JPH0882088A - Connecting scaffold structure - Google Patents

Connecting scaffold structure

Info

Publication number
JPH0882088A
JPH0882088A JP23856494A JP23856494A JPH0882088A JP H0882088 A JPH0882088 A JP H0882088A JP 23856494 A JP23856494 A JP 23856494A JP 23856494 A JP23856494 A JP 23856494A JP H0882088 A JPH0882088 A JP H0882088A
Authority
JP
Japan
Prior art keywords
frame
floor
scaffold
building
overhanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23856494A
Other languages
Japanese (ja)
Other versions
JP3477256B2 (en
Inventor
Takehiro Koshiyama
剛宏 腰山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ando Corp
Original Assignee
Ando Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ando Corp filed Critical Ando Corp
Priority to JP23856494A priority Critical patent/JP3477256B2/en
Publication of JPH0882088A publication Critical patent/JPH0882088A/en
Application granted granted Critical
Publication of JP3477256B2 publication Critical patent/JP3477256B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PURPOSE: To construct a passage between a temporary scaffold and a building frame by using an integrated scaffold structure. CONSTITUTION: A beam frame 10 is mounted on the side of a temporary scaffold 2 in such a way that the height of a passage inside the temporary scaffold 2 is the same as the height of an upper-chord horizontal member 12, the temporary scaffolding 2 being constructed along and at a predetermined distance to a building frame. An overhanging beam 21 secured and supported on the upper-chord horizontal member 12 of the beam frame 10 at its root, extended toward the building frame, and supported on a diagonal member 22 is provided, and a bracket frame 20 forming an overhanging floor 25 by the laying of flooring 23 in a portion surrounded by the overhanging beam 21 is provided, and a ramp frame 30 leading to the building frame is freely removably connected to one end of the overhanging floor 25.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は渡り足場構造に係り、特
に建物の躯体構造と仮設足場との間を行き来するために
架設される渡り足場構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crossover scaffolding structure, and more particularly to a crossover scaffolding structure erected to go back and forth between a frame structure of a building and a temporary scaffolding.

【0002】[0002]

【従来の技術】通常、建設中の躯体外壁面に沿って設け
られる仮設足場は、躯体外壁面と所定の離れをとって組
み立てられている。このため仮設足場を昇降し、所定高
さで躯体部分と行き来するために、仮設足場と躯体との
間に渡り足場が組み立てられている。従来、この種の仮
設足場としては、枠組足場が多く用いられている。そし
て渡り足場は、枠組足場から躯体に梁部材を架け渡し、
躯体側に所定間隔で建地及び腕木をクランプ等の緊結金
具を介して組み上げ、足場板を敷設して構築されてい
た。この場合、梁部材、建地(柱部材)、腕木は通常、
所定長さの足場用鋼管を組み合わせて使用するようにな
っている。さらにクランプ等の緊結金具で各足場用鋼管
の交点を緊結して骨組構造を組み立て、その骨組構造部
分に足場板を敷き並べ、渡り足場を構成するようになっ
ている。なお、足場用鋼管に使用される鋼管は、JIS
G 3444の一般構造用炭素鋼鋼管の3種(STK5
00)に規定されているもので、以下、単管と記す。
2. Description of the Related Art Usually, a temporary scaffold provided along an outer wall surface of a building under construction is assembled with a predetermined distance from the outer wall surface of the building. Therefore, a crossing scaffold is assembled between the temporary scaffold and the skeleton in order to move up and down the temporary scaffold and move back and forth with the skeleton part at a predetermined height. Conventionally, frame scaffolds are often used as temporary scaffolds of this type. Then, the crossing scaffold bridges the beam member from the frame scaffolding to the frame,
It was constructed by assembling the building and arms at predetermined intervals on the body side via clamps and other tight fittings, and laying scaffolding boards. In this case, the beam members, the building (column members), and the arms are usually
It is designed to use a combination of scaffolding steel pipes of a predetermined length. Further, the frame structure is assembled by tightly connecting the intersections of the steel pipes for scaffolding with a clamp or the like, and a scaffold plate is laid on the frame structure part to form a crossover scaffold. The steel pipe used for scaffolding steel is JIS
Three types of general structural carbon steel pipe of G 3444 (STK5
00) and hereinafter referred to as a single tube.

【0003】図10は枠組足場と躯体屋上スラブとの間
に設けられた従来の渡り足場の一例を示したものであ
る。同図に示したように渡り足場50は、躯体51に沿
って組み立てられた枠組足場52の布わく53部分から
張り出された足場用梁材54と、躯体スラブ51a上に
所定間隔で配置されたジャッキベース55上に立設され
た単管柱56とをクランプ57で緊結して骨組構造が構
成されている。そしてはり間方向に沿って単管柱56に
緊結された腕木58に足場板59を敷き並べて、張り出
し床60と所定勾配の昇降路(スロープ)61とが構築
されている。なお、張り出し床60とスロープ61には
墜落防止のために手摺62も設ける必要がある。このた
め柱の間隔に合った長さの単管を手摺62として使用し
ている。
FIG. 10 shows an example of a conventional crossing scaffold provided between a frame scaffold and a building roof slab. As shown in the figure, the crossing scaffold 50 is arranged at a predetermined interval on the scaffolding beam member 54 that is extended from the cloth frame 53 portion of the frame scaffolding 52 assembled along the skeleton body 51 and the skeleton slab 51a. A single pipe column 56 erected on the jack base 55 is tightly connected with a clamp 57 to form a frame structure. A scaffolding board 59 is laid side by side on the arms 58 that are tightly connected to the single tube column 56 along the beam direction, and a projecting floor 60 and a hoistway (slope) 61 with a predetermined slope are constructed. It should be noted that the overhanging floor 60 and the slope 61 also need to be provided with a handrail 62 to prevent a fall. Therefore, a single pipe having a length matching the column interval is used as the handrail 62.

【0004】[0004]

【発明が解決しようとする課題】しかし、前述のような
渡り足場は、長さやサイズの適合した単管やクランプや
足場板を個別に調達して現場で組み立てなくてはなら
ず、設置、解体作業に多くの作業時間をとる必要があ
る。また、スロープ部分が足場を受ける柱と一体構造と
なっているため、屋上スラブの防水工事等において、前
記スロープの設置位置を盛替えるために、渡り足場の一
部をその都度、解体しなくてはならないという問題があ
る。
However, in the above-mentioned crossover scaffolding, single pipes, clamps and scaffolding boards having suitable lengths and sizes must be individually procured and assembled at the site, and the installation and dismantling are required. It takes a lot of work time to work. In addition, since the slope part is an integral structure with the pillar that receives the scaffolding, it is not necessary to disassemble a part of the crossing scaffold each time in order to change the installation position of the slope in waterproofing work of the rooftop slab. There is a problem that it should not.

【0005】そこで、本発明の目的は上述した従来の技
術が有する問題点を解消し、既に組み立てられた枠組足
場に一体的に取り付けて足場を設けることができる渡り
足場構造を提供することにある。
Therefore, an object of the present invention is to solve the problems of the above-mentioned conventional techniques and to provide a crossover scaffolding structure which can be integrally attached to an already assembled frame scaffold to provide a scaffold. .

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に、本発明は建物躯体に沿い、所定の離れをとって構築
された仮設足場内の通路の高さと、上弦横架材位置の高
さとがほぼ一致するように前記仮設足場の側部に取り付
けられる梁枠と、該梁枠の上弦横架材に根元部が固着支
持され、前記建物躯体に向けて延設され斜材により支持
された張り出し梁と、該張り出し梁部分に囲まれるよう
に敷設された床材により張り出し床が形成されるブラケ
ット枠とからなり、前記張り出し床の一端に前記建物躯
体との昇降路枠を着脱自在に連結するようにしたことを
特徴とするものである。
In order to achieve the above object, the present invention is directed to a height of a passage in a temporary scaffold constructed along a building frame with a predetermined distance and a height of an upper chord cross member position. And a beam frame attached to the side part of the temporary scaffold so that they substantially coincide with each other, and a root portion is fixedly supported by an upper chord cross member of the beam frame and extended toward the building frame and supported by a diagonal member. A projecting beam and a bracket frame in which a projecting floor is formed by a floor material laid so as to be surrounded by the projecting beam part, and a hoistway frame with the building frame is detachably attached to one end of the projecting floor. It is characterized by being connected.

【0007】前記昇降路枠は前記建物躯体のスラブ面上
に立設された伸縮自在な脚柱に支持され該脚柱に根元部
が固着支持され、前記ブラケット枠に対向して延設され
た張り出し梁部分に囲まれるように敷設された床材によ
りバルコニー床が形成されたバルコニー枠が前記張り出
し床の端部に連結され、前記バルコニー枠の一端に前記
建物躯体との昇降路枠が着脱自在に連結されるようにす
ることが好ましい。
The hoistway frame is supported by a retractable pedestal erected on the slab surface of the building frame, the root of which is fixedly supported by the pedestal and is extended to face the bracket frame. A balcony frame with a balcony floor formed by the floor material laid so as to be surrounded by the overhanging beam is connected to the end of the overhanging floor, and the hoistway frame with the building frame is removable at one end of the balcony frame It is preferable to be connected to.

【0008】また、前記建物躯体のスラブ面上に立設さ
れた伸縮自在な脚柱に支持され、該脚柱に根元部が固着
支持され、工事用エレベータ乗降ゲートに対向して延設
された張り出し梁部分に囲まれるように敷設された床材
によりエレベータ乗降床が形成されたエレベータ乗降足
場枠が前記張り出し床の端部に連結されるようにするこ
とが好ましい。
Further, it is supported by a retractable pedestal erected on the slab surface of the building frame, the root portion is fixedly supported by the pedestal, and is extended to face the elevator gate for construction work. It is preferable that an elevator boarding / alighting platform frame in which an elevator boarding / alighting floor is formed by a floor material laid so as to be surrounded by the projecting beam portion is connected to an end portion of the projecting floor.

【0009】前記工事用エレベータ乗降足場枠が連結さ
れた張り出し床の一端に、前記建物躯体との昇降路枠が
着脱自在に連結されるように、または前記バルコニー枠
を介して前記建物躯体との昇降路枠が着脱自在に連結さ
れるようにすることが好ましい。
[0009] The hoistway frame with the building frame is detachably connected to one end of the overhanging floor to which the elevator frame for construction work is connected, or with the building frame via the balcony frame. It is preferable that the hoistway frame is detachably connected.

【0010】[0010]

【作用】本発明によれば、建物躯体に沿い、所定の離れ
をとって構築された仮設足場内の通路の高さと、上弦横
架材位置の高さとがほぼ一致するように前記仮設足場の
側部に梁枠を取り付け、該梁枠の上弦横架材に根元部が
固着支持され、前記建物躯体に向けて延設され斜材によ
り支持された張り出し梁を設け、該張り出し梁部分に囲
まれた部分に床材を敷設して張り出し床を形成したブラ
ケット枠とを備え、前記張り出し床の一端に前記建物躯
体との昇降路枠を着脱自在に連結するようにしたことに
より、従来複数の部材を組み合わせて組み立てていた渡
り足場を一体的に構成でき、このため簡単かつ迅速に足
場構造を構築でき、また躯体側と簡単に切り離しができ
る。
According to the present invention, the temporary scaffold of the temporary scaffold is constructed so that the height of the passage in the temporary scaffold constructed along the building frame and spaced apart from each other is substantially equal to the height of the upper chord cross member position. A beam frame is attached to the side part, and a root part is fixedly supported by an upper chord cross member of the beam frame, and a projecting beam extending toward the building frame and supported by a diagonal member is provided and surrounded by the projecting beam portion. A bracket frame in which a floor material is laid to form a projecting floor by laying a floor material in the opened part, and the hoistway frame with the building frame is detachably connected to one end of the projecting floor, thereby providing a plurality of conventional The crossing scaffold that has been assembled by combining the members can be integrally configured, and therefore, the scaffolding structure can be constructed easily and quickly, and can be easily separated from the body side.

【0011】このとき、前記建物躯体のスラブ面上に立
設された伸縮柱に、前記ブラケット枠に向けて延設され
た張り出し梁部分で囲むように床材を敷設してバルコニ
ー床を形成し、該バルコニー枠を前記張り出し床の端部
に連結し、バルコニー枠の一端に前記建物躯体との昇降
路枠を着脱自在に連結することで、前記張り出し床を容
易に拡張でき、前記昇降路枠を配置する場所を自由に設
定、移動できる。
At this time, a floor material is laid on the extensible column standing on the slab surface of the building frame so as to be surrounded by the projecting beam portion extending toward the bracket frame to form a balcony floor. By connecting the balcony frame to the end of the overhanging floor and detachably connecting the hoistway frame with the building frame to one end of the balcony frame, the overhanging floor can be easily expanded, and the hoistway frame You can freely set and move the place to place.

【0012】前記建物躯体のスラブ面上に立設された伸
縮柱に、工事用エレベータ乗降ゲートに向けて延設され
た張り出し梁部分で囲むように床材を敷設してエレベー
タ乗降床となるエレベータ乗降足場枠を形成し、該エレ
ベータ乗降足場枠を前記張り出し床の端部に連結するこ
とで、エレベータ寸法に合致した工事用エレベータ乗降
足場を容易に構築することができる。
An elevator which is used as an elevator floor by laying a floor material around an extensible column which is erected on the slab surface of the building frame so as to be surrounded by a projecting beam portion extending toward the elevator gate for construction work. By forming a boarding / alighting scaffolding frame and connecting the elevator boarding / alighting board frame to the end portion of the overhanging floor, it is possible to easily construct an elevator boarding / alighting scaffold for construction that matches the dimensions of the elevator.

【0013】前記乗降足場枠が形成された張り出し床の
一端に前記建物躯体との昇降路枠を着脱自在に連結し、
あるいは前記張り出し床の一端に前記バルコニー枠を介
して前記建物躯体との昇降路枠を着脱自在に連結するこ
とで、前記躯体との行き来をより簡単に実現でき、昇降
路枠の移動も容易に行える。
A hoistway frame with the building frame is detachably connected to one end of an overhanging floor on which the boarding / alighting platform is formed,
Alternatively, by detachably connecting the hoistway frame with the building frame to one end of the overhanging floor via the balcony frame, it is possible to more easily realize the movement to and from the frame, and the hoistway frame can be easily moved. You can do it.

【0014】[0014]

【実施例】以下、本発明による渡り足場構造の一実施例
を図面を参照して説明する。図1は枠組足場の側面に取
り付けられた本発明による渡り足場1を示した斜視図で
ある。なお図の簡単化のために枠組足場2は仮想線で示
されている。渡り足場1は、梁枠10およびブラケット
枠20とからなり、本実施例では3スパンからなる梁枠
10の中央スパン位置にブラケット枠20が一体的に取
り付けられている。梁枠10及びブラケット枠20はと
もに、通常の枠組足場2の建枠の脚柱、横架材に使用さ
れる材質と同様の単管からなり、外径が42.7mmの
ものが使用されている。このため枠組足場2への緊結に
は既製クランプ4等を使用することができる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a crossing scaffold structure according to the present invention will be described below with reference to the drawings. FIG. 1 is a perspective view showing a crossover scaffold 1 according to the present invention mounted on a side surface of a frame scaffold. The frame scaffold 2 is shown in phantom for simplification of the drawing. The crossover scaffold 1 is composed of a beam frame 10 and a bracket frame 20, and in this embodiment, the bracket frame 20 is integrally attached to the center span position of the beam frame 10 having three spans. Both the beam frame 10 and the bracket frame 20 are made of a single pipe similar to the material used for the pillars and the horizontal members of the building frame of the ordinary frame scaffold 2 and have an outer diameter of 42.7 mm. There is. For this reason, a ready-made clamp 4 or the like can be used for binding to the framework scaffold 2.

【0015】さらに、本実施例では梁枠10を枠組足場
2に固定するために既製クランプ4を使用する他に、梁
受け金具3が用いられている。この梁受け金具3は梁受
け部が略U字形をなし、梁枠10を設置する枠組足場2
の布枠(図示せず)の一部に止めネジ等で固定されてお
り、梁枠10の下弦横架材11の一部をU字部で支持す
るようになっている。このとき上弦横架材12は枠組足
場2の布枠部分に敷設された通路の設置高さとほぼ一致
する高さになるように枠組足場2の側面に梁受け金具3
やクランプ4により固定されるようになっている。
Further, in this embodiment, in addition to using the ready-made clamp 4 for fixing the beam frame 10 to the frame scaffold 2, the beam receiving metal fitting 3 is used. The beam receiving part 3 has a substantially U-shaped beam receiving portion, and the frame scaffold 2 on which the beam frame 10 is installed.
It is fixed to a part of the cloth frame (not shown) by a set screw or the like, and a part of the lower chord cross member 11 of the beam frame 10 is supported by the U-shaped part. At this time, the upper chord cross members 12 are attached to the side surfaces of the frame scaffold 2 so that the height of the upper chord cross member 12 is substantially equal to the installation height of the passage laid in the cloth frame part of the frame scaffold 2.
It is designed to be fixed by the or clamp 4.

【0016】一方、ブラケット枠20は所定の張り出し
梁21とこの張り出し梁21を受ける斜材22からな
り、張り出し梁21で囲まれた張り出し床25には着脱
自在な床材23が敷設されている。この床材23には軽
量化のためにエキスパンドメタルが使用されているが、
滑り止めが施された縞鋼板や、パンチングメタル等を使
用しても良い。さらに上弦横架材12、張り出し梁21
の各交点、隅角部にはさや管13、24が立設されてい
る。このさや管13、24は手摺部材のベース管として
使用されるようになっている。本実施例では手摺部材と
して、手摺ユニット14が使用されている。この手摺ユ
ニット14は、中間ヒンジ部14aで折り畳み自在な平
面視してL字形をなしている。このため手摺を設ける場
合には、手摺ユニット14の脚部を所定位置のさや管1
3、24に差し込むだけで、接続部がロックピン等の公
知の固定ピンで固定され、2スパン分の折れ曲がり部の
手摺を簡単に設置することができる。なお、ヒンジ部1
4aで手摺ユニット14を分解できるようにしておけ
ば、上弦横架材12あるいは張り出し梁21のうちの1
スパンのみに手摺を設けることも可能である。
On the other hand, the bracket frame 20 is composed of a predetermined overhanging beam 21 and a diagonal member 22 for receiving the overhanging beam 21, and a detachable flooring 23 is laid on an overhanging floor 25 surrounded by the overhanging beam 21. . Expanded metal is used for this floor material 23 for weight reduction,
A striped steel plate provided with anti-slip, punching metal, or the like may be used. Furthermore, the upper chord cross member 12 and the overhanging beam 21
The sheath tubes 13 and 24 are erected at the respective intersections and corners. The sheath tubes 13 and 24 are adapted to be used as base tubes for handrail members. In this embodiment, the handrail unit 14 is used as the handrail member. The handrail unit 14 is L-shaped in plan view and is foldable by the intermediate hinge portion 14a. For this reason, when the handrail is provided, the leg portion of the handrail unit 14 is placed at a predetermined position in the sheath tube 1.
The connection portion is fixed by a known fixing pin such as a lock pin by simply inserting the handrail into the wirings 3 and 24, and the handrail of the bent portion for two spans can be easily installed. The hinge part 1
If the handrail unit 14 can be disassembled by 4a, one of the upper chord cross member 12 or the overhanging beam 21 can be provided.
It is also possible to provide handrails only on the span.

【0017】張り出し床25の一端には階段枠30が取
り付けられている。この階段枠30は図2に示したよう
に所定の勾配をなして躯体スラブ51aへ降りられるよ
うに設置されている。階段枠30の張り出し床25への
取り付けは、階段枠30の上端に設けられた係止金具3
1及びこの係止金具31の端部に形成されたロック爪3
2により確実に行われるようになっている。このロック
爪32は枠組足場2に使用される布枠のつかみ金具に設
けられている通常のロック爪と同様の構造からなる。ロ
ック動作としては、階段枠30の係止金具31を張り出
し床25の梁材21bに係止すると同時に、ロック爪3
2が矢印A方向にスライドして梁材21bを把持し、ロ
ック機構が作用するようになっている。これにより張り
出し床25のに連結された階段枠30の係止金具31が
通行時の振動等によりはずれてしまうのを確実に防止で
きる。この階段枠30にも所定位置にさや管33が形成
されており、所定形状の手摺ユニット34を差し込んで
使用することができるようになっている。なお、図1で
は説明のために一方の側の手摺ユニット34のみを示し
ている。
A staircase frame 30 is attached to one end of the overhanging floor 25. As shown in FIG. 2, the staircase frame 30 is installed so as to descend to the skeleton slab 51a with a predetermined slope. To attach the staircase frame 30 to the overhanging floor 25, the locking metal fitting 3 provided at the upper end of the staircase frame 30 is used.
1 and lock claw 3 formed at the end of the locking fitting 31
2 is sure to be performed. The lock claw 32 has a structure similar to that of a normal lock claw provided in a grip of a cloth frame used for the framework scaffold 2. As the locking operation, the locking metal fitting 31 of the staircase frame 30 is locked to the beam member 21b of the overhanging floor 25, and at the same time, the locking claw 3
2 slides in the direction of arrow A to grip the beam 21b, and the lock mechanism operates. As a result, it is possible to reliably prevent the locking metal fitting 31 of the staircase frame 30 connected to the overhanging floor 25 from coming off due to vibration or the like during passage. This staircase frame 30 also has a sheath tube 33 formed at a predetermined position so that a handrail unit 34 having a predetermined shape can be inserted and used. In FIG. 1, only the handrail unit 34 on one side is shown for the sake of explanation.

【0018】ところで、図2に示したように躯体51の
パラペット51bの立ち上がり高さによって渡り足場1
の張り出し床25の設置高さも異なってくる。このため
階段枠30はその高さに応じて階段勾配が適正になるよ
うなスパンLのものを使用することが好ましい。なお、
階段踏板35の踏面は面の傾斜を調整でき、階段勾配に
応じて水平を保持できるようになっている。なお、この
場合、使用する手摺も床面の傾斜に合わせて変更可能な
構造のものを使用することが好ましい。また、勾配が緩
い場合には、図3に示したようなスロープ枠36を階段
枠30の代わりに使用することも好ましい。このスロー
プ枠36は鋼管製の枠体36aにエキスパンドメタルの
床板材37を取り付けたものである。床板材37は昇降
の際に、足元が滑らないような材質のものであれば、縞
鋼板等、種々の板材を使用できることはいうまでもな
い。また、アングル材(山形鋼)等のような棒状の滑り
止め部材を床板材37の上に所定間隔で固着して滑り止
めとしても良い。
By the way, as shown in FIG. 2, depending on the rising height of the parapet 51b of the body 51, the crossover scaffold 1
The installation height of the overhanging floor 25 is also different. For this reason, it is preferable to use the staircase frame 30 having a span L such that the staircase slope becomes appropriate according to the height thereof. In addition,
The slope of the tread surface of the stair tread 35 can be adjusted so that it can be kept horizontal according to the slope of the stairs. In this case, it is preferable to use a handrail having a structure that can be changed according to the inclination of the floor surface. Further, when the slope is gentle, it is also preferable to use the slope frame 36 as shown in FIG. 3 instead of the staircase frame 30. The slope frame 36 comprises a steel pipe frame 36a and an expanded metal floor plate 37 attached thereto. It goes without saying that various kinds of plate materials such as striped steel plates can be used as the floor plate material 37 as long as it is a material that does not slip on the feet when moving up and down. Further, rod-shaped non-slip members such as angle members (angle steel) may be fixed on the floor plate material 37 at predetermined intervals to prevent slipping.

【0019】図5は、図1に示した渡り足場1の変形例
を示したものである。この渡り足場1では梁枠10に対
してブラケット枠20が折り畳み可能な構造になってい
る。すなわち、ブラケット枠20の張り出し梁21の根
元部にヒンジ部21aが形成され、さらに斜材22と張
り出し梁21との接合部22aもヒンジ結合され、2本
の斜材22の下端22bを連結する梁材22dに係止金
具26が設けられ、下弦横架材11に係止するようにな
っている。このようにブラケット枠20が折り畳み可能
になっているので、渡り足場1を運搬する際にコンパク
トな形態にして運搬することができ、枠組足場2の各部
材とともにまとめておくことができるという利点があ
る。
FIG. 5 shows a modification of the crossover scaffold 1 shown in FIG. In this crossover scaffold 1, the bracket frame 20 is foldable with respect to the beam frame 10. That is, the hinge portion 21a is formed at the root of the projecting beam 21 of the bracket frame 20, and the joint 22a between the diagonal member 22 and the projecting beam 21 is also hinge-coupled to connect the lower ends 22b of the two diagonal members 22. An engaging metal fitting 26 is provided on the beam member 22d so as to engage with the lower chord cross member 11. Since the bracket frame 20 is thus foldable, there is an advantage that the crossing scaffold 1 can be carried in a compact form when it is carried and can be put together with each member of the frame scaffold 2. is there.

【0020】図6、図7は、前述の渡り足場1にバルコ
ニー枠を連結し、昇降路枠の向きを変えるようにした他
の実施例を示したものである。同図に示したバルコニー
枠40は、伸縮可能な脚柱部41と、この脚柱部41に
一体的に接続されたバルコニー床42と、バルコニー床
42を支持する斜材43とから構成されている。このう
ち脚柱部41は2重筒構造の鋼管柱からなり、内筒柱4
4を伸縮させてバルコニー床42の高さを調整でき、渡
り足場1の張り出し床25と高さを一致させるようにな
っている。なお、同図にはスラブの不陸調整のためにジ
ャッキベース45が示されているが、ジャッキベース4
5は必要に応じて使用すれば良い。内筒柱44の高さ調
整は固定ボルトBの締め付けにより行うようになってい
る。
FIGS. 6 and 7 show another embodiment in which a balcony frame is connected to the above-mentioned crossing scaffold 1 and the direction of the hoistway frame is changed. The balcony frame 40 shown in the figure includes an extendable pedestal portion 41, a balcony floor 42 integrally connected to the pedestal portion 41, and a diagonal member 43 supporting the balcony floor 42. There is. Of these, the pedestal portion 41 is made of a steel pipe column having a double-tube structure, and
The height of the balcony floor 42 can be adjusted by expanding and contracting 4, and the height is made to match the overhanging floor 25 of the crossing scaffold 1. It should be noted that the jack base 45 is shown in the same drawing for adjusting the unsteadiness of the slab.
5 may be used if necessary. The height of the inner cylindrical column 44 is adjusted by tightening the fixing bolt B.

【0021】このバルコニー枠40の適用例としては、
図7に示したように渡り足場1から躯体51まで階段枠
等を延ばすことができない集合住宅のバルコニー部など
が例示的に挙げられる。このような躯体バルコニー51
Bでは、渡り足場1から一直線状に昇降路枠を設けるこ
とができない。そこで、張り出し床25とほぼ等しい高
さとなるようにバルコニー枠40を設置すれば、このバ
ルコニー枠40から昇降経路を直角に曲げた状態で階段
枠30やスロープ枠36を取り付けることができる。
As an application example of this balcony frame 40,
As shown in FIG. 7, a balcony portion of an apartment house in which a stair frame or the like cannot be extended from the crossing scaffold 1 to the skeleton 51 is exemplified. Such a body balcony 51
In B, the hoistway frame cannot be provided in a straight line from the crossing scaffold 1. Therefore, if the balcony frame 40 is installed so as to have a height substantially equal to that of the overhanging floor 25, the staircase frame 30 and the slope frame 36 can be attached with the elevating path bent from the balcony frame 40 at a right angle.

【0022】図8は、ロングスパン工事用エレベータの
乗降足場として渡り足場1を適用した例を示した実施例
である。ロングスパン工事用エレベータEは長物資材を
積載して昇降運搬することができるため、高層ビルの建
築工事等において、使用されてきているが、ロングスパ
ン工事用エレベータEを枠組足場2の一部に組み込んだ
場合に、所定階での枠組足場2からや躯体51からのエ
レベータ乗降を可能にする必要がある。そこで、このエ
レベータ乗降足場は、エレベータ脇に組み立てられた枠
組足場2に渡り足場1を取り付け、さらに渡り足場1に
エレベータ乗降足場45を連結したものである。エレベ
ータ乗降足場45は、図8に示したように前述のバルコ
ニー枠40を複数スパン構造にしたもので、このスパン
は使用されているロングスパン工事用エレベータEの搬
器長さによって設定するようになっており、渡り足場1
の張り出し床25と連続した乗降床49を構成するよう
になっている。なお、バルコニー枠40がエレベータが
昇降する開口部側に転倒するのを防止するために、伸縮
自在なサポート部材(図示せず)により上階バルコニー
の下面に反力をとったりすることが好ましい。
FIG. 8 is an embodiment showing an example in which the crossover scaffold 1 is applied as a boarding / alighting scaffold of an elevator for long span construction. The long-span construction elevator E has been used for construction work of high-rise buildings because it can load and transport long materials, but the long-span construction elevator E is used as part of the frame scaffolding 2. When incorporated, it is necessary to enable the elevator boarding / alighting from the frame scaffold 2 and the skeleton 51 on a predetermined floor. Therefore, in this elevator boarding / alighting platform, the crossing scaffolding 1 is attached to the frame scaffolding 2 assembled on the side of the elevator, and the elevator boarding / alighting platform 45 is further connected to the crossing scaffolding 1. As shown in FIG. 8, the elevator boarding / alighting platform 45 has a structure in which the balcony frame 40 has a multi-span structure, and this span is set according to the carrier length of the long-span construction elevator E being used. And scaffolding 1
A boarding / alighting floor 49 continuous with the overhanging floor 25 is constructed. In addition, in order to prevent the balcony frame 40 from falling toward the opening side where the elevator moves up and down, it is preferable that a retractable support member (not shown) exerts a reaction force on the lower surface of the upper balcony.

【0023】また、エレベータ乗降床49のロングスパ
ン工事用エレベータEが昇降する開口側には、開閉ゲー
ト46が設けられている。この開閉ゲート46は、エレ
ベータEが停止していない状態の開口部からの墜落防止
のために設けられている。したがって、エレベータEが
エレベータ乗降足場45に停止している時のみ開放する
ようになっている。このときエレベータ乗降足場45と
躯体51とを連絡するために、図9に示したように渡り
足場1の一端に前述のバルコニー枠40を設け、バルコ
ニー枠40から階段枠30等を設置するようにしても良
い。同図に示したようにエレベータ乗降足場45の両側
に渡り足場1を設けることで、図9に破線矢印線で示し
たようなエレベータ乗降床49から枠組足場2、躯体5
1側への通路を確保することができる。
An opening / closing gate 46 is provided on the opening / closing side of the elevator boarding / alighting floor 49 where the long-span construction elevator E moves up and down. The opening / closing gate 46 is provided to prevent the elevator E from falling from the opening when the elevator E is not stopped. Therefore, the elevator E is opened only when it is stopped at the elevator boarding / alighting platform 45. At this time, in order to connect the elevator boarding / alighting platform 45 and the skeleton 51 to each other, the above-mentioned balcony frame 40 is provided at one end of the crossing scaffold 1 as shown in FIG. 9, and the stair frame 30 and the like are installed from the balcony frame 40. May be. By providing the crossover scaffolding 1 on both sides of the elevator boarding / alighting platform 45 as shown in the figure, the elevator boarding / alighting floor 49 to the frame scaffolding 2, the skeleton 5 as shown by the dashed arrow lines in FIG.
It is possible to secure a passage to the 1st side.

【0024】[0024]

【発明の効果】以上の説明から明らかなように、請求項
1記載の発明によれば、仮設足場との行き来をするため
の渡り足場を一体的に構成でき、安価で組み立てが容易
なものとすることができ、また昇降路の盛替えも容易に
行えるので、躯体工事に与える影響を最小にすることが
できるという効果を奏する。
As is apparent from the above description, according to the first aspect of the present invention, the crossover scaffolding for going back and forth from the temporary scaffolding can be integrally configured, which is inexpensive and easy to assemble. In addition, since the hoistway can be easily re-arranged, the effect on the skeleton work can be minimized.

【0025】請求項2記載の発明によれば、昇降路を所
定の方向に向けて設置することができ、渡り足場の適用
場所を広くとることができるという効果を奏する。
According to the second aspect of the present invention, it is possible to install the hoistway in a predetermined direction, and it is possible to obtain a wide application site for the crossover scaffold.

【0026】請求項3記載の発明によれば、エレベータ
乗降足場を容易に構築することができ、渡り足場の適用
範囲を広くとることができるという効果を奏する。
According to the third aspect of the present invention, there is an effect that an elevator boarding / alighting platform can be easily constructed, and an application range of the crossing platform can be widened.

【0027】請求項4または請求項5記載の発明によれ
ば、エレベータ乗降足場と躯体スラブとを行き来する昇
降路を足場に対して着脱自在に構築でき、躯体部分の工
事等への影響を最小にすることができるという効果を奏
する。
According to the invention of claim 4 or claim 5, the hoistway that goes back and forth between the elevator boarding / alighting scaffolding and the skeleton slab can be constructed detachably with respect to the scaffolding, and the influence of the skeleton part on construction and the like can be minimized. There is an effect that can be.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による渡り足場構造の一実施例を示した
斜視図。
FIG. 1 is a perspective view showing an embodiment of a crossing scaffold structure according to the present invention.

【図2】図1に示した渡り足場構造の設置態様の一例を
示した正面図。
FIG. 2 is a front view showing an example of an installation mode of the crossing scaffold structure shown in FIG.

【図3】昇降路枠の一例としてのスロープ枠を示した斜
視図。
FIG. 3 is a perspective view showing a slope frame as an example of a hoistway frame.

【図4】昇降路枠の係止金具の一例を示した部分拡大
図。
FIG. 4 is a partially enlarged view showing an example of a metal fitting for a hoistway frame.

【図5】渡り足場構造の変形例を示した斜視図。FIG. 5 is a perspective view showing a modified example of the crossing scaffold structure.

【図6】渡り足場構造の他の実施例として、バルコニー
枠を連結した足場構造を示した斜視図。
FIG. 6 is a perspective view showing a scaffolding structure in which balcony frames are connected as another embodiment of the crossing scaffolding structure.

【図7】図6に示した渡り足場構造の設置態様の一例を
示した正面図。
7 is a front view showing an example of an installation mode of the crossing scaffold structure shown in FIG.

【図8】渡り足場構造の他の実施例として、エレベータ
乗降足場を連結した足場構造を示した斜視図。
FIG. 8 is a perspective view showing a scaffolding structure in which elevator boarding / alighting scaffolds are connected as another example of the crossing scaffolding structure.

【図9】図8に示した渡り足場構造の設置態様の一例を
示した平面図。
9 is a plan view showing an example of an installation mode of the crossing scaffold structure shown in FIG. 8. FIG.

【図10】従来の渡り足場構造の一例を示した正面図。FIG. 10 is a front view showing an example of a conventional crossing scaffold structure.

【符号の説明】[Explanation of symbols]

1 渡り足場構造 3 梁受け金具 10 梁枠 14 手摺ユニット 20 ブラケット枠 21 張り出し梁 22 斜材 23 床材 25 張り出し床 30 階段枠 31 係止金具 36 スロープ枠 40 バルコニー枠 45 エレベータ乗降足場 1 Crossing scaffolding structure 3 Beam receiving bracket 10 Beam frame 14 Handrail unit 20 Bracket frame 21 Overhanging beam 22 Slanting material 23 Floor material 25 Overhanging floor 30 Stair frame 31 Locking metal fitting 36 Slope frame 40 Balcony frame 45 Elevating platform

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】建物躯体に沿い、所定の離れをとって構築
された仮設足場内の通路の高さと、上弦横架材位置の高
さとがほぼ一致するように前記仮設足場の側部に取り付
けられる梁枠と、 該梁枠の上弦横架材に根元部が固着支持され、前記建物
躯体に向けて延設され斜材により支持された張り出し梁
と、該張り出し梁部分に囲まれるように敷設された床材
により張り出し床が形成されるブラケット枠とからな
り、 前記張り出し床の一端に前記建物躯体との昇降路枠を着
脱自在に連結するようにしたことを特徴とする渡り足場
構造。
1. A temporary scaffold mounted along a side of the building so that the height of a passage in the temporary scaffold constructed at a predetermined distance along the building frame and the height of the upper chord cross member position are substantially the same. Beam frame, a root portion fixedly supported by an upper chord cross member of the beam frame, extending toward the building frame and supported by diagonal members, and laid so as to be surrounded by the projecting beam portion. And a bracket frame in which an overhanging floor is formed by the above-mentioned floor material, and a hoistway frame with the building frame is detachably connected to one end of the overhanging floor.
【請求項2】前記建物躯体のスラブ面上に立設された伸
縮自在な脚柱に支持され、該脚柱に根元部が固着支持さ
れ、前記ブラケット枠に対向して延設された張り出し梁
部分に囲まれるように敷設された床材によりバルコニー
床が形成されたバルコニー枠が前記張り出し床の端部に
連結され、前記バルコニー枠の一端に前記建物躯体との
昇降路枠が着脱自在に連結されたことを特徴とする請求
項1記載の渡り足場構造。
2. A projecting beam which is supported by an extensible pedestal standing upright on the slab surface of the building frame, a root portion of which is fixedly supported by the pedestal, and which is extended to face the bracket frame. A balcony frame having a balcony floor formed by a floor material laid so as to be surrounded by a portion is connected to an end of the overhanging floor, and a hoistway frame with the building frame is detachably connected to one end of the balcony frame. The crossover scaffold structure according to claim 1, wherein the crossover scaffold structure is formed.
【請求項3】前記建物躯体のスラブ面上に立設された伸
縮自在な脚柱に支持され、該脚柱に根元部が固着支持さ
れ、エレベータ乗降ゲートに対向して延設された張り出
し梁部分に囲まれるように敷設された床材によりエレベ
ータ乗降床が形成されたエレベータ乗降足場枠が前記張
り出し床の端部に連結されたことを特徴とする請求項1
記載の渡り足場構造。
3. A projecting beam which is supported by an extendable pedestal standing upright on a slab surface of the building frame, a root of which is fixedly supported by the pedestal, and which is extended to face an elevator boarding / alighting gate. 3. An elevator boarding / alighting scaffolding frame in which an elevator boarding / alighting floor is formed by a floor material laid so as to be surrounded by parts is connected to an end of the overhanging floor.
The described scaffolding structure.
【請求項4】前記エレベータ乗降足場枠が連結された張
り出し床の一端に、前記建物躯体との昇降路枠が着脱自
在に連結されたことを特徴とする請求項3記載の渡り足
場構造。
4. The crossing scaffold structure according to claim 3, wherein a hoistway frame with the building frame is detachably connected to one end of an overhanging floor to which the elevator boarding / alighting platform is connected.
【請求項5】前記エレベータ乗降足場枠が連結された張
り出し床の一端に、前記バルコニー枠を介して前記建物
躯体との昇降路枠が着脱自在に連結されたことを特徴と
する請求項3記載の渡り足場構造。
5. The hoistway frame with the building frame is detachably connected to one end of an overhanging floor to which the elevator boarding / alighting platform is connected, via the balcony frame. Migratory scaffolding structure.
JP23856494A 1994-09-06 1994-09-06 Crossing scaffold structure Expired - Fee Related JP3477256B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23856494A JP3477256B2 (en) 1994-09-06 1994-09-06 Crossing scaffold structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23856494A JP3477256B2 (en) 1994-09-06 1994-09-06 Crossing scaffold structure

Publications (2)

Publication Number Publication Date
JPH0882088A true JPH0882088A (en) 1996-03-26
JP3477256B2 JP3477256B2 (en) 2003-12-10

Family

ID=17032106

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23856494A Expired - Fee Related JP3477256B2 (en) 1994-09-06 1994-09-06 Crossing scaffold structure

Country Status (1)

Country Link
JP (1) JP3477256B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4837488B2 (en) * 2006-08-14 2011-12-14 前田建設工業株式会社 Elevator stage for construction elevators

Also Published As

Publication number Publication date
JP3477256B2 (en) 2003-12-10

Similar Documents

Publication Publication Date Title
US6003630A (en) Unilateral scaffold system
US20100293875A1 (en) Stairway for Use on Building Sites
JPH10280669A (en) Scaffolding unit
EP0606948B1 (en) Universal supporting construction
JP3477256B2 (en) Crossing scaffold structure
JP2000145166A (en) Stair for temporary scaffold
JPH0673243U (en) Steel pipe scaffolding staircase frame
JP3899298B2 (en) Temporary staircase landing
EP1365087A2 (en) Safety barrier apparatus
JP3981604B2 (en) Temporary staircase landing
US20040040786A1 (en) Components for assembling scaffolding system
JP2878589B2 (en) Temporary structure
KR100636409B1 (en) Scaffold
KR200355444Y1 (en) Scaffold
JP2507495Y2 (en) Staircase scaffolding
JP2886507B2 (en) Folding stair unit box
KR100759078B1 (en) Handrail fixing device for construction
JP3359255B2 (en) Scaffolding equipment
JPS637462A (en) Scaffold apparatus for building
JP2003193677A (en) Supporting device of constructing temporary scaffolding
JPH10183987A (en) Temporary scaffold for spiral stairs
KR200367391Y1 (en) Prefab safety balustrade for a temporary of a balcony
JPH11100987A (en) Temporary scaffold device
JPS641395Y2 (en)
AU737415B2 (en) Scaffolding apparatus

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20080926

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20080926

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20090926

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090926

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100926

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees