jack 9 is driven to tension the PC steel material 6 for lateral tightening by the tension rod, and in this state, the second fixing device 8 is tightened. Then, grout is filled in the sheath on the outer periphery of the PC steel material 6 for lateral tightening. Then, even after the tension jack 9 is removed due to the hardening of the grout, the main girder 1 can be laterally tightened and connected firmly.
【0012】前記の構築作業に際し、横締め用PC鋼材
6を緊張ジャッキ9により数十トン(例えば50トン)
という高い引張力で緊張したとき、このPC鋼材6が途
中で切断することがある。そのときは、切断したPC鋼
材6が両側の主桁1aから外方に激しい勢いで飛び出
し、下方に落下することがある。At the time of the above-mentioned construction work, the PC steel material 6 for lateral tightening is tens of tons (for example, 50 tons) by the tension jack 9.
When tensioned by such a high tensile force, the PC steel material 6 may be cut in the middle. At that time, the cut PC steel material 6 may jump out of the main girders 1a on both sides with great force and fall downward.
【0013】これに対する防護対策として、本発明では
PC橋桁2の両側に、飛び出し防護装置10を設けてい
る。この飛び出し防護装置10は、防護シート11と、
防護シート取付け枠12とから構成されている。As a protective measure against this, in the present invention, a pop-out protective device 10 is provided on both sides of the PC bridge girder 2. The protection device 10 is provided with a protection sheet 11 and
And a protective sheet mounting frame 12.
【0014】防護シート取付け枠12は、それぞれ所定
寸法の複数の枠材を矩形に組み、かつ溶接して構成され
る。すなわち、防護シート取付け枠12は、水平矩形枠
13と、この水平矩形枠13の外端部13aから下方に
垂直するように溶接部14で溶接された垂直矩形枠15
と、この垂直矩形枠15の両側下端部と、水平矩形枠1
3の側部との間に溶接部14で溶接された傾斜補強枠1
6とから構成されており、矩形の防護シート11は、垂
直矩形枠15に展開して取付けられるものである。The protective sheet mounting frame 12 is formed by assembling a plurality of frame members each having a predetermined size into a rectangular shape and welding them. That is, the protective sheet mounting frame 12 is composed of a horizontal rectangular frame 13 and a vertical rectangular frame 15 welded by the welding portion 14 so as to be vertically downward from the outer end 13 a of the horizontal rectangular frame 13.
And lower ends of both sides of the vertical rectangular frame 15 and the horizontal rectangular frame 1
Of the inclined reinforcing frame 1 welded at the welded portion 14 to the side of the frame 3
6, and the rectangular protective sheet 11 is developed and attached to the vertical rectangular frame 15.
【0015】水平矩形枠13は、PC橋桁2の上面に配
設されて仮固定され、かつ、垂直矩形枠15はPC橋桁
2の側端から一定の間隔を隔てた側方に位置している。
水平矩形枠13をPC橋桁2の上面に仮固定する手段は
限定されないが、図1〜図3に示す例では水平矩形枠1
3は、アングル材からなる長寸両側枠13bと、同じく
アングル材からなる先端連結枠13cを溶接接合によっ
てほぼコ字状に、組み、さらに長寸両側枠13bの基端
部(図2で左端部)の下面に、2つのガイド長孔17を
有する取付け板18を溶接して構成されている。前記2
つのガイド長孔17に対応して、PC主桁1間のすき間
を埋める床版コンクリート4に固定用ボルト19が挿入
植設されている。The horizontal rectangular frame 13 is disposed on the upper surface of the PC bridge girder 2 and is temporarily fixed, and the vertical rectangular frame 15 is located on a side of the PC bridge girder 2 at a fixed distance from a side end thereof. .
The means for temporarily fixing the horizontal rectangular frame 13 to the upper surface of the PC bridge girder 2 is not limited, but in the example shown in FIGS.
3, a long side frame 13b made of an angle material and a distal end connection frame 13c also made of an angle material are assembled into a substantially U-shape by welding, and the base end of the long side frame 13b (the left end in FIG. 2). A mounting plate 18 having two guide long holes 17 is welded to the lower surface of the portion (1). 2 above
Fixing bolts 19 are inserted and planted in the floor slab concrete 4 that fills the gap between the PC main girders 1 corresponding to the three guide slots 17.
