JPH09279728A - Construction method of outer wall - Google Patents

Construction method of outer wall

Info

Publication number
JPH09279728A
JPH09279728A JP8934896A JP8934896A JPH09279728A JP H09279728 A JPH09279728 A JP H09279728A JP 8934896 A JP8934896 A JP 8934896A JP 8934896 A JP8934896 A JP 8934896A JP H09279728 A JPH09279728 A JP H09279728A
Authority
JP
Japan
Prior art keywords
wall
board
panel
hardware
upward
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8934896A
Other languages
Japanese (ja)
Other versions
JP3120143B2 (en
Inventor
Yoshio Takita
吉男 滝田
Hiroshi Katsuharu
博 勝治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP08089348A priority Critical patent/JP3120143B2/en
Publication of JPH09279728A publication Critical patent/JPH09279728A/en
Application granted granted Critical
Publication of JP3120143B2 publication Critical patent/JP3120143B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To ensure a clearance and improve skeleton precision by building a half PC panel between existing outer walls as a facing material, fixing the upper part of the PC panel by a head connecting hardware, and placing after- placing concrete in the inside of the PC panel. SOLUTION: One raised part of an upward U-shaped bent hardware 10 on the upper part of a half PC panel 4 is fixed to an existing outer wall 2 by an anchor bolt 9. A downward U-shaped bent hardware 11 is mounted on the raised part on the upper part of a PC panel 6. A lengthy bolt 13 is inserted through a cap nut mounted on the downward bent hardware 11 and the other raised part of the upward bent hardware 10. The insert length of the bolt 13 is regulated between the exiting outer wall 2 and the PC panel 6 to ensure a clearance 3, and the lengthy bolt 13 is then fixed to the other raised part of the upward bent hardware 10. Vertical and horizontal reinforcements 17 are arranged on the protruding side of the truss main bar 5 on the inside of the half PC panel 4 to assemble a form 18, and after-placing concrete is placed therein. Further, after solidification, the form 18 is released, and an outer wall by the composed wall is constructed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、建物の外壁の構築
工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an outer wall of a building.

【0002】[0002]

【従来の技術】建物の外壁1を構築する場合で、例えば
1期工事に引き続いて2期工事を行うとき、1期工事で
既に構築が終了している既存外壁2との間には図7に示
すように外壁相互の接触を防ぐため、エキスパンション
・ジョイント(EXP.J)のための所定のクリアラン
ス3である160 mmを確保する必要がある。
2. Description of the Related Art In the case of constructing an outer wall 1 of a building, for example, when a second-stage construction is carried out following a first-stage construction, the construction is completed between the existing outer wall 2 already constructed in the first-stage construction as shown in FIG. In order to prevent the outer walls from contacting each other as shown in Fig. 3, it is necessary to secure a predetermined clearance 3 of 160 mm for the expansion joint (EXP.J).

【0003】このようにエキスパンション・ジョイント
(EXP.J)のための所定のクリアランス3を確保す
る必要のある場合、従来は既存外壁2側に面する型枠は
スタイロフォームなどでクリアランス寸法の厚さのもの
に作って既存外壁2に当接させた状態に組み、このスタ
イロフォームなどによる型枠の部分はコンクリート打
設、固化後に、ガソリンなどで溶かして脱型し、これに
より既存外壁2と新たに構築した外壁1との間にクリア
ランス3を確保していた。
When it is necessary to secure a predetermined clearance 3 for the expansion joint (EXP.J), the mold facing the existing outer wall 2 is conventionally made of Styrofoam or the like and has a clearance dimension of thickness. It is made into one and assembled in a state of contacting the existing outer wall 2, and the part of the formwork made of Styrofoam etc. is concrete-cast, solidified and then melted with gasoline etc. The clearance 3 was secured between the outer wall 1 and the outer wall 1.

【0004】[0004]

【発明が解決しようとする課題】1期工事で構築が終了
している既存の建物の外壁との間に所定のクリアランス
を確保して2期工事の外壁を施工しようとする場合で、
1期工事の建物に既に居住しているときは、住民の安全
確保の点からスタイロフォームなどを用いる型枠工法を
適用することは困難である。
[Problems to be Solved by the Invention] In the case of attempting to construct the outer wall of the second construction by securing a predetermined clearance with the outer wall of the existing building whose construction is completed in the first construction,
If you are already living in the first-stage construction building, it is difficult to apply the formwork method that uses styrofoam, etc. from the viewpoint of ensuring the safety of residents.

【0005】本発明は前記従来例の不都合を解消し、例
えば1期工事に続く2期工事で1期工事側の建物に既に
居住している場合でも、新たに構築しようする外壁と既
存の外壁との間に所定のクリアランスを容易かつ安全に
確保でき、また、片面側からしか施工できない外壁にも
有効で、耐力にも優れた合成壁を構築できる外壁の構築
工法を提供することにある。
The present invention eliminates the inconveniences of the above-mentioned conventional example, and for example, even if the user is already living in the building on the first-stage construction side in the second-stage construction following the first-stage construction, the outer wall to be newly constructed and the existing outer wall It is an object of the present invention to provide an outer wall construction method capable of easily and safely securing a predetermined clearance between the outer wall and the outer wall, effective for an outer wall that can be constructed only from one side, and capable of constructing a composite wall having excellent proof stress.

【0006】[0006]

【課題を解決するための手段】本発明は前記目的を達成
するため、トラス筋の一部を埋め込んだハーフPC板を
外壁材として既存の建物の外壁の間に所定の間隔をおい
て、PC板側を既存外壁側に位置させて建て込み、前記
PC板の上部を既存外壁に頭つなぎ金物で固定し、ハー
フPC板の内側に後打ちコンクリートを打設して合成壁
を構築すること、および、頭つなぎ金物は既存外壁にア
ンカーボルトで固定した上向きのコ字形の曲げ金物と、
ハーフPC板の上部に取り付ける下向きのコ字形の曲げ
金物と、前記下向きの曲げ金物の上部に取り付けた袋ナ
ットと、該袋ナットと前記上向きのコ字形の曲げ金物と
を結合するボルトとで構成することを要旨とするもので
ある。
In order to achieve the above-mentioned object, the present invention uses a half-PC board having a part of truss reinforcement embedded therein as an outer wall material with a predetermined space between the outer walls of an existing building. The board side is located on the existing outer wall side and built, the upper part of the PC board is fixed to the existing outer wall with a head tie metal, and the post-cast concrete is placed inside the half PC board to construct a composite wall, And the head tie hardware is an upward U-shaped bent hardware fixed to the existing outer wall with anchor bolts,
Consists of a downward U-shaped bending metal fitting attached to the upper part of the half PC board, a cap nut attached to the upper part of the downward bending metal fitting, and a bolt connecting the cap nut and the upward U-shaped bending metal fitting. The main point is to do.

【0007】請求項1記載の本発明によれば、既存の建
物の外壁の側にPC板を位置させてハーフPC板を建て
込み、このPC板を外壁の外側面とすることで、既存外
壁との間に型枠を組む必要がなく、エキスパンション・
ジョイント(EXP.J)のための所定のクリアランス
寸法である160 mmを既存外壁との間に容易に確保でき
る。
According to the first aspect of the present invention, the half-PC board is built by locating the PC board on the side of the outer wall of the existing building, and the PC board serves as the outer surface of the outer wall. No need to assemble a formwork with
A predetermined clearance of 160 mm for the joint (EXP.J) can be easily secured between the existing outer wall.

【0008】また、このハーフPC板の内側に後打ちの
コンクリートを打設して合成壁とすることで耐力を得る
ことができ、躯体精度が向上する。
[0008] Further, by placing a post-cast concrete on the inside of the half PC plate to form a composite wall, it is possible to obtain a proof stress and improve the skeleton accuracy.

