JPH10225758A - Method for casting low melting point alloy - Google Patents

Method for casting low melting point alloy

Info

Publication number
JPH10225758A
JPH10225758A JP3363697A JP3363697A JPH10225758A JP H10225758 A JPH10225758 A JP H10225758A JP 3363697 A JP3363697 A JP 3363697A JP 3363697 A JP3363697 A JP 3363697A JP H10225758 A JPH10225758 A JP H10225758A
Authority
JP
Japan
Prior art keywords
molten metal
mold
gate valve
gate
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3363697A
Other languages
Japanese (ja)
Other versions
JP3518227B2 (en
Inventor
Hiroaki Mitsuyoshi
博晃 三吉
Yasuo Mizunaga
康雄 水永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ube Corp
Original Assignee
Ube Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ube Industries Ltd filed Critical Ube Industries Ltd
Priority to JP03363697A priority Critical patent/JP3518227B2/en
Publication of JPH10225758A publication Critical patent/JPH10225758A/en
Application granted granted Critical
Publication of JP3518227B2 publication Critical patent/JP3518227B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Molds, Cores, And Manufacturing Methods Thereof (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

PROBLEM TO BE SOLVED: To shorten cooling time and to improve productivity. SOLUTION: In this low m.p. casting method, dies 1 in a die device freely openable/closable by a die clamping device are clamed and the molten low m.p. alloy stored in a holding furnace is injected and pressurized with an injecting device by abutting a gate valve 50 freely communicating/shutting-out the molten metal and revercible of molten metal to the holding furnace on a runner part in a die cavity 2 and jointing them, cooled and solidified, then a cast product is taken out. Then, in the casting work process consisting of the die clamping process, gate valve jointing process, injecting process, pressure holding process, cooling process, gate shutting-off process, gate valve releasing process, die opening process and product taking-out process, a non-solidified molten metal recovering process for recovering the non-solidified molten metal remained in the die cavity 1 by working a back flow sucking action of the molten metal with the injecting device, is added between the cooling process and the gate shutting-off process followed to the cooling process.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、樹脂の射出成形に
用いられる低融点金属中子等を成形する低融点合金鋳造
方法に係り、特に、金型キャビティ内に溶湯を射出充填
し冷却工程が終了した後に、金型キャビティ内の未凝固
溶湯を射出装置の射出ポンプによって吸引する未凝固溶
湯回収工程を追加して、冷却工程の時間短縮を図った低
融点合金鋳造方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a low-melting point alloy casting method for molding a low-melting point metal core or the like used for injection molding of a resin. The present invention relates to a low-melting point alloy casting method in which an unsolidified molten metal in a mold cavity is sucked by an injection pump of an injection device after the completion to add a non-solidified molten metal collecting step, thereby shortening a cooling step time.

【0002】[0002]

【従来の技術】従来、たとえば、自動車用エンジンへガ
ソリンを噴射するインテークマニホールド等を樹脂材料
で射出成形する際には、インテークマニホールド用中子
が必要であり、インテークマニホールドを樹脂で射出成
形した後に中子を溶解するため、融点の低い、たとえ
ば、Sn−Bi合金等の低融点合金で製作する必要があ
った。この場合、これらの低融点合金の溶湯を、たとえ
ば、溶解炉や保持炉等に保持された溶湯を溶湯管路を経
由して移送し、ダイカストマシンなどの成形装置の金型
キャビティへ射出して鋳造し、成形品として製作してい
た。この場合の鋳造作業の作業工程は、型閉工程、ゲー
トバルブ・ドッキング工程、射出工程、保圧工程、冷却
工程、ゲート遮断工程、ゲートバルブ・離脱工程、型開
工程、製品取出工程を順次実施していた。すなわち、保
持炉と溶湯管路で接続され溶湯を連通・遮断自在なゲー
トバルブを、型閉した金型の金型キャビティのランナ部
へ当接してドッキングして、保持炉に貯蔵された溶湯を
金型キャビティへ射出した後保圧(加圧)し、一定時間
の冷却時間保持し、ゲートバルブを遮断状態にしてゲー
トバルブをランナ部より離脱後退させ、型開してから製
品を取出していた。
2. Description of the Related Art Conventionally, for example, when an intake manifold for injecting gasoline into an automobile engine is injection-molded with a resin material, a core for the intake manifold is required. In order to melt the core, it was necessary to manufacture the core from a low melting point alloy, for example, a low melting point alloy such as a Sn-Bi alloy. In this case, the molten metal of these low-melting point alloys is transferred, for example, through a molten metal pipeline held by a melting furnace or a holding furnace, and injected into a mold cavity of a molding apparatus such as a die casting machine. It was cast and manufactured as a molded product. In this case, the casting process involves a mold closing process, a gate valve / docking process, an injection process, a pressure holding process, a cooling process, a gate shutoff process, a gate valve / release process, a mold opening process, and a product removal process. Was. That is, the gate valve connected to the holding furnace by the molten metal pipe and capable of communicating and shutting off the molten metal is brought into contact with the runner portion of the mold cavity of the closed mold to be docked, and the molten metal stored in the holding furnace is discharged. After injection into the mold cavity, the pressure was maintained (pressurized), the cooling time was held for a certain period of time, the gate valve was shut off, the gate valve was separated from the runner part and retracted, and the product was taken out after opening the mold. .

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記の
ような作業工程では、金型キャビティ内に射出し保圧さ
れた溶湯が完全に凝固するまでは、金型を開いて鋳造品
を取り出すことができず、このため冷却工程に多くの時
間を要し、1ショットの作業時間が多くなり、生産性が
低いという問題があった。
However, in the above working process, it is necessary to open the mold and take out the cast product until the molten metal injected into the mold cavity and held under pressure is completely solidified. For this reason, there is a problem that a long time is required for the cooling step, a work time for one shot is increased, and productivity is low.

【0004】[0004]

【課題を解決するための手段】以上の課題を解決するた
めに、本発明における低融点合金鋳造方法は、型締装置
によって開閉自在な金型装置の金型を型締して保持炉に
貯蔵した低融点合金の溶湯を、溶湯の連通・遮断が自在
で該保持炉へ逆流可能なゲートバルブを金型キャビティ
のランナ部に当接してドッキングしたうえ、射出装置で
射出して加圧し、冷却固化した後に型開して成形品を取
り出す低融点合金鋳造方法であって、型閉工程、ゲート
バルブ・ドッキング工程、射出工程、保圧工程、冷却工
程、ゲート遮断工程、ゲートバルブ・離脱工程、型開工
程、製品取出工程からなる鋳造作業工程のうち、冷却工
程とこれに後続するゲート遮断工程との間に、射出装置
により溶湯の逆流吸引作用を働かせて金型キャビティ内
に残存する未凝固溶湯を射出ポンプへ吸引する未凝固溶
湯回収工程を追加した。
In order to solve the above-mentioned problems, a low melting point alloy casting method according to the present invention is characterized in that a mold of a mold apparatus which can be opened and closed by a mold clamping apparatus is clamped and stored in a holding furnace. A gate valve that allows free flow and backflow of the molten metal of the low melting point alloy that can flow back and forth into the holding furnace contacts the runner part of the mold cavity, docks it, injects it with an injection device, pressurizes it, and cools it. A low-melting alloy casting method in which a mold is opened and a molded product is taken out after solidification. In the casting process consisting of the mold opening process and the product removal process, between the cooling process and the subsequent gate shut-off process, the unsolidification remaining in the mold cavity by using the backflow suction action of the molten metal by the injection device by the injection device. Adding the non-solidified metal recovery step of sucking the hot water into the injection pump.

【0005】[0005]

【発明の実施の形態】本発明の低融点合金鋳造方法は、
型閉工程、ゲートバルブ・ドッキング工程、射出工程、
保圧工程、冷却工程、ゲート遮断工程、ゲートバルブ・
離脱工程、型開工程、製品取出工程からなる鋳造作業工
程のうち、冷却工程とこれに後続するゲート遮断工程と
の間に、射出装置により溶湯の逆流吸引作用を働かせて
金型キャビティ内に残存する未凝固溶湯を回収する未凝
固溶湯回収工程を追加したため、金型キャビティの全溶
湯が完全に冷却固化する長時間を待たずに次工程の未凝
固溶湯回収工程へ移り、冷却時間が、たとえば、半分に
なるなど、大幅に短縮される。その結果、比較的冷却固
化の速い金型表面付近を残し中心部が未凝固溶湯を抜き
取られて空洞化した中空状製品が出来上がるが、この製
品は樹脂の射出成形の中子として使用し、射出成形後は
加熱により溶解するだけであるから、ある程度の強度が
あればこと足り、支障はない。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The low melting point alloy casting method of the present invention comprises:
Mold closing process, gate valve / docking process, injection process,
Packing process, cooling process, gate shut-off process, gate valve
In the casting process consisting of the release process, mold opening process and product removal process, the injection device acts on the backflow suction of the molten metal by the injection device between the cooling process and the subsequent gate shutoff process to remain in the mold cavity. Since the unsolidified molten metal recovery step of recovering the unsolidified molten metal to be added is added, the process moves to the next unsolidified molten metal recovery step of the next step without waiting for a long time for all the molten metal in the mold cavity to completely cool and solidify, and the cooling time is, for example, , Halving, etc. As a result, a hollow product is obtained in which the unsolidified molten metal is extracted from the center and the cavity is hollowed out, leaving the vicinity of the mold surface where cooling and solidification is relatively fast, but this product is used as a core for resin injection molding and injection After molding, it is only melted by heating, so that a certain strength is sufficient and there is no problem.

【0006】[0006]

【実施例】以下図面に基づいて本発明の実施例の詳細に
ついて説明する。図1〜図4はいずれも本発明の実施例
に係り、図1は低融点合金鋳造装置の縦断面図、図2は
低融点合金鋳造装置の全体構成図、図3はゲートバルブ
の油圧回路図、図4はゲートバルブの動作説明図であ
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The embodiments of the present invention will be described below in detail with reference to the drawings. 1 to 4 relate to an embodiment of the present invention. FIG. 1 is a longitudinal sectional view of a low melting point alloy casting apparatus, FIG. 2 is an overall configuration diagram of the low melting point alloy casting apparatus, and FIG. 3 is a hydraulic circuit of a gate valve. FIG. 4 and FIG. 4 are explanatory diagrams of the operation of the gate valve.

【0007】図1や図2に示すように、低融点合金鋳造
装置300は、溶融金属Mを貯溜し保持する保持炉10
と保持炉10内に浸漬された射出装置(射出ポンプ20
Aおよびポンプ切替弁30、連通遮断弁70等)20と
保持炉10内の溶融金属Mの供給ラインとなる溶湯管路
40と溶融金属Mの連通・遮断を制御するゲートバルブ
50とゲートバルブ50から保持炉10へ溶融金属Mを
戻す戻り管路60と金型装置100と金型装置の開閉お
よび型締を行なう図示しない型締装置とで構成され、付
属装置として、溶湯管路40および戻り管路60を保温
する温度調節装置80と保持炉10や上述の管路40、
60を保温する温調ユニット80Aならびに射出装置2
0やゲートバルブ50を操作制御する制御装置200と
で構成される。
As shown in FIGS. 1 and 2, a low melting point alloy casting apparatus 300 includes a holding furnace 10 for storing and holding a molten metal M.
And an injection device (injection pump 20) immersed in the holding furnace 10.
A and a pump switching valve 30, a communication shutoff valve 70, etc.) 20, and a gate valve 50 and a gate valve 50 for controlling communication and shutoff of the molten metal M and a molten metal pipe 40 serving as a supply line of the molten metal M in the holding furnace 10. A return line 60 for returning the molten metal M from the furnace to the holding furnace 10, a mold device 100, and a mold clamping device (not shown) for opening and closing the mold device and for clamping the mold device. The temperature control device 80 for keeping the temperature of the pipe 60 and the holding furnace 10 and the pipe 40 described above,
Temperature control unit 80A for keeping 60 warm and injection device 2
0 and a control device 200 that controls the operation of the gate valve 50.

【0008】保持炉10は、金属容器に溶融金属Mの溶
湯を貯溜し、上部の開口部を被覆したうえ熱媒体で周囲
を加熱保温するようになっており、この保持炉10内に
射出ポンプ20A、ポンプ切替弁30および1つの連通
遮断弁70からなる射出装置20が収納される。射出装
置20の射出ポンプ(給湯ポンプ)20Aは、この保持
炉10内の溶融金属Mに浸漬されて配置され、上方が開
口され下端面が密閉された筒状のシリンダ20a内にピ
ストン20bがサーボモータ21とボールねじ22aを
介して上下方向摺動自在に配設され、シリンダ20aの
下端面の穿設された透孔20cはポンプ切替弁30に接
続される。ポンプ切替弁30は、保持炉10に連通する
ポートと前記透孔20cに接続するポートと溶湯管路4
0へ連通するポートを有するボデイ30aの内部に、流
体圧シリンダ32の作動により上下方向に昇降する弁棒
34の下端の弁体36を昇降してこれらの各ポートを連
通遮断するよう構成されたものである。
The holding furnace 10 stores a molten metal M in a metal container, covers the upper opening, and heats and heats the surroundings with a heat medium. 20A, the injection device 20 including the pump switching valve 30 and one communication cutoff valve 70 is housed. The injection pump (hot water supply pump) 20A of the injection device 20 is immersed in the molten metal M in the holding furnace 10, and is disposed. The piston 20b is servo-operated in a cylindrical cylinder 20a that is open at the top and sealed at the lower end. The motor 20 and a ball screw 22a are provided so as to be slidable in the vertical direction via a ball screw 22a. A through hole 20c formed in the lower end surface of the cylinder 20a is connected to the pump switching valve 30. The pump switching valve 30 includes a port connected to the holding furnace 10, a port connected to the through hole 20 c, and the molten metal pipe 4.
The valve body 36 at the lower end of the valve rod 34 which rises and falls in the vertical direction by the operation of the fluid pressure cylinder 32 is moved up and down inside the body 30a having a port communicating with the port 0 to communicate with each of these ports. Things.

【0009】ポンプ切替弁30のボデイ30aのポート
のひとつに接続された溶湯管路40は、固定配管とこれ
に接続されるフレキシブル管を経由してゲートバルブ5
0に連絡される。
The molten metal pipe 40 connected to one of the ports of the body 30a of the pump switching valve 30 has a gate valve 5 via a fixed pipe and a flexible pipe connected thereto.
Contact 0.

【0010】ゲートバルブ50は、図2〜図3に示すよ
うに、円筒状のバルブ本体51の内部の透孔に、加圧シ
リンダ50bのピストンロッドに連結された加圧プラン
ジャ50aが嵌装され軸方向に摺動自在に形成され、一
方、バルブ本体51に連結されたドッキングシリンダ5
2の作動によってゲートバルブ50全体が前進(上昇方
向)あるいは後退(下降方向)できるように構成されて
いる。そして、図3に示すように、バルブ本体51上部
の側面に2つの開口部が設けられ、それぞれ溶湯管路4
0と戻り管路60に接続されている。
As shown in FIGS. 2 and 3, the gate valve 50 has a pressure plunger 50a connected to a piston rod of a pressure cylinder 50b fitted in a through hole inside a cylindrical valve body 51. A docking cylinder 5 slidably formed in the axial direction and connected to the valve body 51.
2, the gate valve 50 is configured so as to be able to move forward (upward) or retreat (downward). As shown in FIG. 3, two openings are provided in the upper side surface of the valve body 51, and each of the two openings is provided.
0 and connected to the return line 60.

【0011】ゲートバルブ50は、固定金型110Aの
下端面に図示しないベースブロックを介して着脱自在に
固設されたドッキングシリンダ52のピストンロッドの
先端に連結され、ドッキングシリンダ52のピストンロ
ッドの上下進退動に応じてバルブ本体51全体が昇降自
在に配設される。また、加圧プランジャ(プランジャと
もいう)50aをバルブ本体51に対して上下昇降させ
る加圧シリンダ50bが備えられる。このようにして、
ゲートバルブ50は、金型1のランナ部3へのドッキン
グや離脱が可能で、かつ、加圧プランジャ50aの昇降
が自在であり、バルブ本体51内に軸線方向と直角に設
けられた溶湯通路とランナ部3との連通・遮断が可能と
なる。
The gate valve 50 is connected to a distal end of a piston rod of a docking cylinder 52 which is detachably fixed to a lower end surface of a fixed mold 110A via a base block (not shown). The entire valve main body 51 is arranged to be able to move up and down in accordance with the forward and backward movements. Further, a pressurizing cylinder 50b for vertically moving the pressurizing plunger (also referred to as a plunger) 50a with respect to the valve body 51 is provided. In this way,
The gate valve 50 is capable of docking and detaching the mold 1 to and from the runner portion 3 and is capable of moving up and down the pressurizing plunger 50a, and is provided with a molten metal passage provided in the valve body 51 at right angles to the axial direction. Communication with and disconnection from the runner unit 3 becomes possible.

【0012】一方、ゲートバルブ50のもうひとつの開
口部には、フレキシブル管とこれに接続された固定配管
からなる溶融金属Mの戻り管路60が接続され、保持炉
10内に浸漬された連通遮断弁70を経由して保持炉1
0内の溶融金属に連通している。ゲートバルブ50には
温調ユニット80Aによって供給される熱媒体が通過す
る温度調節配管80aが備えられる。ゲートバルブ50
は、図3に示す油圧回路によって制御される。
On the other hand, a return pipe 60 for the molten metal M, which is composed of a flexible pipe and a fixed pipe connected to the flexible pipe, is connected to another opening of the gate valve 50, and the communication pipe is immersed in the holding furnace 10. Holding furnace 1 via shut-off valve 70
It communicates with the molten metal in 0. The gate valve 50 is provided with a temperature control pipe 80a through which the heat medium supplied by the temperature control unit 80A passes. Gate valve 50
Is controlled by a hydraulic circuit shown in FIG.

【0013】溶湯管路40の最上部付近と最下部には、
それぞれ、大気と連通・遮断自在なストップバルブかま
たはプラグを設けておくことが望ましい。その理由は、
長期休転の際に、溶湯管路40内の溶湯を外部に排出す
るためである。
In the vicinity of the uppermost part and the lowermost part of the molten metal pipe 40,
It is desirable to provide a stop valve or a plug that can communicate with and shut off the atmosphere. The reason is,
This is for discharging the molten metal in the molten metal pipe 40 to the outside during a long-term outage.

【0014】連通遮断弁70は、上述したポンプ切替弁
30と同様に、ボデイ30aに固設されたボデイ70a
内に戻り管路60に接続されるポートと保持炉内の溶融
金属に連通するポートを穿設し、その途中に流体圧シリ
ンダ72の作動により上下方向に昇降する弁棒74の下
端の弁体76を昇降してこのポートを連通遮断するよう
構成されている。また、溶湯管路40や戻り管路60
は、固定配管は内部に溶融金属を通し外側を熱媒体を通
過させる二重管とし、二重管とするには困難なフレキシ
ブル管は単管としたままその外側をフレキシブルヒータ
80bで加熱保温する。なお、流体圧シリンダ32と流
体圧シリンダ72は、通常は油圧シリンダよりも空気圧
シリンダを使用する。
The communication cutoff valve 70 is, similarly to the above-described pump switching valve 30, a body 70a fixed to the body 30a.
A port connected to the return line 60 and a port communicating with the molten metal in the holding furnace are formed therein, and a valve body at the lower end of a valve rod 74 that moves up and down by the operation of the fluid pressure cylinder 72 on the way. The port is lifted up and down to shut off communication with this port. In addition, the melt pipe 40 and the return pipe 60
The fixed pipe is a double pipe through which the molten metal passes through the inside and the heat medium passes through the outside. The flexible pipe which is difficult to make a double pipe is a single pipe, and the outside is heated and kept warm by the flexible heater 80b. . The hydraulic cylinder 32 and the hydraulic cylinder 72 usually use pneumatic cylinders rather than hydraulic cylinders.

【0015】一方、制御装置200は、図2に示すよう
に、パーソナルコンピュータで形成されたコントローラ
210と、コントローラ210とサーボモータ21との
中間に接続されたコンバータ220a、カウンタボード
220b、PIOボード220cおよびサーボアンプ2
20と、コントローラ210〜ゲートバルブ50間なら
びにコントローラ210〜温度調節装置80間に配設さ
れたADコンバータ230、複数個のトランスミッタ2
30a、熱電対240とで構成され、サーボモータ21
やゲートバルブ50に操作指令を発振して制御するとと
もに、溶融金属Mの温度管理を司る。
On the other hand, as shown in FIG. 2, the controller 200 includes a controller 210 formed of a personal computer, a converter 220a, a counter board 220b, and a PIO board 220c connected between the controller 210 and the servomotor 21. And servo amplifier 2
20, an AD converter 230 disposed between the controller 210 and the gate valve 50 and between the controller 210 and the temperature controller 80, and a plurality of transmitters 2
30a, a thermocouple 240 and a servomotor 21
And oscillates an operation command to the gate valve 50 to control the temperature of the molten metal M.

【0016】図3は、ゲートバルブ50を駆動操作する
油圧系統図で、加圧プランジャ50aの動作用の加圧シ
リンダ50bとゲートバルブ50の全体を昇降させるド
ッキングシリンダ52の両方に、それぞれ流量調整弁5
4a、54b、電磁弁56a、56b、減圧弁58a、
58bを介して油圧源59および油タンク59aが油圧
配管で接続される。
FIG. 3 is a hydraulic system diagram for driving and operating the gate valve 50. Flow control is performed on both the pressure cylinder 50b for operating the pressure plunger 50a and the docking cylinder 52 for raising and lowering the entire gate valve 50. Valve 5
4a, 54b, solenoid valves 56a, 56b, pressure reducing valve 58a,
The oil pressure source 59 and the oil tank 59a are connected by an oil pressure pipe via 58b.

【0017】このように構成された本発明の低融点合金
鋳造装置300の作動について、図4を参照しながら、
以下に順を追って説明する。 まず、ポンプ切替弁30内の弁体36を下降限まで下
げ、供給管路40のポートを閉じ保持炉内と透孔20c
を繋ぐポートを開いてから、サーボモータ21を駆動し
てボールネジ機構22を介して射出ポンプ(給湯ポン
プ)20Aのピストン20bを上昇させてシリンダ20
a内に規定量の溶融金属Mを吸引し取り込む。このと
き、連通遮断弁70も弁体76を下降限まで下げ、戻り
管路60と保持炉10内の連通を遮断しておく。
The operation of the low-melting point alloy casting apparatus 300 of the present invention thus configured will be described with reference to FIG.
The description will be given in order below. First, the valve element 36 in the pump switching valve 30 is lowered to the lower limit, the port of the supply line 40 is closed, and the inside of the holding furnace and the through hole 20c are closed.
Is opened, and the servo motor 21 is driven to raise the piston 20b of the injection pump (hot water supply pump) 20A through the ball screw mechanism 22 to thereby raise the cylinder 20.
A prescribed amount of molten metal M is sucked and taken into a. At this time, the communication shut-off valve 70 also lowers the valve body 76 to the lower limit, and cuts off the communication between the return line 60 and the holding furnace 10.

【0018】次に、ゲートバルブ50を金型方向に前
進させ、ゲートバルブ50の先端(上端)を金型キャビ
ティ110aのランナ部へ押圧し、金型110にゲート
バルブ50を密着させる(この工程が、図4のドッキン
グ工程である)。 ゲートバルブ50の加圧プランジャ50aを後退させ
る。 ポンプ切替弁30の弁体36を上昇限まで上げ、給湯
ポンプ20Aのピストン20bを下げてシリンダ20a
内の溶融金属Mを供給管路40ならびにゲートバルブ5
0を経由して金型キャビティ内へ充填する(図4の射出
工程)。 充填完了後は一定時間サーボモータ21のトルク制御
を行ない溶融金属の加圧力を制御する(図4の保圧工
程)。
Next, the gate valve 50 is advanced in the direction of the mold, and the tip (upper end) of the gate valve 50 is pressed against the runner of the mold cavity 110a so that the gate valve 50 is brought into close contact with the mold 110 (this step). This is the docking step of FIG. 4). The pressurizing plunger 50a of the gate valve 50 is retracted. The valve body 36 of the pump switching valve 30 is raised to the upper limit, the piston 20b of the hot water supply pump 20A is lowered, and the cylinder 20a
Of molten metal M in the supply line 40 and the gate valve 5
The mold is filled into the mold cavity via the nozzle 0 (injection step in FIG. 4). After the filling is completed, the torque of the servomotor 21 is controlled for a certain period of time to control the pressing force of the molten metal (pressure keeping step in FIG. 4).

【0019】次に、一定時間の冷却工程に入る。この
冷却時間は、従来の冷却時間よりも大幅に短縮された時
間であり、金型キャビティ表面付近の溶湯が凝固し、中
心部は未だ完全に凝固していない半流動状態をしている
時点である。この時点で、直ちに、次工程の未凝固溶湯
回収工程に移行する。この工程における金型キャビティ
部やランナ部の未凝固金属を回収する方法は、連通遮断
弁70を閉じ、ポンプ切替弁30の弁体36を上昇させ
て供給管路40と給湯ポンプ20を連通し、加圧プラン
ジャ50aを下げてピストン20bを上昇して溶湯管路
40に吸引力を働かせて溶湯管路40を通じて射出装置
20の射出ポンプ20A内に吸引する(図4の未凝固金
属回収工程)。
Next, a cooling process for a predetermined time is started. This cooling time is a time greatly shortened from the conventional cooling time, and when the molten metal near the surface of the mold cavity is solidified, and the center portion is in a semi-flow state that has not yet completely solidified. is there. At this point, the process immediately shifts to the next unsolidified molten metal recovery step. The method of collecting the unsolidified metal in the mold cavity and the runner in this step is as follows: the communication shutoff valve 70 is closed, the valve body 36 of the pump switching valve 30 is raised, and the supply pipe 40 and the hot water supply pump 20 are communicated. Then, the pressurizing plunger 50a is lowered, the piston 20b is raised, and a suction force is applied to the molten metal pipe 40 to suck the molten metal into the injection pump 20A of the injection device 20 through the molten metal pipe 40 (unsolidified metal collecting step in FIG. 4). .

【0020】未凝固金属回収工程がタイマアウトした
後は、ゲートバルブ50の加圧プランジャ50aを前進
限まで上昇させ、溶湯管路40や戻り管路60にある溶
融金属Mがゲートバルブ50より漏れ出さないようにす
る(図4のゲート遮断工程)。 1回のショットが完了し、金型を開いて製品を取り出
したり、次ショットのための離型剤塗布などの待時間に
も、溶融金属Mを循環させたいときには、ゲートバルブ
50を金型から後退退避させてから、加圧プランジャ5
0aを前進位置に保持して、溶融金属Mを溶湯管路40
→ゲートバルブ50→戻り管路60の順に保持炉10内
へ流す。なお、において、ピストン20bが下降限に
達して輸送能力がなくなったときには、溶融金属Mの循
環を一時ストップしてと同様な手順により、ピストン
20bを上昇させてシリンダ20a内に溶融金属Mを取
り込む。その後、今までランナ部3にドッキング状態の
ゲートバルブ50を後退(下降)して、ランナ部3から
離脱状態とし、型開して製品を取り出す。
After the unsolidified metal recovery step has timed out, the pressurizing plunger 50a of the gate valve 50 is raised to the forward limit, and the molten metal M in the molten metal pipe 40 and the return pipe 60 leaks from the gate valve 50. It is prevented from coming out (gate shut-off step in FIG. 4). When one shot is completed and the mold is opened and the product is taken out, or when the molten metal M is to be circulated during the waiting time such as the application of the release agent for the next shot, the gate valve 50 is moved from the mold. After retracting, pressurizing plunger 5
0a is held in the forward position, and the molten metal M is
It flows into the holding furnace 10 in order of → the gate valve 50 → the return line 60. Incidentally, in the above, when the piston 20b reaches the lower limit and the transporting ability is lost, the piston 20b is raised to take the molten metal M into the cylinder 20a by the same procedure as temporarily stopping the circulation of the molten metal M. . Thereafter, the gate valve 50 that has been docked to the runner unit 3 is retracted (downward) so as to be detached from the runner unit 3 and the mold is opened to take out the product.

【0021】以上説明したように、本発明の低融点合金
鋳造装置300は、金型キャビティ2のランナ部3にゲ
ートバルブ50をドッキングさせ、射出ポンプ20Aを
速度制御して射出し、射出後の保圧工程の後、冷却工程
を短く切り上げて、直ちに未凝固溶湯回収工程を実施す
ることによって、従来の冷却時間を大幅に短縮した。ま
た、従来技術のように、保持炉10の溶湯液面よりラン
ナ部の高さ位置を高くしなくとも、ゲートバルブ50の
離脱の際にゲートバルブ先端部から溶湯が漏出すること
がない。したがって、高さ位置の制約がなく、高さの異
なる金型を自由に変更できる。そして、ゲートバルブ5
0を固定金型1Aの下端面に昇降自在の取り付ける構造
としたので、ゲートバルブ周辺の省スペース化を図るこ
ともできる。
As described above, in the low melting point alloy casting apparatus 300 of the present invention, the gate valve 50 is docked to the runner section 3 of the mold cavity 2, the injection pump 20A is controlled to perform injection, and injection is performed. After the pressure-holding step, the cooling step was rounded up and the unsolidified molten metal recovery step was immediately performed, thereby greatly shortening the conventional cooling time. Also, unlike the prior art, the molten metal does not leak from the tip of the gate valve when the gate valve 50 is detached, even if the height position of the runner portion is not higher than the liquid level of the molten metal in the holding furnace 10. Therefore, there is no restriction on the height position, and dies having different heights can be freely changed. And the gate valve 5
0 is mounted on the lower end surface of the fixed mold 1A so as to be able to move up and down, so that the space around the gate valve can be saved.

【0022】[0022]

【発明の効果】以上述べたように、本発明の低融点合金
鋳造方法においては、冷却工程とこれに後続するゲート
遮断工程との間に、射出装置により溶湯の逆流吸引作用
を働かせて金型キャビティ内に残存する未凝固溶湯を回
収する未凝固溶湯回収工程を追加したので、冷却工程の
時間を大幅に短縮でき、その結果、1サイクル所要時間
(鋳造サイクルタイム)が短縮されるので、生産性が大
幅に向上する。
As described above, in the method for casting a low melting point alloy according to the present invention, the injection device performs the backflow suction action of the molten metal between the cooling step and the subsequent gate shut-off step. The addition of an unsolidified molten metal recovery step to recover the unsolidified molten metal remaining in the cavity can greatly reduce the time of the cooling step, and as a result, the time required for one cycle (casting cycle time) is shortened. The performance is greatly improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例に係る低融点合金鋳造装置の縦
断面図である。
FIG. 1 is a longitudinal sectional view of a low melting point alloy casting apparatus according to an embodiment of the present invention.

【図2】本発明の実施例に係る低融点合金鋳造装置の全
体構成図である。
FIG. 2 is an overall configuration diagram of a low melting point alloy casting apparatus according to an embodiment of the present invention.

【図3】本発明の実施例に係るゲートバルブの油圧回路
図である。
FIG. 3 is a hydraulic circuit diagram of the gate valve according to the embodiment of the present invention.

【図4】本発明の実施例に係るゲートバルブの動作説明
図である。
FIG. 4 is an explanatory diagram of an operation of the gate valve according to the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 金型 2 金型キャビティ 3 ランナ部 10 保持炉 10a るつぼ 20 射出装置プ 20A 射出ポンプ(給湯ポンプ) 20a シリンダ 20b ピストン 20c 透孔 21 サーボモータ 22 ボールネジ機構 22a ボールねじ 22b ボールナット 30 ポンプ切替弁 30a ボデイ 32 流体圧シリンダ 34 弁棒 36 弁体 40 溶湯管路 50 ゲートバルブ 50a 加圧プランジャ(プランジャ) 50b 加圧シリンダ 51 バルブ本体 52 ドッキングシリンダ 54a、54b 流量調整弁 56a、56b 電磁弁 58a、58b 減圧弁 59 油圧源 59a 油タンク 60 戻り管路 70 連通遮断弁 72 流体圧シリンダ 74 弁棒 76 弁体 80 温度調節装置 80A 温調ユニット 80a 温度調節配管 80b フレキシブルヒータ 100 金型装置 200 制御装置 300 低融点合金鋳造装置 M 溶融金属(溶湯) Reference Signs List 1 mold 2 mold cavity 3 runner section 10 holding furnace 10a crucible 20 injection device pump 20A injection pump (hot water supply pump) 20a cylinder 20b piston 20c through hole 21 servo motor 22 ball screw mechanism 22a ball screw 22b ball nut 30 pump switching valve 30a Body 32 Fluid pressure cylinder 34 Valve rod 36 Valve element 40 Molten pipeline 50 Gate valve 50a Pressurizing plunger (plunger) 50b Pressurizing cylinder 51 Valve body 52 Docking cylinder 54a, 54b Flow control valve 56a, 56b Solenoid valve 58a, 58b Decompression Valve 59 Hydraulic source 59a Oil tank 60 Return line 70 Communication cutoff valve 72 Fluid pressure cylinder 74 Valve rod 76 Valve element 80 Temperature control device 80A Temperature control unit 80a Temperature control pipe 80b Flexible heater 100 Gold Molding device 200 Control device 300 Low melting point alloy casting device M Molten metal (Molten metal)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 型締装置によって開閉自在な金型装置の
金型を型締して保持炉に貯蔵した低融点合金の溶湯を、
溶湯の連通・遮断が自在で該保持炉へ逆流可能なゲート
バルブを金型キャビティのランナ部に当接してドッキン
グしたうえ、射出装置で射出して加圧し、冷却固化した
後に型開して成形品を取り出す低融点合金鋳造方法であ
って、 型閉工程、ゲートバルブ・ドッキング工程、射出工程、
保圧工程、冷却工程、ゲート遮断工程、ゲートバルブ・
離脱工程、型開工程、製品取出工程からなる鋳造作業工
程のうち、冷却工程とこれに後続するゲート遮断工程と
の間に、射出装置により溶湯の逆流吸引作用を働かせて
金型キャビティ内に残存する未凝固溶湯を回収する未凝
固溶湯回収工程を追加したことを特徴とする低融点合金
鋳造方法。
1. A molten metal of a low melting point alloy stored in a holding furnace by clamping a mold of a mold device which can be opened and closed by a mold clamping device,
A gate valve that can freely flow and shut off the molten metal and that can flow back to the holding furnace contacts the runner part of the mold cavity, docks it, injects it with an injection device, pressurizes it, cools and solidifies, then opens the mold and molds A low-melting alloy casting method for extracting products, comprising a mold closing step, a gate valve docking step, an injection step,
Packing process, cooling process, gate shut-off process, gate valve
In the casting process consisting of the release process, mold opening process and product removal process, the injection device acts on the backflow suction of the molten metal by the injection device between the cooling process and the subsequent gate shutoff process to remain in the mold cavity. A method for casting a low-melting alloy, characterized by adding an unsolidified molten metal recovery step of recovering unsolidified molten metal.
JP03363697A 1997-02-18 1997-02-18 Low melting point alloy casting method Expired - Fee Related JP3518227B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03363697A JP3518227B2 (en) 1997-02-18 1997-02-18 Low melting point alloy casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03363697A JP3518227B2 (en) 1997-02-18 1997-02-18 Low melting point alloy casting method

Publications (2)

Publication Number Publication Date
JPH10225758A true JPH10225758A (en) 1998-08-25
JP3518227B2 JP3518227B2 (en) 2004-04-12

Family

ID=12391950

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03363697A Expired - Fee Related JP3518227B2 (en) 1997-02-18 1997-02-18 Low melting point alloy casting method

Country Status (1)

Country Link
JP (1) JP3518227B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030091924A (en) * 2003-11-17 2003-12-03 이현식 The manufacturing method of door knob
WO2004089562A1 (en) * 2003-04-10 2004-10-21 Bühler Druckguss AG Holding furnace and metering device for metal baths
JP2018185548A (en) * 2013-03-14 2018-11-22 エーエスエムエル ネザーランズ ビー.ブイ. Method of and apparatus for supply and recovery of target material

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004089562A1 (en) * 2003-04-10 2004-10-21 Bühler Druckguss AG Holding furnace and metering device for metal baths
US7445748B2 (en) 2003-04-10 2008-11-04 Buhler Druckguss Ag Holding furnace and metering device for metal baths
KR20030091924A (en) * 2003-11-17 2003-12-03 이현식 The manufacturing method of door knob
JP2018185548A (en) * 2013-03-14 2018-11-22 エーエスエムエル ネザーランズ ビー.ブイ. Method of and apparatus for supply and recovery of target material

Also Published As

Publication number Publication date
JP3518227B2 (en) 2004-04-12

Similar Documents

Publication Publication Date Title
KR101070972B1 (en) Method and apparatus for manufacturing metallic parts by die casting
JP3882013B2 (en) Casting water heater
US5181551A (en) Double acting cylinder for filling dies with molten metal
EP0527747B1 (en) Valve mechanism for casting metal alloys with low melting temperatures
US4991641A (en) Method of and apparatus for metal casting
US4958675A (en) Method for casting metal alloys with low melting temperatures
JP2008179061A (en) Injection molding machine and control method thereof
JP3518227B2 (en) Low melting point alloy casting method
EP2658664B1 (en) Die casting machine and method
JP3536570B2 (en) Low melting point alloy casting equipment
US5088546A (en) Vacuum-assisted counter gravity casting apparatus with valve to prevent flow of melt from mold
JPH10225756A (en) Method for casting low melting point alloy
CN209126088U (en) A kind of toy case injection mold
JPH10225755A (en) Apparatus and method for casting low melting point alloy
JPH10202354A (en) Injection control method and injection control device
JP4123396B2 (en) Wax model forming equipment for lost wax process
JPH10225757A (en) Apparatus for casting low melting point alloy
US5031686A (en) Method for casting metal alloys with low melting temperatures
JPH10216916A (en) Device for injecting low melting point alloy
JPH09239510A (en) Apparatus for supplying molten metal
US5090470A (en) Apparatus for casting metal alloys with low melting temperatures
JPH0534847Y2 (en)
JP2581618B2 (en) Die casting machine
JP2593110B2 (en) Method and apparatus for canceling mold injection force output in mold injection molding machine
JP3795837B2 (en) Metal injection molding method and apparatus

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040106

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040119

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080206

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090206

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090206

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100206

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100206

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110206

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110206

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120206

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120206

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120206

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130206

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130206

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130206

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees