JPH10185001A - U-bolt with stopper - Google Patents

U-bolt with stopper

Info

Publication number
JPH10185001A
JPH10185001A JP8356666A JP35666696A JPH10185001A JP H10185001 A JPH10185001 A JP H10185001A JP 8356666 A JP8356666 A JP 8356666A JP 35666696 A JP35666696 A JP 35666696A JP H10185001 A JPH10185001 A JP H10185001A
Authority
JP
Japan
Prior art keywords
bolt
support steel
pipe
stopper
gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP8356666A
Other languages
Japanese (ja)
Inventor
Nobuyoshi Iriki
信好 入木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP8356666A priority Critical patent/JPH10185001A/en
Publication of JPH10185001A publication Critical patent/JPH10185001A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To facilitate mounting operation at work sites, and also shorten its execution time in correction with the U-bolt for mounting the pipeline onto the various kinds of production plants. SOLUTION: A constitution of the U-bolt to be used when it is used to be threadedly fixed to the pipe-line P to the support steel 6 of the kind of plants with the U-bolt 2, the stoppers 1 which are made out of stainless steel and carbon steel, are thick in wall, and are provided with split flat washers, are welded so as to be fixed to placed close to each position in which a gap between the pipeline P and the U-bolt 2 is as specified where the aforesaid pipeline is in the vicinity of each insertion part to the support steel 6 positioned at the surface side of the support steel 6 set so as to be continuous to both the end screw parts of the U-bolt 2.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、Uボルトの原子力
プラントその他各種プラント類での据付け作業に適用さ
れる隙間調整可能なUボルトの構成に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a U-bolt capable of adjusting a gap applied to an installation work of a U-bolt in a nuclear power plant or other various plants.

【0002】[0002]

【従来の技術】図2は従来の配管等の据付け用Uボルト
の構成を示すもので、図においてPはプラント類のサポ
ート鋼材6に取付けられる配管を示す。
2. Description of the Related Art FIG. 2 shows the structure of a conventional U-bolt for installation of piping or the like. In the drawing, P indicates a piping attached to a support steel material 6 of a plant or the like.

【0003】配管Pはプラント類のサポート鋼材表側に
Uボルト2により据付けられるが、この際従来はロック
ナット10をUボルト2の両端基部に設けられたねじ部
に捩じ込み、配管PとUボルト2との隙間3が規定値と
なるよう隙間管理を行なっている。
[0003] The pipe P is installed on the front side of a support steel material of a plant by a U-bolt 2. At this time, conventionally, the lock nut 10 is screwed into a threaded portion provided at both ends of the U-bolt 2, and the pipes P and U are conventionally mounted. Gap management is performed so that the gap 3 with the bolt 2 becomes a specified value.

【0004】この時、隙間管理のため、Uボルト2のね
じ部に捩じ込まれるロックナット10は、隙間3が規定
値付近になるまで捩じ込まれる必要があり、この作業に
手間が掛かっていた。なお4はスペーサ、5は座金、7
は締め付け用六角ナットである。
At this time, the lock nut 10 to be screwed into the threaded portion of the U-bolt 2 needs to be screwed in until the gap 3 becomes close to a specified value for gap management, and this work is troublesome. I was 4 is a spacer, 5 is a washer, 7
Is a hexagon nut for tightening.

【0005】[0005]

【発明が解決しようとする課題】ところで従来プラント
類へのUボルトの据付け作業時は、まず各種プラント内
で、Uボルトにねじ込まれたロックナット10および締
付け用の六角ナット7を外し、Uボルト2を配管Pにか
け、ついでロックナット10をUボルト2に捩じ込んで
行き、Uボルトを配管P側に接触するよう下ろして行
く。
When installing U-bolts in conventional plants, first, in various plants, the lock nut 10 screwed into the U-bolt and the hexagonal nut 7 for tightening are removed, and the U-bolt is removed. Then, the lock nut 10 is screwed into the U-bolt 2 and the U-bolt is lowered so as to come into contact with the pipe P.

【0006】そしてロックナット10によりサポート鋼
材6と配管P間の隙間調整をした後、六角ナット7によ
りサポート鋼材6の裏側より締め付けて固定している。
After the gap between the support steel 6 and the pipe P is adjusted by the lock nut 10, the support steel 6 is tightened and fixed from the back side by the hexagon nut 7.

【0007】又Uボルト2を据え付けても、サポート鋼
材6と配管Pの間に隙間がある場合は、スペーサ4をロ
ックナット10とサポート鋼材6との間に挿入介在させ
るため再度六角ナット7を取り外し、ロックナット10
をゆるめ、配管PからUボルト2を上げて行かなければ
ならない。
If there is a gap between the support steel 6 and the pipe P even after the U bolt 2 is installed, the hex nut 7 is again inserted to insert the spacer 4 between the lock nut 10 and the support steel 6. Removal, lock nut 10
And the U bolt 2 must be raised from the pipe P.

【0008】上述のような従来の手段では、隙間調整用
のロックナット10の取り付け、取り外しに手間がかか
ると云う不具合点があった。
The conventional means as described above has a problem that it takes time to attach and remove the lock nut 10 for adjusting the clearance.

【0009】本発明は上記各不具合点を解消するため、
あらかじめ配管とUボルトの規定隙間が満足される位置
に、従来のロックナットの代りにUボルトにストッパを
溶接により取り付けておくことにより現場でのロックナ
ットの捩じ込み作業の省略を可能とした新たなストッパ
付Uボルトを提供することを目的としている。
The present invention has been made in order to solve the above problems.
By attaching a stopper to the U-bolt by welding instead of the conventional lock nut at a position where the specified gap between the pipe and the U-bolt is satisfied in advance, it has become possible to omit the work of screwing the lock nut on site. It is intended to provide a new U-bolt with a stopper.

【0010】[0010]

【課題を解決するための手段】前記目的を達成するため
の構成として本発明のストッパ付Uボルトは、各種プラ
ント類における、配管をサポート鋼材に据付けるための
Uボルトにおいて、該Uボルト両端部のねじ部に連接す
るサポート鋼材への挿入部近傍位置に、あらかじめ配管
とUボルトの隙間が規定値となるように、ステンレス鋼
及び炭素鋼製の厚肉でかつ平座金を半割形状としたスト
ッパを溶接固定したことを特徴としている。
In order to achieve the above object, a U-bolt with a stopper according to the present invention is provided in a U-bolt for mounting a pipe on a support steel material in various plants and the like. At the position near the insertion part into the support steel material connected to the threaded part, the thick washer made of stainless steel and carbon steel and the flat washer were formed in half so that the gap between the pipe and the U-bolt became the specified value in advance. The stopper is welded and fixed.

【0011】[0011]

【発明の実施の形態】以下図面により本発明の最良と思
われる実施の形態の1例について説明する。図1は本発
明に係るストッパ付Uボルトの構成及び締付け状態を示
す説明図、図3は同Uボルトに溶接する半割型ストッパ
で(a)は平面図、(b)は正面図、(c)は側面図で
ある。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a block diagram showing an embodiment of the present invention; FIG. 1 is an explanatory view showing a configuration and a tightened state of a U-bolt with a stopper according to the present invention, FIG. 3 is a half-type stopper to be welded to the U-bolt, (a) is a plan view, (b) is a front view, c) is a side view.

【0012】これらの図において、Pは配管、2は両端
部にねじ部を設けたUボルト、6はサポート鋼材、4は
スペーサ、5は座金で、Uボルト2の両端部ねじ部はサ
ポート鋼材6に設けた透孔を貫通してサポート鋼材6の
裏側迄挿入され、六角ナット7により締付け固着され
る。なお8は廻り止めを示す。
In these figures, P is a pipe, 2 is a U-bolt having threaded portions at both ends, 6 is a support steel material, 4 is a spacer, 5 is a washer, and a threaded portion at both ends of the U-bolt 2 is a support steel material. 6 is inserted to the back side of the support steel material 6 through the through hole provided in 6, and is fixedly fastened by a hexagon nut 7. Reference numeral 8 denotes a rotation stopper.

【0013】サポート鋼材6の表側にはUボルト2のU
字状部内に配管Pが嵌入されて抱え込まれる状態にサポ
ートされるようにUボルト2が捩じ込まれる。
The U side of the U bolt 2 is provided on the front side of the support steel 6.
The U-bolt 2 is screwed in such a manner that the pipe P is fitted and held in the character-shaped portion.

【0014】Uボルト2の両端ねじ部に連接して、該ボ
ルト2の表側に位置するサポート鋼材への挿入部近傍に
は、配管PとUボルト2の規定隙間が満足される位置
に、従来のロックナットの代りにストッパ1が溶接Wに
て取付けられている。
In the vicinity of the portion of the U-bolt 2 which is connected to the threaded portion at both ends of the U-bolt 2 and near the insertion part of the U-bolt 2 in the support steel material located on the front side of the U-bolt 2, a position where the specified gap between the pipe P and the U-bolt 2 is satisfied The stopper 1 is attached by welding W instead of the lock nut described above.

【0015】ストッパ1の構造は、図3に示すように平
座金を半割形状としたものが採用される。そしてステン
レス鋼及び炭素鋼製の素材で、しかも厚肉のものが用い
られる。
As the structure of the stopper 1, as shown in FIG. 3, a flat washer having a half-split shape is employed. A stainless steel or carbon steel material having a large thickness is used.

【0016】サポート鋼材6にUボルト2を据付ける時
は、まずサポート鋼材6の裏側においてUボルト両端ね
じ部に螺合する締付け用六角ナット7を外したのち、U
ボルト2のU字状曲り部を配管Pの外周に嵌め込み、そ
の両端ねじ部をサポート鋼材6を貫通させ、該鋼材6の
裏側にて締付け用六角ナット7を回動して締め付ける作
業のみで良く、従来のようにロックナットを捩じ込む作
業が必要なくなる。その結果Uボルトの据付けの手間が
減少する。
When installing the U-bolt 2 on the support steel member 6, first remove the hexagonal nuts 7 for screwing on both ends of the U-bolt on the back side of the support steel member 6, and then remove the U-bolt 2.
Only the work of fitting the U-shaped bent portion of the bolt 2 around the outer periphery of the pipe P, threading both ends of the bolt through the support steel material 6, and turning and tightening the hexagonal nut 7 for tightening on the back side of the steel material 6 is sufficient. This eliminates the necessity of screwing the lock nut as in the related art. As a result, the labor for installing the U bolt is reduced.

【0017】Uボルト2へのストッパ1の溶接固定位置
は、あらかじめ配管PとUボルト2の隙間3が規定値と
なるように、本来ロックナットがある位置である。そし
て該ストッパはあらかじめ工場においてUボルト2に溶
接しておく。
The position where the stopper 1 is fixed to the U-bolt 2 by welding is the position where the lock nut is originally located so that the gap 3 between the pipe P and the U-bolt 2 has a predetermined value in advance. The stopper is welded to the U bolt 2 at a factory in advance.

【0018】ストッパ1として厚肉の平座金を半割形状
としたのは、Uボルトを配管に据え付ける時に、ストッ
パが配管にひっかからないようにするためである。
The reason why the thick flat washer is formed in half as the stopper 1 is to prevent the stopper from catching on the pipe when the U-bolt is installed on the pipe.

【0019】又配管Pとサポート鋼材6の間に隙間があ
る場合には、スペーサ4を挿入するが、該スペーサ4を
挿入する際に従来のようにロックナットを緩める必要が
ない。
When there is a gap between the pipe P and the support steel material 6, the spacer 4 is inserted. However, when the spacer 4 is inserted, it is not necessary to loosen the lock nut as in the prior art.

【0020】以上のことから、サポート鋼材へのUボル
トを使用した配管の取付け施工時間の短縮を図ることが
できると共に、特に原子力プラントでの取付け施工の場
合における放射能の高線量域での被曝量の低減が可能と
なる。
From the above, it is possible to shorten the time required for installing pipes using U-bolts to the support steel, and at the same time, to expose the radioactivity to a high dose area particularly in the case of installation work in a nuclear power plant. The amount can be reduced.

【0021】[0021]

【発明の効果】以上述べたように本発明のストッパ付U
ボルトによれば次のような効果を奏する。 (1)工場にて製作された本発明ストッパ付Uボルト
は、現地据え付け時、従来の様にロックナットをUボル
トから取り外す事も捩じ込む事も不要であり、そのまま
サポート鋼材のUボルト用穴に挿入した後、六角ナット
を捩じ込むだけで、据え付けが可能であり、施工時間の
大幅短縮化を図ることができる。
As described above, the U with stopper according to the present invention is
The bolt has the following effects. (1) The U-bolt with stopper of the present invention manufactured at the factory does not need to remove and screw in the lock nut from the U-bolt as it was conventionally at the time of on-site installation. After insertion into the hole, installation is possible only by screwing the hexagon nut, and the construction time can be greatly reduced.

【0022】(2)又、配管とサポート部材に隙間があ
いた場合にスペーサを挿入する必要があるが、その場合
でも従来のようなロックナットの操作はなく、締め込み
用の六角ボルトを外す事によって、サポート鋼材からU
ボルトを引き抜く事ができ操作が簡単になる。
(2) If there is a gap between the pipe and the support member, it is necessary to insert a spacer. Even in such a case, there is no operation of the lock nut as in the conventional case, and the hexagonal bolt for tightening must be removed. From support steel
Bolts can be pulled out for easy operation.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るストッパ付Uボルトの構成図であ
る。
FIG. 1 is a configuration diagram of a U-bolt with a stopper according to the present invention.

【図2】従来の配管等の据付け用Uボルトの構成図であ
る。
FIG. 2 is a configuration diagram of a conventional U-bolt for installation such as piping.

【図3】本発明におけるUボルトに溶接するストッパの
構成図で、(a)は平面図、(b)は正面図、(c)は
側面図である。
3A and 3B are configuration diagrams of a stopper to be welded to a U bolt according to the present invention, wherein FIG. 3A is a plan view, FIG. 3B is a front view, and FIG. 3C is a side view.

【符号の説明】[Explanation of symbols]

1 ストッパ 2 Uボルト 3 配管とUボルトの隙間 4 スペーサ 5 座金 6 サポート鋼材 7 六角ナット 8 廻り止め P 配管 W 溶接部 DESCRIPTION OF SYMBOLS 1 Stopper 2 U bolt 3 Gap between pipe and U bolt 4 Spacer 5 Washer 6 Support steel material 7 Hex nut 8 Detent P Pipe W Weld

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 各種プラント類における、配管をサポー
ト鋼材に据付けるためのUボルトにおいて、該Uボルト
両端部のねじ部に連接するサポート鋼材への挿入部近傍
位置に、あらかじめ配管とUボルトの隙間が規定値とな
るように、ステンレス鋼及び炭素鋼製の厚肉でかつ平座
金を半割形状としたストッパを溶接固定したことを特徴
とするストッパ付Uボルト。
1. A U-bolt for mounting a pipe on a support steel material in various plants, wherein a pipe and a U-bolt are previously placed at a position near an insertion portion of a support steel material connected to a threaded portion at both ends of the U-bolt. A U-bolt with a stopper, characterized in that a thick stopper made of stainless steel and carbon steel and a flat washer having a half-shape shape is welded and fixed so that the gap becomes a specified value.
JP8356666A 1996-12-27 1996-12-27 U-bolt with stopper Withdrawn JPH10185001A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8356666A JPH10185001A (en) 1996-12-27 1996-12-27 U-bolt with stopper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8356666A JPH10185001A (en) 1996-12-27 1996-12-27 U-bolt with stopper

Publications (1)

Publication Number Publication Date
JPH10185001A true JPH10185001A (en) 1998-07-14

Family

ID=18450179

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8356666A Withdrawn JPH10185001A (en) 1996-12-27 1996-12-27 U-bolt with stopper

Country Status (1)

Country Link
JP (1) JPH10185001A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009228880A (en) * 2008-03-25 2009-10-08 Sanwa Tekki Corp Pipe support structure and support method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009228880A (en) * 2008-03-25 2009-10-08 Sanwa Tekki Corp Pipe support structure and support method

Similar Documents

Publication Publication Date Title
US9441663B2 (en) Method of using a retention clip to close hardware
US5813185A (en) Spacer reciever for a wall form tie rod
US6679460B2 (en) Pipe clamp arrangement
US4630647A (en) Pipe repair clamp
JPH10185001A (en) U-bolt with stopper
CN211371481U (en) Small-size pipeline bracket of nuclear power station
JP2023034022A (en) Piping corrosion countermeasure plate, piping corrosion countermeasure member and piping corrosion countermeasure structure
JPH0448393Y2 (en)
JP3147286B2 (en) Open flange device
JP3752321B2 (en) Fluid branching method
CN214738844U (en) Connecting structure of steel column and concrete column
JP3631448B2 (en) Pipe nut fixing
CN220470950U (en) HDPE sewer pipe clamp fastening appurtenance
CN211118002U (en) Supporting and fixing part for electromechanical pipeline on steel beam
JP2773936B2 (en) Supporting device for small diameter piping
JP7188111B2 (en) Overhead ground wire installation tool and overhead ground wire installation method
JPH03568Y2 (en)
KR200242495Y1 (en) Pushing apparatus for preventing nut from be loose
JP2004289983A (en) Conduit water stop device
JPH0680072U (en) Lug type butterfly valve
KR0127801Y1 (en) Welding nut
JP3054543U (en) Nut cover for preventing loosening (mischief)
JPH0351591Y2 (en)
JPH02147766A (en) Embedding method of stud fitting for installation of support member
JPS6312197Y2 (en)

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20040302