JPH10128770A - Foam molding apparatus for building member, jig and method - Google Patents

Foam molding apparatus for building member, jig and method

Info

Publication number
JPH10128770A
JPH10128770A JP8307436A JP30743696A JPH10128770A JP H10128770 A JPH10128770 A JP H10128770A JP 8307436 A JP8307436 A JP 8307436A JP 30743696 A JP30743696 A JP 30743696A JP H10128770 A JPH10128770 A JP H10128770A
Authority
JP
Japan
Prior art keywords
jig
wall panel
foam molding
foundation
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8307436A
Other languages
Japanese (ja)
Other versions
JP3703583B2 (en
Inventor
Hirotaka Wada
博孝 和田
Munechika Minomoto
宗近 簑本
Keisuke Miyazaki
景助 宮崎
Kazuyuki Maeda
和之 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP30743696A priority Critical patent/JP3703583B2/en
Publication of JPH10128770A publication Critical patent/JPH10128770A/en
Application granted granted Critical
Publication of JP3703583B2 publication Critical patent/JP3703583B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

PROBLEM TO BE SOLVED: To mass-produce a building member using foamed urethane with good productivity and to also facilitate quality control by injecting water foamable polyurethane into the jig of the injection part provided between the outlet of a preheating furnace and the inlet of a temp. holding furnace. SOLUTION: In such a case that the last in a preheating furnace 2 is a jig 40 for the foundation, a jig 30 for a wall panel is fed in. Next, urethane is injected into the jig 40 for the foundation fed in an injection part 3 by previous operation and, after the completion of injection, the jig 40 is laterally sent up to the inlet of a temp. holding furnace 2. Thereafter, the jig 30 for the wall panel is fed out of the temp. holding furnace 2 to be fed to a wall panel preparation stand 11. In such a case that the last in the preheating furnace 1 is the jig 30 for the wall panel, the jig 40 for the foundation is fed in. Next, urethane is injected into the jig 30 for the wall panel fed out to the injection part 3 by previous operation and, after the completion of injection, the jig 30 is fed up to the inlet of the temp. holding furnace 2. Thereafter, the jig 40 for the foundation is fed out of the temp. holding furnace 2 to be fed in a foundation preparation stand 12. As mentioned above, the wall panel and a foundation heat insulating material are alternately molded by the same foam molding apparatus.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、断熱材となる発
泡ウレタンの接着性でパネルフレームと面材とを付着さ
せた壁パネルや、布基礎の型枠兼用となる断熱材等の建
築部材を発泡成形する装置,治具,および方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a building material such as a wall panel in which a panel frame and a face material are adhered by adhesiveness of urethane foam as a heat insulating material, and a heat insulating material which is also used as a formwork of a cloth base. The present invention relates to an apparatus, a jig, and a method for foam molding.

【0002】[0002]

【従来の技術】寒冷地住宅等に適した高断熱性,高気密
性の建物に用いる建築部材として、本出願人は、次のよ
うにポリウレタンを断熱材として用いる壁パネルおよび
断熱基礎を提案した。前記壁パネルは、断熱材として用
いる硬質の発泡ウレタンの持つ接着性を利用し、パネル
フレームおよび面材を一体化させるものである。ポリウ
レタンの発泡は、型枠となる治具内に、パネルフレー
ム,面材,および下地桟等の各パネル構成部材を所定の
配置で入れ、この状態でポリウレタンを注入することに
より行う。これによれば、面材や下地材等をビスや釘で
取り付ける工程が不要となり、生産性が大きく向上す
る。また、発泡ウレタンは、一般住宅の断熱材として用
いられている発泡スチレン等に比べて優れた断熱性が得
られる。前記断熱基礎は、基礎型枠を発泡ウレタン製と
し、基礎コンクリートの打設後に、発泡ウレタン製の基
礎型枠をそのまま基礎の断熱材として残すものである。
これによれば、脱型の工程が不要となり、現場施工が簡
単となる。また、断熱性に優れた基礎となる。
2. Description of the Related Art As a building member used for buildings having high heat insulation and high airtightness suitable for houses in cold regions, etc., the present applicant has proposed a wall panel and a heat insulation base using polyurethane as a heat insulating material as follows. . The wall panel integrates a panel frame and a face material by utilizing the adhesiveness of hard urethane foam used as a heat insulating material. Polyurethane is foamed by placing panel components such as a panel frame, a face material, and a base bar in a predetermined arrangement in a jig serving as a mold, and injecting polyurethane in this state. According to this, the step of attaching the face material, the base material, and the like with screws or nails becomes unnecessary, and productivity is greatly improved. Further, urethane foam has excellent heat insulating properties as compared with foamed styrene or the like used as a heat insulating material for ordinary houses. In the heat insulating foundation, the base formwork is made of urethane foam, and after the foundation concrete is cast, the base formwork made of urethane foam is left as it is as a heat insulating material of the foundation.
According to this, the demolding process is not required, and the on-site construction is simplified. In addition, it becomes the basis excellent in heat insulation.

【0003】[0003]

【発明が解決しようとする課題】しかし、このような発
泡ウレタンを用いる壁パネルや基礎型枠を効率良く量産
する設備につき、未開発であった。硬質ウレタンの発泡
剤としては、一般にフロンやその代替え材料が使用され
ているが、いずれも環境上や引火性等の面で好ましくな
い。そのため、建築部材には水発泡のポリウレタンとす
ることが好ましい。このような水発泡のポリウレタンを
注入する一般的なシステムとしては、オープン注入法と
クローズド注入法とがある。オープン注入法は、ノズル
を移動させながら注入する方法であり、複雑な形状の成
形が可能であるが、壁パネルや基礎型枠等の大寸法の建
築部材の場合、ノズルの移動距離が長くなるため、注入
に時間がかかるうえ、装置が大がかりとなり、好ましく
ない。
However, a facility for efficiently mass-producing a wall panel and a base form using such urethane foam has not been developed. As a foaming agent for hard urethane, fluorocarbon or a substitute material thereof is generally used, but any of these is not preferable from the viewpoint of the environment and flammability. Therefore, it is preferable to use water-foamed polyurethane for building members. As a general system for injecting such water-blown polyurethane, there are an open injection method and a closed injection method. The open injection method is a method of injecting while moving the nozzle, and it is possible to form a complicated shape, but in the case of a large-sized building member such as a wall panel or a foundation form, the moving distance of the nozzle becomes long. Therefore, it takes a long time for injection, and the apparatus becomes large, which is not preferable.

【0004】クローズド注入法は、密閉した治具に注入
孔を設け、ノズルを差し込んで注入する方法であり、単
純な形状の製品に適する。クローズド注入法を壁パネル
の製造に適用する場合、段積みしたパネルをプレスで固
定し、注入する、多段プレス方式と、治具をコンベヤ上
で連続搬送する方式とが考えられる。この多段プレス方
式は、比較的設備が簡単で済むが、発泡成形の温度管理
等が難しく、品質管理に問題があり、またパネルの積み
降ろし作業が必要で、生産性の向上が難しい。これらを
検討し、クローズド注入法で連続搬送方式とすることが
好ましいと考えたが、この連続搬送方式の発泡成形装置
や、その治具,成形方法を実現するにつき、工場内の限
られた床面積で、生産性良く量産できるようにするにつ
き、具体的構成の開発が必要となる。
The closed injection method is a method in which an injection hole is provided in a sealed jig and an injection is performed by inserting a nozzle, and is suitable for a product having a simple shape. When the closed injection method is applied to the manufacture of wall panels, a multistage press method in which the stacked panels are fixed by a press and injected and a method in which a jig is continuously conveyed on a conveyor are considered. This multi-stage press system requires relatively simple equipment, but it is difficult to control the temperature of foam molding and the like, there is a problem in quality control, and it is necessary to load and unload panels, and it is difficult to improve productivity. In consideration of these, it was considered preferable to use a continuous conveying method by the closed injection method. However, in order to realize the foaming apparatus, the jig and the forming method of the continuous conveying method, a limited floor in the factory was used. In order to be able to mass-produce with good productivity in terms of area, it is necessary to develop a specific configuration.

【0005】この発明は、上記課題を解消するものであ
り、発泡ウレタンを用いる建築部材を、生産性良く量産
でき、かつ品質管理も容易な建築部材の発泡成形装置,
治具,および方法を提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and is capable of mass-producing building members using urethane foam with high productivity and easily controlling the quality of the building members.
The purpose is to provide jigs and methods.

【0006】[0006]

【課題を解決するための手段】この発明の建築部材の発
泡成形装置は、内部でポリウレタンを発泡させて建築部
材とする発泡形成用の複数の治具と、これらの治具を縦
列に並べて搬送可能な搬送装置を各々内部に有し互いに
並設された予熱炉および保温炉と、前記予熱炉の入口の
手前に設けられて前記治具を所定の状態に準備する準備
台と、前記予熱炉の出口と保温炉の入口の間に設けられ
て前記治具内に水発泡のポリウレタンを注入する注入部
とを備えたものである。ここで言う建築部材は、壁パネ
ルや、基礎型枠兼用断熱材など、建物の構成部材となる
ものである。前記治具は、内部空間の全体にウレタン注
入を行うものであっても、内部空間にパネルフレーム等
の建築部材構成材を入れておき、その内部にウレタン注
入を行うものであっても良い。
SUMMARY OF THE INVENTION A foam molding apparatus for building members according to the present invention comprises a plurality of jigs for forming foam by internally foaming polyurethane into building members, and these jigs are arranged in a column and conveyed. A preheating furnace and a heat retaining furnace each having a possible transfer device therein and arranged in parallel with each other; a preparation table provided in front of an entrance of the preheating furnace to prepare the jig in a predetermined state; and the preheating furnace. And an injection portion provided between the outlet of the heat insulation furnace and the inlet of the heat retaining furnace, for injecting water-foamed polyurethane into the jig. The building member referred to here is a component of the building, such as a wall panel or a heat insulating material also serving as a foundation form. The jig may be for injecting urethane into the entire internal space, or may be for inserting a building component such as a panel frame into the internal space and injecting urethane into the interior.

【0007】この発泡成形装置によると、準備台上で治
具を閉じ状態等に準備しておき、予熱炉に送り込む。治
具内に建築部材構成材を入れる必要がある場合は、この
準備台上で行える。予熱炉に送り込まれた治具およびそ
の内部の建築部材構成材は、搬送装置で予熱炉内を送ら
れる間に所定の温度まで加熱され、予熱炉を出た所で注
入部によりウレタン注入される。この注入により、治具
内、あるいはその内部の建築部材構成材内でポリウレタ
ンが発泡し、治具が保温炉を通過する間に硬化する。こ
のようにして、複数の治具を連続的に搬送しながら建築
部材の発泡成形を行う。そのため、多数の建築部材を能
率良く量産できる。この場合に、治具は予熱炉および保
温炉内を搬送して予熱および保温を行うので、ウレタン
注入前の治具や建築部材構成材の温度制御、および注入
後の保温の管理が容易であり、品質の良い建築部材の発
泡成形が行える。例えば、建築部材構成材を治具内に入
れて発泡成形する場合は、建築部材構成材と発泡ウレタ
ンとの確実な接着が行える。
According to this foam molding apparatus, a jig is prepared in a closed state or the like on a preparation table and is sent to a preheating furnace. If it is necessary to put the building component material in the jig, it can be performed on this preparation table. The jig sent to the preheating furnace and the building member components inside the jig are heated to a predetermined temperature while being sent through the preheating furnace by the transfer device, and urethane is injected by the injection unit at the place where the preheating furnace exits. . Due to this injection, the polyurethane foams in the jig or in the constituent material of the building member therein, and hardens while the jig passes through the heat retaining furnace. In this way, the foaming of the building member is performed while continuously transporting the plurality of jigs. Therefore, a large number of building members can be mass-produced efficiently. In this case, since the jig is transported in the preheating furnace and the preheating furnace to perform preheating and heat preservation, it is easy to control the temperature of the jig and the building member components before urethane injection and to manage the heat preservation after the pouring. And foam molding of high quality building members. For example, in a case where the building member constituent material is put into a jig and foam-formed, the building member constituent material and the urethane foam can be securely bonded.

【0008】この構成の発泡成形装置において、前記複
数の治具のいずれかが、壁パネル用の治具であっても良
い。この壁パネル用治具は、パネルフレームおよび両面
の面材を寝かせて収容する上面開放の治具本体と、この
治具本体の上面開口を蓋する治具蓋とを有するものとす
る。この構成の壁パネル用治具とすることにより、パネ
ルフレームおよび両面の面材を治具内に所定の配置で納
めておいて、ウレタン注入することにより、発泡ウレタ
ンの接着性でパネルフレームおよび面材が互いに固定さ
れた壁パネルを製造することができる。
[0008] In the foam molding apparatus having this configuration, any one of the plurality of jigs may be a jig for a wall panel. This jig for a wall panel has a jig body with an open top for accommodating the panel frame and the surface materials on both sides in a laid state, and a jig lid for covering the top opening of the jig main body. With the jig for a wall panel having this configuration, the panel frame and the surface materials on both sides are placed in a predetermined arrangement in the jig, and the urethane is injected, so that the adhesiveness of the urethane foam is applied to the panel frame and the surface. It is possible to produce wall panels in which the materials are fixed to one another.

【0009】また、前記複数の治具のいずれかが、基礎
型枠兼用の基礎断熱材を成形する治具であっても良い。
この基礎用治具は、互いに分割可能な治具本体および治
具蓋を有するものとする。この基礎用治具を用いること
により、建築部材である基礎断熱材をこの発泡成形装置
で連続して製造するすることができる。これら壁パネル
用治具と基礎用治具は併用しても良い。この場合に、前
記準備台として、壁パネル用治具の準備台と基礎用治具
用の準備台とを並設する。また、前記両搬送装置の端部
間で治具の送りを行う受渡し搬送台を設ける。これによ
り、同じ発泡成形装置を用いて壁パネルと基礎断熱材と
の両方を連続して発泡成形できる。
Further, any one of the plurality of jigs may be a jig for forming a base heat insulating material which also serves as a base formwork.
This foundation jig has a jig main body and a jig lid that can be divided from each other. By using this jig for foundation, a basic heat insulating material as a building member can be manufactured continuously by this foam molding apparatus. These wall panel jigs and foundation jigs may be used in combination. In this case, a preparation table for a wall panel jig and a preparation table for a foundation jig are juxtaposed as the preparation table. In addition, a transfer table for feeding a jig between the ends of the two transfer apparatuses is provided. Thereby, both the wall panel and the basic heat insulating material can be continuously foam-molded using the same foam molding apparatus.

【0010】この構成の発泡成形装置において、前記受
渡し搬送台の上方に、前記壁パネル用治具および基礎用
治具の治具蓋を持ち上げる治具蓋脱着装置を設けること
が好ましい。このように治具蓋脱着装置を設けることに
より、準備台上で脱型や次の壁パネル等の製造のための
パネルフレーム装填等の準備をするときに、治具本体を
開放状態で準備台に載せ、治具蓋を保管しておくことが
できて、作業性が良い。また、治具蓋の治具本体への着
脱作業も効率良く行える。壁パネル用治具と基礎用治具
の治具本体は、互いに略同じ大きさの平面形状とするこ
とが望ましい。この場合に、基礎断熱材は壁パネルに比
べて一般に小さいが、その場合、基礎断熱材の治具本体
には搬送用の基盤部を設けて壁パネル用治具と大きさを
揃える。このように、壁パネル用治具と基礎用治具とで
大きさを揃えることにより、各炉内や炉外での搬送につ
き、両治具に同じ搬送装置で正確な搬送が行える。例え
ば、注入部等に対して位置ずれが生じないようにガイド
部材等を設ける場合にも、共通のガイド部材で壁パネル
用治具と基礎用治具の案内が行える。
[0010] In the foam molding apparatus having this configuration, it is preferable that a jig lid attaching / detaching apparatus that lifts the jig lids of the wall panel jig and the foundation jig is provided above the transfer conveyor. By providing the jig lid attaching / detaching apparatus in this manner, when preparing for demolding and loading of a panel frame for manufacturing the next wall panel, etc. on the preparation table, the jig body is opened and the preparation table is opened. And the jig lid can be stored for good workability. Also, the work of attaching and detaching the jig lid to and from the jig main body can be efficiently performed. It is desirable that the jig bodies of the wall panel jig and the foundation jig have a planar shape having substantially the same size as each other. In this case, the basic heat insulating material is generally smaller than the wall panel, but in this case, the jig body of the basic heat insulating material is provided with a transfer base portion to be equal in size to the wall panel jig. In this way, by equalizing the size of the wall panel jig and the foundation jig, accurate conveyance can be performed to both jigs by using the same conveyance device in each furnace or outside the furnace. For example, even when a guide member or the like is provided so as not to be displaced with respect to the injection portion or the like, the common guide member can guide the jig for the wall panel and the jig for the foundation.

【0011】この発明の壁パネル用治具は、搬送装置上
を搬送可能な発泡成形用の壁パネル用治具であって、壁
パネルのパネルフレームおよび両面の面材を寝かせて収
容する上面開放の治具本体と、この治具本体の上面開口
を蓋する治具蓋とを有するものとする。前記治具本体
は、底板上の四辺に側枠を有し、隣合う2辺の側枠がパ
ネルフレームを配置する基準部材となり、残り2辺の側
枠が外側へ開き可能である。治具蓋には治具本体と結合
する流体圧式のクランプ装置を設け、このクランプ装置
の作動流体を供給する流体経路に、離脱状態で流路を閉
じるカップリングを設ける。 このように、治具本体を
2辺が開放で2辺が位置決め基準となるものとすること
で、パネルフレーム等の治具内への配置作業が容易に精
度良く行える。また、発泡成形後の脱型作業が容易に行
える。さらに、前記カップリングを設けることで、治具
循環経路中の一定位置に設けた流体供給装置等でクラン
プ装置の操作が行え、搬送中にクランプ状態を維持する
ことができる。
A wall panel jig according to the present invention is a foam molding wall panel jig which can be conveyed on a conveying apparatus, and has an upper surface opening for laying down and accommodating a panel frame of a wall panel and surface materials on both sides. And a jig lid for covering the upper surface opening of the jig main body. The jig main body has side frames on four sides on a bottom plate, two adjacent side frames serve as reference members for arranging a panel frame, and the remaining two side frames can be opened outward. The jig lid is provided with a fluid pressure type clamp device coupled to the jig body, and a fluid path for supplying the working fluid of the clamp device is provided with a coupling for closing the flow path in a detached state. In this way, by setting the jig body to be open on two sides and the two sides serving as a positioning reference, the work of disposing the panel frame or the like in the jig can be easily and accurately performed. In addition, the demolding operation after foam molding can be easily performed. Further, by providing the coupling, the clamp device can be operated by a fluid supply device or the like provided at a fixed position in the jig circulation path, and the clamped state can be maintained during conveyance.

【0012】この発明の建築部材の発泡成形方法は、前
記の壁パネル用治具の準備台と基礎用治具用の準備台と
を並設した発泡成形装置を用いる発泡成形方法であっ
て、前記壁パネル用治具と基礎用治具とを略交互に予熱
炉へ搬入する。この方法によると、基礎用治具につき、
治具本体に治具蓋を取付けて予熱炉への搬入の準備をし
ている間に、壁パネル用治具につき、準備台上で治具本
体にパネルフレーム等を入れる作業を行うことができ
る。また、壁パネル用治具に予熱炉への搬入準備をして
いる間に、基礎用治具の準備台上で脱型等の準備作業を
行うことができる。そのため、無駄時間を最小限として
炉内への搬入搬出が行える。なお、一般の2階建て住宅
を考えた場合、1棟の建物に必要な壁パネルと基礎断熱
材との数は、このように交互に成形することで生産でき
る数に略一致する。
[0012] The foam molding method of a building member according to the present invention is a foam molding method using a foam molding apparatus in which a preparation table for the wall panel jig and a preparation table for the foundation jig are juxtaposed. The wall panel jig and the foundation jig are carried into the preheating furnace substantially alternately. According to this method, the jig for the foundation
While attaching the jig lid to the jig body and preparing to carry it into the preheating furnace, for the wall panel jig, it is possible to put the panel frame etc. into the jig body on the preparation table. . In addition, while preparing to carry the jig for the wall panel into the preheating furnace, preparation work such as demolding can be performed on the preparation table of the jig for the foundation. Therefore, it is possible to carry in and out the furnace while minimizing the dead time. When a general two-story house is considered, the number of wall panels and basic heat insulating materials required for one building substantially matches the number that can be produced by alternately molding in this way.

【0013】[0013]

【発明の実施の形態】この発明の一実施形態を図面と共
に説明する。この建築部材の発泡成形装置は、図1に示
すように、直線状に延びる予熱炉1と保温炉2とを並設
すると共に、ポリウレタンの注入部3を設け、これらの
間に発泡成形用の治具30,40を循環させて治具3
0,40内で建築部材を発泡成形するものである。治具
30は図1(C)に示す壁パネル用治具であり、治具4
0は同図(D)に示す基礎断熱材用治具である。これら
の治具30,40で製造する壁パネルおよび基礎断熱材
につき、図13〜16と共に説明した後、各治具30,
40の構成、および発泡成形装置のライン構成を説明す
る。
An embodiment of the present invention will be described with reference to the drawings. As shown in FIG. 1, the foam molding apparatus for a building member includes a preheating furnace 1 and a warming furnace 2 which extend linearly, and a polyurethane injection section 3 is provided between them. By circulating the jigs 30 and 40, the jig 3
Building members are foamed within 0,40. The jig 30 is a jig for the wall panel shown in FIG.
Reference numeral 0 denotes a jig for a basic heat insulating material shown in FIG. The wall panel and the basic heat insulating material manufactured by the jigs 30 and 40 will be described with reference to FIGS.
The configuration of the apparatus 40 and the line configuration of the foam molding apparatus will be described.

【0014】図13(A)は、この発泡成形装置で製造
する壁パネルの一例を示す。この壁パネル50は、住宅
等の建物の外壁パネルとなるものであり、矩形に組んだ
金属製のパネルフレーム51と、その両側に離れて位置
する内外の面材52,53と、これらパネルフレーム5
1および面材52,53間のパネル内空間に充填された
発泡ウレタン54とで主に構成される。その断面を図1
5に示すように、面材52,53の周縁とパネルフレー
ム51との間の隙間は、木桟56および発泡ウレタン等
の発泡樹脂からなる断熱スペーサ55で閉じてある。パ
ネルフレーム51は、両側辺のフレーム材51aを角パ
イプ製とし、上下辺のフレーム材51bを溝形鋼製とし
てある。屋外側の面材52はセラミックス製等の外壁材
からなり、屋内側の面材53は石膏ボード等からなる。
また、屋内側の面材53の裏面にはカーテン下地等とな
る下地材57が適宜設けられる。これれパネルフレーム
51および面材52,53や、他の各部材55〜57
は、断熱材となる発泡ウレタン54がパネル内で発泡成
形されることにより、その発泡ウレタン54の接着性で
一体化される。
FIG. 13A shows an example of a wall panel manufactured by the foam molding apparatus. The wall panel 50 serves as an outer wall panel of a building such as a house, and includes a metal panel frame 51 formed in a rectangular shape, inner and outer face materials 52 and 53 located apart on both sides thereof, and these panel frames. 5
1 and the urethane foam 54 filled in the space between the panels 52 and 53 in the panel. Fig. 1 shows its cross section.
As shown in FIG. 5, the gap between the peripheral edges of the face materials 52 and 53 and the panel frame 51 is closed by a wooden bar 56 and a heat insulating spacer 55 made of a foamed resin such as urethane foam. In the panel frame 51, the frame members 51a on both sides are made of square pipes, and the frame members 51b on the upper and lower sides are made of channel steel. The face material 52 on the outdoor side is made of an outer wall material made of ceramics or the like, and the face material 53 on the indoor side is made of a gypsum board or the like.
A base material 57 serving as a curtain base or the like is appropriately provided on the back surface of the indoor side surface material 53. The panel frame 51, the face members 52 and 53, and other members 55 to 57
The foamed urethane 54 serving as a heat insulating material is foam-molded in the panel, so that the foamed urethane 54 is integrated with the adhesiveness of the foamed urethane 54.

【0015】図16は、開口付きの壁パネル50Aの一
例を示す。開口付きの壁パネル50Aは、アルミ製等の
サッシ58aおよびその内側に続く木製枠58bからな
る開口枠58が設けられる。サッシ58aはパネルフレ
ーム51に設置された上下の横桟51cビス等の固着具
で取付けておき、木製枠58bは発泡ウレタン54の接
着により固定する。その他の構成は図15の開口無し壁
パネル50と同様である。これら開口付きおよび開口無
し壁パネル50A,50は、各々、例えばモジュール寸
法Pに対して、1P幅のものと2P幅のものとを製作す
る。モジュール寸法Pは、建物設計の基準となる寸法の
ことであり、800〜1000mm程度の寸法、例えば9
10mmに設定される。
FIG. 16 shows an example of a wall panel 50A having an opening. The wall panel 50A with an opening is provided with an opening frame 58 composed of a sash 58a made of aluminum or the like and a wooden frame 58b extending inside the sash 58a. The sash 58a is attached with a fixing tool such as screws on the upper and lower horizontal rails 51c installed on the panel frame 51, and the wooden frame 58b is fixed by bonding urethane foam 54. Other configurations are the same as those of the wall panel 50 without an opening shown in FIG. The wall panels 50A, 50 with and without openings are manufactured, for example, with a module size P of 1P width and 2P width, respectively. The module dimension P is a dimension that is a standard for building design, and is a dimension of about 800 to 1000 mm, for example, 9
It is set to 10 mm.

【0016】図13(B)は、この発泡成形装置で製造
する発泡ウレタン製の基礎断熱材60の一例を示し、図
14はこの基礎断熱材60を用いた断熱基礎61および
その周辺部の断面を示す。断熱基礎61は、布基礎の基
礎コンクリート62の両面を基礎断熱材60で覆ったも
のである。基礎断熱材60は、基礎型枠を兼用するもの
とされ、基礎コンクリート62の打設後にそのまま残さ
れる。この断熱基礎61上に土台66を介して壁パネル
50,50Aが設置され、かつ床パネル63が設置され
る。基礎断熱材60の天端部には、必要に応じて木桟や
金属板等の下地材64が設けられ、発泡ウレタン65と
その発泡成形時に一体化される。基礎断熱材60は、基
礎コンクリート62の逆T字状の断面形状に併せて、基
礎立上り部覆い部60aと、ベース上面覆い部60b
と、ベース側面覆い部60cとが屈曲して続く断面形状
とされている。基礎断熱材60の基礎長さ方向の幅寸法
は、例えば2P幅とされる。
FIG. 13B shows an example of a basic heat insulating material 60 made of urethane foam manufactured by the foam molding apparatus. FIG. 14 is a cross-sectional view of a heat insulating base 61 using the basic heat insulating material 60 and its peripheral portion. Is shown. The heat insulating foundation 61 is obtained by covering both sides of a foundation concrete 62 of a cloth foundation with a basic heat insulating material 60. The base heat insulating material 60 is also used as a base formwork, and is left as it is after the base concrete 62 is cast. The wall panels 50 and 50A are installed on the heat insulating foundation 61 via the base 66, and the floor panel 63 is installed. A base material 64 such as a wooden bar or a metal plate is provided at the top end of the basic heat insulating material 60 as necessary, and is integrated with the urethane foam 65 at the time of foam molding. The base insulating material 60 includes a base rising portion covering portion 60a and a base upper surface covering portion 60b in accordance with the inverted T-shaped cross-sectional shape of the base concrete 62.
And the base side surface covering portion 60c have a cross-sectional shape that is continuous. The width dimension of the base heat insulating material 60 in the base length direction is, for example, 2P width.

【0017】図3ないし図5は、壁パネル用治具30の
例を示す。この壁パネル用治具30は、図4のように治
具本体31と治具蓋32とで構成される。治具本体31
は、内部に壁パネルの構成部材となるパネルフレーム5
1および面材52,53等を収容するものであり、底盤
34と側枠35とで上面開放の薄箱状に形成される。側
枠35の隣合う2辺の側枠材35a,35bは、底盤3
4に固定された基準辺となるものであり、残り2辺の側
枠材35c,35dは、外側へ開き可能なように、下端
で支軸36回りに開閉回動自在に支持されている。この
開閉可能な側枠材35c,35dは、閉じ状態、すなわ
ち起立状態で隣の側枠材35a〜35dと手動式のクラ
ンプ装置36で連結される。治具本体31の1辺の側枠
材35cには、複数箇所にポリウレタンの注入孔33が
設けてあり、内部に入れる壁パネルの種類に応じて任意
の注入孔33が使用される。
3 to 5 show examples of the wall panel jig 30. FIG. The wall panel jig 30 includes a jig body 31 and a jig lid 32 as shown in FIG. Jig body 31
Is a panel frame 5 inside which is a constituent member of a wall panel.
1 and the side materials 52, 53, etc., and are formed in a thin box shape with an open top surface by the bottom plate 34 and the side frame 35. Two side frame members 35a and 35b adjacent to the side frame 35 are
The side frames 35c and 35d of the remaining two sides are supported at the lower end so as to be openable and closable about the support shaft 36 so that they can be opened outward. The openable and closable side frame members 35c and 35d are connected to the adjacent side frame members 35a to 35d by a manual clamp device 36 in a closed state, that is, an upright state. Polyurethane injection holes 33 are provided at a plurality of locations in one side frame member 35c of the jig body 31, and an arbitrary injection hole 33 is used depending on the type of a wall panel to be inserted therein.

【0018】治具蓋32は、治具本体31上に載置され
て治具本体31の上面開口を蓋するものであり、上面の
周囲に治具本体31と結合する流体圧式の複数のクラン
プ装置37が設けられている。これらクランプ装置37
は、支軸37a回りに回動自在に設けられて治具本体3
1の周囲の枠材に係合するクランプ片37bとこのクラ
ンプ片37bを回動させるクランプシリンダ37cとで
構成される。これらクランプシリンダ37bは、治具蓋
32の中央に設けた2本の共通流体パイプ38に分岐し
て接続されている。これら共通流体パイプ38には、治
具30の所定位置に、作動流体の供給用のカプラー39
aおよび排出用のカプラー39bが設けられている。
The jig lid 32 is placed on the jig main body 31 to cover the upper opening of the jig main body 31. A plurality of hydraulic pressure clamps connected to the jig main body 31 around the upper surface. A device 37 is provided. These clamping devices 37
The jig main body 3 is provided rotatably around the support shaft 37a.
It comprises a clamp piece 37b that engages with the surrounding frame material and a clamp cylinder 37c that rotates the clamp piece 37b. These clamp cylinders 37b are branched and connected to two common fluid pipes 38 provided at the center of the jig lid 32. These common fluid pipes 38 are provided at predetermined positions on the jig 30 with couplers 39 for supplying working fluid.
a and a coupler 39b for discharge.

【0019】図6は、この壁パネル用治具3内に、各壁
パネル構成部材を入れた状態を示す。すなわち、治具本
体31内にパネルフレーム51、面材52,53、およ
び断熱スペーサ55等を入れ、その上に押さえパッキン
グ71を載せて治具蓋32を閉じる。なお、同図の壁パ
ネル50は幅広(2P幅)のものであり、屋外側の面材
52は2枚に分けて設けられ、その間に漏れ防止材72
と中桟73とが設けられている。図7は、一つの壁パネ
ル用治具3内に、幅狭(1P幅)の開口付き壁パネル5
0Aと無開口壁パネル50の各パネル構成部材を並べて
入れた状態を示す。このように開口付き壁パネル50A
を入れる場合は、治具本体31の上面に、開口枠58を
内側から支える開口枠支持具74を取付け、発泡圧で開
口枠74が撓むことを防止する。また、2枚の壁パネル
50,50Aを同じ治具30内で並べて発泡成形する場
合は、両壁パネル50,50Aのフレーム51,51間
に仕切り板75を介在させる。
FIG. 6 shows a state in which the wall panel components are put in the wall panel jig 3. That is, the panel frame 51, the face members 52 and 53, the heat insulating spacer 55, and the like are placed in the jig body 31, the holding packing 71 is placed thereon, and the jig lid 32 is closed. It should be noted that the wall panel 50 in the figure is wide (2P width), and the surface member 52 on the outdoor side is provided in two pieces, and a leakage prevention member 72 is provided therebetween.
And a middle bar 73 are provided. FIG. 7 shows a wall panel 5 having a narrow (1P width) opening in one wall panel jig 3.
This shows a state in which the respective panel components of 0A and the non-opening wall panel 50 are arranged side by side. Thus, the wall panel 50A with an opening
In order to insert the opening frame, an opening frame support member 74 for supporting the opening frame 58 from the inside is attached to the upper surface of the jig main body 31 to prevent the opening frame 74 from bending due to the foaming pressure. When the two wall panels 50 and 50A are arranged and foamed in the same jig 30, a partition plate 75 is interposed between the frames 51 and 51 of the two wall panels 50 and 50A.

【0020】図10,図11は、基礎断熱材用治具40
の平面図および側面図を各々示す。基礎断熱材用治具4
0は、搬送用底盤41Bの上に型枠部41Aを設けた治
具本体41と、この型枠部41A上に載せられる治具蓋
42とで構成される。搬送用底盤41Bは、壁パネル用
治具30の底盤34と平面形状が同じ大きさおよび形状
に構成される。型枠部41Aは、底盤部と側枠部とでな
る上面開口の浅い箱状とされ、その底面は、図13に示
す基礎断熱材60の内面形状に応じて屈曲した断面形状
とされている。治具蓋42は、治具本体41の上面開口
を閉じるものであり、その下面は、基礎断熱材60の外
側面に対応した断面形状とされている。治具蓋42の基
礎断熱材幅方向に沿う2辺には、壁パネル用治具30と
同様な流体圧式のクランプ装置43が設けられ、これら
クランプ装置43は、流体供給用および排出用のカプラ
ー45a,45bの設けられた流体パイプ44に分岐し
て接続されている。また、治具蓋42には複数の吊上げ
用る係合具46が設けられている。
FIGS. 10 and 11 show a jig 40 for a basic heat insulating material.
1 shows a plan view and a side view, respectively. Jig for basic thermal insulation 4
Reference numeral 0 denotes a jig main body 41 having a mold 41A provided on a transport bottom 41B, and a jig lid 42 placed on the mold 41A. The transport bottom plate 41B has the same size and shape as the bottom plate 34 of the wall panel jig 30 in plan view. The formwork portion 41A is formed in a box shape having a shallow upper surface opening formed of a bottom portion and a side frame portion, and the bottom surface thereof has a cross-sectional shape bent in accordance with the inner shape of the basic heat insulating material 60 shown in FIG. . The jig lid 42 closes the upper opening of the jig body 41, and the lower surface thereof has a cross-sectional shape corresponding to the outer side surface of the basic heat insulating material 60. On the two sides of the jig cover 42 along the width direction of the base heat insulating material, there are provided hydraulic clamping devices 43 similar to the wall panel jig 30. These clamping devices 43 are provided with couplers for supplying and discharging fluid. It is branched and connected to a fluid pipe 44 provided with 45a and 45b. The jig cover 42 is provided with a plurality of engaging members 46 for lifting.

【0021】図2は、発泡成形装置の全体のライン構成
を示す平面図である。並設された予熱炉1および保温炉
2内には、治具30,40を縦一列に搬送する搬送装置
5,6が設置されており、これら搬送装置5,6は各々
2本のローラコンベヤ5a,6aからなる。両搬送装置
5,6は、両端が炉外に延びていて、対応する端部間が
横送り可能な受渡し搬送台7,8で接続され、これら搬
送装置5,6および受渡し搬送台7,8で矩形経路の治
具循環ライン4が構成される。これら治具循環ライン
4,予熱炉1,および保温炉2を制御する制御盤13
は、予熱炉1の近傍に設置されている。治具循環ライン
4における予熱炉1を出た箇所が前記注入部3となり、
この注入部3の近傍に、ポリウレタンの注入装置10が
設置される。治具循環ライン4の予熱炉入口側および保
温炉出口側に各々延長した位置には、壁パネル治具30
用の準備台11と、基礎断熱材40用の準備台12とが
並んで設置されている。これら準備台11,12は、各
々コンベヤ装置で構成される。また、予熱炉入口側の横
装置装置8の上方には、各治具30,40の治具蓋3
2,42を持ち上げて保持する治具蓋脱着装置9が設け
られている。なお、予熱炉1および保温炉2の長さは、
この例では、各々治具30,40を併せて5個ずつ搬送
装置5,6上で載置可能な長さとされている。
FIG. 2 is a plan view showing the entire line configuration of the foam molding apparatus. In the preheating furnace 1 and the insulated furnace 2 arranged side by side, transfer devices 5 and 6 for transferring the jigs 30 and 40 in a vertical line are installed. Each of the transfer devices 5 and 6 is provided with two roller conveyors. 5a and 6a. Both transfer devices 5 and 6 have both ends extending outside the furnace, and the corresponding ends are connected by transferable transfer tables 7 and 8 that can be laterally fed. These transfer devices 5 and 6 and transfer transfer tables 7 and 8 are used. Constitutes a jig circulation line 4 having a rectangular path. A control panel 13 for controlling the jig circulation line 4, the preheating furnace 1, and the heat retaining furnace 2.
Is installed near the preheating furnace 1. The part of the jig circulation line 4 that has exited the preheating furnace 1 is the injection part 3,
In the vicinity of the injection part 3, a polyurethane injection device 10 is installed. A wall panel jig 30 is provided at a position extending from the jig circulation line 4 to the preheating furnace entrance side and the heat insulation furnace exit side, respectively.
A preparation table 11 for the base heat insulating material 40 and a preparation table 12 for the basic heat insulating material 40 are installed side by side. Each of these preparation stands 11 and 12 is constituted by a conveyor device. The jig lids 3 of the jigs 30 and 40 are provided above the horizontal device 8 on the entrance side of the preheating furnace.
A jig lid attaching / detaching device 9 for lifting and holding the jigs 2 and 42 is provided. In addition, the length of the preheating furnace 1 and the heat retaining furnace 2 is
In this example, each of the jigs 30 and 40 has a length that allows the jigs 30 and 40 to be placed on the transporting devices 5 and 6 by five.

【0022】つぎに、上記構成の発泡成形装置による発
泡成形方法を説明する。壁パネル用治具30には、準備
台11上で作業者等により内部にパネルフレーム51等
のパネル構成部材を入れる。このとき、治具蓋32は治
具蓋脱着装置9で保持されている。パネル構成部材の装
填の完了した壁パネル用治具30は、準備台11から受
渡し搬送台8上に送られ、この上で治具蓋脱着装置9に
より治具蓋32が取付けられる。治具蓋脱着装置9は、
圧縮空気等の作動流体の供給装置(図示せず)を備えて
おり、治具蓋32のカプラー39a,39b(図5)か
ら作動流体を供給した後、カプラー39a,39bの接
続を解く。これにより、治具蓋32はクランプ装置37
でクランプ状態となる。
Next, a foam molding method using the foam molding apparatus having the above configuration will be described. A panel component such as a panel frame 51 is put into the wall panel jig 30 by an operator or the like on the preparation table 11. At this time, the jig lid 32 is held by the jig lid attaching / detaching device 9. The jig 30 for the wall panel, on which the loading of the panel components has been completed, is sent from the preparation table 11 to the transfer table 8, and the jig lid 32 is attached thereto by the jig lid attaching / detaching device 9. The jig lid attaching / detaching device 9 includes:
A supply device (not shown) for a working fluid such as compressed air is provided. After supplying the working fluid from the couplers 39a and 39b (FIG. 5) of the jig lid 32, the connection between the couplers 39a and 39b is released. Thereby, the jig lid 32 is attached to the clamp device 37.
Is in the clamped state.

【0023】このように準備の完了した壁パネル用治具
30は、予熱炉1内を搬送され、搬送中に治具30およ
びパネル構成部材が所定温度に予熱されて注入部3に到
達する。この注入部3で、壁パネル用治具30の注入孔
34から治具内に水発泡のポリウレタンが注入され、発
泡ウレタン54の発泡成形が行われる。ウレタン注入
は、注入装置10のノズル(図示せず)を注入孔34に
差し込んで行う。このとき、図8に示すように、無開口
の壁パネル50ではパネル幅の中央の注入孔から注入
し、また図9のように開口付き壁パネル50Aの場合
は、パネル幅の端から注入する。これらの注入は、断熱
スペーサ55に設けた孔から行う。また、パネル各部で
矢印に示すようにガス抜きを行う。
The wall panel jig 30 thus prepared is conveyed in the preheating furnace 1, and the jig 30 and panel components are preheated to a predetermined temperature during the conveyance, and reach the injection section 3. At the injection section 3, water-foamed polyurethane is injected into the jig from the injection hole 34 of the wall panel jig 30, and foaming of the urethane foam 54 is performed. Urethane injection is performed by inserting a nozzle (not shown) of the injection device 10 into the injection hole 34. At this time, as shown in FIG. 8, in the non-opening wall panel 50, the injection is performed from the injection hole in the center of the panel width, and in the case of the wall panel 50A with the opening as illustrated in FIG. 9, the injection is performed from the end of the panel width. . These injections are performed through holes provided in the heat insulating spacer 55. In addition, degassing is performed at each part of the panel as shown by arrows.

【0024】ウレタン注入の完了した壁パネル用治具3
0は、受渡し搬送台7から保温炉2内に送り、保温炉2
を通過する間に所定時間の保温を行う。保温炉2を出た
壁パネル用治具30は、受渡し搬送台8で横送りされ、
治具蓋32が治具蓋脱着装置9で開けて持ち上げられた
後、準備台11に戻される。ここで、発泡形成の完了し
た壁パネル50,50Aが壁パネル用治具30から取り
出され、次の壁パネルのパネル構成部材の装填が行われ
る。
A wall panel jig 3 into which urethane has been injected.
0 is transferred from the transfer table 7 into the insulated furnace 2,
Is kept for a predetermined time while passing through. The wall panel jig 30 that has left the heat retaining furnace 2 is laterally fed by the transfer carrier 8,
After the jig lid 32 is opened and lifted by the jig lid attaching / detaching device 9, the jig lid 32 is returned to the preparation table 11. Here, the foamed wall panels 50 and 50A are taken out of the wall panel jig 30, and the next panel component of the wall panel is loaded.

【0025】基礎用治具40には、隣の準備台12上で
天端部の下地材64等の装填が行われ、準備台12から
受渡し搬送台8に搬出されたところで、治具蓋42が閉
じられる。このように準備の完了した基礎用治具40
は、受渡し搬送台8上を横送りされた後、予熱炉1内に
送られ、予熱炉1を通過する間に所定温度に予熱され
る。このように予熱された基礎用治具40に、注入部3
でウレタン注入が行われ、発泡ウレタン65の発泡成形
が行われる。ウレタン注入された基礎用治具40は、受
渡し搬送台7から保温炉2内に送り、保温炉2を通過す
る間に所定時間の保温を行う。保温炉2を出た基礎用治
具40は、治具蓋42が治具蓋脱着装置9で開けられて
持ち上げられ、準備台12に戻される。ここで、発泡成
形された基礎用断熱材60を取り出し、次の基礎用断熱
材60の成形の準備を行う。
The base jig 40 is loaded with the base material 64 at the top end on the adjacent preparation table 12 and the jig cover 42 is carried out from the preparation table 12 to the delivery conveyance table 8. Is closed. The foundation jig 40 thus prepared is completed.
Is fed into the preheating furnace 1 after being laterally fed on the transfer carrier 8, and is preheated to a predetermined temperature while passing through the preheating furnace 1. The pre-heated foundation jig 40 is filled with the injection portion 3
Then, urethane is injected, and foam molding of the urethane foam 65 is performed. The base jig 40 into which urethane has been injected is sent from the transfer carrier 7 into the insulated furnace 2, and keeps heat for a predetermined time while passing through the insulated furnace 2. The jig for foundation 40 that has exited the heat retaining furnace 2 is lifted by opening the jig lid 42 by the jig lid attaching / detaching device 9, and is returned to the preparation table 12. Here, the foamed base insulating material 60 is taken out, and preparation for forming the next base insulating material 60 is performed.

【0026】上記の壁パネル用治具30および基礎用治
具40の炉内での搬送は、12に示すように、搬送方向
が壁パネル50,50Aの横幅方向となり、また基礎断
熱材60の高さ方向となる姿勢で行われる。また、これ
ら壁パネル用治具30と基礎用治具40とは、図1に示
すように交互に搬送する。この搬送は、1個の治具3
0,40が準備される都度、治具30,40の1ピッチ
分の送りを行う間欠搬送とする。
The transfer of the wall panel jig 30 and the base jig 40 in the furnace is performed in the direction of the width of the wall panels 50 and 50A as shown in FIG. It is performed in a posture that becomes the height direction. The wall panel jig 30 and the foundation jig 40 are alternately conveyed as shown in FIG. This transfer is performed by one jig 3
Each time 0 and 40 are prepared, intermittent conveyance is performed in which the jigs 30 and 40 are fed by one pitch.

【0027】この両治具30,40を交互に搬送する場
合の治具動作流れを図1と共に説明する。図1(A)の
ように、予熱炉2内の最終が基礎用治具40の場合は、
壁パネル用治具30の搬入(動作)をする。次に、前
記の動作で注入部3に搬出された基礎用治具40にウ
レタン注入し、注入完了後に保温炉入口まで横送りする
(動作)。この後、壁パネル用治具30が保温炉2よ
り搬出され、壁パネル準備台1へ搬送される(動作
)。なお、前記の動作で注入部3に搬出された場
合、前記動作の作業が完了しないと、前記の動作は
行わない。図1(B)のように、予熱炉1内の最終が壁
パネル用治具30の場合は、基礎用治具40の搬入(動
作)を行う。次に、前記の動作で注入部3に搬出さ
れた壁パネル用治具30にウレタン注入し、注入完了後
に保温炉入口まで搬送(動作)する。この後、基礎用
治具40が保温炉2より搬出され、基礎用準備台12に
搬入(動作)される。なお、前記動作で注入部3に
搬出された場合、前記の動作が完了しないと、前記動
作は行わない。
A jig operation flow when the two jigs 30 and 40 are alternately conveyed will be described with reference to FIG. As shown in FIG. 1A, when the final jig 40 in the preheating furnace 2 is a foundation jig 40,
The wall panel jig 30 is loaded (operated). Next, urethane is injected into the base jig 40 carried out to the injection section 3 by the above-described operation, and after the injection is completed, the urethane is laterally fed to the heat insulation furnace inlet (operation). Thereafter, the wall panel jig 30 is carried out of the heat retaining furnace 2 and is conveyed to the wall panel preparation table 1 (operation). In addition, when it is carried out to the injection part 3 by the above operation, the above operation is not performed unless the operation of the operation is completed. As shown in FIG. 1B, when the last in the preheating furnace 1 is the wall panel jig 30, the loading (operation) of the foundation jig 40 is performed. Next, urethane is injected into the wall panel jig 30 carried out to the injection section 3 by the above-described operation, and after the injection is completed, the urethane is transported (operated) to the heat insulation furnace inlet. Thereafter, the foundation jig 40 is carried out of the heat retaining furnace 2 and carried (operated) into the foundation preparation table 12. In addition, when it is carried out to the injection part 3 by the above operation, the above operation is not performed unless the above operation is completed.

【0028】このようにして、壁パネル50,50Aと
基礎断熱材60とが同じ発泡成形装置で交互に発泡成形
される。壁パネル50,50Aと基礎断熱材60とは、
1棟の建物に同じ程度の数が必要となるため、このよう
に交互に発泡成形することで、準備台11,12上での
準備が効率良く行える。また、この例では、各炉1,2
内に5個の治具30,40を同時に入れるようにしてい
るが、例えば、30分程度の予熱および保温を行う場
合、治具30,40の搬送間隔は6分程度のとなり、パ
ネル構成部材の準備等に適度と時間となる。このよう
に、予熱炉1および保温炉2を用いて連続ラインで治具
30,40の搬送を行うことにより、温度管理が容易
で、品質管理が行い易く、また優れた生産性が得られ
る。
In this way, the wall panels 50, 50A and the basic heat insulating material 60 are foamed alternately by the same foaming apparatus. The wall panels 50 and 50A and the basic heat insulating material 60
Since the same number is required for one building, preparation on the preparation tables 11 and 12 can be performed efficiently by alternately performing foam molding in this manner. In this example, each of the furnaces 1, 2
Although the five jigs 30 and 40 are simultaneously inserted into the inside of the panel, for example, when preheating and keeping heat for about 30 minutes are performed, the transport interval of the jigs 30 and 40 is about 6 minutes, and the panel constituting member It takes time to prepare for the work. As described above, by carrying the jigs 30 and 40 in a continuous line using the preheating furnace 1 and the heat retaining furnace 2, temperature control is easy, quality control is easy to perform, and excellent productivity is obtained.

【0029】[0029]

【発明の効果】この発明の建築部材の発泡成形装置,治
具,および方法によると、発泡ウレタンを用いる建築部
材を、生産性良く量産でき、かつ品質管理も容易で、高
品質の建築部材を効率良く生産できる。
According to the foaming apparatus, jig, and method for a building member of the present invention, a building member using urethane foam can be mass-produced with high productivity, quality control is easy, and a high-quality building member is obtained. It can be produced efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(A),(B)は、この発明の一実施形態にか
かる発泡成形装置の治具流れを平面図で示す動作説明
図、(C)はその壁パネル用治具の側面図、(D)は基
礎用治具の側面図である。
1A and 1B are operation explanatory views showing a jig flow of a foam molding apparatus according to an embodiment of the present invention in a plan view, and FIG. 1C is a side view of the wall panel jig. (D) is a side view of the jig for foundation.

【図2】同発泡成形装置の平面図である。FIG. 2 is a plan view of the foam molding apparatus.

【図3】(A)は壁パネル用治具の治具本体の平面図、
(B)はその治具蓋の平面図である。
FIG. 3A is a plan view of a jig main body of a wall panel jig,
(B) is a plan view of the jig cover.

【図4】壁パネル用治具の開き状態の側面図である。FIG. 4 is a side view of the opened state of the wall panel jig.

【図5】同壁パネル用治具の組立状態の側面図である。FIG. 5 is a side view of the assembled state of the wall panel jig.

【図6】壁パネル用治具に1枚の幅広壁パネルのパネル
構成部材を納めた状態の断面図である。
FIG. 6 is a cross-sectional view showing a state in which a panel component of one wide wall panel is housed in a wall panel jig.

【図7】壁パネル用治具に2枚の幅狭壁パネルのパネル
構成部材を納めた状態の断面図である。
FIG. 7 is a cross-sectional view showing a state in which panel components of two narrow-wall panels are accommodated in a wall panel jig.

【図8】無開口の壁パネルへのウレタン注入方法を示す
平面図および側面図である。
8A and 8B are a plan view and a side view illustrating a method of injecting urethane into a non-opening wall panel.

【図9】開口付き壁パネルへのウレタン注入方法を示す
平面図および側面図である。
9A and 9B are a plan view and a side view illustrating a method of injecting urethane into a wall panel with openings.

【図10】基礎用治具の平面図である。FIG. 10 is a plan view of a foundation jig.

【図11】基礎用治具の開き状態の側面図である。FIG. 11 is a side view of the opened state of the foundation jig.

【図12】各治具の搬送姿勢の説明図である。FIG. 12 is an explanatory diagram of a conveyance posture of each jig.

【図13】(A)は壁パネル用の切欠斜視図、(B)は
基礎用断熱材の斜視図である。
13A is a cutaway perspective view for a wall panel, and FIG. 13B is a perspective view of a foundation heat insulating material.

【図14】同基礎用断熱材を用いた断熱基礎およびその
周辺部分の断面図である。
FIG. 14 is a sectional view of a heat insulating foundation using the same heat insulating material for a foundation and a peripheral portion thereof.

【図15】無開口の壁パネルの水平断面図および破断側
面図である。
FIG. 15 is a horizontal sectional view and a cutaway side view of an unopened wall panel.

【図16】(A)は開口付き壁パネルの斜視図、(B)
は同図(A)のB−B線拡大断面図、(C)は同図
(A)のC−C線拡大断面図である。
16A is a perspective view of a wall panel with an opening, and FIG.
FIG. 3A is an enlarged sectional view taken along line BB of FIG. 3A, and FIG. 3C is an enlarged sectional view taken along line CC of FIG.

【符号の説明】[Explanation of symbols]

1…予熱炉 2…保温炉 3…注入部 4…治具循環経路 5,6…搬送装置 7,8…受渡し搬送台 9…治具蓋脱着装置 10…注入装置 11,12…準備台 30…壁パネル用治具 32…治具蓋 40…基礎用治具 42…治具蓋 50,50A…壁パネル 60…基礎用断熱材 DESCRIPTION OF SYMBOLS 1 ... Preheating furnace 2 ... Heat insulation furnace 3 ... Injection part 4 ... Jig circulation path 5, 6 ... Conveying device 7, 8 ... Delivery conveying table 9 ... Jig lid attaching / detaching device 10 ... Injecting device 11, 12 ... Preparation table 30 ... Jig for wall panel 32 ... Jig lid 40 ... Jig for foundation 42 ... Jig lid 50, 50A ... Wall panel 60 ... Insulation material for foundation

───────────────────────────────────────────────────── フロントページの続き (72)発明者 前田 和之 大阪府大阪市西区阿波座1丁目5番16号 大和ハウス工業株式会社内 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Kazuyuki Maeda Daiwa House Industry Co., Ltd. 1-5-16 Awaza, Nishi-ku, Osaka-shi, Osaka

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 内部でポリウレタンを発泡させて建築部
材とする発泡形成用の複数の治具と、これらの治具を縦
列に並べて搬送可能な搬送装置を各々内部に有し互いに
並設された予熱炉および保温炉と、前記予熱炉の入口の
手前に設けられて前記治具を所定の状態に準備する準備
台と、前記予熱炉の出口と保温炉の入口の間に設けられ
て前記治具内に水発泡のポリウレタンを注入する注入部
とを備えた建築部材の発泡成形装置。
1. A plurality of jigs for forming a foam by internally foaming polyurethane inside to form a building member, and transporting devices capable of transporting the jigs in a row in a row, each being internally provided. A preheating furnace and a preheating furnace, a preparation table provided before the entrance of the preheating furnace to prepare the jig in a predetermined state, and a preparatory table provided between an exit of the preheating furnace and an entrance of the preheating furnace. And an injection section for injecting water-foamed polyurethane into the fixture.
【請求項2】 前記複数の治具のいずれかが、壁パネル
用の治具であって、この壁パネル用治具は、パネルフレ
ームおよび両面の面材を寝かせて収容する上面開放の治
具本体と、この治具本体の上面開口を蓋する治具蓋とを
有する請求項1記載の建築部材の発泡成形装置。
2. One of the plurality of jigs is a jig for a wall panel, and the jig for a wall panel is a jig having an open top surface for laying down and accommodating a panel frame and surface materials on both sides. The foam molding apparatus for building members according to claim 1, further comprising: a main body; and a jig lid for covering an upper surface opening of the jig main body.
【請求項3】 前記複数の治具のいずれかが、基礎型枠
兼用の基礎断熱材を成形する治具であり、この基礎用治
具は、互いに分割可能な治具本体および治具蓋を有する
請求項1記載の建築部材の発泡成形装置。
3. One of the plurality of jigs is a jig for forming a base insulating material also serving as a base form, and the jig for the base includes a jig body and a jig lid which can be divided from each other. The foam molding apparatus for a building member according to claim 1.
【請求項4】 前記複数の発泡成形用の治具のいずれか
が壁パネル用の治具であって、この壁パネル用治具は、
パネルフレームおよび両面の面材を寝かせて収容する上
面開放の治具本体と、この治具本体の上面開口を蓋する
治具蓋とを有し、前記発泡成形用の残りの治具が基礎型
枠兼用の基礎断熱材を成形する治具であり、この基礎用
治具は、互いに分割可能な治具本体および治具蓋を有
し、前記準備台として壁パネル用治具の準備台および基
礎用治具の準備台を並設し、前記両搬送装置の端部間で
治具の送りを行う受渡し搬送台を設けた請求項1記載の
建築部材の発泡成形装置。
4. A jig for a wall panel, wherein one of the plurality of jigs for foam molding is a jig for a wall panel.
A jig body having an open top surface for storing the panel frame and the surface materials on both sides in a laid state, and a jig lid for covering an upper surface opening of the jig body, wherein the remaining jig for foam molding is a base mold. A jig for forming a base heat insulating material that also serves as a frame. The jig for the base has a jig body and a jig lid which can be divided from each other. 2. The foam molding apparatus for building members according to claim 1, further comprising: a transfer table for disposing a jig between the ends of the two transfer apparatuses.
【請求項5】 前記受渡し搬送台の上方に、前記壁パネ
ル用治具および基礎用治具の治具蓋を持ち上げる治具蓋
脱着装置を設けた請求項4記載の建築部材の発泡成形装
置。
5. The foam molding apparatus for building members according to claim 4, further comprising a jig lid removing device for lifting the jig lids of the wall panel jig and the base jig above the transfer conveyor.
【請求項6】 前記壁パネル用治具と基礎用治具の治具
本体を、互いに略同じ大きさの平面形状とした請求項4
記載の建築部材の発泡成形装置。
6. The jig body of the wall panel jig and the foundation jig has a planar shape having substantially the same size as each other.
A foam molding apparatus for a building member according to the above.
【請求項7】 搬送装置上を搬送可能な発泡成形用の壁
パネル用治具であって、壁パネルのパネルフレームおよ
び両面の面材を寝かせて収容する上面開放の治具本体
と、この治具本体の上面開口を蓋する治具蓋とを有し、
前記治具本体は、底板上の四辺に側枠を有し、隣合う2
辺の側枠がパネルフレームを配置する基準部材となり、
残り2辺の側枠が外側へ開き可能であり、前記治具蓋に
前記治具本体と結合する流体圧式のクランプ装置を有
し、このクランプ装置の作動流体を供給する流体経路
に、離脱状態で流路を閉じるカプラーを設けた壁パネル
用治具。
7. A jig for a wall panel for foam molding capable of being conveyed on a conveying device, wherein the jig main body has an open top surface for storing a panel frame of the wall panel and face materials on both sides in a laid state. A jig lid for covering an upper surface opening of the fixture body,
The jig main body has side frames on four sides on a bottom plate,
The side frame of the side becomes the reference member for arranging the panel frame,
The remaining two side frames can be opened outward, and the jig lid has a fluid pressure type clamp device coupled to the jig body, and the fluid path for supplying the working fluid of the clamp device is in a detached state. A wall panel jig provided with a coupler that closes the flow path.
【請求項8】 請求項4または請求項5記載の建築部材
の発泡成形装置を用いる発泡成形方法であって、前記壁
パネル用治具と基礎用治具とを略交互に予熱炉へ搬入す
る建築部材の発泡成形方法。
8. A foam molding method using the foam molding apparatus for building members according to claim 4 or 5, wherein the wall panel jig and the foundation jig are carried into the preheating furnace substantially alternately. A foam molding method for building components.
JP30743696A 1996-10-31 1996-10-31 Building member foam molding apparatus, jig, and method Expired - Fee Related JP3703583B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30743696A JP3703583B2 (en) 1996-10-31 1996-10-31 Building member foam molding apparatus, jig, and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30743696A JP3703583B2 (en) 1996-10-31 1996-10-31 Building member foam molding apparatus, jig, and method

Publications (2)

Publication Number Publication Date
JPH10128770A true JPH10128770A (en) 1998-05-19
JP3703583B2 JP3703583B2 (en) 2005-10-05

Family

ID=17969058

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30743696A Expired - Fee Related JP3703583B2 (en) 1996-10-31 1996-10-31 Building member foam molding apparatus, jig, and method

Country Status (1)

Country Link
JP (1) JP3703583B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110861249A (en) * 2019-12-11 2020-03-06 上海寰宇物流科技有限公司 Secondary foaming production system and production method for refrigerated container

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110861249A (en) * 2019-12-11 2020-03-06 上海寰宇物流科技有限公司 Secondary foaming production system and production method for refrigerated container
CN110861249B (en) * 2019-12-11 2023-05-05 上海寰宇物流科技有限公司 Secondary foaming production system and production method for frozen container

Also Published As

Publication number Publication date
JP3703583B2 (en) 2005-10-05

Similar Documents

Publication Publication Date Title
JP2008508498A (en) Vacuum foaming method and apparatus for refrigerator cabinet
RU2502597C2 (en) Device and method of continuous long element forming made from foam plastic, plant with said element and structural element made from said foam plastic
US5853512A (en) Method of manufacturing unitary framed foam panels
JP2008508124A (en) Vacuum foaming method for refrigerator and rotary drum equipment and method for vacuum foaming
EP0333782A1 (en) Foamed plastic laminated panel
US20070276526A1 (en) Construction element form and method of fabricating same
KR100762169B1 (en) Apparatus for manufacturing urethane pannel and method of the same
JP3662787B2 (en) Precast concrete component manufacturing system
US3081488A (en) Mold form for fabricating modules
US4860921A (en) Thermal breaker strip for refrigeration cabinets
ITMI20111848A1 (en) METHOD AND APPARATUS FOR VACUUM MOLDING OF POLYURETHANE MATERIAL
JP3703583B2 (en) Building member foam molding apparatus, jig, and method
US3075240A (en) Apparatus for making preformed building elements
KR102037732B1 (en) Structure for an insulation container and constructing method thereof
US7040884B2 (en) Apparatus and process for forming plastic laminated panels
US4676852A (en) Apparatus and method for fabricating refrigeration cabinets
US3328836A (en) Foam panel making apparatus
JP2000008619A (en) TEMPORARY JIG FOR ASSEMBLING INNER MOLD FOR MANUFACTURING SHELL PCa COLUMN MEMBER AND ASSEMBLING METHOD OF INNER MOLD USING THE SAME
KR200292667Y1 (en) Device of manufacturing fireproof panel
KR102612214B1 (en) Apparatus for manufacturing tile walls in self-assembly bathrooms
CN217414381U (en) Steam curing kiln for prefabricating track slab
JP3188344B2 (en) Foam molding method and apparatus
JPH11309600A (en) Work carrying-in and carrying-away device in multistage press
KR970008078B1 (en) Apparatus for shaping articles of separate moulds
JPH03275308A (en) Treatment device for molded product

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050414

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050426

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050623

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050719

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050720

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080729

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110729

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110729

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120729

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120729

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140729

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees