JPH10240360A - Method and device for monitoring demand - Google Patents
Method and device for monitoring demandInfo
- Publication number
- JPH10240360A JPH10240360A JP9062066A JP6206697A JPH10240360A JP H10240360 A JPH10240360 A JP H10240360A JP 9062066 A JP9062066 A JP 9062066A JP 6206697 A JP6206697 A JP 6206697A JP H10240360 A JPH10240360 A JP H10240360A
- Authority
- JP
- Japan
- Prior art keywords
- power
- demand monitoring
- expected
- power consumption
- alarm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims description 91
- 238000000034 method Methods 0.000 title claims description 26
- 230000008859 change Effects 0.000 claims abstract description 14
- 238000012806 monitoring device Methods 0.000 claims abstract description 14
- 230000004044 response Effects 0.000 claims description 4
- 230000000694 effects Effects 0.000 description 15
- 238000010586 diagram Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 208000033748 Device issues Diseases 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Control Of Electrical Variables (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、検出された使用電
力の変化に基づき予想到達電力を演算し、演算された予
想到達電力とデマンド監視レベルとを比較し、前記予想
到達電力が前記デマンド監視レベルを越える場合に警報
が予め出力されるので、使用電力を下げるための対応の
実施を可能にするとともに、使用電力が前記デマンド監
視レベルを越えることを防止するデマンド監視方法およ
び監視装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention computes expected power consumption based on a detected change in power consumption, compares the calculated expected power with a demand monitoring level, and calculates the expected power by the demand monitoring level. The present invention relates to a demand monitoring method and a monitoring device that enable a countermeasure to be taken to reduce power consumption and prevent power consumption from exceeding the demand monitoring level because an alarm is output in advance when the power monitoring level exceeds the level.
【0002】[0002]
【従来の技術】従来のデマンド監視方法および監視装置
は、時々刻々変化する使用電力が積算された使用電力の
積算量が、デマンド監視レベルを越えた時に、デマンド
警報を出力するものであった。2. Description of the Related Art A conventional demand monitoring method and a conventional monitoring device output a demand alarm when an integrated amount of used power obtained by integrating a constantly changing used power exceeds a demand monitoring level.
【0003】[0003]
【発明が解決しようとする課題】上記従来のデマンド監
視方法および監視装置は、時々刻々変化する使用電力が
積算された使用電力の積算量が、デマンド監視レベルを
越えた時に、デマンド警報を出力するものであるので、
該デマンド警報の出されるタイミングが遅いため、使用
電力を下げるための対応を実施するための充分な時間が
無いとともに、場合によっては使用電力が前記デマンド
監視レベルを越えることがあり、該使用電力が該デマン
ド監視レベルを越えると違約金を払わなければならない
という問題があった。The above-mentioned conventional demand monitoring method and monitoring apparatus output a demand alarm when the integrated amount of used power obtained by integrating the constantly changing used power exceeds a demand monitoring level. Because
Since the timing at which the demand alarm is issued is late, there is not enough time to implement a measure to reduce the power consumption, and in some cases, the power consumption may exceed the demand monitoring level, and the power consumption may be reduced. If the demand monitoring level is exceeded, there is a problem that a penalty must be paid.
【0004】そこで本発明者らは、検出された使用電力
の変化に基づき予想到達電力を演算し、演算された予想
到達電力とデマンド監視レベルとを比較し、前記予想到
達電力が前記デマンド監視レベルを越える場合に警報が
予め出力するという本発明の技術的思想に着眼し、さら
に研究開発を重ねた結果、使用電力を下げるための対応
の実施を可能するとともに、使用電力が前記デマンド監
視レベルを越えることを防止するという目的を達成する
本発明に到達した。Therefore, the present inventors calculate the expected arrival power based on the detected change in the used power, compare the calculated expected arrival power with the demand monitoring level, and determine whether the expected arrival power is the demand monitoring level. Focusing on the technical idea of the present invention that an alarm is output in advance when exceeding, and as a result of further research and development, it is possible to implement measures to reduce the power consumption, and the power consumption falls below the demand monitoring level. We have arrived at the present invention which achieves the purpose of preventing its crossing.
【0005】[0005]
【課題を解決するための手段】本発明(請求項1に記載
された第1発明)のデマンド監視方法は、使用電力を検
出し、検出された使用電力の変化に基づき予想到達電力
を演算し、演算された予想到達電力とデマンド監視レベ
ルとを比較し、前記予想到達電力が前記デマンド監視レ
ベルを越える場合に警報を予め出力するものである。A demand monitoring method according to the present invention (a first invention according to claim 1) detects power consumption and calculates expected arrival power based on a change in the detected power consumption. The calculated expected power is compared with the demand monitoring level, and if the expected power exceeds the demand monitoring level, an alarm is output in advance.
【0006】本発明(請求項2に記載された第2発明)
のデマンド監視方法は、前記第1発明において、演算周
期毎に所定時間後の予想到達電力を演算するものであ
る。The present invention (the second invention described in claim 2)
In the demand monitoring method according to the first aspect of the present invention, the expected power after a predetermined time is calculated for each calculation cycle.
【0007】本発明(請求項3に記載された第3発明)
のデマンド監視方法は、前記第2発明において、前記演
算周期が、前記予想到達電力を演算する前記所定時間に
比べて充分短く設定されているものである。The present invention (third invention according to claim 3)
In the demand monitoring method of the second aspect, the calculation cycle is set sufficiently shorter than the predetermined time for calculating the expected power.
【0008】本発明(請求項4に記載された第4発明)
のデマンド監視方法は、前記第3発明において、前記演
算周期より長い一定時間における使用電力の増加分に基
づき所定時間後の予想到達電力を演算するものである。The present invention (the fourth invention described in claim 4)
According to the third aspect of the present invention, in the third aspect, the expected arrival power after a predetermined time is calculated based on an increase in the power consumption during a certain time longer than the calculation cycle.
【0009】本発明(請求項5に記載された第5発明)
のデマンド監視方法は、前記第4発明において、前記予
想到達電力が前記デマンド監視レベルを越える場合に出
力される警報が、使用電力が該デマンド監視レベルに到
達すると予想される時刻に対して、使用電力を下げるた
めに必要な対応時間より充分前に出力されるように設定
されているものである。The present invention (fifth invention described in claim 5)
The demand monitoring method according to the fourth aspect, wherein the alarm output when the expected arrival power exceeds the demand monitoring level is used for a time when the power consumption is expected to reach the demand monitoring level. The output is set so as to be sufficiently earlier than the response time required to reduce the power.
【0010】本発明(請求項6に記載された第6発明)
のデマンド監視装置は、使用電力を検出する使用電力検
出手段と、検出された使用電力とその変化に基づき予想
到達電力を演算し、演算された予想到達電力とデマンド
監視レベルとを比較し、前記予想到達電力が前記デマン
ド監視レベルを越える場合に警報信号を予め出力するコ
ントローラと、前記コントローラからの警報信号が出力
されると警報を発する警報装置とから成るものである。The present invention (the sixth invention described in claim 6)
A demand monitoring device for detecting power consumption, calculating expected power consumption based on the detected power consumption and its change, comparing the calculated expected power power with a demand monitoring level, The controller comprises a controller for outputting an alarm signal in advance when the expected power exceeds the demand monitoring level, and an alarm device for issuing an alarm when an alarm signal is output from the controller.
【0011】本発明(請求項7に記載された第7発明)
のデマンド監視装置は、前記第6発明において、現在の
使用電力を表示する現在電力表示部と、設定された警報
を発生するデマンド監視レベルを表示する警報設定表示
部と、予想される到達電力を表示する予想電力表示部と
を備えた表示装置を備えているものである。The present invention (the seventh invention described in claim 7)
The demand monitoring device according to the sixth aspect, further comprising: a current power display unit for displaying current power consumption; an alarm setting display unit for displaying a demand monitoring level for generating a set alarm; And a display device including an expected power display unit for displaying.
【0012】本発明(請求項8に記載された第8発明)
のデマンド監視装置は、前記第6発明において、前記コ
ントローラが、シーケンサによって構成されているもの
である。The present invention (an eighth invention described in claim 8)
In the demand monitoring device according to the sixth aspect, the controller is configured by a sequencer.
【0013】[0013]
【発明の作用および効果】上記構成より成る第1発明の
デマンド監視方法は、使用電力を検出し、検出された使
用電力の変化に基づき予想到達電力を演算し、演算され
た予想到達電力とデマンド監視レベルとを比較し、前記
予想到達電力が前記デマンド監視レベルを越える場合に
警報を予め出力するので、使用電力を下げるための対応
の実施を可能するとともに、使用電力が前記デマンド監
視レベルを越えることを防止するという効果を奏する。In the demand monitoring method according to the first aspect of the present invention, the power consumption is detected, the expected power is calculated based on the detected change in the power usage, and the calculated expected power and demand are calculated. A comparison is made with the monitoring level, and an alarm is output in advance when the expected power exceeds the demand monitoring level, so that it is possible to take measures to reduce the power consumption, and the power consumption exceeds the demand monitoring level. This has the effect of preventing this.
【0014】上記構成より成る第2発明のデマンド監視
方法は、前記第1発明において、演算周期毎に所定時間
後の予想到達電力を演算するので、使用電力を下げるた
めの対応の実施を可能にするという効果を奏する。According to the demand monitoring method of the second invention having the above configuration, in the first invention, since the expected arrival power after a predetermined time is calculated for each calculation cycle, it is possible to implement measures for reducing the power consumption. It has the effect of doing.
【0015】上記構成より成る第3発明のデマンド監視
方法は、前記第2発明において、前記演算周期が、前記
予想到達電力を演算する前記所定時間に比べて充分短く
設定されているので、予想到達電力の演算精度を高める
という効果を奏する。[0015] In the demand monitoring method according to the third aspect of the present invention, the operation cycle is set to be sufficiently shorter than the predetermined time for calculating the expected power. This has the effect of increasing the power calculation accuracy.
【0016】上記構成より成る第4発明のデマンド監視
方法は、前記第3発明において、前記演算周期より長い
一定時間における使用電力の増加分に基づき所定時間後
の予想到達電力を演算するので、平均的な予想到達電力
を演算するため、予想到達電力の演算精度を高めるとい
う効果を奏する。In the demand monitoring method according to a fourth aspect of the present invention having the above configuration, in the third aspect of the invention, the expected arrival power after a predetermined time is calculated based on an increase in the power consumption during a certain time longer than the calculation cycle. Since the expected expected power is calculated, there is an effect that the calculation accuracy of the expected power is improved.
【0017】上記構成より成る第5発明のデマンド監視
方法は、前記第4発明において、前記予想到達電力が前
記デマンド監視レベルを越える場合に出力される警報
が、使用電力が該デマンド監視レベルに到達すると予想
される時刻に対して、使用電力を下げるために必要な対
応時間より充分前に出力されるように設定されているの
で、使用電力を下げるための対応の実施を容易かつ確実
にするという効果を奏する。In the demand monitoring method according to a fifth aspect of the present invention having the above structure, in the fourth aspect, an alarm output when the expected arrival power exceeds the demand monitoring level is output when the used power reaches the demand monitoring level. Then, since it is set so that the output is output sufficiently earlier than the corresponding time required to reduce the power consumption with respect to the expected time, it is possible to easily and reliably perform the response to reduce the power consumption. It works.
【0018】上記構成より成る第6発明のデマンド監視
装置は、前記使用電力検出手段が、使用電力を検出し、
前記コントローラが、検出された使用電力とその変化に
基づき予想到達電力を演算し、演算された予想到達電力
とデマンド監視レベルとを比較し、前記予想到達電力が
前記デマンド監視レベルを越える場合に警報信号を予め
出力し、前記警報装置が、前記コントローラからの警報
信号が出力されると警報を予め発するので、使用電力を
下げるための対応の実施を可能するとともに、使用電力
が前記デマンド監視レベルを越えることを防止するとい
う効果を奏する。[0018] In the demand monitoring apparatus according to a sixth aspect of the present invention, the power consumption detecting means detects power consumption.
The controller calculates an expected arrival power based on the detected used power and its change, compares the calculated expected arrival power with a demand monitoring level, and issues an alarm when the expected arrival power exceeds the demand monitoring level. A signal is output in advance, and the alarm device issues an alarm in advance when an alarm signal is output from the controller, so that it is possible to implement measures to reduce power consumption, and the power consumption becomes lower than the demand monitoring level. This has the effect of preventing it from exceeding.
【0019】上記構成より成る第7発明のデマンド監視
装置は、前記第6発明において、前記表示装置の前記現
在電力表示部が、現在の使用電力を表示し、前記警報設
定表示部が、設定された警報を発生するデマンド監視レ
ベルを表示し、予想電力表示部が、予想される到達電力
を表示するので、前記現在の使用電力、デマンド監視レ
ベルおよび前記予想される到達電力の監視および周知化
を可能にするという効果を奏する。In the demand monitoring apparatus according to a seventh aspect of the present invention, the current power display section of the display apparatus displays current power consumption, and the alarm setting display section is set. The demand monitoring level at which the alarm is generated is displayed, and the expected power display unit displays the expected power, so that the current use power, the demand monitoring level and the expected power can be monitored and publicized. This has the effect of making it possible.
【0020】上記構成より成る第8発明のデマンド監視
装置は、前記第6発明において、前記コントローラが、
汎用性の高いシーケンサによって構成されているので、
設定および操作が容易であり、ローコストを可能にする
という効果を奏する。[0020] In the demand monitoring apparatus according to an eighth aspect of the present invention, the controller according to the sixth aspect, wherein the controller is
Since it is composed of a versatile sequencer,
It is easy to set and operate, and has the effect of enabling low cost.
【0021】[0021]
【発明の実施の形態】本発明の実施の形態について、以
下図面に基づいて説明する。Embodiments of the present invention will be described below with reference to the drawings.
【0022】(実施形態)本実施形態のデマンド監視方
法および監視装置は、図1および図2に示されるように
使用電力を検出する使用電力検出手段1と、検出された
使用電力とその変化に基づき予想到達電力を演算し、演
算された予想到達電力とデマンド監視レベルとを比較
し、前記予想到達電力が前記デマンド監視レベルを越え
る場合に警報信号を予め出力するコントローラ2と、前
記コントローラからの警報信号が出力されると警報を発
する警報装置3とから成るものである。(Embodiment) A demand monitoring method and a monitoring apparatus according to this embodiment include a power consumption detecting means 1 for detecting power consumption, as shown in FIGS. 1 and 2, and a method for monitoring the detected power consumption and its change. A controller 2 for calculating an expected power to be reached based on the calculated expected power and a demand monitoring level, and outputting a warning signal in advance when the expected power exceeds the demand monitoring level; and And an alarm device 3 that issues an alarm when an alarm signal is output.
【0023】前記使用電力検出手段1は、図1および図
2に示されるように電力会社の電力計に相当する工場内
の電力発振器10によって構成され、工場内の使用電力
を検出して出力するものである。As shown in FIGS. 1 and 2, the used power detecting means 1 is constituted by a power oscillator 10 in a factory corresponding to a power meter of a power company, and detects and outputs the used power in the factory. Things.
【0024】デマンド設定器4は、図1および図2に示
されるように前記コントローラ2に接続され、前記デマ
ンド監視レベル例えば7500KwHを設定するもので
ある。The demand setting unit 4 is connected to the controller 2 as shown in FIGS. 1 and 2, and sets the demand monitoring level, for example, 7500 KwH.
【0025】前記コントローラ2は、図1および図2に
示されるようにシーケンサ20によって構成され、前記
使用電力検出手段1から出力される工場内の使用電力が
入力される第1入力部21と、前記デマンド設定器4か
ら出力される前記デマンド監視レベルが入力される第2
入力部22とを備えている。The controller 2 is constituted by a sequencer 20 as shown in FIGS. 1 and 2, and has a first input section 21 to which the power consumption in the factory output from the power consumption detecting means 1 is inputted. The second in which the demand monitoring level output from the demand setting device 4 is input.
An input unit 22 is provided.
【0026】前記コントローラ2は、0ないし30分ま
で前記第1入力部21から入力され前記使用電力検出手
段1から出力された工場内の前記使用電力の演算周期と
して15秒毎のカウント値D0 ないしD119 を記憶す
る。The controller 2 calculates a count value D 0 every 15 seconds as an operation cycle of the used power in the factory, which is input from the first input unit 21 and output from the used power detection means 1 from 0 to 30 minutes. Or D 119 is stored.
【0027】前記コントローラ2は、図3に示されるよ
うに前記カウント値D0 ないしD11 9 に基づき、現在の
電力値Pt に基づき、その一定時間Δt前の電力値Pt-
Δtとの差ΔPから定まる電力の上昇勾配である変化割
合ΔP/Δtで前記所定時間としてのデマンド時間であ
る予測時間Tまでの残り時間(T−t)において変化す
ると仮定した場合前記予想到達電力Pm を演算する。[0027] The controller 2, based on the count value D 0 to D 11 9 as shown in FIG. 3, based on the current power value P t, before the predetermined time Δt power value P t-
The predicted arrival assuming changes in delta t and a power increase gradient of which is determined from the difference [Delta] P is the rate of change [Delta] P / Delta] t in the remaining time until the predicted time T demand is the time as the predetermined time (T-t) The power Pm is calculated.
【0028】すなわち、本実施形態においては、下記の
数式に従い、一例として一定時間Δtを4分に設定し、
デマンド時間Tを30分に設定して演算する。 Pm ={Pt +(ΔP/Δt)×(T−t)}×(60/30) ={Pt +(ΔP/4)×(30−t)}×(60/30)That is, in the present embodiment, the constant time Δt is set to 4 minutes as an example according to the following equation,
The calculation is performed with the demand time T set to 30 minutes. P m = {P t + (ΔP / Δt) × (T−t)} × (60/30) = {P t + (ΔP / 4) × (30−t)} × (60/30)
【0029】上記数1に従い、15秒毎にカウントされ
た前記カウント値D0 ないしD119を用いて前記現在の
電力値Pt (例えば6800KwH)に基づき前記予想
到達電力Pm (例えば7130KwH)が演算され、演
算された前記予想到達電力Pm と前記デマンド監視レベ
ルPV (例えば7500KwH)とが比較される。According to the above equation (1), the expected attained power P m (for example, 7130 KwH) is calculated based on the current power value P t (for example, 6800 KwH) using the count values D 0 to D 119 counted every 15 seconds. is calculated, the calculated said predicted arrival power P m and the demand monitoring level P V and (e.g. 7500KwH) are compared.
【0030】すなわち、演算された前記予想到達電力P
m (例えば7130KwH)が、本第1実施形態におけ
る前記デマンド監視レベルPV である7500KwHを
越えるかどうか判定される。That is, the calculated expected power P
m (e.g. 7130KwH) is determined whether it exceeds the which is the demand monitoring level P V in the first embodiment 7500KwH.
【0031】図1および図2に示されるように、演算さ
れた前記予想到達電力Pm (例えば7130KwH)
が、前記デマンド監視レベルPV である7500KwH
を越える場合は、第1の出力部23から警報信号が出力
される。As shown in FIGS. 1 and 2, the calculated expected power P m calculated (for example, 7130 KwH)
7500KwH but is the demand monitoring level P V
Is exceeded, the first output unit 23 outputs an alarm signal.
【0032】また図2に示されるように、第2の出力部
24から現在の時刻信号(例えば15分30秒)が出力
され、第3の出力部25から現在の電力信号(例えば6
800KwH)が出力され、第4の出力部26から演算
された予想到達電力信号(例えば7130KwH)が出
力される。As shown in FIG. 2, a current time signal (for example, 15 minutes and 30 seconds) is output from the second output unit 24, and a current power signal (for example, 6 minutes) is output from the third output unit 25.
800KwH), and the calculated expected power signal (for example, 7130KwH) is output from the fourth output unit 26.
【0033】前記警報装置3は、図1および図2に示さ
れるようにブザー30によって構成され、前記コントロ
ーラの前記第1の出力部23からの警報信号が出力され
ると、警報としてのブザー音を発する。The alarm device 3 comprises a buzzer 30 as shown in FIGS. 1 and 2. When an alarm signal is output from the first output section 23 of the controller, a buzzer sound as an alarm is issued. Emits.
【0034】表示装置5は、図1および図2に示される
ように現在の使用電力を表示する現在電力表示部51
と、設定された警報を発生するデマンド監視レベルを表
示する警報設定表示部52と、予想される到達電力を表
示する予想電力表示部53と、現在の時刻を表示する時
刻表示部54とから成る。The display device 5 has a current power display section 51 for displaying the current power consumption as shown in FIGS.
And an alarm setting display section 52 for displaying a demand monitoring level at which a set alarm is generated, an expected power display section 53 for displaying expected arrival power, and a time display section 54 for displaying the current time. .
【0035】上記構成より成る本実施形態のデマンド監
視装置の監視方法は、前記使用電力検出手段1によっ
て、工場内の使用電力が検出され、前記デマンド設定器
4によって、前記デマンド監視レベル例えば7500K
wHが設定される。In the monitoring method of the demand monitoring device according to the present embodiment having the above-described configuration, the power consumption in the factory is detected by the power consumption detecting means 1 and the demand monitoring level, for example, 7500K is detected by the demand setting device 4.
wH is set.
【0036】前記コントローラ2は、前記第1入力部2
1から入力され前記使用電力検出手段1から出力された
工場内の前記使用電力の演算周期として15秒毎のカウ
ント値D0 ないしD119 を0ないし30分の間記憶す
る。The controller 2 is connected to the first input unit 2
The count value D 0 through D 119 every 15 seconds for calculation cycle of the power used in the inputted plant output from the electric power used detecting means 1 from 1 stores for 30 minutes from 0.
【0037】前記コントローラ2は、前記カウント値D
0 ないしD119 に基づき、現在の電力値Pt に基づき、
その一定時間Δt前の電力値Pt-Δt との差ΔPから定
まる電力の変化割合ΔP/Δtでデマンド時間Tまでの
残り時間(T−t)において変化すると仮定した場合前
記予想到達電力Pm を演算する。The controller 2 calculates the count value D
0 to based on D 119, based on the current power value P t,
If the assumption that changes in determined from the difference [Delta] P power rate of change [Delta] P / Delta] t in the remaining time until the demand time T (T-t) the predicted arrival power P with its fixed time Delta] t before power value P t-delta t Calculate m .
【0038】すなわち、前記数1に従い、一例として一
定時間Δtを4分に設定し、予測周期Tを30分に設定
して演算する。上記数1に従い、15秒毎にカウントさ
れた前記カウント値D0 ないしD119 を用いて前記現在
の電力値Pt すなわち6800KwHに基づき前記予想
到達電力値Pm すなわち7130KwHが演算され、演
算された該予想到達電力Pm と前記デマンド監視レベル
すなわち7500KwHとが比較される。That is, according to the above equation 1, as an example, the calculation is performed with the fixed time Δt set to 4 minutes and the prediction cycle T set to 30 minutes. Accordance with the above Equation 1, the count value D 0 not counted every 15 seconds to the predicted arrival power value P m That 7130KwH based on the current power value P t That 6800KwH using D 119 is calculated, which is calculated the expected arrival power P m and the demand monitoring level or 7500KwH are compared.
【0039】すなわち、演算された前記予想到達電力値
Pm が、本第1実施形態における前記デマンド監視レベ
ルである7500KwHを越えるかどうか判定され、該
演算された予想到達電力値Pm が、前記デマンド監視レ
ベルである7500KwHを越える場合は、前記第1の
出力部23から警報信号が出力される。[0039] That is, the calculated said predicted arrival power value P m is, it is determined whether it exceeds 7500KwH is the demand monitoring level in the first embodiment, the computed predicted arrival power value P m is the When the demand monitoring level exceeds 7500 KwH, the first output unit 23 outputs an alarm signal.
【0040】また前記コントローラ2は、第2の出力部
24から現在の時刻信号すなわち15分30秒が出力さ
れ、第3の出力部25から現在の電力信号すなわち68
00KwHが出力され、第4の出力部26から演算され
た予想到達電力信号すなわち7130KwHが出力され
る。The controller 2 outputs the current time signal, that is, 15 minutes and 30 seconds, from the second output unit 24 and the current power signal, that is, 68 minutes, from the third output unit 25.
00KwH is output, and the calculated expected power signal, that is, 7130 KwH, is output from the fourth output unit 26.
【0041】前記警報装置3は、ブザー30によって構
成され、前記コントローラの前記第1の出力部23から
の警報信号が出力されると、警報としてのブザー音を発
する。The alarm device 3 is constituted by a buzzer 30 and emits a buzzer sound as an alarm when an alarm signal is output from the first output section 23 of the controller.
【0042】前記表示装置5は、前記コントローラ2か
らの出力信号によって前記現在電力表示部51において
現在の使用電力が表示され、前記警報設定表示部52に
おいて設定された警報を発生するデマンド監視レベル7
500KwHが表示され、前記予想電力表示部53にお
いて演算された予想到達電力値7130KwHが表示さ
れ、前記時刻表示部54において現在の時刻が表示され
る。The display device 5 displays a current power consumption on the current power display section 51 by an output signal from the controller 2 and generates a demand monitoring level 7 for generating an alarm set on the alarm setting display section 52.
500 KwH is displayed, the expected power value 7130 KwH calculated in the expected power display unit 53 is displayed, and the current time is displayed in the time display unit 54.
【0043】上記作用を奏する本実施形態のデマンド監
視装置は、前記使用電力検出手段1が、使用電力を検出
し、前記コントローラ2が、検出された使用電力とその
変化に基づき予想到達電力を演算し、演算された予想到
達電力とデマンド監視レベルとを比較し、前記予想到達
電力が前記デマンド監視レベルを越える場合に警報信号
を予め出力し、前記警報装置3が、前記コントローラ2
からの警報信号が出力されると警報を予め発するので、
使用電力を下げるための対応の実施を可能にするという
効果を奏する。In the demand monitoring apparatus according to the present embodiment having the above-described operation, the power consumption detecting means 1 detects the power consumption, and the controller 2 calculates the expected power consumption based on the detected power consumption and its change. Then, the calculated expected arrival power is compared with the demand monitoring level, and if the expected arrival power exceeds the demand monitoring level, an alarm signal is output in advance, and the alarm device 3 outputs the controller 2
When an alarm signal is output, an alarm is issued in advance,
This has the effect of making it possible to implement measures to reduce power consumption.
【0044】また本実施形態のデマンド監視装置は、警
報を予め発するので、使用電力を下げるための対応の実
施を可能にするので、使用電力が前記デマンド監視レベ
ルを越えることを防止するという効果を奏する。Further, the demand monitoring device of the present embodiment issues an alarm in advance, so that it is possible to take measures to reduce the power consumption, thereby preventing the power consumption from exceeding the demand monitoring level. Play.
【0045】さらに本実施形態のデマンド監視装置は、
前記表示装置5の前記現在電力表示部51が、現在の使
用電力を表示し、前記警報設定表示部52が、設定され
た警報を発生するデマンド監視レベルを表示し、前記予
想電力表示部53が、予想される到達電力を表示するの
で、前記時刻表示部54が現在の時刻を表示して、使用
電力を下げるための対応を実施する時間的余裕を知らし
め、前記現在の使用電力、デマンド監視レベルおよび前
記予想される到達電力の監視、周知化および時間的余裕
を可能にするという効果を奏する。Further, the demand monitoring device of the present embodiment
The current power display unit 51 of the display device 5 displays current power consumption, the alarm setting display unit 52 displays a demand monitoring level at which a set alarm is generated, and the expected power display unit 53 , The expected power is displayed, so that the time display unit 54 displays the current time to inform the user of the time to perform the action to reduce the power consumption, and monitors the current power consumption and demand monitoring. This has the effect of enabling monitoring, dissemination and time margin of the level and the expected power reached.
【0046】また本実施形態のデマンド監視装置は、前
記コントローラとして汎用性の高いシーケンサーを用い
ているので、設定および操作が容易であり、ローコスト
化を可能にするという効果を奏する。Further, the demand monitoring device of the present embodiment uses a highly versatile sequencer as the controller, so that it is easy to set and operate, and has the effect of reducing costs.
【0047】上記作用を奏する本実施形態のデマンド監
視方法は、使用電力を検出し、検出された使用電力の変
化に基づき予想到達電力を演算し、演算された予想到達
電力とデマンド監視レベルとを比較し、前記予想到達電
力が前記デマンド監視レベルを越える場合に警報を予め
出力するので、使用電力を下げるための対応の実施を可
能するとともに、使用電力が前記デマンド監視レベルを
越えることを防止するという効果を奏する。The demand monitoring method according to the present embodiment having the above-described operation detects the power consumption, calculates the expected power based on the detected change in the power usage, and compares the calculated expected power with the demand monitoring level. By comparison, an alarm is output in advance when the expected arrival power exceeds the demand monitoring level, so that it is possible to take measures to reduce the power consumption and to prevent the power consumption from exceeding the demand monitoring level. This has the effect.
【0048】また本実施形態のデマンド監視方法は、演
算周期毎に所定時間(最大30分後)後の予想到達電力
を演算するので、使用電力を下げるための対応の実施の
ための余裕時間を確保するという効果を奏する。In the demand monitoring method according to the present embodiment, the expected power after a predetermined time (after a maximum of 30 minutes) is calculated for each calculation cycle. It has the effect of securing.
【0049】さらに本実施形態のデマンド監視方法は、
前記演算周期15秒が、前記予想到達電力を演算する前
記所定時間(最大30分後)に比べて充分短く設定され
ているので、予想到達電力の演算精度を高めるという効
果を奏する。Further, the demand monitoring method of the present embodiment
Since the calculation cycle of 15 seconds is set sufficiently shorter than the predetermined time (after a maximum of 30 minutes) for calculating the expected power, there is an effect that the calculation accuracy of the expected power is improved.
【0050】また本実施形態のデマンド監視方法は、前
記演算周期15秒より長い一定時間4分における使用電
力の増加分に基づき所定時間後の予想到達電力を演算す
るので、使用電力値の上昇勾配の平均値を求めることが
出来、突発的なノイズを除去することにより、平均的な
予想到達電力を演算するため、予想到達電力の演算精度
を高めるという効果を奏する。In the demand monitoring method according to the present embodiment, the expected arrival power after a predetermined time is calculated based on the increase in the power consumption during the fixed time of 4 minutes longer than the calculation cycle of 15 seconds. The average expected power can be calculated, and the average expected power can be calculated by removing sudden noise. This has the effect of increasing the accuracy of calculating the expected power.
【0051】さらに本実施形態のデマンド監視方法は、
前記予想到達電力が前記デマンド監視レベルを越える場
合に出力される警報が、使用電力が該デマンド監視レベ
ルに到達すると予想される時刻に対して、使用電力を下
げるために必要な対応時間に比べて充分前に出力される
ように設定されているので、使用電力を下げるための対
応の実施を容易かつ確実にするという効果を奏する。Further, the demand monitoring method of the present embodiment
An alarm that is output when the expected arrival power exceeds the demand monitoring level is compared with a response time required to reduce the power consumption with respect to the time when the power consumption is expected to reach the demand monitoring level. Since the setting is made so as to be output sufficiently before, there is an effect that it is easy and reliable to take measures to reduce the power consumption.
【0052】上述の実施形態は、説明のために例示した
もので、本発明としてはそれらに限定されるものでは無
く、特許請求の範囲、発明の詳細な説明および図面の記
載から当業者が認識することができる本発明の技術的思
想に反しない限り、変更および付加が可能である。The above-described embodiments have been described by way of example only, and the present invention is not limited to these embodiments. Those skilled in the art will recognize from the claims, the detailed description of the invention, and the drawings. Modifications and additions are possible without departing from the technical idea of the present invention.
【0053】上記実施形態においては、一例として前記
演算周期を15秒とし、前記一定時間を4分とし、前記
所定時間を30分としたが、本発明としてはそれらに限
定されるものでは無く、必要および状況に応じて前記演
算周期を30秒、1分等としても良く、前記一定時間を
3分、5分、10分等としても良く、前記所定時間(デ
マンド時間)を40分、1時間等としても良いものであ
る。In the above embodiment, as an example, the calculation cycle is 15 seconds, the fixed time is 4 minutes, and the predetermined time is 30 minutes. However, the present invention is not limited to these. The calculation cycle may be 30 seconds, 1 minute, etc., or the predetermined time may be 3 minutes, 5 minutes, 10 minutes, etc., and the predetermined time (demand time) is 40 minutes, 1 hour according to need and circumstances. It is a good thing.
【図1】本発明の実施形態のデマンド監視装置の概要を
示すブロック図である。FIG. 1 is a block diagram illustrating an outline of a demand monitoring device according to an embodiment of the present invention.
【図2】本実施形態装置の各部を示す詳細ブロック図で
ある。FIG. 2 is a detailed block diagram showing each unit of the apparatus according to the embodiment.
【図3】本実施形態における使用電力の推移および予想
到達電力を示す線図である。FIG. 3 is a diagram showing a transition of used power and an estimated attained power in the present embodiment.
1 使用電力検出手段 2 コントローラ 3 警報装置 DESCRIPTION OF SYMBOLS 1 Power consumption detection means 2 Controller 3 Alarm device
Claims (8)
し、 演算された予想到達電力とデマンド監視レベルとを比較
し、 前記予想到達電力が前記デマンド監視レベルを越える場
合に警報を予め出力することを特徴とするデマンド監視
方法。1. Detecting power consumption, calculating expected power consumption based on a change in the detected power consumption, comparing the calculated expected power with a demand monitoring level, wherein the expected power is monitored by the demand monitoring. A demand monitoring method characterized by outputting an alarm in advance when a level is exceeded.
を特徴とするデマンド監視方法。2. The demand monitoring method according to claim 1, wherein an expected arrival power after a predetermined time is calculated for each calculation cycle.
時間に比べて充分短く設定されていることを特徴とする
デマンド監視方法。3. The demand monitoring method according to claim 2, wherein the calculation cycle is set sufficiently shorter than the predetermined time for calculating the expected power.
分に基づき所定時間後の予想到達電力を演算することを
特徴とするデマンド監視方法。4. The demand monitoring method according to claim 3, wherein an expected attainable power after a predetermined time is calculated based on an increase in power consumption in a certain time longer than the calculation cycle.
合に出力される警報が、使用電力が該デマンド監視レベ
ルに到達すると予想される時刻に対して、使用電力を下
げるために必要な対応時間より充分前に出力されるよう
に設定されていることを特徴とするデマンド監視方法。5. The alarm according to claim 4, wherein the alarm output when the expected arrival power exceeds the demand monitoring level is based on a time when the usage power is expected to reach the demand monitoring level. A demand monitoring method, which is set so as to be output sufficiently before a response time required to lower the demand.
と、 検出された使用電力とその変化に基づき予想到達電力を
演算し、演算された予想到達電力とデマンド監視レベル
とを比較し、前記予想到達電力が前記デマンド監視レベ
ルを越える場合に警報信号を予め出力するコントローラ
と、 前記コントローラからの警報信号が出力されると警報を
発する警報装置とから成ることを特徴とするデマンド監
視装置。6. A power consumption detecting means for detecting power consumption, calculating expected power consumption based on the detected power consumption and a change thereof, comparing the calculated predicted power consumption with a demand monitoring level, A demand monitoring device, comprising: a controller that outputs an alarm signal in advance when the reached power exceeds the demand monitoring level; and an alarm device that issues an alarm when an alarm signal is output from the controller.
る警報設定表示部と、 予想される到達電力を表示する予想電力表示部とを備え
た表示装置を備えていることを特徴とするデマンド監視
装置。7. The present invention according to claim 6, wherein a current power display section for displaying current power consumption, an alarm setting display section for displaying a demand monitoring level for generating a set alarm, and an expected arrival power are displayed. A demand monitoring device comprising a display device having an expected power display unit.
ることを特徴とするデマンド監視装置。8. The demand monitoring device according to claim 6, wherein the controller comprises a sequencer.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9062066A JPH10240360A (en) | 1997-02-28 | 1997-02-28 | Method and device for monitoring demand |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9062066A JPH10240360A (en) | 1997-02-28 | 1997-02-28 | Method and device for monitoring demand |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH10240360A true JPH10240360A (en) | 1998-09-11 |
Family
ID=13189370
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP9062066A Pending JPH10240360A (en) | 1997-02-28 | 1997-02-28 | Method and device for monitoring demand |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH10240360A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6526360B1 (en) | 1999-01-11 | 2003-02-25 | Fanuc Ltd. | Power consumption display device for machine |
| KR20040009031A (en) * | 2002-07-22 | 2004-01-31 | 김규식 | A meter-reading device for detecting power, water, and gas of quantity overconsumed and method for controlling as the same |
| JP2010240915A (en) * | 2009-04-02 | 2010-10-28 | Fanuc Ltd | Power management system for injection molding machines |
| JP2012175849A (en) * | 2011-02-23 | 2012-09-10 | Toshiba Mitsubishi-Electric Industrial System Corp | Power demand management system |
| KR101495160B1 (en) * | 2007-12-24 | 2015-03-02 | 엘지전자 주식회사 | Multi-air conditioner central control device and its power control method |
-
1997
- 1997-02-28 JP JP9062066A patent/JPH10240360A/en active Pending
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6526360B1 (en) | 1999-01-11 | 2003-02-25 | Fanuc Ltd. | Power consumption display device for machine |
| KR20040009031A (en) * | 2002-07-22 | 2004-01-31 | 김규식 | A meter-reading device for detecting power, water, and gas of quantity overconsumed and method for controlling as the same |
| KR101495160B1 (en) * | 2007-12-24 | 2015-03-02 | 엘지전자 주식회사 | Multi-air conditioner central control device and its power control method |
| JP2010240915A (en) * | 2009-04-02 | 2010-10-28 | Fanuc Ltd | Power management system for injection molding machines |
| JP2012175849A (en) * | 2011-02-23 | 2012-09-10 | Toshiba Mitsubishi-Electric Industrial System Corp | Power demand management system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2002093465A (en) | Battery life estimation device for gas meter | |
| RU2005115539A (en) | DEVICE FOR ELECTRICITY LEVEL CONTROL IN MOTOR VEHICLES AND METHOD FOR IMPLEMENTING SUCH CONTROL | |
| JP2008224320A (en) | Water meter | |
| JP6857814B2 (en) | Microcomputer type gas meter | |
| JPH10240360A (en) | Method and device for monitoring demand | |
| US20070075667A1 (en) | Belt driven centrifugal separator with multi-stage, belt deterioration alerting display | |
| JP2005198434A (en) | Remote control device | |
| JP2937300B2 (en) | Intermittent drive flow meter | |
| JP3361965B2 (en) | Flowmeter | |
| JP3203782B2 (en) | Flow measurement device | |
| JPH08220199A (en) | Battery life monitoring device | |
| JP4763882B2 (en) | Flowmeter | |
| JP2568760Y2 (en) | Auxiliary equipment monitoring device | |
| JP3876024B2 (en) | Electronic pulse counter pulse correction method | |
| JP2004108832A (en) | Flow measurement device and control method | |
| JP3816582B2 (en) | Demand monitoring device | |
| JP2002221439A (en) | Electronic water service meter system | |
| JPH0816946A (en) | Smoke sensor with clock | |
| JP2004124869A (en) | Operating condition inspection device for pump device, and device with built-in pump equipped with the pump device | |
| JP2005151717A (en) | Power generation control device for private power generation facilities | |
| JP3338883B2 (en) | Gas safety equipment | |
| JP4177715B2 (en) | Power reference value calculation method and apparatus | |
| JP3603339B2 (en) | Condensation detector | |
| KR20020057321A (en) | Fan fail alarm | |
| JPS5944856B2 (en) | Demand power monitoring device |