JPH0911093A - Operation assignment supporting device - Google Patents

Operation assignment supporting device

Info

Publication number
JPH0911093A
JPH0911093A JP16510395A JP16510395A JPH0911093A JP H0911093 A JPH0911093 A JP H0911093A JP 16510395 A JP16510395 A JP 16510395A JP 16510395 A JP16510395 A JP 16510395A JP H0911093 A JPH0911093 A JP H0911093A
Authority
JP
Japan
Prior art keywords
work
assignment
worker
allocation
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16510395A
Other languages
Japanese (ja)
Other versions
JP3412346B2 (en
Inventor
Junichi Hamano
順一 浜野
Kouji Kamota
浩司 加茂田
Masato Uno
正人 宇野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP16510395A priority Critical patent/JP3412346B2/en
Publication of JPH0911093A publication Critical patent/JPH0911093A/en
Application granted granted Critical
Publication of JP3412346B2 publication Critical patent/JP3412346B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PURPOSE: To minimize and level the operation time of each operator so as to reduce an operation manager's consideration and description time by an operation assignment editing part for deciding the arrangement of operators using a screen for every product and editing for distributing each operation of operation data to the operators. CONSTITUTION: An operation assignment editing part 29 is provided on an assignment device main body and adapted to arrange operators on a screen for every manufacturing lot using a keyboard/mouse and a display, and perform operation assignment and editing for allotting each operation of operation data to an operator, and register the operation position, the operator in the position and the operation of the operator which are the results of assignment in an operation data storing part 28. An operation experience evaluating part 33 is provided on an assignment device main body and adapted to retrieve and evaluate parts of each operator and the existence/absence of his operation experience. In the case of an inexperienced beginner, a warning such as changing of the background color of an operator's name display part of a screen of the display is given.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、産業機械、家庭用電器
などの複数機種の製品を、人手組立ラインで連続的に組
立てる工場での作業割付支援機構に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work allocation support mechanism in a factory for continuously assembling a plurality of types of products such as industrial machines and household electric appliances on a manual assembly line.

【0002】[0002]

【従来の技術】複数作業者に一連の作業を分割して割付
けて組立を行う人手組立ラインでは、この作業割付の結
果がラインの生産を左右することになる。一般に作業割
付では、作業内容を各作業者の能力やラインの制約条件
を考慮して、作業時間が平準化するように割り付けてい
る。ところが出欠勤に伴う作業者の変更や、日々の生産
量の変動に対して、作業人員の増減を行うことで生産能
力を調整しているがための作業者数変動、作業改善によ
る作業手順の変更、また設計仕様変更により部品やその
個数が異なるといった割付における条件の変更が頻発す
る。さらに同じ部品、すなわち部品名称が同じでも長さ
や材質等部品仕様が異なる場合や、単に購入ロットが異
なる場合が有る。この違いは部品コードの相違として表
現される。すなわち機種が同じでも製造ロット単位に見
れば使用部品コード異なる組立が存在する。したがって
指定に対して異なった部品コードの部品を用いた場合、
特に部品仕様が異なると組立異常や製品性能劣化といっ
た大きな問題となる。また、部品仕様が同じでも他の組
立の部品不足等の影響を及ぼし、製造の混乱を招く。
2. Description of the Related Art In a manual assembly line in which a series of works are divided and assigned to a plurality of workers for assembly, the result of this work assignment affects the production of the line. Generally, in work assignment, work contents are assigned so as to equalize the work time in consideration of each worker's ability and line constraint conditions. However, since the production capacity is adjusted by changing the number of workers to change the number of workers due to attendance and changes in daily production volume, fluctuations in the number of workers, Due to changes or changes in design specifications, the conditions of allocation such as the number of parts and the number of parts are often changed. Further, the same part, that is, the same part name may have different part specifications such as length and material, or may simply have different purchase lots. This difference is expressed as a difference in component code. That is, even if the models are the same, there are assemblies in which the parts code used is different in terms of manufacturing lot. Therefore, if you use parts with different part codes for specification,
In particular, if the specifications of parts are different, there will be serious problems such as abnormal assembly and deterioration of product performance. In addition, even if the parts specifications are the same, the shortage of parts in other assembly may be affected, causing manufacturing confusion.

【0003】以上のように作業割付時に考慮しなければ
ならない項目は多岐にわたり、かつ一度行った割付を流
用することは難しく、日々の生産の都度割付を行わなけ
ればならない。しかも組立作業開始に伴う作業割付開始
時点で始めて設計情報を揃え、これを基にその場でデー
タを検討、処理しているために割付処理の混乱を生じて
いる。さらに、これら割付業務は作業管理者が専用の用
紙(作業割付表)に筆記にて行っていた。したがって割
付の手間は非常に大きなものとなっている。
As described above, there are a wide variety of items that must be taken into consideration when allocating work, and it is difficult to divert the allocation once made, and allocation must be made every day during production. Moreover, since the design information is prepared only at the time of starting the work allocation accompanying the start of the assembling work, and the data is examined and processed on the spot based on this, the allocation process is confused. Further, these assignment tasks were performed by the work manager in writing on a dedicated sheet (work assignment table). Therefore, the labor of allocation is very large.

【0004】[0004]

【発明が解決しようとする課題】そこで、従来は、毎回
新しく作業割付表を作成することをせず、以前作成した
表に変更項目を書き込んだり、修正したりしている。こ
のため、書き込み等をを繰り返すにつれ作業割付表が煩
雑になり、記入ミスや読み違い等の誤認識を生じてい
る。さらに、生産の小ロット化が進み生産切換間隔が短
くなった場合、割付業務が生産進度に追い付かなくな
る。このため、作業割付のための検討が不十分で作業の
平準化がうまくおこなえず生産効率が落ちたり、部品や
作業の記述、読み違いが起き不良やライン停止が発生す
るといった問題が生じている。
Therefore, conventionally, a new work allocation table is not created every time, but change items are written or modified in the previously created table. For this reason, as the writing and the like are repeated, the work allocation table becomes complicated, resulting in erroneous recognition of entry errors and misreading. Furthermore, when the production lot is reduced and the production switching interval is shortened, the allocation work cannot keep up with the production progress. For this reason, there is a problem that work allocation is not sufficiently studied, work cannot be leveled well, production efficiency drops, and description of parts and work, misreading occurs and defects and line stops occur. .

【0005】これに対し、特開平06−290188に
あるように従来作業管理者が専用用紙に筆記で行ってい
た上記割付を、パソコンを用いたOA化することによっ
て作成工数を低減する試みがなされているが、最も手間
を要する部品の確認や、必要な作業の判定について考慮
されているわけではない。
On the other hand, as described in Japanese Patent Laid-Open No. 06-290188, an attempt has been made to reduce the number of preparation steps by converting the above-mentioned allocation, which was conventionally performed by a work manager to write on a dedicated sheet, to OA using a personal computer. However, it does not take into consideration the parts that require the most labor and the determination of the required work.

【0006】本発明の目的は作業割付における品質を良
くし(各作業者の作業時間が最短かつ平準化する)、か
つ割付時間(作業管理者の考察及び記述時間)を短くす
る、という二つの機能を提供することにある。
The object of the present invention is to improve the quality of work assignment (to minimize and equalize the work time of each worker) and to shorten the assignment time (work manager's consideration and description time). It is to provide the function.

【0007】[0007]

【課題を解決するための手段】本発明の着目点は、ある
部品に対して必要な組立作業は一意に決まり、さらに必
要な工具はその組立作業から一意に決まるので、割付以
前に予め使用部品が判明した時点で作業と工具を連想す
ることができることにある。例えば、あるモータという
部品を組み付けるには”位置決め作業”を行いさらに”
ねじ締め作業”を2回行い、ねじ締め作業には”エアド
ライバ”という工具を要するということは事前に分かる
ということである。また一方では、出欠勤等によりどの
ような作業者がいるかは当日にならなければわからな
い。したがって、割付ノウハウの一つである個々の作業
者の能力が事前にはわからないので当日でなければ割付
ができないことを意味する。
The point of interest of the present invention is that the assembly work required for a certain part is uniquely determined, and the necessary tools are uniquely determined from the assembly work. It is to be able to associate the work and the tool when it is found. For example, in order to assemble a part called a motor, "positioning work" must be performed
It is understood in advance that the screw tightening work will be performed twice, and that the screw tightening work will require a tool called an "air screwdriver." Therefore, since it is not possible to know in advance the ability of individual workers, which is one of the allocation know-how, it means that allocation can only be done on the day.

【0008】そこで、本発明では作業割付の詳細処理の
内、当日にならなければ分からない作業者に関する処理
等割付ノウハウを必要としない処理を予め行っておき、
割付ノウハウを必要とする作業の作業者への引当処理の
みを簡易に作業管理者に操作させることにより、割付時
間の短縮と品質を向上させることにした。またこのよう
な方式とすることで、新規設計や設計変更等の設計情報
生成/変更と、作業改善や設備仕様変更等による作業の
変更は、実際の組立作業とはタイミング的に無関係に行
うことができ、設計変更や作業改善といった実際の割付
以前に発生する事項で予め処理することができるものに
ついては、その発生段階で個々に処理しておくことで手
数と時間を最小限にすることができる。さらに、作業者
の変更が少ない場合、標準的な作業者と、そこでの作業
時間を想定しておき、この作業時間に基づいて予め作業
割付を行っておき、当日作業者が標準値と異なることで
影響を受ける部分のみ修正を行う方法も考えられる。
Therefore, in the present invention, among the detailed work allocation processes, processes that do not require allocation know-how, such as processes relating to workers that cannot be known until the day, are performed in advance.
By allowing the work manager to easily perform only the allocation process for workers who need allocation know-how, the allocation time is shortened and quality is improved. In addition, by using such a method, generation / change of design information such as new design or design change, and change of work due to work improvement or facility specification change, etc. should be performed independently of the actual assembly work in terms of timing. For items that can be processed in advance, such as design changes and work improvement that occur before actual allocation, it is possible to minimize the number of steps and time by processing them individually at the stage of occurrence. it can. Furthermore, if the number of changes in workers is small, a standard worker and the work time there are assumed, and work assignment is made in advance based on this work time so that the worker on the day differs from the standard value. It is also conceivable to correct only the part affected by.

【0009】本発明ではまず、製造ロット毎の 設計図
面情報を扱う設計図面情報記憶部とそこから部品名称、
部品コードを抽出する部品情報抽出部とその部品の組立
作業に関する留意点である作業ポイントを抽出する作業
ポイント抽出部。また抽出した部品情報と作業ポイント
を製造ロット毎に記憶する部品/作業ポイント記憶部を
もつことにより後述する作業、工具の連想準備を行う。
In the present invention, first, a design drawing information storage unit that handles design drawing information for each manufacturing lot, and a part name,
A part information extraction unit that extracts a part code and a work point extraction unit that extracts work points that are points to be noted regarding the assembly work of the parts. Further, by having a parts / work point storage unit that stores the extracted part information and work points for each manufacturing lot, the work and tool associated preparation to be described later is performed.

【0010】上記のように部品名称が同じならばそれに
対する作業は等しく、さらに、作業が同じならば使用工
具も等しいといえる。したがって部品名称に着目し、部
品名称とその部品に関する複数の作業、各作業に必要な
工具、及びその部品と作業の組合せにおける作業時間を
記憶している作業情報記憶部を用意しておく。さらに、
作業データ展開部にて前記抽出した部品名称を基に作業
情報記憶部の内容から作業、工具、作業時間を求め、作
業データを製造ロット別に記憶する作業データ記憶部に
格納する。
As described above, if the part names are the same, the work for them is the same, and if the work is the same, the tools used are the same. Therefore, paying attention to the part name, a work information storage unit is prepared in which the part name, a plurality of works relating to the part, tools necessary for each work, and work time for the combination of the part and the work are stored. further,
A work, a tool, and a working time are obtained from the contents of the work information storage unit on the basis of the extracted part name in the work data development unit, and the work data is stored in the work data storage unit for storing each manufacturing lot.

【0011】以上は設計変更や作業改善といった実際の
割付以前に発生する事項で予め処理することができる。
したがって、割付時には前記作業データが用意されてい
るので各作業を作業者に分配するだけでよいため画面と
マウスを用いた作業割付編集部により簡易に編集ができ
る。この時、各当日作業者の内、割付けられた部品/作
業の組合せの経験の無い作業者は初級作業者と考えら
れ、作業能力が落ちるのでその点を考慮するための作業
経験評価部を要する。割付結果は割付データ記憶部に記
憶される。さらに割付データは教示データ作成部により
作業者毎に抽出しまとめ作業教示用データとし、作業者
別教示データ記憶部に作業者別に該教示データが記憶さ
れ、その教示データは教示データ表示部にて作業者毎に
提示される。
The above can be processed in advance with items that occur before the actual allocation, such as design changes and work improvement.
Therefore, since the work data is prepared at the time of allocation, it is only necessary to distribute each work to the workers, so that the work can be easily edited by the work allocation editing unit using the screen and the mouse. At this time, among the workers on each day, a worker who has no experience of the assigned parts / work combination is considered to be a beginner worker, and the work ability deteriorates. Therefore, a work experience evaluation unit for considering that point is required. . The allocation result is stored in the allocation data storage unit. Further, the assignment data is extracted for each worker by the teaching data creation unit to be combined work teaching data, the teaching data is stored for each worker in the teaching data storage unit for each worker, and the teaching data is displayed on the teaching data display unit. It is presented for each worker.

【0012】[0012]

【作用】設計図面情報記憶部は、同じ機種でも仕様や部
品の異なるのでこれを判別するため製造ロット毎の 設
計図面情報を扱う。部品情報抽出部は設計図面情報記憶
部から部品名称、部品コードを抽出する。作業ポイント
抽出部は同じ 設計図面情報からその部品の組立作業に
関する留意点である作業ポイントを抽出する。部品、作
業ポイント記憶部は部品情報と作業ポイントを製造ロッ
ト毎に記憶する。以上により製品を組立るための部品と
作業の仕様が抽出、分別できたことになる。
The design drawing information storage unit handles the design drawing information for each manufacturing lot in order to discriminate the specifications and parts of the same model because they are different. The component information extraction unit extracts a component name and a component code from the design drawing information storage unit. The work point extraction unit extracts work points, which are points to be noted regarding the assembly work of the part, from the same design drawing information. The parts / work point storage unit stores part information and work points for each manufacturing lot. From the above, the parts for assembling the product and the specifications of the work can be extracted and sorted.

【0013】一方、作業情報記憶部にて部品名称とその
部品に関する複数の作業、各作業に必要な工具、及びそ
の部品と作業の組合せにおける作業時間を用意しておき
これを記憶する。作業情報編集部にて前記作業情報記憶
部の内容について、例えば作業改善による部品に対する
作業の修正や、工具、作業時間の修正を行う。
On the other hand, the work information storage section prepares a part name, a plurality of works related to the part, tools required for each work, and a working time for a combination of the part and the work, and stores the working time. With respect to the contents of the work information storage unit, the work information editing unit corrects the work on the component due to work improvement, the tool, and the work time.

【0014】作業データ展開部は抽出した該部品名称を
基に該作業情報記憶部の内容から作業、工具、作業時間
を求め、作業データ記憶部に求めた該作業データを製造
ロット別に記憶する。これで作業割付に必要なデータが
整ったことになる。
The work data expansion unit obtains the work, tool and work time from the contents of the work information storage unit based on the extracted part name, and stores the obtained work data in the work data storage unit for each manufacturing lot. This completes the data required for work assignment.

【0015】作業割付編集部では製造ロット毎に画面を
用いて作業者の配置と作業データの各作業を作業者に分
配するための編集をマウス等を用いて行い、作業データ
記憶部に該割付結果を追加記憶する。この時、各作業者
の作業経験状況を作業経験評価部にて調査する。
In the work allocation editing section, the layout of the workers and the editing of the work data to distribute each work to the workers are performed using a screen for each manufacturing lot, and the work data storage section is allocated with the edits. The result is additionally stored. At this time, the work experience evaluation section investigates the work experience situation of each worker.

【0016】教示データ作成部は前記割付データを作業
者毎に抽出しまとめ作業教示用データとし、作業者別教
示データ記憶部に作業者別に該教示データを記憶する。
さらに教示データ表示部にて教示データを作業者毎に提
示する。
The teaching data creation unit extracts the above-mentioned allocation data for each worker and collects it as work teaching data, and stores the teaching data for each worker in the teaching data storage unit for each worker.
Further, the teaching data display section presents teaching data for each worker.

【0017】[0017]

【実施例】本発明を組立ラインに適用した一実施例につ
いて説明する。
EXAMPLE An example in which the present invention is applied to an assembly line will be described.

【0018】図1に本発明に係わる作業割付支援装置の
概略構成を示す。ここで、作業割付装置本体1は、例え
ばパソコン本体から構成され、そのソフトウエアにより
後述する作業割付の処理を実行する。作業割付装置本体
1には、編集等の入力手段たるキーボード及びマウスか
らなる入力装置2、割付表の表示等を行うディスプレイ
3、作成した割付表の印刷等を行うプリンター4、各種
データの記憶を行う記憶装置5が接続されている。さら
に作業者に対し割り付けられた作業を教示する作業教示
装置本体6が接続され、作業教示装置本体6には教示内
容を表示するディスプレイ7及び作業教示データを記憶
する記憶装置8が接続されている。尚、作業教示装置本
体6及びディスプレイ7及び記憶装置8は作業者数に応
じてネットワークなどにより複数組接続される。また、
設計図面情報記憶部9は設計を行うためのCAD等のコ
ンピュータのなかの一つの機能で、設計に係わる情報を
記憶しておりネットワークなどにより接続されている。
FIG. 1 shows a schematic configuration of a work assignment support device according to the present invention. Here, the work allocating apparatus main body 1 is composed of, for example, a personal computer main body, and executes the work allocating process described later by its software. The work allocating device body 1 includes an input device 2 including a keyboard and a mouse as an input means for editing, a display 3 for displaying an allocation table, a printer 4 for printing the created allocation table, and a storage of various data. The storage device 5 is connected. Further, a work teaching device body 6 for teaching the assigned work to the worker is connected, and a display 7 for displaying teaching contents and a storage device 8 for storing work teaching data are connected to the work teaching device body 6. . A plurality of sets of the work teaching device body 6, the display 7, and the storage device 8 are connected by a network or the like according to the number of workers. Also,
The design drawing information storage unit 9 is one of the functions of a computer such as CAD for designing, stores information related to designing, and is connected by a network or the like.

【0019】本発明における処理の構成と順序について
以下に詳細に説明する。
The configuration and order of processing in the present invention will be described in detail below.

【0020】図2に本発明における機能の構成を示す。
設計図面情報記憶部21は記憶装置9の中にあり、製造
ロットの設計図面情報を扱う。設計図面情報には部品形
状や寸法といった一般的な設計情報の他に、部品名称と
部品コード、その部品の組立作業時に注意しなければな
らない留意点である作業ポイントが同時に記述してあ
る。その一例を図3に示す。また、同じ機種でも仕様や
使用する部品は日々異なるので製造単位毎の設計図面情
報となっている。部品情報抽出部22は割付装置本体1
にあり設計図面情報記憶部21から部品名称及び部品コ
ードを抽出する。これは前述したように部品名称が同じ
でも長さや材質等部品仕様が異なる場合や、購入ロット
が異なる場合が有り、この違いは部品コードの相違とし
て表現されている。したがってある製造ロットの組立作
業に対してそこに用いる部品は部品名称と部品コードに
より指定される。作業ポイント抽出部23は割付装置本
体1にあり設計図面情報記憶部21からその部品の組立
作業に関する留意点である作業ポイントを抽出する。部
品、作業ポイント記憶部24は記憶装置5にあり部品情
報と作業ポイントを製造ロット毎に記憶する。以上によ
り製造ロットを組立るための部品と作業の留意点が抽
出、分別、記憶できたことになる。以上の設計図面情報
における部品/作業ポイントの記載例を図4に示す。
FIG. 2 shows the functional configuration of the present invention.
The design drawing information storage unit 21 is included in the storage device 9 and handles design drawing information of manufacturing lots. In the design drawing information, in addition to general design information such as the shape and size of a part, a part name, a part code, and work points, which are points to be noted when assembling the part, are described at the same time. An example is shown in FIG. In addition, even in the same model, the specifications and the parts to be used are different every day, so it is the design drawing information for each manufacturing unit. The parts information extraction unit 22 is the allocation device body 1
The component name and the component code are extracted from the design drawing information storage unit 21. As described above, there are cases where the parts name is the same but the parts specifications such as length and material are different, or the purchase lot is different, and this difference is expressed as a difference in the part code. Therefore, the parts used for the assembly work of a certain manufacturing lot are designated by the part name and the part code. The work point extraction unit 23, which is provided in the layout apparatus main body 1, extracts work points, which are points to be noted regarding the assembly work of the component, from the design drawing information storage unit 21. The parts / work point storage unit 24 is stored in the storage device 5 and stores part information and work points for each manufacturing lot. By the above, the points for assembling the manufacturing lot and the points to be noted in the work have been extracted, sorted and stored. FIG. 4 shows an example of description of parts / work points in the above-mentioned design drawing information.

【0021】作業情報記憶部25は記憶装置5にあり、
部品名称とその部品に関する複数の作業、各作業に必要
な工具、及びその部品と作業の組合せにおける作業時間
を登録しておく。例を図5に示す。例では部品名称がサ
サエイタである部品は、組立作業としてセット、ねじ締
めを2箇所行い、ねじ締め時にエアドライバを要し、各
々の作業時間は2.2秒、4.0秒、4.6秒であるこ
とが登録されている。作業情報編集部26は割付装置本
体1にありキーボード/マウス2とディスプレー3を用
いて前記作業情報記憶部25の内容について、追加、修
正、削除を行う。例えば作業改善による部品に対する作
業の変更とそれに伴う工具の修正や、作業時間の修正を
行う。また、新規部品に関する登録も同様である。
The work information storage unit 25 is in the storage device 5,
A part name, a plurality of works related to the part, a tool required for each work, and a working time for a combination of the part and the work are registered. An example is shown in FIG. In the example, a part with a part name of “sustainer” is set and screwed in two places as an assembly work, and requires an air driver when tightening the screw, and each work time is 2.2 seconds, 4.0 seconds, 4.6. Registered to be seconds. The work information editing unit 26 is provided in the allocating apparatus main body 1 and uses the keyboard / mouse 2 and the display 3 to add, correct, or delete the contents of the work information storing unit 25. For example, the work is changed for the part due to the work improvement, the tool is corrected accordingly, and the work time is corrected. The same applies to registration of new parts.

【0022】作業データ展開部27は割付装置本体1に
あり抽出した製造ロットの各々の部品名称を基に、作業
情報記憶部25の内容から各部品に必要な作業、工具、
作業時間を求め、前述の部品番号、作業ポイントも合わ
せて作業データとして記憶装置5にある作業データ記憶
部28に格納する。作業データ記憶部28にはさらに次
の作業割付編集部29にて決定した作業者とその作業位
置が追加登録される。最終的なデータ構成を図6に示
す。
The work data expansion unit 27 is in the allocating apparatus main body 1, and based on the name of each part of the extracted manufacturing lot, the work required for each part, the tool,
The working time is obtained, and the above-mentioned part number and working point are also stored in the working data storage unit 28 in the storage device 5 as working data. Further, the work data storage unit 28 additionally registers the worker determined by the work assignment editing unit 29 and the work position thereof. The final data structure is shown in FIG.

【0023】作業割付編集部29は割付装置本体1にあ
り、キーボード/マウス2とディスプレー3を用いて製
造ロット毎に画面により作業者の配置と、作業データの
各作業を作業者に引当てるといった作業割付編集を行
い、先の作業データ記憶部28に割付結果である作業位
置とそこにおける作業者とその作業者の作業を登録す
る。作業経験評価部33は割付装置本体1にあり、各作
業者の部品とその作業の経験の有無を検索評価する。未
経験の初級者の場合、ディスプレー3の画面の作業者の
名前表示部分の背景色を変える等の警告を行う。
The work assignment editing unit 29 is provided in the assignment device main body 1 and uses the keyboard / mouse 2 and the display 3 to arrange the workers on the screen for each production lot and allocate each work of the work data to the workers. Work assignment editing is performed, and the work position as the assignment result, the worker at that position, and the work of the worker are registered in the work data storage unit 28. The work experience evaluation unit 33 is provided in the allocating apparatus main body 1 and searches and evaluates the parts of each worker and the experience of the work. In the case of an inexperienced beginner, a warning such as changing the background color of the operator's name display portion of the screen of the display 3 is issued.

【0024】割付時には作業情報編集部26と作業割付
編集部29の双方を随時用いることにより、作業ポイン
トの追加や作業時間の変更等前記作業データの修正を行
いながら割付ができる。以上で実際に作業の教示(誰に
何を何処で何を用いて作業させ、時間がどのくらいかか
るか)に必要な作業データが揃ったことになる。
By using both the work information editing unit 26 and the work allocation editing unit 29 at the time of allocation, it is possible to perform allocation while modifying the work data such as adding work points and changing work time. As described above, the work data necessary for actually teaching the work (who, what, where, what is used, and how long it takes) is prepared.

【0025】教示データ作成部30は教示装置本体6に
あり前記割付データを作業者毎に抽出しまとめ作業教示
用データとし、記憶装置8にある作業者別教示データ記
憶部31に作業者別に教示データを記憶する。さらに教
示データ表示部32にて教示データを作業者毎に提示す
る。
The teaching data creation unit 30 is provided in the teaching device main body 6 and extracts the above-mentioned allocation data for each worker to make it as work teaching data, and teaches it to the teaching data storage unit 31 for each worker in the storage device 8 for each worker. Store data. Further, the teaching data display unit 32 presents teaching data to each worker.

【0026】以下に、本発明を用いて作業割付が行われ
る手順を説明する。
The procedure of work assignment using the present invention will be described below.

【0027】まず新機種の作業割付、すなわち、過去事
例のない初回の割付について図7のフローを用いて説明
する。新機種の設計が行われ、その内容は設計情報記憶
部21に格納されている。設計情報記憶部21から部品
情報抽出部22にて部品名称及び部品コードを抽出す
る。また、作業ポイント抽出部23で組立作業に関する
留意点である作業ポイントを抽出する。そして抽出した
部品名称及び部品コードと作業ポイントを製造ロット毎
に記憶する部品/作業ポイント記憶部24に格納する。
(ステップS1)さらに、作業情報記憶部25にある部
品名称とその部品に関する複数の作業、各作業に必要な
工具、及びその部品と作業の組合せにおける作業時間を
用いて、作業データ展開部27にて抽出した部品名称を
基に作業情報記憶部25の内容から作業、工具、作業時
間を求め(ステップS2)、作業データを製造ロット別
に記憶する作業データ記憶部27に格納する(ステップ
S3)。ここまでの処理は新機種の設計が完了したこと
をきっかけとして本発明により自動的に行われ、以降の
作業割付に先行して予め作業割付に必要なデータを整え
ておくことで作業割付自身の時間を短縮できる。この時
点では図6に示す作業データの内作業者は未定である。
First, the work allocation of a new model, that is, the first allocation without a past case will be described with reference to the flow chart of FIG. A new model is designed, and its contents are stored in the design information storage unit 21. A component name and a component code are extracted from the design information storage unit 21 by the component information extraction unit 22. Further, the work point extracting unit 23 extracts work points which are points to be noted regarding the assembly work. Then, the extracted part name, part code, and work point are stored in the part / work point storage unit 24 that stores each manufacturing lot.
(Step S1) Further, the work data expansion unit 27 is configured to use the part name in the work information storage unit 25, a plurality of works related to the part, the tools required for each work, and the work time in the combination of the parts and work. The work, the tool, and the work time are obtained from the contents of the work information storage unit 25 based on the extracted component name (step S2), and the work data is stored in the work data storage unit 27 for storing each manufacturing lot (step S3). The processing up to this point is automatically performed by the present invention triggered by the completion of the design of the new model. You can save time. At this point in time, the worker in the work data shown in FIG. 6 is undecided.

【0028】作業管理者は作業割付が必要となった時点
で、上記用意された作業データを作業割付編集部29に
より作業者に割り付けていく。このとき個々の内容(文
字、単語)は前記処理により記述されているので、作業
管理者は画面上に示された作業を作業者にマウス等のピ
ックアンドプレース手段を用いて登録するだけでよい。
このときの様子を図8を用いて説明する。
The work manager allocates the prepared work data to the workers by the work allocation editing unit 29 when the work allocation becomes necessary. At this time, since the individual contents (characters, words) are described by the above processing, the work manager need only register the work shown on the screen to the worker by using a pick-and-place means such as a mouse. .
The state at this time will be described with reference to FIG.

【0029】画面には、割付ようとする機種、製造ロッ
ト番号、台数、予定作業者数、タクトが予め表示されて
いる。
On the screen, the model to be assigned, the production lot number, the number of machines, the number of planned workers, and the takt time are displayed in advance.

【0030】まず、部品名称が画面の一部(本例では左
下)にリスト状に表示される。同時に、上記ステップ
2、3にて求められた部品毎の組立に要する作業/工具
/作業時間/作業ポイントが画面にリスト状に表示され
る(本例では中央下)。これは左の部品を選択すると右
の欄に表示するといった操作形態となっている。また、
各々のリストに対してこの画面で新たに削除、追加がで
きる。さらに、作業者の一覧がリスト状に表示されてい
る(本例では右下)。以上の各リストは表示し切れない
場合に、上下にスクロールする。
First, the part names are displayed in a list on a part of the screen (lower left in this example). At the same time, the work / tool / working time / working point required for assembling each component obtained in steps 2 and 3 are displayed in a list on the screen (lower center in this example). This is an operation mode in which the left part is selected and displayed in the right column. Also,
You can delete or add new items to each list on this screen. Further, a list of workers is displayed in a list (lower right in this example). If the above lists cannot be displayed completely, scroll up and down.

【0031】さらに、作業位置毎にそこに位置する作業
者名、その作業者が行う複数の作業を記入しうる欄を持
つ割付表を同時に表示(本例では上半分)されてい
る。”作業位置”はラインにおいて作業者が作業を行う
ことが可能な位置を番号にて示している。この割付表は
全ての作業位置に対して表示し切れないので左右ににス
クロールする。割付操作は基本的にマウス等を用いたピ
ックアンドプレース(画面上に表示された文字等をマウ
スで選択、移動し、所要の位置に貼り付ける)の行える
入力機構により行う。
Further, an allocation table having the name of a worker located at each work position and a column in which a plurality of works performed by the worker can be entered is simultaneously displayed (the upper half in this example). The "work position" indicates the position where the worker can work on the line by number. This allocation table cannot be displayed for all work positions, so scroll left and right. Allocation operation is basically performed by an input mechanism that allows pick and place using a mouse or the like (selecting characters displayed on the screen with the mouse, moving them, and pasting them in the required positions).

【0032】本画面における割付操作は、まずマウス等
にて所要の部品を選択する。するとその部品に必要な作
業/工具/作業時間時間/作業ポイントのリストが表示
される。所要の作業/工具/作業時間時間/作業ポイン
トを選択すると、その作業/工具/作業時間/作業ポイ
ントと先の作業等の属する部品が共に識別される。次
に、そのままマウス等によりこれを所要の作業者の所要
の作業欄に移動し貼り付ける。すると作業欄には”(部
品)−(作業)”といった形式で表示される。この操作
を繰り返し、割付ていない作業/工具/作業時間が無く
なるまで行うと割付操作は終了する(ステップS4)。
すなわち従来筆記によって行われていた作業は基本的に
はマウスの操作だけで済み、大幅な労力の削減となる。
割付が完了するとその内容を作業データ記憶部28に格
納する(ステップS5)。
In the allocation operation on this screen, first, a desired part is selected with a mouse or the like. Then, a list of work / tool / working time / working point required for the part is displayed. When the required work / tool / working time / working point is selected, the work / tool / working time / working point and the part to which the preceding work belongs are both identified. Next, this is moved to the required work column of the required worker by using the mouse or the like, and is pasted. Then, in the work column, it is displayed in a format such as "(component)-(work)". When this operation is repeated until the unassigned work / tool / work time is exhausted, the assignment operation ends (step S4).
That is, the work conventionally performed by writing is basically only required to operate the mouse, which greatly reduces the labor.
When the allocation is completed, the contents are stored in the work data storage unit 28 (step S5).

【0033】この段階で作業割付が終了したことにな
る。以降は割り付けられた作業内容を作業者に提示する
処理に関する。教示データ作成部30は前記割付データ
を作業者毎に抽出しまとめ(ステップS6)、作業者別
教示データ記憶部31に格納する(ステップS7)。教
示データ表示部32にて教示データを作業者毎に提示す
る(ステップS8)。提示画面例を図9に示す。
At this stage, the work allocation is completed. Hereinafter, it relates to a process of presenting the assigned work content to the worker. The teaching data creation unit 30 extracts the above-mentioned allocation data for each worker, collects it (step S6), and stores it in the worker-specific teaching data storage unit 31 (step S7). The teaching data display unit 32 presents the teaching data to each worker (step S8). An example of the presentation screen is shown in FIG.

【0034】以上に本発明における作業割付及び教示の
処理手順を示したが、これとは別途に予め作業情報編集
部26を用いて新規部品に関する登録等、前記作業情報
記憶部25の内容について、追加、修正、削除を行って
おく(ステップS9)。この作業情報編集は、必ずしも
作業割付時に行う必要は無く、割付以前に変更事項をま
とめて編集しておいてもよい。もちろん、作業割付時に
編集しながら割付を行ってもよい。
The work assignment and teaching processing procedures in the present invention have been described above. Separately from this, the contents of the work information storage unit 25 such as registration of new parts using the work information editing unit 26 in advance are described. Addition, correction, and deletion are performed (step S9). This work information edit does not necessarily have to be performed at the time of work assignment, and changes may be collectively edited before assignment. Of course, the work may be assigned while being edited.

【0035】次に、従来機種の組立時の割付について説
明する。
Next, the allocation at the time of assembling the conventional model will be described.

【0036】割り付けようとする製造ロットのタクト、
作業者、部品等の条件が従来と変わらない場合は、ステ
ップS4の直後と考えて良く、そのまま前に行った割付
を作業データ記憶部28から読み出し、ステップS5以
降の処理を行う。
The tact of the production lot to be allocated,
If the conditions of the worker, the parts, etc. are not different from the conventional ones, it may be considered immediately after step S4, and the allocation performed before that is read out from the work data storage unit 28, and the processing from step S5 is performed.

【0037】従来の条件に対し、部品や作業ポイントと
いった設計図面情報が異なる場合は前記ステップS1か
ら始める。
When the design drawing information such as parts and work points are different from the conventional conditions, the process starts from step S1.

【0038】また、設計図面情報が同じ場合でも、作業
改善等が行われ部品に対する作業が異なる場合には、ま
ず、作業情報編集部26による作業情報記憶部25の更
新(ステップS9)を行い、その更新された作業情報を
基にステップ4以降を行う。
Even if the design drawing information is the same, if the work is improved and the work for the parts is different, first, the work information storage unit 25 is updated by the work information editing unit 26 (step S9). Step 4 and subsequent steps are performed based on the updated work information.

【0039】作業当日の勤休等により作業者の変更が生
じた場合、ステップS4の割付以降を行う。
When the worker is changed due to the absence of work on the day of work, etc., the allocation and subsequent steps in step S4 are performed.

【0040】上記手順は当日作業者を該当部品/作業の
既経験者である標準作業者と仮定して、組立当日前に行
っておき組立当日に修正する場合も同様である。
The above procedure is the same when the operator on the same day is assumed to be a standard operator who is an experienced person of the relevant part / work, and the procedure is performed before the day of assembly and is corrected on the day of assembly.

【0041】以上のように本システムによれば、従来の
ように割付条件の変更時に全て再処理するのではなく、
変更の状況に応じて最小限の処理を行えばよい。また、
例え新機種の割付であっても、従来品と部品構成が似て
いて組立作業全体がさほど異ならない設計ならば、その
割付結果を用いて従来機種の修正と同様の手順で割付を
行えばよく、この場合ステップS4の編集工数が大幅に
削減される。
As described above, according to the present system, instead of reprocessing all when changing the allocation condition as in the conventional case,
Minimal processing may be performed according to the status of change. Also,
Even if a new model is assigned, if the parts configuration is similar to the conventional product and the overall assembly work is not so different, the assignment result can be used to perform the assignment in the same procedure as the modification of the conventional model. In this case, the editing man-hour in step S4 is significantly reduced.

【0042】[0042]

【発明の効果】本発明によれば、従来作業管理者が図面
を基に目視によって確認、記入を行っていた部品名称や
部品コード、作業ポイントといった図面情報を、自動的
に必要な図面情報を製造ロット単位で揃え割付画面に表
示するため、図面読み取り時の誤認識や、割付記載時の
誤記入を防止できる。さらに、割付内容がそのまま教示
画面に表示するため、教示の際の内容ミスを防止でき
る。すなわち部品誤用や欠品を防止できる。
According to the present invention, the drawing information such as the part name, the part code, and the work point, which is conventionally visually checked and entered by the work manager based on the drawing, is automatically converted into the necessary drawing information. Since it is displayed on the alignment allocation screen in units of manufacturing lots, it is possible to prevent erroneous recognition at the time of drawing reading and erroneous entry at the time of allocation description. Further, since the allocation contents are displayed as they are on the teaching screen, it is possible to prevent a content error during teaching. That is, it is possible to prevent misuse of parts and lack of parts.

【0043】また、本発明により作業割付時の手数削減
と、事前に作業データを用意できていることにより正味
割付時間が削減されるので、作業余裕と時間的余裕が生
じて割付検討時の考察がより進み、品質の高い割付結果
がえられ生産の効率向上が図れる。本発明により割付を
重ねるに連れ、部品と作業及び作業時間、作業者と作業
といった組合せ状況が蓄積されていくので、この蓄積を
分析しルール化することにより、割付に対し非習熟な作
業管理者でも品質の高い割付を行うことができるように
なる。
Further, according to the present invention, the number of steps at the time of work allocation is reduced, and the work allocation data is prepared in advance to reduce the net allocation time. Will be further advanced, high quality allocation results will be obtained, and production efficiency can be improved. According to the present invention, as the allocation is repeated, the combination status such as parts and work and working time, and worker and work are accumulated. By analyzing this accumulation and making a rule, a work manager unfamiliar with the allocation However, you will be able to make high-quality allocations.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明における装置の概略構成。FIG. 1 is a schematic configuration of an apparatus according to the present invention.

【図2】本発明の一実施例における機能構成。FIG. 2 is a functional configuration according to an embodiment of the present invention.

【図3】設計図面記載例。FIG. 3 is a design drawing description example.

【図4】部品に関する情報の記憶形式例。FIG. 4 is an example of a storage format of information about parts.

【図5】作業データの構成例。FIG. 5 is a configuration example of work data.

【図6】一実施例における処理フロー図。FIG. 6 is a processing flow chart according to an embodiment.

【図7】部品/作業ポイント記憶形式例。FIG. 7 is an example of a part / work point storage format.

【図8】割付画面例。FIG. 8 is an example of an allocation screen.

【図9】教示画面例。FIG. 9 shows an example of a teaching screen.

【符号の説明】[Explanation of symbols]

S・・・フローのステップ S ... Flow steps

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】複数作業者の間で作業を分担する人手組立
ラインにおいて、同一機種であっても部品や作業者や作
業内容が日々異なるような組立作業に対して、製品毎の
設計図面情報を記憶する設計図面情報記憶部、該設計図
面情報記憶部から使用部品の一般呼称である部品名称
と、同一部品名称でも仕様等が異なるために更に詳細な
識別名である部品コードを抽出する部品情報抽出部、同
じ設計図面情報からその部品の組立作業に関する留意点
である作業ポイントを抽出する作業ポイント抽出部、該
部品情報と作業ポイントを製品毎に記憶する部品/作業
ポイント記憶部、部品名称とその部品に関する複数の作
業、各作業に必要な工具、及びその部品と作業の組合せ
における作業時間を記憶している作業情報記憶部、該作
業情記憶部に対してその内容の修正を行う作業情報編集
部、抽出した該部品名称を基に該作業情報記憶部の内容
から作業、工具、作業時間を求める作業データ展開部、
求めた該作業データを製品別に記憶する作業データ記憶
部、製品毎に画面を用いて作業者の配置を決め、該作業
データの各作業を作業者に分配するための編集を行う作
業割付編集部、該割付結果を記憶する割付データ記憶
部、からなる作業割付支援装置。
1. In a manual assembly line in which a plurality of workers share the work, design drawing information for each product for assembly work in which parts, workers and work contents are different every day even if they are of the same model. A design drawing information storage unit that stores the parts, and a part name that is a general name of a used part and a part code that is a more detailed identification name because the specifications are different even if the same part name is used, from the design drawing information storage unit An information extraction unit, a work point extraction unit that extracts work points that are points to be noted regarding assembly work of the part from the same design drawing information, a part / work point storage unit that stores the part information and work points for each product, and a part name A work information storage unit that stores a plurality of works related to the parts and the parts, tools necessary for each work, and a working time in the combination of the parts and the works; Work information editing unit that performs a modification of the contents, work extracted the part name from the contents of the working information storage unit in the group, working data expansion unit for obtaining a tool, the working time,
A work data storage unit that stores the obtained work data for each product, a work assignment editing unit that determines the placement of workers by using a screen for each product, and edits each work of the work data to distribute to each worker , A work allocation support device comprising a layout data storage unit for storing the layout result.
【請求項2】請求項1に記載の前記作業割付支援装置に
おいて、部品名称に着目し、部品名称に応じた作業、作
業に応じた工具及び作業時間といった関係で登録してお
き、部品名称から作業、部品名称と作業から工具及び作
業時間を求める、作業展開方法を実行する作業割付支援
装置。
2. The work allocation support device according to claim 1, focusing on a part name, registering a work according to the part name, a tool and a work time according to the work, and registering from the part name. A work assignment support device that executes a work development method, in which a work and a part name and a tool and a work time are obtained from the work.
【請求項3】請求項1又は請求項2に記載の前記作業割
付支援装置であって、前記部品名称と、前記作業展開方
法による該部品の組立に要する作業/工具/作業時間を
画面に表示し、同時に作業者名と該作業者が行う作業を
記入しうる欄を持つ割付表を表示する表示装置と、マウ
ス等ピックアンドプレースの行える入力機構により所要
の作業/工具/時間をその作業/工具/作業時間の属す
る部品と共に、該割付表に登録する作業割付画面を持つ
作業割付支援装置。
3. The work allocation support device according to claim 1, wherein the work name, the work, the tool, and the work time required for assembling the part by the work development method are displayed on the screen. At the same time, the required work / tool / time is allocated to the work / tool / time by a display device that displays an allocation table having a column for entering the worker name and work to be performed by the worker and an input mechanism capable of picking and placing such as a mouse. A work allocation support device having a work allocation screen to be registered in the allocation table together with tools / work time parts.
【請求項4】請求項1に記載の前記割付データを作業者
毎に抽出しまとめ作業教示用データとする教示データ作
成部、作業者別に該教示データを記憶する作業者別教示
データ記憶部、該教示データを作業者毎に提示する教示
データ表示部、からなり割付結果である作業を各作業者
に提示する作業割付支援装置。
4. A teaching data creation unit that extracts the assignment data according to claim 1 for each worker and collects it as work teaching data, a teaching data storage unit for each worker that stores the teaching data for each worker, A work assignment support device configured to present a work as an assignment result to each worker, which comprises a teach data display unit for presenting the teach data to each worker.
【請求項5】組立作業において部品コードが異なって
も、部品名称が同じならば同一作業、同一工具であるこ
とに着目し、請求項2に記載の作業展開方法により部品
が決定した時点で作業、工具を決めておき、組立当日は
作業者への作業引当のみを行う、作業割付方法を実行す
る作業割付支援装置。
5. When the parts are decided by the work development method according to claim 2, paying attention to the same work and the same tool if the parts names are the same even if the parts code is different in the assembling work. A work allocation support device that executes a work allocation method in which tools are determined and work is only allocated to workers on the day of assembly.
【請求項6】請求項5に記載の作業割付支援装置におい
て、作業、工具を決め、さらに標準的な作業者を想定し
て、前記作業割付方法にて事前に割付を行い、組立当日
には決定した作業者の能力に応じて該割付を修正のみを
行う作業割付方法を実行する作業割付支援装置。
6. The work assignment support device according to claim 5, wherein the work and tools are determined, and further, assuming a standard worker, the work is assigned in advance according to the work assignment method, and on the day of assembly, A work assignment support device that executes a work assignment method that only modifies the assignment according to the determined ability of the worker.
【請求項7】請求項5に記載の作業割付支援装置におい
て、組立当日作業者について該割付データ記憶部を検索
し、過去に割付部品/作業がなければ作業初級者とし
て、画面上に注意を促す表示を行う作業経験評価部を持
つ作業割付支援装置。
7. The work assignment support device according to claim 5, wherein the assignment data storage section is searched for the worker on the assembly day, and if there is no assigned part / work in the past, a caution is given on the screen as a work beginner. A work assignment support device that has a work experience evaluation unit that displays a prompt.
【請求項8】複数作業者の間で作業を分担する人手組立
ラインにおいて、同一機種であっても部品や作業者や作
業内容が日々異なるような組立作業に対して、請求項1
に記載の作業割付支援装置により割付を行う、人手作業
ライン。
8. A manual assembly line in which work is shared among a plurality of workers, and for assembly work in which parts, workers and work contents are different every day even for the same model.
A manual work line in which work is assigned using the work assignment support device described in.
JP16510395A 1995-06-30 1995-06-30 Work assignment support device Expired - Fee Related JP3412346B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16510395A JP3412346B2 (en) 1995-06-30 1995-06-30 Work assignment support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16510395A JP3412346B2 (en) 1995-06-30 1995-06-30 Work assignment support device

Publications (2)

Publication Number Publication Date
JPH0911093A true JPH0911093A (en) 1997-01-14
JP3412346B2 JP3412346B2 (en) 2003-06-03

Family

ID=15805959

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16510395A Expired - Fee Related JP3412346B2 (en) 1995-06-30 1995-06-30 Work assignment support device

Country Status (1)

Country Link
JP (1) JP3412346B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003280723A (en) * 2002-03-25 2003-10-02 Kawasaki Heavy Ind Ltd Work information processing method and work information processing system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH052594A (en) * 1991-06-25 1993-01-08 Fujitsu Ltd Automatic work organizing device
JPH0652178A (en) * 1992-07-28 1994-02-25 Hitachi Ltd Assembly line work plan generation support system
JPH0756997A (en) * 1993-06-30 1995-03-03 Hitachi Ltd Work allocating system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH052594A (en) * 1991-06-25 1993-01-08 Fujitsu Ltd Automatic work organizing device
JPH0652178A (en) * 1992-07-28 1994-02-25 Hitachi Ltd Assembly line work plan generation support system
JPH0756997A (en) * 1993-06-30 1995-03-03 Hitachi Ltd Work allocating system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003280723A (en) * 2002-03-25 2003-10-02 Kawasaki Heavy Ind Ltd Work information processing method and work information processing system

Also Published As

Publication number Publication date
JP3412346B2 (en) 2003-06-03

Similar Documents

Publication Publication Date Title
JP2001219341A (en) Joint support system of working sheet metal
JPWO2003038688A1 (en) Parts catalog creation device
JPH09262745A (en) Work indication system
US20060009869A1 (en) Step processing constitution building/management device in a factory production step management system
JPH05143613A (en) Production planning system
JP3412346B2 (en) Work assignment support device
JPH07287730A (en) Device for supporting allocation of work
JPS62224562A (en) Display device for process control data
JP4998154B2 (en) Manufacturing failure factor analysis support device
US20010046068A1 (en) Print schedule planning method, print schedule planning system and print schedule planning program storage medium
JPH07149268A (en) Nonconformity information input device
JPH06335165A (en) Method and apparatus for constituting data base of power system monitoring control system, method and apparatus for managing data base of power system monitoring control system and power system monitoring control system
JP3192257B2 (en) Manufacturing support equipment
JPH09201747A (en) Extracting method for delay process
JP2002259503A (en) System of production control, method thereof, manufacturing method for semiconductor device using the method, recording medium recorded information thereof, program thereof and computer readable recording medium recorded the program
EP0741348A2 (en) Order control apparatus capable of reducing input operation by an input unit
JPH08222887A (en) System for managing product manufacturing change history and defect history
US7613998B2 (en) Method for automatically creating at least one dialog box on an operator interface of a computer user station
JPH064539A (en) Patrol support system
JPH07296062A (en) Method for supporting decision of staff arrangement
JPH07129630A (en) Method for drawing cad drawing for similar parts
JPH05324669A (en) Production supporting device
JP3695410B2 (en) Production technology management method and apparatus therefor
JPH08278997A (en) Shelf dividing method by category management
JPH01280831A (en) Assisting method for standardization of intra-program data name

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees