JPH10126910A - Gas insulated apparatus conductor supporting jig - Google Patents

Gas insulated apparatus conductor supporting jig

Info

Publication number
JPH10126910A
JPH10126910A JP27949896A JP27949896A JPH10126910A JP H10126910 A JPH10126910 A JP H10126910A JP 27949896 A JP27949896 A JP 27949896A JP 27949896 A JP27949896 A JP 27949896A JP H10126910 A JPH10126910 A JP H10126910A
Authority
JP
Japan
Prior art keywords
pieces
band
piece
shoe
sheath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP27949896A
Other languages
Japanese (ja)
Inventor
Satoru Morimoto
悟 森本
Koichi Kurabayashi
好一 倉林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Furukawa Electric Co Ltd
Original Assignee
Furukawa Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Furukawa Electric Co Ltd filed Critical Furukawa Electric Co Ltd
Priority to JP27949896A priority Critical patent/JPH10126910A/en
Publication of JPH10126910A publication Critical patent/JPH10126910A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars
    • H02G5/06Totally-enclosed installations, e.g. in metal casings
    • H02G5/066Devices for maintaining distance between conductor and enclosure

Landscapes

  • Installation Of Bus-Bars (AREA)

Abstract

PROBLEM TO BE SOLVED: To suppress the deformation of the end of the sheath of a conduit gas insulated cable and facilitate the installation of the cable by a method wherein band pieces are closely linked with each other to tighten the inner pipe of the cable and, further, shoe pieces are pressed against the outer pipe of the cable by using the band pieces as fulcrums. SOLUTION: A conductor supporting jig 21 has two divided band pieces 3 between which an aluminum conductor 2 is held and two shoe pieces 4 which have areas large enough to cover the inner surface of a sheath 1. Flange surfaces are provided on the band pieces 3 and the shoe pieces 4 respectively and the respective flange surfaces are brought into contact with each other. Long holes 9 are formed in the flanges of the shoe pieces 4 and screw holes 23 are formed in the flanges of the band pieces 3. After the conductor supporting jig 21 is inserted into the end of the conduit gas insulated cable, first, nuts 18 are screwed onto bolts 16 to fix the band pieces 3 to the aluminum conductor 2. Then, after bolts 6 are turned to press the shoe pieces 4 against the sheath 1 through bolt caps 7 provided on the band pieces 3, bolts 10 are tightened to fix the band pieces 3 and the shoe pieces 4 to each other.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は外側パイプ(シー
ス)内に内側パイプ(導体)を挿入してなるガス絶縁機
器、例えば管路気中ケーブルを運搬する時に使用する導
体支持治具に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gas insulating device having an inner pipe (conductor) inserted into an outer pipe (sheath), for example, a conductor supporting jig used for transporting a conduit air cable. is there.

【0002】[0002]

【従来の技術】まず、ガス絶縁機器と総称されるものの
中、代表的な単心型管路気中ケーブルの構造につき図3
を参照して説明する。単心管路気中ケーブル101は、
アルミ製外側パイプ1(以下シース1と称す)の中に内
側パイプ2(以下アルミ導体2と称す)が、熱硬化性樹
脂からなる固定型柱状スペーサ31と移動型柱状スペー
サ32とで支持されて同心円状に配置されており、シー
ス1内には絶縁性ガスであるSF6 ガス35が加圧封入
されている。
2. Description of the Related Art First, a typical single-core conduit air cable is generally shown in FIG.
This will be described with reference to FIG. The single-core conduit air cable 101
An inner pipe 2 (hereinafter referred to as an aluminum conductor 2) is supported by a fixed columnar spacer 31 and a movable columnar spacer 32 made of a thermosetting resin in an aluminum outer pipe 1 (hereinafter referred to as a sheath 1). The sheath 1 is pressurized and sealed with an SF6 gas 35 which is an insulating gas.

【0003】管路気中ケーブル101は基本長14mの
ものを工場にて製造(組み立て)し、これを布設現地へ
運搬する。布設現地では管路気中ケーブル101を複数
個相互に接続して線路とする。接続して使用する為に管
路気中ケーブル101のシース1の一方の端部102は
拡管形状に成形し、他方の端部103は端末より若干内
側に入った所を拡管形状に成形して一方のシース端部1
02と隣接管路気中ケーブル101のシース端部103
を嵌合後溶接して接続する。アルミ導体2の接続はアル
ミ導体2の熱伸縮、接続誤差等を吸収する為の摺動部を
有するプラグイン型ロングコンタクト33と隣接するア
ルミ導体2の端末に設けたプラグイン型ショートコンタ
クト34とを嵌合して機械的に接続する。
[0003] A pipe air cable 101 having a basic length of 14 m is manufactured (assembled) at a factory and transported to a laying site. At the installation site, a plurality of pipeline air cables 101 are connected to each other to form a line. One end 102 of the sheath 1 of the conduit air cable 101 is formed into an expanded shape, and the other end 103 is formed into an expanded shape at a position slightly inside the terminal for connection and use. One sheath end 1
02 and the sheath end 103 of the adjacent conduit air cable 101
After fitting, they are connected by welding. The connection of the aluminum conductor 2 includes a plug-in long contact 33 having a sliding portion for absorbing thermal expansion and contraction of the aluminum conductor 2 and a connection error, and a plug-in short contact 34 provided at an end of the adjacent aluminum conductor 2. Are fitted and mechanically connected.

【0004】図3に示す様にこの種の絶縁機器のシース
端部102及び103には運搬時にのみ使用する導体支
持治具21が取り付けられる。導体支持治具21は管路
気中ケーブル101の中に設けられているスペーサ31
及び32とともに端末部102及び103において導体
の自重を支持し、運搬時の加速力及び振動を抑え、アル
ミ導体2の移動を防止し損傷及び変形を防止する目的の
治具である。
As shown in FIG. 3, a conductor support jig 21 used only during transportation is attached to sheath ends 102 and 103 of this type of insulating equipment. The conductor supporting jig 21 is a spacer 31 provided in the conduit air cable 101.
A jig for supporting the weight of the conductor at the terminal portions 102 and 103 together with the terminal portions 32 and 32, suppressing acceleration force and vibration during transportation, preventing the aluminum conductor 2 from moving, and preventing damage and deformation.

【0005】従来の導体支持治具21は、図4に示す様
にアルミ導体2をバンド片3で挟み、このバンド片3の
外周上等間隔に3箇所、バンド片3の外表面に対して垂
直となる様に取り付けたボルト40を介して幅のあまり
広くない押さえ金具41を半径方向のシース1側に突っ
張ることによってアルミ導体2を支持する構造である。
なお、押さえ金具41に設けたボルト40挿入部はボル
ト40の先端が挿入できる貫通孔44となっており、ナ
ット42が貫通孔44の挿入端に当たってナット42の
回動により押さえ金具41が進退する構造となってい
る。
[0005] As shown in FIG. 4, a conventional conductor supporting jig 21 sandwiches an aluminum conductor 2 between band pieces 3, and three places at equal intervals on the outer periphery of the band piece 3 with respect to the outer surface of the band piece 3. The aluminum conductor 2 is supported by pushing a not-so-wide wide holding member 41 toward the sheath 1 side in the radial direction via a bolt 40 attached so as to be vertical.
The insertion portion of the bolt 40 provided on the holding member 41 is a through hole 44 into which the tip of the bolt 40 can be inserted. The nut 42 hits the insertion end of the through hole 44, and the holding member 41 advances and retreats by rotating the nut 42. It has a structure.

【0006】具体的な取り付けは、バンド片3に設けた
ボルト40の先端に押さえ金具41の貫通孔44を装着
した状態で2分割したバンド片3、3をアルミ導体2を
挟むように取り付けてボルト43、43によりアルミ導
体2に固着する。次いでナット42をシース1側に回動
させることにより押さえ金具41をシース1側へ押しや
り、ナット42を更に回動することにより押さえ金具4
1をシース1内面に押圧し、アルミ導体2をシース1に
固定する。
More specifically, the band pieces 3, 3 divided into two pieces are attached so as to sandwich the aluminum conductor 2 in a state where the through holes 44 of the holding metal fittings 41 are attached to the tips of the bolts 40 provided on the band piece 3. It is fixed to the aluminum conductor 2 by bolts 43,43. Next, the holding member 41 is pushed toward the sheath 1 by rotating the nut 42 toward the sheath 1, and the holding member 4 is further rotated by rotating the nut 42.
1 is pressed against the inner surface of the sheath 1 to fix the aluminum conductor 2 to the sheath 1.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、この導
体支持治具21は、シース1内面に前記押さえ金具41
を押し付けるのに、一本ずつ締め、円弧を保つ基準がな
いためナット42を締め付けた際、均等に締め付けられ
ず一箇所の面圧が大きくなる為、図5に誇示する様にシ
ース端部の形状が三角形状に変形してしまうことがあ
る。シース端部附近のシース1の真円が変形すると、管
路気中ケーブル101相互のシースの挿入が不可能また
は不充分となって、溶接接続の不可能または溶接の欠陥
を伴いやすい。また、ボルト40と押さえ金具41が機
械的に接続されていないため導体支持治具21を組み立
ててアルミ導体2を支持させる際、これらが抜けたりバ
ラバラになるため、その防止のために二人作業になって
しまうといった作業性における問題点もある。
However, the conductor supporting jig 21 is provided on the inner surface of the sheath 1 with the holding metal 41.
Is pressed one by one, there is no reference to keep the arc, and when the nut 42 is tightened, it is not evenly tightened and the surface pressure at one place becomes large. Therefore, as shown in FIG. The shape may be deformed into a triangular shape. If the true circle of the sheath 1 near the sheath end is deformed, it becomes impossible or insufficient to insert the sheath between the conduit cables 101, and it is likely that welding connection becomes impossible or welding defects occur. In addition, when the conductor supporting jig 21 is assembled to support the aluminum conductor 2 because the bolt 40 and the holding metal 41 are not mechanically connected to each other, these may come off or fall apart. There is also a problem in workability, such as becoming inconvenient.

【0008】[0008]

【課題を解決するための手段】本発明は上記問題を解決
し、管路気中ケーブル101(等ガス絶縁機器)のシー
ス端部102或いは103の変形をおさえることが出
来、また取付作業が容易にできる導体支持治具を提供す
ることを目的とするものである。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned problems, and can suppress deformation of the sheath end portion 102 or 103 of the conduit air cable 101 (equivalent gas insulating device), and also facilitates installation work. It is an object of the present invention to provide a conductor supporting jig that can be manufactured in a simple manner.

【0009】請求項1の発明は、外側パイプ内に内側パ
イプを挿入してなるガス絶縁機器の内側パイプ外面に締
めつけて取り付けるバンド片と、外側パイプの内面に押
しつけて取り付けるシユウ片を各N個に分割して作製
し、前記バンド片は互いに取付け取り外し可能に連結さ
れ、前記シユウ片はバンド片の中央近傍にシユウ片相互
の合わせ目が位置するようにずらして配置し、前記バン
ド片およびシユウ片には互いに接触するフランジを設け
ておき、そのフランジ面同士を滑らして移動可能及び固
定し得るように連結し環状となるようにしておき、バン
ド片同士を互いに連結接近させたとき内側パイプを締め
付ける構造とし、更にバンド片を支点としてシユウ片を
外側パイプに対し押し付ける機構を備えたことを特徴と
するガス絶縁機器導体支持治具である。
According to the first aspect of the present invention, each of N pieces of band pieces to be fastened to the inner surface of the outer pipe and N pieces of shoe pieces to be pressed to the inner surface of the outer pipe of the gas-insulated equipment having the inner pipe inserted into the outer pipe. The band pieces are attached and detachably connected to each other, and the shoe pieces are displaced so that joints of the shoe pieces are located near the center of the band pieces. The pieces are provided with flanges that are in contact with each other, and the flange surfaces are connected so that they can be slidably moved and fixed so as to form an annular shape.When the band pieces are connected to each other, the inner pipe is closed. Gas insulated equipment, characterized in that it has a tightening structure and further has a mechanism that presses a shoe piece against an outer pipe with a band piece as a fulcrum. A supporting jig.

【0010】請求項2の発明は、外側パイプ内に内側パ
イプを挿入してなるガス絶縁機器の内側パイプ外面に締
めつけて取り付けるバンド片と、外側パイプの内面に押
しつけて取り付けるシユウ片を各N個に分割して作製
し、前記バンド片は互いに取付け取り外し可能に連結さ
れ、前記シユウ片はバンド片の中央近傍にシユウ片相互
の合わせ目が位置するようにずらして配置し、前記バン
ド片およびシユウ片には互いに接触するフランジを設け
ておき、バンド片フランジとシユウ片フランジを個々に
対応させ一個所で滑らして移動可能及び固定し得るよう
に連結しておき、更にバンド片を支点としてシユウ片を
外側パイプに対し押し付ける機構を備えたことを特徴と
するガス絶縁機器導体支持治具である。
[0010] The invention according to claim 2 is that the present invention provides a gas insulating device having an inner pipe inserted into an outer pipe, and N pieces each of which is attached to the outer surface of the inner pipe by tightening the band piece by pressing the inner pipe to the inner surface of the outer pipe. The band pieces are attached and detachably connected to each other, and the shoe pieces are displaced so that joints of the shoe pieces are located near the center of the band pieces. The pieces are provided with flanges that are in contact with each other, and the band piece flanges and the shoe piece flanges are individually associated with each other and connected so as to be slidable and movable and fixed at one place. And a mechanism for pressing the outer pipe against the outer pipe.

【0011】[0011]

【発明の実施の形態】本発明の請求項1の発明になる導
体支持治具の一実施態様を図1により説明する。図1に
示すように本発明の導体支持治具21は、アルミ導体2
を挟むN個に分割(図面では2分割)されたバンド片3
と、シース1内面を覆う充分な大きさのN個(図面では
2個)のシユウ片4とがあり、シユウ片4はバンド片3
の中央に相互の合わせ目が位置するように180/N度
(図面では90度)回転した位置にずらして配置されて
いる。またバンド片3にもシユウ片4にもフランジが設
けられており、シユウ片4側フランジには長孔9が2個
設けられバンド片3側フランジにネジ穴23が刻まれて
いて、ボルト10で締め付けられるように構成されてい
る。長穴の幅も大きめのガタが取ってある。バンド片3
とシユウ片4を片側のボルト10で連結し、同一シユウ
片4上の他のボルト10で別のバンド片3を連結し、次
にそのバンド片3に次のシユウ片4をというように続け
ると、ボルト10のみで導体支持治具全体の輪ができ
る。このボルト10を緩く締めておけばシユウ片4は間
隙を手動で調整でき、またボルト10を締め付ければ、
シユウ片4とバンド片3は固着されてしまう。長穴9の
長手方向は径の方向でシユウ片4中央のバンド片3の割
目方向がよい。幅方向ガタは、シースと導体との芯ずれ
量に対し充分対応が取れるものにする。バンド片3同士
を結ぶボルト16を締めるとバンド片3がアルミ導体2
を締め付ける。更に、シユウ片4上には適当数の押しボ
ルト6がシユウ片4のフランジに設けた螺旋穴24に螺
合し、ボルト6を回動させることにより先端のボルトキ
ャップ7を介してバンド片3とシユウ片4との距離を拡
大しシユウ片4を外側に押し付けるように、即ちシユウ
片4をシース1の内側に押し付けるようになっている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of a conductor supporting jig according to the first aspect of the present invention will be described with reference to FIG. As shown in FIG. 1, the conductor supporting jig 21 of the present invention
Band piece 3 divided into N pieces (two in the drawing) sandwiching
And N pieces (two pieces in the drawing) of a sufficiently large size to cover the inner surface of the sheath 1 are shown.
Are shifted from each other by 180 / N degrees (90 degrees in the drawing) so that the joints are located at the center. A flange is provided on both the band piece 3 and the show piece 4. Two long holes 9 are provided on the show piece 4 side flange, and a screw hole 23 is formed in the band piece 3 side flange. It is configured to be tightened with. There is also a large play on the slot. Band piece 3
And the shoe piece 4 are connected by a bolt 10 on one side, another band piece 3 is connected by another bolt 10 on the same shoe piece 4, and then the next shoe piece 4 is connected to the band piece 3 and so on. Then, only the bolt 10 forms a loop of the entire conductor supporting jig. If this bolt 10 is loosely tightened, the gap of the shoe piece 4 can be adjusted manually, and if the bolt 10 is tightened,
The shoe piece 4 and the band piece 3 are fixed. The longitudinal direction of the elongated hole 9 is a radial direction, and is preferably the direction of the split of the band piece 3 at the center of the show piece 4. The play in the width direction is designed to sufficiently cope with the amount of misalignment between the sheath and the conductor. When the bolt 16 connecting the band pieces 3 is tightened, the band piece 3 becomes the aluminum conductor 2
Tighten. Further, an appropriate number of push bolts 6 are screwed into the screw holes 24 provided on the flanges of the screw pieces 4 on the screw pieces 4, and the band pieces 3 are turned through the bolt caps 7 at the tips by rotating the bolts 6. The distance between the metal piece and the piece 4 is enlarged so that the piece 4 is pressed outward, that is, the piece 4 is pressed inside the sheath 1.

【0012】図1に示す本発明導体支持治具の実施態様
につき組み立て順を説明する。全てのバンド片3とシユ
ウ片4とは先に記載した長穴9内のボルト10にて互い
にリング状に連結される。ボルト10は長穴9内の内側
(導体方向)に位置させ、シユウ片4同士は近ずき加減
にしてまたバンド片3同士は離れ加減にしておく(1個
所のボルト10を外し輪を切っておてもよい)。
The order of assembling the embodiment of the conductor supporting jig of the present invention shown in FIG. 1 will be described. All the band pieces 3 and the show pieces 4 are connected to each other in a ring shape by the bolts 10 in the elongated holes 9 described above. The bolt 10 is positioned inside (in the conductor direction) inside the elongated hole 9, the pieces 4 are approached and adjusted, and the band pieces 3 are separated and adjusted (remove one bolt 10 and cut the ring) May be used).

【0013】管路気中ケーブル101の端末にリング状
に緩く連結された導体支持金具21を挿入し、先ずボル
ト16にナット18を締めつけることによりバンド片
3、3をアルミ導体2に固定する。次に手でシユウ片4
を拡大しシース1にシユウ片4をくっつけ、ボルト10
を若干締め、ボルト6を回動して全てのボルト6の先端
がバンド片3に設けたボルトキャップ7を介してバンド
片3に達したのを確認後、シース1に押しつける方向に
ボルト6を移動し、シユウ片4をシース1に押圧する。
最後にボルト10を完全に締めつけてバンド片3とシユ
ウ片4とを固着して取り付け作業を終わる。
[0013] A conductor support fitting 21 loosely connected in a ring shape is inserted into an end of the conduit air cable 101, and first, a nut 18 is fastened to a bolt 16 to fix the band pieces 3, 3 to the aluminum conductor 2. Next, hand pieces 4
And attach the piece 4 to the sheath 1
After slightly tightening the bolts 6 and confirming that the tips of all the bolts 6 have reached the band pieces 3 via the bolt caps 7 provided on the band pieces 3, tighten the bolts 6 in the direction of pressing against the sheath 1. It moves and presses the piece 4 against the sheath 1.
Finally, the bolt 10 is completely tightened to fix the band piece 3 and the shoe piece 4 to complete the mounting operation.

【0014】請求項2になる発明の実施の形態を次に図
2に従い示す。図1と図2との違いは図2では長穴9に
よる取付けを一個所減らし、連結の役割をバンド片3を
止めているボルト16,ナット18及び通しボルト6に
させたことである。これはNの小さな2から4において
可能である。図2ではN=2のおける構造を示してい
る。図2に示すように本発明の導体支持治具21は、ア
ルミ導体2を挟む2個に分割されたバンド片3と、シー
ス1内面を覆う充分な大きさの2個のシユウ片4とがあ
り、バンド片3相互はボルト16ナット18で連結され
ている。またシユウ片4はバンド片3の中央に相互の合
わせ目が位置するように90度回転した位置にずらして
配置されている。またバンド片3にもシユウ片4にもフ
ランジが設けられており、シユウ片4側フランジには長
孔9が設けられバンド片3側フランジにネジ穴23が刻
まれていて、ボルト10で締め付けられるように構成さ
れている。このボルト10を緩めればシユウ片4は間隙
を手動で調整でき、またボルト10を締め付ければ、シ
ユウ片4とバンド片3は固着されてしまう。この部分が
移動可能な連結部に相当する。一つのバンド片3と組合
うのは一つのシユウ片4のみであり、同一組合せ間では
案内部の長穴9は同一方向であれば複数個設けても構わ
ない。長穴9の方向はシユウ片4中央のバンド片3の割
目方向が望ましい。そして、シユウ片4上には最低一個
以上適当数の押しボルト6がシユウ片4のフランジに設
けたボルト取付け部8の螺旋穴24に螺合し、ボルト6
を回動させることにより先端のボルトキャップ7を介し
てバンド片3とシユウ片4との距離を拡大しシユウ片4
を外側に押し付けるように、即ちシユウ片4をシース1
の内側に押し付けるようになっている。
An embodiment of the present invention according to claim 2 will be described next with reference to FIG. The difference between FIG. 1 and FIG. 2 is that in FIG. 2, the attachment by the elongated hole 9 is reduced by one, and the connection role is changed to the bolt 16, the nut 18 and the through bolt 6 holding the band piece 3. This is possible at 2 to 4 where N is small. FIG. 2 shows a structure where N = 2. As shown in FIG. 2, the conductor supporting jig 21 of the present invention includes a band piece 3 divided into two pieces sandwiching an aluminum conductor 2 and two pieces 4 of a sufficient size to cover the inner surface of the sheath 1. The band pieces 3 are connected to each other by bolts 16 and nuts 18. The pieces 4 are shifted by 90 degrees so that the seam is located at the center of the band 3. A flange is provided on both the band piece 3 and the show piece 4, and a long hole 9 is provided on the flange on the show piece 4, and a screw hole 23 is formed in the flange on the band piece 3, and tightened with the bolt 10. It is configured to be. If the bolt 10 is loosened, the gap of the shoe piece 4 can be adjusted manually, and if the bolt 10 is tightened, the shoe piece 4 and the band piece 3 are fixed. This portion corresponds to a movable connecting portion. Only one shoe piece 4 is combined with one band piece 3, and a plurality of elongated holes 9 of the guide portion may be provided in the same combination in the same direction. The direction of the slot 9 is desirably the split direction of the band piece 3 at the center of the show piece 4. Then, at least one or more appropriate number of push bolts 6 are screwed into the screw holes 24 of the bolt mounting portions 8 provided on the flanges of the screw pieces 4 on the screw pieces 4,
Is rotated to increase the distance between the band piece 3 and the show piece 4 via the bolt cap 7 at the tip, thereby increasing the show piece 4
To the outside, that is, to insert the piece 4 into the sheath 1
It is designed to be pressed inside.

【0015】図2に示す本発明導体支持治具の実施態様
につき組み立て順を説明する。2分割されたバンド片3
同士をボルト16ナット18でゆるく接続することによ
りバンド片3、シユウ片4の輪が出来る。そしてバンド
片3中央近傍にシユウ片4の合わせ目が位置するように
シユウ片4とバンド片3とをボルト10を長穴9を通し
てバンド片3側フランジのネジ穴23に螺合して仮接続
する。ボルト10は長穴9内の内側(導体方向)に位置
させ、シユウ片4同士は近ずき加減にして軽く締める。
なお、この時シユウ片4に設けたボルト取り付け部8の
螺旋穴24にボルト6を螺合させておく。このときボル
ト6の挿入長さは短めにして、バンド片3とボルト6の
先端の間の間隙が取れるようにしておく。
The order of assembling the embodiment of the conductor supporting jig of the present invention shown in FIG. 2 will be described. Band piece 3 divided into two
By loosely connecting them with bolts 16 and nuts 18, a loop of the band piece 3 and the shoe piece 4 is formed. Then, the bolt 4 is screwed into the screw hole 23 of the flange of the band piece 3 through the elongated hole 9 so as to temporarily connect the mesh piece 4 and the band piece 3 so that the joint of the piece 4 is located near the center of the band piece 3. I do. The bolt 10 is positioned inside (in the direction of the conductor) inside the elongated hole 9, and the screw pieces 4 approach each other and are lightly tightened.
At this time, the bolt 6 is screwed into the helical hole 24 of the bolt attachment portion 8 provided on the shoe piece 4. At this time, the insertion length of the bolt 6 is made short so that a gap is formed between the band piece 3 and the tip of the bolt 6.

【0016】さて、この状態ではどこも固定していない
ので、バンド片3同士を手で広げ一方長穴9内のボルト
10の位置をなるべく内側(導体方向)にしてボルト1
0を軽く締める。この様にして内のバンド片3は大きい
径の方へ、外のシユウ片4は小さい径の方にしておく。
シユウ片4は、ボルト10を支点として、ボルト6のう
ちバンド片3側に接することによりバランスする方のボ
ルト6(図においてDと記入してあるボルト)で支えら
れている状態で安定させておく。導体支持治具21を管
路気中ケーブル101の端末に挿入し、先ずボルト16
にナット18を締めつけることによりバンド片3、3を
アルミ導体2に固定する。次に手でシユウ片4を拡大し
シース1にシユウ片4をくっつけ、ボルト10を若干締
め、ボルト6を回動してボルト6の先端がバンド片3に
設けたボルトキャップ7を介してバンド片3に達したの
を確認後、シース1に押しつける方向にボルト6を移動
し、シユウ片4をシース1に押圧する。最後にボルト1
0を完全に締めつけてバンド片3とシユウ片4とを固着
して取り付け作業を終わる。
In this state, since no part is fixed, the band pieces 3 are spread by hand, while the position of the bolt 10 in the elongated hole 9 is set to the inside (conductor direction) as much as possible.
Lightly tighten 0. In this way, the inner band piece 3 has a larger diameter and the outer shoe piece 4 has a smaller diameter.
With the bolt 10 as a fulcrum, the shoe piece 4 is stabilized while being supported by the bolt 6 (the bolt marked D in the figure) which is balanced by contacting the band piece 3 side of the bolt 6. deep. The conductor support jig 21 is inserted into the end of the conduit air cable 101, and the bolt 16
The band pieces 3 are fixed to the aluminum conductor 2 by tightening the nuts 18. Next, the screw 4 is enlarged by hand, the screw 4 is attached to the sheath 1, the bolt 10 is slightly tightened, the bolt 6 is turned, and the tip of the bolt 6 is passed through the bolt cap 7 provided on the band 3. After confirming that the piece 3 has been reached, the bolt 6 is moved in the direction of pressing against the sheath 1, and the shower piece 4 is pressed against the sheath 1. Finally bolt 1
0 is completely tightened to fix the band piece 3 and the show piece 4 to complete the mounting operation.

【0017】本発明ガス絶縁機器導体支持治具は、ガス
絶縁機器内へ電気的に有害となる異物を混入させ、また
は異物の発生を防止する点から非金属で構成することが
望ましく、特に、ボルト、ナット類は熱硬化性樹脂から
なるものを採用し、金属との接触部には全てゴムからな
るクッション13、14、20、ウレタンワッシャー2
3並びにゴムからなるクッションを張り合わせたワッシ
ャー17及びプラスチックからなるカラー22を設けて
ある。
It is desirable that the conductor supporting jig of the present invention be made of a non-metal in order to mix electrically harmful foreign substances into the gas insulating apparatus or to prevent the generation of foreign substances. Bolts and nuts are made of thermosetting resin, and cushions 13, 14, 20 and urethane washers 2 made entirely of rubber are provided at the contact portions with metal.
3 and a washer 17 to which a cushion made of rubber is adhered, and a collar 22 made of plastic.

【0018】本実施態様はバンド片3とシユウ片4を2
個に分割した例につき説明した。しかしながら、ガス絶
縁機器のサイズが大きくなると3分割、4分割等多分割
(N分割)とすることにより組立が容易となり、シユウ
片4によるシース1内面への圧力を全面に対しより均一
とすることが可能となり、シース1の変形をより防止で
きる。
In this embodiment, the band piece 3 and the show piece 4
The example of dividing into individual pieces has been described. However, when the size of the gas insulating device is increased, the assembly is facilitated by dividing into three parts, four parts, etc. (N divisions), and the pressure on the inner surface of the sheath 1 by the shower pieces 4 is made more uniform over the entire surface. And the deformation of the sheath 1 can be further prevented.

【0019】[0019]

【発明の効果】以上説明したように、本発明の請求項1
の導体支持具21によれば長穴9のボルトを連結するこ
とによりシユウ片4バンド片3が輪となり全て一体とな
ってしまうので、取扱が容易で取り扱うときの運搬が簡
単である。また、特別の加工もなしで、従来の問題点で
あるボルトや押さえ金具が抜ける等の部分を皆無として
いる。更にシユウ片4が長穴位置で同心状に拡大、縮小
できるので、均一にシース1を締め付けることが出来、
シース1の変形を抑えることが出来る。バンド片3とシ
ユウ片4が組み合わせられて一体化されているので、導
体支持具21を組み立てて導体2を支持させる際、一人
作業が可能である。バンド片3及びシユウ片4がフラン
ジ構造であるため、構造的に強固で変形しない。また請
求項2の発明によれば、長穴加工を半分に省略できる。
但し、運搬・取付け時に取扱上注意点が増すという欠陥
が出てくる。
As described above, according to the first aspect of the present invention,
According to the conductor support 21 of the present invention, the connection of the bolts of the elongated holes 9 turns the shower pieces 4 and the band pieces 3 into a loop, so that they are all integrated, so that the handling is easy and the transport during handling is easy. In addition, there is no need for any special processing, and there is no portion where the bolts and the holding metal, which are the conventional problems, come off. Further, since the shoe piece 4 can be concentrically enlarged and reduced at the position of the elongated hole, the sheath 1 can be uniformly tightened,
The deformation of the sheath 1 can be suppressed. Since the band piece 3 and the show piece 4 are combined and integrated, when the conductor support 21 is assembled and the conductor 2 is supported, one-person work is possible. Since the band piece 3 and the shoe piece 4 have a flange structure, they are structurally strong and do not deform. According to the second aspect of the present invention, it is possible to omit the processing of the long hole by half.
However, there is a defect that handling precautions increase during transportation and installation.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1(イ)は請求項1の発明の導体支持治具の
構造の一例を示す端面図、図1(ロ)は図1(イ)のY
−Y線断面図である。
FIG. 1A is an end view showing an example of the structure of the conductor supporting jig according to the first aspect of the present invention, and FIG.
FIG. 4 is a sectional view taken along line -Y.

【図2】図2(イ)は請求項2の発明の導体支持治具の
構造の一例を示す端面図、図2(ロ)は図2(イ)のY
−Y線断面図である。
FIG. 2 (a) is an end view showing an example of the structure of the conductor supporting jig according to the invention of claim 2, and FIG. 2 (b) is Y in FIG.
FIG. 4 is a sectional view taken along line -Y.

【図3】標準的な管路気中ケーブルに導体支持治具を取
付けた状況を示す説明図である
FIG. 3 is an explanatory view showing a state where a conductor supporting jig is attached to a standard conduit air cable.

【図4】従来技術の導体支持治具の一例を示す組立図で
ある。
FIG. 4 is an assembly view showing an example of a conventional conductor supporting jig.

【図5】従来の導体支持金具の締付け時の変形状態を示
す説明図である。
FIG. 5 is an explanatory view showing a deformed state at the time of tightening of a conventional conductor supporting fitting.

【符号の説明】[Explanation of symbols]

1 シース 2 アルミ導体 3 バンド片 4 シユウ片 6 ボルト 8 ボルト取付部 9 長穴 10 ボルト 11 シース内面との接触部 16 ボルト 21 導体支持治具 101 管路気中ケーブル 102 シース端部 103 シース端部 REFERENCE SIGNS LIST 1 sheath 2 aluminum conductor 3 band piece 4 shoe piece 6 bolt 8 bolt mounting part 9 long hole 10 bolt 11 contact part with inner surface of sheath 16 bolt 21 conductor support jig 101 conduit air cable 102 sheath end 103 sheath end

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】外側パイプ内に内側パイプを挿入してなる
ガス絶縁機器の内側パイプ外面に締めつけて取り付ける
バンド片と、外側パイプの内面に押しつけて取り付ける
シユウ片を各N個に分割して作製し、前記バンド片は互
いに取付け取り外し可能に連結され、前記シユウ片はバ
ンド片の中央近傍にシユウ片相互の合わせ目が位置する
ようにずらして配置し、前記バンド片およびシユウ片に
は互いに接触するフランジを設けておき、そのフランジ
面同士を滑らして移動可能及び固定し得るように連結し
環状となるようにしておき、バンド片同士を互いに連結
接近させたとき内側パイプを締め付ける構造とし、更に
バンド片を支点としてシユウ片を外側パイプに対し押し
付ける機構を備えたことを特徴とするガス絶縁機器導体
支持治具。
1. A band piece which is fastened to an outer surface of an inner pipe of a gas insulating device having an inner pipe inserted into an outer pipe, and a shoe piece which is mounted by pressing against an inner surface of an outer pipe are divided into N pieces. The band pieces are detachably connected to each other, and the shoe pieces are displaced so that a joint of the shoe pieces is located near the center of the band pieces, and the band pieces and the shoe pieces are in contact with each other. A flange is provided, and the flange surfaces are connected to each other so that the flange surfaces can be slidably moved and fixed so as to be annular, and the inner pipe is tightened when the band pieces are connected and approached to each other. A conductor supporting jig for a gas-insulated device, comprising a mechanism for pressing a shoe piece against an outer pipe with a band piece as a fulcrum.
【請求項2】外側パイプ内に内側パイプを挿入してなる
ガス絶縁機器の内側パイプ外面に締めつけて取り付ける
バンド片と、外側パイプの内面に押しつけて取り付ける
シユウ片を各N個に分割して作製し、前記バンド片は互
いに取付け取り外し可能に連結され、前記シユウ片はバ
ンド片の中央近傍にシユウ片相互の合わせ目が位置する
ようにずらして配置し、前記バンド片およびシユウ片に
は互いに接触するフランジを設けておき、バンド片フラ
ンジとシユウ片フランジを個々に対応させ一個所で滑ら
して移動可能及び固定し得るように連結しておき、更に
バンド片を支点としてシユウ片を外側パイプに対し押し
付ける機構を備えたことを特徴とするガス絶縁機器導体
支持治具。
2. A band piece which is fastened to an outer surface of an inner pipe of a gas insulation device having an inner pipe inserted into an outer pipe, and a shoe piece which is mounted by pressing against an inner surface of an outer pipe, are divided into N pieces. The band pieces are detachably connected to each other, and the shoe pieces are displaced so that a joint of the shoe pieces is located near the center of the band pieces, and the band pieces and the shoe pieces are in contact with each other. The band piece flange and the show piece flange are individually associated with each other so that they can be slid and moved and fixed in one place, and the show piece is attached to the outer pipe with the band piece as a fulcrum. A conductor supporting jig for gas-insulated equipment, comprising a pressing mechanism.
JP27949896A 1996-10-22 1996-10-22 Gas insulated apparatus conductor supporting jig Pending JPH10126910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27949896A JPH10126910A (en) 1996-10-22 1996-10-22 Gas insulated apparatus conductor supporting jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27949896A JPH10126910A (en) 1996-10-22 1996-10-22 Gas insulated apparatus conductor supporting jig

Publications (1)

Publication Number Publication Date
JPH10126910A true JPH10126910A (en) 1998-05-15

Family

ID=17611893

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27949896A Pending JPH10126910A (en) 1996-10-22 1996-10-22 Gas insulated apparatus conductor supporting jig

Country Status (1)

Country Link
JP (1) JPH10126910A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106575864A (en) * 2014-07-28 2017-04-19 阿尔斯通技术有限公司 Electrical equipment comprising improved means for attaching an insulation medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106575864A (en) * 2014-07-28 2017-04-19 阿尔斯通技术有限公司 Electrical equipment comprising improved means for attaching an insulation medium

Similar Documents

Publication Publication Date Title
US4933512A (en) Cable closure
KR101518679B1 (en) Adapter assembly for connecting pipe and assembling device thereof
JPS6124593B2 (en)
US8727388B2 (en) Coupling arrangement comprising a coupling body and a metal pipe, as well as method for assembly of the coupling body
JPS633134B2 (en)
KR960002237B1 (en) Pipe branching device
US9188007B2 (en) Gas turbine shaft bearing system service tool and bearing system service method
US4024339A (en) Supporting insulator assembly for gas-insulated equipment
JPH10126910A (en) Gas insulated apparatus conductor supporting jig
US2835723A (en) Telescopic inspection sections for bus enclosures
JPH0215757B2 (en)
JPS5953774B2 (en) gas insulated power line
US4215237A (en) Bus conductor support system
JP2848767B2 (en) Circuit breaker having components secured by interference fit
US5464258A (en) Compression joint
JPS6233708B2 (en)
CN204012153U (en) The expansion tool of intermediate insulation joint
EP0675510A1 (en) Apparatus and method for attaching end fittings in composite insulators
JP3020350B2 (en) Cable fixing device
CN116368702A (en) Flange design for high-pressure Gas Insulated Switchgear (GIS), bus bar and pipeline (GIL)
JP2569975Y2 (en) Duct connection device
GB2229245A (en) A pipe repair or connection clamp
JPH10126911A (en) Conductor fixing device
JP4172860B2 (en) Temporary fixing device for movable piping members
JPS6313668Y2 (en)