Method and device for managing working process for building or the like in construction job site

Info

Publication number
JPH10273974A
JPH10273974A JP11575897A JP11575897A JPH10273974A JP H10273974 A JPH10273974 A JP H10273974A JP 11575897 A JP11575897 A JP 11575897A JP 11575897 A JP11575897 A JP 11575897A JP H10273974 A JPH10273974 A JP H10273974A
Authority
JP
Japan
Prior art keywords
work
data
share
progress
shared
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11575897A
Other languages
Japanese (ja)
Inventor
Tadashi Shimada
忠 嶋田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP11575897A priority Critical patent/JPH10273974A/en
Publication of JPH10273974A publication Critical patent/JPH10273974A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Time Recorders, Dirve Recorders, Access Control (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method and a device for managing a working process, which are extremely excellent so that shared works charged to subcontractors can be smoothly carried out in accordance with a progress of a work. SOLUTION: A device for managing a working process is composed of two master machines which store in memory shared works in working plan process data, as shared working data for shared work in charge, and which manage working processes in the shared works charged to subcontractors, as individual working process data, and a plurality of slave machines 3 are respectively managed by the subcontractors, and which manage the working progresses as various progress data. Further, the master machines 2 are provided with adjusting devices for the order of shared working data in the working plan process data or the order of working process data in each shared work, and the slave machines 3 are arranged so as to recognize the orders of working process data in shared works, in progress data or replaced and adjusted shared works.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建設現場等におけ
る建設物等の作業工程管理方法及びその作業工程管理装
置に関し、更に詳しくは、建設物等を一定の期間内で完
成させるべく予め設定された作業計画工程と実際の作業
の進捗状況とを常に比較して進捗状況に準じた最も作業
効率の良い各受持分担作業を前記作業計画工程を基に入
れ替えて各受持分担作業に従事する各業者にリアルタイ
ムに促すことで、各業者側でより正確な受持分担作業日
時の最終調整や準備作業等の実行日時等の各判断を適格
に行うことが可能となり、しいては建設現場等における
各業者の各受持分担作業を実際の作業の進捗状況に準じ
てよりスムーズに遂行させることが出来る建設現場等に
おける建設物等の作業工程管理方法及びその作業工程管
理装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for managing a work process of a building or the like at a construction site or the like, and more particularly, to a method of managing a work or the like in a construction site or the like. The work planning process and the actual work progress are constantly compared, and each of the shared work with the highest work efficiency according to the progress is replaced based on the work planning process to engage in each shared work. By prompting each contractor in real time, it is possible for each contractor to make more accurate decisions on final adjustment of the date and time of ownership work and execution date of preparation work etc. The present invention also relates to a work process management method for a building or the like at a construction site or the like, and a work process management device for the same, which can more smoothly perform each shared work of each contractor according to the progress of the actual work. It is.

【0002】[0002]

【従来の技術】従来、上記建設現場等において所定の建
設物等を一定の期間内で完成させる場合、一般にゼネコ
ンとかデべロッパーと称する大手総合建設会社や建設総
合請負業者がクライアントより前記建設物等の受注を引
き受け、その後建設を行う建設物等の仕掛から完成まで
の全作業計画工程等を設定し、建設物等の構造や種類等
によって選出した仮設工事、鳶職、左官、大工、電気工
事、運送、配送等の各専門業者に建設物等の各受持分担
作業を指示し、仕掛から完成までの全作業を前記作業計
画工程に基づいて総合管理していた。
2. Description of the Related Art Conventionally, when a predetermined construction or the like is completed within a certain period of time at the above-mentioned construction site or the like, a general construction company or a general construction contractor generally called a general contractor or a developer generally sends the construction work from a client. And other orders, and then set up the entire work planning process from the work in process to the completion of the construction, etc., to be constructed. , And instruct each specialized contractor such as transportation, delivery, etc., on each share-sharing work of a building or the like, and comprehensively manage all the work from the work in progress to the completion based on the work planning process.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記の
如く大手総合建設会社や建設総合請負業者が、選出した
仮設工事、鳶職、左官、大工、電気工事、運送、配送等
の各専門業者に建設物等の各受持分担作業を指示し、仕
掛から完成までの全作業を前記作業計画工程に基づいて
総合管理する場合に於いては、下記の様な問題が生じて
いた。
However, as described above, the major general construction companies and general contractors have selected specialized construction, construction, plasterer, carpentry, carpentry, electrical work, transportation, delivery, etc. However, the following problems have arisen in the case of instructing each shared work such as the above, and comprehensively managing all work from work in process to completion based on the work planning process.

【0004】即ち、上記の如く建設物等の各受持分担作
業に従事する各業者は、通常、前記大手総合建設会社や
建設総合請負業者等の設定した作業計画工程に準じて予
め周間や月間の作業予定を綿密に組んで他の作業現場と
の調整を図ったり、又調整がつかない場合には、一日の
中で複数箇所の作業現場を持回りで移動する様な作業計
画を立てることになる。
[0004] That is, as described above, each contractor engaged in each share-sharing work of a building or the like usually preliminarily performs weekly work in accordance with the work planning process set by the major general construction company or the general construction contractor. Carefully schedule monthly work schedules and coordinate with other work sites, or if adjustment is not possible, make a work plan to move around multiple work sites throughout the day. Will be.

【0005】よって、本来、各受持分担作業が予め設定
された作業計画工程に準じてなされるのであれば何ら問
題はないが、如何せん、特に建設物等の各受持分担作業
は、天候のみならず機材の搬入時間に大きく左右される
ものもあり、必ずしも作業計画工程に準じて行われてい
ないのが常である。
[0005] Therefore, there is no problem as long as each shared work is originally performed according to a preset work planning process. However, each shared work of a building or the like is performed only by weather. However, there are some items that are greatly affected by the time required to carry in the equipment, and are not always performed according to the work planning process.

【0006】従って、一般に建設現場等には、大手総合
建設会社や建設総合請負業者等から現場における管理責
任者が選任されて各受持分担作業の進捗状況を把握し、
各受持分担作業に従事する各業者間の調整を行ってはい
るが、如何せん、該管理責任者も常時同じ建設現場等に
常駐するのは極めて希で、やはり各業者と同様に数カ所
の建設現場等を巡回しているのが一般的であり、何れに
しても各建設現場等の時間毎や日毎のより正確な各受持
分担作業の進捗状況を十分把握することが出来ず、よっ
てしばしば作業計画工程に準じて周間や月間の作業予定
を綿密に組んだ業者と各受持分担作業に何らかの問題が
生じて作業計画通りに各受持分担作業が行えない業者間
とで各受持分担作業に関する衝突が生じていた。
[0006] Therefore, in general, a construction manager or the like is appointed from a major general construction company or a general construction contractor to manage the work at the site, and grasps the progress of each sharing work.
Although coordination among contractors engaged in each share-sharing work is made, it is extremely rare that the manager in charge is always resident at the same construction site, etc. It is common to patrol the sites, etc., and in any case, it is not possible to sufficiently grasp the progress status of each assigned work every hour or every day at each construction site. Each contract between a contractor who carefully schedules work during the week or month according to the work planning process, and a contractor who cannot perform each contracted share work according to the work plan due to some problem in each share work There was a conflict regarding sharing work.

【0007】然して、本発明は上記問題を解決するもの
であり、各建設現場等の正確な各受持分担作業の進捗状
況をリアルタイムに各受持分担作業に従事する各業者に
促すことにより各業者側でより正確な受持分担作業日時
の最終調整や準備作業等の実行日時等の各判断を適格に
行うことが出来るだけでなく、例えば各受持分担作業に
何らかの問題が生じて作業計画通りに各受持分担作業が
行われていない場合であっても、予め設定された作業計
画工程と実際の作業の進捗状況とを常に比較して進捗状
況に準じた最も作業効率の良い各受持分担作業を前記作
業計画工程を基に入れ替えて各受持分担作業に従事する
各業者にリアルタイムに促すことで、各業者側でより正
確な受持分担作業日時の最終調整や準備作業等の実行日
時等の各判断を適格に行うことが可能となり、しいては
建設現場等における各業者の各受持分担作業を実際の作
業の進捗状況に準じてよりスムーズに遂行させることが
出来る極めて優れた建設現場等における建設物等の作業
工程管理方法及びその作業工程管理装置を提供すること
を課題とするものである。
However, the present invention solves the above-mentioned problem, and prompts each contractor engaged in each sharing work in real time about the progress of each sharing work at each construction site. In addition to being able to make more accurate decisions on the final adjustment of the date and time of the shared work and the date and time of execution of the preparation work, etc., the trader can also perform work planning due to any problems in the shared work. Even if each share work is not performed as described above, the preset work planning process is always compared with the actual work progress, and each work with the highest work efficiency according to the progress is performed. By exchanging the share work based on the work planning process and prompting each contractor engaged in each share work in real time, each trader side can make more accurate final adjustment of the share work date and time, preparation work, etc. Appropriate judgments such as execution date It is possible to carry out each work of each contractor at the construction site etc. more smoothly according to the progress of the actual work. It is an object of the present invention to provide a work process management method and a work process management device.

【0008】[0008]

【課題を解決するための手段】本発明は、上記課題を解
決するために全く新しい建設現場等における建設物等の
作業工程管理方法及びその作業工程管理装置を発明した
ものである。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention has invented a method and apparatus for managing a work process of a building or the like at a completely new construction site.

【0009】即ち、建設現場等における建設物等の作業
工程管理方法として本発明は、建設物等の各受持分担作
業に従事する各業者毎に管理された複数の子機3又は所
定の子機3より建設物等の各受持分担作業又は各受持分
担作業内での各作業工程の少なくとも何れか一方の各種
進捗データを親機2へと発し、その後該親機2に予め管
理されてなる建設物等の仕掛から完成までの全作業計画
工程データ又は部分作業計画工程データの少なくとも何
れか一方と前記各種進捗データを比較し、必要に応じて
予め設定された作業計画工程データにおける各受持分担
作業の夫々に設定された各受持分担作業データの順番又
は各受持分担作業内での各作業工程の夫々に設定された
各作業工程データの順番を入れ替え調整し、その後前記
進捗データの内容又は該進捗データを基に入れ替え調整
された各受持分担作業データの順番又は入れ替え調整さ
れた各受持分担作業内での各作業工程データの順番を前
記復数の子機3の全て又は所定の子機3を介してリアル
タイムで確認可能なことから、各建設現場等の正確な各
受持分担作業の進捗状況をリアルタイムに各受持分担作
業に従事する各業者に促すことにより各業者側でより正
確な受持分担作業日時の最終調整や準備作業等の実行日
時等の各判断を適格に行うことが出来る利点を有する。
In other words, the present invention provides a method of managing work processes of a building or the like at a construction site or the like, according to the present invention. The machine 3 sends to the master unit 2 various progress data of at least one of each share work or each work process in the share work of the building or the like, and is then managed by the master machine 2 in advance. Comparing the various progress data with at least one of the entire work plan process data or the partial work plan process data from the work in progress to the completion of the construction or the like, and comparing each of the work plan process data set in advance as necessary. The order of each of the shared work data set for each of the shared work or the order of each work process data set for each of the work processes in each shared work is adjusted and then the progress is adjusted. Data content Indicates the order of the respective shared work data exchanged and adjusted based on the progress data or the order of each work process data in each of the exchanged shared work that has been adjusted and adjusted, for all or a predetermined child Since it is possible to check in real time through the machine 3 the progress of each work to be shared at each construction site, etc., is accurately promoted to each contractor engaged in each work in real time, so that each of the contractors can improve the progress. There is an advantage that each determination such as the final adjustment of the date and time of the work to be shared and the date and time of execution of the preparation work can be appropriately performed.

【0010】更に、上記建設現場等における建設物等の
作業工程管理方法を実施するための装置として本発明
は、建設を行う建設物等の仕掛から完成までの全作業計
画工程データ又は部分作業計画工程データの少なくとも
何れか一方と、該作業計画工程データにおける仮設工
事、鳶職、左官、大工、電気工事、運送、配送等の各受
持分担作業を個々の受持分担作業データとして記憶する
と共に、前記各受持分担作業内での各作業工程を個々の
作業工程データとして管理する親機2と、前記各受持分
担作業に従事する各業者毎に管理され、且つ該各受持分
担作業又は各受持分担作業内での各作業工程の少なくと
も何れか一方の進捗状況を各種の進捗データとして管理
する複数の子機3とからなり、しかも前記親機2には所
定の子機3から送られてきた進捗データと前記全作業計
画工程データ又は部分作業計画工程データの少なくとも
何れか一方とを比較し、必要に応じて予め設定された作
業計画工程データの各受持分担作業データの順番又は各
受持分担作業内での各作業工程データの順番を入れ替え
調整する作業順番調整装置4が設けられてなり、しかも
前記全ての子機3の夫々が、該作業順番調整装置4に送
られてきた進捗データの内容又は該進捗データを基に入
れ替え調整された各受持分担作業データの順番又は入れ
替え調整された各受持分担作業内での各作業工程データ
の順番をリアルタイムに確認可能な構成にしてなるもの
である。
Further, as an apparatus for carrying out the method for managing a work process of a building or the like at a construction site or the like, the present invention provides a whole work plan process data or a partial work plan from a work in progress to completion of a building or the like to be constructed. At least one of the process data and, in the work plan process data, the temporary work, the eavesdropper, the plasterer, the carpenter, the electric work, the transportation, the distribution and the like of each share work is stored as individual share work data, The parent machine 2 that manages each work process in each of the shared work as individual work process data, and is managed for each contractor engaged in the shared work, and the shared work or It comprises a plurality of slaves 3 for managing the progress of at least one of the work processes in each share work as various types of progress data. Is The received progress data is compared with at least one of the entire work plan process data and the partial work plan process data, and the order of each share work data of the work plan process data set in advance is set as necessary. A work order adjusting device 4 for changing and ordering the order of each work process data in the share work is provided, and all of the slave units 3 are provided with the progress sent to the work order adjuster 4. A configuration capable of confirming in real time the order of each shared work data that has been replaced and adjusted based on the content of the data or the progress data or the order of each work process data within each of the shared work that has been replaced and adjusted. It becomes.

【0011】よって、各建設現場等の正確な各受持分担
作業の進捗状況をリアルタイムに各受持分担作業に従事
する各業者に促すことにより各業者側でより正確な受持
分担作業日時の最終調整や準備作業等の実行日時等の各
判断を適格に行うことが出来る利点を有する。
[0011] Therefore, by prompting each contractor engaged in each share-sharing work in real time to the accurate progress status of each share-sharing work at each construction site or the like, each contractor can obtain a more accurate date and time of the share-sharing work. There is an advantage that each judgment such as the execution date and time of the final adjustment and the preparation work can be appropriately performed.

【0012】更に、上記装置によれば、各受持分担作業
に何らかの問題が生じて作業計画通りに各受持分担作業
が行われていない場合であっても、予め設定された作業
計画工程と実際の作業の進捗状況とを常に比較して進捗
状況に準じた最も作業効率の良い各受持分担作業を前記
作業計画工程を基に入れ替えて各受持分担作業に従事す
る各業者にリアルタイムに促すことで、各業者側でより
正確な受持分担作業日時の最終調整や準備作業等の実行
日時等の各判断を適格に行うことが可能となり、しいて
は建設現場等における各業者の各受持分担作業を実際の
作業の進捗状況に準じてよりスムーズに遂行させること
が出来る利点を有する。
Further, according to the above-mentioned apparatus, even if a problem occurs in each of the sharing work and the respective sharing work is not performed according to the work plan, the work planning process set in advance can be performed. Always compare the actual work progress with each work sharing work with the highest work efficiency according to the progress status based on the work planning process and give each contractor engaged in each work share work in real time By prompting each supplier, it is possible to make more accurate decisions on the final adjustment of the date and time of the work to be shared and the date and time of execution of preparation work, etc. There is an advantage that the sharing work can be performed more smoothly according to the progress of the actual work.

【0013】更に、親機2と子機3が、双方向通信可能
な構成にしてなることから、必要に応じて所定の各受持
分担作業に従事してなる子機3より作業順番調整装置4
に送られてきた進捗データ又は該進捗データを基に入れ
替え調整された各受持分担作業の順番又は入れ替え調整
された各受持分担作業内での各作業工程の順番等の情報
データを親機2から次の各受持分担作業に従事する業者
の子機3へと24時間何時でも確実に送ったり、又前記情
報データを必要に応じて何れの子機3側からでも24時間
何時でも瞬時に取り出して確認することが出来、よって
特に一日の中で複数箇所の作業現場を持回りで移動する
様な業者にとって大なる利点がある。
Further, since the master unit 2 and the slave unit 3 are configured to be capable of two-way communication, the slave unit 3 engaged in each of the predetermined sharing tasks as required requires a work order adjusting device. 4
The master machine sends information data such as the progress data sent to the master device or the order of each of the shared work that has been replaced and adjusted based on the progress data or the order of each work process in each of the shared work that has been replaced and adjusted. 2 to the slave unit 3 of the contractor engaged in each of the following sharing work, and send it reliably 24 hours a day, or send the information data from any slave unit 3 anytime 24 hours as needed. This is a great advantage, especially for a company that travels around a plurality of work sites in a single day.

【0014】更に、各子機3が互いに双方向通信可能な
構成にしてなることから、親機2に何らかのアクシデン
トが発生したり、又回線使用等によって、該親機2との
アクセスが希望する時間等に行うことが出来ない事態が
生じた場合であっても、関係する受持分担作業に従事す
る業者の子機3より現在の進捗状況を知ることが出来、
よって親機2の作業順番調整装置4を介することなく、
次の各受持分担作業の日時等の予想を各子機3を有した
夫々の業者側で立てることが出来る利点を有する。
Further, since each slave unit 3 is configured to be capable of two-way communication with each other, an access to the master unit 2 is desired due to occurrence of some accident in the master unit 2 or use of a line. Even in the case where a situation that cannot be performed in time or the like occurs, it is possible to know the current progress status from the slave unit 3 of the contractor engaged in the related sharing work,
Therefore, without going through the work order adjusting device 4 of the parent machine 2,
This has the advantage that the respective contractors having the slaves 3 can make predictions about the date and time of the next sharing work.

