JPH09228480A - Execution metal fittings and beam with execution metal fittings - Google Patents

Execution metal fittings and beam with execution metal fittings

Info

Publication number
JPH09228480A
JPH09228480A JP4151396A JP4151396A JPH09228480A JP H09228480 A JPH09228480 A JP H09228480A JP 4151396 A JP4151396 A JP 4151396A JP 4151396 A JP4151396 A JP 4151396A JP H09228480 A JPH09228480 A JP H09228480A
Authority
JP
Japan
Prior art keywords
construction
metal fitting
wall
finishing plate
wall finishing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4151396A
Other languages
Japanese (ja)
Inventor
Kazuya Eguchi
和也 江口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP4151396A priority Critical patent/JPH09228480A/en
Publication of JPH09228480A publication Critical patent/JPH09228480A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To make it possible to execute a construction work by oneself, by protruding a receive flap of a wall-finishing board having a nearly same size with the thickness of the wall-finishing board, at the edge of an execution metal fitting body. SOLUTION: A receive flap 12 having a nearly same size with the thickness of a wall-finishing board is protruded at the lower end edge of an executing metal tool body 11 to form an executing metal fitting 1. On executing a structure, fittings like nails or bolts are inserted in respective fitting holes 6 of the executing metal fitting body 11 to fix a column 2 and a beam 3. In the same way, fittings are inserted in respective fitting holes 6 of the execution metal fitting body 11 at appropriate positions to fix the column 2 and the beam 3. The lower end of the wall-finishing board is temporarily placed on the receive flap 12 of the execution metal fitting 1 at the nearby position of the floor and then, the wall-finishing board is fixed to the column 2 and the beam 3 by fixing tools. And further, the upper end edge of the wall-finishing board is temporarily positioned along the receive flap 12 at the nearby position of the ceiling and then, it is fixed to the column 2 and the beam 3.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、柱と梁を固定する
板状の施工金具及び施工金具付き梁に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a plate-shaped construction metal fitting for fixing a column and a beam and a beam with the construction metal fitting.

【0002】[0002]

【従来の技術】従来のこの種のものは、図7に従来例の
構成図が示される。図7に示されるように、従来の柱1
01と梁102を固定する板状の施工金具103の機能
は、柱101と梁102を固定するだけであり、柱10
1と梁102を固定した後に合板等の壁仕上げ板を取り
付ける場合には、施工金具103は役に立たず、この場
合には、二人作業で、一人が壁仕上げ板を押さえて動か
ない状態にして、他の一人が釘を打ち付けて壁仕上げ板
を柱101と梁102に取り付けるといった作業が必要
であった。これは、H型鋼の上下フランジの外面側に木
質材料を着設して成る梁を使用した場合にも同様であっ
た。
2. Description of the Related Art FIG. 7 shows the configuration of a conventional example of this type. As shown in FIG. 7, the conventional pillar 1
The function of the plate-like construction metal fitting 103 for fixing 01 and the beam 102 is only to fix the column 101 and the beam 102.
When the wall finishing plate such as plywood is attached after fixing the beam 1 and the beam 102, the construction metal fitting 103 is useless, and in this case, one person holds the wall finishing plate and does not move it by two people's work. It was necessary for another person to hammer the nails and attach the wall finishing plate to the pillar 101 and the beam 102. This was also the case when a beam formed by attaching a wood material to the outer surface of the upper and lower flanges of H-section steel was used.

【0003】[0003]

【発明が解決しようとする課題】しかし、従来例におい
ては、壁仕上げ板を柱101と梁102に取り付ける場
合には、必ず、二人作業が必要であるという不都合があ
った。本発明はこの点に鑑みてなされたものであり、壁
仕上げ板を取り付ける場合に、一人作業を実現できる施
工金具及び施工金具付き梁を提供することを目的とする
ものである。
However, in the conventional example, when the wall finishing plate is attached to the pillar 101 and the beam 102, there is an inconvenience that two people must work. The present invention has been made in view of this point, and an object of the present invention is to provide a construction fitting and a beam with a construction fitting that can realize a work by one person when a wall finishing plate is attached.

【0004】[0004]

【課題を解決するための手段】本発明の請求項1記載の
施工金具は、柱と梁を固定する板状の施工金具であっ
て、施工金具本体の端縁に壁仕上げ板の厚み寸法と略同
一寸法の壁仕上げ板の受け片を突設して成ることを特徴
とするものである。
A construction metal fitting according to claim 1 of the present invention is a plate-shaped construction metal fitting for fixing a column and a beam, and has a thickness dimension of a wall finishing plate at an end edge of the construction metal fitting main body. It is characterized in that it is formed by projecting a receiving piece of a wall finishing plate having substantially the same size.

【0005】本発明の請求項2記載の施工金具付き梁
は、H型鋼の上下フランジの外面側に木質材料を着設し
て成る梁の、上フランジ又は下フランジの少なくとも一
方を、長手方向全長にわたって前記木質材料より突出さ
せて、壁仕上げ板の厚み寸法と略同一寸法の壁仕上げ板
の受け片を形成して施工金具となしたことを特徴とする
ものである。
According to a second aspect of the present invention, there is provided a beam with a fitting, wherein at least one of an upper flange and a lower flange of a beam formed by attaching a wood material to the outer surface side of the upper and lower flanges of H-shaped steel has a total length in the longitudinal direction. Over the above-mentioned wood-based material to form a receiving piece of the wall finishing plate having substantially the same thickness as the thickness of the wall finishing plate to form a working metal fitting.

【0006】[0006]

【発明の実施の形態】図1は、本発明の請求項1に対応
した実施形態である施工金具の使用状態を示す構成図で
ある。図2は、同実施形態である施工金具の斜視図であ
る。図3は、同実施形態である施工金具の使用状態を示
す部分斜視図である。図4(a)、(b)は、同実施形
態である施工金具の斜視図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a configuration diagram showing a usage state of a construction metal fitting which is an embodiment corresponding to claim 1 of the present invention. FIG. 2 is a perspective view of the construction metal fitting according to the embodiment. FIG. 3 is a partial perspective view showing a usage state of the construction metal fitting according to the embodiment. FIG. 4A and FIG. 4B are perspective views of the construction metal fitting according to the same embodiment.

【0007】図1乃至図3に示されるように、この施工
金具1は、柱2と梁3を固定する板状の施工金具1であ
って、施工金具本体11の端縁に壁仕上げ板5の厚み寸
法と略同一寸法の壁仕上げ板の受け片12を突設してお
り、例えば、受け片12の上に壁仕上げ板5を載置した
状態で、釘、ボルト等の固着具により壁仕上げ板5を柱
2と梁3に取り付けるものである。
As shown in FIGS. 1 to 3, the construction metal fitting 1 is a plate-shaped construction metal fitting 1 for fixing a pillar 2 and a beam 3, and a wall finishing plate 5 is attached to an end edge of a construction metal fitting body 11. The receiving piece 12 of the wall finishing plate having substantially the same dimension as the thickness dimension of the wall is projected. For example, with the wall finishing plate 5 placed on the receiving piece 12, the wall is fixed by fasteners such as nails and bolts. The finishing plate 5 is attached to the columns 2 and the beams 3.

【0008】図1に示されるように、床付近に使用され
る施工金具1は、施工金具本体11の下端縁に壁仕上げ
板5の厚み寸法と略同一寸法の受け片12を突設してお
り、天井付近に使用される施工金具1は、施工金具本体
11の上端縁に壁仕上げ板4の厚み寸法と略同一寸法の
受け片12を突設しており、施工金具本体11には、複
数の取り付け孔6が形成されている。
As shown in FIG. 1, the construction metal fitting 1 used near the floor has a receiving piece 12 of substantially the same size as the thickness of the wall finishing plate 5 protruding from the lower end edge of the construction metal fitting body 11. The metal fitting 1 used in the vicinity of the ceiling has a receiving piece 12 projecting from the top edge of the metal fitting body 11 and having substantially the same size as the thickness of the wall finishing plate 4, A plurality of mounting holes 6 are formed.

【0009】施工金具1の形状は図1に示されるものに
限定するものではなく、例えば図4(a)、(b)に示
されるものであってもよい。その材質は、金属、プラス
チック等を使用できる。また、施工金具本体11と受け
片12とは一体として形成されたものであってもよい
し、受け片12を施工金具本体11に後付けしたもので
あってもよい。壁仕上げ板4の材質は合板等の木質材
料、プラスチックを使用できる。
The shape of the metal fitting 1 is not limited to that shown in FIG. 1, but may be one shown in FIGS. 4 (a) and 4 (b), for example. The material may be metal, plastic, or the like. Further, the construction tool body 11 and the receiving piece 12 may be integrally formed, or the receiving piece 12 may be attached to the construction tool body 11 afterwards. As a material of the wall finishing board 4, a wood material such as plywood or plastic can be used.

【0010】以下に、図1乃至図3に基づいて、この施
工金具1の使用方法について説明する。先ず、図1に示
されるように、釘、ボルト等の固着具を施工金具本体1
1の各々の取り付け孔6に挿通して、柱2と梁3とを固
定する。同様にして、適宜箇所において、施工金具本体
11の各々の取り付け孔6の挿通して、柱2と梁3とを
固定して、柱2と梁3とを固定を完了する。
Hereinafter, a method of using the construction fitting 1 will be described with reference to FIGS. 1 to 3. First, as shown in FIG. 1, the fasteners such as nails and bolts are attached to the construction metal fitting body 1
The column 2 and the beam 3 are fixed by being inserted into the respective mounting holes 6 of No. 1. Similarly, at appropriate places, the attachment holes 6 of the construction metal fitting body 11 are inserted, the columns 2 and the beams 3 are fixed, and the columns 2 and the beams 3 are fixed.

【0011】次いで、床付近においては、施工金具1の
受け片12の上に壁仕上げ板5を載置して仮置きした状
態で、釘、ボルト等の固着具により壁仕上げ板5を柱2
と梁3に取り付ける。
Next, in the vicinity of the floor, with the wall finishing plate 5 placed and temporarily placed on the receiving piece 12 of the construction metal fitting 1, the wall finishing plate 5 is fixed to the pillar 2 by a fastener such as a nail or a bolt.
And attach to beam 3.

【0012】この場合には、壁仕上げ板5を仮置きして
動かない状態で壁仕上げ板5を柱2と梁3に取り付ける
ため、一人作業が可能であり、施工の簡略化を図ること
ができる。また、施工金具1は従来から必要であったた
め、施工部材が従来に比べ増加して施工工程が増加する
という不都合はない。
In this case, since the wall finishing plate 5 is temporarily placed and is attached to the pillar 2 and the beam 3 in a state where the wall finishing plate 5 does not move, one person can work and the construction can be simplified. it can. Further, since the construction metal fitting 1 has been conventionally required, there is no inconvenience that the construction member is increased and the construction process is increased as compared with the conventional construction.

【0013】さらに、壁仕上げ板5の厚み寸法と、受け
片12は略同一寸法であるため、壁仕上げ板5を柱2と
梁3に取り付けた後に、受け片12が壁仕上げ板5から
突出した状態になるという不都合もない。
Further, since the thickness of the wall finishing plate 5 and the receiving piece 12 are substantially the same, the receiving piece 12 projects from the wall finishing plate 5 after the wall finishing plate 5 is attached to the pillar 2 and the beam 3. There is no inconvenience that it will be in the state of being.

【0014】一方、天井付近においては、施工金具1の
受け片12に壁仕上げ板5の上端縁を沿わせて仮置きし
た状態で、又は施工金具1の受け片12に壁仕上げ板5
の上端縁を沿わせるだけでは不充分な場合には、受け片
12に壁仕上げ板5の上端縁を沿わせると共に、壁仕上
げ板5を片手で押さえた状態で、壁仕上げ板5を柱2と
梁3に取り付けるため、一人作業が可能であり、施工の
簡略化を図ることができる。また、施工金具1は従来か
ら必要であったため、施工部材が従来に比べ増加して施
工工程が増加するという不都合はない。
On the other hand, near the ceiling, the wall finishing plate 5 is temporarily placed on the receiving piece 12 of the construction fitting 1 along the upper edge of the wall finishing board 5 or on the receiving piece 12 of the construction fitting 1.
If it is not enough to move the upper end edge of the wall finishing plate 5 along the upper edge of the wall finishing plate 5 with the receiving piece 12 while pressing the wall finishing plate 5 with one hand, Since it is attached to the beam 3, it is possible for one person to work and the construction can be simplified. Further, since the construction metal fitting 1 has been conventionally required, there is no inconvenience that the construction member is increased and the construction process is increased as compared with the conventional construction.

【0015】さらに、床付近における場合と同様に、壁
仕上げ板5を柱2と梁3に取り付けた後に、受け片12
が壁仕上げ板5から突出した状態になるという不都合も
ない。
Further, similarly to the case near the floor, after the wall finishing plate 5 is attached to the pillar 2 and the beam 3, the receiving piece 12 is attached.
There is no inconvenience that the bulge protrudes from the wall finishing plate 5.

【0016】同様にして、適宜箇所において、壁仕上げ
板5を柱2と梁3に取り付けて、壁仕上げ板5の取り付
けを完了する。
Similarly, the wall finishing plates 5 are attached to the columns 2 and the beams 3 at appropriate places, and the attachment of the wall finishing plates 5 is completed.

【0017】図5は、本発明の請求項2に対応した実施
形態である施工金具付き梁の斜視図である。図6は、同
実施形態である施工金具付き梁の使用状態を示す構成図
である。
FIG. 5 is a perspective view of a beam with a construction fitting which is an embodiment corresponding to claim 2 of the present invention. FIG. 6 is a configuration diagram showing a usage state of the beam with a construction fitting according to the embodiment.

【0018】図5及び図6に示されるように、この施工
金具付き梁7は、H型鋼8の上フランジ9及び下フラン
ジ10の外面側に木質材料13を着設して成る梁の、上
フランジ9及び下フランジ10の一方を、長手方向全長
にわたって前記木質材料13より突出させて、壁仕上げ
板5の厚み寸法と略同一寸法の壁仕上げ板の受け片12
を形成して施工金具1となしたものである。
As shown in FIG. 5 and FIG. 6, the beam 7 with construction fittings is an upper beam of a beam formed by attaching a wood material 13 on the outer surface side of the upper flange 9 and the lower flange 10 of the H-shaped steel 8. One of the flange 9 and the lower flange 10 is projected from the wood-based material 13 along the entire length in the longitudinal direction, and the wall-finishing plate receiving piece 12 having substantially the same size as the thickness of the wall-finishing plate 5.
To form the metal fitting 1.

【0019】受け片12とH型鋼8とは一体として形成
されたものであってもよいし、受け片12をH型鋼8に
後付けしたものであってもよい。受け片12の材質は、
金属、プラスチック等を使用できる。
The receiving piece 12 and the H-shaped steel 8 may be integrally formed, or the receiving piece 12 may be attached to the H-shaped steel 8 afterwards. The material of the receiving piece 12 is
Metal, plastic, etc. can be used.

【0020】以下に、図5及び図6に基づいて、この施
工金具付き梁7の使用方法について説明する。先ず、図
6に示されるように、施工金具付き梁7と柱2とを固定
する。
Hereinafter, a method of using the beam 7 with the construction fitting will be described with reference to FIGS. 5 and 6. First, as shown in FIG. 6, the beam 7 with a construction fitting and the pillar 2 are fixed.

【0021】次いで、施工金具付き梁7より上側に壁仕
上げ板5を取り付ける場合には、施工金具1としての受
け片12の上に壁仕上げ板5を載置して仮置きした状態
で、釘、ボルト等の固着具により壁仕上げ板5を柱2に
取り付ける。
Next, when the wall finishing plate 5 is attached to the upper side of the beam 7 with the working metal fitting, the wall finishing board 5 is placed on the receiving piece 12 as the working metal fitting 1 and temporarily placed in the nail. The wall finishing plate 5 is attached to the pillar 2 by a fastener such as a bolt.

【0022】この場合には、H型鋼8の上フランジ9及
び下フランジ10の外面側に木質材料13を着設して成
る梁を使用した場合に、壁仕上げ板5を仮置きして動か
ない状態で壁仕上げ板5を柱2に取り付けるため、一人
作業が可能であるため施工の簡略化を図ることができ
る。
In this case, when the beam formed by attaching the wood material 13 to the outer surface of the upper flange 9 and the lower flange 10 of the H-shaped steel 8 is used, the wall finishing plate 5 is temporarily placed and does not move. Since the wall finishing plate 5 is attached to the pillar 2 in this state, the work can be simplified because one person can work.

【0023】また、施工部材が従来に比べ増加して施工
工程が増加するという不都合はない。さらに、壁仕上げ
板5の厚み寸法と、受け片12は略同一寸法であるた
め、壁仕上げ板5を柱2に取り付けた後に、受け片12
が壁仕上げ板5から突出した状態になるという不都合も
ない。
Further, there is no inconvenience that the number of construction members is increased as compared with the conventional one and the construction process is increased. Furthermore, since the thickness dimension of the wall finishing plate 5 and the receiving piece 12 are substantially the same, after the wall finishing board 5 is attached to the pillar 2, the receiving piece 12
There is no inconvenience that the bulge protrudes from the wall finishing plate 5.

【0024】一方、施工金具付き梁7より下側に壁仕上
げ板5を取り付ける場合には、壁仕上げ板5の上端縁を
受け片12に沿わせて仮置きした状態で、又は受け片1
2に壁仕上げ板5の上端縁を沿わせるだけでは不充分な
場合には、受け片12に壁仕上げ板5の上端縁を沿わせ
ると共に、壁仕上げ板5を片手で押さえた状態で、釘、
ボルト等の固着具により壁仕上げ板5を柱2に取り付け
るため、一人作業が可能であり、施工の簡略化を図るこ
とができる。また、施工部材が従来に比べ増加して施工
工程が増加するという不都合はない。
On the other hand, when the wall finishing plate 5 is attached to the lower side of the beam 7 with the fitting, the upper edge of the wall finishing plate 5 is temporarily placed along the receiving piece 12 or the receiving piece 1
When it is not enough to place the upper edge of the wall finishing plate 5 on the wall 2, it is necessary to place the upper edge of the wall finishing plate 5 on the receiving piece 12 while holding the wall finishing plate 5 with one hand. ,
Since the wall finishing plate 5 is attached to the pillar 2 by a fixing tool such as a bolt, one person can work and the construction can be simplified. Further, there is no inconvenience that the number of construction members is increased and the number of construction steps is increased compared to the conventional case.

【0025】さらに、施工金具付き梁7より上側に壁仕
上げ板5を取り付ける場合と同様に、壁仕上げ板5を柱
2に取り付けた後に、受け片12が壁仕上げ板5から突
出した状態になるという不都合もない。
Further, similarly to the case where the wall finishing plate 5 is attached to the upper side of the beam 7 with the fitting, after the wall finishing plate 5 is attached to the pillar 2, the receiving piece 12 is in a state of protruding from the wall finishing plate 5. There is no inconvenience.

【0026】同様にして、適宜箇所において、壁仕上げ
板5を柱2に取り付けて、壁仕上げ板5の取り付けを完
了する。
Similarly, the wall finishing plate 5 is attached to the pillar 2 at an appropriate position, and the attachment of the wall finishing plate 5 is completed.

【0027】[0027]

【発明の効果】本発明の請求項1記載の施工金具は、壁
仕上げ板を仮置きして動かない状態で壁仕上げ板を柱と
梁に取り付けるため、一人作業が可能であり、施工の簡
略化を図ることができる。また、施工金具は従来から必
要であったため、施工部材が従来に比べ増加して施工工
程が増加するという不都合はない。さらに、壁仕上げ板
の厚み寸法と、壁仕上げ板の受け片は略同一寸法である
ため、壁仕上げ板を柱に取り付けた後に、受け片が壁仕
上げ板から突出した状態になるという不都合もない。
According to the first aspect of the present invention, since the wall finishing plate is temporarily placed and the wall finishing plate is attached to the pillar and the beam without moving, the work can be performed by one person. Can be realized. Further, since the construction fitting has been conventionally required, there is no inconvenience that the construction member is increased and the construction process is increased as compared with the conventional construction. Further, since the thickness dimension of the wall finishing plate and the receiving piece of the wall finishing plate are substantially the same size, there is no inconvenience that the receiving piece is projected from the wall finishing plate after the wall finishing plate is attached to the pillar. .

【0028】本発明の請求項2記載の施工金具付き梁
は、壁仕上げ板を仮置きして動かない状態で壁仕上げ板
を柱に取り付けるため、一人作業が可能であるため施工
の簡略化を図ることができる。また、施工部材が従来に
比べ増加して施工工程が増加するという不都合はない。
さらに、壁仕上げ板の厚み寸法と、壁仕上げ板の受け片
は略同一寸法であるため、壁仕上げ板を柱に取り付けた
後に、受け片が壁仕上げ板から突出した状態になるとい
う不都合もない。
In the beam with a mounting bracket according to claim 2 of the present invention, since the wall finishing plate is temporarily placed and attached to the pillar without moving, the construction can be simplified because one person can work. Can be planned. Further, there is no inconvenience that the number of construction members is increased and the number of construction steps is increased compared to the conventional case.
Further, since the thickness dimension of the wall finishing plate and the receiving piece of the wall finishing plate are substantially the same size, there is no inconvenience that the receiving piece is projected from the wall finishing plate after the wall finishing plate is attached to the pillar. .

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の請求項1に対応した実施形態である施
工金具の使用状態を示す構成図である。
FIG. 1 is a configuration diagram showing a usage state of a construction metal fitting which is an embodiment corresponding to claim 1 of the present invention.

【図2】同上実施形態である施工金具の斜視図である。FIG. 2 is a perspective view of a construction metal fitting according to the same embodiment.

【図3】同上実施形態である施工金具の使用状態を示す
部分斜視図である。
FIG. 3 is a partial perspective view showing a usage state of the construction metal fitting according to the embodiment.

【図4】同上実施形態である施工金具の(a)、(b)
各々別の形態を示す斜視図である。
[FIG. 4] (a) and (b) of the construction metal fitting according to the embodiment.
It is a perspective view showing each different form.

【図5】本発明の請求項2に対応した実施形態である施
工金具付き梁の斜視図である。
FIG. 5 is a perspective view of a beam with a construction fitting that is an embodiment corresponding to claim 2 of the present invention.

【図6】同上実施形態である施工金具付き梁の使用状態
を示す構成図である。
FIG. 6 is a configuration diagram showing a usage state of the beam with a construction fitting according to the embodiment.

【図7】従来例を示す構成図である。FIG. 7 is a configuration diagram showing a conventional example.

【符号の説明】[Explanation of symbols]

1 施工金具 2 柱 3 梁 5 壁仕上げ板 6 取り付け孔 7 施工金具付き梁 8 H型鋼 9 上フランジ 10 下フランジ 11 施工金具本体 12 受け片 13 木質材料 1 Construction Metal Fitting 2 Pillar 3 Beam 5 Wall Finishing Plate 6 Mounting Hole 7 Beam with Construction Metal Fitting 8 H-Shaped Steel 9 Upper Flange 10 Lower Flange 11 Construction Hardware Main Body 12 Receiving Piece 13 Wood Material

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 柱と梁を固定する板状の施工金具であっ
て、施工金具本体の端縁に壁仕上げ板の厚み寸法と略同
一寸法の壁仕上げ板の受け片を突設して成ることを特徴
とする施工金具。
1. A plate-shaped construction metal fitting for fixing a pillar and a beam, wherein a wall-finishing plate receiving piece having substantially the same size as the thickness of the wall-finishing metal plate is provided at an end edge of the construction metal fitting main body. Construction metal fittings characterized by that.
【請求項2】 H型鋼の上下フランジの外面側に木質材
料を着設して成る梁の、上フランジ又は下フランジの少
なくとも一方を、長手方向全長にわたって前記木質材料
より突出させて、壁仕上げ板の厚み寸法と略同一寸法の
壁仕上げ板の受け片を形成して施工金具となしたことを
特徴とする施工金具付き梁。
2. A wall finishing plate in which at least one of an upper flange and a lower flange of a beam formed by attaching a wood material to outer surfaces of upper and lower flanges of H-section steel is made to project from the wood material over the entire length in the longitudinal direction. A beam with a construction metal fitting, characterized in that a construction piece is formed by forming a receiving piece of a wall finishing plate having substantially the same size as the thickness dimension of.
JP4151396A 1996-02-28 1996-02-28 Execution metal fittings and beam with execution metal fittings Pending JPH09228480A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4151396A JPH09228480A (en) 1996-02-28 1996-02-28 Execution metal fittings and beam with execution metal fittings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4151396A JPH09228480A (en) 1996-02-28 1996-02-28 Execution metal fittings and beam with execution metal fittings

Publications (1)

Publication Number Publication Date
JPH09228480A true JPH09228480A (en) 1997-09-02

Family

ID=12610466

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4151396A Pending JPH09228480A (en) 1996-02-28 1996-02-28 Execution metal fittings and beam with execution metal fittings

Country Status (1)

Country Link
JP (1) JPH09228480A (en)

Similar Documents

Publication Publication Date Title
EP3444410B1 (en) Bracing panel
JP4289703B2 (en) Horizontal member joint structure
JPH09228480A (en) Execution metal fittings and beam with execution metal fittings
JP3872881B2 (en) Brace fixing bracket and brace fixing method
JPH0636110Y2 (en) Mounting structure for wall panels for openings
JP4294157B2 (en) Decorative plate mounting structure
JP2579104Y2 (en) Stud clasp
JP3025608B2 (en) Wall material fastening device
JP3126116B2 (en) Construction method of protruding corner using long protruding corner material
JP2002167891A (en) Corner jointing hardware and connecting structure between floor above and below
JPH11241438A (en) Metal fixture and mounting method of alc panel
JPH0314506Y2 (en)
JPS6029558Y2 (en) Torso panel mounting device
JPS6015841Y2 (en) panel mounting device
JPH08120792A (en) Beam coupling metal fitting
JP2514769B2 (en) Beam receiving method and beam receiving bracket
JP3029452U (en) Rafter stop bracket
JPH07189472A (en) Corner material
JPH05248025A (en) Fitting construction for roof backing material
JP2002013212A (en) Skeleton connecting structure for backing, and connecting member and fixing member for use in the skeleton connecting structure
JPS5813696B2 (en) Architectural board mounting device
JPH04231536A (en) Attaching structure and attaching hardware of concrete panel
JPH05230902A (en) Panel mounting metal for external wall and mounting structure thereof
JPH08189120A (en) Support structure of floor joist and cradling receive and floor panel
JPH055968U (en) Laying structure of building boards