JPH0913898A - Nut for rock bolt - Google Patents

Nut for rock bolt

Info

Publication number
JPH0913898A
JPH0913898A JP7161811A JP16181195A JPH0913898A JP H0913898 A JPH0913898 A JP H0913898A JP 7161811 A JP7161811 A JP 7161811A JP 16181195 A JP16181195 A JP 16181195A JP H0913898 A JPH0913898 A JP H0913898A
Authority
JP
Japan
Prior art keywords
nut
lock bolt
washer
ground
rock bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7161811A
Other languages
Japanese (ja)
Other versions
JP3101180B2 (en
Inventor
Toru Haneuma
徹 羽馬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KFC Ltd
Original Assignee
KFC Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=15742368&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JPH0913898(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by KFC Ltd filed Critical KFC Ltd
Priority to JP07161811A priority Critical patent/JP3101180B2/en
Publication of JPH0913898A publication Critical patent/JPH0913898A/en
Application granted granted Critical
Publication of JP3101180B2 publication Critical patent/JP3101180B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: To shorten the projected length of a rock bolt. CONSTITUTION: A rock bolt 20 is driven into a bore hole drilled in the natural ground and, then, the shaft section 42 of a nut 40 is loosely inserted in the round hole 31 of a washer 30. In this state, the internal thread section 41 of the nut 40 is coupled to an external thread section 21 on the base end external surface of the rock bolt 20. With the development of the coupling work, the shaft section 42 of the nut 40 advances into the bore hole, and the washer 30 is pressed to the subsoil with the head 43 of the nut 40, thereby firmly anchoring the rock bolt 20 to the subsoil.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はトンネル工事等で地山の
定着に用いるロックボルトにプレート、ワッシャー等の
座板と組み合わせて嵌め込むことで、ロックボルトを地
山に固定するロックボルト用ナットに係り、とくに仮支
保工なため後で切断が可能なように、FRPや樹脂など
からなり、外周にねじを形成した、単位長さ当たりのね
じ強度(ねじ山の引張強度)が低いロックボルトに好適
なロックボルト用ナットに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a lock bolt nut for fixing a rock bolt to a natural rock by fitting it into a rock bolt used for fixing a natural rock in a tunnel construction etc. in combination with a seat plate such as a plate and a washer. In particular, the lock bolt has a low screw strength per unit length (tensile strength of the thread), which is made of FRP or resin and has a thread formed on the outer circumference so that it can be cut later because it is temporary support work. The present invention relates to a nut for a lock bolt.

【0002】[0002]

【従来の技術】山岳等のトンネル工事で一般的なナトム
工法(NATM工法)では、地山を掘削したあと(必要
な場合は壁をセメントで固めた後)、壁から岩盤内部へ
垂直に多数のロックボルトを打ち込み、セメント系或い
は樹脂系等の所定の定着材で定着させるなどして、トン
ネルの壁近くの地盤を強固にするとともに岩盤内部の地
盤で支持することで内壁周辺の崩落を防ぐようにしてい
る(支保工)。ロックボルトには工事トンネルの側壁等
に垂直に打ち込み定着させたあとそのまま地盤中に残し
て長期間、地盤の補強を行う支保工用と、工事トンネル
先端の切羽鏡やサイロット等に打ち込み、定着させる
が、一時的な補強を行うだけで後にトンネル掘進ととも
に切断される仮支保工用とが有る。
2. Description of the Related Art In the NATO method (NATM method), which is common in tunnel construction in mountains, etc., after excavating the natural ground (when necessary, after cementing the wall with cement), a large number of pieces are vertically inserted into the bedrock. The rock bolts are driven in and fixed with a predetermined fixing material such as cement or resin to strengthen the ground near the tunnel wall and support the ground inside the rock to prevent collapse around the inner wall. I am doing it (support work). The lock bolt is vertically driven into the side wall of the construction tunnel and fixed, and then left in the ground as it is for reinforcement of the ground for a long time, and it is driven into the face mirror and silot etc. at the tip of the construction tunnel and fixed. However, it is for temporary support work that will be cut off along with the tunnel excavation with only temporary reinforcement.

