Concrete made large block

Info

Publication number
JPH09316895A
JPH09316895A JP15641096A JP15641096A JPH09316895A JP H09316895 A JPH09316895 A JP H09316895A JP 15641096 A JP15641096 A JP 15641096A JP 15641096 A JP15641096 A JP 15641096A JP H09316895 A JPH09316895 A JP H09316895A
Authority
JP
Japan
Prior art keywords
block
face plate
plate portion
retaining wall
connecting member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP15641096A
Other languages
Japanese (ja)
Other versions
JP2860780B2 (en
Inventor
Kozo Yamamoto
耕三 山元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANNICHI CONCRETE KK
Original Assignee
NANNICHI CONCRETE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANNICHI CONCRETE KK filed Critical NANNICHI CONCRETE KK
Priority to JP15641096A priority Critical patent/JP2860780B2/en
Publication of JPH09316895A publication Critical patent/JPH09316895A/en
Application granted granted Critical
Publication of JP2860780B2 publication Critical patent/JP2860780B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily build a weir levee or a retaining wall by connecting the side faces of the counterfort of the upper and lower stage blocks to each other by a connecting member. SOLUTION: Connecting bolts 21 are put through and fixed in a horizontal direction in two counterforts 11L and 11R protruded from the left and right of the back surface of a surface plate part 10 to a rear side. A connecting member 22 connected to an upper stage block is attached to one end part of each bolt 21 and a connecting member 23 connected to a lower stage block is attached to the other end part, each by a nut 24. By repeating arraying of the upper stage block on the lower stage block array by shifting 1/2 of the block horizontal width and in a manner of broken joint piling, these blocks are alternately connected each other by the connecting members 22 and 23. Further, for each piling of one stage of a block array or a plurality of stages, a back filling material 26 such as freshly mixed concrete is filled with between it and an earth layer 17 and a weir levee or a retaining wall having a required height is built. Thus, a weir levee or a retaining wall having a height of, for example 20m or higher, is easily built.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、左右に長い横長
長方形の面板部を有し、下段に配列した面板部上に、横
幅の1/2づゝをずらして上段の面板部を配列する破り
目地で多段に積み上げてダムなどの堰堤や土留用などの
擁壁を構築する重力式のコンクリート製大形ブロックに
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention has a laterally long rectangular face plate portion on the left and right, and a top plate portion arranged on the lower stage is displaced by 1/2 of the lateral width to arrange the upper face plate portion. The present invention relates to a large gravity concrete block that is stacked in multiple stages to construct dams such as dams and retaining walls for retaining soil.

【0002】[0002]

【従来の技術】実公昭58−3872号公報、特公昭6
2−28245号公報により、上記のように破り目地で
下段の横長長方形の面板部上に上段の面板部を多段に積
み上げて堰堤や擁壁を構築するため、左右に長い横長長
方形の面板部と、この面板部の左右の側縁から内側に面
板部の横幅の1/4づゝ離れた位置を中心として面板部
に対し直角で、且つ面板部と同高で、面板部の背面と一
体の左右2つの後向きの控壁を有するコンクリート製大
形ブロックが公知である。上記公知のブロックは、左右
の控壁の後端部と、面板部の、左右の控壁が後向きに突
出する位置に夫々上下方向の鉄筋貫通孔を合計して4つ
有し、堰堤や擁壁の基礎から林立する4本宛の所定の鉄
筋に上端から上記4つの鉄筋貫通孔を嵌め、鉄筋沿いに
ブロックを降ろして多段に破り目地で積み上げるのであ
る。
2. Description of the Related Art Japanese Utility Model Publication 58-3872 and Japanese Patent Publication 6
According to Japanese Patent Laid-Open No. 2-28245, in order to construct a dam or a retaining wall by stacking the upper face plate portion in multiple stages on the lower horizontally long rectangular face plate portion at the break joint as described above, a horizontally long rectangular face plate portion is provided to the left and right. , At right angles to the face plate portion centering on a position ¼ "lateral width of the face plate portion inward from the left and right side edges of the face plate portion, and at the same height as the face plate portion, integrated with the back face of the face plate portion. A large concrete block having two rear facing walls is known. The publicly known block has a total of four vertical reinforcing bar through holes at the rear end portions of the left and right retaining walls and at the positions where the left and right retaining walls of the face plate portion project rearward. The above four reinforcing bar through-holes are fitted from the upper end to predetermined reinforcing bars for the four trees standing from the foundation of the wall, and the blocks are lowered along the reinforcing bars and piled up at multiple joints at multiple joints.

【0003】[0003]

【発明が解決しようとする課題】一般にブロックの高さ
は75cm程度あるので、例えばブロックを10段積み
上げるには、基礎から高さ7.5mの鉄筋を立たせる必
要があり、各段のブロックを8.5m程吊り上げ、4つ
の鉄筋貫通孔の下端を所定の4本の鉄筋の上端に嵌めね
ばならない。ブロックは1個の重量が800〜900k
gもある重量物なので、吊り上げはクレーンなどの機械
で行うにしても、吊り上げたブロックの4つの鉄筋貫通
孔の下端を正確に所定の4本の鉄筋の上端に位置させて
嵌めるのに非常に手数と時間を要する。殊に、4本づゝ
の鉄筋をブロックの4つ宛の鉄筋貫通孔に合わせて基礎
から正確に立たせても、鉄筋の高さが7.5mもある
と、鉄筋の上部は揺れて4本づゝの鉄筋の各上端はブロ
ックの4つ宛の鉄筋貫通孔の位置からずれるため、堰堤
や擁壁の下方の段を構成するブロックの4つの鉄筋貫通
孔を鉄筋に嵌める作業は難渋する。従って、堰堤や擁壁
の施工能率は極めて悪い。
Generally, the height of the blocks is about 75 cm, so for example, to stack 10 blocks, it is necessary to erect a reinforcing bar of 7.5 m in height from the foundation. It must be lifted for about 8.5 m and the lower ends of the four reinforcing bar through holes must be fitted to the upper ends of the four specified reinforcing bars. Each block weighs 800-900k
Even if a machine such as a crane is used for lifting, since it is a heavy object, it is very difficult to fit the lower ends of the four reinforcing bar through holes of the suspended block exactly to the upper ends of the four specified reinforcing bars. It takes time and labor. Especially, even if four rebars are placed upright from the foundation by aligning the four rebars with the through holes for the four blocks, if the height of the rebar is 7.5m, the upper part of the rebar sways and shakes four. Since each upper end of each rebar is displaced from the position of the four rebar through holes of the block, it is difficult to fit the four rebar through holes of the block forming the step below the dam or retaining wall into the rebar. Therefore, the construction efficiency of dams and retaining walls is extremely poor.

【0004】[0004]

【課題を解決するための手段】そこで本発明は、例えば
下から2段目のブロックを、下から1段目と、下から3
段目の破れ目地で配列されたブロックと互い違いに連結
部材で結合しながら多段に積み上げ、高さが20mもあ
るような堰堤や、擁壁などを容易に構築できるようにし
て、上記従来のブロックの、基礎から高く林立させた鉄
筋を利用して積み上げる問題点を解消したのである。
Therefore, according to the present invention, for example, a block in the second stage from the bottom, a block in the first stage from the bottom, and a block in the third stage from the bottom.
Blocks arranged in a broken joint at the step are alternately connected by connecting members to be stacked in multiple stages to make it possible to easily construct a dam or a retaining wall having a height of 20 m. However, the problem of stacking up by using steel bars that have been raised from the foundation is solved.

【0005】[0005]

【発明の実施の形態】このため請求項1のコンクリート
製大形ブロックは、左右に長い横長長方形の面板部と、
この面板部の左右の側縁から内側に面板部の横幅の1/
4づゝ離れた位置を中心として面板部に対し直角で、且
つ面板部の背面と一体の左右2つの後向きの控壁を有
し、破り目地で多段に積み上げるコンクリート製大形ブ
ロックにおいて、上記左右2つの控壁に夫々横方向に連
結ボルトを貫通固定し、この各ボルトの一端部に上段の
ブロックと連結する連結部材、他端部に下段のブロック
と連結する連結部材を夫々ナットで取付けるようにした
ことを特徴とする。又、請求項2のコンクリート製大形
ブロックは、左右に長い横長長方形の面板部と、この面
板部の左右の側縁から内側に面板部の横幅の1/4づゝ
離れた位置を中心として面板部に対し直角で、且つ面板
部の背面と一体の左右2つの後向きの控壁を有し、破り
目地で多段に積み上げるコンクリート製大形ブロックに
おいて、上記左右2つの控壁の後端部に後向きに突出す
るボルトを固定し、左右2つの控壁の一方のボルトには
上段のブロックと連結する連結部材、他方の控壁のボル
トには下段のブロックと連結する連結部材を夫々ナット
で取付けるようにしたことを特徴とする。請求項3のコ
ンクリート製大形ブロックは、左右に長い横長長方形の
面板部と、この面板部の左右の側縁から内側に面板部の
横幅の1/4づゝ離れた位置を中心として面板部に対し
直角で、且つ面板部の背面と一体の左右2つの後向きの
控壁を有し、破り目地で多段に積み上げるコンクリート
製大形ブロックにおいて、前記面板部の背面の、左右の
控壁の中心から左右に、面板部の横幅の1/8づゝ離れ
た位置に後向きに突出する左右2本宛の連結ボルトを固
定し、この左右2本宛の連結ボルトの一方には上段のブ
ロックと連結する連結部材、他方には下段のブロックと
連結する連結部材を夫々ナットで取付けるようにしたこ
とを特徴とする。そして、請求項1,請求項2,請求項
3のどのコンクリート製大形ブロックにも、左右の2つ
の控壁に、連結部材の幅よりも直径が大きい横方向の貫
通孔を開設することが好ましい。
Therefore, the large block made of concrete according to claim 1 has a horizontally long rectangular face plate portion on the left and right,
From the left and right side edges of this face plate part, inwardly of the lateral width of the face plate part
In a large concrete block that has two rear facing walls that are perpendicular to the face plate centered at a distance of 4 inches and is integrated with the back face of the face plate, and is stacked in multiple stages at a tear joint, Connect the connecting bolts through the two retaining walls in the lateral direction, and attach the connecting member that connects to the upper block to one end of each bolt and the connecting member that connects to the lower block to the other end with nuts. It is characterized by having done. Further, the large concrete block of claim 2 is centered on a horizontally long rectangular face plate portion and a position which is inwardly separated from the left and right side edges of the face plate portion by 1/4 of the lateral width of the face plate portion. In a large concrete block that has two rear facing walls that are at right angles to the face plate and is integral with the back surface of the face plate, and is stacked in multiple steps at a tear joint, at the rear ends of the two left and right retaining walls. Fix the bolts that project backwards, and attach the connecting member that connects to the upper block to one bolt of the two left and right retaining walls, and the connecting member that connects to the lower block to the other retaining wall bolts with nuts. It is characterized by doing so. The large concrete block according to claim 3 has a horizontally long rectangular face plate portion, and a face plate portion centered on a position distant from the left and right side edges of the face plate portion inward by ¼ of the lateral width of the face plate portion. In a large concrete block that has two right and left rear facing walls that are at right angles to the rear surface of the face plate part and that is stacked in multiple steps at a tear joint, the center of the left and right back walls on the back face of the face plate part From the left and right, fix the connecting bolts to the left and right that project backwards at a position that is 1/8 of the lateral width of the face plate part, and connect the upper block to one of the two connecting bolts to the left and right. The connecting member for connecting to the lower block and the connecting member for connecting to the lower block are attached to the other by nuts. In any of the large concrete blocks of claim 1, claim 2, and claim 3, lateral through holes having a diameter larger than the width of the connecting member can be formed in the two left and right retaining walls. preferable.

【0006】[0006]

【実施例】図示の各実施例において、10は左右に長い
横長長方形の面板部、11L,11Rは、上記面板部の
左右の側縁L,Rから内側に面板部の横幅Wの1/4づ
ゝ離れた位置11´,11´を中心とする所定の厚さ
の、面板部と高さHが同じで、且つ面板部に対して直角
な、面板部の背面10bと一体の左右2つの後向きの控
壁を示す。各部の寸法の一例を示すと、面板部10の横
幅Wは2m、従って、面板部の横幅Wから内側に1/4
づゝ離れた左右の控壁11L,11Rの中心11´,1
1´は面板部の左右の側縁L,Rから内側に50cmの
位置であり、面板部と左右の控壁11L,11Rの高さ
Hは75cm、左右の控壁の、後向きの長さは30c
m、各控壁の面板部の背面と接続した基部の幅w1 は2
0cm、後端の幅w2 は15cmであり、面板部の厚さ
は左右の側縁で13cm、左右の控壁が接続した部分の
厚さは20cm、中央の厚さは17cmである。このた
め面板部の背面10bは、控壁が接続した部分を除き、
全体として逆W字形の、中央で対称な傾斜面にし、面板
部自体の強度と、面板部と左右の控壁との接続強度の向
上を図っている。勿論、面板部及び左右の控壁の内部に
は鉄筋が配筋してある。尚、面板部の表面10aはコン
クリートで形成しても、コンクリート中に一部を埋込ん
だ自然石を表面に露出させ、周囲の環境に調和するよう
にしてもよい。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In each of the illustrated embodiments, 10 is a horizontally long rectangular face plate portion, and 11L and 11R are 1/4 of the lateral width W of the face plate portion from the left and right side edges L and R of the face plate portion. Two right and left units having a predetermined thickness centered on positions 11 'and 11' which are spaced apart from each other and having the same height H as the face plate portion and perpendicular to the face plate portion and integrated with the back surface 10b of the face plate portion. Shows a rear facing wall. As an example of the dimensions of each part, the lateral width W of the face plate portion 10 is 2 m, and therefore the lateral width W of the face plate portion is ¼ inward from the lateral width W.
Centers 11 ', 1 of the left and right retaining walls 11L, 11R
1'is a position 50 cm inward from the left and right side edges L, R of the face plate portion, the height H of the face plate portion and the left and right retaining walls 11L, 11R is 75 cm, and the rearward facing length of the left and right retaining walls is 30c
m, the width w 1 of the base portion connected to the back surface of the face plate of each retaining wall is 2
0 cm, the width w 2 of the rear end is 15 cm, the thickness of the face plate portion is 13 cm at the left and right side edges, the thickness of the portion where the left and right retaining walls are connected is 20 cm, and the thickness at the center is 17 cm. For this reason, the back surface 10b of the face plate portion, except for the portion where the retaining wall is connected,
As a whole, it has an inverted W-shaped inclined surface symmetrical with respect to the center to improve the strength of the face plate portion itself and the connection strength between the face plate portion and the left and right retaining walls. Of course, reinforcing bars are arranged inside the face plate and the left and right retaining walls. The surface 10a of the face plate portion may be formed of concrete, or a natural stone partially embedded in concrete may be exposed on the surface so as to be in harmony with the surrounding environment.

【0007】そして、面板部の左右の側縁L,Rの一方
には上下方向の突条12、他方に上記突条が嵌合する溝
13を設け、積み上げた同じ段の左右に隣接したブロッ
クが突条12を溝13に嵌合して噛み合うようにし、
又、左右の控壁11L,11Rの、面板部の背面と接続
した基部の上下の一方に台形の突出部14、他方に上記
突出部が嵌合する溝形凹部15を夫々基部を横切って横
方向に設け、破り目地で積み上げた下段のブロックの左
の控壁11Lの基部の突出部14が、上段のブロックの
右の控壁11Rの基部の凹部15に嵌合して噛み合うよ
うにし、これによりブロックを破り目地で積み上げて堰
堤や擁壁を構築した場合に、上下方向の各段の同じ列の
左右に隣接するブロック同志と、上の段と下の段の上下
に重なったブロック同志とが互いにスクラムを組み、堰
堤や擁壁の組み積み強度を高めるようにしてある。又、
左右の控壁11L,11Rには横方向の貫通孔16が上
下に開設してある。この貫通孔16の直径は、後述する
連結部材22,23の幅、約5cmよりも大きく、例え
ば10〜15cm程度である。破り目地でブロックを1
段、又は数段積み上げる毎に、裏に生コンクリートなど
の裏込め材料を充填する際、裏込め材料が横方向の貫通
孔16,16の内部に入り込んで孔を埋め、これによっ
ても積み上げた堰堤や擁壁と、背後の土層との結合強度
と、併せて堰堤や擁壁の組み積み強度の向上を図るよう
にしてある。
Further, one of the left and right side edges L and R of the face plate portion is provided with a vertical protrusion 12 and a groove 13 into which the above protrusion is fitted, and the other adjacent blocks on the same row are stacked. Fits the ridges 12 into the grooves 13 and engages with each other.
Further, the trapezoidal protrusions 14 are provided on one of the upper and lower sides of the bases of the left and right retaining walls 11L and 11R connected to the back surface of the face plate portion, and the groove-shaped recesses 15 into which the above-mentioned protrusions are fitted are traversed across the bases. Direction, and the protrusion 14 at the base of the left retaining wall 11L of the lower block piled up at the break joint is fitted into the concave portion 15 at the base of the right retaining wall 11R of the upper block so that they engage with each other. When blocks are torn and piled up at joints to construct a dam or retaining wall, the blocks are adjacent to each other on the left and right in the same row of each step in the vertical direction, and the blocks that are above and below the upper and lower steps. Have assembled scrums with each other to increase the stacking strength of dams and retaining walls. or,
The left and right retaining walls 11L and 11R are provided with through holes 16 in the horizontal direction in the vertical direction. The diameter of the through hole 16 is larger than the width of the connecting members 22 and 23, which will be described later, about 5 cm, for example, about 10 to 15 cm. 1 block at break joint
When filling the backfill material such as ready-mixed concrete into the back every time it is stacked in steps or several steps, the backfill material enters inside the through holes 16, 16 in the lateral direction to fill the holes, and this also builds up the dam. In addition to the strength of the connection between the retaining wall and the retaining wall and the soil layer behind it, the strength of the dam and retaining wall is improved.

【0008】前述の連結部材22,23は、基礎から立
つアンカーと、その上に配列した1段目のブロックを結
合したり、1段目と2段目、2段目と3段などの上段の
ブロックと、下段のブロックを互い違いに結合するため
のもので、例えば厚さ6mm、幅5cm程度の鉄のフラ
ットバーを使用することが好ましく、基礎のアンカー
と、1段目のブロックを結合するものゝ長さはブロック
の高さの1/2より少し長い程度、上段のブロックと下
段のブロックを結合するものゝ長さはブロックの高さよ
り少し長い程度でよい。又、基礎から立つアンカーも鉄
のフラットバーとし、基礎の中に埋められる鉄筋に溶接
して基礎の上面から立たせる。
The above-mentioned connecting members 22 and 23 connect the anchor standing from the foundation and the block of the first stage arranged on the anchor, or the upper stage such as the first stage and the second stage, the second stage and the third stage. For alternately connecting the lower block and the lower block, for example, it is preferable to use an iron flat bar having a thickness of 6 mm and a width of about 5 cm. The base anchor and the first block are connected. The length of the object is a little longer than 1/2 of the height of the block, and the length of the one connecting the upper block and the lower block is a little longer than the height of the block. In addition, the anchor that stands from the foundation is also an iron flat bar, and is welded to the reinforcing bar embedded in the foundation to stand from the top surface of the foundation.

【0009】図1は請求項1の一実施例であって、左右
2つの後向きの控壁11L,11Rには高さHの1/2
の位置(上下の横方向の貫通孔16,16の中間位置)
に夫々横方向に連結ボルト21を貫通、固定し、この各
連結ボルトの一端部、例えば各控壁の左側面から突出し
たボルトの左端部に上段のブロックの連結ボルトと連結
する連結部材22、右側面から突出したボルトの右端部
に下段のブロックの連結ボルトと連結する連結部材23
を夫々ワッシャ25を介してナット24で固定できるよ
うにしてある。尚、左右の控壁に横方向に貫通、固定し
た連結ボルト21はブロックを成形する際に控壁に埋込
んで取付けておいてもよいし、ボルトの挿通孔を有する
ようにブロックを成形し、成形後にその挿通孔にボルト
21を貫通して固定してもよい。
FIG. 1 shows an embodiment of claim 1 in which the left and right rear facing walls 11L and 11R have a half height H.
Position (intermediate position between upper and lower through holes 16, 16)
A connecting member 22 for connecting and fixing the connecting bolts 21 in the lateral direction, and connecting one end of each connecting bolt, for example, the left end of the bolt protruding from the left side surface of each retaining wall to the connecting bolt of the upper block. A connecting member 23 that connects to the connecting bolt of the lower block at the right end of the bolt protruding from the right side surface.
Can be fixed with nuts 24 via washers 25, respectively. Incidentally, the connecting bolts 21 penetrating and fixed in the lateral direction on the left and right retaining walls may be embedded in the retaining wall and attached when molding the block, or the block may be molded so as to have a bolt insertion hole. After the molding, the bolt 21 may be fixed by penetrating the insertion hole.

【0010】左右の後向きの控壁11L,11Rは、面
板部と接続した基部の幅w1 が厚く、後端の幅w2 が薄
く、これにより各控壁の側面は基部から後端に向かって
テーパがついている。従って、図1(C)に拡大して示
したように、連結ボルト21の左右各端部に嵌めるワッ
シャ25は控壁の側面とは逆のテーパ面を有するものを
使用し、そのテーパ面を控壁の側面に当てゝ側面のテー
パを打消し、連結ボルト21の各端部に対し垂直にナッ
ト24で各連結部材22,23の各端部を取付けられる
ようにすることが好ましい。
The left and right rear facing walls 11L and 11R have a large width w 1 at the base portion connected to the face plate portion and a small width w 2 at the rear end, whereby the side surfaces of each retaining wall face from the base portion to the rear end. Taper. Therefore, as shown in an enlarged view in FIG. 1C, the washer 25 fitted on each of the left and right ends of the connecting bolt 21 has a tapered surface opposite to the side surface of the retaining wall, and the tapered surface is It is preferable that the side wall of the retaining wall is applied and the taper of the side face is canceled so that each end of each connecting member 22 and 23 can be attached by a nut 24 perpendicularly to each end of the connecting bolt 21.

【0011】土層17の前に生コンクリートを現場打ち
して構築した基礎18には、図1(D),(E)に示す
ように左右方向に配列した1段目のブロックの左右の控
壁11L,11Rの一方の側面、例えば右側面から突出
する連結ボルトの右端部に取付けた連結部材23の下端
部とナットで連結するアンカー19を所定の位置から上
向きに突出させておく。従って、一段目のブロックを基
礎18上に左右方向に隣接し、突条12と溝13を噛み
合わせながら配列し、各ブロックの左右の控壁11L,
11Rの右側面から突出する連結ボルトの右端部と、基
礎の上面から立つアンカー19を、ボルトで取付けた連
結部材23を介して結合し、1段目のブロックの配列
(I)を基礎上に固定する。尚、連結部材23を基礎に
埋めて立て、アンカー19と兼用させてもよい。
On the foundation 18 constructed by pouring ready-mixed concrete in front of the soil layer 17, as shown in FIGS. 1 (D) and 1 (E), the left and right backing blocks of the first block arranged in the left and right direction are arranged. An anchor 19 which is connected to the lower end of the connecting member 23 attached to the right end of the connecting bolt protruding from one side surface of the walls 11L and 11R, for example, the right side surface with a nut, is projected upward from a predetermined position. Therefore, the blocks of the first stage are adjacent to each other on the foundation 18 in the left-right direction, and are arranged while the protrusions 12 and the grooves 13 are engaged with each other.
The right end portion of the connecting bolt protruding from the right side surface of 11R and the anchor 19 standing from the upper surface of the foundation are connected via a connecting member 23 attached by a bolt, and the first-stage block array (I) is placed on the foundation. Fix it. Alternatively, the connecting member 23 may be embedded in the foundation and stood up to serve also as the anchor 19.

【0012】次いで、1段目のブロックの配列上に、面
板部の横幅の1/2をずらせ、破り目地積みで2段目の
ブロックを配列し、図1(E)に示すように1段目のブ
ロックの左の控壁11Lの左側面から突出する連結ボル
トの左端部と、2段目のブロックの右の控壁11Rの左
側面から突出する連結ボルトの左端部、及び1段目のブ
ロックの右の控壁11Rの左側面から突出する連結ボル
トの左端部と、2段目の右隣りのブロックの左の控壁1
1Lの左側面から突出する連結ボルトの左端部を、夫々
ナット24で取付けた連結部材22により結合し、2段
目のブロックの配列(II)を1段目のブロックの配列
(I)上に固定する。そして、2段目のブロックの配列
上に3段目のブロックを破り目地で配列したら〔3段目
のブロックの配列(III)は1段目の配列(I)と同
じである。〕、2段目のブロックの左の控壁11Lの右
側面から突出する連結ボルトの右端部と、3段目のブロ
ックの右の控壁11Rの右側面から突出する連結ボルト
の右端部、及び2段目のブロックの右の控壁の右側面か
ら突出する連結ボルトの右端部と、3段目の右隣りのブ
ロックの左の控壁の右側面から突出する連結ボルトの右
端部を、夫々ナット24で取付けた連結部材23により
結合し、3段目のブロックの配列(III)を2段目の
ブロックの配列(II)上に固定する。これにより、1
段目のブロックと2段目のブロック、2段目のブロック
と3段目のブロックは連結部材22,23で互い違いに
結合され、しかも上下のブロックの控壁の基部にある突
出部14と凹部15は嵌り合う。
Next, 1/2 of the lateral width of the face plate portion is shifted on the array of the first stage blocks, and the second stage blocks are arrayed in the tear joint stacking, as shown in FIG. 1 (E). The left end of the connecting bolt protruding from the left side surface of the left retaining wall 11L of the eye block, the left end of the connecting bolt protruding from the left side surface of the right retaining wall 11R of the second block, and the first step The left end of the connecting bolt protruding from the left side surface of the right retaining wall 11R of the block and the left retaining wall 1 of the block adjacent to the right of the second stage
The left ends of the connecting bolts projecting from the left side surface of 1L are connected by connecting members 22 attached with nuts 24, respectively, and the array (II) of the second block is arranged on the array (I) of the first block. Fix it. Then, when the blocks in the third row are arranged at the joints on the arrangement of the blocks in the second row [the array (III) of the blocks in the third row is the same as the array (I) in the first row]. ] The right end portion of the connecting bolt protruding from the right side surface of the left retaining wall 11L of the second block, the right end portion of the connecting bolt protruding from the right side surface of the right retaining wall 11R of the third block, and The right end of the connecting bolt protruding from the right side of the right retaining wall of the second block and the right end of the connecting bolt protruding from the right side of the left retaining wall of the block adjacent to the third stage on the right side, respectively. The connection member 23 attached with the nut 24 is used for connection, and the arrangement (III) of the blocks in the third stage is fixed onto the arrangement (II) of the blocks in the second stage. This gives 1
The block of the second step and the block of the second step are alternately coupled by the connecting members 22 and 23, and the projecting portion 14 and the concave portion at the base of the retaining wall of the upper and lower blocks are connected. 15 fit together.

【0013】このようにして下の段のブロックの配列上
に、ブロックの横幅の1/2宛をずらせて破り目地積み
で上の段のブロックを配列することを繰返し、下の段の
各ブロックの左と右の控壁11L,11Rに横方向に貫
通して設けた連結ボルトの左右の各端部と、上の段の隣
り合った2つのブロックの一方は左の控壁、他方は右の
控壁11L,11Rに夫々横方向に貫通して設けた連結
ボルトの対応する端部とを夫々ナットにより取付けた連
結部材22,23で互い違いに連結し、ブロックの配列
を1段、又は複数段、積み上げる毎に、土層17との間
に生コンクリートなどの裏込め材料26を充填し、所要
の高さの堰堤や擁壁を構築することができる。尚、各控
壁に設けた横方向の貫通孔16の直径は、前述したよう
に連結部材22,23の幅よりも大きいので、裏込め材
料26は貫通孔16の中に回り込み、これにより前述し
たように堰堤や擁壁と背後の土層との結合強度と、併せ
て堰堤や擁壁の組み積み強度の向上を図ることができ
る。
In this way, by arranging the blocks of the lower row by ½ of the horizontal width of the block, the blocks of the upper row are arranged in a broken joint, and the blocks of the lower row are repeatedly arranged. Left and right end walls 11L and 11R of the connecting bolts penetrating laterally in the lateral direction, and one of the two adjacent blocks of the upper step is the left end wall, the other is the right The corresponding end portions of the connecting bolts penetrating laterally through the retaining walls 11L and 11R are alternately connected by connecting members 22 and 23 attached by nuts, respectively, and the block arrangement is arranged in one step or in plurals. A backfill material 26 such as ready-mixed concrete may be filled between the soil layer 17 and the soil layer 17 to build a dam or retaining wall of a desired height. Since the diameter of the through hole 16 in the lateral direction provided in each retaining wall is larger than the width of the connecting members 22 and 23 as described above, the backfill material 26 wraps around the through hole 16, thereby As described above, it is possible to improve the bonding strength between the dam or retaining wall and the soil layer behind it, and at the same time, improve the stacking strength of the dam or retaining wall.

【0014】図2,3は請求項2の一実施例であって、
左右2つの後向きの控壁11L,11Rの中心11´,
11´の後端には高さHの1/2の位置の中心に、後向
きに突出する連結ボルト21を埋込んで固定し、例えば
左の控壁11Lの後端から突出する連結ボルトには、破
り目地で積んだ上段のブロックの右の控壁11Rの後端
から突出する連結ボルトと連結する連結部材22、右の
控壁11Rの後端から突出する連結ボルトには下段のブ
ロックの左の控壁11Lの後端から突出する連結ボルト
と連結する連結部材23をナット24で固定できるよう
にしてある。
2 and 3 show an embodiment of claim 2,
Center 11 'of the left and right rear facing walls 11L, 11R,
A rearwardly projecting connecting bolt 21 is embedded and fixed at the center of the position of 1/2 of the height H at the rear end of 11 '. For example, for the connecting bolt projecting from the rear end of the left retaining wall 11L, , A connecting member 22 for connecting with a connecting bolt projecting from the rear end of the right retaining wall 11R of the upper block piled with tear joints, a connecting bolt protruding from the rear end of the right retaining wall 11R has a left side of the lower block The connecting member 23 connected to the connecting bolt protruding from the rear end of the retaining wall 11L can be fixed by the nut 24.

【0015】土層17の前に生コンクリートを現場打ち
して構築した基礎18には、図3(A),(B)に示す
ように、左右方向に配列した1段目のブロックの右の控
壁11Rの後端から突出する連結ボルトに連結するアン
カー19、又はアンカー兼用の連結部材23を上向きに
突出させておく。従って、一段目のブロックを基礎18
上に左右方向に隣接し、突条12と溝13を噛み合わせ
ながら配列し、各ブロックの左の控壁11Rの後端から
突出する連結ボルト21と、基礎の上面から立つアンカ
ー19ないし連結部材23をナットで結合し、1段目の
ブロックの配列(I)を基礎上に固定する。
As shown in FIGS. 3 (A) and 3 (B), the foundation 18 constructed by pouring ready-mixed concrete in front of the soil layer 17 is located on the right side of the first block arranged in the left-right direction. An anchor 19 or a connecting member 23 also serving as an anchor, which is connected to a connecting bolt protruding from the rear end of the retaining wall 11R, is projected upward. Therefore, the first block is the base 18
Connection bolts 21 that are adjacent to each other in the left-right direction and that are arranged while engaging the protrusions 12 and the grooves 13 and project from the rear end of the left retaining wall 11R of each block, and the anchor 19 or the connection member that stands from the upper surface of the foundation. 23 is connected with a nut, and the array (I) of the first block is fixed on the foundation.

【0016】次いで、1段目のブロックの配列上に、面
板部の横幅の1/2をずらせて破り目地積みで2段目の
ブロックを配列し、1段目のブロックの右の控壁11R
の後端から突出する連結ボルトと、2段目のブロックの
左の控壁11Lの後端から突出する連結ボルトを、夫々
ナット24で取付けた連結部材22により結合して2段
目のブロックの配列(II)を、1段目のブロックの配
列(I)上に固定する。そして、2段目のブロックの配
列上に3段目のブロックを破り目地で配列したら〔3段
目のブロックの配列(III)は1段目の配列(I)と
同じである。〕、2段目のブロックの右の控壁の後端か
ら突出する連結ボルトと、3段目のブロックの左の控壁
の後端から突出する連結ボルトを、夫々ナット24で取
付けた連結部材23により結合し、3段目のブロックの
配列(III)を、2段目のブロックの配列(II)上
に固定する。これにより、1段目のブロックと2段目の
ブロック、2段目のブロックと3段目のブロックは連結
部材22,23で互い違いに結合され、しかも上下のブ
ロックの控壁の基部にある突出部14と凹部15は嵌り
合う。
Next, on the array of the first-stage blocks, the second-stage blocks are arranged by shifting the lateral width of the face plate portion by ½, and the second-stage blocks are arranged.
The connecting bolts protruding from the rear end and the connecting bolts protruding from the rear end of the left retaining wall 11L of the second stage block are connected by connecting members 22 attached with nuts 24, respectively. The array (II) is fixed on the array (I) of the first block. Then, when the blocks in the third row are arranged at the joints on the arrangement of the blocks in the second row [the array (III) of the blocks in the third row is the same as the array (I) in the first row]. ] A connecting member in which a connecting bolt protruding from the rear end of the right retaining wall of the second block and a connecting bolt protruding from the rear end of the left retaining wall of the third block are attached by nuts 24, respectively. 23, and the array (III) of the block in the third row is fixed on the array (II) of the block in the second row. As a result, the first block, the second block and the second block and the third block are alternately joined by the connecting members 22 and 23, and the protrusions at the base of the retaining walls of the upper and lower blocks. The part 14 and the recess 15 fit together.

【0017】このようにして下の段のブロックの配列上
に、ブロックの横幅の1/2宛をずらせて破り目地積み
で上の段のブロックを配列することを繰返し、下の段の
各ブロックの左右の控壁11L,11Rの一方の後端か
ら突出する連結ボルトと、上の段の隣り合った2つのブ
ロックの他方の控壁の後端から突出する連結ボルトを、
夫々ナットで取付けた連結部材22,23で互い違いに
連結し、ブロックの配列を1段、又は複数段、積み上げ
る毎に、土層17との間に生コンクリートなどの裏込め
材料26を充填し、所要の高さの堰堤や擁壁を構築する
ことができる。尚、請求項1と同様に裏込め材料26は
貫通孔16の中に回り込み、これにより前述したように
堰堤や擁壁と背後の土層との結合強度と、併せて堰堤や
擁壁の組み積み強度の向上を図ることができる。
In this way, arranging the blocks on the lower row by ½ of the width of the block and arranging the blocks on the upper row by tearing and loading the blocks repeatedly, and each block in the lower row is repeated. Connecting bolts protruding from one rear end of the left and right retaining walls 11L and 11R, and connecting bolts protruding from the rear ends of the other retaining walls of the two adjacent blocks in the upper step,
Each of them is alternately connected by connecting members 22 and 23 attached with nuts, and the backfill material 26 such as ready-mixed concrete is filled between the soil layer 17 and the soil layer 17 each time the blocks are stacked one step or a plurality of steps. Weirs and retaining walls of the required height can be constructed. The backfill material 26 wraps around the through hole 16 as in the case of claim 1, and as a result, as described above, the strength of the bond between the dam or retaining wall and the soil layer behind it is combined with the structure of the dam or retaining wall. The stacking strength can be improved.

【0018】図4,5は請求項3の一実施例であって、
面板部の背面に、左右2つの後向きの控壁11L,11
Rの中心11´,11´から左右に面板部の横幅Wの1
/8づつ離れた高さHの1/2の位置の中心に、後向き
に突出する左側と右側の左右2本宛の連結ボルト21
L,21Rを埋込んで固定し、この左側と右側の左右2
本宛の連結ボルトの一方例えば右のもの21Rに破り目
地で積んだ上段のブロックの背面の左右2本宛の連結ボ
ルトの右のもの21Rと連結する連結部材22、左の連
結ボルト21Lに下段のブロックの左右2本宛の連結ボ
ルトの左の連結ボルト21Lと連結する連結部材23を
夫々ワッシャを介してナット24で固定できるようにし
てある。
4 and 5 show an embodiment of claim 3,
On the back surface of the face plate portion, two left and right rear facing walls 11L, 11
From the center 11 'of the R, 11' to the left and right, the width W of the face plate is 1
Connecting bolts 21 for the left and right two bolts projecting rearward at the center of 1/2 of the height H, which are / 8
L and 21R are embedded and fixed, left and right 2
One of the connecting bolts for the book, for example, the right one 21R, the connecting member 22 for connecting to the right one 21R of the connecting bolts for the two left and right connecting bolts on the back side of the upper block that is piled up with the tear joint, the lower connecting bolt 21L The connecting members 23, which are connected to the left connecting bolts 21L of the connecting bolts for the two right and left blocks of the block, can be fixed by the nuts 24 via the washers.

【0019】ブロックの背面10bは左右の控壁11
L,11Rとの接続部を除き、前述したように逆W字形
の、中央で対称な傾斜面であり、しかも左右の側縁L,
Rの厚さと、中央の厚さは異なるので、図4(C)に示
すように各側縁L,Rから左右の控壁11L,11Rの
基部に向かう背面10b´と、左右の控壁の基部から中
央に向かう背面10b″の傾斜角度は相違する。従っ
て、左右2本宛の左の連結ボルト21Lに嵌めるワッシ
ャ25Lと、右の連結ボルト21Rに嵌めるワッシャ2
5Rは、夫々ブロックの背面の傾斜角度とは逆の傾斜面
を有すると共に、厚さも異なるものを使用し、背面の傾
斜を打消し、且つ背面からの突出面が同一面25´にな
るようにし、ナット24で各連結部材22,23の各端
部を連結ボルト21L,21Rに同一面25´で、且つ
直角に取付けられるようにすることが好ましい。
The back surface 10b of the block is the left and right retaining walls 11
Except for the connection with L and 11R, it is an inverted W-shaped inclined surface symmetrical with respect to the center as described above, and the left and right side edges L,
Since the thickness of R and the thickness of the center are different from each other, as shown in FIG. 4C, the rear surface 10b 'from each side edge L, R toward the base of the left and right retaining walls 11L, 11R and the left and right retaining walls. The inclination angles of the back surface 10b ″ from the base portion toward the center are different. Therefore, the washer 25L fitted to the left connecting bolt 21L for the left and right two and the washer 2 fitted to the right connecting bolt 21R.
Each of the 5Rs has an inclined surface opposite to the inclination angle of the back surface of the block and has a different thickness so as to cancel the inclination of the back surface and make the protruding surface from the back surface the same surface 25 '. It is preferable that each end of each connecting member 22, 23 is attached to the connecting bolts 21L, 21R with the nut 24 on the same plane 25 'and at a right angle.

【0020】土層17の前に生コンクリートを現場打ち
して構築した基礎18には、図5(A),(B)に示す
ように、左右方向に配列した1段目のブロックの背面の
左右左側と、右側の2本宛の連結ボルトの一方、例えば
左の連結ボルト21Lから下がる連結部材23の下端部
とナットで連結するアンカー19ないし、このアンカー
と兼用の連結部材23を所定の位置に埋め込んで上向き
に突出させておく。従って、一段目のブロックを基礎1
8上に左右方向に隣接し、突条12と溝13を噛み合わ
せながら配列し、各ブロックの面板部の背面の左右2本
宛の連結ボルトの左の連結ボルト21Lと、基礎の上面
から立つアンカー19(23)をナット24で結合し、1
段目のブロックの配列(I)を基礎上に固定する。
As shown in FIGS. 5 (A) and 5 (B), the foundation 18 constructed by pouring ready-mixed concrete in front of the soil layer 17, as shown in FIGS. One of the left and right connecting bolts, and one of the right connecting bolts, for example, the anchor 19 that is connected to the lower end of the connecting member 23 that descends from the left connecting bolt 21L by a nut, or the connecting member 23 that also serves as this anchor is at a predetermined position. Embed in and project upward. Therefore, the first block is the basis 1
8 are adjacent to each other in the left-right direction, and are arranged while the protrusions 12 and the grooves 13 are engaged with each other, and stand from the top of the foundation and the left connecting bolts 21L of the connecting bolts for the left and right two on the rear surface of the face plate of each block Connect the anchor 19 (23) with the nut 24, and
The array (I) of the block in the tier is fixed on the foundation.

【0021】次いで、1段目のブロックの配列上に、面
板部の横幅の1/2をずらせて破り目地積みで2段目の
ブロックを配列し、1段目のブロックの背面の左側と右
側の左右2本宛の連結ボルトの右の連結ボルト21R
と、2段目のブロックの背面の右側の2本の連結ボルト
の右の連結ボルト21R、及び2段目の右隣りのブロッ
クの背面の左側の2本の連結ボルトの右の連結ボルト2
1Rを、夫々ナット24で取付けた連結部材22により
結合し、2段目のブロックの配列(II)を1段目のブ
ロック(I)の配列上に固定する。そして、2段目のブ
ロックの配列上に3段目のブロックを破り目地で配列し
たら〔3段目のブロックの配列(III)は1段目の配
列(I)と同じである。〕、2段目のブロックの背面の
左側と右側の左右2本宛の連結ボルトの夫々左の連結ボ
ルト21L,21Lと、3段目の左のブロックの背面の
右側の左右2本の連結ボルトの左の連結ボルト21L、
及び右隣りのブロックの背面の左側の左右2本の連結ボ
ルトの左の連結ボルト21Lを、夫々ナット24で取付
けた連結部材23により結合し、3段目のブロックの配
列(III)を2段目のブロックの配列(II)上に固
定する。これにより、1段目のブロックと2段目のブロ
ック、2段目のブロックと3段目のブロックは連結部材
22,23で互い違いに結合され、しかも上下のブロッ
クの控壁の基部にある突出部14と凹部15は嵌り合
う。
Next, the second-stage blocks are arranged on the first-stage block array by shifting the lateral width of the face plate portion by 1/2, and the second-stage blocks are arranged, and the left and right sides of the back surface of the first-stage block are arranged. Right connecting bolt 21R of the connecting bolts to the left and right of
And the right connecting bolt 21R of the two connecting bolts on the right side of the rear surface of the second block, and the right connecting bolt 2 of the two connecting bolts on the left side of the rear surface of the block adjacent on the right of the second step.
The 1Rs are connected by the connecting members 22 attached by the nuts 24, respectively, and the array (II) of the second block is fixed on the array of the first block (I). Then, when the blocks in the third row are arranged at the joints on the arrangement of the blocks in the second row [the array (III) of the blocks in the third row is the same as the array (I) in the first row]. ] The left and right connecting bolts 21L, 21L of the left and right connecting bolts on the rear surface of the second block and the left and right connecting bolts on the right side of the rear surface of the third block, respectively Left connecting bolt 21L,
And the left connecting bolts 21L of the left and right connecting bolts on the left side of the rear surface of the right adjacent block are connected by connecting members 23 attached by nuts 24, respectively, and the block arrangement (III) of the third step is set in two steps. Fix on the eye block array (II). As a result, the first block, the second block and the second block and the third block are alternately joined by the connecting members 22 and 23, and the protrusions at the base of the retaining walls of the upper and lower blocks. The part 14 and the recess 15 fit together.

【0022】このようにして下の段のブロックの配列上
に、ブロックの横幅の1/2宛をずらせて破り目地積み
で上の段のブロックを配列することを繰返し、下の段の
各ブロックの背面の左側と右側から突出する左右2本宛
の連結ボルトと、上の段の隣り合ったブロックの背面の
左側と右側から突出する左右2本宛の連結ボルトの一方
は左の連結ボルト同志、他方は右の連結ボルト同志を、
夫々ナットで取付けた連結部材22,23で互い違いに
連結し、ブロックの配列を1段、又は複数段、積み上げ
る毎に、土層17との間に生コンクリートなどの裏込め
材料26を充填し、所要の高さの堰堤や擁壁を構築する
ことができる。尚、請求項1,2と同様に裏込め材料2
6は貫通孔16の中に回り込み、これにより前述したよ
うに堰堤や擁壁と背後の土層との結合強度と、併せて堰
堤や擁壁の組み積み強度の向上を図ることができる。
In this way, by arranging the blocks of the lower row by ½ of the lateral width of the block, the blocks of the upper row are arranged in a broken joint, and the blocks of the lower row are repeatedly arranged. The left and right connecting bolts projecting from the left and right sides of the back of the block, and the left and right connecting bolts of the two projecting from the left and right sides of the backs of the adjacent blocks in the upper row are one of the left connecting bolts. , The other is the right connecting bolt comrades,
Each of them is alternately connected by connecting members 22 and 23 attached with nuts, and the backfill material 26 such as ready-mixed concrete is filled between the soil layer 17 and the soil layer 17 each time the blocks are stacked one step or a plurality of steps. Weirs and retaining walls of the required height can be constructed. The backfill material 2 is the same as in claims 1 and 2.
Reference numeral 6 wraps around the through hole 16, and as a result, as described above, it is possible to improve the bonding strength between the dam or retaining wall and the soil layer behind it, as well as the stacking strength of the dam or retaining wall.

【0023】尚、図示の請求項1,2,3の各実施例で
は、連結ボルト21の取付位置は同じ高さの控壁や面板
部の高さの1/2にしてあるが、下から高さの1/3の
位置、或いは下から高さの2/3の位置など、所定の位
置であれば良い。
In each of the first, second and third embodiments shown in the drawings, the mounting position of the connecting bolt 21 is 1/2 of the height of the retaining wall or face plate portion having the same height. It may be a predetermined position such as a position of 1/3 of the height or a position of 2/3 of the height from the bottom.

【0024】[0024]

【発明の効果】以上で明らかなように、本発明ではブロ
ックの横幅の1/2宛をずらせて破り目地積みで交互に
ブロックの配列を積み上げて堰堤や擁壁を構築する際
に、請求項1によればブロックの背面の左右の後向きの
控壁に、横方向に貫通して取付けた連結ボルトを利用
し、例えば1段目のブロックの左の控壁の左側面と、2
段目の左のブロックの右の控壁の左側面、同じ1段目の
ブロックの右の控壁の左側面と、2段目の右のブロック
の左の控壁の左側面を、夫々連結ボルトの各端部にナッ
トで取付けた連結部材で結合し、又、2段目の右のブロ
ックの左の控壁の右側面と、3段目の左のブロックの右
の控壁の右側面、同じ2段目の右ブロックの右の控壁の
右側面と、3段目の右のブロックの左の控壁の右側面
を、夫々連結ボルトの各端部にナットで取付けた連結部
材で結合し、こうして上段と下段のブロックの控壁の側
面を連結部材で互い違いに連結し、請求項2によればブ
ロックの背面の左右の控壁の後端から突出する連結ボル
トを利用し、例えば1段目のブロックの右の控壁の後端
と、2段目の右のブロックの左の控壁の後端を夫々連結
ボルトにナットで取付けた連結部材で結合し、又、2段
目の右のブロックの右の控壁の後端と、3段目の右のブ
ロックの左の控壁の後端、及び2段目の左のブロックの
右の控壁と、3段目のブロックの左の控壁の後端を、夫
々連結ボルトにナットで取付けた連結部材により結合
し、こうして上段と下段のブロックの控壁の後端を連結
部材で互い違いに連結し、又、請求項3によれば、ブロ
ックの左右の控壁を中心としてその左右の背面から突出
する左右2本宛の連結ボルトを利用し、例えば1段目の
左右2本宛の連結ボルトの夫々右の連結ボルトで、2段
目の左のブロックの右側の左右2本の連結ボルトの右の
連結ボルト、及び2段目の右のブロックの左側の左右2
本の連結ボルトの右の連結ボルトを、夫々ナットで取付
けた連結部材により結合し、又、2段目の右のブロック
の左右2本宛の連結ボルトの左の連結ボルトと、3段目
の左のブロックの右側の左右2本宛の連結ボルトの左の
連結ボルト、及び3段目の右のブロックの左側の左右2
本宛の連結ボルトの左の連結ボルトを、夫々ナットで取
付けた連結部材により結合し、こうして上段と下段のブ
ロックの背面を連結部材で互い違いに連結し、1段目の
ブロックの配列の上に1段宛ブロックを破り目地積みで
積み上げる毎に、互い違いに連結部材をナットで固定し
て堰堤や擁壁を構築することができる。従って、型枠な
どを用いず、ブロックを積み上げる段数が何段であって
も、又、高さが20m、或いはそれ以上に高い堰堤や擁
壁であっても極めて容易に、且つ能率的に構築でき、施
工期間を短縮できる。
As is clear from the above, according to the present invention, when a block or a retaining wall is constructed by stacking an array of blocks alternately by shifting the horizontal width of the block to 1/2, and constructing a dam or a retaining wall. According to No. 1, connecting bolts are attached to the left and right rear facing walls on the back side of the block so as to penetrate in the lateral direction.
The left side of the right retaining wall of the left block of the second stage, the left side of the right retaining wall of the same block of the first stage, and the left side of the left retaining wall of the right block of the second stage are respectively connected. Connect each end of the bolt with a connecting member that is attached with a nut, and the right side of the left retaining wall of the second block on the right and the right side of the right retaining wall of the third block on the left. , The right side of the right retaining wall of the same right block of the second stage and the right side of the left retaining wall of the right block of the third stage are connected with nuts at each end of the connecting bolts. In this way, the side walls of the retaining walls of the upper and lower blocks are alternately coupled by a coupling member in this way, and according to claim 2, using connecting bolts projecting from the rear ends of the left and right retaining walls on the back surface of the block, for example, Attach the rear end of the right retaining wall of the first block and the rear end of the left retaining wall of the second block to the connecting bolts with nuts. They are connected by a beam connecting member, and the rear end of the right retaining wall of the right block of the second stage, the rear end of the left retaining wall of the right block of the third stage, and the left block of the second stage The back wall of the right side wall and the rear end of the left side wall of the third block are connected by connecting members attached to the connecting bolts with nuts, respectively, thus connecting the back ends of the back walls of the upper and lower blocks. According to the third aspect of the present invention, the connecting bolts are connected alternately, and the left and right connecting bolts projecting from the left and right rear surfaces of the block centering on the left and right retaining walls are used. The right connecting bolt of the second connecting block is the right connecting bolt on the right side of the second block, and the right connecting bolt of the two connecting bolts is on the left side of the second block.
The connecting bolts on the right side of the connecting bolts are connected by connecting members attached with nuts, respectively, and the connecting bolts on the left side of the right and left two blocks of the right block on the second stage and the connecting bolt on the third stage Left connection bolt of the left and right connection bolts on the right side of the left block, and left and right 2 of the third block on the right side
Connect the connecting bolts on the left side of the connecting bolts for the books by connecting members attached with nuts, respectively, thus connecting the back surfaces of the upper block and the lower block alternately with the connecting members, and place them on top of the arrangement of the first block. Each time the blocks addressed to the first level are torn and piled up with joints, the connecting members can be alternately fixed with nuts to construct a dam or retaining wall. Therefore, it is extremely easy and efficient to construct a block or a retaining wall without using a formwork, regardless of the number of steps of stacking blocks, or with a height of 20 m or higher. It can be done and the construction period can be shortened.

【図面の簡単な説明】[Brief description of drawings]

【図1】請求項1のブロックの一実施例で、(A)はブ
ロックの一半は表面から、他半は裏面から見た正面図、
(B)は側面図、(C)は一部を拡大した平面図、
(D)は構築した堰堤や擁壁の側面図、(E)は構築し
た堰堤や擁壁の一部の一半は表面から、他半は裏面から
見た正面図である。
1 is an embodiment of the block of claim 1, (A) is a front view of one half of the block as seen from the front side and the other half as seen from the back side;
(B) is a side view, (C) is a partially enlarged plan view,
(D) is a side view of the constructed dam or retaining wall, and (E) is a front view of one part of the constructed dam or retaining wall as seen from the front side and the other half as seen from the back side.

【図2】請求項2のブロックの一実施例で、(A)はブ
ロックの一半は表面から、他半は裏面から見た正面図、
(B)は側面図、(C)は平面図である。
FIG. 2 is an embodiment of the block according to claim 2, wherein (A) is a front view of one half of the block as seen from the front side and the other half as seen from the back side;
(B) is a side view, and (C) is a plan view.

【図3】(A)は請求項2のブロックで構築した堰堤や
擁壁の側面図、(B)は構築した堰堤や擁壁の一部の一
半は表面から、他半は裏面から見た正面図である。
FIG. 3 (A) is a side view of the dam or retaining wall constructed by the block of claim 2, (B) is a half of the constructed dam or retaining wall as seen from the front, and the other half as seen from the back. It is a front view.

【図4】請求項3のブロックの一実施例で、(A)はブ
ロックの一半は表面から、他半は裏面から見た正面図、
(B)は側面図、(C)は一部を拡大した平面図であ
る。
FIG. 4 is an embodiment of the block according to claim 3, wherein (A) is a front view of one half of the block seen from the front side and the other half seen from the back side;
(B) is a side view and (C) is a partially enlarged plan view.

【図5】(A)は請求項3のブロックで構築した堰堤や
擁壁の側面図、(B)は構築した堰堤や擁壁の一部の一
半は表面から、他半は裏面から見た正面図である。
5 (A) is a side view of the dam or retaining wall constructed by the block of claim 3, (B) is a view of one half of the constructed dam or retaining wall from the front surface, and the other half from the back surface. It is a front view.

【符号の説明】[Explanation of symbols]

10 ブロックの面板部 11L 左の控壁 11R 右の控壁 12 面板部の左右の側縁の一方に設けた突条 13 面板部の左右の側縁の他方に設けた凹溝 14 左右の控壁の基部の上下の一方に設けた突出部 15 左右の控壁の基部の上下の他方に設けた凹部 16 左右の控壁に設けた横方向の貫通孔 17 土層 18 基礎 19 アンカー 21 連結ボルト 22 連結部材 23 連結部材 24 ナット 25 ワッシャ 26 裏込め材料 10 Block face plate portion 11L Left retaining wall 11R Right retaining wall 12 Protrusions provided on one of the left and right side edges of the face plate portion 13 Recessed groove provided on the other of the left and right side edges of the face plate portion 14 Left and right retaining walls Protrusions provided on one of the upper and lower sides of the base of the base 15 Recesses provided on the other of the upper and lower bases of the left and right bases 16 Transverse through holes provided on the left and right bases 17 Earth layer 18 Foundation 19 Anchor 21 Connecting bolt 22 Connecting member 23 Connecting member 24 Nut 25 Washer 26 Backfilling material

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成8年8月22日[Submission date] August 22, 1996

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】請求項1[Correction target item name] Claim 1

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】請求項2[Correction target item name] Claim 2

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【手続補正3】[Procedure 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0005[Correction target item name] 0005

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0005】[0005]

【発明の実施の形態】このため請求項1のコンクリート
製大形ブロックは、左右に長い横長長方形の面板部と、
この面板部の左右の側縁から内側に面板部の横幅の1/
4づゝ離れた位置を中心として面板部に対し直角で、且
つ面板部の背面と一体の左右2つの後向きの控壁を有
し、破り目地で多段に積み上げるコンクリート製大形ブ
ロックにおいて、上記左右2つの控壁に夫々横方向に連
結ボルトを貫通固定し、この各ボルトの一端部に上段の
ブロックと連結する連結部材、他端部に下段のブロック
と連結する連結部材を夫々ナットで取付けるようにした
ことを特徴とする。又、請求項2のコンクリート製大形
ブロックは、左右に長い横長長方形の面板部と、この面
板部の左右の側縁から内側に面板部の横幅の1/4づゝ
離れた位置を中心として面板部に対し直角で、且つ面板
部の背面と一体の左右2つの後向きの控壁を有し、破り
目地で多段に積み上げるコンクリート製大形ブロックに
おいて、上記左右2つの後向きの控壁の後端部に後向き
に突出するボルトを固定し、左右2つの控壁の一方のボ
ルトには上段のブロックと連結する連結部材、他方の控
壁のボルトには下段のブロックと連結する連結部材を夫
々ナットで取付けるようにしたことを特徴とする。請求
項3のコンクリート製大形ブロックは、左右に長い横長
長方形の面板部と、この面板部の左右の側縁から内側に
面板部の横幅の1/4づゝ離れた位置を中心として面板
部に対し直角で、且つ面板部の背面と一体の左右2つの
後向きの控壁を有し、破り目地で多段に積み上げるコン
クリート製大形ブロックにおいて、前記面板部の背面
の、左右の控壁の中心から左右に、面板部の横幅の1/
8づゝ離れた位置に後向きに突出する左右2本宛の連結
ボルトを固定し、この左右2本宛の連結ボルトの一方に
は上段のブロックと連結する連結部材、他方には下段の
ブロックと連結する連結部材を夫々ナットで取付けるよ
うにしたことを特徴とする。そして、請求項1,請求項
2,請求項3のどのコンクリート製大形ブロックにも、
左右の2つの控壁に、連結部材の幅よりも直径が大きい
横方向の貫通孔を開設することが好ましい。
Therefore, the large block made of concrete according to claim 1 has a horizontally long rectangular face plate portion on the left and right,
From the left and right side edges of this face plate part, inwardly of the lateral width of the face plate part
In a large concrete block that has two rear facing walls that are perpendicular to the face plate centered at a distance of 4 inches and is integrated with the back face of the face plate, and is stacked in multiple stages at a tear joint, Connect the connecting bolts through the two retaining walls in the lateral direction, and attach the connecting member that connects to the upper block to one end of each bolt and the connecting member that connects to the lower block to the other end with nuts. It is characterized by having done. Further, the large concrete block of claim 2 is centered on a horizontally long rectangular face plate portion and a position which is inwardly separated from the left and right side edges of the face plate portion by 1/4 of the lateral width of the face plate portion. In a large concrete block that has two right and left rear facing walls that are at right angles to the face plate portion and is integrated with the back surface of the face plate portion, and is stacked in multiple steps at a tear joint, the rear ends of the two left and right rear facing walls A bolt projecting rearward is fixed to one of the two parts, one of the two left and right retaining walls is connected with a connecting member that connects to the upper block, and the other retaining wall bolt is connected with a connecting member that is connected to the lower block. It is characterized in that it was installed in. The large concrete block according to claim 3 has a horizontally long rectangular face plate portion, and a face plate portion centered on a position distant from the left and right side edges of the face plate portion inward by ¼ of the lateral width of the face plate portion. In a large concrete block that has two right and left rear facing walls that are at right angles to the rear surface of the face plate part and that is stacked in multiple steps at a tear joint, the center of the left and right back walls on the back face of the face plate part From left to right, 1 / width of the face plate
Fixing the connecting bolts for the left and right two bolts protruding rearward at a distance of 8 inches, one of the connecting bolts for the two left and right bolts, the connecting member for connecting with the upper block, and the other with the lower block. The connecting members to be connected are each attached by a nut. And any of the large concrete blocks of claim 1, claim 2 and claim 3,
It is preferable to form a lateral through hole having a diameter larger than the width of the connecting member in the two left and right retaining walls.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 左右に長い横長長方形の面板部と、この
面板部の左右の側縁から内側に面板部の横幅の1/4づ
ゝ離れた位置を中心として面板部に対し直角で、且つ面
板部の背面と一体の左右2つの控壁を有し、破り目地で
多段に積み上げるコンクリート製大形ブロックにおい
て、上記左右2つの後向きの控壁に、夫々横方向に連結
ボルトを貫通固定し、この各ボルトの一端部に上段のブ
ロックと連結する連結部材、他端部に下段のブロックと
連結する連結部材を夫々ナットで取付けるようにしたこ
とを特徴とするコンクリート製大形ブロック。
1. A laterally long rectangular face plate part, which is long in the left-right direction, and a right angle with respect to the face plate part centered at a position that is inwardly separated from the left and right side edges of the face plate part by 1/4 of the lateral width of the face plate part. In a large concrete block that has two left and right retaining walls that are integral with the back surface of the face plate and that is stacked in multiple stages at break joints, connecting bolts are laterally fixed through the two rearward facing retaining walls on the left and right, A large block made of concrete, characterized in that one end of each of the bolts is connected to the upper block by a connecting member, and the other end of the bolt is connected by a connecting member with the lower block.
【請求項2】 左右に長い横長長方形の面板部と、この
面板部の左右の側縁から内側に面板部の横幅の1/4づ
ゝ離れた位置を中心として面板部に対し直角で、且つ面
板部の背面と一体の左右2つの後向きの控壁を有し、破
り目地で多段に積み上げるコンクリート製大形ブロック
において、上記左右2つの控壁の後端部に後向きに突出
するボルトを固定し、左右2つの控壁の一方のボルトに
は上段のブロックと連結する連結部材、他方の控壁のボ
ルトには下段のブロックと連結する連結部材を夫々ナッ
トで取付けるようにしたことを特徴とするコンクリート
製大形ブロック。
2. A horizontally long rectangular face plate part, which is long in the left-right direction, and a right angle with respect to the face plate part centered at a position that is inwardly separated from the left and right side edges of the face plate part by 1/4 of the lateral width of the face plate part. In a large concrete block that has two left and right rear facing walls that are integrated with the back of the face plate and is stacked in multiple steps at a break joint, fix the rearward projecting bolts to the rear ends of the two left and right facing walls. , One of the two left and right retaining walls is connected with a connecting member for connecting to the upper block, and the other retaining wall is connected with a connecting member for connecting to the lower block with nuts. Large concrete block.
【請求項3】 左右に長い横長長方形の面板部と、この
面板部の左右の側縁から内側に面板部の横幅の1/4づ
ゝ離れた位置を中心として面板部に対し直角で、且つ面
板部の背面と一体の左右2つの後向きの控壁を有し、破
り目地で多段に積み上げるコンクリート製大形ブロック
において、前記面板部の背面の、左右の控壁の中心から
左右に、面板部の横幅の1/8づゝ離れた位置に後向き
に突出する左右2本宛の連結ボルトを固定し、この左右
2本宛の連結ボルトの一方には上段のブロックと連結す
る連結部材、他方には下段のブロックと連結する連結部
材を夫々ナットで取付けるようにしたことを特徴とする
コンクリート製大形ブロック。
3. A laterally long rectangular face plate portion that is long to the left and right, and a right angle with respect to the face plate portion centered on a position that is inwardly separated from the left and right side edges of the face plate portion by 1/4 of the lateral width of the face plate portion. A large concrete block having two left and right rear facing walls that are integrated with the back surface of the face plate portion and stacked in multiple steps at a break joint. The face plate portion is located on the back side of the face plate portion from the center of the left and right holding walls to the left and right. Fix the rearwardly projecting connecting bolts to the left and right two at a position ⅛ of the lateral width of, and connect the connecting bolts to one of the left and right two connecting bolts to the upper block, and to the other Is a large concrete block characterized in that the connecting members for connecting to the lower block are each attached with a nut.
【請求項4】 請求項1から請求項3にどれか1項に記
載のコンクリート製大形ブロックにおいて、左右の2つ
の控壁に、上向き連結部材や、下向き連結部材の幅より
も直径が大きい横方向の貫通孔を開設したことを特徴と
するコンクリート製大形ブロック。
4. The large concrete block according to any one of claims 1 to 3, wherein the two left and right retaining walls have a diameter larger than the width of the upward connecting member or the downward connecting member. A large block made of concrete that has a horizontal through hole.
JP15641096A 1996-05-29 1996-05-29 Large concrete block Expired - Fee Related JP2860780B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15641096A JP2860780B2 (en) 1996-05-29 1996-05-29 Large concrete block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15641096A JP2860780B2 (en) 1996-05-29 1996-05-29 Large concrete block

Publications (2)

Publication Number Publication Date
JPH09316895A true JPH09316895A (en) 1997-12-09
JP2860780B2 JP2860780B2 (en) 1999-02-24

Family

ID=15627144

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15641096A Expired - Fee Related JP2860780B2 (en) 1996-05-29 1996-05-29 Large concrete block

Country Status (1)

Country Link
JP (1) JP2860780B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6348631B1 (en) * 2017-04-03 2018-06-27 丸栄コンクリート工業株式会社 Embankment construction
JP2018178554A (en) * 2017-04-14 2018-11-15 丸栄コンクリート工業株式会社 Establishment of embankment
CN111877265A (en) * 2020-07-15 2020-11-03 胡杨 River landscape slope protection construction method
JP2023032482A (en) * 2021-08-27 2023-03-09 金森建設株式会社 Reinforcement structure and reinforcement method of erosion control dam

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6348631B1 (en) * 2017-04-03 2018-06-27 丸栄コンクリート工業株式会社 Embankment construction
JP2018178371A (en) * 2017-04-03 2018-11-15 丸栄コンクリート工業株式会社 Establishment of embankment
JP2018178554A (en) * 2017-04-14 2018-11-15 丸栄コンクリート工業株式会社 Establishment of embankment
CN111877265A (en) * 2020-07-15 2020-11-03 胡杨 River landscape slope protection construction method
JP2023032482A (en) * 2021-08-27 2023-03-09 金森建設株式会社 Reinforcement structure and reinforcement method of erosion control dam

Also Published As

Publication number Publication date
JP2860780B2 (en) 1999-02-24

Similar Documents

Publication Publication Date Title
US6615561B2 (en) Retaining wall block
US4426176A (en) L-Shaped concrete block and method for constructing a retaining wall by such L-shaped concrete blocks
JPH08218401A (en) Block for lean type retaining wall and construction method of lean type retaining wall in which the block is used
US5123777A (en) Construction elements
JPH09316895A (en) Concrete made large block
JP3032764U (en) Large concrete block
KR102190522B1 (en) A constructure method of precast concrete structuret
JP2000328586A (en) Retaining wall
JP3960501B2 (en) Steel retaining wall and method for constructing steel retaining wall
JP2003003420A (en) Supporting member for prefabricated bridge
JP2002309596A (en) Group of blocks for retaining wall, method of forming retaining wall, and method of forming road
JP4030817B2 (en) Precast solid intersection
JPH0641993A (en) Learned retaining wall
JP3146184B2 (en) Precast foundation beam joining method
JPH01210521A (en) Building method and framing board of buried concrete structure
JPS6312174Y2 (en)
JP2009299364A (en) Harbor structure and its construction method
JP3109724B2 (en) Empty loading block for revetment and its construction method
JP3301966B2 (en) Shade concrete block
JP3561436B2 (en) Retaining wall block for planting and method of constructing retaining wall for planting using the block
JP2838485B2 (en) Concrete block
JP3110278B2 (en) Construction method of concrete block and concrete structure
JP2003342933A (en) Method for constructing swash-plate bank
JP2671942B2 (en) Pier
JP2724734B2 (en) Concrete block and retaining wall construction method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20081211

LAPS Cancellation because of no payment of annual fees