【0016】したがって、図1の配置でPC橋桁2の上
面に防護シート取付け枠12の水平矩形枠13を設置
し、前記取付け板18のガイド長孔17に固定用ボルト
19を挿通し、取付け板18の上側から固定用ボルト1
9に締結ナット23を締結することにより、水平矩形枠
13の基端部をPC主桁1の上面に着脱自在に固定でき
る。Therefore, the horizontal rectangular frame 13 of the protective sheet mounting frame 12 is installed on the upper surface of the PC bridge girder 2 in the arrangement of FIG. Fixing bolt 1 from above 18
By fastening the fastening nut 23 to the base 9, the base end of the horizontal rectangular frame 13 can be detachably fixed to the upper surface of the PC main girder 1.
【0017】一方、図3に示すように垂直矩形枠15の
4辺の各枠には、防護シート11を取付けるため、所定
間隔で複数のボルト孔24が開設されている。図4に示
すように防護シート11は、4辺側部にボルト孔付き止
め金具25を所定間隔で複数開設されてなるシート単体
11aを複数枚(例えば2枚ないし3枚)重合して構成
される。各シート単体11aは、軟質合成樹脂シートや
皮革などからなる2枚の表装材の間にアラミド繊維を挟
持すると共に、4辺の縁部に芯材26が介在してあり、
この芯材26を介してボルト孔付き止め金具25を取付
けてある。また防護シート11の大きさは、例えば1辺
が約1.3mないし約2.0mである。On the other hand, as shown in FIG. 3, a plurality of bolt holes 24 are formed at predetermined intervals in each of four sides of the vertical rectangular frame 15 in order to mount the protective sheet 11 thereon. As shown in FIG. 4, the protective sheet 11 is formed by stacking a plurality (for example, two or three) of a single sheet 11a in which a plurality of fasteners 25 with bolt holes are provided at predetermined intervals on four sides. You. Each sheet unit 11a has an aramid fiber sandwiched between two facing materials made of a soft synthetic resin sheet, leather, or the like, and a core material 26 is interposed at four edges.
A stopper 25 with a bolt hole is attached via the core 26. The size of the protective sheet 11 is, for example, about 1.3 m to about 2.0 m on one side.
【0018】前記防護シート11は、破断した横締め用
PC鋼材6が激しい勢いで飛び出したときの重量を確実
に受けることができる強度を有し、かつ製作コストが安
く、しかも、施工現場での取扱いの容易性の観点から構
成されたもので、前記アラミド繊維からなり、かつ縁部
に芯材26を介在した矩形のシート単体11aを複数枚
重ねることで前記の条件を満たすことができる。前記2
枚ないし3枚のシート単体11aを、それぞれのボルト
孔付き止め金具25を合致させて重ね合わせ、この防護
シート11の周縁部を、垂直矩形枠15の上下左右の4
辺枠に沿わせたうえ、防護シート11のボルト孔付き止
め金具25と垂直矩形枠15のボルト孔24を通してボ
ルト30を挿入し、これにナットを締結することによ
り、防護シート11の4辺を張設して垂直矩形枠15に
強固に固定できる。The protective sheet 11 has a strength capable of reliably receiving the weight of the broken PC steel material 6 for lateral tightening when the PC steel material 6 protrudes with violent momentum, has a low manufacturing cost, and has a low construction cost. The above condition is satisfied by stacking a plurality of rectangular single sheets 11a made of the aramid fiber and having a core material 26 interposed therebetween at the edges. 2 above
One to three sheets 11a are superimposed on each other with the bolts 25 having fittings in alignment with each other, and the peripheral edge of the protective sheet 11 is
Along with the side frame, the bolt 30 is inserted through the bolt 25 of the protection sheet 11 and the bolt hole 24 of the vertical rectangular frame 15, and nuts are fastened to the four sides of the protection sheet 11. It can be firmly fixed to the vertical rectangular frame 15 by being stretched.
【0019】図1から明らかなように、防護シート取付
け枠12はPC橋桁2の両側に対称的に配設され、かつ
このとき、PC橋桁2の外側に一定の間隔を隔てて配設
される防護シート11は、その中心部で横締め用PC鋼
材6の軸延長線が交わるように配設される。As is apparent from FIG. 1, the protective sheet mounting frames 12 are symmetrically disposed on both sides of the PC bridge girder 2 and at this time, are disposed outside the PC bridge girder 2 at regular intervals. The protection sheet 11 is disposed such that the axial extension of the laterally tightened PC steel material 6 intersects at the center thereof.
【0020】したがって、PC鋼材6の緊張時に、万一
これが切断して側方に飛び出したとき、この切断された
PC鋼材6は激しい勢いで防護シート11にぶつかり、
しかも金属板のように反発することがなく、円滑にその
勢いが減殺されて下方に落下する。防護シート11の下
方には、橋長手方向に伸長する作業用足場27が設けら
れており、防護シート11にぶつかって減速して落下す
る前記の切断したPC鋼材6は、この作業用足場27で
受け止められて、下方に落下しない。Therefore, if the PC steel 6 is cut and jumps out to the side when the PC steel 6 is tensed, the cut PC steel 6 hits the protective sheet 11 with violent force,
Moreover, it does not repel like a metal plate, but its momentum is smoothly reduced and it falls down. A work scaffold 27 extending in the longitudinal direction of the bridge is provided below the protection sheet 11, and the cut PC steel material 6 that falls against the protection sheet 11 at a reduced speed is used for the work scaffold 27. It is received and does not fall down.
【0021】作業用足場27は公知の手段で取付けられ
るもので、その内端は補強枠28を介してアンカーボル
ト(図示せず)により両側の主桁1aに取付けられてい
る。また、作業用足場27の外端から立上る傾斜支持枠
29の上端は、図示省略する上部水平支持枠と上部垂直
支持枠によりPC橋桁2の上面で支持されている。The working scaffold 27 is attached by a known means, and the inner end thereof is attached to the main girder 1a on both sides by an anchor bolt (not shown) via a reinforcing frame 28. The upper end of the inclined support frame 29 rising from the outer end of the work scaffold 27 is supported on the upper surface of the PC bridge girder 2 by an upper horizontal support frame and an upper vertical support frame (not shown).
【0022】本発明のおける作業手順を説明すると、
PC橋桁2の一側に緊張ジャッキ9を取付け、次に防
護装置10をPC橋桁2に取付ける(このとき、作業用
足場はすでに設けられている)。つづいて、横締め用
PC鋼材6の緊張作業を行なう。次に防護装置10を
PC橋桁2から取外す。つづいて、緊張ジャッキ9を
PC橋桁2の一側から取外し、次の位置に移動する。な
お、アンカーボルト19は後工程で切断する。The work procedure of the present invention will be described.
The tension jack 9 is attached to one side of the PC bridge girder 2 and then the protective device 10 is attached to the PC bridge girder 2 (at this time, the working scaffold is already provided). Subsequently, a tensioning operation of the laterally tightened PC steel material 6 is performed. Next, the protective device 10 is removed from the PC bridge girder 2. Subsequently, the tension jack 9 is removed from one side of the PC bridge girder 2 and moved to the next position. The anchor bolt 19 is cut in a later step.
【0023】前記〜の作業を順次繰返すことによ
り、PC橋桁2の長手方向に所定の間隔をあけて導入さ
れている横締め用PC鋼材6を順次手際よく、安全に緊
張することができる。By sequentially repeating the above operations (1) to (4), the laterally tightened PC steel material 6 introduced at predetermined intervals in the longitudinal direction of the PC bridge girder 2 can be sequentially and skillfully and safely tensioned.
【0024】なお、図5には、防護シート取付け枠12
における他の例に係る水平矩形枠13dと、その固定手
段が示されている。図5における水平矩形枠13dはア
ングル材を平面長方形に組んで構成されている。そして
この水平矩形枠13dを図5のようにPC橋桁2の上面
に配置し、さらに、水平矩形枠13dの長寸両側枠13
bを押さえる2本の単管からなる押圧杆20を配設し、
両押圧杆20の間を通して固定ボルト19の上部を立ち
上げ、押さえ金具21で両押圧杆20を押さえ、かつ押
さえ金具21のボルト孔22に固定ボルト19を挿通さ
せ、押さえ金具21の上側からアンカーボルト19のね
じ部に締結ナット23を締結することにより、水平矩形
枠13dの基端部をPC主桁1の上面に着脱自在に固定
できる。FIG. 5 shows the protective sheet mounting frame 12.
2 shows a horizontal rectangular frame 13d according to another example of the above and a fixing means therefor. The horizontal rectangular frame 13d in FIG. 5 is configured by assembling angle materials into a flat rectangular shape. Then, the horizontal rectangular frame 13d is arranged on the upper surface of the PC bridge girder 2 as shown in FIG.
b, a pressing rod 20 composed of two single tubes for holding b is provided,
The upper part of the fixing bolt 19 is raised through the two pressing rods 20, the pressing rods 20 are pressed by the holding metal 21, and the fixing bolts 19 are inserted into the bolt holes 22 of the holding metal 21, and the anchoring is performed from above the holding metal 21. By fastening the fastening nut 23 to the screw portion of the bolt 19, the base end of the horizontal rectangular frame 13d can be detachably fixed to the upper surface of the PC main girder 1.