【0015】又、作業工程管理装置には、作業計画工程
データにおける各受持分担作業又は該各受持分担作業内
の各作業工程の少なくとも何れか一方に従事すべく選出
された各業者の管理する子機3の夫々に対応して所定の
作業予約コード又は作業予約データを設定する作業予約
設定装置5と、作業予約コード又は作業予約データが設
定された各受持分担作業又は該各受持分担作業内の各作
業工程の内容の変更や取消等の各種緊急情報データを前
記子機3又は親機2の少なくとも何れか一方より受付け
て、該作業予約コード又は作業予約データが設定された
各受持分担作業又は該各受持分担作業内の各作業工程の
内容の変更や取消等を行う作業内容変更装置6と、各受
持分担作業又は該各受持分担作業内の各作業工程の内容
に何らかの変更が生じた場合に、前記親機2又は子機3
へと内容変更が生じた作業予約コード又は作業予約デー
タの少なくとも何れか一方を発して告知する告知装置7
とが設けられたものである。
Further, the work process management device includes a management system for each contractor selected to engage in at least one of each share work in the work plan process data or each work process in the share work. A work reservation setting device 5 for setting a predetermined work reservation code or work reservation data in correspondence with each of the slave units 3 to be set, and each assigned work or each received work set with the work reservation code or work reservation data Various emergency information data such as change or cancellation of the contents of each work process in the shared work is received from at least one of the slave unit 3 and the master unit 2 and the work reservation code or the work reservation data is set. A work content changing device 6 for changing or canceling the content of each share process or each work process in each share process, and a work content change device 6 for each share process or each work process in each share process. Some change in the content When the Flip, the main terminal 2 or sub-terminal 3
Notification device 7 for issuing and notifying at least one of the work reservation code and the work reservation data whose contents have been changed to
Are provided.

【0016】よって、例えば各受持分担作業又は該各受
持分担作業内の各作業工程において予め使用されるべく
設定された建設部材等のコスト面等を考慮しての使用部
材等の種類変更のみならず建設物等に予期せぬ設計変更
や仕様変更等が生じた場合であっても、各受持分担作業
又は該各受持分担作業内の各作業工程の内容の変更や取
消等を、関連する各業者に告知すべく大手総合建設会社
や建設総合請負業者のもとに呼び集めて説明する等の煩
雑な作業を一切行うことなく、大手総合建設会社や建設
総合請負業者が管理する親機2から関連する各業者にて
管理されてなる子機3へ又は該子機3から親機2へと何
時でも簡単に、且つ瞬時に各受持分担作業又は該各受持
分担作業内の各作業工程の内容の変更や取消等を明確に
告知して変更内容等の告知における時間ロスを大幅に低
減することが出来る利点を有する。
Therefore, for example, the type of the used member or the like is changed in consideration of the cost aspect of the construction member or the like set to be used in advance in each sharing work or each work process in the sharing work. Not only in the case of unexpected design change or specification change of the construction, etc., but also the change or cancellation of each share work or each work process in each share work. Is managed by a major general construction company or general contractor without any complicated work such as calling and explaining to a major general contractor or general contractor to notify relevant contractors. From the parent device 2 to the child device 3 managed by the relevant contractor or from the child device 3 to the parent device 2 at any time, easily and instantaneously in each of the share work or the share work. The change and cancellation of the contents of each work process shall be clearly notified and the details of the change It has the advantage that it is possible to significantly reduce the time loss in the notice of.

【0017】更に、親機2が所定の地域等に分散して設
けられ、且つ該各親機2にて管理されてなる各データの
全てが所定の地域等に設けられた中央データ管理装置8
によって集中管理されてなり、しかも該中央データ管理
装置8と各親機2が双方向通信可能な構成にしてなるこ
とから、各親機2によって各地域や各地方等毎における
複数箇所の建設現場を広域に管理することが出来るだけ
でなく、各建設現場の進捗状況を中央データ管理装置8
にて確実に把握すると共に、各建設現場毎の各受持分担
作業又は該各受持分担作業内の各作業工程において使用
された建設部材等の各種データを全て蓄積管理して、今
後の建設物等の受注時における仕様や見積り等の参考デ
ータに即時使用することが出来るだけでなく、中央デー
タ管理装置8側からでも各親機2を介して使用部材等の
種類変更や建設物等の設計変更、仕様変更等を関連する
各業者にて管理されてなる子機3へと発して何時でも簡
単に、且つ瞬時に告知することが出来る利点を有する。
Furthermore, a central data management device 8 is provided in which the master unit 2 is distributed in a predetermined area or the like and all the data managed by each master unit 2 is provided in a predetermined area or the like.
The central data management device 8 and each master unit 2 are configured to be capable of two-way communication with each other, so that each master unit 2 has a plurality of construction sites in each region or each region. Not only can be managed over a wide area, but also the progress of each construction site can be
And securely store and manage all data such as construction members used in each work share in each construction site or each work process in each work share, Not only can it be used immediately for reference data such as specifications and estimates at the time of receiving orders for goods, etc., but also the central data management device 8 can change the type of used materials and the like and construct There is an advantage that a design change, a specification change, and the like can be issued to the slave unit 3 managed by each related company and can be notified easily and instantly at any time.

【0018】更に、親機2又は中央データ管理装置8の
少なくとも何れか一方には、前記作業計画工程データの
内容を書き替え可能な計画工程データ書き替え装置9が
設けられてなることから、親機2側からでも又中央デー
タ管理装置8側からでも予め設定された作業計画工程デ
ータの内容を瞬時に、且つ確実に書き替えて関連する夫
々の子機3を管理する各業者に伝えることが出来る利点
を有する。
Further, at least one of the master unit 2 and the central data management device 8 is provided with a planning process data rewriting device 9 capable of rewriting the contents of the work planning process data. It is possible to instantly and surely rewrite the contents of the preset work planning process data from the machine 2 side or from the central data management device 8 side, and to convey the information to each contractor who manages each related slave unit 3. It has the advantages that it can.

【0019】又、前記親機2又は中央データ管理装置8
の少なくとも何れか一方には、所定の子機3から送られ
てきた進捗データを基に建設物等の組み上げ状態の仮想
画像を作成する自動画像作成装置10が設けられてなるこ
とから、各地域や各地方等毎における複数箇所の建設現
場における建築物等の現在の状態を誰でも簡単に、しか
もリアルに確認することが可能となり、よって進捗状況
の詳細をより正確に把握することが出来る利点を有す
る。
The master unit 2 or the central data management device 8
Is provided with an automatic image creation device 10 for creating a virtual image of an assembled state of a building or the like based on the progress data sent from the predetermined slave unit 3. The advantage is that anyone can easily and realistically check the current state of buildings at multiple construction sites in each region and so on, so that the details of progress can be grasped more accurately. Having.

【0020】[0020]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

<第一実施形態>図1に於いて、1は本発明の建設現場
等における建設物等の作業工程管理方法を実施するため
の第一実施形態である作業工程管理装置を示し、2は該
装置1の一方を構成すると共に、所定の建設現場の作業
管理を行う業者の存する建物内の所定の箇所等に設置さ
れた親機を示す。
<First Embodiment> In FIG. 1, reference numeral 1 denotes a work process management apparatus which is a first embodiment for carrying out a work process management method for a building or the like at a construction site according to the present invention, and 2 denotes a work process management device. A master unit, which constitutes one of the devices 1 and is installed at a predetermined location in a building where a contractor who performs work management at a predetermined construction site, is shown.

【0021】尚、上記親機2には、予め建設を行う建設
物等の仕掛から完成までの全作業又は/及び部分作業の
作業計画工程データ(矢印A)と、該作業計画工程デー
タにおける仮設工事、鳶職、左官、大工、電気工事、運
送、配送等の各受持分担作業を個々の受持分担作業デー
タ(矢印B)と、前記各受持分担作業内での各作業工程
を個々の作業工程データ(矢印C)として管理する中央
処理装置2aと、各データを一括表示又は/及び部分表示
可能なモニター2bが設けられてなる。
The master unit 2 includes work planning process data (arrow A) for all or partial works from the work in progress to completion of a construction or the like to be constructed in advance, and temporary setting data in the work planning process data. Each of the sharing work such as construction, eavesdropper, plasterer, carpenter, electric work, transportation, delivery, etc., is shown in individual sharing work data (arrow B), and each work process in each of the above sharing work is described individually. A central processing unit 2a that manages the work process data (arrow C) and a monitor 2b that can collectively display and / or partially display each data are provided.

【0022】3は前記装置1の他方を構成すると共に、
前記親機2の管理する受持分担作業データ(矢印B)が
付された建設物等の建設に従事する仮設工事、鳶職、左
官、大工、電気工事、運送、配送等の各受持分担作業を
行う各業者毎に管理される複数の子機を示し、且つ該各
子機3は全て通信回線等によって前記親機2と双方向通
信可能に設けられてなる。
3 constitutes the other of the device 1 and
Employment and sharing work data managed by the master unit 2 (arrow B). Employment and construction work, such as temporary work, plasterer, plasterer, carpenter, electrical work, transportation, delivery, etc. And a plurality of slave units managed by each of the vendors, and all the slave units 3 are provided so as to be capable of two-way communication with the master unit 2 through a communication line or the like.

【0023】尚、上記各子機3には、前記親機2によっ
て管理されてなる作業計画工程データ(矢印A)を通信
回線等を介して表示する作業計画工程データ表示部3c
と、前記受持分担作業データが付された各受持分担作業
内での各作業工程の作業工程データ(矢印C)を通信回
線等を介して表示する作業工程データ表示部3bと、各受
持分担作業又は各受持分担作業内での各作業工程の少な
くとも何れか一方の進捗状況、例えば、具体的な作業に
ついて現時点で着手前か着手済か、又何処までの作業の
途中か、所定の作業は終了したか等を各種の進捗データ
として管理する進捗データ管理装置(図示せず)と、選
択によって前記親機2へ進捗データ(矢印D)を送るた
めの各種のデータ選択キー3aが設けられてなる。
Each of the slave units 3 has a work planning step data display section 3c for displaying the work planning step data (arrow A) managed by the master unit 2 via a communication line or the like.
A work process data display section 3b for displaying, via a communication line, work process data (arrow C) of each work process in each share work to which the share work data is attached, The progress status of at least one of the share work and each work process in each share work, for example, whether the specific work has been started or has been started at this time, how far the work is in progress, A progress data management device (not shown) that manages whether or not the work has been completed as various progress data, and various data selection keys 3a for sending progress data (arrow D) to the master unit 2 by selection. It is provided.

【0024】4は前記親機2に設けられ、且つ前記所定
の子機3から送られてきた進捗データ(矢印D)と前記
全作業計画工程データ又は部分作業計画工程データの少
なくとも何れか一方とを比較し、必要に応じて予め設定
された作業計画工程データの各受持分担作業データの順
番又は各受持分担作業内での各作業工程データの順番を
入れ替え調整する作業順番調整装置4を示す。
Reference numeral 4 denotes the progress data (arrow D) provided in the master unit 2 and sent from the predetermined slave unit 3 and at least one of the total work planning process data and the partial work planning process data. A work order adjusting device 4 that compares and adjusts the order of each work share data of the work plan process data set in advance or the order of each work process data within each share work as needed. Show.

【0025】尚、前記全ての子機3は、上記作業順番調
整装置4に送られてきた進捗データ(矢印D)又は該進
捗データを基に入れ替え調整された各受持分担作業デー
タの順番又は入れ替え調整された各受持分担作業内での
各作業工程データの順番を通信回線等を介してリアルタ
イムに確認可能な機能を有してなる。
It is to be noted that all of the slave units 3 are provided with the progress data (arrow D) sent to the work order adjusting device 4 or the order of the respective shared work data adjusted based on the progress data. It has a function capable of confirming, in real time, the order of each work process data in each of the exchanged shared work which has been adjusted through a communication line or the like.

【0026】本発明の第一実施形態における建設現場等
における建設物等の作業工程管理装置は以上の構成から
なるが、次に係る装置を用いて建設物等の作業工程を管
理する場合について説明する。
The work process management apparatus for a construction or the like at a construction site or the like in the first embodiment of the present invention has the above-described configuration. A case where the work process for a construction or the like is managed using the following apparatus will be described. I do.

【0027】先ず、前記作業工程管理装置1の親機2に
は、所定の子機3から送られてきた進捗データと前記全
作業計画工程データ又は部分作業計画工程データの少な
くとも何れか一方とを比較し、必要に応じて予め設定さ
れた作業計画工程データの各受持分担作業データの順番
又は各受持分担作業内での各作業工程データの順番を入
れ替え調整する作業順番調整装置4が設けられてなるこ
とから、図2に示す様に、例えば、所定の子機3から送
られてきた受持分担作業データ(B−3,B−4)の作
業工程データ(3−a,3−b,4−a)の進捗データ
が前記作業計画工程データと比べ作業遅れが生じている
場合には、前記作業順番調整装置4が自動的に予め設定
された作業計画工程データ(矢印A)の中の受持分担作
業データ(B−3,B−4)の作業工程データ(3−
a,3−b,4−a)と、作業順序が入れ替わっても支
障の全くない所定の受持分担作業データ(B−5,B−
6)の作業工程データ(5−a,5−b,6−a,6−
b)とを入れ替え調整することになる。
First, the master machine 2 of the work process management device 1 stores the progress data sent from the predetermined slave machine 3 and at least one of the total work plan process data and the partial work plan process data. A work order adjustment device 4 is provided for comparing and, if necessary, changing the order of each work share data of the work plan process data set in advance or the order of each work process data in each work share work. As shown in FIG. 2, for example, as shown in FIG. 2, the work process data (3-a, 3-3) of the shared work data (B-3, B-4) sent from the predetermined slave unit 3 is obtained. If the progress data of b, 4-a) has a work delay compared to the work plan process data, the work order adjustment device 4 automatically sets the work plan process data (arrow A) of the preset work plan process data. Of share work data (B-3) B-4) of the work process data (3-
a, 3-b, 4-a) and predetermined shared work data (B-5, B-
6) work process data (5-a, 5-b, 6-a, 6-
b) is replaced and adjusted.

【0028】尚、上記全ての子機3は、作業順番調整装
置4に送られてきた進捗データ又は該進捗データを基に
入れ替え調整された各受持分担作業データの順番又は入
れ替え調整された各受持分担作業内での各作業工程デー
タの順番をリアルタイムに確認可能なことから、各建設
現場等の正確な各受持分担作業の進捗状況をリアルタイ
ムに各受持分担作業に従事する各業者に促すことにより
各業者側でより正確な受持分担作業日時の最終調整や準
備作業等の実行日時等の各判断を適格に行うことが出来
る利点がある。
In addition, all of the above-mentioned slave units 3 perform the order of the progress data sent to the work order adjusting device 4 or the respective shared work data exchanged and adjusted based on the progress data or each of the exchanged work data. Since the order of each work process data in the shared work can be confirmed in real time, the exact progress of each shared work at each construction site etc. can be confirmed in real time by each contractor engaged in each shared work There is an advantage that each of the traders can appropriately perform each determination such as the final adjustment of the date and time of the work to be shared and the execution date and time of the preparation work and the like.

【0029】更に、上記装置1によれば、各受持分担作
業に何らかの問題が生じて作業計画通りに各受持分担作
業が行われていない場合であっても、予め設定された作
業計画工程と実際の作業の進捗状況とを常に比較して進
捗状況に準じた最も作業効率の良い各受持分担作業を前
記作業計画工程を基に入れ替えて各受持分担作業に従事
する各業者にリアルタイムに促すことで、各業者側でよ
り正確な受持分担作業日時の最終調整や準備作業等の実
行日時等の各判断を適格に行うことが可能となり、しい
ては建設現場等における各業者の各受持分担作業を実際
の作業の進捗状況に準じてよりスムーズに遂行させるこ
とが出来る利点がある。
Further, according to the above-mentioned apparatus 1, even if a problem occurs in each of the sharing work and the respective sharing work is not performed according to the work plan, the work planning process set in advance can be performed. And the actual work progress is constantly compared, and each of the shared work with the highest working efficiency according to the progress is replaced based on the work planning process, and each contractor engaged in each shared work is notified in real time. It is possible for each contractor to make more accurate decisions on the final adjustment of the date and time of the work to be shared and the date and time of execution of preparation work, etc. There is an advantage that each sharing work can be performed more smoothly according to the progress of the actual work.

【0030】更に、上記装置1の一方と他方を構成する
親機2と子機3が、双方向通信可能なことから、必要に
応じて所定の各受持分担作業に従事してなる子機3より
作業順番調整装置4に送られてきた進捗データ又は該進
捗データを基に入れ替え調整された各受持分担作業の順
番又は入れ替え調整された各受持分担作業内での各作業
工程の順番等の情報データを親機2から次の各受持分担
作業に従事する業者の子機3へと24時間何時でも確実に
送ったり、又前記情報データを必要に応じて何れの子機
3側からでも24時間何時でも瞬時に取り出して確認する
ことが出来、よって特に一日の中で複数箇所の作業現場
を持回りで移動する様な業者にとって大なる利点があ
る。
Further, since the master unit 2 and the slave unit 3 constituting one and the other of the above-mentioned apparatus 1 can perform two-way communication, the slave unit is engaged in a predetermined sharing work as required. 3 is the progress data sent to the work order adjusting device 4, or the order of the respective shared work that is replaced and adjusted based on the progress data, or the order of each work process in the respective shared work that is replaced and adjusted. Etc. from the master unit 2 to the slave unit 3 of the contractor engaged in each of the following sharing and sharing work 24 hours without fail, and the information data can be sent to any slave unit 3 if necessary. Can be instantly taken out and checked 24 hours a day, so there is a great advantage especially for those who move around multiple work sites in a day.

【0031】<第二実施形態>更に、図3に示す様に、
作業工程管理装置1に、作業計画工程データにおける各
受持分担作業又は該各受持分担作業内の各作業工程の少
なくとも何れか一方に従事すべく選出された各業者の管
理する子機3の夫々に対応して所定の作業予約コード
(図示せず)又は作業予約データ(図示せず)を設定す
る作業予約設定装置5と、作業予約コード又は作業予約
データが設定された各受持分担作業又は該各受持分担作
業内の各作業工程の内容の変更や取消等の各種緊急情報
データ(矢印E)を前記子機3又は親機2の少なくとも
何れか一方より受付けて、該作業予約コード又は作業予
約データが設定された各受持分担作業又は該各受持分担
作業内の各作業工程の内容の変更や取消等を行う作業内
容変更装置6と、各受持分担作業又は該各受持分担作業
内の各作業工程の内容に何らかの変更が生じた場合に、
前記親機2又は子機3へと内容変更が生じた作業予約コ
ード又は作業予約データの少なくとも何れか一方を発し
て告知する告知装置7とが設けられていてもよい。
<Second Embodiment> Further, as shown in FIG.
In the work process management device 1, the slave unit 3 managed by each of the contractors selected to engage in at least one of the respective share work in the work plan process data or each work process in the respective share work is included. A work reservation setting device 5 for setting a predetermined work reservation code (not shown) or work reservation data (not shown) corresponding to each of them, and each shared work set with the work reservation code or work reservation data Alternatively, various emergency information data (arrow E), such as a change or cancellation of the content of each work process in each of the shared work, is received from at least one of the slave unit 3 and the master unit 2 and the work reservation code is received. Alternatively, a work content changing device 6 for changing or canceling the content of each of the shared work or each work process in each of the shared work in which the work reservation data is set, and each of the shared work or each of the received work. Of each work process in the equity work If any change has occurred in the,
A notification device 7 for issuing and notifying at least one of the work reservation code and the work reservation data whose contents have changed to the master unit 2 or the slave unit 3 may be provided.

【0032】よって、この場合には、例えば各受持分担
作業又は該各受持分担作業内の各作業工程において予め
使用されるべく設定された建設部材等のコスト面等を考
慮しての使用部材等の種類変更のみならず建設物等に予
期せぬ設計変更や仕様変更等が生じた場合であっても、
各受持分担作業又は該各受持分担作業内の各作業工程の
内容の変更や取消等を、関連する各業者に告知すべく大
手総合建設会社や建設総合請負業者のもとに呼び集めて
説明する等の煩雑な作業を一切行うことなく、大手総合
建設会社や建設総合請負業者等が管理する親機2から関
連する各業者にて管理されてなる子機3へ又は該子機3
から親機2へと何時でも簡単に、且つ瞬時に各受持分担
作業又は該各受持分担作業内の各作業工程の内容の変更
や取消等を明確に告知して変更内容等の告知における時
間ロスを大幅に低減することが出来る利点がある。
Accordingly, in this case, for example, the use of the construction members and the like set in advance to be used in each sharing work or each work process in the sharing work in consideration of the cost and the like. Not only in case of unexpected change of design or specification of construction etc.
Call the major general construction company or general contractor to notify the relevant contractors of any changes or cancellations in the contents of each share work or each work process in each share work. Without performing any complicated work such as explanation, from the master unit 2 managed by a major general construction company or a general construction contractor to the slave unit 3 managed by each related company or the slave unit 3
At any time, easily and instantly to the master unit 2 from the operator to clearly notify the change or cancellation of the contents of each share work or each work process in each share work, and to notify the change contents etc. There is an advantage that time loss can be greatly reduced.

【0033】<第三実施形態>更に、図4(イ)に示す
様に、親機2が所定の地域等に分散して設けられ、且つ
該各親機2にて管理されてなる各データの全てが所定の
地域等に設けられた中央データ管理装置8によって集中
管理され、しかも該中央データ管理装置8と各親機2が
双方向通信可能に設けられていてもよい。
<Third Embodiment> Further, as shown in FIG. 4 (a), the master unit 2 is distributed in a predetermined area or the like, and each data managed by each master unit 2 is provided. May be centrally managed by a central data management device 8 provided in a predetermined area or the like, and the central data management device 8 and each master unit 2 may be provided so as to be capable of two-way communication.

【0034】よって、この場合には、各親機2によって
各地域や各地方等毎における複数箇所の建設現場を広域
に管理することが出来るだけでなく、各建設現場の進捗
状況を中央データ管理装置8にて確実に把握すると共
に、各建設現場毎の各受持分担作業又は該各受持分担作
業内の各作業工程において使用された建設部材等の各種
データを全て蓄積管理して、今後の建設物等の受注時に
おける仕様や見積り等の参考データに即時使用すること
が出来るだけでなく、中央データ管理装置8側からでも
各親機2を介して使用部材等の種類変更や建設物等の設
計変更、仕様変更等を関連する各業者にて管理されてな
る子機3へと発して何時でも簡単に、且つ瞬時に告知す
ることが出来る利点がある。
Therefore, in this case, not only can each master unit 2 manage a plurality of construction sites in each region or each region in a wide area, but also the progress status of each construction site can be centrally managed. The device 8 reliably grasps and collects and manages all data such as construction members used in each work share in each construction site or each work process in each work share, Not only can it be used immediately for reference data such as specifications and estimates at the time of receiving orders for constructions, etc., but also from the central data management device 8 side, the type of used members etc. can be changed via There is an advantage that a design change, a specification change, and the like can be issued to the slave unit 3 managed by each related company and the notification can be made easily and instantly at any time.

【0035】更に、図4(ロ)に示す様に、親機2又は
中央データ管理装置8の少なくとも何れか一方に、作業
計画工程データの内容を書き替え可能な計画工程データ
書き替え装置9が設けられていてもよく、この場合に
は、親機2側からでも又中央データ管理装置8側からで
も予め設定された作業計画工程データの内容を瞬時に、
且つ確実に書き替えて関連する夫々の子機3を管理する
各業者に伝えることが出来る利点がある。
Further, as shown in FIG. 4B, a planned process data rewriting device 9 capable of rewriting the contents of the work planning process data is provided in at least one of the master unit 2 and the central data management device 8. In this case, the contents of the work plan process data set in advance can be instantaneously received from the master device 2 side or the central data management device 8 side.
In addition, there is an advantage that the information can be surely rewritten and transmitted to the respective companies that manage the related slave units 3.

【0036】<第四実施形態>更に、図5に示す様に、
親機2又は中央データ管理装置8の少なくとも何れか一
方に、所定の子機3から送られてきた進捗データを基に
建設物等の組み上げ状態の仮想画像を作成する自動画像
作成装置10が設けられていてもよく、この場合には、各
地域や各地方等毎における複数箇所の建設現場における
建築物等の現在の状態を誰でも簡単に、しかもリアルに
確認することが可能となり、よって進捗状況の詳細をよ
り正確に把握することが出来る利点がある。
<Fourth Embodiment> Further, as shown in FIG.
At least one of the master device 2 and the central data management device 8 is provided with an automatic image creation device 10 for creating a virtual image of an assembled state of a building or the like based on progress data sent from a predetermined slave device 3. In this case, it is possible for anyone to easily and realistically check the current state of the building at multiple construction sites in each region and each region. There is an advantage that the details of the situation can be grasped more accurately.

【0037】<第五実施形態>更に、上記各実施形態に
於いて、子機3と親機2又は親機2と中央データ管理装
置8は、通信回線等によって双方向通信可能に設けられ
てなるが、各子機3が互いに双方向通信可能(図示せ
ず)に設けられていてもよく、この場合には、親機2に
何らかのアクシデントが発生したり、又回線使用等によ
って、該親機2とのアクセスが希望する時間等に行うこ
とが出来ない事態が生じた場合であっても、関係する受
持分担作業に従事する業者の子機3より現在の進捗状況
を知ることが出来、よって親機2の作業順番調整装置4
を介することなく、次の各受持分担作業の日時等の予想
を各子機3を有した夫々の業者側で立てることが出来る
利点がある。
<Fifth Embodiment> In each of the above embodiments, the slave unit 3 and the master unit 2 or the master unit 2 and the central data management device 8 are provided so as to be capable of two-way communication by a communication line or the like. However, each of the slave units 3 may be provided so as to be capable of two-way communication with each other (not shown). In this case, the master unit 2 generates some kind of accident, Even if a situation occurs in which access to the machine 2 cannot be performed at a desired time, etc., it is possible to know the current progress status from the slave unit 3 of the contractor engaged in the related sharing work. Therefore, the work order adjusting device 4 of the master unit 2
This has the advantage that each trader having each slave unit 3 can make an estimate of the date and time of the next share-sharing work without going through.

【0038】<第六実施形態>更に、上記各実施形態に
於いて、通信回線等は有線式で開示されてなるが、必ず
しも有線式に限定されるものではなく、図6(イ)に示
す様に、各子機3と親機2又は親機2と中央データ管理
装置8とが夫々に設けられた空中線(3dと2c又は2cと8
a)による電磁波等を用いた無線式の通信回線等を介し
て通信可能に設けられていてもよく、又通信回線等が無
線式及び有線式の混在すべく信回線等であってもよく、
更に、同図(ロ)に示す様に、中央データ管理装置8と
計画工程データ書き替え装置9が夫々に設けられた空中
線(8aと9a)による電磁波等を用いた無線式で双方向通
信可能に設けられた構成であってもよく、又、計画工程
データ書き替え装置9と子機3が電磁波等を用いた無線
式で双方向通信可能(図示せず)に設けられた構成であ
ってもよく、本発明における通信手段の具体的な構成も
決して限定されないのは言うまでもない。
<Sixth Embodiment> Further, in each of the above embodiments, the communication line and the like are disclosed in a wired manner, but are not necessarily limited to the wired one, and are shown in FIG. Similarly, an antenna (3d and 2c or 2c and 8c) in which each of the slave units 3 and the master unit 2 or the master unit 2 and the central data management device 8 are provided respectively.
a) may be provided so as to be able to communicate via a wireless communication line or the like using electromagnetic waves or the like according to a), or the communication line or the like may be a communication line or the like so that both wireless and wired communication lines are mixed;
Further, as shown in FIG. 2 (b), the central data management device 8 and the planned process data rewriting device 9 are capable of wireless two-way communication using electromagnetic waves and the like by antennas (8a and 9a) provided respectively. Or the configuration in which the planned process data rewriting device 9 and the slave unit 3 are provided so as to be capable of wireless two-way communication using electromagnetic waves or the like (not shown). Needless to say, the specific configuration of the communication means in the present invention is not limited at all.

【0039】尚、上記各実施形態に於いて、各子機は予
め各受持分担作業に従事する各業者毎に管理されてなる
が、該子機が携帯可能で、しかも一般電話回線や所定波
長等の電磁波を用いて親機又は他の子機等と通信可能に
設けられていてもよく、この場合には、建設現場から直
接、且つ迅速に各種の進捗状況を親機又は他の子機等に
リアルタイムに発することが出来る利点があるが、必ず
しも必須の要件ではなく、各子機が各業者の本社社屋内
や営業所等内の建設物内に固定されて設置されていても
よく、又各業者が携帯する携帯機又は各業者が移動する
ための移動手段としての車等に装着された移動端末機と
前記の如く各業者の本社社屋内や営業所等内の建設物内
に固定された子機とが通信可能で、しかも該子機と前記
親機が通信可能な構成であってもよい。
In each of the above-described embodiments, each slave unit is managed in advance by each contractor engaged in each share-sharing operation. It may be provided so as to be able to communicate with the master unit or another slave unit or the like using electromagnetic waves such as wavelengths. In this case, the progress status of the master unit or other slave units can be immediately and directly monitored from the construction site. Although there is an advantage that it can be issued to the machine in real time, it is not necessarily an essential requirement, and each slave unit may be fixedly installed in the building inside the headquarters company office or business office of each contractor. In addition, a portable terminal carried by each trader or a mobile terminal attached to a car or the like as a means of movement for each trader and a building inside the headquarters company room or business office of each trader as described above. The fixed slave can communicate with the slave, and the slave and the master can communicate with each other. And it may be formed.

【0040】更に、上記各実施形態に於いて、作業工程
管理装置は、先ず各業者毎に管理された子機より各種進
捗データを親機へ発し、その後該親機で全作業計画工程
データ又は部分作業計画工程データの少なくとも何れか
一方と前記各種進捗データを比較し、必要に応じて予め
設定された作業計画工程データにおける各受持分担作業
の夫々に設定された各受持分担作業データの順番又は各
受持分担作業内での各作業工程の夫々に設定された各作
業工程データの順番を入れ替え調整し、その後前記進捗
データの内容又は該進捗データを基に入れ替え調整され
た各受持分担作業データの順番又は入れ替え調整された
各受持分担作業内での各作業工程データの順番を前記子
機を介してリアルタイムで確認可能な方法で用いられる
が、例えば、作業工程管理装置が、予め親機より建設物
等の各受持分担作業に従事する各業者毎に管理された子
機へと全作業計画工程データ、或いは部分作業計画工程
データ、或いは受持分担作業データ、或いは作業工程デ
ータを発し、その後該データを確認後、前記子機より建
設物等の各受持分担作業又は各受持分担作業内での各作
業工程の少なくとも何れか一方の各種進捗データを親機
へと発し、その後親機で各種進捗データ全作業計画工程
データ又は部分作業計画工程データの少なくとも何れか
一方とを比較し、必要に応じて予め設定された作業計画
工程データにおける各受持分担作業の夫々に設定された
各受持分担作業データの順番又は各受持分担作業内での
各作業工程の夫々に設定された各作業工程データの順番
を入れ替え調整し、その後前記進捗データの内容又は該
進捗データを基に入れ替え調整された各受持分担作業デ
ータの順番又は入れ替え調整された各受持分担作業内で
の各作業工程データの順番を前記子機を介してリアルタ
イムで確認可能な方法で用いてもよく、特に後者の様な
方法で用いたならば、各業者が親機へアクセスせずとも
常に親機から全作業計画工程データ、或いは部分作業計
画工程データ、或いは受持分担作業データ、或いは作業
工程データを発することが出来、よって各業者が多忙の
場合であっても必ず子機へ各データを強制的に表示した
り又告知してより円滑な段取作業が可能な様に各業者に
確認させて各データの見逃しや忘れのない工程管理シス
テムを構築することが出来る利点がある。
Further, in each of the above-mentioned embodiments, the work process management device first issues various progress data from the slave units managed for each contractor to the master unit, and thereafter, the work schedule management unit or the entire work plan process data or At least one of the partial work planning process data and the various progress data are compared, and if necessary, each of the sharing work data set for each of the sharing work in the work planning process data set in advance is used. The order or the order of each work process data set in each work process in each share work is exchanged and adjusted, and then the contents of the progress data or each of the receipts adjusted based on the progress data are adjusted. The order of the shared work data or the order of each work process data in each of the shared work that has been exchanged and adjusted is used in a manner that can be confirmed in real time via the slave unit. The schedule management device transfers all work planning process data, partial work planning process data, or sharing work to sub-units managed by each contractor who is engaged in each sharing work such as construction from the master machine in advance. Data or work process data is issued, and after confirming the data, various progress data of at least one of each work sharing work of each building or each work process in each work sharing work from the slave unit. To the master machine, and then the master machine compares various progress data with at least one of the whole work plan process data and the partial work plan process data, and receives each of the received work plan work data in the preset work plan process data as necessary. The order of each of the shared work data set for each of the shared work or the order of each work process data set for each of the work processes in each shared work is adjusted and the progress is then adjusted. The order of each of the shared work data exchanged and adjusted based on the contents of the data or the progress data or the order of each work process data within each of the exchanged shared work that has been adjusted in real time via the slave unit. It may be used in a method that can be confirmed in the above, especially if used in the latter way, each contractor does not always have access to the parent machine, always from the parent machine all work planning process data, or partial work planning process data, Alternatively, it is possible to issue the work data or the work process data, so that even when each contractor is busy, the data is forcibly displayed and notified to the slave unit, and the setup is smoother. There is an advantage that it is possible to construct a process management system that allows each contractor to check the data so that the work can be performed, and that does not overlook or forget each data.

【0041】[0041]

【発明の効果】叙上の様に、本発明の建設現場等におけ
る建設物等の作業工程管理方法によれば、各建設現場等
の正確な各受持分担作業の進捗状況をリアルタイムに各
受持分担作業に従事する各業者に促すことにより、各業
者側でより正確な受持分担作業日時の最終調整や準備作
業等の実行日時等の各判断を適格に行うことが出来る効
果がある。
As described above, according to the work process management method for constructions and the like at construction sites and the like of the present invention, the progress of each sharing work at each construction site and the like is accurately monitored in real time. By prompting each contractor engaged in the sharing work, there is an effect that each trader can appropriately perform each determination such as the final adjustment of the date and time of the sharing work and the execution date and time of the preparation work.

【0042】従って、前記方法を実施する装置によれ
ば、各受持分担作業に何らかの問題が生じて作業計画通
りに各受持分担作業が行われていない場合であっても、
予め設定された作業計画工程と実際の作業の進捗状況と
を常に比較して進捗状況に準じた最も作業効率の良い各
受持分担作業を前記作業計画工程を基に入れ替えて各受
持分担作業に従事する各業者にリアルタイムに促すこと
で各業者側でより正確な受持分担作業日時の最終調整や
準備作業等の実行日時等の各判断を適格に行うことが可
能となり、しいては建設現場等における各業者の各受持
分担作業を実際の作業の進捗状況に準じてよりスムーズ
に遂行させることが出来るという極めて優れた建設現場
等における建設物等の作業工程管理装置を提供すること
が出来るという格別な効果を有するに至った。
Therefore, according to the apparatus for carrying out the above method, even if there is a problem in each of the sharing work and the respective sharing work is not performed according to the work plan,
By comparing the preset work planning process and the actual work progress at all times, each of the shared work with the highest work efficiency according to the progress is replaced based on the work planning process, and each shared work is changed. By prompting each of the contractors involved in the project in real time, it is possible for each contractor to make more accurate decisions on the final adjustment of the date and time of the sharing work and the date and time of execution of the preparation work, etc. It is possible to provide an extremely excellent work process management device for a construction or the like in a construction site or the like, in which each of the contractors' shared work at the site or the like can be smoothly performed in accordance with the progress of the actual work. It has a special effect of being able to do it.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の建設現場等における建設物等の作業工
程管理方法の実施形態である作業工程管理装置を示し、
同図(イ)は装置全体の構成図、同図(ロ)は親機の構
成図。
FIG. 1 shows a work process management apparatus which is an embodiment of a work process management method for a building or the like at a construction site or the like according to the present invention;
FIG. 2A is a configuration diagram of the entire apparatus, and FIG.

【図2】本発明の建設現場等における建設物等の作業工
程管理装置の作動時の状態を示す構成図。
FIG. 2 is a configuration diagram showing a state at the time of operation of a work process management device for a construction or the like at a construction site or the like according to the present invention.

【図3】本発明の建設現場等における建設物等の作業工
程管理装置の他の実施形態を示す構成図。
FIG. 3 is a configuration diagram showing another embodiment of a work process management apparatus for a construction or the like at a construction site or the like according to the present invention.

【図4】本発明の建設現場等における建設物等の作業工
程管理装置の他の実施形態を示し、同図(イ),(ロ)
は構成図。
FIGS. 4A and 4B show another embodiment of a work process management apparatus for a construction or the like in a construction site or the like according to the present invention.
Is a configuration diagram.

【図5】本発明の建設現場等における建設物等の作業工
程管理装置の他の実施形態を示す構成図。
FIG. 5 is a configuration diagram showing another embodiment of the work process management apparatus for a construction or the like at a construction site or the like according to the present invention.

【図6】本発明の建設現場等における建設物等の作業工
程管理装置の他の実施形態を示し、同図(イ),(ロ)
は構成図。
FIGS. 6A and 6B show another embodiment of a work process management apparatus for a construction object or the like at a construction site or the like according to the present invention.
Is a configuration diagram.

【符号の説明】[Explanation of symbols]

1…作業工程管理装置 2…親機 3…子機 3b…作業工程データ表示部 3c…作業計画工程データ表示部 4…作業順番調整装置 5…作業予約設定装置 6…作業内容変更装置 7…告知装置 8…中央データ管理装置 9…計画工程データ書き替え装置 DESCRIPTION OF SYMBOLS 1 ... Work process management device 2 ... Master machine 3 ... Slave machine 3b ... Work process data display part 3c ... Work plan process data display part 4 ... Work order adjustment device 5 ... Work reservation setting device 6 ... Work content change device 7 ... Notification Device 8: Central data management device 9: Planned process data rewriting device

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 建設物等の各受持分担作業に従事する各
業者毎に管理された複数の子機(3) 又は所定の子機(3)
より建設物等の各受持分担作業又は各受持分担作業内で
の各作業工程の少なくとも何れか一方の各種進捗データ
を親機(2) へと発し、その後該親機(2) に予め管理され
てなる建設物等の仕掛から完成までの全作業計画工程デ
ータ又は部分作業計画工程データの少なくとも何れか一
方と前記各種進捗データを比較し、必要に応じて予め設
定された作業計画工程データにおける各受持分担作業の
夫々に設定された各受持分担作業データの順番又は各受
持分担作業内での各作業工程の夫々に設定された各作業
工程データの順番を入れ替え調整し、その後前記進捗デ
ータの内容又は該進捗データを基に入れ替え調整された
各受持分担作業データの順番又は入れ替え調整された各
受持分担作業内での各作業工程データの順番を前記復数
の子機(3) の全て又は所定の子機(3) を介してリアルタ
イムで確認可能な建設現場等における建設物等の作業工
程管理方法。
A plurality of sub-units (3) or predetermined sub-units (3) managed for each contractor engaged in each share-sharing work of a building or the like.
The progress data of at least one of each shareable work of the building and the like or each work process in each shareable work is transmitted to the master unit (2), and then the master unit (2) transmits the progress data to the master unit (2) in advance Comparing the various progress data with at least one of the entire work plan process data or the partial work plan process data from the work in process to the completion of the managed construction, and the work plan process data set in advance as necessary The order of each share work data set for each of the share work in each or the order of each work process data set for each work process in each share work is adjusted and then The content of the progress data or the order of the respective shared work data exchanged and adjusted based on the progress data or the order of each work process data in each of the exchanged shared work that has been adjusted is changed to the slave unit (3 All) or Working process management method, such as construction material in the identifiable construction site or the like in real time through the constant of handset (3).
【請求項2】 建設物等の仕掛から完成までの全作業計
画工程データ又は部分作業計画工程データの少なくとも
何れか一方と、該作業計画工程データにおける仮設工
事、鳶職、左官、大工、電気工事、運送、配送等の各受
持分担作業を個々の受持分担作業データとして記憶する
と共に、前記各受持分担作業内での各作業工程を個々の
作業工程データとして管理してなる親機(2) より予め建
設物等の各受持分担作業に従事する各業者毎に管理され
た複数の子機(3) の全て又は所定の子機(3) へと全作業
計画工程データ、或いは部分作業計画工程データ、或い
は受持分担作業データ、或いは作業工程データを発し、
その後該データを受けた複数の子機(3) の全て又は所定
の子機(3) より建設物等の各受持分担作業又は各受持分
担作業内での各作業工程の少なくとも何れか一方の各種
進捗データを親機(2)へと発し、その後各種進捗データ
と前記全作業計画工程データ又は部分作業計画工程デー
タの少なくとも何れか一方とを比較し、必要に応じて予
め設定された作業計画工程データにおける各受持分担作
業の夫々に設定された各受持分担作業データの順番又は
各受持分担作業内での各作業工程の夫々に設定された各
作業工程データの順番を入れ替え調整し、その後前記進
捗データの内容又は該進捗データを基に入れ替え調整さ
れた各受持分担作業データの順番又は入れ替え調整され
た各受持分担作業内での各作業工程データの順番を前記
復数の子機(3) の全て又は所定の子機(3) を介してリア
ルタイムで確認可能な建設現場等における建設物等の作
業工程管理方法。
2. At least one of the whole work plan process data or the partial work plan process data from the work in process to the completion of a construction or the like, and a temporary work, a hoodie, a plasterer, a carpenter, an electric work, etc. in the work plan process data. The parent machine (2) stores each share work such as transportation and delivery as individual share work data and manages each work process in each share work as individual work process data. ) All work planning process data or partial work to all or predetermined slave units (3) managed in advance by each contractor engaged in each sharing work such as construction Emit planned process data, or shared work data, or work process data,
After that, at least one of all of the plurality of slave units (3) that have received the data or predetermined share units (3) and / or each work sharing work for each building or the like in each share sharing work. The various progress data is sent to the parent machine (2), and thereafter, the various progress data is compared with at least one of the entire work plan process data or the partial work plan process data, and the work set in advance as necessary. Swap and adjust the order of each work share data set for each share work in the planned work data or the order of each work process data set for each work process within each share work. Then, the content of the progress data or the order of the respective shared work data exchanged and adjusted based on the progress data or the order of each work process data in each of the exchanged shared work that has been adjusted is changed to the child number. Machine (3) Working process management method for a construction or the like in the construction site or the like can be confirmed in real time via a predetermined handset (3).
【請求項3】 建設を行う建設物等の仕掛から完成まで
の全作業計画工程データ又は部分作業計画工程データの
少なくとも何れか一方と、該作業計画工程データにおけ
る仮設工事、鳶職、左官、大工、電気工事、運送、配送
等の各受持分担作業を個々の受持分担作業データとして
記憶すると共に、前記各受持分担作業内での各作業工程
を個々の作業工程データとして管理する親機(2) と、前
記各受持分担作業に従事する各業者毎に管理され、且つ
該各受持分担作業又は各受持分担作業内での各作業工程
の少なくとも何れか一方の進捗状況を各種の進捗データ
として管理する複数の子機(3) とからなり、しかも前記
親機(2) には所定の子機(3) から送られてきた進捗デー
タと前記全作業計画工程データ又は部分作業計画工程デ
ータの少なくとも何れか一方とを比較し、必要に応じて
予め設定された作業計画工程データの各受持分担作業デ
ータの順番又は各受持分担作業内での各作業工程データ
の順番を入れ替え調整する作業順番調整装置(4) が設け
られてなり、しかも前記全ての子機(3) 又は所定の子機
(3) が、該作業順番調整装置(4) に送られてきた進捗デ
ータの内容又は該進捗データを基に入れ替え調整された
各受持分担作業データの順番又は入れ替え調整された各
受持分担作業内での各作業工程データの順番をリアルタ
イムに確認可能な構成にしてなることを特徴とする建設
現場等における建設物等の作業工程管理装置。
3. At least one of the whole work plan process data or the partial work plan process data from the work in process to the completion of the construction or the like to be constructed, and the temporary work, looter, plasterer, carpenter, A master unit that stores each of the shared work such as electrical work, transportation, and delivery as individual shared work data, and manages each work process in the shared work as individual work process data. 2) and the progress status of at least one of each of the sharing work or each work process in each of the sharing work is managed by each contractor engaged in each of the sharing work. The master unit (2) includes a plurality of slave units (3) managed as progress data, and the master unit (2) includes progress data sent from a predetermined slave unit (3) and the entire work plan process data or partial work plan. At least one of process data Work order adjustment device that compares the order of each work share data of the work plan process data set in advance or the order of each work process data within each share work to be set as necessary. (4), and all of the above-mentioned slave units (3) or predetermined slave units
(3) is the content of the progress data sent to the work order adjusting device (4), or the order of the ownership work data that has been replaced and adjusted based on the progress data, or the ownership share that has been replaced and adjusted. A work process management device for a building or the like at a construction site or the like, wherein the order of each work process data in the work can be confirmed in real time.
【請求項4】 前記親機(2) と子機(3) が、双方向通信
可能な構成にしてなることを特徴とする請求項3記載の
建設現場等における建設物等の作業工程管理装置。
4. The work process management apparatus for a construction or the like in a construction site or the like according to claim 3, wherein the master unit (2) and the slave unit (3) are configured to be capable of two-way communication. .
【請求項5】 前記各子機(3) が互いに双方向通信可能
な構成にしてなることを特徴とする請求項3又は4記載
の建設現場等における建設物等の作業工程管理装置。
5. The work process management apparatus for a construction or the like at a construction site or the like according to claim 3, wherein the slave units (3) are configured to be capable of two-way communication with each other.
【請求項6】 作業工程管理装置には、作業計画工程デ
ータにおける各受持分担作業又は該各受持分担作業内の
各作業工程の少なくとも何れか一方に従事すべく選出さ
れた各業者の管理する子機(3) の夫々に対応して所定の
作業予約コード又は作業予約データを設定する作業予約
設定装置(5) と、作業予約コード又は作業予約データが
設定された各受持分担作業又は該各受持分担作業内の各
作業工程の内容の変更や取消等の各種緊急情報データを
前記子機(3) 又は親機(2) より受付けて、該作業予約コ
ード又は作業予約データが設定された各受持分担作業又
は該各受持分担作業内の各作業工程の内容の変更や取消
等を行う作業内容変更装置(6) と、各受持分担作業又は
該各受持分担作業内の各作業工程の内容に何らかの変更
が生じた場合に、前記親機(2) 又は子機(3) へと内容変
更が生じた作業予約コード又は作業予約データの少なく
とも何れか一方を発して告知する告知装置(7) とが設け
られてなることを特徴とする請求項3乃至5の何れかに
記載の建設現場等における建設物等の作業工程管理装
置。
6. The work process management device manages each contractor selected to be engaged in at least one of each share work in the work plan process data or each work process in the share work. A work reservation setting device (5) for setting a predetermined work reservation code or work reservation data corresponding to each of the slave units (3) to be set, Various emergency information data such as a change or cancellation of the contents of each work process in each of the shared work is received from the slave unit (3) or the master unit (2), and the work reservation code or the work reservation data is set. A work content change device (6) for changing or canceling the contents of each received share work or each work process in the received share work, and each received share work or each received share work If any change occurs in the contents of each of the work processes, the master unit ( (2) A notification device (7) for issuing and notifying at least one of the work reservation code and the work reservation data whose contents have been changed to the slave unit (3). 6. The work process management device for a building or the like in a construction site or the like according to any one of 3 to 5.
【請求項7】 前記親機(2) が所定の地域等に分散して
設けられ、且つ該各親機(2) にて管理されてなる各デー
タの全てが所定の地域等に設けられた中央データ管理装
置(8) によって集中管理されてなり、しかも該中央デー
タ管理装置(8)と各親機(2) が双方向通信可能な構成に
してなることを特徴とする請求項3乃至6の何れかに記
載の建設現場等における建設物等の作業工程管理装置。
7. The master unit (2) is provided dispersedly in a predetermined area or the like, and all data managed by each master unit (2) are provided in a predetermined area or the like. The central data management device (8) is centrally managed, and the central data management device (8) and each parent device (2) are configured to be capable of two-way communication. A work process management device for a construction or the like at a construction site or the like according to any one of the above.
【請求項8】 前記親機(2) 又は中央データ管理装置
(8) の少なくとも何れか一方には、前記作業計画工程デ
ータの内容を書き替え可能な計画工程データ書き替え装
置(9) が設けられてなることを特徴とする請求項7記載
の建設現場等における建設物等の作業工程管理装置。
8. The master unit (2) or a central data management device
The construction site according to claim 7, characterized in that at least one of (8) is provided with a planning process data rewriting device (9) capable of rewriting the contents of the work planning process data. Work process management device for constructions in Japan.
【請求項9】 前記親機(2) 又は中央データ管理装置
(8) の少なくとも何れか一方には、所定の子機(3) から
送られてきた進捗データを基に建設物等の組み上げ状態
の仮想画像を作成する自動画像作成装置(10)が設けられ
てなることを特徴とする請求項7又は8記載の建設現場
等における建設物等の作業工程管理装置。
9. The master unit (2) or a central data management device
At least one of (8) is provided with an automatic image creation device (10) for creating a virtual image of an assembled state of a construction or the like based on progress data sent from a predetermined slave unit (3). 9. The work process management apparatus for a construction or the like at a construction site or the like according to claim 7 or 8, wherein
JP11575897A 1997-01-29 1997-05-06 Method and device for managing working process for building or the like in construction job site Pending JPH10273974A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11575897A JPH10273974A (en) 1997-01-29 1997-05-06 Method and device for managing working process for building or the like in construction job site

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP9-15771 1997-01-29
JP1577197 1997-01-29
JP11575897A JPH10273974A (en) 1997-01-29 1997-05-06 Method and device for managing working process for building or the like in construction job site

Publications (1)

Publication Number Publication Date
JPH10273974A true JPH10273974A (en) 1998-10-13

Family

ID=26351976

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11575897A Pending JPH10273974A (en) 1997-01-29 1997-05-06 Method and device for managing working process for building or the like in construction job site

Country Status (1)

Country Link
JP (1) JPH10273974A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002092083A (en) * 2000-09-20 2002-03-29 Airu Network Kk Construction site management system
JP2003187045A (en) * 2001-12-17 2003-07-04 Takenaka Komuten Co Ltd Work control system
JP2006309610A (en) * 2005-04-28 2006-11-09 Asahi Kasei Homes Kk Construction work planning system for building
JP2013134686A (en) * 2011-12-27 2013-07-08 Maeda Corp Process management system, management terminal, and process management method
JP2016184427A (en) * 2016-06-08 2016-10-20 前田建設工業株式会社 Process management system, management terminal, and method for managing process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002092083A (en) * 2000-09-20 2002-03-29 Airu Network Kk Construction site management system
JP2003187045A (en) * 2001-12-17 2003-07-04 Takenaka Komuten Co Ltd Work control system
JP2006309610A (en) * 2005-04-28 2006-11-09 Asahi Kasei Homes Kk Construction work planning system for building
JP2013134686A (en) * 2011-12-27 2013-07-08 Maeda Corp Process management system, management terminal, and process management method
JP2016184427A (en) * 2016-06-08 2016-10-20 前田建設工業株式会社 Process management system, management terminal, and method for managing process

Similar Documents

Publication Publication Date Title
US11935126B2 (en) Retail location services
CA2594639C (en) System and method of real-time homebuilding scheduling
Jiang et al. Digital twin-enabled real-time synchronization for planning, scheduling, and execution in precast on-site assembly
CN102769659B (en) The web services communication that engagement process control system is used
Cavalieri et al. An experimental benchmarking of two multi-agent architectures for production scheduling and control
EP1306786A2 (en) Project management system
CA2473003A1 (en) System and method for managing workplace real estate and other resources
KR101908263B1 (en) Shipping schedule management system using Electronic-calendar, and method thereof
Zekavat et al. Holonic construction management: Unified framework for ICT-supported process control
KR102269793B1 (en) System for controlling heavy equipment in construction site using iot
JPH10273974A (en) Method and device for managing working process for building or the like in construction job site
JP2005272067A (en) Maintenance track record managing device of elevator
JP2001282352A (en) Network type automatic concrete plant
CN109801026A (en) A kind of construction material allocator, device, system and readable storage medium storing program for executing in bulk
KR100845707B1 (en) Multi-planner operation planning system and method of container terminal
JP3933562B2 (en) Construction work integrated management system and method
JP2003536186A (en) Traffic information display configuration system and method
Lesaint et al. Field workforce scheduling
KR102377646B1 (en) Method for processing of cargo receipt based on blockchain and transport management server
US20170270459A1 (en) Device, System, and Method for Tracking Job Management
Egri et al. Cooperative planning in the supply network–a multiagent organization model
KR20090114241A (en) System for Analyzing a Resource Supplying Performance
Dawood et al. The value of visual 4D planning in the UK construction industry
Dunke et al. Day-ahead and online decision-making for collaborative on-site logistics
JP2001318966A (en) Method for controlling stock and production of cement of manufacturing plant of ready mixed concrete

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040402