JPH10279262A - Suspension implement for hanging carriage - Google Patents

Suspension implement for hanging carriage

Info

Publication number
JPH10279262A
JPH10279262A JP10246897A JP10246897A JPH10279262A JP H10279262 A JPH10279262 A JP H10279262A JP 10246897 A JP10246897 A JP 10246897A JP 10246897 A JP10246897 A JP 10246897A JP H10279262 A JPH10279262 A JP H10279262A
Authority
JP
Japan
Prior art keywords
hook
main body
hanging
loop
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10246897A
Other languages
Japanese (ja)
Inventor
Motohiro Shinjo
基弘 新庄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pascal KK
Original Assignee
Pascal KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pascal KK filed Critical Pascal KK
Priority to JP10246897A priority Critical patent/JPH10279262A/en
Publication of JPH10279262A publication Critical patent/JPH10279262A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To maintain constant a space between the lower end parts of a pair of tension cables by forming guide parts in both end parts of a main body rod and hook parts in the vicinity of both ends of the main body rod in a suspension implement for hangingly carrying a bar-like work on the hook of a crane by the tension cables and carrying the same. SOLUTION: Guide parts 5 are fixed in both end parts of a main body rod 4, and hooking members 6 having hook parts 6a are fixed in the vicinity of both ends of the main body rod 4. Then, loop parts 3a provided in both end parts of a sling 3 are hooked on the hook 2 of a crane, a part of the sling 3 extended from one loop part 3a is inserted into the left guide part 5 to be unhooked from the left hook part 6a, and a part extended from the other loop part 3a is inserted into the right guide part 5 to be unhooked from the right hook part 6a and thereby a hoisting accessory 1 is formed. Thus, the positions of the pair of supporting parts 3b of the sling 3 for supporting a work W are regulated and the work W is stably carried.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】 本発明は、クレーンのフッ
クに張力索にて棒状ワークを吊持して搬送するのに用い
る吊持搬送用吊り具に関し、特にワーク側において1対
の張力索が接近しないように規制する機能を有するもの
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hanging / conveying hanger used for suspending and transporting a bar-shaped work by a tension cable on a hook of a crane, and in particular, a pair of tension cables approaching the work side. It relates to a device that has a function of restricting it from being performed.

【0002】[0002]

【従来の技術】 従来、図8に示すように、棒状のワー
クW(ロッド、管材等)をクレーンのフック100に張
力索101(ワイヤやスリング)にて吊持する際に、両
端部がクレーンのフック100に支持された2本のU状
の張力索101を用い、2本の張力索101の下端部の
1対のU形部101aにワークWを支持し、1対のU形
部101aとワークWとの間の摩擦力を介して、1対の
U形部101a間の間隔を確保した状態でワークWを吊
持して搬送する。
2. Description of the Related Art Conventionally, as shown in FIG. 8, when a rod-shaped work W (rod, pipe material, etc.) is suspended on a hook 100 of a crane by a tension cable 101 (wire or sling), both ends of the work W The work W is supported on a pair of U-shaped portions 101a at the lower end portions of the two tension lines 101 using two U-shaped tension lines 101 supported by the hooks 100. The work W is suspended and conveyed in a state where the space between the pair of U-shaped portions 101a is secured through the frictional force between the work W and the work W.

【0003】[0003]

【発明が解決しようとする課題】 図8に示すようにし
てワークWを吊持して搬送する場合、1対の張力索10
1に作用する張力には、それらを接近させる分力が含ま
れているため、搬送中の振動等の影響を受けて1対の張
力索101が相接近方向へ移動し、重心のバランスが崩
れ、図9に示すように、張力索101からワークWが脱
落するという問題がある。しかも、何らかの棒状部材を
介して張力索の位置を規制する場合、棒状部材の長さが
一定であると、種々の長さのワークに適用しにくく汎用
性に欠ける。また、張力索を位置規制する為の何らかの
閉ループ状のガイド部を用いる場合、ガイド部に張力索
を導入するのが面倒となることも考えられる。本発明の
目的は、1対の張力索の下端部間の間隔が狭くならない
ように張力索を規制できるようにした吊持搬送用吊り具
を提供することである。
When the work W is suspended and transported as shown in FIG.
Since the tension acting on 1 includes a component force that causes them to approach each other, the pair of tension cables 101 moves in the phase approaching direction under the influence of vibrations during transportation, and the balance of the center of gravity is lost. As shown in FIG. 9, there is a problem that the work W falls off from the tension cable 101. In addition, when the position of the tension cable is regulated via some rod-shaped member, if the length of the rod-shaped member is constant, it is difficult to apply the method to works of various lengths and lacks versatility. In addition, in the case of using any closed-loop guide for regulating the position of the tension cable, it may be troublesome to introduce the tension cable into the guide. SUMMARY OF THE INVENTION It is an object of the present invention to provide a suspending / transporting suspending device capable of regulating a tension cable so that a distance between lower ends of a pair of tension cables is not reduced.

【0004】[0004]

【課題を解決するための手段】 請求項1の吊持搬送用
吊り具は、クレーンのフックに張力索にて棒状ワークを
吊持して搬送するのに用いる吊持搬送用吊り具におい
て、ロッド状の本体ロッドの両端部に張力索をガイドす
る閉ループ状のガイド部を夫々形成し、本体ロッドの両
端付近部に張力索を掛ける為のフック部を夫々形成した
ものである。
According to a first aspect of the present invention, there is provided a hanging and transporting hanger used for hanging and transporting a bar-shaped work with a tension cable on a hook of a crane. A closed loop-shaped guide portion for guiding the tension cable is formed at each end of the main body rod, and hook portions for hanging the tension cable are formed near both ends of the main rod.

【0005】クレーンのフックから延びる1対の張力索
(1本の連続した張力索または2本の独立の張力索)は
1対のガイド部を夫々挿通しており、ワークを吊持する
際には、一方のガイド部を挿通した張力索をワークの下
側を経由させて一方のフック部に掛けるとともに、他方
のガイド部を挿通した張力索をワークの下側を経由させ
て他方のフック部に掛ければ、張力索でワークを吊持し
て搬送することができる。本体ロッドの各端部にガイド
部があり、本体ロッドの各端付近部にフック部があるの
で、ワーク側において1対の張力索は、本体ロッドの1
対のガイド部及び1対のフック部で位置規制されて相接
近することがないので、ワークを安定的に吊持して搬送
できる。
[0005] A pair of tension cables (one continuous tension cable or two independent tension cables) extending from the hook of the crane are inserted through a pair of guide portions, respectively. Is to hook the tension cable passing through one guide section on one hook through the lower side of the work, and to pass the tension cable passing through the other guide section on the lower side of the work through the other hook section. , The work can be transported by hanging it with a tension cable. A guide portion is provided at each end of the main body rod, and a hook portion is provided near each end of the main body rod.
Since the position is regulated by the pair of guide portions and the pair of hook portions and they do not approach each other, the work can be stably suspended and transported.

【0006】また、ガイド部が閉ループ状であるので張
力索が外れることがないし、フック部に張力索を掛ける
ことができるので、ワークの下側に張力索を掛け回して
からフック部に張力索を簡単に掛けることができるし、
また、ワークの搬送後に張力索をフック部から外すのも
容易になる。尚、1対の張力索は両端部がクレーンのフ
ックに支持された1本の張力索でもよく、各々の両端部
がクレーンのフックに支持された2本の張力索でもよ
い。
In addition, since the guide portion has a closed loop shape, the tension line does not come off, and the tension line can be hung on the hook portion. Can be easily applied,
In addition, it becomes easy to remove the tension cord from the hook after the work is transported. The pair of tension cables may be a single tension cable having both ends supported by a crane hook, or two tension cables having both ends supported by a crane hook.

【0007】請求項2の吊持搬送用吊り具は、請求項1
の発明において、前記フック部は、本体ロッドの軸方向
と直交する面に位置するように設けられたことを特徴と
するものである。それ故、ワークを吊持したとき本体ロ
ッドがその軸心回りに少し回動してもフック部から張力
索が外れないように構成することができる。その他請求
項1と同様の作用を奏する。
According to a second aspect of the present invention, there is provided a hanging and transporting hanger.
In the invention, the hook portion is provided so as to be located on a surface orthogonal to the axial direction of the main body rod. Therefore, when the work is suspended, the tension cable can be prevented from coming off from the hook even if the main body rod rotates slightly around its axis. Other operations are the same as those of the first aspect.

【0008】請求項3の吊持搬送用吊り具は、請求項2
の発明において、前記ガイド部は、開ループ状のガイド
部本体と、その開口部を内側から塞ぐ閉位置と内側へ開
いた開位置とに切換え可能で一端部がガイド部本体にピ
ン結合された爪部材と、この爪部材を閉位置の方へ付勢
するバネ部材とを備えたことを特徴とするものである。
爪部材を強制的に開かない状態では、爪部材がバネ部材
で閉位置に付勢されているため爪部材が閉位置を保持
し、ガイド部が閉ループ状になっている。爪部材を開位
置に切換えた状態で、張力索をガイド部に導入できるた
め、ガイド部に対する張力索の着脱が簡単になる。爪部
材が閉位置のとき爪部材が張力索で外側へ押されても外
側へ開かないようになっているので、張力索を確実に保
持することができる。その他請求項2と同様の作用を奏
する。
According to a third aspect of the present invention, there is provided a hanging and transporting hanger.
In the invention, the guide portion is switchable between an open loop-shaped guide portion main body, a closed position for closing the opening from the inside and an open position opened to the inside, and one end is pin-connected to the guide portion main body. A claw member and a spring member for urging the claw member toward the closed position are provided.
In a state in which the claw member is not forcibly opened, the claw member is urged to the closed position by the spring member, so that the claw member holds the closed position, and the guide portion has a closed loop shape. Since the tension cable can be introduced into the guide portion with the claw member switched to the open position, the attachment and detachment of the tension cable with respect to the guide portion is simplified. When the claw member is in the closed position, even if the claw member is pushed outward by the tension cable, it does not open outward, so that the tension cable can be securely held. Other effects are the same as those of the second aspect.

【0009】請求項4の吊持搬送用吊り具は、請求項1
〜3の何れか1項の発明において、両端部にクレーンの
フックに掛ける為のループ部を有する1本の張力索であ
って、一方のループ部から延びる部分が一方のガイド部
を挿通して一方のフック部に掛脱自在であり、他方のル
ープ部から延びる部分が他方のガイド部を挿通して他方
のフック部に掛脱自在であり、長さ方向中央部分が本体
ロッドに沿って延びる1本の張力索を設けたことを特徴
とするものである。ワークを吊持しない状態では、張力
索を1対のフック部に掛けた状態でも掛けない状態で
も、本体ロッドを張力索で支持して移動可能である。ワ
ークを吊持する際には、張力索の長さ方向中央部分を1
対のフック部から外し、ワークの下側に掛け回してから
1対のフック部に掛ければ、ワークを吊持して搬送でき
るようになる。1本の張力索であるので、設備費の面で
有利である。その他請求項1〜3の何れか1項と同様の
作用を奏する。
According to a fourth aspect of the present invention, there is provided a hanging and transporting hanger.
In the invention according to any one of the first to third aspects, it is a single tension cord having a loop portion for hanging on a crane hook at both ends, and a portion extending from one loop portion is inserted through one guide portion. A portion extending from the other loop portion is freely hookable to and detachable from the other hook portion, and a portion extending from the other loop portion is freely hookable to the other hook portion, and a central portion in the longitudinal direction extends along the main body rod. It is characterized in that one tension cord is provided. In a state where the work is not suspended, the main body rod can be supported by the tension cable and can be moved regardless of whether the tension cable is hung on the pair of hook portions or not. When suspending the work, the center of the tension cable
If the workpiece is detached from the pair of hooks, hung on the lower side of the work, and then hung on the pair of hooks, the work can be suspended and transported. Since one tension cable is used, it is advantageous in terms of equipment costs. In addition, the same operation as any one of the first to third aspects is achieved.

【0010】請求項5の吊持搬送用吊り具は、請求項1
〜3の何れか1項の発明において、両端部にクレーンの
フックに掛ける為のループ部を夫々有する2本の張力索
であって、その一方の張力索の1対のループ部から延び
る部分が一方のガイド部を挿通して一方のフック部に掛
脱自在であり、他方の張力索の1対のループ部から延び
る部分が他方のガイド部を挿通して他方のフック部に掛
脱自在である2本の張力索を設けたことを特徴とするも
のである。
According to a fifth aspect of the present invention, there is provided a hanging and transporting hanger.
In the invention according to any one of the above-described embodiments, two tension cables each having a loop portion for hanging on a hook of a crane at both ends, and a portion extending from a pair of loop portions of one tension cable is provided. One of the tension portions can be inserted into and removed from one of the hook portions while a portion extending from the pair of loop portions of the other tension cable can be inserted into and removed from the other hook portion. It is characterized in that certain two tension cables are provided.

【0011】ワークを吊持しない状態では、各張力索の
U形の下端部を対応するフック部に掛けておけば、本体
ロッドを張力索で支持して移動可能である。ワークを吊
持しない状態において、各張力索の下端部を対応するフ
ックから外せば、各張力索を対応するガイド部から抜き
取ることができる。ワークを吊持する際には、各張力索
のU形の下端部を対応するフック部から外し、ワークの
下側に掛け回してから対応するフック部に掛ければ、ワ
ークを吊持搬送できるようになる。ワークに接触する張
力索の本数が合計4本になるので、安定性に優れるし、
また、各張力索を対応するフック部に掛脱する作業も簡
単になる。不使用状態では、2本の張力索を本体ロッド
から外して別の用途に使用できるので有利である。その
他請求項1〜3の何れか1項と同様の作用を奏する。
In a state where the work is not suspended, the main body rod can be supported and moved by hooking the U-shaped lower end of each tension cable to the corresponding hook. If the lower end of each tension cable is removed from the corresponding hook in a state where the work is not suspended, each tension cable can be pulled out from the corresponding guide portion. When suspending the work, remove the U-shaped lower end of each tension cord from the corresponding hook part, hang it on the lower side of the work, and hang it on the corresponding hook part so that the work can be suspended and transported. become. Since the total number of tension cables in contact with the work is four, it is excellent in stability,
In addition, the work of hooking and removing each tension cable from the corresponding hook portion is also simplified. In the unused state, the two tension cords are advantageously detached from the main rod and can be used for another purpose. In addition, the same operation as any one of the first to third aspects is achieved.

【0012】請求項6の吊持搬送用吊り具は、請求項1
〜4の何れか1項の発明において、前記本体ロッドにそ
の長さを調節可能な長さ調節機構を設けたことを特徴と
するものである。前記長さ調節機構を介して、ワークの
長さに応じて本体ロッドの長さを調節し、一層安定した
状態に吊持することができる。その他、請求項1〜4の
何れか1項と同様の作用を奏する。
According to a sixth aspect of the present invention, there is provided a hanging and transporting hanger.
5. The invention according to any one of items 4 to 4, wherein the main body rod is provided with a length adjusting mechanism capable of adjusting the length thereof. Through the length adjusting mechanism, the length of the main body rod can be adjusted in accordance with the length of the work, and can be hung in a more stable state. In addition, the same operation as in any one of claims 1 to 4 is achieved.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施の形態につい
て図面を参照しつつ説明する。図1〜図3に示すよう
に、この吊持搬送用吊り具1は、クレーンのフック2に
張力索としての帯状のスリング3で棒状のワークWを吊
持して搬送する為のものであり、この吊持搬送用吊り具
1(以下、吊り具という)は、ロッド状の本体ロッド4
と、この本体ロッド4の両端部に固着された1対の閉ル
ープ状のガイド部5と、本体ロッド4の両端付近部に固
着され夫々フック部6aを有する1対のフック部材6
と、1本の連続したスリング3等を備えている。
Embodiments of the present invention will be described below with reference to the drawings. As shown in FIGS. 1 to 3, the suspending / transporting hanger 1 is for suspending and transporting a bar-shaped work W with a belt-shaped sling 3 as a tension cable on a hook 2 of a crane. The hanging and transporting suspending device 1 (hereinafter referred to as a suspending device) is a rod-shaped main body rod 4.
A pair of closed loop-shaped guide portions 5 fixed to both ends of the main body rod 4 and a pair of hook members 6 fixed to the vicinity of both ends of the main body rod 4 and each having a hook portion 6a.
And one continuous sling 3.

【0014】前記本体ロッド4は、金属製の所定の長さ
(例えば、60〜150cm)を有する管材で構成され
ている。前記ガイド部5はアイボルトで構成され、この
アイボルトの脚部5aがフック部材6に螺合され且つ必
要に応じて溶接されており、左右1対のガイド部5は、
本体ロッド4の軸心を含む共通の面に位置するように設
けられている。これらガイド部5はスリング3を挿通さ
せてガイドする為のものである。
The main body rod 4 is made of a metal tube having a predetermined length (for example, 60 to 150 cm). The guide portion 5 is formed of an eyebolt. The leg portion 5a of the eyebolt is screwed to the hook member 6 and welded as necessary.
It is provided so as to be located on a common surface including the axis of the main body rod 4. These guide portions 5 are for inserting and guiding the sling 3.

【0015】前記フック部材6は、フック本体部6bと
フック部6aとを一体形成したものであり、フック部6
aはスリング3を掛け得るように上方へ湾曲状に形成さ
れ、フック部6aはフック本体部6bから前方へ張り出
すように設けられている。フック本体部6bに凹設の凹
部に本体ロッド4の端部が嵌合されて溶接接合され、ガ
イド部5の脚部5aはフック本体部6bに螺合してあ
る。左右1対のフック部6aは、本体ロッド4に対して
同じ位置関係として、本体ロッド4の軸心に直交する面
に位置するように設けられており、フック部6aの上側
の開口部からスリング3を掛脱できるようになってい
る。
The hook member 6 is formed by integrally forming a hook body 6b and a hook 6a.
a is formed to be curved upward so that the sling 3 can be hung, and the hook portion 6a is provided so as to project forward from the hook body portion 6b. The end of the main body rod 4 is fitted and welded to the concave portion provided in the hook main body 6b, and the leg 5a of the guide portion 5 is screwed to the hook main body 6b. The pair of left and right hook portions 6a are provided in the same positional relationship with respect to the main body rod 4 so as to be located on a surface orthogonal to the axis of the main body rod 4, and are sled from the upper opening of the hook portion 6a. 3.

【0016】前記スリング3の両端部には、クレーンの
フック2に掛ける為のループ部3aが形成されている。
このスリング3のうちの、一方のループ部3aから延び
る部分が左側のガイド部5を挿通して左側のフック部6
aに掛脱自在であり、他方のループ部3aから延びる部
分が右側のガイド部5を挿通して右側のフック部6aに
掛脱自在であり、長さ方向中央部分が本体ロッド4に沿
って延びるようになっている。
At both ends of the sling 3, loop portions 3a for hanging the hooks 2 of the crane are formed.
A portion of the sling 3 extending from one of the loop portions 3a passes through the left guide portion 5 and the left hook portion 6a.
a portion extending from the other loop portion 3a is inserted into the right guide portion 5 so as to be freely hookable and disengageable from the right hook portion 6a, and a central portion in the longitudinal direction extends along the body rod 4. It is designed to extend.

【0017】この吊り具1の作用と効果について説明す
る。図1の状態は、ワークWを吊持しクレーンで搬送し
ている状態を示し、この吊持搬送状態において、本体ロ
ッド4の両端付近部の1対のフック部6aと、本体ロッ
ド4の両端部の1対のガイド部5とで、ワークWを支持
しているスリング3の1対の支持部3bの位置が規制さ
れ、1対の支持部3bが相接近方向へ移動することがな
いので、安定的にワークWを搬送することができる。
The operation and effect of the hanging device 1 will be described. 1 shows a state in which the workpiece W is suspended and transported by a crane. In this suspended transport state, a pair of hook portions 6a near both ends of the main body rod 4 and both ends of the main body rod 4 are shown. The position of the pair of support portions 3b of the sling 3 supporting the work W is regulated by the pair of guide portions 5 of the portion, and the pair of support portions 3b do not move in the phase approaching direction. The work W can be stably conveyed.

【0018】その搬送後にワークWを取り外す際には、
ワークWを床面や台上に下ろし、スリング3を緩めてか
ら、スリング3の長さ方向中央部分を1対のフック部6
aから外せば、ワークWを取り出すことができる。この
ようにワークWを取外した状態で、クレーンでスリング
3を介して本体ロッド4を吊持すると、スリング3の長
さ方向中央部分が本体ロッド4に沿って延び、スリング
3が1対のガイド部5から外れないので、本体ロッド4
を移動させることができる。その後、床面や台上に載置
されたワークWを吊持する際には、本体ロッド4をワー
クWの所へ移動させ、スリング3の長さ方向中央部分を
ワークWの下側を経由して1対のフック部6aに掛けて
吊り上げれば、図1の状態になる。
When removing the work W after the transfer,
After lowering the work W on the floor or table and loosening the sling 3, the center part of the sling 3 in the length direction is connected to a pair of hook portions 6.
By removing the workpiece W from a, the work W can be taken out. When the main body rod 4 is hung by the crane via the sling 3 in a state where the work W is removed in this manner, the central portion in the longitudinal direction of the sling 3 extends along the main body rod 4, and the sling 3 is connected to the pair of guides. Since it does not come off from the part 5, the body rod 4
Can be moved. Thereafter, when suspending the work W placed on the floor surface or on the table, the main body rod 4 is moved to the work W, and the center of the sling 3 in the length direction passes under the work W. Then, when it is hung on the pair of hook portions 6a and lifted, the state shown in FIG. 1 is obtained.

【0019】このように、1対のフック部6aは、スリ
ング3を掛脱可能になっているため、ワークWの搬送前
後におけるスリング3の掛脱を簡単に行うことができ
る。1対のガイド部5はループ状に形成されているた
め、ガイド部5からスリング3が外れることはなく信頼
性に優れる。そして、フック部6aが本体ロッド4の軸
心と直交する面に位置するように設けられているため、
ワークWを吊持したときに、本体ロッド4がその軸心回
りに少し回動しても、スリング3がフック部6aから外
れることがない。また、1本のスリング3にてワークW
を吊持できるため、スリング3の所要数が少なく、設備
費の面でも有利である。
As described above, since the pair of hook portions 6a are capable of hanging the sling 3, the sling 3 can be easily moved before and after the transfer of the work W. Since the pair of guide portions 5 are formed in a loop shape, the sling 3 does not come off from the guide portions 5 and the reliability is excellent. And since the hook part 6a is provided so that it may be located in the surface orthogonal to the axis of the main body rod 4,
When the work W is suspended, the sling 3 does not come off the hook 6a even if the main body rod 4 rotates slightly around its axis. In addition, the work W
Can be hung, the required number of slings 3 is small, and this is also advantageous in terms of equipment costs.

【0020】次に、この吊り具1の変更形態について説
明する。 1)図4に示すように、各ガイド部5Aが、開ループ状
のガイド部本体5bと、その開口部を内側から塞ぐ閉位
置と内側へ開いた開位置とに切換え可能で一端部がガイ
ド部本体5bにピン5dにてピン結合された爪部材5c
と、この爪部材5cを閉位置の方へ付勢する捩じりバネ
からなるバネ部材(図示略)であってピン5dに外装さ
れて、一端がガイド部本体5bに係止されまた他端が爪
部材5cに係止されたバネ部材とを備えている。
Next, a modified embodiment of the hanging device 1 will be described. 1) As shown in FIG. 4, each guide portion 5A can be switched between an open loop-shaped guide portion main body 5b, a closed position for closing the opening from the inside, and an open position opened for the inside, and one end is guided. Claw member 5c pin-connected to the main body 5b with a pin 5d
And a spring member (not shown) formed of a torsion spring for urging the claw member 5c toward the closed position, which is externally mounted on the pin 5d, one end of which is locked by the guide portion main body 5b, and the other end thereof. And a spring member locked to the claw member 5c.

【0021】従って、スリング3をガイド部5Aに導入
する際には爪部材5cを内側へ押して開位置に切換えれ
ば簡単にスリング3をガイド部5Aに導入でき、その後
爪部材5cはバネ部材の付勢力で閉位置になり、ガイド
部5Aは閉ループ状態を保持する。スリング3をガイド
部5Aから外す際には、爪部材5cを内側へ押して開ル
ープ状にすればスリング3をガイド部5Aから簡単に外
すことができる。
Therefore, when the sling 3 is introduced into the guide portion 5A, the sling 3 can be easily introduced into the guide portion 5A by pushing the claw member 5c inward and switching to the open position. The guide unit 5A is brought into the closed position by the urging force, and maintains the closed loop state. When removing the sling 3 from the guide portion 5A, the sling 3 can be easily removed from the guide portion 5A by pushing the claw member 5c inward to form an open loop.

【0022】2)図5に示すように、この吊り具1Aに
おいては、本体ロッド4の長さをワークWの長さに応じ
て調節する為の長さ調節機構10が設けられている。即
ち、本体ロッド4Aはその長さ方向中央位置において分
割され、これら本体ロッド4Aには、本体ロッドとして
機能する本体外管11が相対摺動自在に外嵌され、各本
体ロッド4Aには適当間隔置きに4組のボルト穴12が
貫通状に形成され、本体外管11の両端近傍部には、夫
々1組のボルト穴13が貫通状に形成され、通常比較的
短尺のワークWをハンドリングする際は、両方の本体ロ
ッド4Aを本体外管11に最大限挿入させた状態で、本
体外管11の両端側において、ボルト14をボルト穴1
2とボルト穴13とに挿通させてナット14aで締結し
た状態で使用する。
2) As shown in FIG. 5, the hanging device 1A is provided with a length adjusting mechanism 10 for adjusting the length of the main body rod 4 in accordance with the length of the work W. That is, the main body rod 4A is divided at its longitudinal center position, and a main body outer tube 11 functioning as a main body rod is fitted to these main body rods 4A so as to be relatively slidable. In each case, four sets of bolt holes 12 are formed in a penetrating manner, and in the vicinity of both ends of the main body outer tube 11, one set of bolt holes 13 are formed in a penetrating manner, and usually handles a relatively short work W. At this time, the bolts 14 are inserted into the bolt holes 1 at both ends of the main body outer tube 11 in a state where both main body rods 4A are inserted into the main body outer tube 11 to the maximum.
It is used in a state where it is inserted through the bolt hole 13 and the bolt 13 and fastened with the nut 14a.

【0023】そして、長さの大きなワークWを吊持する
場合には、片方又は両方のナット14aを緩めて片方又
は両方のボルト14を抜き、本体ロッド4Aの片方又は
両方を適宜のピッチだけ本体外管11から伸長側へ引出
してから、取り外したボルト14をボルト穴12とボル
ト穴13とに挿通させてナット14aで締結することに
より、それら本体ロッド4Aの長さを適宜長く調節した
状態で使用する。この長さ調節機構10を設けた場合、
ワークWの長さに応じて本体ロッド4Aの長さを6段階
に調節できるため、ワークWを吊持したときの安定性が
高まる。それ故、この吊り具1Aは種々の長さのワーク
Wの吊持搬送に適用でき、汎用性に優れる。
When a long workpiece W is to be suspended, one or both nuts 14a are loosened and one or both bolts 14 are pulled out, and one or both of the main body rods 4A are moved by an appropriate pitch to the main body. After being pulled out from the outer tube 11 to the extension side, the removed bolt 14 is inserted into the bolt hole 12 and the bolt hole 13 and fastened with the nut 14a, so that the length of the main body rod 4A is appropriately adjusted to be longer. use. When the length adjusting mechanism 10 is provided,
Since the length of the main body rod 4A can be adjusted in six stages according to the length of the work W, stability when the work W is suspended is enhanced. Therefore, the suspending tool 1A can be applied to suspending and transporting works W of various lengths, and is excellent in versatility.

【0024】3)図6に示すように、前記スリング3の
代わりに、張力索としての1本のワイヤ15を適用して
もよい。即ち、このワイヤ15の両端部にはクレーンの
フック2に掛ける為のループ部15aが形成され、、一
方のループ部15aから延びる部分が左側のガイド部5
を挿通して左側のフック部6aに掛脱自在であり、他方
のループ部15aから延びる部分が右側のガイド部5を
挿通して右側のフック部6aに掛脱自在であり、長さ方
向中央部分が本体ロッド4に沿って延びるようになって
いる。
3) As shown in FIG. 6, instead of the sling 3, a single wire 15 as a tension cable may be applied. That is, a loop portion 15a for hanging the hook 2 of the crane is formed at both ends of the wire 15, and a portion extending from one of the loop portions 15a is a guide portion 5 on the left side.
And the portion extending from the other loop portion 15a can be inserted into and removed from the right hook portion 6a through the right guide portion 5 so as to be detachable from the left hook portion 6a. The portion extends along the body rod 4.

【0025】4)図7に示すように、両端部にクレーン
のフック2に掛ける為のループ部16a,17aを夫々
有する2本のワイヤ16,17を設け、その一方のワイ
ヤ16の1対のループ部16aから延びる部分が左側の
ガイド部5を挿通しており、その下端部のU形部16b
が左側のフック部6aに掛脱自在であり、他方のワイヤ
17の1対のループ部17aから延びる部分が右側のガ
イド部5を挿通しており、その下端部のU形部17bが
右側のフック部6aに掛脱自在になっている。
4) As shown in FIG. 7, two wires 16 and 17 having loop portions 16a and 17a for hanging on hooks 2 of a crane are provided at both ends, and a pair of one of the wires 16 is provided. A portion extending from the loop portion 16a passes through the left guide portion 5, and a U-shaped portion 16b at the lower end thereof
Can be hooked on and removed from the left hook portion 6a, the portion of the other wire 17 extending from the pair of loop portions 17a passes through the right guide portion 5, and the U-shaped portion 17b at the lower end thereof is positioned on the right side. The hook 6a is freely detachable.

【0026】ワークを吊持しない状態では、各ワイヤ1
6,17のU形部16b,17bを対応するフック部6
aに掛けておけば、本体ロッド4をワイヤ16,17で
支持して移動可能である。ワークを吊持しない状態にお
いて、各ワイヤ16,17を対応するフック部6aから
外せば、各ワイヤ16,17を対応するガイド部5から
抜き取ることができる。ワークを吊持する際には、各ワ
イヤ16,17のU形部16b,17bを対応するフッ
ク部6aから外し、ワークの下側に掛け回してから対応
するフック部6aに掛ければ、ワークを吊持して搬送で
きるようになる。ワークに接触するワイヤ16,17の
本数が合計4本になるので、吊持した状態における安定
性に優れるし、また、各ワイヤ16,17を対応するフ
ック部6aに掛脱する作業も簡単になる。不使用状態で
は、2本のワイヤ16,17を本体ロッド4から外して
別の用途に使用できるので有利である。
When the work is not suspended, each wire 1
Hook portions 6 corresponding to U-shaped portions 16b and 17b
If it is hung on a, the main body rod 4 can be supported and moved by the wires 16 and 17. If the wires 16, 17 are detached from the corresponding hook portions 6a in a state where the work is not hung, the wires 16, 17 can be pulled out from the corresponding guide portions 5. When suspending the work, the U-shaped portions 16b and 17b of the wires 16 and 17 are detached from the corresponding hook portions 6a, hung on the lower side of the work, and then hanged on the corresponding hook portions 6a. It can be suspended and transported. Since the total number of wires 16 and 17 that come into contact with the work is four, the stability in the suspended state is excellent, and the work of hooking and removing the wires 16 and 17 from the corresponding hook portions 6a is also easy. Become. In the non-use state, the two wires 16, 17 can be removed from the main body rod 4 and used for another purpose, which is advantageous.

【0027】5)前記ガイド部5の形状は円形ループ状
に限らず、スリングの断面形状に応じた長円形ループ状
でもよく、その他の形状のループ状でもよい。また、ガ
イド部5,5Aは必ずしもアイボルトで構成する必要は
なく、また、本体ロッド4の軸心と直交する面内に位置
するように形成してもよい。また、フック部6aの形状
も円形に限らず、スリングの断面形状に応じた長円形で
もよく、その他の形状でもよい。また、フック部材6の
代わりに開ループ状にしたアイボルトを本体ロッド4に
溶接接合して構成してもよく、また、フック部6aをガ
イド部5と一体的に形成してもよい。その他、本発明の
趣旨を逸脱しない範囲で、種々の変更を付加した態様で
実施可能であることは勿論である。
5) The shape of the guide portion 5 is not limited to a circular loop shape, but may be an oval loop shape according to the cross-sectional shape of the sling, or may be a loop shape of another shape. Further, the guide portions 5 and 5A do not necessarily need to be formed of eyebolts, and may be formed so as to be located in a plane orthogonal to the axis of the main body rod 4. Further, the shape of the hook 6a is not limited to a circle, but may be an oval according to the cross-sectional shape of the sling, or may be another shape. Further, instead of the hook member 6, an open-loop eyebolt may be formed by welding to the main body rod 4, and the hook portion 6a may be formed integrally with the guide portion 5. In addition, it goes without saying that the present invention can be implemented in a form in which various changes are added without departing from the spirit of the present invention.

【0028】[0028]

【発明の効果】請求項1の発明によれば、本体ロッドを
設け、その本体ロッドに1対のガイド部と1対のフック
部とを設け、それら本体ロッドとガイド部とフック部を
介してワークを支持する1対の張力索部分が相接近しな
いように規制できるため、非常に簡単な構成の吊持搬送
用吊り具により、ワークを吊持して搬送する際の安全性
を高め、作業能率を高めることができる。請求項2の発
明によれば、前記フック部は、本体ロッドの軸方向と直
交する面に位置するように設けられたので、ワークを吊
持したとき本体ロッドがその軸心回りに少し回動しても
フック部から張力索が外れないように構成できる。その
他請求項1と同様の効果を奏する。
According to the first aspect of the present invention, a main body rod is provided, a pair of guide portions and a pair of hook portions are provided on the main body rod, and the main body rod, the guide portion, and the hook portion are interposed. Since a pair of tension cables supporting the work can be regulated so that they do not come close to each other, the safety of hanging and transferring the work is enhanced by the very simple structure of the hanging and transporting hanger. Efficiency can be improved. According to the invention of claim 2, since the hook portion is provided so as to be located on a surface orthogonal to the axial direction of the main body rod, the main body rod slightly rotates around its axis when the work is suspended. Even in this case, the tension cable can be configured so as not to come off from the hook portion. The other effects are the same as those of the first aspect.

【0029】請求項3の発明によれば、爪部材を開位置
に切換えた状態で、張力索をガイド部に出し入れできる
ため、ガイド部に対する張力索の着脱が簡単になる。爪
部材が閉位置のとき爪部材が張力索で外側へ押されても
外側へ開かないようになっているので、張力索を確実に
保持することができる。その他請求項2と同様の効果を
奏する。
According to the third aspect of the present invention, the tension cable can be put in and taken out of the guide section with the claw member switched to the open position, so that the tension cable can be easily attached to and detached from the guide section. When the claw member is in the closed position, even if the claw member is pushed outward by the tension cable, it does not open outward, so that the tension cable can be securely held. Other effects are the same as those of the second aspect.

【0030】請求項4の発明によれば、1本の張力索が
本体ロッドから分離されることがなく、1本の張力索で
あるので設備費の面で有利である。その他請求項1〜3
の何れか1項と同様の効果を奏する。請求項5の発明に
よれば、ワークを吊持しないとき、張力索を本体ロッド
から分離して別の用途に適用できること、ワークに接触
する張力索の本数が4本になるので安定性に優れるこ
と、張力索をフックに掛脱する作業が簡単になること、
等の効果が得られる。その他請求項1〜3の何れか1項
と同様の効果を奏する。
According to the fourth aspect of the present invention, since one tension cord is not separated from the main body rod and is one tension cord, it is advantageous in terms of equipment cost. Other claims 1-3
The same effect as any one of the above items is obtained. According to the invention of claim 5, when the work is not hung, the tension cable can be separated from the main body rod and applied to another use, and the number of tension cables in contact with the work becomes four, so that the stability is excellent. That the work of hanging the tension cable on and off the hook is simplified,
And the like. In addition, the same effect as any one of the first to third aspects is obtained.

【0031】請求項6の発明によれば、前記本体ロッド
にその長さを調節可能な長さ調節機構を設けたので、長
さ調節機構を介して、ワークの長さに応じて本体ロッド
の長さを調節し、一層安定した状態に吊持することがで
きる。その他、請求項1〜4の何れか1項と同様の効果
を奏する。
According to the sixth aspect of the present invention, the main body rod is provided with a length adjusting mechanism capable of adjusting the length thereof. The length can be adjusted and it can be hung in a more stable state. In addition, the same effect as any one of the first to fourth aspects can be obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施形態に係る吊持搬送用吊り具の斜
視図である。
FIG. 1 is a perspective view of a hanger for hanging and transporting according to an embodiment of the present invention.

【図2】図1の吊持搬送用吊り具の一部切欠き横断平面
図である。
FIG. 2 is a partially cutaway cross-sectional plan view of the hanging and transporting hanger of FIG. 1;

【図3】図2のIII −III 線断面図である。FIG. 3 is a sectional view taken along line III-III in FIG. 2;

【図4】変更形態に係る吊持搬送用吊り具の要部平面図
である。
FIG. 4 is a plan view of a main part of a hanging and transporting hanger according to a modified embodiment.

【図5】別の変更形態に係る吊持搬送用吊り具の図2相
当図である。
FIG. 5 is a diagram corresponding to FIG. 2 of a hanging and transporting hanger according to another modification.

【図6】別の変更形態に係る吊持搬送用吊り具の模式図
である。
FIG. 6 is a schematic view of a hanging and transporting hanger according to another modification.

【図7】別の変更形態に係る吊持搬送用吊り具の模式図
である。
FIG. 7 is a schematic view of a hanging and conveying hanging device according to another modification.

【図8】従来技術に係る図1相当図である。FIG. 8 is a diagram corresponding to FIG. 1 according to the prior art.

【図9】従来技術に係りワーク脱落開始状態を示す図1
相当図である。
FIG. 9 is a diagram showing a state in which a workpiece is started to fall according to the related art
FIG.

【符号の説明】[Explanation of symbols]

1 吊持搬送用吊り具 2 フック 3 スリング(張力索) 4,4A 本体ロッド 5,5A ガイド部 5b ガイド部本体 5c 爪部材 5d ピン 6 フック部材 6a フック部 10 長さ調節機構 11 本体外管 12 ボルト穴 13 ボルト穴 14 ボルト 14a ナット 15,16,17 ワイヤ DESCRIPTION OF SYMBOLS 1 Hanging device for suspension conveyance 2 Hook 3 Sling (tension cable) 4, 4A Main body rod 5, 5A Guide part 5b Guide part main body 5c Claw member 5d Pin 6 Hook member 6a Hook part 10 Length adjustment mechanism 11 Main body outer tube 12 Bolt hole 13 Bolt hole 14 Bolt 14a Nut 15,16,17 Wire

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 クレーンのフックに張力索にて棒状ワー
クを吊持して搬送するのに用いる吊持搬送用吊り具にお
いて、 ロッド状の本体ロッドの両端部に張力索をガイドする閉
ループ状のガイド部を夫々形成し、本体ロッドの両端付
近部に張力索を掛ける為のフック部を夫々形成したこと
を特徴とする吊持搬送用吊り具。
1. A hanging and transporting suspending device used for suspending and transporting a rod-shaped workpiece by a tension cable on a hook of a crane, wherein a closed loop-shaped guide for guiding a tension cable to both ends of a rod-shaped main body rod. A hanger for hanging and transporting, wherein a guide portion is formed, and a hook portion for hanging a tension cable is formed near both ends of a main body rod.
【請求項2】 前記フック部は、本体ロッドの軸方向と
直交する面に位置するように設けられたことを特徴とす
る請求項1に記載の吊持搬送用吊り具。
2. The hanging and conveying hanging device according to claim 1, wherein the hook portion is provided so as to be located on a surface orthogonal to the axial direction of the main body rod.
【請求項3】 前記ガイド部は、開ループ状のガイド部
本体と、その開口部を内側から塞ぐ閉位置と内側へ開い
た開位置とに切換え可能で一端部がガイド部本体にピン
結合された爪部材と、この爪部材を閉位置の方へ付勢す
るバネ部材とを備えたことを特徴とする請求項2に記載
の吊持搬送用吊り具。
3. The guide portion can be switched between an open loop-shaped guide portion main body, a closed position for closing the opening from the inside and an open position opened to the inside, and one end is pin-connected to the guide portion main body. 3. The hanging and transporting hanger according to claim 2, further comprising a claw member and a spring member for urging the claw member toward the closed position.
【請求項4】 両端部にクレーンのフックに掛ける為の
ループ部を有する1本の張力索であって、一方のループ
部から延びる部分が一方のガイド部を挿通して一方のフ
ック部に掛脱自在であり、他方のループ部から延びる部
分が他方のガイド部を挿通して他方のフック部に掛脱自
在であり、長さ方向中央部分が本体ロッドに沿って延び
る1本の張力索を設けたことを特徴とする請求項1〜3
の何れか1項に記載の吊持搬送用吊り具。
4. A tension cable having a loop portion at both ends for hooking on a hook of a crane, and a portion extending from one loop portion passes through one guide portion and is hooked on one hook portion. A portion extending from the other loop portion is removably attached to the other hook portion through the other guide portion, and a central portion in the longitudinal direction is provided with one tension cord extending along the main body rod. 4. The device according to claim 1, wherein
The suspending / transporting hanger according to any one of the above items.
【請求項5】 両端部にクレーンのフックに掛ける為の
ループ部を夫々有する2本の張力索であって、その一方
の張力索の1対のループ部から延びる部分が一方のガイ
ド部を挿通して一方のフック部に掛脱自在であり、他方
の張力索の1対のループ部から延びる部分が他方のガイ
ド部を挿通して他方のフック部に掛脱自在である2本の
張力索を設けたことを特徴とする請求項1〜3の何れか
1項に記載の吊持搬送用吊り具。
5. Two tension cables each having a loop portion at both ends for hooking the hook of a crane, and a portion extending from a pair of loop portions of one tension cable passes through one guide portion. The two tension cables which can be hooked / removed on one hook portion and the portions extending from the pair of loop portions of the other tension wire are inserted through the other guide portion and can be hooked / removed on the other hook portion. The hanging and transporting hanger according to any one of claims 1 to 3, further comprising:
【請求項6】 前記本体ロッドにその長さを調節可能な
長さ調節機構を設けたことを特徴とする請求項1〜4の
何れか1項に記載の吊持搬送用吊り具。
6. The hanging and conveying hanging device according to claim 1, wherein a length adjusting mechanism capable of adjusting the length of the main body rod is provided.
JP10246897A 1997-04-04 1997-04-04 Suspension implement for hanging carriage Pending JPH10279262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10246897A JPH10279262A (en) 1997-04-04 1997-04-04 Suspension implement for hanging carriage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10246897A JPH10279262A (en) 1997-04-04 1997-04-04 Suspension implement for hanging carriage

Publications (1)

Publication Number Publication Date
JPH10279262A true JPH10279262A (en) 1998-10-20

Family

ID=14328294

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10246897A Pending JPH10279262A (en) 1997-04-04 1997-04-04 Suspension implement for hanging carriage

Country Status (1)

Country Link
JP (1) JPH10279262A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103007868A (en) * 2012-12-27 2013-04-03 陕西化建工程有限责任公司 Welding lifting lug type hoisting method of loop reactor
CN105458235A (en) * 2015-12-15 2016-04-06 铜陵铜官府文化创意股份公司 Mold shell hoisting device and hoisting method thereof
CN111891897A (en) * 2020-08-13 2020-11-06 泰州市宏达工矿安全部件有限公司 Sling with detachable protective sleeve
CN113636485A (en) * 2020-05-11 2021-11-12 丙申南京网络技术有限公司 Cell cryopreserved grabbing device for box

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103007868A (en) * 2012-12-27 2013-04-03 陕西化建工程有限责任公司 Welding lifting lug type hoisting method of loop reactor
CN105458235A (en) * 2015-12-15 2016-04-06 铜陵铜官府文化创意股份公司 Mold shell hoisting device and hoisting method thereof
CN113636485A (en) * 2020-05-11 2021-11-12 丙申南京网络技术有限公司 Cell cryopreserved grabbing device for box
CN111891897A (en) * 2020-08-13 2020-11-06 泰州市宏达工矿安全部件有限公司 Sling with detachable protective sleeve
CN111891897B (en) * 2020-08-13 2023-11-10 泰州市宏达工矿安全部件有限公司 Sling tool with detachable sheath

Similar Documents

Publication Publication Date Title
JP2009113879A (en) Hoisting tool of pipe body
JPH10279262A (en) Suspension implement for hanging carriage
KR100444672B1 (en) Hanger transfer apparatus for black in white
JP5100347B2 (en) Auxiliary equipment for slinging
JPH11228071A (en) Multifunctional lifter
JP2015086032A (en) Palette hoisting auxiliary tool
KR200201338Y1 (en) Crane hook assistant unit
JP2001240360A (en) Long material hoisting accessory
JP2865540B2 (en) Elevator car elevator
JP6820605B2 (en) How to transport hanging tools and heavy objects
US20200079294A1 (en) Transport Frame for Mounting a Gang Box onto a Vehicle
CN207209376U (en) A kind of rectangle section of jurisdiction Horizontal clamp
JP5564984B2 (en) Remote sling mechanism
JPH0324551Y2 (en)
CN218290130U (en) Cylinder body transport fixture
JPH03267296A (en) Hoisting accessories and crane
CS270442B2 (en) Carrying device for suspension railway
JP2517995Y2 (en) Pipe hanger
JPH0435346Y2 (en)
JPH10182059A (en) Long member hanging rope lateral extension tool
JP2006160490A (en) Hanging device using belt sling
JP6930085B2 (en) Intermediate boom, crane and intermediate jib storage method
KR200158659Y1 (en) Hanger apparatus for moving iron plate
JP6130584B1 (en) Hanging adapter
JP3064793U (en) Pruning machine transfer equipment between trees

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040308

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060809

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060817

A02 Decision of refusal

Effective date: 20061228

Free format text: JAPANESE INTERMEDIATE CODE: A02