JPH10219697A - Method of foundation work in cantilever type garage or the like - Google Patents

Method of foundation work in cantilever type garage or the like

Info

Publication number
JPH10219697A
JPH10219697A JP2063497A JP2063497A JPH10219697A JP H10219697 A JPH10219697 A JP H10219697A JP 2063497 A JP2063497 A JP 2063497A JP 2063497 A JP2063497 A JP 2063497A JP H10219697 A JPH10219697 A JP H10219697A
Authority
JP
Japan
Prior art keywords
foundation
cantilever type
garage
frame
type garage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2063497A
Other languages
Japanese (ja)
Inventor
Yoshiichi Takubo
芳一 田窪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAKUBO KOGYOSHO KK
Original Assignee
TAKUBO KOGYOSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAKUBO KOGYOSHO KK filed Critical TAKUBO KOGYOSHO KK
Priority to JP2063497A priority Critical patent/JPH10219697A/en
Publication of JPH10219697A publication Critical patent/JPH10219697A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To complete concrete placing in foundation work at one time by stably holding a cantilever type garage by joining columns of the cantilever type garage by bolts to a shape steel foundation frame having horizontal level adjusters. SOLUTION: A foundation frame A is constituted in a rectangular shape by H shape steel 2 and 2 and C shape steel 3 and 3, and connecting parts 4 and 4 to join columns 1a and 1a of a cantilever type garage by bolts are arranged so that the center of gravity of the cantilever type garage is positioned on the foundation frame A, and a reinforcing welding wire net 6 is unfolded in the frame. First of all, a hole H in which the foundation frame A is embedded is excavated, and cobble stones (g) are laid, and the foundation frame A is arranged on it, and the columns 1a and 1a of the cantilever type garage are joined to the connecting parts 4 and 4 by bolts, and the cantilever type garage is erected, and a horizontal level of the foundation frame A is adjusted by horizontal level adjusters 5 arranged in the four corners of the foundation frame A, and concrete is placed. Therefore, the cantilever type garage is stably held only by the foundation frame A, and concrete placing can be completed at one time.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は基礎工事の方法、詳
しくは車庫等の基礎工事の方法に関するものであり、特
に片持ち型車庫等のように上体がアンバランスな物件に
適した基礎工事の方法である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of foundation work, and more particularly to a method of foundation work for a garage or the like, and more particularly, to a foundation work suitable for an unbalanced upper body such as a cantilevered garage. This is the method.

【0002】[0002]

【従来の技術】従来このような片持ち型車庫等の基礎工
事を行う場合は、 柱を立設する箇所に穴を掘り、グリを敷く。 コンクリートを打設し、柱との接続のためアンカーボ
ルトを埋込む。 3〜4日養生する。 柱を立設し、水平レベルを調整する。 車庫本体を組立てる。 柱の基礎接続部分および土間にコンクリートを打設す
る。 3〜4日養生する。(図1を参照) と以上のような工程で工事を行っていた。しかし、これ
では組立業者は、1回目()、2回目()と
現場に2度行かなくてはならない。さらに、コンクリー
トの養生が、と2回に分けて行われるため使用可能
までの工事日数が8日〜10日間かかるという問題点が
あった。
2. Description of the Related Art Conventionally, when foundation work such as a cantilever type garage is performed, a hole is dug in a place where a pillar is to be erected, and a bar is laid. Cast concrete and embed anchor bolts to connect to columns. Cure for 3-4 days. Erect columns and adjust the horizontal level. Assemble the garage body. Concrete is cast in the foundation connection of pillars and in the soil. Cure for 3-4 days. (Refer to Fig. 1). However, this requires the assembler to go to the site twice, once () and second (). Further, since the curing of the concrete is performed twice, it takes 8 to 10 days to construct the concrete.

【0003】[0003]

【発明が解決しようとする課題】そこで本発明は、コン
クリート打設を1回で完了できる基礎工事の方法であ
り、そうすることにより、組立業者が現場へ行くのは1
回で充分であるうえ、コンクリートの養生が1回で済む
ので工事日数が大幅に減少するという基礎工事の方法を
提供することを目的としたものである。
SUMMARY OF THE INVENTION Accordingly, the present invention is a method of foundation work in which concrete placement can be completed in a single operation.
An object of the present invention is to provide a method of foundation work in which the number of times required for the work is sufficient and the curing time for the concrete is one, so that the number of work days is greatly reduced.

【0004】[0004]

【課題を解決するための手段】上記目的を達成するため
に、本発明のうち請求項1記載の発明は、片持ち型車庫
等の柱との接続部と、水平レベル調整装置を備えた基礎
枠を用いて行う基礎工事の方法であり、接続部として
は、請求項2記載のように片持ち型車庫等を基礎枠の上
に立設しても全体の重心が基礎枠から外れることのな
い、すなわち基礎枠を埋込まなくても車庫本体を立設し
た状態で保持できる位置に接続部を配置すれば良く、ま
た水平レベル調整装置としては、請求項3に記載のよう
に基礎枠の四隅部に螺孔を設け、該螺孔に下向きに貫通
したボルトの先端部をプレートで受けることにより、ボ
ルトを正逆に回して枠の四隅を上下に微動させ、基礎枠
の水平レベルを調整するものである。工程順序として
は、請求項4に記載のように基礎枠を埋込むための穴を
掘り、水平レベル調整装置で基礎枠を前記穴内に水平に
設置し、接続部に本体柱を接続して基礎枠上に片持ち型
車庫等を立設後コンクリート打設を行うことを特徴とす
る片持ち型車庫等における基礎工事の方法である。
In order to achieve the above object, according to the first aspect of the present invention, there is provided a base having a connecting portion with a column such as a cantilevered garage and a horizontal level adjusting device. This is a method of foundation work performed using a frame, and as a connecting portion, even if a cantilevered garage or the like is erected on the foundation frame as described in claim 2, the entire center of gravity is deviated from the foundation frame. In other words, the connecting portion may be arranged at a position where the garage main body can be held upright without embedding the base frame, and the horizontal level adjusting device may be a base frame as described in claim 3. By providing screw holes at the four corners and receiving the tip of the bolt penetrating downward through the screw hole with a plate, turning the bolt forward and reverse to finely move the four corners of the frame up and down and adjust the horizontal level of the base frame Is what you do. As a process sequence, a hole for embedding a foundation frame is dug as described in claim 4, the foundation frame is horizontally installed in the hole by a horizontal level adjustment device, and the main body pillar is connected to the connection portion to form a foundation. This is a method of foundation work in a cantilevered garage or the like, wherein concrete is cast after standing a cantilevered garage or the like on a frame.

【0005】[0005]

【発明の実施の形態】以下、本発明の実施の形態の一例
を、図面に基づいて説明する。図1は、従来の基礎工事
方法により立設した片持ち型車庫1を示した断面図であ
り、gはグリ、C1は1回目に打設したコンクリート
で、aはアンカーボルト、C2は2回目に打設したコン
クリートである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a cross-sectional view showing a cantilever type garage 1 erected by a conventional foundation construction method, where g is a grind, C1 is concrete poured in a first time, a is an anchor bolt, and C2 is a second time. It is concrete poured in.

【0006】図2は、本発明の基礎工事方法による片持
ち型車庫1の立設の基礎部分を示した斜視図であり、基
礎枠Aは対向する2辺をH形鋼2、2とC形鋼3、3で
矩形に構成した枠であり、左右のH形綱2、2の一端部
上面にそれぞれ接続部4、4を設け、片持ち型車庫の柱
1a、1aの下端部に設けた接続プレート1b、1bと
ボルト締めにより接続固定する。また、基礎枠Aの四隅
寄り部にはそれぞれ水平レベル調整装置5が配置され
る。Hは基礎枠Aを埋込むための穴で、深さは約300
mmであり、中にはグリgを敷く。また基礎枠内に補強
用溶接金網6を入れてある。
FIG. 2 is a perspective view showing a standing portion of an upright cantilever garage 1 according to the foundation construction method of the present invention. It is a rectangular frame made of shaped steel members 3, 3. Connection portions 4, 4 are provided on the upper surfaces of the end portions of the left and right H-shaped ropes 2, 2, respectively, and provided at the lower end portions of the pillars 1a, 1a of the cantilever garage. The connection plates 1b and 1b are connected and fixed by bolting. Further, horizontal level adjusting devices 5 are arranged at the four corners of the base frame A, respectively. H is a hole for embedding the base frame A and has a depth of about 300.
mm, and grits g are laid inside. Further, a reinforcing wire mesh 6 is placed in the base frame.

【0007】図3は、本発明の基礎工事方法による片持
ち型車庫1の立設を示した断面図であり、穴H底面にグ
リgを敷き、その上に基礎枠Aを設置し、H形綱2の端
部上面に設けられた接続部4と、柱1aの下端部に取り
付けられた接続プレート1bとをボルト7で締付け固定
して片持ち型車庫を立設し、H形綱2に溶着した短寸の
コ形鋼5bに螺孔を設け、下向きに貫通した調整ボルト
5aの先端を接地プレート5cに突き当てた水平レベル
調整装置5の調整ボルト5aを正逆に回すことにより基
礎枠Aを上下に微動させ水平レベルを調整する。なお、
基礎枠Aの大きさは、車庫全体の重心が基礎枠上に位置
するように設定するので、この状態においてコンクリー
トを打たなくても、支えなしに自立する。
FIG. 3 is a sectional view showing the cantilever type garage 1 erected according to the foundation construction method of the present invention. A grind g is laid on the bottom surface of the hole H, and a foundation frame A is placed thereon. The connecting portion 4 provided on the upper surface of the end of the shape rope 2 and the connection plate 1b attached to the lower end of the pillar 1a are fixed with bolts 7 to fix the cantilever type garage, and the H-shaped rope 2 A screw hole is provided in the short U-shaped steel 5b welded to the base plate, and the adjustment bolt 5a of the horizontal level adjustment device 5 in which the tip of the adjustment bolt 5a penetrating downward is abutted against the ground plate 5c is turned in the normal or reverse direction. The horizontal level is adjusted by slightly moving the frame A up and down. In addition,
Since the size of the base frame A is set so that the center of gravity of the entire garage is located on the base frame, in this state, even if the concrete is not struck, the base is self-supporting.

【0008】図4は、図3で水平レベル調整を行った
後、コンクリートC3を打った状態を示した断面図であ
る。片持ち型車庫1が自立しているため基礎枠の部分と
土間の部分を同時に打設することができる。
FIG. 4 is a cross-sectional view showing a state where concrete C3 has been struck after the horizontal level adjustment in FIG. Since the cantilever type garage 1 is self-supporting, the portion of the foundation frame and the portion between the soils can be cast simultaneously.

【0009】図5は、本発明の基礎工事方法を用いた、
他の形状の片持ち型車庫1′を立設した状態の断面図で
あり、1′aが柱で1′cは副柱である。この片持ち型
車庫1′は柱が4本あるが一側方へ寄った位置にあるた
め、本発明の基礎工事方法を利用するのが良い。
FIG. 5 is a schematic diagram showing the use of the foundation construction method of the present invention.
It is sectional drawing in the state where the cantilever type garage 1 'of another shape was set up, 1'a is a pillar and 1'c is a sub pillar. Although the cantilever type garage 1 'has four pillars but is located at a position closer to one side, it is preferable to use the foundation construction method of the present invention.

【0010】[0010]

【発明の効果】本発明の片持ち型車庫等における基礎工
事の方法は、従来ならば組立業者が2回に分けて現場に
足を運ばなければならないところが、1回で済み、しか
もコンクリートの養生が1回で終るため工事日数が大幅
に減少し、また、車庫本体の重心が基礎枠上に位置する
ため、支えなしで自立するので全体に安定しており、埋
込み深さを従来よりも浅くすることができる。
According to the present invention, the method of foundation work in a cantilevered garage or the like is a conventional method in which an assembler would have to visit the site twice in two steps. Is completed once, greatly reducing the number of construction days. In addition, since the center of gravity of the garage main body is located on the base frame, the garage is self-supporting without any support, so the whole is stable and the embedding depth is shallower than before. can do.

【図面の簡単な説明】[Brief description of the drawings]

【図1】従来の基礎工事方法により立設した片持ち型車
庫1を示した断面図
FIG. 1 is a sectional view showing a cantilever type garage 1 erected by a conventional foundation construction method.

【図2】本発明の基礎工事方法による片持ち型車庫1の
立設の基礎部分を示した斜視図
FIG. 2 is a perspective view showing a standing part of an upright cantilever garage 1 according to the foundation construction method of the present invention.

【図3】本発明の基礎工事方法による片持ち型車庫1の
立設を示した断面図
FIG. 3 is a cross-sectional view showing the cantilever type garage 1 standing by the foundation construction method of the present invention.

【図4】図3で水平レベル調整を行った後、コンクリー
トC3を打った状態を示した断面図
FIG. 4 is a cross-sectional view showing a state where concrete C3 has been struck after performing horizontal level adjustment in FIG. 3;

【図5】本発明の基礎工事方法を用いた、他の形状の片
持ち型車庫1′を立設した状態の断面図
FIG. 5 is a sectional view of a state in which a cantilevered garage 1 'of another shape is erected using the foundation construction method of the present invention.

【符号の説明】[Explanation of symbols]

1、1′…片持ち型車庫 1a、1′a…柱 1b…接続プレート 1′c…副柱 2…H形綱 3…C形鋼 4…接続部 5…水平レベル調整装置 5a…調整ボルト 5b…コ形鋼 5c…接地プレート 6…補強用溶接金網 7…ボルト A…基礎枠 C1、C2、C3…コンクリート H…穴 a…アンカーボルト g…グリ 1, 1 '... cantilever type garage 1a, 1'a ... pillar 1b ... connection plate 1'c ... sub-pillar 2 ... H-shaped rope 3 ... C-shaped steel 4 ... connection part 5 ... horizontal level adjustment device 5a ... adjustment bolt 5b: U-shaped steel 5c: Ground plate 6: Welding wire mesh for reinforcement 7: Bolt A: Foundation frame C1, C2, C3: Concrete H: Hole a: Anchor bolt g: Grind

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】片持ち型車庫の柱との接続部と、水平レベ
ル調整装置を備えた基礎枠を用いた片持ち型車庫等にお
ける基礎工事の方法。
1. A method of foundation work in a cantilevered garage or the like using a connection portion with a pillar of a cantilevered garage and a foundation frame provided with a horizontal level adjusting device.
【請求項2】片持ち型車庫を基礎枠に立設しても重心が
基礎枠上に位置するよう接続部を配置した請求項1記載
の片持ち型車庫等における基礎工事の方法。
2. The method of foundation work in a cantilevered garage or the like according to claim 1, wherein the connecting portions are arranged so that the center of gravity is located on the foundation frame even when the cantilevered garage is erected on the foundation frame.
【請求項3】基礎枠の四隅部に螺孔を設け、該螺孔に下
向きに貫通したボルトの先端部をプレートで受けること
により、基礎枠の水平レベルを調整する水平レベル調整
装置を利用した請求項1または2記載の片持ち型車庫等
における基礎工事の方法。
3. A horizontal level adjusting device for adjusting the horizontal level of the base frame by providing screw holes at four corners of the base frame and receiving a tip of a bolt penetrating downward through the screw hole by a plate. A method for foundation work in a cantilevered garage or the like according to claim 1 or 2.
【請求項4】基礎枠を埋込むための穴を掘り、基礎枠を
前記穴内に水平に設置し、基礎枠上に片持ち型車庫等を
立設後コンクリート打設を行う請求項1ないし3記載の
片持ち型車庫等における基礎工事の方法。
4. A hole for embedding a foundation frame, digging a foundation frame horizontally in the hole, placing a cantilever type garage on the foundation frame and then pouring concrete. The method of foundation work in the cantilever type garage etc. as described.
JP2063497A 1997-02-03 1997-02-03 Method of foundation work in cantilever type garage or the like Pending JPH10219697A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2063497A JPH10219697A (en) 1997-02-03 1997-02-03 Method of foundation work in cantilever type garage or the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2063497A JPH10219697A (en) 1997-02-03 1997-02-03 Method of foundation work in cantilever type garage or the like

Publications (1)

Publication Number Publication Date
JPH10219697A true JPH10219697A (en) 1998-08-18

Family

ID=12032674

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2063497A Pending JPH10219697A (en) 1997-02-03 1997-02-03 Method of foundation work in cantilever type garage or the like

Country Status (1)

Country Link
JP (1) JPH10219697A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010116754A (en) * 2008-11-14 2010-05-27 Asahi Kasei Homes Co Structure, and construction and designing method of structure
KR101240376B1 (en) 2011-07-04 2013-03-11 이종익 The frame assembly of steel house

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010116754A (en) * 2008-11-14 2010-05-27 Asahi Kasei Homes Co Structure, and construction and designing method of structure
KR101240376B1 (en) 2011-07-04 2013-03-11 이종익 The frame assembly of steel house

Similar Documents

Publication Publication Date Title
US20120023847A1 (en) Foundation construction for superstructures
JPH0393923A (en) Connection method of steel pillar of cast-in-place pile and connection structure
JPH11100854A (en) Building and foundation structure therefor
JP2000064305A (en) Foundation structure of steel tower and construction thereof
JPH11181790A (en) Execution method of building foundation
JPH111924A (en) Erection method and device of insertion type steel pipe column
JPH10219697A (en) Method of foundation work in cantilever type garage or the like
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JPH0533351A (en) Steel column base of steel frame structure and execution thereof
JP3700119B2 (en) Pillar construction method
JPH082181Y2 (en) Foundation for steel structures
JPS61233131A (en) Foundation structure of pole
JPH02164930A (en) Foundation structure for building
JPH1096210A (en) Method of executing enlargement of bridge pier
JP2002194748A (en) Foundation constructing method and building foundation structure
JP2002021096A (en) Building and constructing method therefor
JPH0232417B2 (en)
JP2004162346A (en) Pile head connection structure of prefabricated pile
JP2004143878A (en) Construction method for joining foundation pile and column together and metal joint for joining
JPH10131300A (en) Execution method for building by preceding erection of steel frame
JPH07109098B2 (en) Construction method of basement floor and beam-column joint used for the construction method
JP2002309587A (en) Independent foundation, method of constructing, it, and independent foundation structure
JP3027498B2 (en) Precast concrete foundation and its construction method
JP2001115464A (en) Joining structure of pile to column
JP3005885B2 (en) How to build the foundation of a structure