【0025】[0025]
【発明の効果】以上説明したように、本発明によると、
PC橋桁における横締め用PC鋼材に緊張ジャッキによ
り大きな引張力で緊張を与える際、万一このPC鋼材が
破断し、切断したPC鋼材がPC橋桁の側方に飛び出し
たとき、このPC鋼材は防護装置における防護シートに
当って円滑に受止められて、その飛び出しがコントロー
ルされ、減速されて下方の作業用足場で受けられるの
で、従来のように破断したPC鋼材の切断線が下方に落
下し、道路を通行している人や自動車,列車に当り、こ
れらを傷付ける危険性を確実に解消でき、かつ構成も簡
潔であるというすぐれた効果がある。As described above, according to the present invention,
When the PC steel for lateral tightening in the PC bridge girder is tensioned with a large tensile force by a tension jack, the PC steel is broken if the cut PC steel protrudes to the side of the PC bridge girder. It is received smoothly by hitting the protective sheet in the device, its protrusion is controlled, and it is slowed down and received on the lower work scaffold, so that the cutting line of the broken PC steel material falls down as before, There is an excellent effect that the danger of hitting a person, a car, or a train passing on the road and damaging them can be reliably eliminated and the configuration is simple.
【図1】本発明の実施形態を示し、PC橋桁における横
締め用PC鋼材の緊張時の状態を示す断面図である。FIG. 1 is a cross-sectional view showing an embodiment of the present invention and showing a state in which a laterally tightened PC steel material is tensioned in a PC bridge girder.
【図2】(A)は防護シート取付け枠の拡大平面図、
(B)は同図(A)のC−C線の拡大断面図である。FIG. 2A is an enlarged plan view of a protective sheet mounting frame.
FIG. 2B is an enlarged sectional view taken along line CC of FIG.
【図3】(A)は図2(A)の右側部分の正面図、
(B)は同図(A)の垂直短形枠を示す右側面図であ
る。FIG. 3 (A) is a front view of the right side of FIG. 2 (A),
FIG. 4B is a right side view showing the vertical rectangular frame of FIG.
【図4】防護シートの斜視図である。FIG. 4 is a perspective view of a protective sheet.
【図5】(A)は本発明の他の実施形態に係る防護シー
トの取付け枠の平面図、(B)は同図(A)のD−D線
の拡大断面図である。5A is a plan view of a protective sheet mounting frame according to another embodiment of the present invention, and FIG. 5B is an enlarged cross-sectional view taken along line DD of FIG. 5A.
1 主桁 2 PC橋桁 3 上部 4 床版コンクリート 5 地覆鉄筋 6 横締め用PC鋼材 7 第1定着具 8 第2定着具 9 緊張ジャッキ 10 飛び出し防護装置 11 防護シート 12 防護シート取付け枠 13 水平短形枠 14 溶接部 15 垂直短形枠 16 傾斜補強枠 17 ガイド長孔 18 取付け板 19 固定用ボルト 20 押圧杆 21 押さえ金具 22 ボルト孔 23 締結ナット 24 ボルト孔 25 ボルト孔付き止め金具 26 芯材 27 作業用足場 28 補強枠 29 傾斜支持枠 30 ボルト DESCRIPTION OF SYMBOLS 1 Main girder 2 PC bridge girder 3 Upper part 4 Floor slab concrete 5 Ground covering steel 6 PC steel for side tightening 7 1st fixing device 8 2nd fixing device 9 Tension jack 10 Protrusion protection device 11 Protective sheet 12 Protective sheet mounting frame 13 Horizontal short Formwork 14 Welded part 15 Vertical short formwork 16 Inclined reinforcing frame 17 Guide long hole 18 Mounting plate 19 Fixing bolt 20 Pressing rod 21 Pressing fitting 22 Bolthole 23 Fastening nut 24 Bolthole 25 Bolthole stop fitting 26 Core material 27 Scaffolding for work 28 Reinforcement frame 29 Inclined support frame 30 Bolt
Claims (2)
の主桁を貫通する横締め用PC鋼材の両端部がPC橋桁
の両側部に定着されている構造において、前記PC橋桁
の上面に防護シート取付け枠を着脱自在に設け、この取
付け枠に、PC橋桁の両側から所定の間隔を隔てた位置
で、かつ前記PC鋼材の軸延長線がシート面と交わるよ
うに位置させて保護シートを取付けた構成を特徴とする
PC橋桁におけるPC鋼材横締め緊張用防護装置。In order to connect a plurality of main girders in a horizontal direction, in a structure in which both ends of a laterally tightened PC steel material penetrating the main girders are fixed to both side parts of the PC bridge girders, an upper surface of the PC bridge girders is provided. A protective sheet mounting frame is provided detachably on the protective sheet, and the protective sheet is positioned on the mounting frame at a predetermined distance from both sides of the PC bridge girder and such that the axial extension line of the PC steel crosses the sheet surface. A protective device for tensioning laterally tightened PC steel in a PC bridge girder, characterized in that it is equipped with:
上面に配設する水平矩形枠と、この水平矩形枠に設けら
れる垂直矩形枠とからなり、前記防護シートは、アラミ
ド繊維からなるシート単体を複数枚重ねて構成し、この
防護シートの周縁部を前記垂直矩形枠に取付けることを
特徴とする請求項1記載のPC橋桁におけるPC鋼材横
締め緊張用防護装置。2. The protective sheet mounting frame comprises a horizontal rectangular frame provided on the upper surface of a PC bridge girder and a vertical rectangular frame provided on the horizontal rectangular frame. The protective sheet is a single sheet made of aramid fiber. The protective device for lateral tightening and tightening of PC steel beams in a PC bridge girder according to claim 1, wherein a plurality of the protective sheets are stacked, and a peripheral portion of the protective sheet is attached to the vertical rectangular frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31779897A JP3115552B2 (en) | 1997-10-09 | 1997-10-09 | Protective device for PC steel girder tension in PC girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31779897A JP3115552B2 (en) | 1997-10-09 | 1997-10-09 | Protective device for PC steel girder tension in PC girder |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH11117231A true JPH11117231A (en) | 1999-04-27 |
JP3115552B2 JP3115552B2 (en) | 2000-12-11 |
Family
ID=18092166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP31779897A Expired - Fee Related JP3115552B2 (en) | 1997-10-09 | 1997-10-09 | Protective device for PC steel girder tension in PC girder |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3115552B2 (en) |
-
1997
- 1997-10-09 JP JP31779897A patent/JP3115552B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP3115552B2 (en) | 2000-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100727172B1 (en) | Precast Concrete Panel and Nonsupport Construction Method of Bridge's Cantilever Work Utilizing P.C.P | |
JP3818020B2 (en) | Cross-section precast segment method | |
JP2020100976A (en) | Shear reinforcement construction method for pc box girder bridge | |
JPH0782709A (en) | Reinforcing method for concrete structure, employing hollow pc steel bar | |
JP2004218429A (en) | Bridge structure | |
KR100648046B1 (en) | Beam and Girder Reinforcing Apparatus using External Post-Tension and Reinforcing Method using the same | |
JPH04285247A (en) | Member for introducing prestress and method of introducing prestress | |
JPH08120948A (en) | Reinforcing structure for existing concrete structure | |
JP3115552B2 (en) | Protective device for PC steel girder tension in PC girder | |
JP2002070154A (en) | Fixing structure for structural steel product and joint structure | |
KR200184684Y1 (en) | Apparatus to prevent the negative moment of a bridge | |
KR100436747B1 (en) | Apparatus and method for repairing and reinforcing bridge by using truss members | |
JP3466136B2 (en) | Method and apparatus for overhanging PC bridge | |
JPH10266133A (en) | Reinforcing structure of highway bridge | |
KR100426611B1 (en) | Connecting device for enhancing steel wire for a bridge | |
JP2615842B2 (en) | Synthetic floorboard | |
JP3996043B2 (en) | Joint structure of bridge corrugated steel web composite girder | |
JP2688613B2 (en) | Stringed beam floor structure | |
KR200392009Y1 (en) | Composite frame for Slab-form | |
JPH0542553B2 (en) | ||
KR20040033238A (en) | External prestressing strengthening structure using cfrp(carbon fiber reinfroced polymer) plates | |
JPH0452250Y2 (en) | ||
KR200305673Y1 (en) | External prestressing strengthening structure using cfrp(carbon fiber reinfroced polymer) plates | |
JP3018968B2 (en) | Bending reinforcement method for existing columns | |
JP2895422B2 (en) | Pillar reinforcement structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |