JPH093915A - Hanger of ceiling and receive member of base form - Google Patents
Hanger of ceiling and receive member of base formInfo
- Publication number
- JPH093915A JPH093915A JP18461995A JP18461995A JPH093915A JP H093915 A JPH093915 A JP H093915A JP 18461995 A JP18461995 A JP 18461995A JP 18461995 A JP18461995 A JP 18461995A JP H093915 A JPH093915 A JP H093915A
- Authority
- JP
- Japan
- Prior art keywords
- hanger
- ceiling
- base
- base form
- receive member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、プラスティック(あ
る程度硬いものなら鋼鉄などでもよい)の受け材で基礎
工事の時、吊り木とベース型枠を浮かすものである。
(吊り木によって立ち上がりの型枠を浮かす)よって1
回でコンクリート打設工事が終了する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention floats a hanging tree and a base formwork at the time of foundation work by using a plastic (a steel which may be hard to a certain degree may be steel) support material.
(Float the standing formwork with a hanging tree)
The concrete pouring work is completed in a few times.
【0002】[0002]
【従来の技術】従来の基礎工事はベースコンクリート打
設後、乾燥期間を経て型枠をセットして、コンクリート
を打設していた。その結果、工期が1週間ほどかかって
いた。2. Description of the Related Art In the conventional foundation work, after pouring concrete into the base, after a drying period, the formwork is set and the concrete is poured. As a result, the construction period took about a week.
【0003】[0003]
【発明の効果】本発明は、その工期を短縮し現場施工の
生産性向上と専門的技術がなくても施工できるように開
発したもので、ベース型枠と吊り木(吊り木によって立
ち上がり型枠を浮かす)を浮かし1回でコンクリート打
設が出来るもので、従来の基礎工事の工期の3分の1〜
2分の1の工期で出来る。したがって、作業日程が大幅
に短縮されるためコストも大幅に削減することが出来
る。一般住宅の120mm〜150mmの基礎幅に対応
できる。Industrial Applicability The present invention was developed to shorten the construction period and improve the productivity of on-site construction and to perform construction without specialized technology. It is possible to place concrete in one time, and it is 1/3 of the construction period of conventional foundation work.
It can be done in half the construction period. Therefore, the work schedule is significantly shortened, and the cost can be significantly reduced. It can support the basic width of 120 mm to 150 mm of general houses.
【0004】[0004]
【課題を解決するための手段】図1の1はベース型枠 2はベース筋 3は基礎下端主筋 4は吊り木 5は桟木 をそれぞれ受けるために設ける。1 of FIG. 1 is provided to receive a base formwork 2, a base reinforcement 3, a foundation lower main reinforcement 4, a hanging tree 5 and a pier, respectively.
【図1】本発明の透視図である。FIG. 1 is a perspective view of the present invention.
【図2】本発明の使用中の透視図である。FIG. 2 is a perspective view of the present invention in use.
Aは基礎上端主筋、Bは横筋、Cはベース筋、Dは基礎
下端主筋、Eは吊り木、Fは立ち上がり型枠材、Gはベ
ース型枠材、Hは吊り木受け材(0mm〜40mm)、
Iは桟木A is a base upper end main bar, B is a horizontal bar, C is a base bar, D is a base lower end main bar, E is a hanging tree, F is a standing form material, G is a base form material, and H is a hanging tree receiving member (0 mm to 40 mm). ),
I is a pier
Claims (1)
受け材。1. A support material for floating a hanging tree and a base formwork for foundation work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18461995A JPH093915A (en) | 1995-06-16 | 1995-06-16 | Hanger of ceiling and receive member of base form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18461995A JPH093915A (en) | 1995-06-16 | 1995-06-16 | Hanger of ceiling and receive member of base form |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH093915A true JPH093915A (en) | 1997-01-07 |
Family
ID=16156409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP18461995A Pending JPH093915A (en) | 1995-06-16 | 1995-06-16 | Hanger of ceiling and receive member of base form |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH093915A (en) |
-
1995
- 1995-06-16 JP JP18461995A patent/JPH093915A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ATE315142T1 (en) | HOLDER FOR SUPPORTING A CONSTRUCTION ELEMENT FOR SUPPORTING A CONSTRUCTION | |
DE69931439D1 (en) | Modular wall element | |
ATE92570T1 (en) | FORMWORK. | |
JPH093915A (en) | Hanger of ceiling and receive member of base form | |
IT7924474A0 (en) | FORMING TABLE FOR PRECAST REINFORCED CONCRETE SLABS. | |
KR950006176A (en) | Waterproof jaw dies | |
KR970006111Y1 (en) | Steel reinforcing separator for concrete slab | |
KR200315449Y1 (en) | An iron frame | |
ATE304634T1 (en) | SYSTEM FOR PRODUCING LOST FORMWORK ELEMENTS FOR FILLING (STEEL) CONCRETE | |
JPS5817044Y2 (en) | Architectural anchor fittings | |
JPS6135657Y2 (en) | ||
DE59914185D1 (en) | Concrete formwork for the production of concrete articles | |
JPS6462534A (en) | Method of joining construction of post and pc beam | |
JPS5815521Y2 (en) | eave frame | |
SU1458528A1 (en) | Method and apparatus for repairing a metal roof | |
JPH0351384Y2 (en) | ||
JP2003286727A (en) | Foundation reinforcing bar support fixture, and foundation construction method using the same | |
KR970006112Y1 (en) | Steel reinforcing separator for concrete slab | |
JPS5923123Y2 (en) | Construction barrel embedded in steel concrete wall | |
SE9901449D0 (en) | Bridge construction | |
JPS6187809U (en) | ||
JPH09324539A (en) | Holder for waterstop and execution method of placing joint section | |
KR940011740A (en) | Plaster concrete pouring of bridges using deck plates | |
JPH1077739A (en) | Support for concrete formwork | |
JPH10121482A (en) | Support of pipe for architecture |