JPH09268580A - Construction method of retaining wall - Google Patents

Construction method of retaining wall

Info

Publication number
JPH09268580A
JPH09268580A JP9772496A JP9772496A JPH09268580A JP H09268580 A JPH09268580 A JP H09268580A JP 9772496 A JP9772496 A JP 9772496A JP 9772496 A JP9772496 A JP 9772496A JP H09268580 A JPH09268580 A JP H09268580A
Authority
JP
Japan
Prior art keywords
embedded
decorative
plate
retaining wall
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9772496A
Other languages
Japanese (ja)
Inventor
Nobuyuki Sakamoto
伸之 坂本
Shigenobu Tanaka
重信 田中
Seiichi Maruyama
誠一 丸山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOUYOKO GIKEN KK
Toyoko Giken Co Ltd
Sango Co Ltd
Sango KK
Original Assignee
TOUYOKO GIKEN KK
Toyoko Giken Co Ltd
Sango Co Ltd
Sango KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOUYOKO GIKEN KK, Toyoko Giken Co Ltd, Sango Co Ltd, Sango KK filed Critical TOUYOKO GIKEN KK
Priority to JP9772496A priority Critical patent/JPH09268580A/en
Publication of JPH09268580A publication Critical patent/JPH09268580A/en
Pending legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

PROBLEM TO BE SOLVED: To make it possible to eliminate the need for a disassembling work of a form after the placement of concrete and enhance the outward appearance or strength of a retaining wall. SOLUTION: An embedded weir plate 2 is erected on a base part of foundation concrete 33 of a retaining wall on the natural ground side while a decorated weir plate 3 is erected on the foundation concrete 33 at the opposed position separated with a specified spacing from the embedded weir plate 2. The space between the embedded weir plate 2 and the decorated weir plate 3, which are erected as opposed, is connected with a connecting metal fitting 4, thereby constructing a concrete placement form 1 where concrete is placed in the form. PC embedded panels 10 are laid out every where on the upper and lower and right and left areas on the embedded weir plate 2 while each of the PC embedded panels 10 is connected with a connecting metal fitting 13. Decorated panels 15 are continuously laid out on the decorated weir plate 3 every where on the upper and lower and right and left areas white each decorated panel 15 is connected with a connecting reinforcing bar 18.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、切土あるいは盛土
などによる地山の急斜面等の土の崩壊を防止する擁壁の
施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a retaining wall for preventing the collapse of soil such as steep slopes of natural ground due to cut soil or embankment.

【0002】[0002]

【従来の技術】切土や盛土などをして設けられた地山の
急斜面では斜面の崩壊を防止するために、コンクリート
などで形成された擁壁を設ける場合がある。従来、上記
の擁壁を設ける場合は、地山の斜面に沿って予め基礎コ
ンクリートを打設しておき、その基礎コンクリート部分
に、2枚の堰板を所定間隔(成形する擁壁の幅に対応さ
せた間隔)離して設けた型枠に、コンクリートを打設し
て形成している。かかる型枠成形時には、相対する堰板
間にセパレータを設けて、各堰板の間が所定間隔に保た
れるようにしている。そして、地山の斜面側の堰板面と
斜面との間に長さ調節可能な油圧ジャッキ等を掛け渡し
て、打設したコンクリートが硬化するまで、型枠が倒れ
ないように支えている。擁壁の施工後は、擁壁の裏側に
土砂などを埋め戻す。
2. Description of the Related Art In some cases, a steep slope of a natural ground formed by cutting or embankment may be provided with a retaining wall made of concrete or the like in order to prevent the slope from collapsing. Conventionally, when the above retaining wall is provided, basic concrete is placed in advance along the slope of the natural ground, and two dam plates are arranged at predetermined intervals (within the width of the retaining wall to be formed) on the basic concrete portion. It is formed by placing concrete on the molds that are spaced apart (corresponding intervals). At the time of molding the mold, a separator is provided between the opposing barrier plates so that the barrier plates are kept at a predetermined distance. A hydraulic jack or the like having an adjustable length is laid between the dam plate surface and the slope on the slope side of the ground to support the formwork so as not to fall until the cast concrete is hardened. After constructing the retaining wall, backfill the retaining wall with earth and sand.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記従来の型
枠は、コンクリートが硬化した後に解体する必要があり
手間のかかるものであった。また、解体した型枠は廃材
として処分されるものも多くあり、廃棄物の減少が求め
られているなか、好ましいものではなかった。さらに
は、型枠工事のような、作業者による手作業が多くしか
も熟練を要する作業に対する、作業能率および精度の向
上を図ることが求められている。そこで、本発明の擁壁
の施工方法は、埋込み堰板と化粧堰板を連結金具で連結
して型枠を成形し、コンクリート打設後に型枠の解体作
業を要しないとともに、埋込み堰板と化粧堰板を容易か
つ確実に連結することができる擁壁の施工方法を提供す
ることを目的とする。また、擁壁の美観や強度を向上さ
せることができる擁壁の施工方法を提供することを目的
とする。
However, the above-mentioned conventional formwork is troublesome because it needs to be dismantled after the concrete is hardened. In addition, many of the dismantled molds are disposed of as waste materials, which is not preferable while the reduction of waste is required. Furthermore, it is required to improve work efficiency and accuracy for work that requires a lot of skill and is manually performed by a worker, such as formwork. Therefore, the method for constructing the retaining wall of the present invention is to form a form by connecting the embedded weir plate and the decorative weir plate with connecting fittings, and without disassembling the form frame after concrete placement, An object of the present invention is to provide a method for constructing a retaining wall that can easily and surely connect decorative barrier plates. Moreover, it aims at providing the construction method of a retaining wall which can improve the aesthetics and strength of a retaining wall.

【0004】[0004]

【課題を解決するための手段】本発明の擁壁の施工方法
は上記課題を解決したもので、土砂の崩壊防止などのた
めに地山の斜面等に沿ってコンクリート製の擁壁を構築
する施工方法であって、コンクリート打設面の適宜位置
にネジ孔を有するPC埋込みパネルを上下,左右に連続
配置させるとともに、各PC埋込みパネルを連結部材で
連結させた埋込み堰板と、表面に化粧模様を施し背面の
適宜位置にネジ孔を有する化粧パネルを上下,左右に連
続配置するとともに各化粧パネルを連結部材で連結させ
た化粧堰板とを所定間隔で相対させるとともに、化粧堰
板と埋込み堰板とのネジ孔に連結金具の両端をネジ止め
して両堰板を連結し、化粧堰板と埋込み堰板との間にコ
ンクリートを打設して、化粧堰板と埋込み堰板とを打設
したコンクリート中に埋め殺しにして一体とし、強度の
高い擁壁を構築するとともに、コンクリート打設後の型
枠解体作業が不要になるようにした。
The method for constructing a retaining wall of the present invention has solved the above-mentioned problems, and a retaining wall made of concrete is constructed along the slope of a natural ground to prevent the collapse of sediment. It is a construction method, in which the PC embedding panels having screw holes at appropriate positions on the concrete placing surface are continuously arranged vertically and horizontally, and the embedding dam plate in which each PC embedding panel is connected by a connecting member and the makeup on the surface A decorative panel with a pattern and screw holes at appropriate positions on the back is arranged vertically and horizontally, and at the same time, it is made to face the decorative barrier plate in which each decorative panel is connected by a connecting member, and the decorative barrier plate is embedded. Both ends of the connecting metal fittings are screwed into the screw holes with the weir plate to connect both weir plates, and concrete is placed between the decorative weir plate and the embedded weir plate to connect the decorative weir plate and the embedded weir plate. Placed concrete An integral in the killing buried, with building a high strength retaining wall, and so mold dismantling of concrete after casting becomes unnecessary.

【0005】また、埋込み堰板と化粧堰板を連結する連
結金具は、断面略く字形に弾性変形されるとともにその
折り曲げ線に対して対称位置にそれぞれ長孔を設けた薄
鋼板と、外端を化粧堰板と埋込み堰板のネジ孔にネジ止
めする2本の連結棒とから構成し、2本の連結棒の内端
側を断面略く字形に曲げられた薄鋼板の2つの長孔に挿
入して薄鋼板の弾性力により2本の連結棒を圧着させる
ようにして、容易に埋め込み堰板と化粧堰板との連結作
業を行えるようにしたさらに、埋込み堰板の複数箇所に
排水口を設け、各排水口から擁壁の厚さ方向の中程に向
かって下方に傾斜する第1排水パイプを設け、各第1排
水パイプの先端を、埋込み堰板と化粧堰板との間の任意
位置を上から下に向かうように配置された補強パイプの
一端に連結し、各補強パイプの下端を、埋込み堰板と化
粧堰板との間の下部から化粧堰板の下部に向かって下方
に傾斜する第2排水パイプの後端に連結し、第1排水パ
イプと第2排水パイプを補強パイプを介して連通するよ
うにして、擁壁の背面に溜まる水を排水できるようにし
たり、埋込み堰板と化粧堰板の下端を基礎コンクリート
用の鉄筋に固定してコンクリート打設用型枠の強度を向
上させるようにした。
Further, the connecting metal fitting for connecting the embedded weir plate and the decorative weir plate is elastically deformed into a substantially V-shaped cross section, and a thin steel plate provided with elongated holes at symmetrical positions with respect to the bending line, and an outer end. Is composed of a decorative dam plate and two connecting rods screwed into the screw holes of the embedded dam plate, and two long holes of a thin steel plate in which the inner end sides of the two connecting rods are bent into a substantially V-shaped cross section. It is inserted into the base and the two connecting rods are crimped by the elastic force of the thin steel plate so that the connecting work between the embedded dam plate and the decorative dam plate can be easily performed. A first drainage pipe that is provided with a mouth and is inclined downward from each drainage port toward the middle of the thickness of the retaining wall is provided, and the tip of each first drainage pipe is placed between the embedded weir plate and the decorative weir plate. Connect any position of the to one end of the reinforcement pipe arranged from the top to the bottom, The lower end of the strong pipe is connected to the rear end of the second drainage pipe that inclines downward from the lower portion between the embedded barrier plate and the decorative barrier plate toward the lower part of the decorative barrier plate, and the first drainage pipe and the second drainage pipe are connected. By connecting the pipes through the reinforcing pipes, the water that accumulates on the back of the retaining wall can be drained, or the lower ends of the embedded weir plate and decorative weir plate are fixed to the reinforcing bars for basic concrete for concrete placement. The strength of the formwork was improved.

【0006】[0006]

【発明の実施の形態】本発明の擁壁の施工方法の実施の
形態を図1〜図6により説明する。切土や盛土などをし
て設けられた地山の斜面に構築されるコンクリート製の
擁壁を施工する擁壁用のコンクリート打設用型枠1は、
擁壁の基礎コンクリート33の地山側の基部に、埋込み
堰板2が起立させられているとともに、埋込み堰板2か
ら所定間隔離した相対する位置の基礎コンクリート33
上に化粧堰板3が起立させられ、相対して起立させられ
た埋込み堰板2と化粧堰板3との間が連結金具4で連結
されている。また、埋込み堰板2と化粧堰板3の下端が
基礎コンクリート用の鉄筋に連結されているとともに、
下端を基礎コンクリート用の鉄筋に連結した内部鉄筋3
4が埋込み堰板2と化粧堰板3の間の上下方向に沿って
配筋されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a retaining wall construction method of the present invention will be described with reference to FIGS. The concrete pouring formwork 1 for a retaining wall for constructing a concrete retaining wall constructed on the slope of the natural ground provided by cutting and embankment,
The embedded weir plate 2 is erected at the base of the retaining wall foundation concrete 33 on the side of the natural ground, and the foundation concrete 33 at the opposite position is separated from the embedded weir plate 2 by a predetermined distance.
The makeup barrier plate 3 is erected on the upper side, and the embedded barrier plate 2 and the makeup barrier plate 3 which are erected oppositely are connected by a connecting fitting 4. Further, the lower ends of the embedded dam plate 2 and the decorative dam plate 3 are connected to the reinforcing bars for the basic concrete,
Inner rebar with lower end connected to rebar for foundation concrete 3
4 are arranged along the vertical direction between the embedded weir plate 2 and the decorative weir plate 3.

【0007】図2に示すように、基礎コンクリート33
の地山側の基部に起立させられた埋込み堰板2は、例え
ばコンクリートで略長方形状に形成されたPC埋込みパ
ネル10が上下,左右に連続配置されているとともに、
各PC埋込みパネル10が連結部材として上下方向に配
置された連結鉄筋13によって相互に連結されている。
なお、PC埋込みパネル10は、上下位置に配置される
各PC埋込みパネル10の端部をずらして配置すること
により、各PC埋込みパネル10を強固に連結できるよ
うにしている。なお、各PC埋込みパネル10を連結し
ている連結鉄筋13の下端が基礎コンクリート用の鉄筋
に溶接などにより固定されて埋込み堰板2が連結鉄筋1
3を介して基礎コンクリート33に固定されている。こ
のPC埋込みパネル10は、コンクリート、レジンコン
クリート、FRP、GRCから選ばれた1種により形成
することができ、あらかじめ工場などで成形されて寸法
精度の向上などが図られている。なお、PC埋込みパネ
ル10の形状は略長方形状に限るものではなく、略H形
状などに形成することも可能である。
As shown in FIG. 2, the foundation concrete 33
In the embedding dam plate 2 erected at the base on the natural ground side, for example, PC embedding panels 10 formed of concrete in a substantially rectangular shape are arranged vertically and horizontally, and
The PC-embedded panels 10 are connected to each other by connecting rebars 13 arranged vertically as connecting members.
The PC-embedded panels 10 are arranged so that the end portions of the PC-embedded panels 10 arranged at the upper and lower positions are offset from each other so that the PC-embedded panels 10 can be firmly connected to each other. In addition, the lower end of the connecting reinforcing bar 13 connecting the respective PC embedding panels 10 is fixed to the reinforcing bar for the basic concrete by welding or the like so that the embedding dam plate 2 is connected to the reinforcing bar
It is fixed to the foundation concrete 33 through 3. The PC-embedded panel 10 can be formed of one kind selected from concrete, resin concrete, FRP, and GRC, and is molded in advance in a factory or the like to improve dimensional accuracy. It should be noted that the shape of the PC-embedded panel 10 is not limited to the substantially rectangular shape, but may be formed in a substantially H shape or the like.

【0008】図3に示すように、PC埋込みパネル10
の背面の上下の相対する縁部には、湾曲した鉄筋保持部
を有する2対の固定金具12が設けられて、鉄筋保持部
で連結鉄筋13を保持できるようになっている。固定金
具12は、PC埋込みパネル10を上下,左右に連続配
置させたときに、各PC埋込みパネル10の固定金具1
2が上下方向に沿って一直線上に配置されるように取り
付け位置が調整されており、上下方向に沿って配置され
た連結鉄筋13をPC埋込みパネル10の固定金具12
で係止させて各PC埋込みパネル10を連結できるよう
になっている。
As shown in FIG. 3, a PC embedded panel 10 is provided.
Two pairs of fixing fittings 12 each having a curved reinforcing bar holding portion are provided on the upper and lower opposite edges of the back surface of the so that the connecting reinforcing bar 13 can be held by the reinforcing bar holding portion. The fixing metal fittings 12 are the fixing metal fittings 1 of each PC embedding panel 10 when the PC embedding panels 10 are continuously arranged vertically and horizontally.
The mounting positions are adjusted so that the two are arranged in a straight line along the up-down direction, and the connecting rebars 13 arranged along the up-down direction are attached to the fixing brackets 12 of the PC-embedded panel 10.
Each PC embedding panel 10 can be connected by locking with.

【0009】PC埋込みパネル10のコンクリート打設
側の面には、PC埋込みパネル10を軽量化する凹部1
0aが設けられている。また、凹部10aの底部の適宜
位置に、その内周面にネジ溝が設けられたインサート1
1が埋め込み固定されてネジ孔が形成されており、後記
する連結金具4の連結棒の端部をねじ込んで連結金具4
の端部を迅速に係止することができるようになってい
る。なお、インサート11を設けずにPC埋込みパネル
10の凹部10aの底部の適宜位置に直接ネジ孔を設け
るようにしてもかまわない。PC埋込みパネル10の相
対する側面には、連結突起10bと、連結突起10bを
嵌合させる嵌合溝10cが設けられており、複数のPC
埋込みパネル10で埋込み堰板2を構築する際に各PC
埋込みパネル10が強く連結できるようになっている。
On the surface of the PC-embedded panel 10 on the concrete pouring side, a recess 1 for reducing the weight of the PC-embedded panel 10 is formed.
0a is provided. In addition, the insert 1 in which a thread groove is provided on the inner peripheral surface at an appropriate position on the bottom of the recess 10a
1 is embedded and fixed to form a screw hole, and an end portion of a connecting rod of a connecting metal fitting 4 described later is screwed into the connecting metal fitting 4
The end of the can be locked quickly. Note that the screw hole may be directly provided at an appropriate position on the bottom of the recess 10 a of the PC-embedded panel 10 without providing the insert 11. On the opposite side surfaces of the PC-embedded panel 10, a connecting protrusion 10b and a fitting groove 10c into which the connecting protrusion 10b is fitted are provided.
Each PC when the embedded dam plate 2 is constructed with the embedded panel 10.
The embedded panel 10 can be strongly connected.

【0010】埋込み堰板2から所定間隔離して地山の斜
面側とは反対側の基礎コンクリート33上に起立させら
れている化粧堰板3は、例えば表面に凹凸模様などの化
粧模様を施すとともにコンクリートで略長方形状に形成
された化粧パネル15が上下,左右に連続配置されてい
るとともに、各化粧パネル15が連結部材として上下方
向に配置された連結鉄筋18によって相互に連結されて
いる。なお、化粧パネル15は、PC埋込みパネル10
と同様に、上下位置に配置される各化粧パネル15の端
部をずらして配置することにより、各化粧パネル15を
強固に連結できるようにしている。また、各化粧パネル
15を連結している連結鉄筋18の下端が基礎コンクリ
ート用の鉄筋に溶接などにより固定されて化粧堰板3が
連結鉄筋18を介して基礎コンクリート33に固定され
ている。
The decorative barrier 3 which is isolated from the embedded barrier 2 for a predetermined period of time and stands up on the foundation concrete 33 on the side opposite to the slope side of the ground is provided with a decorative pattern such as an uneven pattern on the surface. The decorative panels 15 formed of concrete in a substantially rectangular shape are continuously arranged vertically and horizontally, and the decorative panels 15 are connected to each other by connecting rebars 18 arranged vertically as connecting members. The decorative panel 15 is the PC-embedded panel 10.
Similarly, by arranging the decorative panels 15 arranged at the upper and lower positions with their ends displaced, the decorative panels 15 can be firmly connected. Further, the lower end of the connecting reinforcing bar 18 connecting the decorative panels 15 is fixed to the reinforcing bar for the basic concrete by welding or the like, and the decorative dam plate 3 is fixed to the basic concrete 33 via the connecting reinforcing bar 18.

【0011】この化粧パネル15は、コンクリート、レ
ジンコンクリート、FRP、GRCから選ばれた1種に
より一層に形成することができるほか、上記の中から2
種以上の材料を用いて多層に形成してパネルの強度の向
上を図ることができ、あらかじめ工場などで成形されて
寸法精度の向上などが図られる。さらには、そのまま表
面仕上げ材となるように化粧パネルの表面に設けられた
凹凸模様等に、着色などを施して施工する擁壁の美観を
向上させることができる。なお、化粧パネル15の形状
は略長方形状に限るものではなく、略H形状などに形成
することも可能である。
The decorative panel 15 can be made of a single layer selected from concrete, resin concrete, FRP and GRC, and in addition to the above, 2
The strength of the panel can be improved by forming it in multiple layers using at least one kind of material, and the dimensional accuracy can be improved by molding in advance in a factory or the like. Furthermore, it is possible to improve the aesthetics of the retaining wall constructed by coloring the uneven pattern or the like provided on the surface of the decorative panel so as to be a surface finish as it is. It should be noted that the shape of the decorative panel 15 is not limited to the substantially rectangular shape, but may be formed in a substantially H shape.

【0012】図4に示すように、化粧パネル15の背面
の上下の相対する縁部には、PC埋込みパネル10と同
様に湾曲した鉄筋保持部を有する2対の固定金具17が
設けられて、鉄筋保持部で連結鉄筋18を保持できるよ
うになっている。固定金具17は、PC埋込みパネル1
0の固定金具12と同様に、各化粧パネル15の固定金
具17が上下方向に沿って一直線上に配置されており、
連結鉄筋18を固定金具17で係止させて各化粧パネル
15を連結できるようになっている。
As shown in FIG. 4, two pairs of fixing metal fittings 17 having curved reinforcing bar holding portions are provided at the upper and lower opposite edges of the back surface of the decorative panel 15, as in the PC embedded panel 10. The connecting bar 18 can be held by the reinforcing bar holding portion. The fixing bracket 17 is the PC embedded panel 1
Like the fixing bracket 12 of 0, the fixing bracket 17 of each decorative panel 15 is arranged in a straight line along the vertical direction,
Each connecting panel 15 can be connected by locking the connecting reinforcing bar 18 with a fixing member 17.

【0013】化粧パネル15の背面(コンクリート打設
側の面)には、化粧パネル15を軽量化する凹部15a
が設けられている。また、凹部15aの底部の適宜位置
には、その内周面にネジ溝が設けられたインサート16
が埋め込み固定されてネジ孔が形成されており、後記す
る連結金具4の連結棒の端部をねじ込んで連結金具4の
端部を迅速に係止することができるようになっている。
なお、PC埋込みパネル10と同様に、直接ネジ孔を凹
部15aの底部に設けるようにしてもよい。化粧パネル
15の相対する側面には、連結突起15bと連結突起1
5bを嵌合させる嵌合溝15cが設けられており、複数
の化粧パネル15で化粧堰板3を構築する際に各化粧パ
ネル15が強く連結できるようになっている。なお、P
C埋込みパネル10のインサート11と化粧パネル15
のインサート16は、パネルを組み合わせたときに相対
できるように、その埋め込み位置が調整されている。
A concave portion 15a for reducing the weight of the decorative panel 15 is provided on the back surface of the decorative panel 15 (surface on the concrete pouring side).
Is provided. Further, at an appropriate position on the bottom of the recess 15a, an insert 16 having a thread groove on its inner peripheral surface is formed.
Is embedded and fixed to form a screw hole, and the end of the connecting rod of the connecting fitting 4 described later can be screwed in to quickly lock the end of the connecting fitting 4.
Similar to the PC-embedded panel 10, screw holes may be directly provided at the bottom of the recess 15a. On the opposite side surfaces of the decorative panel 15, the connection protrusion 15b and the connection protrusion 1 are provided.
A fitting groove 15c for fitting the 5b is provided so that each decorative panel 15 can be strongly connected when the decorative barrier plate 3 is constructed with a plurality of decorative panels 15. Note that P
Insert 11 of C-embedded panel 10 and decorative panel 15
The insertion position of the insert 16 is adjusted so that the insert 16 can be opposed to each other when the panels are assembled.

【0014】図5に示すように、埋込み堰板2と化粧堰
板3を連結している連結金具4は、例えば長い丸棒を用
いた2本の連結棒20,21の内端側が断面略く字形に
曲げられた薄鋼板22の2つの長孔22aに挿入され、
薄鋼板22の弾性力により2本の連結棒20,21を圧
着させている。この連結金具4は、2本の連結棒20,
21の外端がネジ部に形成されてPC埋込みパネル10
と化粧パネル15のインサート11,16にねじ込むこ
とができるようになっており、両堰板を確実に連結でき
るとともに所定間隔に保持できるようになっている。な
お、連結棒の長さ調節をするため、各連結棒の端部に継
手(例えば、圧着継手など)を介して延長棒を設けるよ
うにしてもよい。また、2本の連結棒20,21、埋込
み堰板2や化粧堰板3の傾斜角度に容易に対応できるよ
うに、連結棒21を途中から切断し、その切断部分をボ
ールジョイントなどを介して連結するようにしてもよ
く、この場合、埋込み・化粧パネルのコンクリート打設
側の面とは垂直方向に連結棒の端部をねじ込むことがで
きる。
As shown in FIG. 5, the connecting metal fitting 4 connecting the embedded weir plate 2 and the decorative weir plate 3 has, for example, two connecting rods 20 and 21 using long round rods, whose inner ends are substantially in cross section. Inserted into the two long holes 22a of the thin steel plate 22 bent in a V shape,
The elastic force of the thin steel plate 22 presses the two connecting rods 20 and 21 together. This connecting fitting 4 includes two connecting rods 20,
The PC embedded panel 10 has an outer end 21 formed on a screw portion.
It is possible to screw it into the inserts 11 and 16 of the decorative panel 15, so that both dam plates can be reliably connected and held at a predetermined interval. In addition, in order to adjust the length of the connecting rod, an extension rod may be provided at the end of each connecting rod via a joint (for example, a crimp joint). Further, the connecting rod 21 is cut from the middle so that the inclination angle of the two connecting rods 20, 21, the embedded weir plate 2 and the decorative weir plate 3 can be easily coped with, and the cut portion is passed through a ball joint or the like. They may be connected, and in this case, the end of the connecting rod can be screwed in a direction perpendicular to the surface of the embedding / decorating panel on the concrete pouring side.

【0015】そのほかに、図6に示すように、コンクリ
ート打設用型枠1に第1排水パイプや補強パイプ,第2
排水パイプにより水抜きを設けて擁壁の背面に溜まる水
を排水できるようにしてもかまわない。具体的には、埋
込み堰板2の所定のPC埋込みパネル10′の適宜位置
に排水口40が設けられており、各排水口40から、埋
込み堰板2と化粧堰板3との間の中程に向かって下方に
傾斜させられた第1排水パイプ41が設けられている。
第1排水パイプ41の後端には、土砂流入防止用のフィ
ルター41aが設けられて、パイプ内の目詰まりを防止
できるようになっている。なお、PC埋込みパネル1
0′の排水口40にフィルター41aを設けるようにし
てもよい。
In addition to the above, as shown in FIG. 6, the first drainage pipe, the reinforcing pipe, and the second drainage pipe are provided on the concrete pouring formwork 1.
A drainage pipe may be provided to drain water accumulated on the back of the retaining wall. Specifically, a drainage port 40 is provided at an appropriate position of a predetermined PC embedding panel 10 ′ of the embedding dam plate 2, and each drainage port 40 is located between the embedding dam plate 2 and the makeup dam plate 3. A first drainage pipe 41 is provided which is inclined downward toward the distance.
A filter 41a for preventing sediment inflow is provided at the rear end of the first drainage pipe 41 so that clogging in the pipe can be prevented. In addition, PC embedded panel 1
A filter 41a may be provided on the 0'drainage port 40.

【0016】各第1排水パイプ41の先端は、埋込み堰
板2と化粧堰板3の間の任意位置に上から下に向かって
配置されて排水を導く補強パイプ42の一端に連結され
て、擁壁の背面の水が第1排水パイプ41を介して排水
パイプ42に流入されるようになっている。なお、図5
(b)に示すように、両堰板の間に配置された補強パイ
プ42は、複数の補強パイプ42が継手44を介して1
区画が略菱形の格子状に連結連通されており、格子状の
補強パイプ42の上部の適宜位置数箇所と第1排水パイ
プ41の先端とが継手44を介して角度調整可能に連結
されている。そして、格子状の補強パイプ42の下端の
適宜位置数箇所が、両堰板の間の下部から化粧堰板3の
下部に向かって下方に傾斜させられた第2排水パイプ4
3の後端に継手44を介して角度調整可能に連結され
て、第1排水パイプ41と第2排水パイプ43を補強パ
イプ42を介して連通させて擁壁の背面に溜まった水を
擁壁の下部前方から排水できるようになっている。とこ
ろで、化粧堰板3の下部に配置される化粧パネル15の
うちの所定の化粧パネル15′には、その適宜位置に第
2排水パイプ43の先端を配置する孔45が設けられて
おり、第2排水パイプ43の先端から擁壁の前面に排水
できるようになっている。
The tip of each first drainage pipe 41 is connected to one end of a reinforcing pipe 42 which is disposed at an arbitrary position between the embedded weir plate 2 and the decorative weir plate 3 from the top to the bottom so as to guide the drainage. The water on the back surface of the retaining wall is designed to flow into the drainage pipe 42 via the first drainage pipe 41. FIG.
As shown in (b), the reinforcing pipes 42 arranged between the two dam plates are composed of a plurality of reinforcing pipes 42 through a joint 44.
The compartments are connected and communicate with each other in a substantially rhombic lattice shape, and several points at appropriate positions on the upper portion of the lattice-shaped reinforcing pipe 42 and the tip of the first drainage pipe 41 are connected via a joint 44 so that the angle can be adjusted. . Then, the second drainage pipe 4 in which several points at appropriate positions on the lower end of the grid-shaped reinforcing pipe 42 are inclined downward from the lower portion between the both dam plates toward the lower part of the decorative dam plate 3.
The third drainage pipe 41 and the second drainage pipe 43 are connected to each other through a joint 44 at the rear end of the retaining pipe 3 so that the first drainage pipe 41 and the second drainage pipe 43 communicate with each other, and water collected on the back surface of the retaining wall is retained. It is designed so that water can be drained from the lower front of the. By the way, a predetermined decorative panel 15 ′ of the decorative panels 15 arranged below the decorative barrier plate 3 is provided with a hole 45 for arranging the tip of the second drainage pipe 43 at an appropriate position. 2 The water can be drained from the tip of the drainage pipe 43 to the front of the retaining wall.

【0017】上記の第1排水パイプ41,補強パイプ4
2,第2排水パイプ43は、それぞれが錆びにくい金属
や合成樹脂などで形成されている。また、格子状の補強
パイプ42の上部が第1排水パイプ41に連結されると
ともに補強パイプ42の下部が第2排水パイプ43に連
結されており、両排水パイプや補強パイプはコンクリー
ト内に埋め込まれて擁壁の強度を向上させることができ
るようになっている。また、補強パイプ42は略菱形の
格子状に限るものではないし、第1排水パイプと第2排
水パイプを単一の補強パイプの両端に連結したり、第
1,第2排水パイプと補強パイプを1つのパイプで構成
するようにしてもかまわない。なお、補強パイプを格子
状に形成すれば、第2排水パイプの本数を第1排水パイ
プの本数よりも少なくでき、擁壁の表面の孔の数を少な
くすることができるので景観上好ましいものとなる。
The above-mentioned first drainage pipe 41 and reinforcing pipe 4
The second and second drainage pipes 43 are each made of metal or synthetic resin that is resistant to rust. The upper part of the grid-shaped reinforcing pipe 42 is connected to the first drainage pipe 41 and the lower part of the reinforcing pipe 42 is connected to the second drainage pipe 43. Both drainage pipes and the reinforcing pipes are embedded in concrete. The strength of the retaining wall can be improved. Further, the reinforcing pipe 42 is not limited to the substantially rhombic lattice, and the first drain pipe and the second drain pipe are connected to both ends of a single reinforcing pipe, or the first and second drain pipes and the reinforcing pipe are connected to each other. It may be configured with one pipe. If the reinforcing pipes are formed in a grid pattern, the number of the second drainage pipes can be made smaller than that of the first drainage pipes, and the number of holes on the surface of the retaining wall can be reduced, which is preferable in view of landscape. Become.

【0018】上記構成の埋込み堰板2,化粧堰板3や連
結金具4を用いて擁壁を構築するには、擁壁の基礎コン
クリート33の地山の斜面側の基部に、各埋込みパネル
10を上下,左右に連続配置させるとともに、各埋込み
パネル10を上下方向に配置した連結鉄筋13で連結し
た埋込み堰板2を起立させる。埋込み堰板2から所定間
隔を開けた基礎コンクリート33上には、基礎コンクリ
ート用の鉄筋に連結させるようにして内部鉄筋34を配
筋して擁壁の構造躯体とする。また、内部鉄筋34の埋
込み堰板2とは逆側で、内部鉄筋34から所定間隔を開
けた相対する位置の基礎コンクリート33上に、各化粧
パネル15を上下,左右に連続配置させるとともに、各
化粧パネル15を上下方向に配置した連結鉄筋18で連
結した化粧堰板3を起立させる。
In order to construct a retaining wall using the embedded barrier plate 2, the decorative barrier plate 3 and the connecting metal fittings 4 having the above-mentioned constitution, each embedded panel 10 is provided at the base of the foundation concrete 33 of the retaining wall on the slope side of the natural ground. And the embedding dam plate 2 in which the embedding panels 10 are connected by the connecting rebars 13 arranged in the up-and-down direction. On the basic concrete 33 spaced apart from the embedded dam plate 2 by a predetermined distance, the internal reinforcing bars 34 are laid out so as to be connected to the reinforcing bars for the basic concrete to form a structural body of the retaining wall. In addition, on the opposite side of the internal rebar 34 from the embedded dam plate 2, each decorative panel 15 is continuously arranged vertically and horizontally on the basic concrete 33 at a position opposed to the internal rebar 34 with a predetermined interval therebetween. The decorative barrier plate 3 in which the decorative panel 15 is connected by the connecting rebars 18 arranged in the vertical direction is erected.

【0019】水抜きを設ける場合は、埋込み堰板2に設
けられた複数の排水口40それぞれに、第1排水パイプ
41の後端を連結し、擁壁の厚さの中程の上から下に向
かって略菱形の格子状に補強パイプ42を連通連結させ
るとともに、各第1排水パイプ41の先端を補強パイプ
の上部に連結する。そして、擁壁の下部から擁壁の下部
前方に向かって下方に傾斜するようにして配置した第2
排水パイプ43の後端と補強パイプ42の下部とを連結
し、第2排水パイプの先端を化粧パネル15′の孔45
に連結させる。なお、補強パイプ42などを内部鉄筋3
4に係止するようにしてもかまわない。
In the case of providing drainage, the rear end of the first drainage pipe 41 is connected to each of the plurality of drainage ports 40 provided in the embedded weir plate 2, and the middle of the thickness of the retaining wall is changed from the top to the bottom. The reinforcing pipes 42 are connected to each other in a generally rhombic lattice shape toward each other, and the tips of the first drainage pipes 41 are connected to the upper portions of the reinforcing pipes. The second portion is arranged so as to incline downward from the lower portion of the retaining wall toward the front of the lower portion of the retaining wall.
The rear end of the drainage pipe 43 and the lower portion of the reinforcing pipe 42 are connected to each other, and the tip of the second drainage pipe is connected to the hole 45 of the decorative panel 15 '.
Connect to. In addition, the reinforcing pipe 42 and the like are connected to the internal rebar 3
It does not matter even if it is locked to 4.

【0020】そして、埋込み堰板2のPC埋込みパネル
10と化粧堰板3の各化粧パネル15の相対するインサ
ート11,16との間に連結金具4の外端を係止し、埋
込み堰板2と化粧堰板3を連結するとともに所定間隔に
保持して、地山30の斜面に沿って擁壁のコンクリート
打設用型枠1を構築する。この型枠は埋込み堰板2と化
粧堰板3の下端が基礎コンクリート用の鉄筋に固定され
て強度の高いものとなっており、構築される擁壁を強固
なものとすることができる。
Then, the outer end of the connecting fitting 4 is locked between the PC-embedded panel 10 of the embedding dam plate 2 and the facing inserts 11 and 16 of each decorative panel 15 of the embossment dam plate 3, and the embedding dam plate 2 is embedded. The decorative dam plate 3 is connected and held at a predetermined interval, and the concrete placing formwork 1 for the retaining wall is constructed along the slope of the natural ground 30. In this formwork, the lower ends of the embedded weir plate 2 and the decorative weir plate 3 are fixed to the reinforcing bars for the basic concrete to have high strength, and the retaining wall to be constructed can be made strong.

【0021】連結金具4で両堰板を連結するには、薄鋼
板22の両端部を掴んで薄鋼板22を略く字形に折り曲
げ、各連結棒20,21の圧着を緩めて2本の連結棒2
0,21の間隔を調節し、各連結棒20,21の外端を
PC埋込みパネル10,化粧パネル15のインサート1
1,16にねじ込んで固定させたところで薄鋼板22を
元に戻して連結棒20,21を圧着させることにより化
粧堰板3と埋込み堰板2を所定間隔に連結保持し、コン
クリート打設時のコンクリートの側圧に対抗する。この
とき、連結金具4の連結棒20,21の外端は両パネル
のインサート11,16にネジ止めされているので、埋
込み堰板2と化粧堰板3を確実に連結して両堰板を基礎
コンクリート33上に自立させることができ、強固なコ
ンクリート打設用型枠1とすることができる。なお、連
結金具4で両堰板を連結した後に、連結金具4の連結棒
20,21の適宜位置と、両堰板の間に配筋された内部
鉄筋34の適宜位置とを溶接などにより固着させるよう
にして内部鉄筋34のかぶり厚を確保するとともに、コ
ンクリート打設用型枠1の強度を向上させるようにして
もかまわない。擁壁のコンクリート打設用型枠1を構築
した後、上記の埋込み堰板2と化粧堰板3との間にコン
クリートを打設し、打設したコンクリートが硬化すれば
擁壁が完成する。擁壁の完成後、擁壁の背面に土砂が埋
め戻される。
In order to connect both dam plates with the connecting fitting 4, the both ends of the thin steel plate 22 are grasped and the thin steel plate 22 is bent into a substantially V shape, and the crimping of the connecting rods 20 and 21 is loosened to connect the two. Stick 2
The space between 0 and 21 is adjusted so that the outer ends of the connecting rods 20 and 21 are inserted into the PC-embedded panel 10 and the decorative panel 15.
The thin steel plate 22 is returned to the original position after being screwed and fixed to 1, 16 and the connecting rods 20 and 21 are pressure-bonded to connect and hold the decorative dam plate 3 and the embedded dam plate 2 at a predetermined interval. Against the lateral pressure of concrete. At this time, since the outer ends of the connecting rods 20 and 21 of the connecting metal fitting 4 are screwed to the inserts 11 and 16 of both panels, the embedded weir plate 2 and the decorative weir plate 3 are surely connected to each other. It can be self-supporting on the basic concrete 33, and can be a strong concrete casting formwork 1. After connecting the two dam plates with the connecting metal fitting 4, the appropriate positions of the connecting rods 20 and 21 of the connecting metal fitting 4 and the appropriate positions of the internal rebars 34 arranged between the two dam plates are fixed by welding or the like. The cover thickness of the internal rebar 34 may be ensured and the strength of the concrete pouring formwork 1 may be improved. After constructing the concrete casting formwork 1 for the retaining wall, concrete is placed between the embedded weir plate 2 and the decorative weir plate 3, and when the placed concrete hardens, the retaining wall is completed. After the retaining wall is completed, the back of the retaining wall will be backfilled with earth and sand.

【0022】打設されたコンクリートは、埋込み堰板2
と化粧堰板3の連結鉄筋13,18の周囲や、各PC埋
込みパネル10と化粧パネル15の凹部10a,15a
に入り込み、化粧堰板3や埋込み堰板2と打設されたコ
ンクリートが強く一体化し、化粧堰板3と埋込み堰板2
を擁壁の構造躯体とすることができる。また、両堰板が
埋め殺しにされるので、擁壁構築後の型枠解体作業を要
しない。なお、基礎コンクリートは先に施工してもよい
し、擁壁のコンクリート打設用型枠1と同時にコンクリ
ート打設して施工してもよい。また、基礎コンクリート
と擁壁とを同時に施工するときは、埋込み堰板2と化粧
堰板3とを連結鉄筋を介して基礎コンクリート33用の
鉄筋に固定する。上記の擁壁は、切土や盛土などをして
設けられた地山の斜面に沿って設けられているが、その
ほか、塀や壁,せきなどの鉛直構造物として任意の場所
に起立させるようにしてもかまわない。このとき、擁壁
の背面が土砂で埋まらない場合は水抜き用の排水パイプ
は設けないようにする。
The cast concrete is the embedded dam plate 2
Around the connecting rebars 13 and 18 of the and the decorative barrier plate 3, and the recesses 10a and 15a of the PC embedding panel 10 and the decorative panel 15 respectively.
The concrete that has entered and is strongly integrated with the decorative dam plate 3 and the embedded dam plate 2 is strongly integrated, and the decorative dam plate 3 and the embedded dam plate 2 are strongly integrated.
Can be the structural body of the retaining wall. Further, since both the dam plates are buried, it is not necessary to dismantle the formwork after constructing the retaining wall. The basic concrete may be applied first, or may be applied by placing concrete simultaneously with the concrete placing formwork 1 for the retaining wall. Further, when the basic concrete and the retaining wall are simultaneously constructed, the embedded dam plate 2 and the decorative dam plate 3 are fixed to the reinforcing bar for the basic concrete 33 via the connecting reinforcing bar. The above retaining wall is provided along the slope of the ground that is cut or filled, but in addition, it should be erected at any place as a vertical structure such as a fence, wall, or weir. But it doesn't matter. At this time, if the back surface of the retaining wall is not filled with earth and sand, do not provide a drainage pipe for draining water.

【0023】[0023]

【発明の効果】本発明の擁壁の施工方法によれば、埋込
み堰板と化粧堰板とを連結金具で容易かつ確実に連結す
ることができるのでコンクリート打設用型枠の強度を向
上させることができるし、コンクリート打設後の型枠解
体作業が不要となり、施工期間の短縮やコストの削減を
図ることができる。また、型枠の解体作業が行なわれず
それに伴う廃材が出ないので、廃棄物処理に要するコス
トがかからないし、廃棄物減少にも役立つものとなる。
また、擁壁の背面に溜まる水を第1排水パイプ,補強パ
イプ,第2排水パイプを介して排水するようにすれば、
擁壁の前面の下部に排水するので擁壁の前面全体に複数
の排水用の孔が表われることがなく、景観上好ましいも
のとなる。また、両堰板の下端を基礎コンクリート用の
鉄筋に固定してより強固な擁壁を構築することができ
る。
According to the method of constructing a retaining wall of the present invention, the embedded dam plate and the decorative dam plate can be easily and surely connected by the connecting metal fittings, so that the strength of the concrete placing formwork is improved. Moreover, it is not necessary to dismantle the formwork after placing concrete, and it is possible to reduce the construction period and cost. Further, since the dismantling work of the formwork is not performed and the waste material accompanying it is not generated, the cost required for the waste treatment is not required and the waste can be reduced.
Moreover, if the water accumulated on the back surface of the retaining wall is drained through the first drain pipe, the reinforcing pipe, and the second drain pipe,
Since water is drained to the lower part of the front surface of the retaining wall, a plurality of drainage holes do not appear on the entire front surface of the retaining wall, which is preferable in view of landscape. Further, the lower ends of both dam plates can be fixed to the reinforcing bars for the basic concrete to construct a stronger retaining wall.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の擁壁の施工方法の実施の形態を示す側
面説明図である。
FIG. 1 is an explanatory side view showing an embodiment of a retaining wall construction method of the present invention.

【図2】埋込み堰板を示す正面説明図である。FIG. 2 is a front view showing a buried dam plate.

【図3】埋込みパネルを示す平面説明図(a)と、図3
(a)のA−A矢視図(b)と、埋込みパネルの側面説
明図(c)である。
FIG. 3 is an explanatory plan view (a) showing the embedded panel, and FIG.
It is an AA arrow line view of (a), and a side explanatory view (c) of an embedding panel.

【図4】化粧パネルを示す平面説明図(a)と、図4
(a)のB−B矢視図(b)と、化粧パネルの側面説明
図(c)である。
FIG. 4 is an explanatory plan view (a) showing a decorative panel, and FIG.
It is the BB arrow line view (b) of (a), and the side surface explanatory drawing (c) of a decorative panel.

【図5】連結金具を示す平面説明図(a)と、側面説明
図(b)である。
FIG. 5 is an explanatory plan view (a) showing a coupling fitting and a side explanatory view (b).

【図6】擁壁内に排水用のパイプを設けた場合を示す側
面説明図(a)と、擁壁に埋め込まれる格子状に連結さ
れた補強パイプの正面説明図(b)である。
FIG. 6 is a side explanatory view (a) showing a case where a drainage pipe is provided in the retaining wall, and a front explanatory view (b) of the reinforcing pipes embedded in the retaining wall and connected in a grid pattern.

【符号の説明】[Explanation of symbols]

1 コンクリート打設用型枠 2 埋込み堰板 3 化粧堰板 4 連結金具 10 PC埋込みパネル 15 化粧パネル 40 排水口 41 第1排水パイプ 42 補強パイプ 43 第2排水パイプ 1 Concrete formwork 2 Embedded dam plate 3 Decorative dam plate 4 Connecting fitting 10 PC embedding panel 15 Decorative panel 40 Drainage port 41 First drainage pipe 42 Reinforcement pipe 43 Second drainage pipe

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田中 重信 神奈川県横浜市港北区新横浜2丁目14番地 27東横技研株式会社内 (72)発明者 丸山 誠一 神奈川県横浜市港北区岸根町35−1株式会 社サンゴ内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Shigenobu Tanaka 2-14-14 Shin-Yokohama, Kohoku-ku, Yokohama-shi, Kanagawa Toyoko Giken Co., Ltd. (72) Seiichi Maruyama 35-1 Kishine-cho, Kohoku-ku, Yokohama-shi, Kanagawa Inside the coral

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 土砂の崩壊防止などのために地山の斜面
等に沿ってコンクリート製の擁壁を構築する施工方法で
あって、 コンクリート打設面の適宜位置にネジ孔を有するプレキ
ャストコンクリート埋込みパネル(以下PC埋込みパネ
ルとする)を上下,左右に連続配置させるとともに、各
PC埋込みパネルを連結部材で連結させた埋込み堰板
と、 表面に化粧模様を施し背面の適宜位置にネジ孔を有する
化粧パネルを上下,左右に連続配置するとともに各化粧
パネルを連結部材で連結させた化粧堰板とを所定間隔で
相対させるとともに、化粧堰板と埋込み堰板とのネジ孔
に連結金具の両端をネジ止めして両堰板を連結し、化粧
堰板と埋込み堰板との間にコンクリートを打設して、化
粧堰板と埋込み堰板とを打設したコンクリート中に埋め
殺しにして一体とすることを特徴とする擁壁の施工方
法。
1. A construction method for constructing a concrete retaining wall along a slope or the like of a ground to prevent the collapse of earth and sand, which comprises precast concrete embedding having screw holes at appropriate positions on a concrete placing surface. Panels (hereinafter referred to as PC embedding panels) are arranged vertically and horizontally, and the embedding dam plate is formed by connecting each PC embedding panel with a connecting member, and the surface is decorated with screw holes at appropriate positions on the back surface. The decorative panels are arranged vertically and horizontally, and at the same time, the decorative barriers in which the decorative panels are connected by connecting members are made to face each other at a predetermined interval, and both ends of the connecting metal fittings are screwed into the decorative barriers and the embedded barriers. Connect both weir plates by screwing, place concrete between the decorative weir plate and the embedded weir plate, and use it to embed the decorative weir plate and embedded weir plate in the cast concrete. Retaining wall method of construction which is characterized in that an integral Te.
【請求項2】 埋込み堰板と化粧堰板とを連結する連結
金具は、断面略く字形に弾性変形されるとともにその折
り曲げ線に対して対称位置にそれぞれ長孔が設けられた
薄鋼板と、外端が化粧堰板と埋込み堰板のネジ孔にネジ
止めされる2本の連結棒とから構成され、2本の連結棒
の内端側が断面略く字形に曲げられた薄鋼板の2つの長
孔に挿入されて薄鋼板の弾性力により2本の連結棒を圧
着させることを特徴とする請求項1に記載の擁壁の施工
方法。
2. A connecting metal member for connecting the embedded barrier plate and the decorative barrier plate is a thin steel plate elastically deformed into a substantially V-shaped cross section and provided with elongated holes at symmetrical positions with respect to the bending line. The outer end is composed of a decorative weir plate and two connecting rods screwed into the screw holes of the embedded weir plate, and the inner end sides of the two connecting rods are two thin steel plates bent in a substantially V-shaped cross section. The method for constructing a retaining wall according to claim 1, wherein the two connecting rods are inserted into the long holes and crimped by the elastic force of the thin steel plate.
【請求項3】 埋込み堰板の複数箇所に排水口が設けら
れ、各排水口から擁壁の厚さ方向の中程に向かって下方
に傾斜する第1排水パイプが設けられ、各第1排水パイ
プの先端が、埋込み堰板と化粧堰板との間の任意位置を
上から下に向かうように配置された補強パイプの一端に
連結され、各補強パイプの下端が、埋込み堰板と化粧堰
板との間の下部から化粧堰板の下部に向かって下方に傾
斜する第2排水パイプの後端に連結され、第1排水パイ
プと第2排水パイプは補強パイプを介して連通されてい
ることを特徴とする請求項1または2に記載の擁壁の施
工方法。
3. A drainage port is provided at a plurality of positions on the embedded weir plate, and a first drainage pipe is provided which inclines downward from each drainage port toward the middle in the thickness direction of the retaining wall. The tip of the pipe is connected to one end of a reinforcing pipe arranged so that the arbitrary position between the embedded weir plate and the decorative weir plate faces from top to bottom, and the lower end of each reinforcing pipe is connected to the embedded weir plate and the decorative weir plate. It is connected to the rear end of the second drainage pipe that inclines downward from the lower part between the plate and the lower part of the decorative dam plate, and the first drainage pipe and the second drainage pipe are connected through a reinforcing pipe. The method for constructing a retaining wall according to claim 1 or 2, wherein.
【請求項4】 埋込み堰板と化粧堰板の下端を基礎コン
クリート用の鉄筋に固定した請求項1から3までのいず
れか1つに記載の擁壁の施工方法。
4. The method of constructing a retaining wall according to claim 1, wherein the embedded dam plate and the decorative dam plate are fixed at their lower ends to a reinforcing bar for basic concrete.
JP9772496A 1996-03-27 1996-03-27 Construction method of retaining wall Pending JPH09268580A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9772496A JPH09268580A (en) 1996-03-27 1996-03-27 Construction method of retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9772496A JPH09268580A (en) 1996-03-27 1996-03-27 Construction method of retaining wall

Publications (1)

Publication Number Publication Date
JPH09268580A true JPH09268580A (en) 1997-10-14

Family

ID=14199844

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9772496A Pending JPH09268580A (en) 1996-03-27 1996-03-27 Construction method of retaining wall

Country Status (1)

Country Link
JP (1) JPH09268580A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11323968A (en) * 1998-05-20 1999-11-26 Katsuya Hiraoka Concrete panel and execution method of building/ constructed body therewith
JP2001271364A (en) * 2000-03-27 2001-10-05 Akemi Ishikawa Decoration finished panel material
JP2010101036A (en) * 2008-10-22 2010-05-06 Hirotoshi Masuda Method for constructing concrete building frame by using permanent form, concrete building frame using the method, and foundation block for constructing concrete building frame using the permanent form
KR101321824B1 (en) * 2012-01-16 2013-10-23 임종덕 Method for constructing of Natural Affinity Type Vegetation Wall and Apparatus for Use in Such Method
JP5570085B1 (en) * 2013-12-09 2014-08-13 株式会社フジモト Radiation shielding wall construction form and radiation shielding wall construction method using the same
JP2016023476A (en) * 2014-07-22 2016-02-08 株式会社フジモト Concrete mold for aseismic and vibration control reinforcement of concrete structure, and aseismic and vibration control reinforcement method for concrete structure using the same
JP2017180075A (en) * 2016-03-24 2017-10-05 日鐵住金建材株式会社 Repair method and repair structure for steel sheet pile, and filler material leakage preventing member used with the same

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11323968A (en) * 1998-05-20 1999-11-26 Katsuya Hiraoka Concrete panel and execution method of building/ constructed body therewith
JP2001271364A (en) * 2000-03-27 2001-10-05 Akemi Ishikawa Decoration finished panel material
JP2010101036A (en) * 2008-10-22 2010-05-06 Hirotoshi Masuda Method for constructing concrete building frame by using permanent form, concrete building frame using the method, and foundation block for constructing concrete building frame using the permanent form
KR101321824B1 (en) * 2012-01-16 2013-10-23 임종덕 Method for constructing of Natural Affinity Type Vegetation Wall and Apparatus for Use in Such Method
JP5570085B1 (en) * 2013-12-09 2014-08-13 株式会社フジモト Radiation shielding wall construction form and radiation shielding wall construction method using the same
JP2016023476A (en) * 2014-07-22 2016-02-08 株式会社フジモト Concrete mold for aseismic and vibration control reinforcement of concrete structure, and aseismic and vibration control reinforcement method for concrete structure using the same
JP2017180075A (en) * 2016-03-24 2017-10-05 日鐵住金建材株式会社 Repair method and repair structure for steel sheet pile, and filler material leakage preventing member used with the same

Similar Documents

Publication Publication Date Title
US6854231B2 (en) Multi-channel retaining wall block and system
CA2676369C (en) Wall with decorative facing
AU620012B2 (en) Pre-cast, reinforced concrete retaining wall system
AU1778899A (en) Stabilizing elements for mechanically stabilized earthen structure and mechanically stabilized earthen structure
JPH09268580A (en) Construction method of retaining wall
JPH0932014A (en) Method of execution for retaining wall
JPH09268579A (en) Construction method of retaining wall
GB2373530A (en) Preformed Modular Sub-surface Drainage System
KR100662028B1 (en) Construction bio-block for retaining wall
EP0707117A1 (en) Modular block retaining wall construction and components
JP3794890B2 (en) Retaining wall
US6902353B2 (en) Top block for retaining wall
JP3838536B2 (en) Retaining wall construction method
JPH08291528A (en) Retaining wall construction method
JP3438332B2 (en) Water passing device for retaining wall
KR19990075158A (en) Construction method of reinforced earth retaining wall using only natural stone and its structure
JP4555972B2 (en) Waterway construction method and waterway structure
JPH0995957A (en) Planting method for retaining wall and retaining wall capable of being planted
JPH03156026A (en) Steep-sloped banking equipped with downspout drain outlet, and wall body and wall surface unit therefor
JPH07166596A (en) Underground water storage tank and construction method thereof
JPH0540110Y2 (en)
JPS6024759Y2 (en) Concrete block for retaining wall
JP3017999B2 (en) Construction method of L-shaped shade concrete block
JPH044067Y2 (en)
JPS639625Y2 (en)