【0003】前者の支保工用の場合、構造部材としてな
るべく高強度のものが望ましく鋼製のものが利用され
る。そして、打設後はプレート、ワッシャー等の座板と
ナットを用いて地盤への締めつけが行われ、長期間、強
固に定着するようにしている。一方、後者の仮支保工の
場合、後に切断可能なように、FRPや樹脂などからな
り、外周にねじを形成した、単位長さ当たりのねじ強度
(ねじ山の引張強度)が低い構造部材が用いられる。但
し、仮設の場合、短期間の内に除去されることが多いの
で通常はナットによる締めつけはされず、単に地盤中に
打設されるだけである。
In the former case of supporting work, it is desirable that the structural member has as high strength as possible, and that made of steel is used. After the driving, the plate is tightened to the ground using a seat plate such as a plate and a washer and a nut, so that the fixing is firmly performed for a long period of time. On the other hand, in the case of the latter temporary support work, a structural member made of FRP, resin or the like and having a screw formed on the outer periphery and having a low screw strength per unit length (tensile strength of the thread) so that it can be cut later can Used. However, in the case of temporary installation, since it is often removed within a short period of time, it is usually not tightened with nuts, but simply placed in the ground.

【0004】ここで、工事トンネルの側壁に対し垂直か
つ放射状に打設するパターンボルトの場合、後で拡幅し
ない場合は図4の右側に示す如く、鋼製のロックボルト
1をプレート、ワッシャー等の座板とナットを用いて地
盤に締めつけ支保工を行うが、後で拡幅のため掘削する
予定が有る場合、FRPや樹脂などのように比較的強度
の低いロックボルトで仮支保工を行う。但し、仮設期間
が長くなるので、定着強度を上げるため図4の左側に示
す如く、低強度のロックボルト2にプレート、ワッシャ
ー等の座板と組み合わせたナットを嵌め込みたい場合が
有る。ところが、FRPや樹脂などからなる構造部材で
は、鋼製ロックボルトの如く自在なピッチで外面に雄ね
じ部を切削することが難しい。このことから、従来は、
図5に示す如く、ロックボルト2の素材成型時にその外
形を所謂ロープねじ状(鋼製ロックボルトに形成される
雄ねじ部よりピッチが粗い)に加工するようにしてい
た。
Here, in the case of a pattern bolt which is laid radially and vertically to the side wall of a construction tunnel, when the width is not widened later, as shown on the right side of FIG. 4, the steel lock bolt 1 is used as a plate, washer or the like. The seat plate and nuts are used to tighten and support the ground, but if there is a plan to excavate for widening later, temporary support work will be performed with a relatively low-strength rock bolt such as FRP or resin. However, since the temporary installation period becomes long, there is a case where it is desired to fit a nut combined with a seat plate such as a plate and a washer into the low-strength lock bolt 2 as shown on the left side of FIG. 4 in order to increase the fixing strength. However, with a structural member made of FRP, resin, or the like, it is difficult to cut the male screw portion on the outer surface at a free pitch like a steel lock bolt. From this fact, conventionally,
As shown in FIG. 5, when the material of the lock bolt 2 is molded, its outer shape is processed into a so-called rope screw shape (the pitch is coarser than the male screw portion formed on the steel lock bolt).

【0005】ロープねじ加工されたロックボルト2に用
いるナット3は、同じくロープねじの雌ねじ部を形成し
たものとなる。このようなロープねじ加工されたロック
ボルト2とナット3において、打設後のロックボルト2
にプレート、ワッシャー等の座板4と組み合わせたナッ
ト3を嵌め込んでロックボルト2を地山5に締めつけ、
定着させる場合に、ロックボルト2とナット3の嵌め合
わせ部分のねじ山に掛かる引っ張り荷重を小さくし、ね
じ山の引張強度の低い素材でも十分に耐えられるように
する必要がある。このため、図5に示す如く、ロックボ
ルト2とナット3との嵌め合わせ長さLをかなり長くし
なければならず、ナット3を長尺にして雌ねじ部に十分
な長さを確保しなければならない。
The nut 3 used for the rope bolt processed lock bolt 2 also has a female thread portion of the rope screw. In such a lock bolt 2 and a nut 3 which are rope-thread processed, the lock bolt 2 after being cast
Insert the nut 3 combined with the seat plate 4 such as plate and washer into the and tighten the lock bolt 2 to the natural ground 5,
When fixing, it is necessary to reduce the tensile load applied to the thread of the fitting portion of the lock bolt 2 and the nut 3 so that even a material having a low tensile strength of the thread can sufficiently withstand. For this reason, as shown in FIG. 5, the fitting length L of the lock bolt 2 and the nut 3 must be considerably long, and the nut 3 must be long to secure a sufficient length in the female thread portion. I won't.

【0006】[0006]

【発明が解決しようとする課題】けれども、従来のナッ
ト3では地山の内壁に当たるプレート、ワッシャー等の
座板4をナット3の一端面で押さえるようになっている
ので、ナット3が長尺になるとそれだけナット3を含め
たロックボルト2の端部がトンネル空間内に大きく突出
してしまう。この結果、トンネル施工の途中において他
の作業の邪魔になったり、次工程で防水シート、アイソ
レーションシート等のシート類6を敷設する場合、突出
したロックボルト頭部に阻害されてシート類6に凸凹が
生じ、所期のシート性能を発揮できなくなってしまうな
どの問題があった。
However, in the conventional nut 3, since the plate which hits the inner wall of the natural ground and the seat plate 4 such as the washer are pressed by one end surface of the nut 3, the nut 3 is long. In that case, the end portion of the lock bolt 2 including the nut 3 largely projects into the tunnel space. As a result, when interfering with other work during the tunnel construction, or when laying sheets 6 such as a waterproof sheet and an isolation sheet in the next process, the sheets 6 are blocked by the protruding lock bolt heads. There was a problem that unevenness occurred and the desired seat performance could not be achieved.

【0007】以上から本発明の目的は、ロックボルトの
突出長さを短くできるロックボルト用ナットを提供する
ことである。
In view of the above, an object of the present invention is to provide a lock bolt nut capable of shortening the protruding length of the lock bolt.

【0008】[0008]

【課題を解決するための手段】上記課題は本発明におい
ては、外周に雄ねじ部の形成されたロックボルトに螺合
可能な所定長の雌ねじ部を有し、地山に打ち込まれたロ
ックボルトに座板と組み合わせて嵌め込むことで、ロッ
クボルトを地盤に固定するロックボルト用ナットにおい
て、座板の穴に遊挿可能なシャフト部と、シャフト部の
手元側に固着され、座板の穴より大きい頭部から成り、
頭部からシャフト部まで連続するように所定長の雌ねじ
部を形成したことにより達成される。
According to the present invention, there is provided a lock bolt having a female screw portion of a predetermined length which can be screwed into a lock bolt having a male screw portion formed on the outer periphery thereof and which is driven into the ground. In the nut for the lock bolt that fixes the lock bolt to the ground by fitting it together with the seat plate, the shaft part that can be loosely inserted into the hole of the seat plate and the proximal side of the shaft part are fixed, and Consists of a large head,
This is achieved by forming an internal thread portion of a predetermined length so as to be continuous from the head portion to the shaft portion.

【0009】[0009]

【作用】本発明によれば、ロックボルトを用いて仮設期
間の長い仮支保工を行う場合、地山にボアホールを穿設
しておく。そして、ロックボルトを打設したあと、座板
の穴にナットのシャフト部を遊挿した状態で、ロックボ
ルト頭部外面の雄ねじ部にナットの雌ねじ部を嵌め込ん
でいく。嵌め込みの進行とともにナットのシャフト部は
ボアホール内に入り込み、座板はナットの頭部によって
地盤に押し当てられ、ロックボルトが地盤に強固に定着
される。これにより、ロックボルトに座板と組み合わせ
たナットを嵌め込んだとき、ナットの大部分はボアホー
ル内に入り込み、ほぼナットの頭部と座板を合わせた厚
み分が外に出るだけなので、ロックボルトの突出長さを
短くでき、他の作業の邪魔とならず、また、次工程で防
水シート、アイソレーションシート等のシート類を敷設
する場合に凸凹が小さくなるので所期のシート性能を発
揮させることができる。
According to the present invention, when the temporary support work for a long temporary period is performed using the lock bolt, the bore hole is bored in the natural ground. Then, after the lock bolt is driven, the shaft portion of the nut is loosely inserted into the hole of the seat plate, and the female screw portion of the nut is fitted into the male screw portion of the outer surface of the lock bolt head. As the fitting progresses, the shaft portion of the nut enters into the borehole, the seat plate is pressed against the ground by the head of the nut, and the lock bolt is firmly fixed to the ground. As a result, when the nut combined with the seat plate is fitted into the lock bolt, most of the nut will go into the bore hole, and the thickness of the nut head and seat plate will almost go out. The projecting length of can be shortened so that it does not interfere with other work, and the unevenness becomes small when laying sheets such as waterproof sheets and isolation sheets in the next process, so the desired seat performance is exhibited. be able to.

【0010】[0010]

【実施例】図1は本発明の一実施例に係わるロックボル
トセットの外観斜視図、図2はワッシャーとナットの組
み合わせ状態での斜視断面図である。ロックボルトセッ
ト10はロックボルト20と、該ロックボルト20を地
山に締めつけるための角型のワッシャー30及びナット
40の組み合わせからなる。ロックボルト20は後に切
断ができるように、FRPや樹脂などからなる比較的低
強度のものであり、外面には全長にわたってロープねじ
が螺旋状に形成されてなる雄ねじ部21が設けられてい
る(雄ねじ部21のピッチは鋼製ロックボルトより粗
い)。ロックボルト20の先端は斜めに切断加工されて
地山への打設を円滑に行えるようになっている。
1 is an external perspective view of a lock bolt set according to an embodiment of the present invention, and FIG. 2 is a perspective sectional view showing a combination of a washer and a nut. The lock bolt set 10 is composed of a lock bolt 20 and a combination of a square washer 30 and a nut 40 for tightening the lock bolt 20 on the ground. The lock bolt 20 is made of FRP, resin, or the like and has a relatively low strength so that it can be cut later, and a male screw portion 21 formed by spirally forming a rope screw is provided on the outer surface of the lock bolt 20 ( The pitch of the male screw portion 21 is coarser than that of the steel lock bolt). The tip of the lock bolt 20 is obliquely cut so that it can be smoothly driven into the natural ground.

【0011】ワッシャー30とナット40はともに鋼製
またはFRP製である。ワッシャー30には丸穴31が
形成されており、丸穴31の中にナット40を遊挿可能
になっている。一方、ナット40の内側には全長にわた
ってロックボルト20の雄ねじ部21に螺合する雌ねじ
部41が形成されている(図2参照)。このナット40
はロックボルト20との嵌め合わせた場合に、ねじ山に
掛かる引っ張り荷重が小さくなるように十分な長さに形
成されている。
Both the washer 30 and the nut 40 are made of steel or FRP. A round hole 31 is formed in the washer 30, and the nut 40 can be loosely inserted into the round hole 31. On the other hand, inside the nut 40, a female screw portion 41 that is screwed into the male screw portion 21 of the lock bolt 20 is formed over the entire length (see FIG. 2). This nut 40
Is formed to have a sufficient length so that the tensile load applied to the screw thread becomes small when fitted with the lock bolt 20.

【0012】ナット40は円筒状のシャフト部42と、
シャフト部42の一端に設けられた頭部43とから成
り、シャフト部42はナット40の大半の長さを占めて
いる。シャフト部42はワッシャー30の丸穴31より
僅かに小さな外径に形成されており、丸穴31の中にシ
ャフト部42を遊挿可能になっている。これに対し、頭
部43は丸穴31より遙かに大きく形成されており、シ
ャフト部42に嵌め込まれたワッシャー30が抜けない
ようになっている。頭部43は六角になっており、締め
つけ工具を嵌めて回転できるようになっている。
The nut 40 has a cylindrical shaft portion 42,
The head portion 43 is provided at one end of the shaft portion 42, and the shaft portion 42 occupies most of the length of the nut 40. The shaft portion 42 is formed to have an outer diameter slightly smaller than that of the round hole 31 of the washer 30, and the shaft portion 42 can be freely inserted into the round hole 31. On the other hand, the head portion 43 is formed to be much larger than the round hole 31 so that the washer 30 fitted in the shaft portion 42 does not come off. The head 43 has a hexagonal shape so that a tightening tool can be fitted and rotated.

【0013】図3はロックボルトセット10の使用方法
を示す説明図である。例えば、工事トンネルの内側壁に
仮支保工を行う場合、まず、地山5にボアホール50を
穿設し(図3(1)参照)、打ち込み機を用いてボアホ
ール50の中にロックボルト20を打設する(図3
(2)参照)。切羽鏡、サイロットなど短期間の仮設で
あればそのままで良いが、後で拡幅するなどのため仮設
期間が比較的長い場合、ワッシャー30を組み合わせた
ナット40を嵌め合わせることで、強固な定着を図る。
FIG. 3 is an explanatory view showing how to use the lock bolt set 10. For example, in the case of temporarily supporting the inner wall of the construction tunnel, first, the borehole 50 is bored in the natural ground 5 (see FIG. 3 (1)), and the lock bolt 20 is inserted into the borehole 50 using a driving tool. Placing (Fig. 3
(See (2)). If it is a short-term temporary installation such as a face mirror or a silot, it can be left as it is, but if the temporary installation is relatively long due to widening later, a nut 40 combined with the washer 30 is fitted to firmly fix the fixing. .

【0014】すなわち、ロックボルト20の手元側端部
がワッシャー30とナット40の頭部43を合わせた厚
みより少し多い長さだけ突き出た位置まで打設したあ
と、ナット40のシャフト部42をワッシャー30の丸
穴31に挿入した状態で、シャフト部42の先端側から
ロックボルト20の雄ねじ部21にナット40の雌ねじ
部41を螺合させて嵌め込んでいく。この際、ナット4
0の頭部43に締めつけ工具を嵌めて回転させる。ナッ
ト40の嵌め込みの進行に伴い、シャフト部41はボア
ホール50の中に徐々に入り込んでいく。ワッシャー3
0はナット40の頭部43に押されて前進し、地盤51
に当たったところで更にナット40を締め付けると、ロ
ックボルト20が地盤51に固く定着する(図3(3)
参照)。
That is, after the lock bolt 20 is driven to a position where the end portion on the proximal side of the lock bolt 20 projects a little more than the total thickness of the washer 30 and the head portion 43 of the nut 40, the shaft portion 42 of the nut 40 is washered. In the state of being inserted into the round hole 31 of 30, the female screw portion 41 of the nut 40 is screwed into the male screw portion 21 of the lock bolt 20 from the tip side of the shaft portion 42 to be fitted therein. At this time, nut 4
A tightening tool is fitted on the head 43 of 0 and rotated. As the fitting of the nut 40 progresses, the shaft portion 41 gradually enters the bore hole 50. Washer 3
0 is pushed by the head 43 of the nut 40 to move forward, and the ground 51
When the nut 40 is further tightened where it hits the lock bolt 20, the lock bolt 20 is firmly fixed to the ground 51 (Fig. 3 (3)).
reference).

【0015】ワッシャー30と組み合わせたナット40
の締めつけが完了したとき、ロックボルト20とナット
40の嵌め合い長さ(図3(3)の符号L参照)が十分
に長いので、ねじのピッチが粗くてもねじ山に掛かる引
っ張り荷重は小さく、ねじ山の引張強度が比較的低いロ
ックボルト20でも十分に耐えることができる。また、
ロックボルト20の内、地盤から突出する長さはワッシ
ャー30とナット40の頭部43を合わせた厚みより少
し長いだけの短いものとなる。従って、工事トンネルで
他の作業をする場合の邪魔になることはなく、また、図
3(4)に示す如くロックボルト20の定着後に防水シ
ート、アイソレーションシート等のシート類52を張る
場合にも、シート類52に生じる凸凹を小さくでき、所
期のシート性能を良好に発揮させることができる。
Nut 40 in combination with washer 30
When the tightening is completed, the fitting length of the lock bolt 20 and the nut 40 (see symbol L in FIG. 3 (3)) is sufficiently long, so that even if the pitch of the screw is rough, the tensile load applied to the screw thread is small. The lock bolt 20 having a relatively low tensile strength of the screw thread can sufficiently withstand. Also,
The length of the lock bolt 20 protruding from the ground is a little shorter than the combined thickness of the washer 30 and the head 43 of the nut 40. Therefore, it does not interfere with other work in the construction tunnel, and as shown in FIG. 3 (4), when the sheets 52 such as a waterproof sheet and an isolation sheet are stretched after the lock bolt 20 is fixed. In addition, the unevenness generated in the sheets 52 can be reduced, and desired sheet performance can be satisfactorily exhibited.

【0016】仮設期間が終わり、トンネル拡幅などのた
めロックボルト20の打設箇所を掘削する場合には、該
ロックボルト20がFRPや樹脂などからなるので容易
に切断することができ、機械掘削の妨げとならない。
When the place where the lock bolt 20 is to be excavated for the purpose of widening the tunnel after the temporary construction period is over, the lock bolt 20 is made of FRP, resin or the like and can be easily cut. Does not hinder.

【0017】この実施例によれば、ワッシャー30と組
み合わせたナット40をロックボルト20に螺合し、嵌
め合わせると、ワッシャー30はナット40のシャフト
部42に嵌まった状態で頭部43に押さえられて地盤に
当接し、ナット40を締めつけると反作用でロックボル
ト20が地盤に固く定着する。ナット40の嵌め込みが
進行するとき、シャフト部42は先端からボアホール5
0の中に入り込んでいくので、ロックボルト20の内、
外部に突出するのはワッシャー30と頭部43を合わせ
た厚み程度となるので、突出長さが非常に短くなり、工
事トンネルで他の作業をする場合の邪魔になることはな
く、また、ロックボルト20の定着後に防水シート、ア
イソレーションシート等のシート類52を張る場合に
も、シート類52に生じる凸凹を小さくでき、所期のシ
ート性能を良好に発揮させることができる。
According to this embodiment, when the nut 40 combined with the washer 30 is screwed onto the lock bolt 20 and fitted, the washer 30 is pressed against the head portion 43 while being fitted on the shaft portion 42 of the nut 40. When the nut 40 is contacted with the ground and the nut 40 is tightened, the lock bolt 20 is firmly fixed to the ground by a reaction. As the fitting of the nut 40 progresses, the shaft portion 42 is inserted from the tip to the bore hole 5
Since it goes into 0, of the lock bolt 20,
Since the thickness of the washer 30 and the head 43 is projected to the outside, the projecting length is extremely short, which does not interfere with other work in the construction tunnel, and also locks the lock. Even when the sheets 52 such as the waterproof sheet and the isolation sheet are stretched after the fixing of the bolts 20, the irregularities generated in the sheets 52 can be made small, and the desired sheet performance can be exhibited well.

【0018】なお、上記した実施例ではロックボルトは
FRPや樹脂などからなり、外周にねじを形成したもの
としたが、他の材質を用いたロックボルトであっても良
く、また、座板としてワッシャーを用いたが、プレート
(ベアリングプレートなど)を用いても良い。
In the above-mentioned embodiment, the lock bolt is made of FRP, resin or the like and has a screw formed on the outer circumference. However, it may be a lock bolt made of other material, or as a seat plate. Although the washer is used, a plate (bearing plate or the like) may be used.

【0019】[0019]

【発明の効果】以上本発明のロックボルト用ナットによ
れば、座板の穴にナットのシャフト部を遊挿した状態
で、ロックボルト頭部外面の雄ねじ部にナットの雌ねじ
部を嵌め込んでいくと、嵌め込みの進行とともにナット
のシャフト部はボアホール内に入り込み、座板はナット
の頭部によって地山に押し当てられ、ロックボルトが地
盤に締めつけられるように構成したので、ロックボルト
に座板と組み合わせたナットを嵌め込んだとき、ナット
の大部分はボアホール内に入り込み、頭部が外に出るだ
けなので、ロックボルトの突出長さを短くでき、他の作
業の邪魔とならず、また、次工程で防水シート、アイソ
レーションシート等のシート類を敷設する場合に凸凹が
小さくなるので所期のシート性能を発揮させることがで
きる。
As described above, according to the lock bolt nut of the present invention, with the shaft portion of the nut loosely inserted in the hole of the seat plate, the female screw portion of the nut is fitted into the male screw portion on the outer surface of the lock bolt head. Then, as the fitting progresses, the shaft part of the nut enters the bore hole, the seat plate is pressed against the ground by the nut head, and the lock bolt is tightened to the ground. When the nut combined with is inserted, most of the nut goes into the borehole and the head only goes out, so the protruding length of the lock bolt can be shortened and it does not interfere with other work. When laying sheets such as a waterproof sheet and an isolation sheet in the next step, the unevenness becomes small, so that the desired sheet performance can be exhibited.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例に係るロックボルトセットの
外観斜視図である。
FIG. 1 is an external perspective view of a lock bolt set according to an embodiment of the present invention.

【図2】ワッシャーとナットの組み合わせ状態での斜視
断面図である。
FIG. 2 is a perspective cross-sectional view of a combination of a washer and a nut.

【図3】ロックボルトセットの使用方法の説明図であ
る。
FIG. 3 is an explanatory diagram of how to use the lock bolt set.

【図4】パターンボルトの施工状態の説明図である。FIG. 4 is an explanatory view of a construction state of a pattern bolt.

【図5】従来の仮支保工用ロックボルトセットの問題点
の説明図である。
FIG. 5 is an explanatory diagram of a problem of a conventional temporary support work lock bolt set.

【符号の説明】[Explanation of symbols]

10 ロックボルトセット 20 ロックボルト 21 雄ねじ部 30 ワッシャー 31 丸穴 40 ナット 41 雌ねじ部 42 シャフト部 43 頭部 10 lock bolt set 20 lock bolt 21 male screw part 30 washer 31 round hole 40 nut 41 female screw part 42 shaft part 43 head

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 外周に雄ねじ部の形成されたロックボル
トに螺合可能な所定長の雌ねじ部を有し、地山に打ち込
まれたロックボルトに座板と組み合わせて嵌め込むこと
で、ロックボルトを地盤に固定するロックボルト用ナッ
トにおいて、 座板の穴に遊挿可能なシャフト部と、 シャフト部の手元側に固着され、座板の穴より大きい頭
部から成り、 頭部からシャフト部まで連続するように所定長の雌ねじ
部を形成したこと、 を特徴とするロックボルト用ナット。
1. A lock bolt having a female screw portion of a predetermined length which can be screwed into a lock bolt having a male screw portion formed on the outer periphery, and is fitted into a rock bolt driven into the ground in combination with a seat plate. In the nut for the lock bolt that fixes the to the ground, it consists of a shaft part that can be loosely inserted in the hole of the seat plate and a head that is fixed to the proximal side of the shaft part and is larger than the hole of the seat plate. A nut for a lock bolt, characterized in that a female thread portion of a predetermined length is formed so as to be continuous.
JP07161811A 1995-06-28 1995-06-28 Lock bolt nut Expired - Lifetime JP3101180B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07161811A JP3101180B2 (en) 1995-06-28 1995-06-28 Lock bolt nut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07161811A JP3101180B2 (en) 1995-06-28 1995-06-28 Lock bolt nut

Publications (2)

Publication Number Publication Date
JPH0913898A true JPH0913898A (en) 1997-01-14
JP3101180B2 JP3101180B2 (en) 2000-10-23

Family

ID=15742368

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07161811A Expired - Lifetime JP3101180B2 (en) 1995-06-28 1995-06-28 Lock bolt nut

Country Status (1)

Country Link
JP (1) JP3101180B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009293196A (en) * 2008-06-02 2009-12-17 Katekkusu:Kk Rock bolt structure and its tensile yield strength test method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3101180B2 (en) 1995-06-28 2000-10-23 株式会社ケー・エフ・シー Lock bolt nut

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6124520B2 (en) * 1980-01-02 1986-06-11 Baamingamu Boruto Co
JP3101180B2 (en) 1995-06-28 2000-10-23 株式会社ケー・エフ・シー Lock bolt nut

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6124520B2 (en) * 1980-01-02 1986-06-11 Baamingamu Boruto Co
JP3101180B2 (en) 1995-06-28 2000-10-23 株式会社ケー・エフ・シー Lock bolt nut

Non-Patent Citations (11)

* Cited by examiner, † Cited by third party
Title
JPN3013000508; スイス特許公報 CH654057 , 19860131, SWISS FEDERAL INSTITUTE OF INTELLECTUAL PROPERTY
JPN3013000509; 甲第2号証の翻訳文
JPN3013000510; 新村出 編: 広辞苑 第2版第9刷, 19750925, PAGE 1346, (株)岩波書店
JPN3013000511; 本件特許の審査手続における平成11年11月17日付けの拒絶理由通知書の写し
JPN3013000512; 本件特許の審査手続において、平成12年1月7日付けで提出された手続補正書の写し
JPN3013000513; 本件特許の審査手続において、平成12年1月7日付けで提出された意見書の写し
JPN3013000514; 国際公開 WO 88/08065 号公報 , 19881020, 世界知的所有権機関
JPN3013000515; 甲第9号証の翻訳文
JPN3013000516; 現場技術者のための吹付けコンクリート・ロックボルト Q&A , 200303, PAGES 142-145, (社)日本トンネル技術協会
JPN3013000517; ロックボルト工の現場設計法に関する研究(その2)報告書 (日本道路公団東京第二建設局委託) , 198003, PAGES 44-46, 109-112, (社)日本トンネル技術協会
JPN3013000518; 今田徹 他: 'ロックボルト工入門 (1)' トンネルと地下 VOL. 9, NO. 2, 19780120, PAGES 54-60, (社)日本トンネル技術協会

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009293196A (en) * 2008-06-02 2009-12-17 Katekkusu:Kk Rock bolt structure and its tensile yield strength test method

Also Published As

Publication number Publication date
JP3101180B2 (en) 2000-10-23

Similar Documents

Publication Publication Date Title
KR101143375B1 (en) Tunnel construction lock bolt unit having insertion depth control function
KR102137563B1 (en) cut slop retaining wall construction structure and the method of constructing cut slop retaining wall
JP2018091050A (en) Protection method of tunnel waterproof sheet and drilling bit and drilling tool for using for this
JPH0913898A (en) Nut for rock bolt
JP3205546B2 (en) Lock bolt nut
KR100524316B1 (en) rock bolt
JP4931766B2 (en) Lock bolt nut
KR100505330B1 (en) Tension nail of construction
JPS58153816A (en) Reinforced cap device for pile head
KR20060097166A (en) Anchor bolt
JP3412809B2 (en) FRP lock bolt
JP2002194737A (en) Concrete pile and its connection nipple
JP3213294B2 (en) Lock bolt nut
JP2008081985A (en) Pile and pile head anchoring structure
JPH0730562B2 (en) Reinforced earth method with tubular reinforcement
JP2517918Y2 (en) Rock bolt for civil engineering
JP3197546B1 (en) Temporary lock bolt and lock bolt construction method using the temporary lock bolt
JP2017110486A (en) Fixing tool for lock bolt head
JPH08152015A (en) Shearing bolt for repiaring and reinforcing face of slope and inner peripheral surface of tunnel
JP2001107700A (en) Structure for fixing mine facility installing bracket in tunnel segment
JPS59179927A (en) Earth anchor bar
JPH07268877A (en) Method for reinforcing excavation slope
KR200292891Y1 (en) liner screw of reninforcing rod
JPH0612036Y2 (en) Fixing material for earth anchor
JPS6111318Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080818

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090818

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100818

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110818

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120818

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130818

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140818

Year of fee payment: 14

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R157 Certificate of patent or utility model (correction)

Free format text: JAPANESE INTERMEDIATE CODE: R157

EXPY Cancellation because of completion of term