JPH108709A - Temporary passageway for construction site - Google Patents

Temporary passageway for construction site

Info

Publication number
JPH108709A
JPH108709A JP18407296A JP18407296A JPH108709A JP H108709 A JPH108709 A JP H108709A JP 18407296 A JP18407296 A JP 18407296A JP 18407296 A JP18407296 A JP 18407296A JP H108709 A JPH108709 A JP H108709A
Authority
JP
Japan
Prior art keywords
passage
temporary
baseboard
joint
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18407296A
Other languages
Japanese (ja)
Other versions
JP3718288B2 (en
Inventor
Yoshihiro Yonahara
好宏 與那原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JAPAN STEELS INT KK
JAPAN STEELS INTERNATL KK
Original Assignee
JAPAN STEELS INT KK
JAPAN STEELS INTERNATL KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JAPAN STEELS INT KK, JAPAN STEELS INTERNATL KK filed Critical JAPAN STEELS INT KK
Priority to JP18407296A priority Critical patent/JP3718288B2/en
Publication of JPH108709A publication Critical patent/JPH108709A/en
Application granted granted Critical
Publication of JP3718288B2 publication Critical patent/JP3718288B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily assemble and disassemble a temporary passageway provided on a construction site, etc., and, at the same time, to enable the passing of workers to be effected safely with high joint strength. SOLUTION: Passageway members 1 are formed of approximately long plate- like floor boards 3 and baseboards 4 on both side edges and, at the same time, joint pieces 5 having joint holes 5a are provided to both longitudinal ends of the base boards 4. Joint members are so constituted that projection pieces are projected to the outsides of erecting sections on both sides of a U-shaped member and that one erecting section can be oscillated with an axial joint. A plurality of passageway members 1 are continuously arranged and joint sections can be connected with the joint members.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は建築および土木工事等の
現場において、スラブの開口部や鉄骨の梁の間などに架
け渡して使用する仮設の通路に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary passage which is used by being bridged between an opening of a slab or a beam of a steel frame at a site of construction or civil engineering work.

【0002】[0002]

【従来の技術】従来、スラブの開口部や鉄骨の梁の間、
資材保管用のステージ間などに作業者が移動するための
仮設の通路を設ける場合、梁材などに長い鋼材を適宜間
隔で架け渡し、その上に足場板を架け渡すとともに、足
場板の両側にパイプをクランプなどで取り付けて手摺と
し、作業者が移動する通路としている。
2. Description of the Related Art Conventionally, between slab openings and steel beams,
When providing temporary passages for workers to move between stages for storing materials, long steel materials should be bridged at appropriate intervals over beams, etc. A pipe is attached by a clamp or the like to form a handrail, which is a passage for workers to move.

【0003】[0003]

【発明が解決しようとする課題】従来の仮設の通路は、
その組み立てや解体に手間がかかるとともに、熟練した
者でないと組み立てることが難しかった。また、長いス
パンの場所に通路を形成する場合は、通行する作業者の
重みで通路が撓んだり、足場板が外れる等して安定性に
欠けることがあった。また、長いスパンの架け渡しで
は、梁材と梁材の間に架け渡す鋼材が長くなり、その保
管や移動は容易なものではないし、架け渡す場所に合わ
せて鋼材寸法を決定しているので、掛け渡し長さの異な
る別の場所には使用できず、経済的とはいえなかった。
そこで本発明は、仮設通路を通路部材と連結部材とで構
成し、複数の通路部材を連結部材で連結することによ
り、種々の長さの仮設通路に対応できるようにするとと
もに、仮設通路の連結部を大きな強度で連結できるよう
にし、さらに仮設通路の組立て分解が容易にできるよう
にすることを目的とする。
The conventional temporary passage is:
It takes time and effort to assemble and disassemble it, and it was difficult to assemble without a skilled person. In addition, when a passage is formed in a place with a long span, the passage may be bent due to the weight of a passing worker, or the scaffold plate may come off, resulting in lack of stability. In addition, when bridging over a long span, the steel bridging between the beams becomes long, and its storage and movement are not easy, and the steel dimensions are determined according to the bridging place, It was not economical because it could not be used elsewhere with different crossover lengths.
In view of the above, the present invention provides a temporary passage including a passage member and a connecting member, and connecting a plurality of passage members with a connecting member so as to be able to cope with temporary passages of various lengths. It is an object of the present invention to enable parts to be connected with great strength and to make it easy to assemble and disassemble a temporary passage.

【0004】[0004]

【課題を解決するための手段】本発明は、建設現場等に
配設される通路部材と連結部材とからなる仮設通路であ
って、上記目的を達成したものである。通路部材は通路
方向に長い略長板状の床材と、その床材の両側縁に取り
付けられる巾木とからなるとともに、巾木の長手方向両
端に、連結孔を有する接続片がそれぞれ巾木の延長上に
突設されている。連結部材は、前記床材の短辺方向の両
端間に配置するコ字形部材と、そのコ字形部材の両端起
立部の外面に前記接続片の連結孔に貫通されるように突
設した突起片とからなるとともに、コ字形部材の一方の
起立部がその残りの部分に揺動可能に軸連結され、かつ
その揺動可能な起立部に設けた突起片の先端部に抜け止
めピンが設けられている。
SUMMARY OF THE INVENTION The present invention is a temporary passage comprising a passage member and a connecting member provided at a construction site or the like, and has achieved the above object. The passage member comprises a substantially long plate-like floor material that is long in the direction of the passage, and a skirting board attached to both side edges of the floor material, and connecting pieces having connection holes at both ends in the longitudinal direction of the skirting board are respectively skirting boards. It is protruded on the extension of. The connecting member has a U-shaped member disposed between both ends in the short side direction of the flooring material, and a projecting piece projecting from the outer surface of the upright end of both ends of the U-shaped member so as to penetrate through the connecting hole of the connecting piece. And one of the upright portions of the U-shaped member is pivotally connected to the remaining portion thereof in a pivotable manner, and a stopper pin is provided at the tip of a projection provided on the pivotable upright portion. ing.

【0005】通路部材の巾木の上端縁に沿ってパイプを
取り付けて、そのパイプに手摺用支柱をクランプで固定
することができる。また通路部材の床材は、その短辺方
向に長い凹部と凸部が交互に表われる様に軽金属板で形
成し、連結部材を鉄製にして、全体を軽量にするととも
に作業者の通行に十分耐え得る強度にすることができ
る。
[0005] A pipe can be attached along the upper edge of the baseboard of the passage member, and a handrail support can be fixed to the pipe with a clamp. Also, the floor material of the passage member is formed of a light metal plate so that long concave portions and convex portions are alternately shown in the short side direction, and the connecting member is made of iron, so that the overall weight is reduced and sufficient for the passage of workers. The strength can be endurable.

【0006】[0006]

【作用】上記の仮設通路を組立てて長い仮設通路にする
場合、通路部材をその長手方向に連続配置し、隣接する
通路部材の両側の接続片が仮設通路の両側でそれぞれ重
なる状態にする。そしてその左右の重なった接続片の間
にコ字形部材を配置してその両端起立部が通路部材側の
接続片に接する状態にし、かつ起立部に設けられた突起
片を重なった状態の2つの接続片の連結孔に挿入する。
なお、前記のようにコ字形部材を配置するためには、軸
連結された方の起立部をその軸部を支点にして内側に倒
して配置し、先に固定状態の起立部の突起片を連結孔に
挿入し、次に前記の倒した起立部を起して突起片を接続
片の連結孔に挿入する。そして軸連結された方の起立部
の突起片の先端部にピンを差し込むことにより抜け止め
とし、コ字形部材をその連結状態に保持する。
When the temporary passage is assembled into a long temporary passage, the passage members are arranged continuously in the longitudinal direction, and the connecting pieces on both sides of the adjacent passage member are overlapped on both sides of the temporary passage. Then, a U-shaped member is disposed between the left and right overlapping connection pieces so that the upright ends thereof are in contact with the connection piece on the passage member side, and the projection pieces provided on the upright portions are overlapped with each other. Insert the connection piece into the connection hole.
In addition, in order to arrange the U-shaped member as described above, the upright portion connected to the shaft is laid down with the shaft portion as a fulcrum, and the protruding piece of the upright portion in the fixed state is first placed. Then, the protruding piece is inserted into the connecting hole of the connecting piece by raising the above-mentioned upright portion. Then, a pin is inserted into the tip of the protruding piece of the upright portion connected to the shaft to prevent it from coming off, and the U-shaped member is held in the connected state.

【0007】この場合、接続片の連結孔を長孔に形成
し、その孔に対応した形状の突起片を連結部材の起立片
に設けておくことにより、通路部材1の連結状態をより
安定したものにすることができる。通路部材に手摺を設
ける場合は、手摺支柱の下部を通路部材の巾木の上部に
クランプで取り付け、その支柱の上部に水平手摺をクラ
ンプで固定する。また、通路部材の床を凹凸状に形成す
ることにより、軽量であって強度が大きなものとなり、
連結部材を鉄製にすることで連結部の強度を大きくする
ことができる。
In this case, the connection state of the passage member 1 is made more stable by forming the connection hole of the connection piece in a long hole and providing a projection piece having a shape corresponding to the hole on the upright piece of the connection member. Can be something. When providing a handrail on the passage member, the lower part of the handrail support is attached to the upper part of the baseboard of the passage member with a clamp, and the horizontal handrail is fixed on the upper part of the support with a clamp. In addition, by forming the floor of the passage member in an uneven shape, it is lightweight and has high strength,
By making the connecting member made of iron, the strength of the connecting portion can be increased.

【0008】[0008]

【実施例】本発明の建設現場用仮設通路を図1〜3によ
り説明する。仮設通路は、複数の通路部材1と複数の連
結部材2とからなり、複数の通路部材1を通路方向に連
続配置して、隣合う通路部材1の境を連結部材2でそれ
ぞれ連結して形成される。通路部材1は、通路方向に長
い略長板状の床材3の両側縁に巾木4が設けられてお
り、床材3は短辺方向に長い凹部と凸部が交互に連続す
るようにアルミのような軽金族板で一体に成形されてい
るが、数部材を連結して形成してもよい。巾木4も床材
3と同一材料で形成され、両巾木4の長手方向両端に、
連結孔5aを有する接続片5がそれぞれ巾木4の延長上
に突設されている。巾木4の長手方向両端に取り付けら
れる2つの接続片5は、巾木4の内側と外側との互いに
逆となるように取り付けられ、隣合う通路部材1を連結
する場合に、両側の接続片5がぶつかることなく重なる
ようにする。
DESCRIPTION OF THE PREFERRED EMBODIMENTS A temporary passage for a construction site according to the present invention will be described with reference to FIGS. The temporary passage includes a plurality of passage members 1 and a plurality of connection members 2, and is formed by arranging the plurality of passage members 1 continuously in the passage direction and connecting boundaries of adjacent passage members 1 with the connection members 2. Is done. The passage member 1 is provided with baseboards 4 on both side edges of a substantially long plate-like floor material 3 which is long in the passage direction, and the floor material 3 is such that long concave portions and convex portions are alternately continuous in the short side direction. Although it is integrally formed of a light metal plate such as aluminum, it may be formed by connecting several members. The baseboard 4 is also formed of the same material as the flooring 3, and at both longitudinal ends of both baseboards 4,
The connection pieces 5 having the connection holes 5 a are respectively provided on the extension of the baseboard 4 to protrude. The two connecting pieces 5 attached to both ends in the longitudinal direction of the baseboard 4 are mounted so that the inside and the outside of the baseboard 4 are opposite to each other, and when connecting adjacent passage members 1, the connecting pieces on both sides are used. 5 so that they do not hit each other.

【0009】本実施例の接続片5は例えば鉄製であって
巾木4にボルト止めされており、接続片5に設けた連結
孔5aは略長方形に形成されていて、後記する連結部材
2の突起片11が挿入された状態で両者の係合状態がガ
タつくことがなく、隣合う通路部材1を強固に連結でき
るようになっている。なお、接続片5の連結孔は長方形
以外の楕円形や、2つの円を連続させた形状などに形成
してもよく、その場合、突起片11も対応した断面形に
形成する。
The connecting piece 5 of this embodiment is made of, for example, iron and is bolted to the baseboard 4. The connecting hole 5a formed in the connecting piece 5 is formed in a substantially rectangular shape. When the projections 11 are inserted, the engagement between them does not rattle, and the adjacent passage members 1 can be firmly connected. Note that the connection hole of the connection piece 5 may be formed in an elliptical shape other than a rectangle, a shape in which two circles are connected, or the like. In this case, the projection piece 11 is also formed in a corresponding cross-sectional shape.

【0010】また両側の巾木5の上端縁に沿ってパイプ
6が取り付けられ、パイプ6の適宜位置に手摺支柱7の
下部をクランプ8により固定し、さらに支柱7の上部に
水平パイプ9をクランプ10で固定することにより、通
路部材に手摺を取り付けることができる。なお手摺支柱
7の下端1箇所を固定するだけでなく、支柱7の下端を
巾木4の下端まで延ばしてクランプで巾木の下端に固定
するようにしてもよい。その場合、巾木4の下端縁に沿
ってパイプを取り付けるようにすれば、支柱下端をクラ
ンプ固定するのが容易になる。また巾木にパイプ6を取
り付けることにより、通路部材の強度が増し、作業者の
通行時に撓みにくくなる。
A pipe 6 is attached along the upper edge of the baseboard 5 on both sides, and the lower part of the handrail support 7 is fixed at an appropriate position of the pipe 6 by a clamp 8, and a horizontal pipe 9 is clamped on the upper part of the support 7. By fixing at 10, the handrail can be attached to the passage member. In addition to fixing only one lower end of the handrail support 7, the lower end of the support 7 may be extended to the lower end of the baseboard 4 and fixed to the lower end of the baseboard with a clamp. In this case, if the pipe is attached along the lower edge of the baseboard 4, it is easy to clamp and fix the lower end of the support. Further, by attaching the pipe 6 to the baseboard, the strength of the passage member is increased, and it is difficult for the passage member to bend when passing.

【0011】連結部材2は、コ字形部材2aの両端の起
立部2bの外面にそれぞれ突起片11が突設され、突起
片11は断面略長方形に形成されて前記の接続片5の連
結孔5a内に挿入されるようになっている。コ字形部材
2aの一方の起立部2bは固定状態であり、他方の起立
部2bはヒンジ12によりコ字形部材2aの残りの部分
に揺動可能に連結され、コ字形部材2aを通路部材1の
連結部に配置する際に片側の起立部2bを内側に倒せる
ようになっている。また揺動可能な方の起立部2bに設
けた突起片11の先端部にはピン孔13が設けられ、突
起片11が連結される通路部材の2枚の接続片5の連結
孔5aに挿入された状態でピン孔13にピン14を差し
込むことにより、コ字形部材2aと接続片5との結合状
態を保持できるようになっている。このように構成され
る連結部材2は鉄製であり、前記の通路部材1を十分な
強度で連結することができる。
The connecting member 2 has projecting pieces 11 projecting from the outer surfaces of the upright portions 2b at both ends of the U-shaped member 2a. The projecting pieces 11 are formed in a substantially rectangular cross section, and the connecting holes 5a of the connecting pieces 5 are formed. It is designed to be inserted inside. One upright portion 2b of the U-shaped member 2a is in a fixed state, and the other upright portion 2b is swingably connected to the remaining portion of the U-shaped member 2a by a hinge 12, and the U-shaped member 2a is connected to the passage member 1. When arranging in the connecting portion, the upright portion 2b on one side can be turned inward. Further, a pin hole 13 is provided at the tip of the protruding piece 11 provided on the swingable upright portion 2b, and is inserted into the connecting hole 5a of the two connecting pieces 5 of the passage member to which the protruding piece 11 is connected. By inserting the pin 14 into the pin hole 13 in the state as described above, the connection state between the U-shaped member 2a and the connection piece 5 can be maintained. The connecting member 2 configured in this manner is made of iron, and can connect the passage member 1 with sufficient strength.

【0012】なお前記のヒンジ12は、360度回動で
きるものであるが、通路部材1を連結する場合に起立部
11が接続片5に当接されてピン14で抜け止めされれ
ば、連結部はガタつくことなく大きな強度で連結され
る。しかし、ヒンジ12にストッパを設けてヒンジの揺
動角度を規制し、起立部2bが起立した状態と内側に倒
れた状態の90度の範囲内の揺動に規制してもよい。ま
た前記では1つの起立部2bをヒンジ結合したが、ヒン
ジの代わりの他の軸連結構成にしてもよい。さらにピン
14は、図示を省略したが鎖でコ字形部材2aの任意位
置に連結されている。
The hinge 12 can be rotated by 360 degrees. However, when the upright portion 11 is brought into contact with the connecting piece 5 and is prevented from coming off by the pin 14 when connecting the passage member 1, the hinge 12 is connected. The parts are connected with great strength without rattling. However, a stopper may be provided on the hinge 12 to limit the swing angle of the hinge, and the swing may be limited to a swing within a range of 90 degrees between the upright portion 2b and the upright portion 2b. In the above description, one upright portion 2b is hingedly connected, but another shaft connection structure may be used instead of the hinge. Further, although not shown, the pin 14 is connected to an arbitrary position of the U-shaped member 2a by a chain.

【0013】[0013]

【発明の効果】本発明の仮設通路は、通路部材の両端に
連結孔を有する接続片が突設され、隣合う通路部材を必
要数だけ連結部材で容易に連結して種々の長さの仮設通
路を形成することができる。また連結部材は、コ字形部
材の一方の起立部が揺動可能に形成されているので、そ
の起立部を内側に倒した状態で連結部に配置し、その後
に起立部を起して突起片を接続片の連結孔に挿入するの
で、複数の通路部材の連結分解が容易であり、しかも仮
設通路の連結部の強度が大きなものとなる。
According to the temporary passage of the present invention, connecting pieces having connecting holes are protruded at both ends of the passage member. A passage can be formed. In addition, since the connecting member is formed so that one of the upright portions of the U-shaped member can swing, the upright portion is disposed on the connecting portion in a state where the upright portion is tilted inward. Is inserted into the connection hole of the connection piece, the connection and disassembly of the plurality of passage members is easy, and the strength of the connection portion of the temporary passage is increased.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の建設現場用仮設通路を構成する通路部
材の斜視図である。
FIG. 1 is a perspective view of a passage member constituting a temporary passage for a construction site according to the present invention.

【図2】本発明の建設現場用仮設通路を構成する連結部
材の斜視図である。
FIG. 2 is a perspective view of a connecting member forming a temporary passage for a construction site according to the present invention.

【図3】本発明の建設現場用仮設通路の組立て状態の斜
視図である。
FIG. 3 is a perspective view of the temporary passage for a construction site of the present invention in an assembled state.

【符号の説明】[Explanation of symbols]

1 通路部材 2 連結部材 2a コ字形部材 2b 起立部 5 接続片 5a 連結孔 11 突起片 DESCRIPTION OF SYMBOLS 1 Passage member 2 Connection member 2a U-shaped member 2b Standing part 5 Connection piece 5a Connection hole 11 Projection piece

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 建設現場等に配設される通路部材と連結
部材とからなる仮設通路であって、通路部材は通路方向
に長い略長板状の床材と、その床材の両側縁に取り付け
られる巾木とからなるとともに、巾木の長手方向両端
に、連結孔を有する接続片がそれぞれ巾木の延長上に突
設され、連結部材は、前記床材の短辺方向の両端間に配
置するコ字形部材と、そのコ字形部材の両端起立部の外
面に前記接続片の連結孔に貫通されるように突設した突
起片とからなるとともに、コ字形部材の一方の起立部が
揺動可能に軸連結され、かつその揺動可能な起立部に設
けた突起片の先端部に抜け止めピンが設けられて、複数
の通路部材を長手方向に連続配置して連結部材で連結で
きることを特徴とする建設現場用仮設通路。
1. A temporary passage composed of a passage member and a connecting member provided at a construction site or the like, wherein the passage member has a substantially long plate-like floor material that is long in the direction of the passage, and two side edges of the floor material. Along with the baseboard to be attached, connecting pieces having connection holes are respectively protruded on the extension of the baseboard at both ends in the longitudinal direction of the baseboard, and the connecting member is provided between both ends in the short side direction of the flooring. It comprises a U-shaped member to be arranged, and a projection protruding from the outer surface of the upright portion at both ends of the U-shaped member so as to penetrate through the connection hole of the connection piece, and one upright portion of the U-shaped member swings. A pin is movably connected to the shaft, and a retaining pin is provided at a tip end of a protruding piece provided on the swingable upright portion, so that a plurality of passage members can be continuously arranged in the longitudinal direction and connected by a connecting member. Characteristic temporary passage for construction sites.
【請求項2】 通路部材の巾木の上端縁に沿ってパイプ
が取り付けられ、そのパイプに手摺用支柱がクランプで
固定されるようになっていることを特徴とする請求項1
に記載の建設現場用仮設通路。
2. A pipe is attached along an upper edge of a baseboard of a passage member, and a handrail support is fixed to the pipe by a clamp.
4. A temporary passage for a construction site according to (1).
【請求項3】 通路部材の床材は、その短辺方向に長い
凹部と凸部が交互に表われる様に軽金属板で形成され、
連結部材は鉄製であることを特徴とする請求項1又は2
に記載の建設現場用仮設通路。
3. The floor material of the passage member is formed of a light metal plate such that long concave portions and convex portions alternate in the short side direction thereof.
3. The connecting member is made of iron.
4. A temporary passage for a construction site according to (1).
JP18407296A 1996-06-25 1996-06-25 Temporary passage for construction site Expired - Lifetime JP3718288B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18407296A JP3718288B2 (en) 1996-06-25 1996-06-25 Temporary passage for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18407296A JP3718288B2 (en) 1996-06-25 1996-06-25 Temporary passage for construction site

Publications (2)

Publication Number Publication Date
JPH108709A true JPH108709A (en) 1998-01-13
JP3718288B2 JP3718288B2 (en) 2005-11-24

Family

ID=16146898

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18407296A Expired - Lifetime JP3718288B2 (en) 1996-06-25 1996-06-25 Temporary passage for construction site

Country Status (1)

Country Link
JP (1) JP3718288B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2491566A (en) * 2011-05-27 2012-12-12 Adam Millar & Sons Ltd Stairway apparatus for installation to a natural slope
KR20200120184A (en) * 2019-04-11 2020-10-21 에스폼 주식회사 Working platform
CN113897869A (en) * 2021-10-15 2022-01-07 中铁六局集团路桥建设有限公司 Attached type hanging basket pedestrian passageway

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2491566A (en) * 2011-05-27 2012-12-12 Adam Millar & Sons Ltd Stairway apparatus for installation to a natural slope
GB2491566B (en) * 2011-05-27 2017-04-12 Adam Millar & Sons Ltd Stairway apparatus
KR20200120184A (en) * 2019-04-11 2020-10-21 에스폼 주식회사 Working platform
CN113897869A (en) * 2021-10-15 2022-01-07 中铁六局集团路桥建设有限公司 Attached type hanging basket pedestrian passageway
CN113897869B (en) * 2021-10-15 2023-11-28 中铁六局集团路桥建设有限公司 Attached cradle pedestrian passageway

Also Published As

Publication number Publication date
JP3718288B2 (en) 2005-11-24

Similar Documents

Publication Publication Date Title
US3685866A (en) Connector for structural steel
GB2164674A (en) Assembly of reticular, structural components
JPH108709A (en) Temporary passageway for construction site
JP2002155507A (en) Bridge
KR20220034433A (en) Prefabricated truss
US4675942A (en) Hinge pin support having variably positionable enterengaging members
JP3200266B2 (en) Deck plate beam fixing bracket
JP2789512B2 (en) Loading stage and handrail support fixture
WO2022024542A1 (en) Oblique beam metal connector and beam-connecting structure
JP3310440B2 (en) Architectural floor structural materials
JPH0914583A (en) Lattice girder unit and railway stringing support beam using same
JP4797293B2 (en) Roof truss and its assembling method
JP3655381B2 (en) Unit truss and its joint structure
JPH0528282Y2 (en)
JP2888952B2 (en) Joint member and three-dimensional frame using the joint member
JP4015570B2 (en) Beam bracket and joint structure using the beam bracket
JP3360128B2 (en) Connection device for cylindrical members
JPS584149B2 (en) scaffolding board
JP2000257154A (en) Connection joint of steel beam
JP3945875B2 (en) Building structure of square wave plate structure
JPH0743302Y2 (en) Ceiling frame structure
JP2887374B2 (en) Beam support for pipe support for shoring
JP2003119967A (en) Ridge beam mounting structure
JPH037474Y2 (en)
JPH07317220A (en) Anchor/reinforcement support structure of flat deck plate

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050801

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050816

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050902

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090909

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100909

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110909

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110909

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120909

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130909

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term