JPH09318158A - Bath apparatus - Google Patents

Bath apparatus

Info

Publication number
JPH09318158A
JPH09318158A JP8138185A JP13818596A JPH09318158A JP H09318158 A JPH09318158 A JP H09318158A JP 8138185 A JP8138185 A JP 8138185A JP 13818596 A JP13818596 A JP 13818596A JP H09318158 A JPH09318158 A JP H09318158A
Authority
JP
Japan
Prior art keywords
water
water level
bath
hot water
bathtub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8138185A
Other languages
Japanese (ja)
Inventor
Tadashi Ohata
正 大畑
Yutaka Okumura
裕 奥村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP8138185A priority Critical patent/JPH09318158A/en
Publication of JPH09318158A publication Critical patent/JPH09318158A/en
Pending legal-status Critical Current

Links

Landscapes

  • Control For Baths (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce trial rum time by reheating bathtub water after a bathtub is filled with water to a trial run water level lower than a lower limit water level and higher than a circulation port on the basis of a trial run command. SOLUTION: When a trial run is made before an ordinary run, a trial run switch 12 is turned on. Then, a microcomputer executes a trial run control program. A hot water supply command is transmitted to a hot water supply control section. A hot water supply section starts supplying hot water and the hot water is supplied to a trial run standard level L3 higher than a circulation port and lower than a lowest limit water level. The hot water supply control section transmits a hot water supply finish signal to the microcomputer 21. The microcomputer 21 confirms that present water level agrees with the trial run standard water level L3 when receiving the hot water supply finish signal, and a water level storing command is given to a water level setting section. The water level setting section lens and stores values of a water level sensor 10 and water quantity. When storing is finished, the microcomputer 21 transmits a command to a reheating control section to start reheating bath water. Thus, bath filling time is reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、試運転時間を短縮
しうる風呂装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bath device which can shorten a trial run time.

【0002】[0002]

【従来の技術】従来、風呂の試運転を行う際には、所定
流量の湯水を給湯器から往き管および循環口を経て浴槽
内に供給して最低水張り水位まで水張りし、その状態で
追い焚き作業を実施していた。
2. Description of the Related Art Conventionally, when performing a test operation of a bath, hot water having a predetermined flow rate is supplied from a water heater into a bathtub through an outflow pipe and a circulation port to fill the water to a minimum water level, and then reheating work in that state. Was being carried out.

【0003】[0003]

【発明が解決しようとする課題】しかし、この最低水張
り水位は通常運転時の水位、すなわち入浴を想定した製
品仕様上の水位であるため、循環口よりかなり高い位置
であることが多い。そして、この場合には浴槽内への注
湯量が多くなり、試運転に時間がかかるという不都合が
あった。
However, since this minimum water level is the water level during normal operation, that is, the water level according to the product specifications assuming bathing, it is often a position considerably higher than the circulation port. In this case, the amount of molten metal poured into the bathtub increases, and there is a disadvantage that the trial run takes time.

【0004】本発明は、上記事情に鑑み、通常運転時の
最低水張り水位とは別に試運転基準水位を設定すること
により、試運転時間を短縮することが可能な風呂装置を
提供することを目的とする。
In view of the above circumstances, it is an object of the present invention to provide a bath apparatus capable of shortening the trial run time by setting the trial run reference water level separately from the minimum water level during normal operation. .

【0005】[0005]

【課題を解決するための手段】すなわち本発明は、給湯
器から往き管および循環口を経て湯水を浴槽内に供給し
て最高水張り水位と最低水張り水位との間で水張りし、
前記浴槽内の湯水を前記給湯器との間で循環させて追い
焚きを行う風呂装置において、試運転指令を出力する試
運転スイッチを備え、この試運転スイッチからの試運転
指令に基づいて前記最低水張り水位より低く前記循環口
より高い試運転基準水位まで水張りを行う水張り制御手
段を備え、前記試運転基準水位まで水張りされた状態で
前記浴槽内の湯水の追い焚きを行う追い焚き制御手段を
備えて構成される。
Means for Solving the Problems That is, the present invention is to supply hot water from a hot water supply device to a bathtub through an outflow pipe and a circulation port to fill water between a maximum water level and a minimum water level,
In a bath device for reheating by circulating hot water in the bathtub with the water heater, a test operation switch for outputting a test operation command is provided, and the temperature is lower than the minimum water level based on the test operation command from the test operation switch. It is provided with a water filling control means for performing water filling up to a test operation standard water level higher than the circulation port, and with a reheating control means for reheating the hot water in the bathtub while being watered up to the test operation standard water level.

【0006】また本発明は、風呂リモコンからの指令に
基づいて、給湯器から往き管および循環口を経て湯水を
浴槽内に供給して最高水張り水位と最低水張り水位との
間で水張りし、前記浴槽内の湯水を前記給湯器との間で
循環させて追い焚きを行う風呂装置において、前記風呂
リモコン上のスイッチの特殊操作により前記最低水張り
水位より低く前記循環口より高い試運転基準水位まで水
張りを行う水張り制御手段を備え、前記試運転基準水位
まで水張りされた状態で前記浴槽内の湯水の追い焚きを
行う追い焚き制御手段を備えて構成される。
Further, according to the present invention, hot water is supplied into the bathtub from the water heater through the outflow pipe and the circulation port based on a command from the bath remote controller to fill the water between the maximum water level and the minimum water level, and In a bath device that reheats hot water in a bathtub by circulating it between the water heater and the hot water supply device, by special operation of a switch on the bath remote controller, water is filled up to a reference water level lower than the minimum water level and higher than the circulation port by a special operation. It comprises water filling control means for performing, and reheating control means for reheating the hot water in the bathtub in a state of being filled up to the test operation reference water level.

【0007】また本発明は、給湯器から往き管および循
環口を経て湯水を浴槽内に供給して最高水張り水位と最
低水張り水位との間で水張りし、前記浴槽内の湯水を前
記給湯器との間で循環させて追い焚きを行う風呂装置に
おいて、試運転指令を出力する試運転スイッチを備え、
この試運転スイッチからの試運転指令に基づいて、前記
浴槽内へ段階的に注湯しつつ風呂循環チェックを行うと
共に、前記最低水張り水位より低く前記循環口より高い
試運転基準水位まで水張りを行う注湯制御手段を備え、
前記試運転基準水位まで水張りされた状態で前記浴槽内
の湯水の追い焚きを行う追い焚き制御手段を備えて構成
される。
Further, according to the present invention, hot water is supplied into the bathtub from the water heater through the outflow pipe and the circulation port to fill the water between the maximum water level and the minimum water level, and the hot water in the bath is connected to the water heater. In a bath device that recirculates between and reheats, a trial run switch that outputs a trial run command is provided,
Based on a test operation command from this test operation switch, a bath circulation check is performed while pouring the water into the bathtub step by step, and water is poured to a test operation standard water level lower than the minimum water level and higher than the circulation port. Equipped with means,
It is configured to include reheating control means for reheating the hot water in the bathtub in a state in which the hot water is filled to the test operation reference water level.

【0008】また本発明は、給湯器から往き管および循
環口を経て湯水を浴槽内に供給して最高水張り水位と最
低水張り水位との間で水張りし、前記浴槽内の湯水を前
記給湯器との間で循環させて追い焚きを行う風呂装置に
おいて、試運転指令を出力する試運転スイッチを備え、
この試運転スイッチからの試運転指令に基づいて、前記
浴槽内へ段階的に注湯しつつ風呂循環チェックを行うと
共に、前記最低水張り水位より低く前記循環口より高い
試運転基準水位まで水張りを行う注湯制御手段を備え、
前記試運転基準水位に関するデータを学習して記憶する
水位設定手段を備え、この水位設定手段によって記憶さ
れた試運転基準水位に関するデータに基づいて前記試運
転基準水位まで水張りを行う水張り制御手段を備え、前
記試運転基準水位まで水張りされた状態で前記浴槽内の
湯水の追い焚きを行う追い焚き制御手段を備えて構成さ
れる。
Further, according to the present invention, hot water is supplied into the bathtub from the water heater through the outflow pipe and the circulation port to fill the water between the maximum water level and the minimum water level, and the hot water in the bath is connected to the water heater. In a bath device that recirculates between and reheats, a trial run switch that outputs a trial run command is provided,
Based on a test operation command from this test operation switch, a bath circulation check is performed while pouring the water into the bathtub step by step, and water is poured to a test operation standard water level lower than the minimum water level and higher than the circulation port. Equipped with means,
The test operation standard water level is provided with water level setting means for learning and storing the data, and the test operation standard water level is provided based on the test operation reference water level data stored by the water level setting means. It is configured to include reheating control means for reheating the hot water in the bathtub in a state of being filled with water up to the reference water level.

【0009】[0009]

【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて説明する。図1は本発明による風呂装置の一実
施形態を示す構成図、図2は図1に示す風呂装置の風呂
制御部の一例を示す制御ブロック図、図3は試運転制御
プログラムの一例を示すフローチャートである。
Embodiments of the present invention will be described below with reference to the drawings. 1 is a configuration diagram showing an embodiment of a bath apparatus according to the present invention, FIG. 2 is a control block diagram showing an example of a bath control unit of the bath apparatus shown in FIG. 1, and FIG. 3 is a flowchart showing an example of a trial run control program. is there.

【0010】本発明による風呂装置1は、図1に示すよ
うに、浴槽2を有しており、浴槽2の底部付近には循環
口3が形成されている。循環口3には往き管6および戻
り管5を介して給湯器7が接続されている。戻り管5に
は水流スイッチ9および水位センサ10が設けられてお
り、給湯器7には試運転スイッチ12が設けられてい
る。さらに、浴槽2の近傍には風呂リモコン13が設置
されている。
The bath apparatus 1 according to the present invention has a bathtub 2 as shown in FIG. 1, and a circulation port 3 is formed near the bottom of the bathtub 2. A water heater 7 is connected to the circulation port 3 via an outflow pipe 6 and a return pipe 5. The return pipe 5 is provided with a water flow switch 9 and a water level sensor 10, and the water heater 7 is provided with a test operation switch 12. Further, a bath remote controller 13 is installed near the bathtub 2.

【0011】また、給湯器7にはマイクロコンピュータ
21が組み込まれており、マイクロコンピュータ21の
入力側には、図2に示すように、前記水流スイッチ9、
前記水位センサ10および前記試運転スイッチ12が接
続されている。さらにマイクロコンピュータ21には、
水位設定手段としての水位設定部22、注湯制御手段と
しての注湯制御部23、追い焚き制御手段としての追い
焚き制御部24、水張り制御手段としての水張り制御部
25が接続されていると共に、信号線11を介して前記
風呂リモコン13が接続されている。
A microcomputer 21 is incorporated in the water heater 7, and the water flow switch 9, 9 is provided on the input side of the microcomputer 21 as shown in FIG.
The water level sensor 10 and the test operation switch 12 are connected. Furthermore, in the microcomputer 21,
A water level setting unit 22 as a water level setting unit, a pouring control unit 23 as a pouring control unit, a reheating control unit 24 as a reheating control unit, and a water filling control unit 25 as a water filling control unit are connected, The bath remote controller 13 is connected via a signal line 11.

【0012】本発明による風呂装置1は以上のような構
成を有するので、この風呂装置1における通常運転に際
しては、給湯器7から湯水が往き管6および循環口3を
経て浴槽2内に注湯されて最高水張り水位L1と最低水
張り水位L2との間で水張りされると共に、浴槽2内の
湯水が循環口3および戻り管5を経て給湯器7に供給さ
れて加熱された後、往き管6および循環口3を経て浴槽
2内に戻されて追い焚きが行われる。
Since the bath device 1 according to the present invention has the above-mentioned structure, during normal operation of the bath device 1, hot water is poured from the water heater 7 into the bathtub 2 through the outflow pipe 6 and the circulation port 3. It is filled with water between the highest water level L1 and the lowest water level L2, and the hot water in the bathtub 2 is supplied to the water heater 7 through the circulation port 3 and the return pipe 5 to be heated, and then the forward pipe 6 And it is returned to the inside of the bathtub 2 through the circulation port 3 for additional heating.

【0013】また、この通常運転に先立って試運転を行
う際には、試運転スイッチ12をONにする。すると、
マイクロコンピュータ21は、以下に述べるとおり、図
3に示す試運転制御プログラムPRGに基づいて所定の
試運転作業を実行するように制御する。
When the trial run is performed prior to the normal run, the trial run switch 12 is turned on. Then
As described below, the microcomputer 21 controls to execute a predetermined test operation work based on the test operation control program PRG shown in FIG.

【0014】まず、マイクロコンピュータ21は注湯制
御部23に対して試運転注湯指令を出力し、これを受け
て注湯制御部23は次のような注湯動作を実行する。
First, the microcomputer 21 outputs a test operation pouring command to the pouring control unit 23, and the pouring control unit 23 receives the command and executes the following pouring operation.

【0015】すなわち、試運転制御プログラムPRGの
ステップS1で、給湯器7から段階的に一定流量(例え
ば、第1回目は100リットル、第2回目以降は30リ
ットル)の湯水を往き管6および循環口3を経て浴槽2
内に供給するという注湯動作を行った後、試運転制御プ
ログラムPRGのステップS2で、風呂循環チェック
(すなわち、浴槽2内の水位が循環口3に達しているか
否かのチェック)を行う。それには、戻り管5に設けら
れた水流スイッチ9がON状態かOFF状態かで判断す
る。すなわち、水流スイッチ9がOFF状態であれば浴
槽2内の水位が循環口3に達していないと判定し、水流
スイッチ9がON状態であれば浴槽2内の水位が循環口
3に達していると判定する。その結果、浴槽2内の水位
が循環口3に達していないと判定されている間は、試運
転制御プログラムPRGのステップS1、S2に戻っ
て、注湯動作および風呂循環チェックが繰り返される。
That is, in step S1 of the test operation control program PRG, hot water having a constant flow rate (for example, 100 liters for the first time and 30 liters for the second time and thereafter) is gradually supplied from the water heater 7 to the outflow pipe 6 and the circulation port. Bathtub 2 through 3
After performing the pouring operation of supplying the water to the inside, a bath circulation check (that is, a check as to whether the water level in the bathtub 2 has reached the circulation port 3) is performed in step S2 of the test operation control program PRG. For that purpose, it is judged whether the water flow switch 9 provided in the return pipe 5 is in the ON state or the OFF state. That is, if the water flow switch 9 is in the OFF state, it is determined that the water level in the bathtub 2 has not reached the circulation port 3, and if the water flow switch 9 is in the ON state, the water level in the bathtub 2 has reached the circulation port 3. To determine. As a result, while it is determined that the water level in the bathtub 2 has not reached the circulation port 3, the process returns to steps S1 and S2 of the test operation control program PRG to repeat the pouring operation and the bath circulation check.

【0016】こうして何回かの注湯動作によって浴槽2
内の水位が循環口3に達したと判定されたところで、試
運転制御プログラムPRGのステップS3に入り、さら
に一定流量(例えば、30リットル)の注湯動作が行わ
れる。すると、浴槽2内の水位が循環口3より少し上側
の試運転基準水位L3に達する。
In this way, the bathtub 2 is operated by pouring several times.
When it is determined that the water level inside has reached the circulation port 3, step S3 of the test operation control program PRG is entered, and a pouring operation of a constant flow rate (for example, 30 liters) is further performed. Then, the water level in the bathtub 2 reaches the trial operation standard water level L3 slightly above the circulation port 3.

【0017】この際、浴槽2内に注湯される水量は試運
転基準水位L3に対応した水量であるので、通常運転時
の最低水張り水位L2に対応した水量を注湯する従来法
と比べて注湯量は少なくて済み、それだけ水張りに要す
る時間が短縮される。
At this time, since the amount of water poured into the bathtub 2 is the amount corresponding to the standard water level L3 for trial operation, the amount of water corresponding to the minimum water level L2 during normal operation is poured as compared with the conventional method. The amount of hot water required is small, and the time required for filling water is reduced accordingly.

【0018】こうして浴槽2内の水位が試運転基準水位
L3に達したところで、注湯制御部23による注湯動作
が終了し、注湯制御部23はマイクロコンピュータ21
に対して注湯終了信号を出力する。
When the water level in the bathtub 2 reaches the trial operation reference water level L3 in this way, the pouring operation by the pouring control section 23 is completed, and the pouring control section 23 is controlled by the microcomputer 21.
A pouring completion signal is output to.

【0019】この注湯終了信号を受けた時点でマイクロ
コンピュータ21は、浴槽2内の現在の水位が試運転基
準水位L3に一致していると認識し、水位設定部22に
対して水位記憶指令を出力する。これを受けて水位設定
部22は、試運転制御プログラムPRGのステップS4
で、上述の試運転基準水位L3に関するデータ(試運転
基準水位L3に相当する水位センサ10の値および水量
など)を学習して内部に記憶した後、マイクロコンピュ
ータ21に水位記憶終了信号を出力する。
Upon receipt of the pouring end signal, the microcomputer 21 recognizes that the current water level in the bathtub 2 matches the test operation reference water level L3, and issues a water level storage command to the water level setting section 22. Output. In response to this, the water level setting unit 22 causes the trial operation control program PRG to execute step S4.
Then, the data regarding the above-mentioned test operation reference water level L3 (the value of the water level sensor 10 corresponding to the test operation reference water level L3, the water amount, etc.) is learned and stored internally, and then a water level storage end signal is output to the microcomputer 21.

【0020】この水位記憶終了信号を受けると、マイク
ロコンピュータ21は追い焚き制御部24に対して追い
焚き指令を出力する。これを受けて追い焚き制御部24
は、試運転制御プログラムPRGのステップS5で、浴
槽2内の湯水の追い焚きを開始する。すると、浴槽2内
の湯水が戻り管5、往き管6を経て給湯器7との間で循
環し、浴槽2内の湯水の温度が検出されるため、追い焚
き制御部24は、試運転制御プログラムPRGのステッ
プS6で、浴槽2内の湯水の温度が所定の設定温度以上
であるか否かを判定する。その結果、浴槽2内の湯水の
温度が設定温度より低いと判定された場合には、給湯器
7内のバーナ(図示せず)が点火し、給湯器7から往き
管6へ供給される湯水が加熱されるので、浴槽2内の湯
水の温度が上昇する。
Upon receiving the water level storage end signal, the microcomputer 21 outputs a reheating command to the reheating control unit 24. In response to this, the reheating control unit 24
Starts reheating the hot water in the bathtub 2 in step S5 of the test operation control program PRG. Then, the hot and cold water in the bathtub 2 circulates between the hot water supply 7 and the return pipe 5 and the forward pipe 6, and the temperature of the hot and cold water in the bathtub 2 is detected. In step S6 of PRG, it is determined whether the temperature of the hot water in the bathtub 2 is equal to or higher than a predetermined set temperature. As a result, when it is determined that the temperature of the hot water in the bathtub 2 is lower than the set temperature, a burner (not shown) in the water heater 7 is ignited, and hot water supplied from the water heater 7 to the outflow pipe 6 is supplied. Is heated, the temperature of the hot water in the bathtub 2 rises.

【0021】この際、浴槽2内の水位は試運転基準水位
L3に一致しており、通常運転時の最低水張り水位L2
よりかなり低いので、浴槽2内および循環経路中に存在
する湯水の量(従って、その熱容量)は僅かである。そ
のため、浴槽2内の湯水の温度上昇は速やかに行われ、
温度検出時の応答性に優れることから、追い焚きに要す
る時間が短縮される。
At this time, the water level in the bathtub 2 matches the test operation standard water level L3, and the minimum water level L2 during normal operation is set.
Since it is much lower, the amount of hot water present in the bath 2 and in the circulation path (and thus its heat capacity) is small. Therefore, the temperature rise of the hot and cold water in the bathtub 2 is performed promptly,
Since the responsiveness at the time of temperature detection is excellent, the time required for reheating is shortened.

【0022】また、このとき浴槽2内の水位は循環口3
より少し上側の試運転基準水位L3に達しているので、
追い焚き作業に伴って浴槽2内の水位が過渡的に多少上
下しても戻り管5および往き管6が常に水封された状態
を維持することができ、追い焚き作業を安定して実施す
ることが可能となる。
At this time, the water level in the bathtub 2 is determined by the circulation port 3
Since the trial operation standard water level L3, which is slightly higher, has been reached,
Even if the water level in the bathtub 2 transiently rises or falls with the reheating work, the return pipe 5 and the going pipe 6 can always be kept water-sealed, and the reheating work can be performed stably. It becomes possible.

【0023】こうして、浴槽2内の湯水の温度が上昇し
て設定温度に達したところで、追い焚き制御部24によ
る追い焚き動作が終了し、追い焚き制御部24はマイク
ロコンピュータ21に対して注湯終了信号を出力する。
In this way, when the temperature of the hot water in the bathtub 2 rises and reaches the set temperature, the reheating operation by the reheating control section 24 is completed, and the reheating control section 24 pours hot water to the microcomputer 21. Output the end signal.

【0024】ここで、試運転制御プログラムPRGに基
づく試運転作業が完了する。
At this point, the test operation work based on the test operation control program PRG is completed.

【0025】また、2度目以降の試運転に際しては、上
述した1度目の試運転時に試運転基準水位L3に関する
データが水位設定部22内に記憶されているので、その
データを利用することによって試運転時間を一層短縮す
ることができる。
Further, in the second and subsequent trial runs, since the data regarding the trial run reference water level L3 is stored in the water level setting unit 22 during the above-mentioned first trial run, the trial run time can be further improved by using the data. It can be shortened.

【0026】すなわち、マイクロコンピュータ21は水
張り制御部25に対して試運転水張り指令を出力し、こ
れを受けて水張り制御部25は、水位設定部22内に記
憶された試運転基準水位L3に関するデータを参照し
て、給湯器7から一定流量(例えば、190リットル)
の湯水を浴槽2内に供給して試運転基準水位L3まで水
張りを行う。
That is, the microcomputer 21 outputs a trial run water filling command to the water fill control unit 25, and in response to this, the water fill control unit 25 refers to the data regarding the test run reference water level L3 stored in the water level setting unit 22. Then, a constant flow rate from the water heater 7 (for example, 190 liters)
The hot water is supplied to the bathtub 2 to fill it up to the test operation standard water level L3.

【0027】この際、1度目の試運転時と同様に、浴槽
2内に注湯される水量は試運転基準水位L3に対応した
水量であるので、通常運転時の最低水張り水位L2に対
応した水量を注湯する従来法と比べて注湯量は少なくて
済み、それだけ水張りに要する時間が短縮される。その
上、注湯すべき水量は水位設定部22内に記憶されてい
るので、1度目の試運転時と異なり、風呂循環チェック
を省略して試運転基準水位L3まで一気に短時間で注湯
することができることから、1度目の試運転時と比べて
水張り時間をさらに短縮することが可能となる。
At this time, as in the case of the first trial run, the amount of water poured into the bathtub 2 corresponds to the trial run standard water level L3, so the water amount corresponding to the minimum flooding water level L2 during normal operation is set. Compared with the conventional method of pouring, the amount of pouring is smaller and the time required for filling water is shortened accordingly. In addition, since the amount of water to be poured is stored in the water level setting unit 22, unlike the first test run, the bath circulation check can be omitted and the test run reference water level L3 can be poured at once in a short time. As a result, it is possible to further reduce the water filling time as compared with the first trial operation.

【0028】こうして、浴槽2内の水位が試運転基準水
位L3に達したところで、水張り制御部25による水張
り動作が終了し、水張り制御部25はマイクロコンピュ
ータ21に対して水張り終了信号を出力する。
In this way, when the water level in the bathtub 2 reaches the trial operation standard water level L3, the water filling operation by the water filling control unit 25 ends, and the water filling control unit 25 outputs a water filling end signal to the microcomputer 21.

【0029】この水張り終了信号を受けた時点でマイク
ロコンピュータ21は、浴槽2内の現在の水位が試運転
基準水位L3に一致していると認識し、追い焚き制御部
24に対して追い焚き指令を出力する。これを受けて追
い焚き制御部24は、1度目の試運転時と同じ手順で浴
槽2内の湯水の追い焚きを行う。
At the time of receiving this water filling end signal, the microcomputer 21 recognizes that the current water level in the bathtub 2 matches the test operation reference water level L3, and issues a reheating command to the reheating control section 24. Output. In response to this, the reheating control unit 24 reheats the hot water in the bathtub 2 in the same procedure as in the first trial operation.

【0030】この際も、浴槽2内の水位は試運転基準水
位L3に一致しており、通常運転時の最低水張り水位L
2よりかなり低いため、浴槽2内の湯水の温度上昇は速
やかに行われ、温度検出時の応答性に優れることから、
追い焚きに要する時間が短縮される。また、このとき浴
槽2内の水位が過渡的に多少上下しても追い焚き作業を
安定して実施できることは、1度目の試運転の場合と同
様である。
Also at this time, the water level in the bathtub 2 matches the trial operation standard water level L3, and the minimum water level L during normal operation is L.
Since the temperature is much lower than 2, the temperature of the hot water in the bathtub 2 rises quickly and the responsiveness at the time of temperature detection is excellent.
The time required for reheating is reduced. Further, at this time, the reheating work can be stably performed even if the water level in the bathtub 2 transiently rises or falls, as in the case of the first trial operation.

【0031】こうして浴槽2内の湯水の温度が上昇して
所定の設定温度に達したところで、追い焚き制御部24
による追い焚き動作が終了し、追い焚き制御部24はマ
イクロコンピュータ21に対して注湯終了信号を出力す
る。
In this way, when the temperature of the hot water in the bathtub 2 rises and reaches a predetermined set temperature, the reheating control section 24
Then, the reheating operation is finished, and the reheating control unit 24 outputs a pouring end signal to the microcomputer 21.

【0032】ここで、2度目以降の試運転作業が完了す
る。
At this point, the trial operation work for the second time and thereafter is completed.

【0033】このように、1度目の試運転と比べて2度
目以降の試運転では、1度目の試運転時に学習して記憶
した試運転基準水位L3に関するデータを利用して水張
り時間を短縮することができるので、試運転時間もそれ
だけ短縮することが可能となる。
As described above, in the second and subsequent trial runs, the water filling time can be shortened by using the data relating to the trial run reference water level L3 learned and stored in the first trial run as compared with the first trial run. The trial run time can be shortened accordingly.

【0034】なお、上述の実施形態においては、給湯器
7に設けられた試運転スイッチ12をONにすることに
よって試運転を開始する風呂装置1について説明した
が、風呂リモコン13上のスイッチ(図示せず)の特殊
操作(二重押し、二度押し等)で試運転を開始するよう
にして、特別な試運転スイッチ12を不要とすることも
可能である。
In the above embodiment, the bath apparatus 1 which starts the trial run by turning on the trial run switch 12 provided in the water heater 7 has been described, but a switch on the bath remote controller 13 (not shown). It is also possible to eliminate the special trial run switch 12 by starting the trial run by a special operation () (double push, double push, etc.).

【0035】[0035]

【発明の効果】以上説明したように本発明によれば、給
湯器から往き管および循環口を経て湯水を浴槽内に供給
して最高水張り水位と最低水張り水位との間で水張り
し、前記浴槽内の湯水を前記給湯器との間で循環させて
追い焚きを行う風呂装置において、試運転指令を出力す
る試運転スイッチを備え、この試運転スイッチからの試
運転指令に基づいて前記最低水張り水位より低く前記循
環口より高い試運転基準水位まで水張りを行う水張り制
御部などの水張り制御手段を備え、前記試運転基準水位
まで水張りされた状態で前記浴槽内の湯水の追い焚きを
行う追い焚き制御部などの追い焚き制御手段を備えて構
成したので、試運転を行う際に、最低水張り水位より低
い試運転基準水位まで水張りした状態で浴槽内の湯水の
追い焚きを行うことができるため、水張り及び追い焚き
に要する時間、ひいては試運転時間を短縮することが可
能となる。
As described above, according to the present invention, hot water is supplied from the water heater through the outflow pipe and the circulation port into the bathtub to fill the water between the maximum water level and the minimum water level, and the bathtub In a bath device for reheating by circulating hot water in the water heater with the water heater, a test operation switch for outputting a test operation command is provided, and the circulation is lower than the minimum water level based on the test operation command from the test operation switch. Equipped with a water filling control unit such as a water filling control unit for performing water filling to a trial operation standard water level higher than the mouth, and a reheating control unit such as a reheating controller that reheats hot and cold water in the bathtub while being watered to the trial operation standard water level. Since it is configured with a means, when performing a trial run, the hot water in the bathtub should be reheated while the water is filled up to the trial run standard water level that is lower than the minimum water level. Since it, the time required for water filling and Reheating, it is possible to shorten the turn commissioning time.

【0036】また本発明によれば、風呂リモコンからの
指令に基づいて、給湯器から往き管および循環口を経て
湯水を浴槽内に供給して最高水張り水位と最低水張り水
位との間で水張りし、前記浴槽内の湯水を前記給湯器と
の間で循環させて追い焚きを行う風呂装置において、前
記風呂リモコン上のスイッチの特殊操作により前記最低
水張り水位より低く前記循環口より高い試運転基準水位
まで水張りを行う水張り制御部などの水張り制御手段を
備え、前記試運転基準水位まで水張りされた状態で前記
浴槽内の湯水の追い焚きを行う追い焚き制御部などの追
い焚き制御手段を備えて構成したので、風呂リモコンを
用いて試運転を行う際に、最低水張り水位より低い試運
転基準水位まで水張りした状態で浴槽内の湯水の追い焚
きを行うことができるため、水張り及び追い焚きに要す
る時間、ひいては試運転時間を短縮することが可能とな
る。さらに、既存の風呂リモコンを用いて試運転を実施
することができるので、特別な試運転スイッチを設ける
必要がなく、部品点数の増加を回避することが可能とな
る。
Further, according to the present invention, hot water is supplied from the water heater into the bathtub through the outflow pipe and the circulation port based on a command from the bath remote controller to fill the water between the maximum water level and the minimum water level. In a bath device that reheats hot water in the bathtub by circulating it between the hot water supply device and the water heater, a special operation of a switch on the bath remote control lowers the water level below the minimum water level to a trial operation reference water level higher than the circulation port. Since it is provided with a water filling control means such as a water filling control part for performing water filling, and is provided with a reheating control means such as a reheating control part for reheating the hot water in the bathtub in a state of being watered up to the test operation standard water level. , When performing a test run using the bath remote control, it is possible to reheat the hot and cold water in the bathtub with the test run water level lower than the minimum water level. Because, the time required for water filling and Reheating, it is possible to shorten the turn commissioning time. Furthermore, since the trial operation can be performed using the existing bath remote controller, it is not necessary to provide a special trial operation switch, and it is possible to avoid an increase in the number of parts.

【0037】また本発明によれば、給湯器から往き管お
よび循環口を経て湯水を浴槽内に供給して最高水張り水
位と最低水張り水位との間で水張りし、前記浴槽内の湯
水を前記給湯器との間で循環させて追い焚きを行う風呂
装置において、試運転指令を出力する試運転スイッチを
備え、この試運転スイッチからの試運転指令に基づい
て、前記浴槽内へ段階的に注湯しつつ風呂循環チェック
を行うと共に、前記最低水張り水位より低く前記循環口
より高い試運転基準水位まで水張りを行う注湯制御部な
どの注湯制御手段を備え、前記試運転基準水位まで水張
りされた状態で前記浴槽内の湯水の追い焚きを行う追い
焚き制御部などの追い焚き制御手段を備えて構成したの
で、1度目の試運転を行う際に、最低水張り水位より低
い試運転基準水位まで水張りした状態で浴槽内の湯水の
追い焚きを行うことができるため、水張り及び追い焚き
に要する時間、ひいては試運転時間を短縮することが可
能となる。
Further, according to the present invention, hot water is supplied from the water heater through the outflow pipe and the circulation port into the bathtub to fill the water between the highest water level and the lowest water level, and the hot water in the bath is supplied to the hot water supply. In a bath device that reheats by circulating it with a vessel, it is equipped with a trial run switch that outputs a trial run command, and based on the trial run command from this trial run switch, the bath circulation is performed while pouring water into the bath in stages. Along with performing a check, a pouring control means such as a pouring control unit for performing water filling to a trial operation standard water level lower than the minimum water level higher than the circulation port is provided, and the inside of the bathtub is watered to the trial operation standard water level. Since the reheating control means such as the reheating control unit for reheating the hot water is provided, when performing the first trial operation, the test operation reference water level lower than the minimum water level is reached. It is possible to perform the hot water reheating in the bathtub with water filling state, the time required for water filling and Reheating, it is possible to shorten the turn commissioning time.

【0038】また本発明によれば、給湯器から往き管お
よび循環口を経て湯水を浴槽内に供給して最高水張り水
位と最低水張り水位との間で水張りし、前記浴槽内の湯
水を前記給湯器との間で循環させて追い焚きを行う風呂
装置において、試運転指令を出力する試運転スイッチを
備え、この試運転スイッチからの試運転指令に基づい
て、前記浴槽内へ段階的に注湯しつつ風呂循環チェック
を行うと共に、前記最低水張り水位より低く前記循環口
より高い試運転基準水位まで水張りを行う注湯制御部な
どの注湯制御手段を備え、前記試運転基準水位に関する
データを学習して記憶する水位設定部などの水位設定手
段を備え、この水位設定手段によって記憶された試運転
基準水位に関するデータに基づいて前記試運転基準水位
まで水張りを行う水張り制御部などの水張り制御手段を
備え、前記試運転基準水位まで水張りされた状態で前記
浴槽内の湯水の追い焚きを行う追い焚き制御部などの追
い焚き制御手段を備えて構成したので、1度目の試運転
を行う際に、最低水張り水位より低い試運転基準水位ま
で水張りした状態で浴槽内の湯水の追い焚きを行うこと
ができると共に、2度目以降の試運転を行う際に、1度
目の試運転時に学習して記憶した試運転基準水位に関す
るデータを利用して試運転基準水位まで一気に短時間で
水張りし、その状態で浴槽内の湯水の追い焚きを行うこ
とができるため、水張り及び追い焚きに要する時間、ひ
いては試運転時間を一層短縮することが可能となる。
Further, according to the present invention, hot water is supplied into the bathtub from the water heater through the outflow pipe and the circulation port to fill the water between the maximum water level and the minimum water level, and the hot water in the bath is supplied to the hot water supply. In a bath device that reheats by circulating it with a vessel, it is equipped with a trial run switch that outputs a trial run command, and based on the trial run command from this trial run switch, the bath circulation is performed while pouring water into the bath in stages. A water level setting for checking and storing the data related to the reference water level for trial run is provided with a pouring control means such as a pouring control unit for performing water filling to a trial run reference water level lower than the lowest water level and higher than the circulation port. Water that is provided with a water level setting means such as a section, and fills up to the test operation reference water level based on the data regarding the test operation reference water level stored by the water level setting means. Since it is provided with a refilling control means such as a replenishment control section and a replenishment control section that replenishes the hot water in the bathtub in a state of being filled up to the test operation standard water level, the first refilling means is provided. When performing the test run of, the hot water in the bathtub can be reheated while the water is filled up to the test run standard water level that is lower than the minimum water level, and learning is performed during the first test run when performing the second and subsequent test runs. By using the data about the trial operation standard water level stored in memory, the water can be filled up to the trial operation standard water level in a short time, and the hot water in the bathtub can be reheated in that state, so the time required for water filling and reheating, and eventually It is possible to further shorten the trial run time.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による風呂装置の一実施形態を示す構成
図である。
FIG. 1 is a configuration diagram showing an embodiment of a bath device according to the present invention.

【図2】図1に示す風呂装置の風呂制御部の一例を示す
制御ブロック図である。
FIG. 2 is a control block diagram showing an example of a bath control unit of the bath device shown in FIG.

【図3】試運転制御プログラムの一例を示すフローチャ
ートである。
FIG. 3 is a flowchart showing an example of a test operation control program.

【符号の説明】[Explanation of symbols]

1……風呂装置 2……浴槽 3……循環口 5……戻り管 6……往き管 7……給湯器 12……試運転スイッチ 13……風呂リモコン 22……水位設定手段(水位設定部) 23……注湯制御手段(注湯制御部) 24……追い焚き制御手段(追い焚き制御部) 25……水張り制御手段(水張り制御部) L1……最高水張り水位 L2……最低水張り水位 L3……試運転基準水位 1 …… Bath device 2 …… Bath 3 …… Circulation port 5 …… Return pipe 6 …… Outgoing pipe 7 …… Water heater 12 …… Test run switch 13 …… Bath remote control 22 …… Water level setting means (water level setting unit) 23: Pouring control means (pouring control section) 24: Reheating control means (reheating control section) 25: Water filling control means (water filling control section) L1: Maximum water level L2: Minimum water level L3 ...... Test run standard water level

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 給湯器から往き管および循環口を経て湯
水を浴槽内に供給して最高水張り水位と最低水張り水位
との間で水張りし、前記浴槽内の湯水を前記給湯器との
間で循環させて追い焚きを行う風呂装置において、 試運転指令を出力する試運転スイッチを備え、この試運
転スイッチからの試運転指令に基づいて前記最低水張り
水位より低く前記循環口より高い試運転基準水位まで水
張りを行う水張り制御手段を備え、前記試運転基準水位
まで水張りされた状態で前記浴槽内の湯水の追い焚きを
行う追い焚き制御手段を備えたことを特徴とする風呂装
置。
1. Hot water is supplied to a bathtub from a water heater through an outflow pipe and a circulation port, and water is filled between a maximum water level and a minimum water level, and the hot water in the bath is connected to the water heater. A bath device that circulates and reheats water is equipped with a trial run switch that outputs a trial run command, and based on the trial run command from this trial run switch, fills water to a trial run standard water level that is lower than the minimum water level and higher than the circulation port. A bath apparatus comprising a control means and a reheating control means for reheating the hot water in the bathtub in a state where the hot water is filled to the test operation standard water level.
【請求項2】 風呂リモコンからの指令に基づいて、給
湯器から往き管および循環口を経て湯水を浴槽内に供給
して最高水張り水位と最低水張り水位との間で水張り
し、前記浴槽内の湯水を前記給湯器との間で循環させて
追い焚きを行う風呂装置において、 前記風呂リモコン上のスイッチの特殊操作により前記最
低水張り水位より低く前記循環口より高い試運転基準水
位まで水張りを行う水張り制御手段を備え、前記試運転
基準水位まで水張りされた状態で前記浴槽内の湯水の追
い焚きを行う追い焚き制御手段を備えたことを特徴とす
る風呂装置。
2. Based on a command from the bath remote controller, hot water is supplied from the water heater into the bathtub through the outflow pipe and the circulation port to fill the bathtub with water between the highest water level and the lowest water level. In a bath device that reheats hot water by circulating it between the hot water supply device and a hot water supply device, a special operation of a switch on the bath remote controller performs water filling control to perform water filling to a trial operation standard water level lower than the minimum water level and higher than the circulation port. A bath apparatus comprising: a reheating control means for reheating the hot water in the bathtub in a state where the hot water is filled to the test operation standard water level.
【請求項3】 給湯器から往き管および循環口を経て湯
水を浴槽内に供給して最高水張り水位と最低水張り水位
との間で水張りし、前記浴槽内の湯水を前記給湯器との
間で循環させて追い焚きを行う風呂装置において、 試運転指令を出力する試運転スイッチを備え、この試運
転スイッチからの試運転指令に基づいて、前記浴槽内へ
段階的に注湯しつつ風呂循環チェックを行うと共に、前
記最低水張り水位より低く前記循環口より高い試運転基
準水位まで水張りを行う注湯制御手段を備え、前記試運
転基準水位まで水張りされた状態で前記浴槽内の湯水の
追い焚きを行う追い焚き制御手段を備えたことを特徴と
する風呂装置。
3. Hot water is supplied from the water heater into the bathtub through the outflow pipe and the circulation port to fill the water between the maximum water level and the minimum water level, and the hot water in the bath is connected to the water heater. In a bath device that circulates and reheats, a test operation switch that outputs a test operation command is provided, and based on the test operation command from this test operation switch, the bath circulation check is performed while pouring the water into the bath in stages, A pouring control means for pouring water to a trial operation standard water level lower than the minimum water level and higher than the circulation port is provided, and a reheating control means for reheating hot water in the bathtub while being watered to the test operation standard water level. A bath device characterized by being equipped.
【請求項4】 給湯器から往き管および循環口を経て湯
水を浴槽内に供給して最高水張り水位と最低水張り水位
との間で水張りし、前記浴槽内の湯水を前記給湯器との
間で循環させて追い焚きを行う風呂装置において、 試運転指令を出力する試運転スイッチを備え、この試運
転スイッチからの試運転指令に基づいて、前記浴槽内へ
段階的に注湯しつつ風呂循環チェックを行うと共に、前
記最低水張り水位より低く前記循環口より高い試運転基
準水位まで水張りを行う注湯制御手段を備え、前記試運
転基準水位に関するデータを学習して記憶する水位設定
手段を備え、この水位設定手段によって記憶された試運
転基準水位に関するデータに基づいて前記試運転基準水
位まで水張りを行う水張り制御手段を備え、前記試運転
基準水位まで水張りされた状態で前記浴槽内の湯水の追
い焚きを行う追い焚き制御手段を備えたことを特徴とす
る風呂装置。
4. Hot water is supplied into the bathtub from the water heater through the outflow pipe and the circulation port to fill the water between the maximum water level and the minimum water level, and the hot water in the bath is connected to the water heater. In a bath device that circulates and reheats, a test operation switch that outputs a test operation command is provided, and based on the test operation command from this test operation switch, the bath circulation check is performed while pouring water into the bath in stages, It is provided with pouring control means for filling water to a trial operation standard water level lower than the lowest water level and higher than the circulation port, and water level setting means for learning and storing data regarding the test operation standard water level, which is stored by this water level setting means. A water filling control means for performing water filling to the test operation reference water level based on the data on the test operation reference water level is provided, and the water filling to the test operation reference water level is performed. Bath apparatus comprising the reheating control means performs hot water reheating in the bath in a state.
JP8138185A 1996-05-31 1996-05-31 Bath apparatus Pending JPH09318158A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8138185A JPH09318158A (en) 1996-05-31 1996-05-31 Bath apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8138185A JPH09318158A (en) 1996-05-31 1996-05-31 Bath apparatus

Publications (1)

Publication Number Publication Date
JPH09318158A true JPH09318158A (en) 1997-12-12

Family

ID=15216058

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8138185A Pending JPH09318158A (en) 1996-05-31 1996-05-31 Bath apparatus

Country Status (1)

Country Link
JP (1) JPH09318158A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009115394A (en) * 2007-11-07 2009-05-28 Panasonic Corp Bath system with water heater having automatic function
JP2015129590A (en) * 2014-01-06 2015-07-16 大阪瓦斯株式会社 Trial operation method of cogeneration system
JP2019207057A (en) * 2018-05-29 2019-12-05 株式会社ノーリツ Trial operation method for hot water system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009115394A (en) * 2007-11-07 2009-05-28 Panasonic Corp Bath system with water heater having automatic function
JP2015129590A (en) * 2014-01-06 2015-07-16 大阪瓦斯株式会社 Trial operation method of cogeneration system
JP2019207057A (en) * 2018-05-29 2019-12-05 株式会社ノーリツ Trial operation method for hot water system

Similar Documents

Publication Publication Date Title
JPH09318158A (en) Bath apparatus
JP2007198683A (en) Control device of bath water heater
JPH08166163A (en) Bath boiler with hot water heater
JP3173216B2 (en) Hot water temperature adjustment method for dropping the bathtub
JP2565042B2 (en) Automatic bath filling method
JP2005134028A (en) Storage type water heater
JP2533275B2 (en) Bath water filling equipment
JP7485944B2 (en) Bath equipment
JP2007192421A (en) Control device for bath water heater
JPS616535A (en) Hot water supplying device for bath
JP4138734B2 (en) Hot water storage water heater
JPH0650602A (en) Automatic electric bath water warmer
JP3132790B2 (en) Automatic bath pot and hot water filling method
JPH03194349A (en) Bath filling device
JPH04283349A (en) Hot water supplying apparatus for bath
JP2734073B2 (en) Bath water heater and large hot water bath water heater
JPH03233258A (en) Hot water temperature varying control method in automatic bath device
JPH10300200A (en) Method for automatically filling bath with hot water
JPH01247942A (en) Water level detector
JP2526629Y2 (en) Hot water filling equipment
JPH0960972A (en) Bath heater with hot water supply device
JPH05215404A (en) Supplying apparatus for hot water
JPH04263739A (en) Hot water pouring temperature control for bath
JPH05296559A (en) Controller for electric hot water generator for bath
JPH05296558A (en) Controller for electric hot water generator for bath