JPH0981257A - Quick look-up chart for working schedule - Google Patents

Quick look-up chart for working schedule

Info

Publication number
JPH0981257A
JPH0981257A JP23137795A JP23137795A JPH0981257A JP H0981257 A JPH0981257 A JP H0981257A JP 23137795 A JP23137795 A JP 23137795A JP 23137795 A JP23137795 A JP 23137795A JP H0981257 A JPH0981257 A JP H0981257A
Authority
JP
Japan
Prior art keywords
work
display
schedule
displayed
reference board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP23137795A
Other languages
Japanese (ja)
Inventor
Yoshiaki Nezu
美明 根津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP23137795A priority Critical patent/JPH0981257A/en
Publication of JPH0981257A publication Critical patent/JPH0981257A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To make it possible to recognize the schedule of each work at a glance and to vidually recognize time difference from originally planned work when practical work is advanced or delayed from its schedule. SOLUTION: The diameters of a 1st circular members 3, a 2nd circular member 4 and a 3rd circular member 5, in that order are successively reduced and these members 3 to 5 are respectively optionally rotated around a shaft 10. A data display 13 and a display 16 of the names of respective work sorts are respectively formed on the 1st member 3 and the 2nd member 4 and the same display 27 as the display 16 is formed also on the 3rd member 5. The starting data of the initial work is set up to the display 13 by turning the 2nd member 4, and when the start of the practical work is delayed or advanced from the schedule, the 3rd member 5 is rotated from the 2nd member 4 by the delayed or advanced number of days.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、作業日程の設定、管
理、確認等のために使用される作業日程早見盤にかか
り、例えば建物の建設現場における施工作業や、土木作
業、さらには工場における製品の製造作業等に利用でき
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work schedule quick board used for setting, managing and confirming work schedules. For example, construction work at a construction site of a building, civil engineering work, and further in a factory. It can be used for product manufacturing work.

【0002】[0002]

【背景技術】住宅のユーザとの間で建設契約が成立する
と、住宅メーカでは、建設現場での作業着工から竣工引
渡しまでの各作業種類についての日程が計画される。従
来、このような計画は例えばノート型のカレンダに記載
して管理するようになっており、また、予定よりも作業
が遅れた場合や進んだ場合にも、同様なカレンダーによ
って作業状況が管理されていた。一方、特開平1−94
161号に示されているように、建設現場での施工作業
をコンピュータで管理するようにしたものも知られてい
る。
BACKGROUND ART When a construction contract is concluded with a user of a house, a house maker plans a schedule for each work type from the start of work at a construction site to the delivery of a completed work. Conventionally, such a plan is written and managed in a notebook calendar, for example, and when the work is behind or ahead of schedule, the work status is managed by a similar calendar. Was there. On the other hand, JP-A-1-94
As shown in No. 161, there is also known one in which construction work at a construction site is managed by a computer.

【0003】[0003]

【発明が解決しようとする課題】カレンダによって建設
現場での作業を管理するようにした場合には、作業着工
から竣工引渡しまでの各作業についての日程を一目で認
識することは困難である。また、実際の作業が予定より
も遅れた場合や進んだ場合には、当初計画された作業と
のずれを視覚的に容易にとらえることは難しく、これを
瞬時に理解することは困難である。また、建設現場での
作業をコンピュータで管理するようにした場合には、作
業日程の管理のための装置全体が高価になるという問題
が生ずる。
When the work at the construction site is managed by the calendar, it is difficult to recognize at a glance the schedule for each work from the start of work to the delivery of the completed work. Further, when the actual work is delayed or advanced as compared with the planned work, it is difficult to visually grasp the deviation from the initially planned work, and it is difficult to instantly understand this. Further, when the work at the construction site is managed by a computer, there arises a problem that the entire apparatus for managing the work schedule becomes expensive.

【0004】本発明の目的は、各作業についての日程を
一目で認識できるとともに、実際の作業が予定よりも遅
れた場合や進んだ場合には当初計画された作業とのずれ
を視覚的に容易にとらえることができ、また、構成が簡
単で安価に作ることができる作業日程早見盤を提供する
ところにある。
The object of the present invention is to recognize the schedule for each work at a glance, and if the actual work is behind or ahead of schedule, it is easy to visually notice the deviation from the originally planned work. It is intended to provide a work schedule quick reference board that can be captured in a simple manner and can be manufactured at low cost.

【0005】[0005]

【課題を解決するための手段】本発明にかかる作業日程
早見盤は、円周方向に日付が順番に表示された第1部材
と、円周方向に各作業種類名称がその作業順序に従って
表示された第2部材と、この第2部材と同じ表示事項が
表示された第3部材とを有し、第3部材が上側になって
第2部材および第3部材が回転中心軸を同じにして第1
部材に回転自在に重ね配設され、かつ、第1部材、第2
部材および第3部材の各前記表示事項が同時視認可能に
半径方向にずれて表示されていることを特徴とするもの
である。
A work schedule quick reference board according to the present invention displays a first member in which dates are sequentially displayed in the circumferential direction and work type names in the circumferential direction according to the work order. A second member and a third member on which the same display items as the second member are displayed, and the third member is on the upper side and the second member and the third member have the same rotation center axis and are 1
The first member and the second member are rotatably stacked on the member.
The display items of the member and the third member are displayed so as to be visually recognized at the same time so that they can be visually recognized at the same time.

【0006】以上において、第1部材、第2部材および
第3部材の各前記表示事項を同時視認可能に半径方向に
ずらして表示するためには、一例として、これらの部材
の大きさを同じとするとともに、これらの部材の外周部
分に半径方向の大きさが段階的に異なる透明部分を設
け、これらの透明部分を通して半径方向にずらして表示
した各表示事項を視認できるようにしてもよい。しか
し、第1部材、第2部材、第3部材のうち少なくとも第
2部材と第3部材を円形とし、第2部材の直径を第3部
材よりも大きくし、これらの第2部材と第3部材の各前
記表示事項を第2部材、第3部材の各外周辺部に表示す
るとともに、第1部材を第2部材よりも大きい表面積を
有するものにし、この第1部材の前記表示事項を第2部
材から外れた位置に表示する構成とすることが望まし
い。
In the above description, in order to display the display items of the first member, the second member, and the third member by shifting them in the radial direction so that they can be visually recognized at the same time, as an example, these members have the same size. At the same time, it is possible to provide transparent portions having radially different sizes in the outer peripheral portions of these members so that the display items displayed by being shifted in the radial direction can be visually recognized through these transparent portions. However, among the first member, the second member, and the third member, at least the second member and the third member are circular, and the diameter of the second member is larger than that of the third member. Each of the above-mentioned display items is displayed on the outer peripheral portions of the second member and the third member, and the first member has a surface area larger than that of the second member. It is desirable that the display is made at a position deviated from the member.

【0007】また、第1部材を第2部材よりも大きい直
径を有する円形とし、この第1部材を第2部材、第3部
材の回転中心軸と同じ軸を中心にして台座部材に回転に
設け、第1部材よりも大きい表面積を有するこの台座部
材には第1部材から外れた位置に基準マークを表示す
る。
Further, the first member is circular with a diameter larger than that of the second member, and the first member is rotatably mounted on the pedestal member about the same axis as the rotation center axis of the second and third members. A reference mark is displayed on the pedestal member having a surface area larger than that of the first member at a position deviated from the first member.

【0008】台座部材の裏面にはこの台座部材が取り付
けられる取付部材に吸着する吸着部材を設ける。
On the back surface of the pedestal member, there is provided a suction member which is attached to the mounting member to which the pedestal member is attached.

【0009】この吸着部材の一例は、取付部材が鉄製で
ある場合には、マグネットであり、また、他の材料から
なる場合には吸盤であり、取付部材が鉄製である場合に
も吸盤でよい。
An example of this attracting member is a magnet when the mounting member is made of iron, a suction cup when the mounting member is made of another material, and a suction cup when the mounting member is made of iron. .

【0010】第3部材が重なる第2部材の部分であって
この第2部材の前記表示事項の先頭から後側の位置に、
作業着工が予定よりも遅れていることを表す作業着工遅
れマークを表示し、第3部材にはこの第3部材の前記表
示事項の前側の位置に、第3部材の回転で作業着工遅れ
マークが露出する窓孔を設ける。
A portion of the second member where the third member overlaps, and the second member is located at a position on the rear side from the beginning of the display item,
A work start delay mark indicating that work start is behind schedule is displayed, and a work start delay mark is displayed on the third member at a position in front of the display item of the third member by rotation of the third member. Provide an exposed window hole.

【0011】また、第3部材が重なる第2部材の部分で
あってこの第2部材の前記表示事項の後尾から前側の位
置に、作業着工が予定より進んでいることを表示する作
業着工進みマークを表示し、第3部材にはこの第3部材
の前記表示事項の後側の位置に、第3部材の回転で作業
着工進みマークが露出する窓孔を設ける。
Further, a work start progress mark indicating that the work start is ahead of schedule in a portion of the second member where the third member overlaps and at a position from the rear end to the front side of the display item of the second member. The third member is provided with a window hole on the rear side of the display item of the third member, the work starting progress mark being exposed by the rotation of the third member.

【0012】本発明にかかる作業日程早見盤は、建物の
建設現場における施工作業について使用でき、この他に
例えば土木作業、工場での製品製造作業等にも使用でき
る。
The work schedule reference board according to the present invention can be used for construction work at a construction site of a building, and can also be used for civil engineering work, product manufacturing work in a factory, and the like.

【0013】[0013]

【作用】第1部材に対して第2部材を回転させ、各作業
種類のうちの最初の作業とこの最初の作業が始まる日付
とを一致させると、各作業についての日程を第1部材の
表示事項により一目で認識できる。また、実際の作業が
予定よりも遅れて始まった場合や進んで始まった場合
は、第1部材および第2部材に対して第3部材を回転さ
せ、実際の作業の開始の日付に合わせると、これ以後の
作業日程が第1部材の表示事項から判明するとともに、
第2部材の表示事項との比較によって当初計画された作
業とのずれを視覚的にとらえることができる。
When the second member is rotated with respect to the first member and the first work of each work type is matched with the date when this first work starts, the schedule for each work is displayed on the first member. It can be recognized at a glance depending on the matter. In addition, if the actual work starts later than the schedule or starts ahead of schedule, the third member is rotated with respect to the first member and the second member, and when the actual work is started, The work schedule after this will be known from the items displayed on the first member,
By comparing with the display item of the second member, the deviation from the initially planned work can be visually recognized.

【0014】第1部材が台座部材に回転自在に設けら
れ、この台座部材に基準マークが表示されている場合に
は、各作業種類のうちの最初の作業が開始される日付を
この基準マークと一致させるように第1部材を回転させ
ることができ、これにより作業日程早見盤を基準マーク
の位置で例えば上下方向の向きに合わせ、視認しやすい
状態にして使用できる。
When the first member is rotatably provided on the pedestal member and the reference mark is displayed on the pedestal member, the date when the first work of each work type is started is referred to as the reference mark. It is possible to rotate the first member so as to make them coincide with each other, whereby the work schedule quick reference board can be used in a state in which it is easily visible by aligning it with the vertical direction at the position of the reference mark, for example.

【0015】また、台座部材の裏面に吸着部材が設けら
れている場合には、作業日程早見盤をこの吸着部材で取
付部材に取り付けた状態で使用できるようになる。
Further, when the suction member is provided on the back surface of the pedestal member, the work schedule quick reference board can be used while being attached to the mounting member by this suction member.

【0016】さらに、第2部材に作業着工遅れマークが
表示され、第3部材にはこの作業着工遅れマークが露出
する窓孔が設けられている場合には、予定よりも実際の
作業が遅れて始まったとき、窓孔からの作業着工遅れマ
ークの露出によって作業の遅れを印象深く認識できる。
Further, when the work start delay mark is displayed on the second member and the third member is provided with a window hole through which the work start delay mark is exposed, the actual work is delayed from the scheduled time. When it starts, the work delay can be impressively recognized by exposing the work start delay mark from the window.

【0017】また、第2部材に作業着工進みマークが表
示され、第3部材にこの作業着工進みマークが露出する
窓孔が設けられている場合には、予定よりも実際の作業
が進んで始まったとき、窓孔からの作業着工進みマーク
の露出によって作業の早い進みを印象深く認識できる。
Further, when the work start progress mark is displayed on the second member and the third member is provided with a window hole through which the work start progress mark is exposed, the actual work starts ahead of schedule. When the work start progress mark is exposed from the window hole, the quick progress of the work can be recognized impressively.

【0018】[0018]

【実施例】図1には、本実施例にかかる作業日程早見盤
1の全体平面図が示され、図2にはその分解斜視図が示
されている。この作業日程早見盤1は、パネル式プレハ
ブ住宅についての建設現場施工作業の日程を管理するた
めに使用される。作業日程早見盤1は、下から上に順番
に重ねられる台座部材2、第1部材3、第2部材4、第
3部材5を含んで構成され、各部材2〜5の中心部に形
成された孔6〜9に回転中心軸10が挿入されて各部材
2〜5が結合されているとともに、各部材2〜5は軸1
0を中心に互いに回転自在となっている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows an overall plan view of a work schedule reference board 1 according to this embodiment, and FIG. 2 shows an exploded perspective view thereof. This work schedule reference board 1 is used for managing the construction work schedule of a panel type prefabricated house. The work schedule reference board 1 is configured to include a pedestal member 2, a first member 3, a second member 4, and a third member 5, which are stacked in order from bottom to top, and are formed in the central portions of the members 2 to 5. The rotation center shaft 10 is inserted into the holes 6 to 9 and the members 2 to 5 are coupled to each other.
They are rotatable around 0.

【0019】台座部材2は合成樹脂製の厚板からなり、
第1〜第3部材3〜5は合成樹脂製の薄板からなる。ま
た、台座部材2は四角形であり、第1〜第3部材3〜5
は円形である。第3部材5の直径よりも第2部材4の直
径は大きく、第2部材4の直径よりも第1部材3の直径
は大きい。また、第1部材3の表面積よりも第3部材5
の表面積は大きい。さらに、台座部材2、第1部材3、
第2部材4の各全面は不透明であり、これに対して第3
部材5は後で述べる通り一部を除いて不透明である。
The pedestal member 2 comprises a thick plate made of synthetic resin,
The first to third members 3 to 5 are thin plates made of synthetic resin. Further, the base member 2 has a quadrangular shape, and the first to third members 3 to 5 are used.
Is circular. The diameter of the second member 4 is larger than the diameter of the third member 5, and the diameter of the first member 3 is larger than the diameter of the second member 4. In addition, the third member 5 is larger than the surface area of the first member 3.
Has a large surface area. Further, the pedestal member 2, the first member 3,
The entire surface of the second member 4 is opaque, while the third member
The member 5 is opaque except for a part as described later.

【0020】台座部材2の表面には、孔6から第1部材
3の半径よりも少し大きい位置に、言い変えると、台座
部材2に重ね配設される第1部材3から外れた位置に基
準マーク11が表示されている。また、台座部材2の裏
面には吸着部材であるマグネット12が固定されてお
り、四角形の台座部材2の互いに対向する二辺に沿って
設けられたマグネット12によって作業日程早見盤1が
例えば建設管理室や建設現場における鉄製の部材に取り
付け可能となっており、この鉄製の部材を作業日程早見
盤1の取付部材として利用できるようになっている。
On the surface of the pedestal member 2, reference is made at a position slightly larger than the radius of the first member 3 from the hole 6, in other words, at a position deviated from the first member 3 superposed on the pedestal member 2. The mark 11 is displayed. Further, a magnet 12 as an attracting member is fixed to the back surface of the pedestal member 2, and the work schedule quick reference board 1 is constructed and managed by the magnets 12 provided along two sides of the quadratic pedestal member 2 facing each other. It can be attached to an iron member in a room or a construction site, and this iron member can be used as an attachment member for the work schedule quick reference board 1.

【0021】第1部材3の表面の外周辺部には日付の表
示13が設けられ、この表示13は、図3の通り外側の
月の表示14と、内側の日の表示15とからなり、表示
14は外側で表示15は内側となっている。図1の通
り、本実施例では月の表示14は五ヶ月分あり、それぞ
れの月について日の表示15が設けられている。月の表
示14には「月」のみが表示され、この作業日程早見盤
1を使用する者が「1」「2」等のその月を表す数字を
フェルトペン等で記入できるようになっている。
A date display 13 is provided on the outer peripheral portion of the surface of the first member 3, and the display 13 comprises an outer month display 14 and an inner day display 15 as shown in FIG. The display 14 is outside and the display 15 is inside. As shown in FIG. 1, in this embodiment, the month display 14 is for five months, and the day display 15 is provided for each month. Only "month" is displayed on the month display 14, and a person who uses the work schedule quick reference board 1 can write a number representing the month such as "1" or "2" with a felt-tip pen or the like. .

【0022】図1の通り、第2部材4の表面の外周辺部
には複数の作業種類名称をその作業順序に従って円周方
向に記載した表示16が設けられ、この表示16は図3
の通り、「基礎工程」「組立工程」等のような作業種類
についての大概念名称の表示17と、この大概念名称の
中に含まれる「着工」「根伐り」等のような作業の小概
念名称18とからなり、表示17は外側に、表示18は
内側にそれぞれ記載されている。表示18の内側にはリ
ードタイムの表示19があり、この表示19は、図4か
ら明らかな通り、住宅が完成して引き渡される日から逆
算した日数を順番に記載したものである。
As shown in FIG. 1, on the outer peripheral portion of the surface of the second member 4, there is provided a display 16 in which a plurality of work type names are written in the circumferential direction according to the work order, and the display 16 is shown in FIG.
As shown in the figure, the display 17 of the major concept names for the types of work such as “basic process” and “assembly process”, and the small work such as “starting” and “root cutting” included in the major concept names. It is composed of a concept name 18 and the display 17 is written on the outside and the display 18 is written on the inside. Inside the display 18, there is a display 19 of the lead time, and as is clear from FIG. 4, this display 19 sequentially shows the number of days back calculated from the date when the house is completed and delivered.

【0023】図3の通り、複数の作業種類の名称につい
ての表示16の前には表示16のタイトル表示20があ
り、表示16はこのタイトル表示20の後側から始まっ
ており、表示16と表示20との間は表示16の先頭1
6Aとなっている。図2の通り、第3部材5が重なる第
2部材4の表面の部分であって、表示16の先頭16A
から後側の位置には、作業着工が予定よりも遅れている
ことを表す作業着工遅れマーク21が表示されている。
このマーク21は、色分け表示22と、髑髏の図形表示
23とからなる。色分け表示22は斜線で赤と黄に色分
けされ、この色分けは、第1部材3、第2部材4、さら
には第3部材5の回転方向(これらの部材3〜5の表示
事項(部材3,4では前記表示13,16)の表示方
向)である時計回り方向に赤の面積が次第に増加するよ
うに行われている。図5の通り、色分け表示22の外側
には、予定からの遅れた日数を表す遅れ日数の表示24
が設けられている。
As shown in FIG. 3, there is a title display 20 of the display 16 before the display 16 of the names of a plurality of work types, and the display 16 starts from the rear side of the title display 20. Between 20 and the beginning 1 of display 16
6A. As shown in FIG. 2, a portion of the surface of the second member 4 where the third member 5 overlaps with the top 16A of the display 16.
At the position on the rear side from, a work start delay mark 21 indicating that work start is behind schedule is displayed.
The mark 21 includes a color-coded display 22 and a skull graphic display 23. The color-coded display 22 is shaded with red and yellow, and the color-coded display 22 includes the rotation directions of the first member 3, the second member 4, and the third member 5 (display items of these members 3 to 5 (members 3, 5. In No. 4, the area of red is gradually increased in the clockwise direction, which is the display direction of the displays 13 and 16). As shown in FIG. 5, on the outside of the color-coded display 22, a display 24 of the number of delay days indicating the number of days behind the schedule is displayed.
Is provided.

【0024】図2の通り、第3部材5が重なる第2部材
4の表面の部分であって、表示16の後尾16Bから前
側の位置には、作業着工が予定より進んでいることを表
す作業着工進みマーク25が表示されており、このマー
ク25は本実施例では太陽の図形である。図7の通り、
マーク25の外側には、作業着工が予定より進んだため
に住宅が予定より早く引き渡される日数の表示26が設
けられている。
As shown in FIG. 2, at a position on the surface of the second member 4 where the third member 5 overlaps, and at a position on the front side from the tail 16B of the display 16, a work indicating that the work start is ahead of schedule. A construction start mark 25 is displayed, and this mark 25 is a sun figure in this embodiment. As shown in Figure 7,
On the outside of the mark 25, there is provided a display 26 indicating the number of days that the house will be delivered earlier than planned because the construction work has started ahead of schedule.

【0025】図2の通り、第3部材5の表面の外周辺部
には表示27が設けられ、図3の通り、この表示27は
第2部材4における表示16と同じであるため、複数の
作業種類名称をその作業順序に従って円周方向に表示し
たものとなっており、表示27は作業の大概念名称の表
示28と小概念名称の表示29とからなる。そして、表
示27と表示16の回転中心軸10を中心とした表示角
度範囲は同じである。本実施例では、表示16とは逆に
表示27における大概念名称の表示28が内側で小概念
名称の表示29が外側になっているが、これを逆にして
もよい。
As shown in FIG. 2, a display 27 is provided on the outer peripheral portion of the surface of the third member 5, and as shown in FIG. 3, since this display 27 is the same as the display 16 on the second member 4, a plurality of displays 27 are provided. The work type names are displayed in the circumferential direction in the order of the work, and the display 27 is composed of a display 28 of the major concept name of the work and a display 29 of the minor concept name of the work. The display angle ranges of the display 27 and the display 16 about the rotation center axis 10 are the same. In the present embodiment, contrary to the display 16, the display 28 of the large concept name in the display 27 is inside and the display 29 of the small concept name is outside, but this may be reversed.

【0026】図2に示す通り、第3部材5には表示27
の前側の位置に、言い換えると表示27の先頭27Aと
接する位置に窓孔30が設けられ、また、表示27の後
側の位置に、言い換えると、表示27の後尾27Bと接
する位置に窓孔31が設けられている。第3部材5にお
ける回転中心軸10からの窓孔30,31の半径位置
と、第2部材4における回転中心軸10からのマーク2
1,25の半径位置とは同じであるため、第3部材5を
第2部材4に対して回転させると窓孔30,31にマー
ク21,25が露出するようになっている。
As shown in FIG. 2, an indicator 27 is provided on the third member 5.
A window hole 30 is provided at a position on the front side of the display 27, in other words, at a position in contact with the head 27A of the display 27, and at a position on the back side of the display 27, in other words, at a position in contact with the tail 27B of the display 27. Is provided. The radial positions of the window holes 30 and 31 from the rotation center axis 10 in the third member 5 and the marks 2 from the rotation center axis 10 in the second member 4
Since the radial positions of 1 and 25 are the same, when the third member 5 is rotated with respect to the second member 4, the marks 21 and 25 are exposed in the window holes 30 and 31, respectively.

【0027】以上説明した第1部材3における日付の表
示13と、第2部材4における作業種類名称の表示16
と、第3部材5における作業種類名称の表示27は、こ
れらの部材3〜5の前述した直径の違いから半径方向に
ずれており、このため、これらの日付13,16,27
を同時に視認できるようになっている。
The date display 13 on the first member 3 and the work type name display 16 on the second member 4 described above.
And the display 27 of the work type name on the third member 5 deviates in the radial direction due to the above-mentioned difference in the diameter of these members 3 to 5, and therefore these dates 13, 16, 27
Can be seen at the same time.

【0028】次に本実施例にかかる作業日程早見盤1の
使用方法について説明する。まず、台座部材2のマグネ
ット12を鉄製部材に吸着させ、この鉄製部材を取付部
材にして作業日程早見盤1を取付固定する。この取付固
定は、台座部材2に表示された基準マーク11を図1の
通り真上にして行う。次いで、第1部材3に記載されて
いる日付の表示13のうち、月の表示14の欄に当該作
業が施工される月の数字をフェルトペン等で記入する。
この記入は、「月」の文字の前に行い、合計五個ある月
の表示14のそれぞれに順番の月の表示を記載する。施
工すべき複数の作業種類のうち、最初の作業種類である
「基礎工程」の「着工」を始める月日が決定したなら
ば、台座部材2に対して第1部材3を回転させ、第1部
材3に設けられている日付の表示13のうち、その月日
と対応する月、日を基準マーク11と一致させる。ま
た、第2部材4を台座部材2および第1部材3に対して
回転させ、この第2部材4に設けられている各作業種類
名称の表示16のうち、「基礎工程」の「着工」を基準
マーク11と一致させる。この状態が図3に示されてい
る。
Next, a method of using the work schedule quick reference board 1 according to this embodiment will be described. First, the magnet 12 of the pedestal member 2 is attracted to an iron member, and this iron member is used as a mounting member to fix the work schedule quick reference board 1. This attachment and fixing is performed with the reference mark 11 displayed on the base member 2 right above as shown in FIG. Next, among the date indications 13 described on the first member 3, the number of the month on which the work is to be performed is entered in the column of the month indication 14 with a felt-tip pen or the like.
This entry is performed before the letter "month", and the display of the sequential months is described in each of the five month displays 14 in total. If the date of starting the “starting work” of the “basic process”, which is the first work type among the plurality of work types to be constructed, is determined, the first member 3 is rotated with respect to the pedestal member 2, and the first Among the date indications 13 provided on the member 3, the month and the day corresponding to the date are matched with the reference mark 11. Further, the second member 4 is rotated with respect to the pedestal member 2 and the first member 3, and in the display 16 of each work type name provided on the second member 4, the “start” of “basic process” is selected. Match with the reference mark 11. This state is shown in FIG.

【0029】この結果、第2部材4に設けられている各
作業種類名称の表示16のうち、最後の作業である「竣
工引渡し工程」の「引渡し」を行う月日が、図4に示さ
れている通り、この「引渡し」と一致している第1部材
3の日付の表示13から判明する。また、「基礎工程」
の「着工」から「竣工引渡し工程」の「引渡し」までの
間に行う各作業の月日は、第2部材4に記載された各作
業種類名称の表示16と第1部材3に表示された日付の
表示13とから読みとることができる。また、各作業に
ついての「引渡し」から逆算した日数がリードタイムの
表示19から解る。
As a result, in the display 16 of each work type name provided on the second member 4, the date when the "delivery" of the "finished delivery process", which is the last work, is performed is shown in FIG. As described above, it is found from the date display 13 of the first member 3 that coincides with this “delivery”. In addition, "basic process"
The date and time of each work performed from the “start of construction” to the “delivery” of the “completion delivery process” are displayed on the display 16 of each work type name described on the second member 4 and the first member 3. It can be read from the date display 13. Further, the lead time display 19 shows the number of days back calculated from the "delivery" for each work.

【0030】このため、実施例では、第2部材4を回転
させると、第1部材3の日付の表示13と第2部材4の
各作業種類名称の表示16とにより各作業についての日
程を一目で認識できるようになり、作業の管理、確認を
容易に行える。また、別の建設現場で作業を行う場合に
は、第1部材3を回転させ、その建設現場で行う最初の
作業の月日と対応する第1部材3の日付の表示16にお
ける月、日を基準マーク11と一致させ、そして、第2
部材4を回転させる。
For this reason, in the embodiment, when the second member 4 is rotated, the date 13 of the first member 3 and the work type name display 16 of the second member 4 indicate the schedule for each work at a glance. You can easily recognize and manage the work. Further, when performing work at another construction site, the first member 3 is rotated, and the month and day in the display 16 of the date of the first member 3 corresponding to the date of the first work performed at the construction site are displayed. Match the fiducial mark 11 and then the second
The member 4 is rotated.

【0031】これにより、基準マーク11で作業日程早
見盤1の例えば上下方向の向きを一定にしながらこの作
業日程早見盤1を各建設現場で使用できる。
With this arrangement, the work schedule quick reference board 1 can be used at each construction site while the work schedule quick reference board 1 is fixed in the vertical direction, for example, with the reference mark 11.

【0032】図5は、実際の「基礎工程」の「着工」が
予定よりも十日遅れて始まった場合を示す。この場合に
は、図3と比べ、第3部材5を第2部材4に対して十日
分だけ回転させる。第3部材5の表示27は第2部材4
の表示16と同じであるため、予定よりも遅れる最初か
ら最後までの各作業の日程が第1部材3の日付の表示1
3から解り、また、図6に示す通り、最後の作業である
「竣工引渡し工程」の「引渡し」の日がいつになるか解
る。さらに、当初計画された作業日程とのずれが第2部
材4の表示16と第3部材5の表示27との比較で解
る。
FIG. 5 shows a case in which the "starting" of the actual "basic process" starts ten days later than planned. In this case, compared with FIG. 3, the third member 5 is rotated with respect to the second member 4 by ten days. The indication 27 of the third member 5 is the second member 4
Since it is the same as the display 16 of the above, the schedule of each work from the beginning to the end which is behind the schedule is the display 1 of the date of the first member 3.
As can be seen from FIG. 3, and as shown in FIG. 6, the date of “delivery” of the final work “delivery delivery process” will be understood. Further, the deviation from the initially planned work schedule can be understood by comparing the display 16 of the second member 4 and the display 27 of the third member 5.

【0033】これとは逆に実際の「基礎工程」の「着
工」が始まった日が予定よりも早かった場合、すなわ
ち、作業が早く進んで開始された場合には、その進んだ
日数分だけ第3部材5を第2部材4に対して図5とは反
対側に回転させる。これによっても、第3部材5に設け
られた表示27と第1部材3の表示13とで今後施工す
べき各作業についての日程等の前記内容と同じ内容が解
る。
On the contrary, if the actual "ground work""start" was started earlier than planned, that is, if the work was started earlier, only the number of the advanced days was started. The third member 5 is rotated with respect to the second member 4 in the opposite side of FIG. Also by this, the same contents as the above contents such as the schedule for each work to be performed in the future can be understood from the display 27 provided on the third member 5 and the display 13 of the first member 3.

【0034】以上のことから、本実施例では、実際の作
業が予定よりも遅れた場合および進んだ場合の両方につ
いて、第3部材5の表示27と第1部材3の表示13、
さらには第2部材の表示16により、当初計画された作
業とのずれを視覚的にとらえることができることにな
る。
From the above, in the present embodiment, the display 27 of the third member 5 and the display 13 of the first member 3, both when the actual work is behind and when it is ahead of schedule,
Further, the display 16 of the second member makes it possible to visually detect a deviation from the initially planned work.

【0035】特に、図5の通り、実際の作業が予定より
も遅れた場合には、第3部材5に設けられた窓孔30に
第2部材4に表示された作業着工遅れマーク21が現れ
るため、この遅れを視覚的に確認できる。そして、本実
施例では、このマーク21の色分け表示22は遅れた日
数が多くなる程赤の面積が増加するものとなっているた
め、赤の面積によって遅れの日数を警告的に表示でき
る。また、遅れの日数が一定以上を越えると、窓孔30
には髑髏の図形表示23が現れるため、遅れが一定日数
以上を越えたことを示すことができる。
In particular, as shown in FIG. 5, when the actual work is delayed, the work start delay mark 21 displayed on the second member 4 appears in the window hole 30 provided in the third member 5. Therefore, this delay can be visually confirmed. In the present embodiment, the color-coded display 22 of the mark 21 is such that the red area increases as the number of delayed days increases, so that the number of delayed days can be displayed as a warning depending on the red area. If the number of delay days exceeds a certain level, the window hole 30
Since the skull graphic display 23 appears in, it is possible to indicate that the delay has exceeded a certain number of days.

【0036】これとは逆に実際の作業の開始が予定より
も早くなった場合には、図7の通り、第3部材5に設け
られた窓孔31に第2部材4に表示された作業着工進み
マーク25が現れるため、この作業の進みをマーク25
によって示すことができる。
On the contrary, when the actual work is started earlier than planned, the work displayed on the second member 4 in the window hole 31 provided in the third member 5 as shown in FIG. The start progress mark 25 appears.
Can be indicated by:

【0037】また、作業着工遅れマーク21および作業
着工進みマーク25にはその遅れ日数、進み日数の表示
24,26が設けられているため、最初の作業の日の予
定日との比較、最後の作業の日の予定日との比較を行え
る。
Further, since the work start delay mark 21 and the work start progress mark 25 are provided with the indications 24 and 26 of the number of delay days and the number of advance days, comparison with the planned date of the first work day and the last day You can compare the work date with the scheduled date.

【0038】なお、本実施例では、第1部材3に合計五
つ表示されている月のうち、図6の通り、一つの月の日
数は24日になっている。この月は、12月には年末休
みがあるように、一ヶ月のうちに作業が施工されない休
みの日がまとまってある場合に、その月に作業がかかっ
て行われる場合に使用される。
In this embodiment, out of the total of five months displayed on the first member 3, as shown in FIG. 6, one month has 24 days. This month is used when work is performed in the month when work is not completed within one month, such as the year-end holiday in December.

【0039】以上において、マーク21,25の遅れ日
数の表示24、進み日数の表示26は必ずしも必要では
なく、省略してもよい。
In the above, the display 24 of the number of delayed days and the display 26 of the number of advanced days of the marks 21 and 25 are not always necessary and may be omitted.

【0040】また、第2部材4に設けられたリードタイ
ムの表示19を省略してもよい。
The lead time display 19 provided on the second member 4 may be omitted.

【0041】[0041]

【発明の効果】本発明によれば、第1部材に設けられた
日付の表示事項と第2部材に設けられた各作業種類名称
の表示事項とにより、各作業についての日程を一目で認
識でき、また、第3部材には第2部材と同じ表示事項が
設けられているため、第3部材の回転により、実際の作
業が予定よりも遅れて始まった場合や進んで始まった場
合には第1部材、第2部材、第3部材の各表示事項から
当初計画された作業とのずれを視覚的にとらえることが
できる。また、本発明にかかる作業日程早見盤は少ない
部材点数で構成され、かつ、これらの部材を同じ軸を中
心にして回転自在に結合するだけでよいため、構造が簡
単で安価でつくることができる。
According to the present invention, the date for each work can be recognized at a glance by the date display item provided on the first member and the work type name display item provided on the second member. Also, since the third member is provided with the same display items as the second member, if the actual work is started later or ahead of schedule due to the rotation of the third member, The deviation from the initially planned work can be visually recognized from the display items of the first member, the second member, and the third member. Further, the work schedule quick check board according to the present invention is configured with a small number of members, and since these members only need to be rotatably connected about the same axis, the structure can be made simple and inexpensive. .

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例にかかる作業日程早見盤の全
体を示す平面図である。
FIG. 1 is a plan view showing an entire work date quick reference board according to an embodiment of the present invention.

【図2】同作業日程早見盤の分解斜視図である。FIG. 2 is an exploded perspective view of the work schedule quick reference board.

【図3】図1の一部拡大図である。FIG. 3 is a partially enlarged view of FIG. 1;

【図4】図1の別の箇所の一部拡大図である。FIG. 4 is a partially enlarged view of another portion of FIG.

【図5】実際の作業が予定よりも遅れて始まった場合を
示す図3と同様の図である。
FIG. 5 is a view similar to FIG. 3, showing a case where the actual work is started later than planned.

【図6】図5の場合における図4と同じ箇所を示す図で
ある。
6 is a diagram showing the same portion as FIG. 4 in the case of FIG. 5;

【図7】実際の作業が予定よりも早く始まった場合を示
す図4と同じ箇所の図である。
FIG. 7 is a diagram of the same portion as FIG. 4, showing a case where the actual work starts earlier than planned.

【符号の説明】[Explanation of symbols]

1 作業日程早見盤 2 台座部材 3 第1部材 4 第2部材 5 第3部材 10 回転中心軸 11 基準マーク 12 吸着部材であるマグネット 13 第1部材の日付の表示事項 16 第2部材の各作業種類名称の表示事項 21 作業着工遅れマーク 25 作業着工進みマーク 27 第3部材の各作業種類名称の表示事項 30,31 窓孔 1 Work schedule quick reference board 2 Base member 3 1st member 4 2nd member 5 3rd member 10 Rotation center axis 11 Reference mark 12 Magnet which is an attracting member 13 Date display item of 1st member 16 Work type of 2nd member Name display items 21 Work start delay mark 25 Work start progress mark 27 Display items for each work type of the 3rd member 30, 31 Window hole

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 円周方向に日付が順番に表示された第1
部材と、円周方向に各作業種類名称がその作業順序に従
って表示された第2部材と、この第2部材と同じ表示事
項が表示された第3部材とを有し、第3部材が上側にな
って第2部材および第3部材が回転中心軸を同じにして
第1部材に回転自在に重ね配設され、かつ、第1部材、
第2部材および第3部材の各前記表示事項が同時視認可
能に半径方向にずれて表示されていることを特徴とする
作業日程早見盤。
1. A first display in which dates are sequentially displayed in a circumferential direction.
It has a member, a second member in which each work type name is displayed in the circumferential direction in the order of the work, and a third member in which the same display items as the second member are displayed, and the third member is on the upper side. The second member and the third member are rotatably stacked on the first member with the same center axis of rotation, and the first member,
A work schedule quick reference board, wherein the display items of the second member and the third member are displayed so as to be visually recognized at the same time, being shifted in the radial direction.
【請求項2】 請求項1に記載の作業日程早見盤におい
て、第1部材、第2部材、第3部材のうち少なくとも第
2部材と第3部材は円形であって、第2部材の直径は第
3部材よりも大きく、これらの第2部材と第3部材の各
前記表示事項は第2部材、第3部材の各外周辺部に表示
され、第1部材は第2部材よりも大きい表面積を有し、
この第1部材の前記表示事項は第2部材から外れた位置
に表示されていることを特徴とする作業日程早見盤。
2. The work schedule quick reference board according to claim 1, wherein at least a second member and a third member among the first member, the second member, and the third member are circular, and the diameter of the second member is The second member and the third member are displayed on the outer peripheral portions of the second member and the third member, respectively, and the first member has a larger surface area than the second member. Have,
The work schedule quick reference board, wherein the display item of the first member is displayed at a position deviated from the second member.
【請求項3】 請求項2に記載の作業日程早見盤におい
て、第1部材は第2部材よりも大きい直径を有する円形
であり、この第1部材は第2部材、第3部材の回転中心
軸と同じ軸を中心にして台座部材に回転自在に配設さ
れ、かつ、第1部材よりも大きい表面積を有するこの台
座部材には第1部材から外れた位置に基準マークが表示
されていることを特徴とする作業日程早見盤。
3. The work schedule reference board according to claim 2, wherein the first member is a circle having a diameter larger than that of the second member, and the first member is a rotation center shaft of the second member and the third member. It is rotatably arranged on the pedestal member about the same axis as and has a surface area larger than that of the first member. A featured work schedule quick board.
【請求項4】 請求項3に記載の作業日程早見盤におい
て、台座部材の裏面にはこの台座部材が取り付けられる
取付部材に吸着する吸着部材が設けられていることを特
徴とする作業日程早見盤。
4. The work schedule reference board according to claim 3, wherein a suction member for adsorbing to a mounting member to which the pedestal member is attached is provided on a back surface of the pedestal member. .
【請求項5】 請求項1〜4のいずれかに記載の作業日
程早見盤において、第3部材が重なる第2部材の部分で
あってこの第2部材の前記表示事項の先頭から後側の位
置に、作業着工が予定より遅れていることを表す作業着
工遅れマークが表示され、第3部材にはこの第3部材の
前記表示事項の前側の位置に、第3部材の回転で前記作
業着工遅れマークが露出する窓孔が設けられていること
を特徴とする作業日程早見盤。
5. The work schedule quick reference board according to any one of claims 1 to 4, which is a portion of the second member where the third member overlaps, and the position of the second member from the beginning to the rear of the display item. A work start delay mark indicating that work start is behind schedule is displayed on the third member, and the work start delay is caused by the rotation of the third member at the position of the third member in front of the display item. A work schedule quick reference board characterized by having a window hole through which the mark is exposed.
【請求項6】 請求項1〜5のいずれかに記載の作業日
程早見盤において、第3部材が重なる第2部材の部分で
あってこの第2部材の前記表示事項の後尾から前側の位
置に、作業着工が予定より進んでいることを表す作業着
工進みマークが表示され、第3部材にはこの第3部材の
前記表示事項の後側の位置に、第3部材の回転で前記作
業着工マークが露出する窓孔が設けられていることを特
徴とする作業日程早見盤。
6. The work schedule reference board according to any one of claims 1 to 5, wherein a portion of the second member on which a third member overlaps is located at a position from the rear to the front of the display item of the second member. , A work start progress mark indicating that the work start is ahead of schedule is displayed, and the work start mark is displayed on the third member at a position behind the display item of the third member by rotating the third member. A work schedule quick reference board, which is characterized by having a window hole that exposes.
JP23137795A 1995-09-08 1995-09-08 Quick look-up chart for working schedule Withdrawn JPH0981257A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23137795A JPH0981257A (en) 1995-09-08 1995-09-08 Quick look-up chart for working schedule

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23137795A JPH0981257A (en) 1995-09-08 1995-09-08 Quick look-up chart for working schedule

Publications (1)

Publication Number Publication Date
JPH0981257A true JPH0981257A (en) 1997-03-28

Family

ID=16922672

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23137795A Withdrawn JPH0981257A (en) 1995-09-08 1995-09-08 Quick look-up chart for working schedule

Country Status (1)

Country Link
JP (1) JPH0981257A (en)

Similar Documents

Publication Publication Date Title
US5709410A (en) Development and construction job scheduling method
JPH02183195A (en) Astronomical timepiece and disc used therefor
US6705646B1 (en) Compact multiyear calendar
JPH04328489A (en) Day-of-the-week indicating structure and data and day-of-the-week indicating structure of clock
JPH0981257A (en) Quick look-up chart for working schedule
US5189285A (en) Calendar date finder
US20150168918A1 (en) Optimized multifunction display device
EP0278975A4 (en) Orbit clock.
US5678862A (en) Indicating device
JP6997751B2 (en) A display device that displays a series of periodic events that form an annual cycle and a timekeeper with such a display device.
US20020163858A1 (en) Seven-day clock
JPH0236476A (en) Displaying system for period of data base
US20060207128A1 (en) Calendar
JP7535275B2 (en) calendar
JP3626321B2 (en) World time dial
KR102545191B1 (en) Calendar
JP3060680U (en) Perpetual calendar
US5098101A (en) Method of recording and tracking timed events in a game
US8266831B2 (en) Promotional multi-year rotational calendar
KR20000020886U (en) Multi Calendar
KR100855454B1 (en) A solid table of the age of moon
JPH0715360U (en) Yearly chart
JP2549419B2 (en) Exterior planning paper
JP2565072Y2 (en) Calendar display device
KR20030041158A (en) Universal timepiece

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20021203