- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Elevator Door Apparatuses (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明はエレベータの乗場出入口装置の取付方法に関
する、 〔従来の技術〕 第6図は一般的な乗場出入口装置の構成を示す斜視
図、第7図は従来の乗場出入口装置の取付方法を説明す
る側面図である。DETAILED DESCRIPTION OF THE INVENTION [Industrial application] The present invention relates to a method for mounting a hall entrance / exit device for an elevator. [Prior Art] FIG. 6 is a perspective view showing the configuration of a general hall entrance / exit device. FIG. 7 is a side view illustrating a method of mounting a conventional hall entrance / exit device.
エレベータの乗場出入口装置は、第6図に示すよう
に、建屋壁1に形成される乗場出入口2の側部に沿つて
延設される一対の縦枠3、および上部に沿つて延設され
る上枠4から一体的に構成される三方枠5と、乗場床6
に沿つて延設されるシル7などと含んでいる。また、上
述した三方枠5の上枠4は、第7図に示すように、乗場
出入口2の上部近傍に配置されるブラケツト9、ポケツ
ト10を介して建屋壁1の昇降路8側の壁部1aに支持され
る。一方、シル7は、乗場出入口2の下部近傍に配置さ
れ上述した壁部1aの下方の壁部1bに固定される基部11、
およびこの基部11に移動可能に締結されシル7が取付け
られる取付部12からなる本設ブラケツト13を介して壁部
1bに支持さる。なお、図示を省略したが、乗場扉はポケ
ツト10に備えられるガイドレール14により懸垂され、下
部がシル7に係合するようになつている。As shown in FIG. 6, a hall entrance / exit device for an elevator is extended along a pair of vertical frames 3 extending along side portions of a hall entrance / exit 2 formed in a building wall 1, and along an upper portion. A three-sided frame 5 integrally formed from the upper frame 4 and a landing floor 6
It also includes a sill 7 that extends alongside. Further, as shown in FIG. 7, the upper frame 4 of the three-sided frame 5 is a wall portion on the hoistway 8 side of the building wall 1 via a bracket 9 and a pocket 10 arranged near the upper part of the hall entrance / exit 2. Supported by 1a. On the other hand, the sill 7 is arranged in the vicinity of the lower portion of the hall entrance / exit 2, and is fixed to the wall portion 1b below the above-mentioned wall portion 1a.
And a wall portion via a main bracket 13 including a mounting portion 12 movably fastened to the base portion 11 and to which the sill 7 is attached.
Supported by 1b. Although not shown, the hall door is suspended by a guide rail 14 provided in the pocket 10, and the lower portion is adapted to engage with the sill 7.
このような乗場出入口装置にあつて、従来、下記の手
順で取付けがおこなわれていた。すなわち、第7図に示
すように昇降路8側の壁部1bに本設ブラケツト13の基部
11を固定し、この基部11に取付部12を締結して、この取
付部12にシル7を取付ける。このとき、基部11に対して
取付部12を適宜移動させることによつて、シル7の取付
位置の調整をおこなう。次いで、壁部1aにブラケツト9
を固定し、このブラケツト9にポケツト10を締結し、別
に縦枠3、上枠4から三方枠5を組立てて、この三方枠
5の上枠4をポケツト10に取付けるようになつていた。Conventionally, such a hall entrance / exit device has been attached according to the following procedure. That is, as shown in FIG. 7, the base portion of the permanent bracket 13 is attached to the wall portion 1b on the hoistway 8 side.
11 is fixed, the attachment portion 12 is fastened to the base portion 11, and the sill 7 is attached to the attachment portion 12. At this time, the attachment position of the sill 7 is adjusted by appropriately moving the attachment portion 12 with respect to the base portion 11. Next, the bracket 9 is attached to the wall 1a.
Was fixed, the pocket 10 was fastened to the bracket 9, the vertical frame 3, the upper frame 4 and the three-way frame 5 were separately assembled, and the upper frame 4 of the three-way frame 5 was attached to the pocket 10.
ところで、一般に乗場出入口装置の三方枠やシルの設
置後に、乗場出入口付近の建屋壁の仕上げをおこなうよ
うになつている。そして、上述した従来の乗場出入口装
置の取付方法にあつては、三方枠5やシル7の設置を昇
降路8側でおこなうことから、足場が悪く、比較的長い
作業時間を要し、そのため、乗場出入口2付近の建屋壁
1の仕上げが遅くなるという問題があつた。また、乗場
出入口装置を取付けるエレベータ据付業者と、建屋壁の
仕上げに係る業者とは異なることが多く、三方枠5やシ
ル7の設置が予定より遅れた場合、建屋壁1の仕上げが
遅れる等、工程上支障を生じる懸念があつた。By the way, generally, after the installation of the three-way frame and sill of the hall entrance / exit device, the building wall near the hall entrance / exit is finished. And in the above-mentioned conventional method of mounting the hall entrance / exit device, since the three-way frame 5 and the sill 7 are installed on the hoistway 8 side, the scaffolding is poor and a relatively long working time is required. There was a problem that the building wall 1 near the entrance 2 was delayed. In addition, the elevator installation company that installs the landing entrance / exit device is often different from the building wall finishing company. If the installation of the three-way frame 5 or the sill 7 is delayed, the building wall 1 will be finished too late. There was a concern that it would interfere with the process.
本発明はこのような従来技術における実情に鑑みなさ
れたもので、その目的は、乗場出入口付近の建屋壁の仕
上げを比較的早い時期におこなうことのできる乗場出入
口装置の取付方法を提供することにある。The present invention has been made in view of the above-mentioned circumstances in the prior art, and an object thereof is to provide a mounting method of a hall entrance / exit device that can finish a building wall near the hall entrance / exit at a relatively early time. is there.
この目的を達成するために本発明は、建屋壁に形成さ
れる乗場出入口の上部近傍に配置され、建屋壁の昇降路
側に固設されるポケツトと、このポケツトを介し支持さ
れ、上記乗場出入口の側部および上部に沿つて延設され
る三方枠と、上記乗場出入口の下部近傍に配置され、建
屋壁の昇降路側に固設される本設ブラケツトと、この本
設ブラケツトを介し支持され、乗場床に沿つて延設され
る乗場扉用シルとを含む乗場出入口装置の取付方法にお
いて、上記シルを上記乗場床に第1の仮設ブラケツトを
介し仮固定するとともに、上記三方枠を上記建屋壁に第
2の仮設ブラケツトを介し仮固定し、次いで上記シルと
建屋壁の昇降路側と間に上記本設ブラケツトを介設し、
更に、上記三方枠と建屋壁側との間に上記ポケツトを介
設した構成にしてある。In order to achieve this object, the present invention is arranged in the vicinity of the upper part of the landing doorway formed in the building wall, is fixed to the hoistway side of the building wall, and is supported through this pocket, and is supported by the landing doorway. A three-sided frame that extends along the side and the upper part, a permanent bracket that is arranged near the lower part of the entrance / exit of the hall, and is fixedly installed on the hoistway side of the building wall, and is supported via this bracket In a method for mounting a hall entrance / exit device including a hall door sill extending along a floor, the sill is temporarily fixed to the hall floor via a first temporary bracket, and the three-way frame is attached to the building wall. Temporarily fixed via a second temporary bracket, then the permanent bracket is interposed between the sill and the hoistway side of the building wall,
Further, the pocket is provided between the three-sided frame and the building wall side.
〔作用〕 本発明は上記のようにシルが第1の仮設ブラケツトを
介し乗場床に、三方枠が第2の仮設ブラケツトを介し建
具壁、例えば乗場出入口を側部にそれぞれ仮固定される
ことから、これらのシル、三方枠の設置を乗場床でおこ
なうことができ、すなわち、足場が良いので比較的短時
間のうちにシル三方枠を設置できる。これによつて、乗
場出入口付近の建屋壁の仕上げを比較的早い時期にのお
こなうことができる。[Operation] As described above, according to the present invention, the sill is temporarily fixed to the landing floor via the first temporary bracket, and the three-way frame is temporarily fixed to the fitting wall, for example, the landing entrance / exit to the side portion via the second temporary bracket. The sill and the three-sided frame can be installed on the landing floor, that is, since the scaffolding is good, the sill and the three-sided frame can be installed in a relatively short time. As a result, the building wall near the entrance / exit of the hall can be finished relatively early.
以下、本発明の乗場出入口装置の取付方法を図面に基
づいて説明する。Hereinafter, a method for mounting the hall entrance / exit device of the present invention will be described with reference to the drawings.
第1図ないし第5図は本発明の乗場出入口装置の取付
方法の一実施例を説明する図で、第1図は作業手順を示
すフローチヤート、第2図はシルおよび三方枠が仮固定
された状態を示す側面図、第3図はシル部分の拡大側面
図、第4図は三方枠部分の拡大平面図、第5図は第4図
い対応する正面図である。なお、これらの第2図〜第5
図において、前述した第6図、第7図に示すものと同等
のものは同一符号を付してある。1 to 5 are views for explaining an embodiment of a method of mounting a hall entrance / exit device according to the present invention. FIG. 1 is a flow chart showing a work procedure, and FIG. 2 is a sill and a three-way frame temporarily fixed. 3 is an enlarged side view of the sill portion, FIG. 4 is an enlarged plan view of the three-sided frame portion, and FIG. 5 is a front view corresponding to FIG. Incidentally, these FIG. 2 to FIG.
In the figure, the same components as those shown in FIGS. 6 and 7 described above are designated by the same reference numerals.
本実施例が用いられる第2図の乗場出入口装置には、
乗場出入口2の下部に配置される複数の第1の仮設ブラ
ケツト20と、乗場出入口2の側部に配置される第2の仮
設ブラケツト21とが備えられている。上述した第1の仮
設ブラケツト20は、第3図に示すように、乗場床6に埋
設されたアンカーボルト22により固定される基部23と、
この基部23に移動可能に締結され、シル7が取付けられ
る取付部24とからなつている。一方、上述した第2図の
仮設ブラケツト21は、第4図および第5図に示すよう
に、乗場出入口2を形成する建屋壁1の縁部1cに埋設さ
れたアンカーボルト25により固定される基部26と、この
基部26に移動可能に締結され、三方枠5の縦枠3が取付
けられる取付部27とからなつている。The hall entrance / exit device of FIG. 2 in which this embodiment is used,
A plurality of first temporary brackets 20 arranged at the lower part of the hall entrance / exit 2 and a second temporary bracket 21 arranged on the side of the hall entrance / exit 2 are provided. As shown in FIG. 3, the first temporary bracket 20 described above has a base portion 23 fixed by anchor bolts 22 embedded in the landing floor 6,
The sill 7 is movably fastened to the base portion 23 and has a mounting portion 24 to which the sill 7 is mounted. On the other hand, the temporary bracket 21 of FIG. 2 described above is, as shown in FIGS. 4 and 5, a base portion fixed by an anchor bolt 25 embedded in an edge portion 1c of the building wall 1 forming the hall entrance / exit 2. 26 and a mounting portion 27 movably fastened to the base portion 26 and to which the vertical frame 3 of the three-way frame 5 is mounted.
この実施例にあつては、第1図に示す手順にしたがつ
て乗場出入口装置の取付けがおこなわれる。すなわち、
まず手順S1で基部23と取付部24とを締結して第1の仮設
ブラケツト20を組立て、この第1の仮設ブラケツト20の
取付部24にシル7を取付けるとともに、基部23を乗場床
6に埋設されたアンカーボルト22によつて固定する。次
いで、手順S2として一対の縦枠3の上端と上枠4の側部
とをそれぞれ連結して三方枠5を組立て、この三方枠5
の縦枠3の取付部27を取付け、一方、建屋壁1の縁部1c
に埋設されたアンカーボルト25により基部26を固定し、
これらの基部26と取付部27とを締結して第2の仮設ブラ
ケツト21を組立てるとともに、乗場出入口2の側部と上
部に沿つて三方枠5を設置する。このとき、第2図に示
すように、シル7が第1の仮設ブラケツト20を介し、ま
た、三方枠5が第2のブラケツト21を介してそれぞれ支
持されていることから、この乗場出入口2付近の建屋壁
1の仕上げが実施可能である。In this embodiment, the hall entrance / exit device is attached according to the procedure shown in FIG. That is,
First, in step S1, the base portion 23 and the mounting portion 24 are fastened to assemble the first temporary bracket 20, the sill 7 is attached to the mounting portion 24 of the first temporary bracket 20, and the base portion 23 is embedded in the landing floor 6. It is fixed by the anchor bolts 22 that are attached. Next, in step S2, the upper ends of the pair of vertical frames 3 and the side portions of the upper frame 4 are connected to each other to assemble the three-way frame 5, and the three-way frame 5 is assembled.
The mounting portion 27 of the vertical frame 3 is attached, while the edge 1c of the building wall 1 is attached.
Secure the base 26 with the anchor bolts 25 embedded in the
The base portion 26 and the mounting portion 27 are fastened to assemble the second temporary bracket 21, and the three-way frame 5 is installed along the side portion and the upper portion of the hall entrance / exit 2. At this time, as shown in FIG. 2, since the sill 7 is supported by the first temporary bracket 20 and the three-sided frame 5 is supported by the second bracket 21, respectively, the vicinity of the hall entrance / exit 2 It is possible to finish the building wall 1 of.
そして、例えばこのような建屋壁1の仕上げの終了
後、手順S3とし第3図に示す状態のシル7と壁部1bとの
間に、前述した第7図に示す本設ブラケツト13を介設す
るとともに、第2図に示す状態の三方枠5の上枠4と壁
部1aとの間に、前述した第7図に示すブラケツト9、ポ
ケツト10を介設する。次いで手順S4として第1の仮設ブ
ラケツト20をシル7と乗場床6とから、第2の仮設ブラ
ケツト21を三方枠5の縦枠3と建屋壁1と縁部1cとから
それぞれ取外し、アンカーボルト22、25を取除く。この
とき、シル7および三方枠5は、前述した第7図に示す
場合と同様に、それぞれブラケツト13、ポケツト10等を
介して支持されている。Then, for example, after finishing the building wall 1 as described above, in step S3, the above-mentioned main bracket 13 shown in FIG. 7 is interposed between the sill 7 and the wall portion 1b in the state shown in FIG. In addition, the bracket 9 and the pocket 10 shown in FIG. 7 are provided between the upper frame 4 and the wall portion 1a of the three-way frame 5 in the state shown in FIG. Next, in step S4, the first temporary bracket 20 is removed from the sill 7 and the landing floor 6, and the second temporary bracket 21 is removed from the vertical frame 3 of the three-way frame 5, the building wall 1 and the edge 1c, respectively, and the anchor bolt 22 , Remove 25. At this time, the sill 7 and the three-sided frame 5 are supported via the bracket 13, the pocket 10, etc., respectively, as in the case shown in FIG. 7 described above.
このように構成した実施例にあつては、上述したよう
にシル7が第1の仮設ブラケツト20を介し乗場床6に、
三方枠5が第2の仮設ブラケツト21を介して建屋壁1の
縁部1cにそれぞれ仮固定されることから、これらのシル
7、三方枠5の設置を乗場床6側でおこなうことがで
き、すなわち、昇降路8側での作業と比べて足場が良い
ので、比較的短時間のうちにシル7、三方枠5を設置で
きる。そのため、乗場出入口2付近の建屋壁1の仕上げ
を比較的早い時期におこなうことができる。In the embodiment configured in this way, the sill 7 is attached to the landing floor 6 via the first temporary bracket 20 as described above.
Since the three-sided frame 5 is temporarily fixed to the edge 1c of the building wall 1 via the second temporary bracket 21, the sill 7 and the three-sided frame 5 can be installed on the landing floor 6 side. That is, since the scaffolding is better than the work on the hoistway 8 side, the sill 7 and the three-sided frame 5 can be installed in a relatively short time. Therefore, it is possible to finish the building wall 1 near the landing entrance 2 at a relatively early time.
尚、上記実施例では、仮設ブラケツトを取外すように
したが、壁仕上げ時に埋め込むことのできる現場におい
ては、取外す必要はない。Although the temporary bracket is removed in the above-mentioned embodiment, it is not necessary to remove the temporary bracket when it can be embedded at the time of wall finishing.
本発明は以上のように構成してあることから、乗場出
入口付近の建屋壁の仕上げを早い時期におこなうことが
でき、したがつて、建屋壁の仕上げに係る業者の工程遅
れを防止できるという効果がある。Since the present invention is configured as described above, it is possible to finish the building wall near the entrance / exit of the landing at an early stage, and therefore, it is possible to prevent the process delay of the contractor for finishing the building wall. There is.
第1図ないし第5図は本発明の乗場出入口装置の取付方
法の一実施例を説明する図で、第1図は作業手順を示す
フローチヤート、第2図はシルおよび三方枠が仮固定さ
れた状態を示す側面図、第3図はシル部分の拡大側面
図、第4図は三方枠部分の拡大平面図、第5図は第4図
に対応する正面図、第6図は一般的な乗場出入口装置の
構成を示す斜視図、第7図は従来の乗場出入口装置の取
付方法を説明する側面図である。 1……建屋壁、2……乗場出入口、5……三方枠、6…
…乗場床、7……シル、8…昇降路、20……第1の仮設
ブラケツト、21……第2の仮設ブラケツト、22,25……
アンカーボルト。1 to 5 are views for explaining an embodiment of a method of mounting a hall entrance / exit device according to the present invention. FIG. 1 is a flow chart showing a work procedure, and FIG. 2 is a sill and a three-way frame temporarily fixed. FIG. 3 is an enlarged side view of the sill portion, FIG. 4 is an enlarged plan view of the three-sided frame portion, FIG. 5 is a front view corresponding to FIG. 4, and FIG. FIG. 7 is a perspective view showing the structure of the hall entrance / exit device, and FIG. 7 is a side view for explaining a method of mounting the conventional hall entrance / exit device. 1 ... Building wall, 2 ... Hallway entrance / exit, 5 ... Three-way frame, 6 ...
… Floor floor, 7 …… sill, 8… hoistway, 20 …… first temporary bracket, 21 …… second temporary bracket, 22,25 ……
Anchor bolt.
Claims (1)
に配置され、建屋壁の昇降路側に固設されるポケツト
と、このポケツトを介し支持され、上記乗場出入口の側
部および上部に沿つて延設される三方枠と、上記乗場出
入口の下部近傍に配置され、建屋壁の昇降路側に固設さ
れる本設ブラケツトと、この本設ブラケツトを介し支持
され、乗場床に沿つて延設される乗場扉用シルとを含む
乗場出入口装置の取付方法において、上記シルを上記乗
場床に第1の仮設ブラケツトを介し仮固定するととも
に、上記三方枠を上記建屋壁に第2の仮設ブラケツトを
介し仮固定し、次いで上記シルと建屋壁の昇降路側との
間に上記本設ブラケツトを介設し、更に、上記三方枠と
建屋壁の昇降路側との間に上記ポケツトを介設したこと
を特徴とする乗場出入口装置の取付方法。1. A pocket, which is arranged near an upper portion of a landing doorway formed on a building wall, is fixed to the hoistway side of the building wall, and is supported through the pocket, and is located along the side and upper portions of the landing doorway. The three-sided frame that is extended along with the permanent bracket that is fixed near the lower part of the entrance and exit of the hall and is fixed to the hoistway side of the building wall, and is supported via this permanent bracket and extends along the floor of the hall. In the method for mounting a hall entrance / exit device including a sill for a hall door, the sill is temporarily fixed to the hall floor via a first temporary bracket, and the three-way frame is attached to a second temporary bracket on the building wall. Temporary fixing via the sill, then the main bracket is provided between the sill and the hoistway side of the building wall, and further, the pocket is provided between the three-way frame and the hoistway side of the building wall. Characteristic entrance / exit Mounting method of the device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16364089A JPH089469B2 (en) | 1989-06-28 | 1989-06-28 | How to install the landing gate device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16364089A JPH089469B2 (en) | 1989-06-28 | 1989-06-28 | How to install the landing gate device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0331189A JPH0331189A (en) | 1991-02-08 |
JPH089469B2 true JPH089469B2 (en) | 1996-01-31 |
Family
ID=15777786
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP16364089A Expired - Lifetime JPH089469B2 (en) | 1989-06-28 | 1989-06-28 | How to install the landing gate device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH089469B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2320402A2 (en) | 2009-11-04 | 2011-05-11 | Somfy SAS | Remote control and/or information collecting device for home automation appliances comprising a ring-shaped photovoltaic panel |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002284471A (en) * | 2001-03-27 | 2002-10-03 | Toshiba Elevator Co Ltd | Elevator gateway device |
JP7406630B2 (en) * | 2020-05-12 | 2023-12-27 | 株式会社日立製作所 | Elevator equipment and its three-sided frame mounting structure |
-
1989
- 1989-06-28 JP JP16364089A patent/JPH089469B2/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2320402A2 (en) | 2009-11-04 | 2011-05-11 | Somfy SAS | Remote control and/or information collecting device for home automation appliances comprising a ring-shaped photovoltaic panel |
Also Published As
Publication number | Publication date |
---|---|
JPH0331189A (en) | 1991-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5479754A (en) | Method and apparatus for installing an elevator shaft door | |
RU2671071C2 (en) | Elevator system, door threshold unit and method of installing door unit of elevator stair platform | |
US11498812B2 (en) | Elevator landing door assembly and its installation method | |
JPH089469B2 (en) | How to install the landing gate device | |
JP2503750B2 (en) | Elevator hall device | |
JP2713013B2 (en) | Mounting structure for elevator sill | |
JPH0133580Y2 (en) | ||
JPH0840678A (en) | Curing device for opening part of elevator doorway | |
JPH0318591A (en) | Doorsill at elevator getting-on field | |
JPH02310287A (en) | Door device of elevator | |
JP2502165B2 (en) | Elevator hall door device | |
JPS60242282A (en) | Platform side access apparatus of elevator | |
JPH07102951B2 (en) | Temporary elevator | |
JP3228821B2 (en) | Temporary fixing device for elevator doorway members | |
JPH036623Y2 (en) | ||
JPH07215645A (en) | Access unit block temporarily fixing device | |
JPS6341417Y2 (en) | ||
JP2846546B2 (en) | Guide rail centering device for counterweight | |
JPS62280183A (en) | Platform door device for elevator | |
JP2953281B2 (en) | Mounting structure of partitioning device | |
JPH07237868A (en) | Elevator front panel unit | |
JPH0361287A (en) | Cage stop device for elevator | |
JPH05319744A (en) | Elevator device | |
JPH0398985A (en) | Landing device for elevator | |
JPH0470233B2 (en) |