JPH0882102A - Fixture of safety fence post installed in construction of reinforced concrete structure - Google Patents

Fixture of safety fence post installed in construction of reinforced concrete structure

Info

Publication number
JPH0882102A
JPH0882102A JP24230794A JP24230794A JPH0882102A JP H0882102 A JPH0882102 A JP H0882102A JP 24230794 A JP24230794 A JP 24230794A JP 24230794 A JP24230794 A JP 24230794A JP H0882102 A JPH0882102 A JP H0882102A
Authority
JP
Japan
Prior art keywords
insertion pipe
pipe
fixture
safety fence
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP24230794A
Other languages
Japanese (ja)
Inventor
Sadami Satake
貞巳 佐竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SATAKE TEKKO KK
Original Assignee
SATAKE TEKKO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SATAKE TEKKO KK filed Critical SATAKE TEKKO KK
Priority to JP24230794A priority Critical patent/JPH0882102A/en
Publication of JPH0882102A publication Critical patent/JPH0882102A/en
Pending legal-status Critical Current

Links

Landscapes

  • Fencing (AREA)

Abstract

PURPOSE: To protect peripheral concrete from being contaminated and damaged by fixing temporarily an insertion pipe fixture with reinforcements, threading the insertion pipe with the fixture and applying a large rotary power to the insertion pipe in the extracting direction and canceling the bonding between the outer peripheral surface and the concrete. CONSTITUTION: A female screw threaded with a male screw of the lower end of an insertion pipe is installed to the inner peripheral surface of a peripheral wall 5a of a bottomed short cylindrical body 5. A pair of temporary fixing plates 7 are welded with a base plate 5b. A nut 8 is fixedly mounted to the bottom side of the central part of the base plate 5b where a fixing bolt 9 is threaded with the nut 8. The paired temporary fixing plates 7 are fixedly mounted to the shaft center of the bottomed short cylindrical body 5 at its symmetrical position. A nut 11, which is designed to be definitely pressed on the top of reinforcements R, is welded with the tip of the fixing bolt 9. When a safety fence is to be removed, a large revolving force is instantaneously added to the insertion pipe in the extraction direction. If the insertion pipe is slightly rotated, the close contact between the outer peripheral surface and the concrete is canceled.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋コンクリート構造
物の床部に打設されるコンクリート内にほぼ下半部が埋
設され、該構造物の施工中において、その周縁に設けら
れる安全柵用支柱を固定するための固定具に関するもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a post for a safety fence in which almost the lower half of the structure is embedded in concrete that is placed on the floor of a reinforced concrete structure and is provided at the periphery of the structure during construction. The present invention relates to a fixture for fixing the.

【0002】[0002]

【従来の技術】鉄筋コンクリート構造物の施工において
は、その施工途中において、床部となる部分に開口が一
時的に設けられることがある。例えば、図11及び図1
2に示されるように、床部Fにおけるエレベータ装置が
構築される部分には、開口Aが一時的に設けられ、床部
Fにおける該開口Aに臨む部分には、梁部Bが設けられ
る。この種の構造物の施工中においては、このような開
口Aが必ず設けられる。よって、床部Fに接続して開口
Aが設けられていると極めて危険であるので、開口Aの
周辺には、安全柵Sが設けられる。なお、図11及び図
12において、Wは、該開口Aに接続して設けられた壁
部を示す。
2. Description of the Related Art In the construction of a reinforced concrete structure, an opening may be temporarily provided in a portion to be a floor during the construction. For example, FIG. 11 and FIG.
As shown in FIG. 2, an opening A is temporarily provided in a portion of the floor F where the elevator apparatus is constructed, and a beam B is provided in a portion of the floor F facing the opening A. Such an opening A is always provided during the construction of this type of structure. Therefore, since it is extremely dangerous if the opening A is provided in connection with the floor F, a safety fence S is provided around the opening A. Note that, in FIGS. 11 and 12, W indicates a wall portion provided so as to be connected to the opening A.

【0003】この安全柵Sは、開口Aに臨む床部Fに所
定の間隔をおいて支柱31を立設し、各支柱31に棒材
32を水平にして固定したものである。この支柱31を
床部Fにおける開口Aに臨む部分に固定するには、以下
のようにして行われていた。即ち、床部Fの上記部分に
位置する最上部の鉄筋Rに番線と称される鉄線33によ
って差込パイプ34を縛り付けて固定し(図15)、こ
の状態でコンクリートCを打設して(図16)、該差込
パイプ34の上端部を除く部分を該コンクリートC内に
埋設し、該差込パイプ34に前記支柱31の下端部を挿
入して、該支柱31を固定していた。なお、図15及び
図16において、Gは、コンクリートCの打設時に使用
される型枠を示す。
In this safety fence S, columns 31 are erected at a predetermined interval on a floor portion F facing the opening A, and rods 32 are horizontally fixed to each column 31. The support 31 is fixed to a portion of the floor F facing the opening A in the following manner. That is, the insertion pipe 34 is fixed to the uppermost reinforcing bar R located at the above-mentioned portion of the floor F by the iron wire 33 called a number wire (FIG. 15), and the concrete C is poured in this state ( 16), the portion excluding the upper end portion of the insertion pipe 34 is embedded in the concrete C, and the lower end portion of the support column 31 is inserted into the insertion pipe 34 to fix the support column 31. In addition, in FIG.15 and FIG.16, G shows the formwork used when the concrete C is poured.

【0004】そして、開口Aに構築物(例えば、エレベ
ータ装置)を構築した後には、安全柵Sを撤去する。こ
こで、上記した差込パイプ34は、その上端部が床部F
から突出しているため、安全柵Sの撤去時において、同
時に処理する必要がある。従来においては、差込パイプ
34の周辺部のコンクリートCを除去し(図17)、こ
の状態で、該差込パイプ34の上端部をガスバーナーに
よって溶断し(図18)、その後に、差込パイプ34の
溶断のためにコンクリートCを除去した穴部35に再度
コンクリートCを埋めて修復していた(図19)。
After constructing a structure (for example, an elevator device) in the opening A, the safety fence S is removed. Here, the above-mentioned insertion pipe 34 has a floor portion F at its upper end portion.
Since it protrudes from the above, it is necessary to process it at the same time when the safety fence S is removed. Conventionally, the concrete C around the insertion pipe 34 is removed (FIG. 17), and in this state, the upper end of the insertion pipe 34 is melt-cut by a gas burner (FIG. 18), and then the insertion pipe 34 is inserted. Concrete C was buried again in the hole 35 from which the concrete C had been removed to melt the pipe 34 (FIG. 19).

【0005】このように、差込パイプ34を使用する従
来の構造では、該差込パイプ34の周辺のコンクリート
Cの除去、該差込パイプ34の上端部の溶断、除去した
コンクリートCの修復の各作業が必要となる。このよう
に、上記安全柵Sの設置、及びその撤去は、構造物の本
体部の工事とは無関係なものであって、このために多大
のコストを要していた。特に、ガスバーナーによる差込
パイプ34の溶断作業は、極めて面倒で多くの時間を要
すると共に、溶断熱によって、周辺のコンクリートが焼
き付いて変色されてしまう不具合があった。一つの鉄筋
コンクリート構造物を構築するには、数多くの差込パイ
プが埋設されるので、これの溶断に要する費用は多大で
ある。
As described above, in the conventional structure using the insertion pipe 34, the concrete C around the insertion pipe 34 is removed, the upper end of the insertion pipe 34 is melted, and the removed concrete C is repaired. Each work is required. As described above, the installation of the safety fence S and the removal thereof are unrelated to the construction of the main body of the structure, which requires a great deal of cost. In particular, the work of melting the insertion pipe 34 with a gas burner is extremely troublesome and takes a lot of time, and there is a problem that the surrounding concrete is burned and discolored due to the heat insulation. Since many insertion pipes are buried to construct one reinforced concrete structure, the cost required for fusing them is great.

【0006】[0006]

【発明が解決しようとする課題】本発明は、鉄筋コンク
リート構造物の施工中において、その周縁に設ける安全
柵用支柱を固定するための固定具において、安全柵の撤
去時に、固定具を構成する差込パイプの取外しを簡単に
行えるようにすることを課題としている。
SUMMARY OF THE INVENTION The present invention relates to a fixture for fixing a support post for a safety fence provided on the periphery of a reinforced concrete structure during the construction of the reinforced concrete structure. The task is to make it easy to remove the entry pipe.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
の本発明は、鉄筋コンクリート構造物に打設されるコン
クリート内にほぼ下半部が埋設され、該構造物の施工中
においてその周縁部に設けられる安全柵用支柱を固定す
るための固定具であって、該安全柵用支柱の下端部を差
し込むための差込パイプと、連結手段を介して該差込パ
イプを分離可能に連結するための差込パイプ連結具とか
ら成り、仮固定手段によって、該差込パイプを連結した
該差込パイプ連結具を構造物を構成する部材に仮固定し
た状態でコンクリートを打設して、差込パイプ連結具の
全部、及び差込パイプの下端部を該コンクリート内に埋
設し、該差込パイプのみを該差込パイプ連結具から分離
して抜き取り可能にしたことを特徴としている。
According to the present invention for solving the above-mentioned problems, a lower half portion is substantially embedded in concrete poured into a reinforced concrete structure, and a peripheral portion thereof is provided during construction of the structure. A fixture for fixing a safety fence support provided, for connecting the insertion pipe for inserting the lower end of the safety fence support and the insertion pipe separably via a connecting means. The insert pipe connecting tool, and the concrete is placed by temporarily fixing the insert pipe connecting tool connecting the insert pipes to the member constituting the structure by the temporary fixing means. All of the pipe connectors and the lower end portion of the insertion pipe are embedded in the concrete, and only the insertion pipe can be separated from the insertion pipe connector and extracted.

【0008】[0008]

【発明の作用】差込パイプを連結した差込パイプ連結具
を仮固定手段によって構造物を構成する部材に仮固定
し、この状態でコンクリートを打設すると、差込パイプ
連結具の全部、及び差込パイプの下端部がコンクリート
内に埋設される。下端部がコンクリート内に埋設された
該差込パイプに安全柵用支柱の下端部を差し込んで固定
する。また、安全柵の撤去時に差込パイプを取り外すに
は、該差込パイプに所定方向の回転力を加えて、これを
僅かに回転させると、差込パイプの外周面とコンクリー
トとの密着が解除される。その後に、連結手段を介して
差込パイプ連接具に連結されている差込パイプを該差込
パイプ連結具から分離して抜き取る。なお、差込パイプ
連結具は、コンクリート内に埋設されたまま残る。
According to the present invention, the insertion pipe connecting tool connected to the insertion pipe is temporarily fixed to the member constituting the structure by the temporary fixing means, and when concrete is placed in this state, the entire insertion pipe connecting tool and The lower end of the bayonet pipe is buried in concrete. The lower end of the safety fence post is inserted and fixed into the insertion pipe whose lower end is embedded in concrete. To remove the insertion pipe when removing the safety fence, apply a rotational force in a specified direction to the insertion pipe and rotate it slightly to release the adhesion between the outer peripheral surface of the insertion pipe and concrete. To be done. After that, the insertion pipe connected to the insertion pipe connecting device via the connecting means is separated from the insertion pipe connecting device and pulled out. Note that the plug-in pipe connector remains embedded in the concrete.

【0009】[0009]

【実施例】以下、実施例を挙げて本発明を詳細に説明す
る。図1は、本発明に係る安全柵用支柱の固定具の分解
斜視図であり、図2は、この固定具の側面断面図であ
り、図3は、同じく正面図であり、図4は、この固定具
を鉄筋Rに仮固定した状態の側面断面図であり、図5
は、同じく正面断面図である。最初に、図1ないし図5
を参照して、本発明に係る固定具について説明し、その
後に、その使用方法について説明する。本発明に係る固
定具は、下端部の外周面に雄ねじ1が設けられた差込パ
イプPと、鉄筋コンクリート構造物の床部を構成する鉄
筋に仮固定した状態で該差込パイプPを螺合により連結
させるための差込パイプ連結具Dとから成る。差込パイ
プPの上端部には、回し棒2(図7参照)を挿通させる
ための挿通穴3が設けられていると共に、この挿通穴3
と位相が90°異なる部分に一対一組となった二組の蝶
ボルト4が該差込パイプPの軸方向に沿って所定の間隔
をおいて螺合されている。この蝶ボルト4は、該差込パ
イプPに挿入される安全柵Sの支柱31の下端部を固定
するためのものである。
EXAMPLES The present invention will be described in detail below with reference to examples. FIG. 1 is an exploded perspective view of a fixture for a safety fence post according to the present invention, FIG. 2 is a side sectional view of the fixture, FIG. 3 is a front view of the same, and FIG. FIG. 6 is a side sectional view showing a state in which this fixing tool is temporarily fixed to the reinforcing bar R, and FIG.
FIG. 4 is a front sectional view of the same. First, FIGS.
The fixture according to the present invention will be described with reference to, and then the method of using the fixture will be described. The fixture according to the present invention includes a male pipe 1 provided on the outer peripheral surface of the lower end portion thereof, and a male pipe 1 provided on the outer peripheral surface of the male pipe 1 and the male pipe 1 which is temporarily fixed to the reinforcing bar constituting the floor of the reinforced concrete structure. And an insertion pipe connecting tool D for connecting with each other. An insertion hole 3 for inserting the turning rod 2 (see FIG. 7) is provided in the upper end portion of the insertion pipe P, and the insertion hole 3
Two sets of butterfly bolts 4 which are one-to-one set are screwed at predetermined intervals along the axial direction of the insertion pipe P at portions where the phases differ by 90 °. The butterfly bolt 4 is for fixing the lower end portion of the pillar 31 of the safety fence S inserted into the insertion pipe P.

【0010】差込パイプ連結具Dは、有底短円筒体5の
周壁部5aの内周面に前記差込パイプPの下端部の雄ね
じ1と螺合される雌ねじ6が設けられ、その底板部5b
に一対の仮固定板7が溶接により固着され、更に、この
底板部5bの中心部の底面側にナット8が固着されて、
該ナット8に固定ボルト9が螺合された構成である。一
対の仮固定板7には、鉄筋Rを挿入するための鉄筋挿入
溝7aが設けられていて、該鉄筋挿入溝7aは、鉄筋R
の挿入を容易にするために奥側から開口側に向けて、そ
の幅が漸次広くなっている。この一対の仮固定板7は、
有底短円筒体5の軸心に対して対称位置に固着されてい
て、その間に固定ボルト9が配設されている。また、有
底短円筒体5の底板部5bから底面側に向けて突出して
いる固定ボルト9の先端部には、鉄筋Rの上面部に対す
る押付けを確実にするための押付部材(実施例ではナッ
トで構成されている)11が溶接により固着されてい
る。更に、有底短円筒体5の周壁部5aにおける鉄筋挿
入溝7aの開口側と反対側に位置する部分には、L字形
をしたアンカー部材12が固着され、その底板部5bの
底面側に向けて延設されている。
In the insertion pipe connector D, a female screw 6 to be screwed with the male screw 1 at the lower end of the insertion pipe P is provided on the inner peripheral surface of the peripheral wall portion 5a of the bottomed short cylindrical body 5 and its bottom plate. Part 5b
A pair of temporary fixing plates 7 are fixed to each other by welding, and a nut 8 is fixed to the bottom surface side of the central portion of the bottom plate portion 5b.
A fixing bolt 9 is screwed onto the nut 8. The pair of temporary fixing plates 7 are provided with a reinforcing bar insertion groove 7a for inserting the reinforcing bar R, and the reinforcing bar insertion groove 7a is
The width gradually increases from the back side toward the opening side in order to facilitate the insertion of the. The pair of temporary fixing plates 7 are
The bottomed short cylindrical body 5 is fixed at a symmetrical position with respect to the axis of the cylindrical body 5, and a fixing bolt 9 is arranged therebetween. Further, at the tip of the fixing bolt 9 protruding from the bottom plate portion 5b of the bottomed short cylindrical body 5 toward the bottom surface side, a pressing member (a nut in the embodiment) for ensuring pressing against the upper surface portion of the reinforcing bar R is performed. 11) which is fixed by welding. Further, an L-shaped anchor member 12 is fixed to a portion of the peripheral wall portion 5a of the bottomed short cylindrical body 5 located on the side opposite to the opening side of the reinforcing bar insertion groove 7a, and is directed toward the bottom surface side of the bottom plate portion 5b. Has been extended.

【0011】次に、上記した固定具を使用して、上記開
口Aの周辺に設ける安全柵Sの支柱31を固定する場合
について説明する。まず、床部Fにおける開口Aに臨む
部分に配筋された最上部の横鉄筋Rに差込パイプ連結具
Dを仮固定させる。即ち、差込パイプ連結具Dを構成す
る一対の仮固定板7の各鉄筋挿入溝7aに該鉄筋Rを挿
入した状態で、固定ボルト9を回転させて、その下端に
固着された押付部材11を該鉄筋Rの上面部に押し付け
る(図4ないし図6)。これにより、差込パイプ連結具
Dは鉄筋Rに仮固定され、図5に示されるように、一対
の仮固定板7の間に固定ボルト9が配設されているため
に、差込パイプ連結具Dは、鉄筋Rに安定して仮固定さ
れる。
Next, a description will be given of the case where the support 31 of the safety fence S provided around the opening A is fixed by using the above-mentioned fixture. First, the insertion pipe connector D is temporarily fixed to the uppermost horizontal reinforcing bar R arranged in the portion of the floor F facing the opening A. That is, with the reinforcing bars R inserted in the reinforcing bar insertion grooves 7a of the pair of temporary fixing plates 7 constituting the insertion pipe connector D, the fixing bolt 9 is rotated to press the pressing member 11 fixed to the lower end thereof. Is pressed against the upper surface of the reinforcing bar R (FIGS. 4 to 6). As a result, the insertion pipe connector D is temporarily fixed to the reinforcing bar R, and as shown in FIG. 5, since the fixing bolt 9 is arranged between the pair of temporary fixing plates 7, the insertion pipe connection device D The tool D is stably and temporarily fixed to the reinforcing bar R.

【0012】次に、差込パイプPの挿通穴3に回し棒2
を挿通させ、この回し棒2により該差込パイプPを回転
させて、その下端部の雄ねじ1を有底短円筒体5の雌ね
じ6に螺合させると、差込パイプ連結具Dに差込パイプ
Pが連結される(図7)。この状態で、床部Fとなる部
分にコンクリートCを打設すると、差込パイプ連結具D
の全部、及び差込パイプPの下端部が該コンクリートC
内に埋設されて、該差込パイプPが床部Fの床面から突
出した状態で固定される(図8)。差込パイプ連結具D
に設けられたアンカー部材12がコンクリートC内に埋
設されるために、床部Fに対する差込パイプPの固定強
度は大きい。そして、図11に示されるように、床部F
における開口Aに臨む部分に所定の間隔をおいて多数本
の差込パイプPが固定され、安全柵Sを構成する多数本
の支柱31の下端部をそれぞれ各差込パイプPに挿入し
て、蝶ボルト4によって、該支柱31の下端部を該差込
パイプPに固定する。
Next, the turning rod 2 is inserted into the insertion hole 3 of the insertion pipe P.
The insertion pipe P is rotated by the turning rod 2, and the male screw 1 at the lower end of the insertion pipe P is screwed into the female screw 6 of the bottomed short cylindrical body 5. The pipe P is connected (FIG. 7). In this state, when concrete C is placed in the part that becomes the floor F, the plug connector D
And the lower end of the plug-in pipe P is the concrete C
It is embedded inside and is fixed in a state where the insertion pipe P projects from the floor surface of the floor portion F (FIG. 8). Plug-in pipe connector D
Since the anchor member 12 provided on the floor is embedded in the concrete C, the fixing strength of the insertion pipe P with respect to the floor F is large. Then, as shown in FIG. 11, the floor portion F
A large number of insertion pipes P are fixed to the portion facing the opening A at a predetermined interval, and the lower ends of the large number of support columns 31 forming the safety fence S are inserted into the respective insertion pipes P, The lower end of the column 31 is fixed to the insertion pipe P by the butterfly bolt 4.

【0013】そして、上記開口Aにエレベータ装置など
の構築物を構築した後において、安全柵Sを撤去する際
に、床部Fの床面から突出している差込パイプPを抜き
取るには、以下のようにして行う。即ち、差込パイプP
の挿通穴3に回し棒2を挿通して、この回し棒2によっ
て該差込パイプPに抜き取り方向の大きな回転力を瞬間
的に加えて、該差込パイプPを僅かに回転させると、こ
の外周面とコンクリートCとの密着が解除される。これ
以後は、小さな回転力によって差込パイプPはスムーズ
に回転して、差込パイプ連結具Dから分離されて、抜き
取られる(図9)。そして、差込パイプPが抜き取られ
て形成された穴部13には、コンクリートCを埋設し
て、該穴部13を塞いでおく(図10)。このようにし
て、床部Fに固定されていた差込パイプPは、簡単に抜
き取ることができて、差込パイプ連結具Dは、床部Fの
コンクリートC内に埋設されたままとなる。
Then, after constructing a structure such as an elevator device in the opening A, when removing the safety fence S, in order to pull out the insertion pipe P protruding from the floor surface of the floor portion F, To do so. That is, the insertion pipe P
When the turning rod 2 is inserted into the insertion hole 3 of No. 2 and the turning rod 2 momentarily applies a large rotational force in the extracting direction to the insertion pipe P, the insertion pipe P is slightly rotated. The close contact between the outer peripheral surface and the concrete C is released. After this, the insertion pipe P is smoothly rotated by a small rotational force, separated from the insertion pipe connector D, and extracted (FIG. 9). Then, concrete C is embedded in the hole 13 formed by extracting the insertion pipe P to close the hole 13 (FIG. 10). In this way, the insertion pipe P fixed to the floor portion F can be easily pulled out, and the insertion pipe connector D remains buried in the concrete C of the floor portion F.

【0014】また、上記実施例は、差込パイプ連結具の
仮固定の対称が鉄筋コンクリート構造物を構成する鉄筋
の例であるが、この差込パイプ連結具は、鉄筋コンクリ
ート構造物の構成、或いは施工態様によって、鉄骨、型
枠などに仮固定して使用される場合がある。図13に示
される例は、リング体の内周面に雌ねじを設けて差込パ
イプ連結具D’が形成され、コンクリート構造物の床部
に埋設される鉄骨14に該差込パイプ連結具D’を溶接
Wにより仮固定し、そのリング体の内周面の雌ねじと、
差込パイプPの下端部の外周面に設けられた雄ねじとを
螺合して、両者を連結した例である。また、図14に示
される例は、脚体15の上端に上記差込パイプ連結具
D’が溶接により固着され、床部(スラブ)を形成する
ための型枠16に前記脚体15を釘17により仮固定す
る例である。いずれの例の場合においても、差込パイプ
連結具D’に差込パイプPを螺合により連結した状態
で、コンクリートを打設する。
Further, the above embodiment is an example of the reinforcing bar in which the temporary fixing symmetry of the plug-in pipe connector constitutes the reinforced concrete structure. This plug-in pipe connector is constructed or constructed of the reinforced concrete structure. Depending on the mode, it may be used by temporarily fixing it to a steel frame, a mold or the like. In the example shown in FIG. 13, an internal thread is provided on the inner peripheral surface of the ring body to form an insertion pipe connector D ′, and the insertion pipe connector D is attached to the steel frame 14 embedded in the floor of the concrete structure. 'Is temporarily fixed by welding W, and the female screw on the inner peripheral surface of the ring body,
This is an example in which a male screw provided on the outer peripheral surface of the lower end portion of the insertion pipe P is screwed to connect both. In addition, in the example shown in FIG. 14, the insertion pipe connector D ′ is fixed to the upper end of the leg body 15 by welding, and the leg body 15 is nailed to a formwork 16 for forming a floor portion (slab). This is an example of temporarily fixing with 17. In either case, concrete is placed in a state where the insertion pipe P is screwed to the insertion pipe connector D ′.

【0015】また、上記実施例では、鉄筋コンクリート
構造物の床部の開口の周辺に設けられる安全柵用支柱を
固定する例を挙げたが、本発明に係る固定具は、該鉄筋
コンクリート構造物の床部の周縁、或いは他の構造物の
端縁などの危険箇所に設けられる安全柵用支柱を固定す
る場合においても使用可能である。更に、差込パイプ連
結具に対して差込パイプを分離可能に連結するための連
結手段は、上記実施例のように「ねじ」に限定されるも
のではなく、コンクリートの打設後において、該コンク
リート内に埋設されている差込パイプ連結具に対して差
込パイプを分離して抜き取ることができれば、いかなる
構造であってもよい。
Further, in the above-mentioned embodiment, the example of fixing the support post for the safety fence provided around the opening of the floor portion of the reinforced concrete structure has been described. The fixture according to the present invention is the floor of the reinforced concrete structure. It can also be used when fixing a support post for a safety fence provided at a dangerous place such as a peripheral edge of a portion or an edge of another structure. Furthermore, the connecting means for connecting the insertion pipe to the insertion pipe connecting device in a separable manner is not limited to the "screw" as in the above-mentioned embodiment, and after the concrete is poured, Any structure may be used as long as the insertion pipe can be separated and pulled out from the insertion pipe connector embedded in the concrete.

【0016】[0016]

【発明の効果】本発明に係る安全柵用支柱の固定具は、
安全柵用支柱の下端部を差し込むための差込パイプと、
連結手段を介して該差込パイプを分離可能に連結するた
めの差込パイプ連結具とから成り、仮固定手段によっ
て、該差込パイプを連結した該差込パイプ連結具を構造
物を構成する部材に仮固定した状態でコンクリートを打
設して、差込パイプ連結具の全部、及び差込パイプの下
端部を該コンクリート内に埋設し、該差込パイプのみを
該差込パイプ連結具から分離して抜き取り可能な構成に
なっているので、固定具を構成する差込パイプの抜き取
りが極めて簡単に行えると共に、その抜き取り時におい
て、周辺のコンクリートを汚損、或いは破損させること
も全くない。この結果、従来のように、差込パイプの上
端部をガスバーナーにより溶断する必要がなくなって、
安全柵の撤去時における差込パイプの処分に要する費用
も少なくなる。
EFFECT OF THE INVENTION A fixture for a safety fence post according to the present invention is
An insertion pipe for inserting the lower end of the safety fence support,
And an insertion pipe connector for detachably connecting the insertion pipe via a connecting means, and the temporary fixing means configures the structure of the insertion pipe connector to which the insertion pipe is connected. Concrete is placed in a state where it is temporarily fixed to the member, the entire insert pipe connector and the lower end of the insert pipe are embedded in the concrete, and only the insert pipe is inserted from the insert pipe connector. Since it can be separated and extracted, the insertion pipe that constitutes the fixture can be extracted very easily, and at the time of extraction, there is no possibility of soiling or damaging the surrounding concrete. As a result, it is no longer necessary to melt the upper end of the insertion pipe with a gas burner as in the conventional case.
The cost of disposing the plug-in pipe when removing the safety fence is also reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る安全柵用支柱の固定具の分解斜視
図である。
FIG. 1 is an exploded perspective view of a fixture for a support for a safety fence according to the present invention.

【図2】この固定具の側面断面図である。FIG. 2 is a side sectional view of the fixture.

【図3】この固定具の正面図である。FIG. 3 is a front view of this fixture.

【図4】この固定具を鉄筋Rに仮固定した状態の側面断
面図である。
FIG. 4 is a side sectional view showing a state in which the fixing tool is temporarily fixed to a reinforcing bar R.

【図5】同じく正面断面図である。FIG. 5 is a front sectional view of the same.

【図6】差込パイプ連結具Dを鉄筋Rに仮固定した状態
の側面断面図である。
FIG. 6 is a side sectional view showing a state in which the insertion pipe connector D is temporarily fixed to the reinforcing bar R.

【図7】鉄筋Rに仮固定された差込パイプ連結具Dに差
込パイプPを螺合した状態の側面断面図である。
FIG. 7 is a side sectional view showing a state in which an insertion pipe P is screwed into an insertion pipe connector D temporarily fixed to a reinforcing bar R.

【図8】床部Fに固定された差込パイプPに安全柵用の
支柱31を差し込んだ状態の側面断面図である。
FIG. 8 is a side sectional view showing a state in which a support post 31 for a safety fence is inserted into an insertion pipe P fixed to a floor portion F.

【図9】安全柵Sの撤去時に差込パイプPを抜き取った
状態の側面断面図である。
FIG. 9 is a side sectional view showing a state in which the insertion pipe P is pulled out when the safety fence S is removed.

【図10】差込パイプPを抜き取って生じた穴部13に
コンクリートCを埋設した状態の側面断面図である。
FIG. 10 is a side sectional view showing a state in which concrete C is embedded in a hole 13 formed by pulling out the insertion pipe P.

【図11】鉄筋コンクリート構造物の床部Fに設けられ
た開口Aを示す平面図である。
FIG. 11 is a plan view showing an opening A provided in a floor portion F of a reinforced concrete structure.

【図12】同じく断面図である。FIG. 12 is a sectional view of the same.

【図13】鉄骨14に差込パイプ連結具D’を溶接によ
り仮固定した状態を示す図である。
FIG. 13 is a view showing a state in which an insertion pipe connector D ′ is temporarily fixed to a steel frame 14 by welding.

【図14】型枠16に仮固定された脚体15に差込パイ
プ連結具D’を溶接により仮固定した状態を示す図であ
る。
FIG. 14 is a view showing a state in which an insert pipe connector D ′ is temporarily fixed to a leg 15 temporarily fixed to a mold 16 by welding.

【図15】鉄線33により差込パイプ34を鉄筋Rに固
定した状態の側面断面図である。
FIG. 15 is a side sectional view showing a state in which the insertion pipe 34 is fixed to the reinforcing bar R by the iron wire 33.

【図16】床部Fに打設されたコンクリートC内に差込
パイプ34の大部分が埋設された状態の側面断面図であ
る。
FIG. 16 is a side cross-sectional view showing a state in which most of the insertion pipe 34 is embedded in the concrete C cast on the floor F.

【図17】差込パイプ34の上端部を溶断するために、
その周辺のコンクリートCを除去した状態の側面断面図
である。
FIG. 17 is a view for cutting the upper end of the insertion pipe 34 by fusing.
It is a side surface sectional view in the state where concrete C of the circumference was removed.

【図18】差込パイプ34の上端部を溶断した状態の側
面断面図である。
FIG. 18 is a side sectional view showing a state in which an upper end portion of the insertion pipe 34 is melted and cut.

【図19】差込パイプ34を溶断した穴部35にコンク
リートCを埋設した状態の側面断面図である。
FIG. 19 is a side sectional view showing a state in which concrete C is embedded in a hole portion 35 in which the insertion pipe 34 is melted and cut.

【符号の説明】[Explanation of symbols]

A:開口 C:コンクリート D,D’:差込パイプ連結具 F:床部 P:差込パイプ R:鉄筋(構造物を構成する部材) S:安全柵 1:差込パイプの雄ねじ 5:有底短円筒体 6:有底短円筒体の雌ねじ 7:仮固定板(仮固定手段) 7a:鉄筋挿入溝 9:固定ボルト 12:アンカー部材 A: Opening C: Concrete D, D ': Insert pipe connecting tool F: Floor P: Insert pipe R: Reinforcing bar (member that constitutes the structure) S: Safety fence 1: Male screw of insert pipe 5: Yes Short bottom cylindrical body 6: Female screw of bottomed short cylindrical body 7: Temporary fixing plate (temporary fixing means) 7a: Reinforcing bar insertion groove 9: Fixing bolt 12: Anchor member

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 鉄筋コンクリート構造物に打設されるコ
ンクリート内にほぼ下半部が埋設され、該構造物の施工
中においてその周縁部に設けられる安全柵用支柱を固定
するための固定具であって、 該安全柵用支柱の下端部を差し込むための差込パイプ
と、連結手段を介して該差込パイプを分離可能に連結す
るための差込パイプ連結具とから成り、仮固定手段によ
って、該差込パイプを連結した該差込パイプ連結具を構
造物を構成する部材に仮固定した状態でコンクリートを
打設して、差込パイプ連結具の全部、及び差込パイプの
下端部を該コンクリート内に埋設し、該差込パイプのみ
を該差込パイプ連結具から分離して抜き取り可能にした
ことを特徴とする鉄筋コンクリート構造物の施工中に設
けられる安全柵用支柱の固定具。
1. A fixture for fixing a safety fence support provided in a peripheral portion of a reinforced concrete structure, the lower half of which is substantially embedded in the concrete when the structure is being constructed. And a inserting pipe for inserting the lower end of the safety fence support and an inserting pipe connecting tool for separably connecting the inserting pipe through a connecting means. Concrete is placed in a state in which the plug-in pipe connecting tool connected to the plug-in pipe is temporarily fixed to a member constituting a structure, and the entire plug-in pipe connecting tool and the lower end portion of the plug-in pipe are A fixture for a post for a safety fence provided during construction of a reinforced concrete structure, which is embedded in concrete, and is capable of being separated and withdrawn only from the insert pipe connecting device.
【請求項2】 前記差込パイプ連結具を仮固定するため
の部材が鉄筋であって、前記仮固定手段は、鉄筋挿入溝
を備えていて、差込パイプ連結具の本体の底面に所定の
間隔をおいて固設された一対の仮固定板と、該本体の底
部に螺合された固定ボルトとから成り、該一対の仮固定
板の各鉄筋挿入溝に鉄筋を挿入して、前記固定ボルトを
鉄筋の上面部に押し付けることにより、該鉄筋に差込パ
イプ連結具を仮固定することを特徴とする請求項1に記
載の鉄筋コンクリート構造物の施工中に設けられる安全
柵用支柱の固定具。
2. The member for temporarily fixing the insertion pipe connector is a reinforcing bar, and the temporary fixing means has a reinforcing bar insertion groove, and is provided on a bottom surface of a main body of the insertion pipe connector. It consists of a pair of temporary fixing plates fixed at intervals and fixing bolts screwed to the bottom of the main body, and inserts a reinforcing bar into each reinforcing bar insertion groove of the pair of temporary fixing plates to fix it. The fixture for a safety fence post provided during construction of a reinforced concrete structure according to claim 1, wherein the insertion pipe connector is temporarily fixed to the reinforcing bar by pressing a bolt against the upper surface of the reinforcing bar. .
【請求項3】 差込パイプ連結具に対して差込パイプを
分離可能に連結するための連結手段が、該差込パイプの
下端部の外周に形成された雄ねじと、有底短円筒状の該
差込パイプ連結具の内周面に形成された雌ねじとで構成
されていることを特徴とする請求項1に記載の鉄筋コン
クリート構造物の施工中に設けられる安全柵用支柱の固
定具。
3. A connecting means for connecting the insertion pipe to the insertion pipe connecting device so that the insertion pipe can be separated from each other. The fixture for a safety fence post provided during construction of a reinforced concrete structure according to claim 1, characterized in that the fixture is formed of an internal thread formed on the inner peripheral surface of the insertion pipe connector.
【請求項4】 前記差込パイプ連結具にはアンカー部材
が一体に設けられていることを特徴とする請求項1に記
載の鉄筋コンクリート構造物の施工中に設けられる安全
柵用支柱の固定具。
4. The fixture for a safety fence post provided during construction of a reinforced concrete structure according to claim 1, wherein an anchor member is integrally provided on the plug connection tool.
JP24230794A 1994-09-08 1994-09-08 Fixture of safety fence post installed in construction of reinforced concrete structure Pending JPH0882102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24230794A JPH0882102A (en) 1994-09-08 1994-09-08 Fixture of safety fence post installed in construction of reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24230794A JPH0882102A (en) 1994-09-08 1994-09-08 Fixture of safety fence post installed in construction of reinforced concrete structure

Publications (1)

Publication Number Publication Date
JPH0882102A true JPH0882102A (en) 1996-03-26

Family

ID=17087281

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24230794A Pending JPH0882102A (en) 1994-09-08 1994-09-08 Fixture of safety fence post installed in construction of reinforced concrete structure

Country Status (1)

Country Link
JP (1) JPH0882102A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006316492A (en) * 2005-05-12 2006-11-24 Sefuteikkusu:Kk Protective fence on concrete member
WO2011009168A1 (en) * 2009-07-21 2011-01-27 John Clement Preston Safety barrier
CN105755980A (en) * 2016-03-17 2016-07-13 合肥晨煦信息科技有限公司 Lighting guardrail
JP2018053595A (en) * 2016-09-29 2018-04-05 大和ハウス工業株式会社 Fall prevention device mounting member and column support

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006316492A (en) * 2005-05-12 2006-11-24 Sefuteikkusu:Kk Protective fence on concrete member
JP4698282B2 (en) * 2005-05-12 2011-06-08 株式会社セフティックス Guard fence on concrete member
WO2011009168A1 (en) * 2009-07-21 2011-01-27 John Clement Preston Safety barrier
CN105755980A (en) * 2016-03-17 2016-07-13 合肥晨煦信息科技有限公司 Lighting guardrail
JP2018053595A (en) * 2016-09-29 2018-04-05 大和ハウス工業株式会社 Fall prevention device mounting member and column support

Similar Documents

Publication Publication Date Title
US4900193A (en) Concrete structural member splicing device
KR101358242B1 (en) Device for fixing riser pipe
JPH0882102A (en) Fixture of safety fence post installed in construction of reinforced concrete structure
KR101122122B1 (en) Connecting apparatus for steel reinforcement
JPH09296611A (en) Support-fixing device for safety fence to be installed during construction of concrete structure
KR200242825Y1 (en) An automatic joining apparatus for an iron rod
JP3604225B2 (en) Temporary fixing device for steel plate for building structure reinforcement
JP3930833B2 (en) Method for manufacturing concrete segment
JP4455702B2 (en) Fitting and its connection method
JP2005083156A (en) Reinforcement grasper
JP2006097358A (en) Concrete floor structure and its construction method
JPH1193410A (en) Supporting device for temporary works
JP5506122B2 (en) Reinforcement method of outer steel tube concrete composite pile
KR102497786B1 (en) Manufacturing method for concrete manhole and concrete manhole manufactured by this method and construction of this manhole
JPH0438039Y2 (en)
KR200349955Y1 (en) Apparatus for fixing a steel tube of a safe handrail
JPH0732708Y2 (en) Precast concrete pillar members
JPH0913695A (en) Repairing method of reinforced concrete pole member
KR100855059B1 (en) A penetration type sleeve structure and installing method thereof
JP3648528B2 (en) Method for assembling divided box culvert and jig for connecting tension material used for the assembly
KR200345020Y1 (en) Binding Apparatus of Inner and Outer Form for Concrete Pouring
JPS6316774Y2 (en)
JPH1162229A (en) Separator coupling for concrete form
JPH0849306A (en) Anchorage device of anchor bolt
JP2520179Y2 (en) Support leg attachment / detachment structure for secondary lining formwork