【0009】請求項2記載の本発明によれば、前記作用
に加えて、ハーフPC板は既存外壁に頭つなぎ金物でそ
の上部を固定するから、安定した状態で後打ちコンクリ
ートを打設できる。
According to the second aspect of the present invention, in addition to the above-mentioned action, the half PC plate has its upper portion fixed to the existing outer wall by the head tie metal, so that the post-cast concrete can be poured in a stable state.

【0010】そして、頭つなぎ金物は既存外壁にアンカ
ーボルトで固定した上向きのコ字形の曲げ金物と、ハー
フPC板の上部に取り付ける下向きのコ字形の曲げ金物
と、前記下向きの曲げ金物の上部に取り付けた袋ナット
と、該袋ナットと前記上向きのコ字形の曲げ金物とを結
合するボルトとで構成するから、簡単に固定でき、所定
のクリアランス確保の間隔調整も容易で、後打ちコンク
リート打設後の撤去も簡単である。
The head tie metal is attached to the existing outer wall with an anchor bolt and has an upward U-shaped bending metal fitting, a downward U-shaped bending metal fitting attached to the upper part of the half PC board, and an upper portion of the downward bending metal fitting. Since it is composed of the attached cap nut and the bolt connecting the cap nut and the upward U-shaped bent metal fitting, it can be easily fixed, and the interval for securing a predetermined clearance can be easily adjusted. Later removal is also easy.

【0011】[0011]

【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1は本発明の外壁の構築工
法の実施形態を示す縦断側面図で、本発明の工法は例え
ば1期工事で既に構築されている既存外壁2との間に所
定のクリアランス3を確保して2期工事で新たに外壁1
を施工する場合に適用するものである。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a vertical cross-sectional side view showing an embodiment of a construction method for an outer wall of the present invention. In the construction method of the present invention, for example, a predetermined clearance 3 is secured between an existing outer wall 2 already constructed in the first construction phase. Outer wall 1 newly constructed in the second phase
It is applied when constructing.

【0012】図中4は外壁1の外側面を構成するハーフ
PC板で、これは図6に示すようなトラス筋5を主筋と
して、該トラス筋5の複数を適宜間隔で配列してPC板
6に下方の約半分を埋め込んだものである。
Reference numeral 4 in the drawing denotes a half PC board which constitutes the outer side surface of the outer wall 1. This is a PC board in which a plurality of truss bars 5 are arranged at appropriate intervals with the truss bars 5 as shown in FIG. It is the one in which the lower half of 6 is embedded.

【0013】このPC板6の端部は、外壁1として建て
込んだとき、1階の下部に位置するものはフラットに形
成するが、2階以上の外壁1を構成するものとして上方
に順次建て込んだとき、上下の接合部は立ち上がり部7
を設けて段違い部に形成した。
When the PC board 6 is built as the outer wall 1, the one located at the lower part of the first floor is formed flat, but the outer wall 1 of the second floor and above is constructed in order upward. When assembled, the upper and lower joints are
Was formed to form a stepped portion.

【0014】図2はハーフPC板4を外壁1として建て
込んだときに、その上部を既存外壁2に固定する頭つな
ぎ金物8を示し、該頭つなぎ金物8は既存外壁2にアン
カーボルト9で固定した上向きのコ字形の曲げ金物10
と、ハーフPC板4の上部に取り付ける下向きのコ字形
の曲げ金物11と、前記下向きの曲げ金物11の上部に取り
付けた袋ナット12と、該袋ナット12と前記上向きのコ字
形の曲げ金物10とを結合する長尺ボルト13とで構成する
FIG. 2 shows a head tie metal 8 for fixing the upper part of the half PC board 4 to the existing outer wall 2 when the half PC board 4 is built as the outer wall 1. The head tie metal 8 is attached to the existing outer wall 2 by an anchor bolt 9. Fixed upward U-shaped bent hardware 10
A downward bent U-shaped bending metal fitting 11 attached to the upper part of the half PC board 4, a cap nut 12 mounted on the downward bending metal fitting 11, the cap nut 12 and the upward U-shaped bending metal fitting 10. Consists of a long bolt 13 for connecting and

【0015】次にかかるハーフPC板4を用いて合成壁
による外壁1の施工方法を説明する。ハーフPC板4を
PC板6の側を外側にして既存外壁2との間に所定(16
0 mm)のクリアランス3を確保して建て込む。このと
き、PC板6の下部は図4にも示すようにアングル材14
で外側を1階の床部分に固定する。
Next, a method of constructing the outer wall 1 with a synthetic wall using the half PC board 4 will be described. The half PC board 4 is placed between the existing outer wall 2 and the PC board 6 side outside (16
Secure a clearance of 0 mm) and build it. At this time, as shown in FIG.
Secure the outside to the floor on the first floor.

【0016】ハーフPC板の上部は、PC板6を既存外
壁2に頭つなぎ金物8で固定する。固定方法は上向きの
コ字形の曲げ金物10の一方の立ち上がり部をアンカーボ
ルト9で既存外壁2に固定し、PC板6の上部の立ち上
がり部7に下向きのコ字形の曲げ金物11を被せるように
して取り付ける。
On the upper part of the half PC board, the PC board 6 is fixed to the existing outer wall 2 by a head tie hardware 8. The fixing method is to fix one rising part of the upward U-shaped bending metal fitting 10 to the existing outer wall 2 with the anchor bolt 9 and cover the rising part 7 at the upper part of the PC board 6 with the downward U-shaped bending metal fitting 11. To install.

【0017】次に下向きのコ字形の曲げ金物11に取り付
けてある袋ナット12と上向きのコ字形の曲げ金物10の他
方の立ち上がり部に長尺ボルト13を挿通し、既存外壁2
とPC板6との間に所定のクリアランス3が確保される
ように長尺ボルト13の挿通長さを調整した後、ナット15
とワッシャー16で長尺ボルト13を上向きのコ字形の曲げ
金物10の他方の立ち上がり部に固定する。
Next, a long bolt 13 is inserted through the cap nut 12 attached to the downward U-shaped bending metal fitting 11 and the other rising portion of the upward U-shaped bending metal fitting 10, and the existing outer wall 2 is inserted.
After adjusting the insertion length of the long bolt 13 so that a predetermined clearance 3 is secured between the PC plate 6 and the PC plate 6, the nut 15
Then, the long bolt 13 is fixed to the other rising portion of the upward U-shaped bending hardware 10 with the washer 16.

【0018】これにより、既存外壁2との間に所定のク
リアランス3が確保された状態でPC板6が建て込まれ
る。
As a result, the PC board 6 is built in with the predetermined clearance 3 secured between it and the existing outer wall 2.

【0019】そして、ハーフPC板4の内側のトラス主
筋5が突出している側に、さらに縦横筋17などを配筋
し、型枠18を組み、この型枠18内に後打ちコンクリート
を打設すれば、後打ちコンクリートの固化後、型枠18を
脱型すればこの後打ちコンクリートとハーフPC板4と
で合成壁による外壁1が構築される。この場合、脱型は
外壁1の内側の部分だけで行えばよいから、既存外壁1
との間に160 mm程度の隙間しか存在しなくても問題はな
い。
Then, vertical and horizontal reinforcements 17 and the like are further arranged on the side where the truss main reinforcements 5 project inside the half PC board 4, a formwork 18 is assembled, and post-cast concrete is placed in the formwork 18. Then, after the post-cast concrete is solidified, the mold 18 is removed from the mold, and the post-cast concrete and the half PC board 4 form the outer wall 1 made of a composite wall. In this case, since the demolding may be performed only on the inner part of the outer wall 1, the existing outer wall 1
There is no problem if there is only a gap of about 160 mm between and.

【0020】建物の2階以上の部分は、図4に示すよう
にハーフPC板4のPC板6の立ち上がり部7を相互に
噛み合わせて結合固定する。この場合、図3に示したよ
うに立ち上がり部7の上面にエサフォーム19を取り付け
ておくことで、後打ちコンクリートを打設したときに、
立ち上がり部7の相互の噛み合わせ部分からコンクリー
トが外に漏れだすことを防止できる。
As shown in FIG. 4, the rising portions 7 of the PC plates 6 of the half PC plate 4 are meshed with each other and fixedly connected to each other on the second floor and above of the building. In this case, as shown in FIG. 3, by attaching the Esaform 19 to the upper surface of the rising portion 7, when the post-cast concrete is placed,
It is possible to prevent concrete from leaking out from the interlocking portions of the rising portions 7.

【0021】[0021]

【発明の効果】以上述べたように本発明の外壁の構築工
法は、例えば1期工事に続く2期工事で1期工事側の建
物に既に居住している場合でも、新たに構築しようする
外壁と既存の外壁との間に型枠を組む必要がなく、ハー
フPC板を所定間隔で建て込むだけでよいから、所定の
クリアランスを容易かつ安全に確保でき、また、片面側
からしか施工できない外壁にも有効で、さらに、ハーフ
PC板と後打ちコンクリートとの合成により外壁を構築
できるから耐力にも優れ、躯体精度の向上が図れるもの
である。
As described above, the construction method of the outer wall of the present invention is to construct a new outer wall even if the building on the side of the first construction is already living in the second construction following the first construction. Since it is not necessary to assemble a formwork between the outer wall and the existing outer wall, and only half PC boards need to be built at a predetermined interval, the predetermined clearance can be easily and safely secured, and the outer wall can be installed only from one side. It is also effective for the above, and since the outer wall can be constructed by synthesizing the half-PC board and the post-cast concrete, the proof strength is also excellent and the skeleton accuracy can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の外壁の構築工法の実施形態を示す縦断
側面図である。
FIG. 1 is a vertical sectional side view showing an embodiment of a construction method for an outer wall of the present invention.

【図2】本発明の外壁の構築工法で使用する頭つなぎ金
物の側面図である。
FIG. 2 is a side view of the head tie metal used in the outer wall construction method of the present invention.

【図3】本発明の外壁の構築工法の実施形態を示す上部
の側面図である。
FIG. 3 is a side view of the upper portion showing the embodiment of the construction method for the outer wall of the present invention.

【図4】本発明の外壁の構築工法によるハーフPC板の
固定方法の縦断側面図である。
FIG. 4 is a vertical cross-sectional side view of a method of fixing a half PC board by a construction method of an outer wall of the present invention.

【図5】本発明の外壁の構築工法で使用するハーフPC
板の斜視図である。
FIG. 5: Half PC used in the construction method of the outer wall of the present invention
It is a perspective view of a board.

【図6】本発明の外壁の構築工法で使用するハーフPC
板に配筋するトラス筋の斜視図である。
FIG. 6 is a half PC used in the construction method of the outer wall of the present invention
It is a perspective view of the truss muscle arrange | positioned to a board.

【図7】所定のクリアランスを確保して構築された外壁
の縦断側面図である。
FIG. 7 is a vertical sectional side view of an outer wall constructed with a predetermined clearance secured.

【符号の説明】[Explanation of symbols]

1…外壁 2…既存外壁 3…クリアランス 4…ハーフPC板 5…トラス筋 6…PC板 7…立ち上がり部 8…頭つなぎ金物 9…アンカーボルト 10…上向きのコ字形
の曲げ金物 11…下向きのコ字形の曲げ金物 12…袋ナット 13…長尺ボルト 14…アングル材 15…ナット 16…ワッシャー 17…縦横筋 18…型枠 19…エサフォーム
1 ... Outer wall 2 ... Existing outer wall 3 ... Clearance 4 ... Half PC plate 5 ... Truss muscle 6 ... PC plate 7 ... Rising part 8 ... Head connecting hardware 9 ... Anchor bolt 10 ... Upward U-shaped bending hardware 11 ... Downward U B-shaped bent hardware 12… Bag nut 13… Long bolt 14… Angle material 15… Nut 16… Washer 17… Vertical / horizontal streak 18… Form 19… Esaform

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 トラス筋の一部を埋め込んだハーフPC
板を外壁材として既存の建物の外壁の間に所定の間隔を
おいて、PC板側を既存外壁側に位置させて建て込み、
前記PC板の上部を既存外壁に頭つなぎ金物で固定し、
ハーフPC板の内側に後打ちコンクリートを打設して合
成壁を構築することを特徴とする外壁の構築工法。
1. A half PC in which a part of truss muscle is embedded.
With the board as the outer wall material, with a predetermined gap between the outer walls of the existing building, the PC board side is positioned on the existing outer wall side and built in.
Fix the upper part of the PC board to the existing outer wall with a head tie hardware,
A construction method for outer walls, in which post-cast concrete is placed inside the half-PC board to construct a composite wall.
【請求項2】 頭つなぎ金物は既存外壁にアンカーボル
トで固定した上向きのコ字形の曲げ金物と、ハーフPC
板の上部に取り付ける下向きのコ字形の曲げ金物と、前
記下向きの曲げ金物の上部に取り付けた袋ナットと、該
袋ナットと前記上向きのコ字形の曲げ金物とを結合する
ボルトとで構成する請求項1記載の外壁の構築工法。
2. The head tie hardware is an upward U-shaped bent hardware fixed to an existing outer wall with anchor bolts, and a half PC.
A downward bending U-shaped metal fitting attached to the upper part of the plate, a cap nut attached to the upper portion of the downward bending metal fitting, and a bolt connecting the cap nut and the upward U-shaped bending metal fitting. Item 1. A construction method for an outer wall according to item 1.
JP08089348A 1996-04-11 1996-04-11 Exterior wall construction method Expired - Fee Related JP3120143B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08089348A JP3120143B2 (en) 1996-04-11 1996-04-11 Exterior wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08089348A JP3120143B2 (en) 1996-04-11 1996-04-11 Exterior wall construction method

Publications (2)

Publication Number Publication Date
JPH09279728A true JPH09279728A (en) 1997-10-28
JP3120143B2 JP3120143B2 (en) 2000-12-25

Family

ID=13968214

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08089348A Expired - Fee Related JP3120143B2 (en) 1996-04-11 1996-04-11 Exterior wall construction method

Country Status (1)

Country Link
JP (1) JP3120143B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677532A (en) * 2017-03-03 2017-05-17 李侠 Tie fixing piece for outer wall exterior formwork and floor formwork

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677532A (en) * 2017-03-03 2017-05-17 李侠 Tie fixing piece for outer wall exterior formwork and floor formwork

Also Published As

Publication number Publication date
JP3120143B2 (en) 2000-12-25

Similar Documents

Publication Publication Date Title
HU213816B (en) Concrete form walls
JP2002339451A (en) Precast concrete slab, its manufacturing method, precast concrete slab for balcony, and outer thermal insulating structure
JPH09279728A (en) Construction method of outer wall
JPH11270146A (en) Reinforcement engineering method of existing beam body
JPH09295313A (en) Manufacture of immersed tube
JPH0972028A (en) Connecting tool for form panel
JP3833791B2 (en) Concrete foundation formwork
JP2000129953A (en) Fitting method of base isolation device to foundation
JP3014987U (en) Reinforcement equipment for existing buildings
JPS5926741B2 (en) Foundation construction equipment
JPS6195127A (en) Concrete formwork process
JPH03275839A (en) Connection construction of reinforced concrete column and steel beam
JP2723418B2 (en) Formwork for foundation construction
JPH0444678Y2 (en)
JP3119117B2 (en) PC version driving formwork and formwork method
JPS5929078Y2 (en) Concrete pouring equipment
JPH0261238A (en) Steel plate concrete method
JPH0750489Y2 (en) Concrete connection equipment
JP2512327Y2 (en) Concrete formwork for underground beams
JPS59177445A (en) Semi-pc slab construction method and semi-pc panel used therein
JPS6239248Y2 (en)
JPH061000B2 (en) Heat insulation molding plate
JP2545296Y2 (en) PC folded beam formwork
JPH026901B2 (en)
JPS60233253A (en) Construction of concrete floor panel

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees