JPH0849246A - Equipment installing base and method for installation work of the equipment - Google Patents
Equipment installing base and method for installation work of the equipmentInfo
- Publication number
- JPH0849246A JPH0849246A JP18822494A JP18822494A JPH0849246A JP H0849246 A JPH0849246 A JP H0849246A JP 18822494 A JP18822494 A JP 18822494A JP 18822494 A JP18822494 A JP 18822494A JP H0849246 A JPH0849246 A JP H0849246A
- Authority
- JP
- Japan
- Prior art keywords
- equipment
- foundation
- bolt
- installation
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、主として排熱回収ボイ
ラ等の機器を基礎コンクリートに据え付ける機器据付基
礎及び機器据付工法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention mainly relates to an equipment installation foundation and an equipment installation construction method for installing equipment such as an exhaust heat recovery boiler on foundation concrete.
【0002】[0002]
【従来の技術】従来使用されている機器据付基礎は、図
6〜9に示すものが知られている。図6は従来技術に係
る機器据付基礎1′の一部破砕断面斜視図、図7(A)
は図6のアンカーボルト7及びパイプスリーブ12を中
心に示した縦断面図、(B)は図6のアンカーフレーム
28のレグ29部分の側面図、図8は図6に示した機器
据付基礎1′にバッカー23を設けた状態の一部破砕断
面斜視図、図9は図8のバッカー23の上に機器ベース
フレーム24を設置した状態の一部破砕断面斜視図、を
各々示す。2. Description of the Related Art Conventionally used equipment installation foundations are shown in FIGS. FIG. 6 is a partially crushed sectional perspective view of a device installation base 1 ′ according to the prior art, FIG.
6 is a longitudinal sectional view mainly showing the anchor bolt 7 and the pipe sleeve 12 of FIG. 6, (B) is a side view of the leg 29 portion of the anchor frame 28 of FIG. 6, and FIG. 8 is the equipment installation base 1 shown in FIG. ′ Is a partially crushed sectional perspective view with the backer 23 provided, and FIG. 9 is a partially crushed sectional perspective view with the equipment base frame 24 installed on the backer 23 in FIG.
【0003】図6において、機器据付基礎1′の基礎工
事は所定の場所の土砂を掘削し、捨コンクリート42を
打設し、強固になった表面上に機器のアンカーフレーム
28を設置する。図7(B)に示すように、アンカーフ
レーム28の設置は、プレート32を配置した後アンカ
ーフレーム28に固定したレグ29に設けたナット31
にアジャストボルト30を螺合し、アジャストボルト3
0の回転調節により、アンカーフレーム28のレベル出
し及び芯出しを行なう。In FIG. 6, in the foundation work of the equipment installation foundation 1 ', earth and sand in a predetermined place are excavated, waste concrete 42 is placed, and the anchor frame 28 of the equipment is installed on the solid surface. As shown in FIG. 7 (B), the anchor frame 28 is installed by mounting the plate 32 and then fixing the nut 31 to the leg 29 fixed to the anchor frame 28.
Screw the adjustment bolt 30 onto the adjustment bolt 3
By adjusting the rotation of 0, the anchor frame 28 is leveled and centered.
【0004】更に、図7(A)に示すように、パイプス
リーブ12の下端に溶接されたエンドプレート20にア
ンカーボルト7の下端側8aのナット11を溶接し、ア
ンカーボルト7の上端側8bとナット10とによって機
器を固定する。パイプスリーブ12の上端寄りには、こ
のパイプスリーブ12を支える補強用プレート26及び
補強用サポート27が設けられ、両部材ともパイプスリ
ーブ12に溶接されている。そして、機器を所定の場所
に設定し、配筋を施工した後基礎コンクリート38を打
設し機器を据え付けするものである。Further, as shown in FIG. 7 (A), a nut 11 on the lower end side 8a of the anchor bolt 7 is welded to the end plate 20 welded to the lower end of the pipe sleeve 12, and the upper end side 8b of the anchor bolt 7 is welded. The device is fixed by the nut 10. A reinforcing plate 26 and a reinforcing support 27 that support the pipe sleeve 12 are provided near the upper end of the pipe sleeve 12, and both members are welded to the pipe sleeve 12. Then, the equipment is set in a predetermined place, and after the reinforcement is installed, the foundation concrete 38 is placed and the equipment is installed.
【0005】図8は、図6に示した機器据付基礎1′に
バッカー23を複数個設けて配置した状態の一部破砕断
面斜視図であり、図9は、図8に示したバッカー23の
上に機器ベースフレーム24を配置した一部破砕断面斜
視図である。図6に示した構造部分と同じ構造部分には
同一の参照番号を付けてその説明を省略する。FIG. 8 is a partially fragmented sectional perspective view showing a state in which a plurality of backers 23 are provided on the equipment installation base 1'shown in FIG. 6, and FIG. 9 is a perspective view of the backers 23 shown in FIG. It is a partially crushed sectional perspective view which arrange | positioned the equipment base frame 24 on it. The same reference numerals are given to the same structural parts as those shown in FIG. 6, and the description thereof will be omitted.
【0006】[0006]
【発明が解決しようとする課題】しかしながら、このよ
うな従来の機器据付基礎1′においては、基礎コンクリ
ート38の上面から100〜150mmほどアンカーボ
ルト7が突出しているため、機器搬入が予定される場所
の基礎については、大がかりなネジ部の養生を施すか、
迂回路を付けるか、機器搬入後基礎工事をするか、等の
対策を講じなければならなかった。そのため仮設費の増
加や工程に支障を生じ、土建工程の調整を含めた全体工
程の見直し等が要求された。However, in such a conventional equipment installation foundation 1 ', since the anchor bolt 7 projects from the upper surface of the foundation concrete 38 by about 100 to 150 mm, the equipment is to be brought into the place. For the basics of, do you do major curing of the screw part,
It was necessary to take measures such as adding a detour or performing basic work after loading the equipment. As a result, temporary construction costs increased and the process was hindered, and it was required to review the entire process including adjustment of the earth-building process.
【0007】又、このような従来の機器据付基礎及びそ
の工法は、土建工事に長期間を要するので早期に施工を
行なう必要があるが、排熱回収ボイラー等の機器据え付
けの様に、配置上高圧給水ポンプの据付基礎の上を排熱
回収ボイラーを載荷した大型搬送機が通過した後でなけ
れば機器据付基礎の施工が困難である場合が多く、この
ような機器据付基礎の施工後では高圧給水ポンプの基礎
ボルトが、上記大型搬送機の通行に支障となるため、万
止むなく上記大型搬送機が通過後に基礎工事を着手する
ことになり、全体の機器据付工程に大きな支障となる恐
れがあった。この様に、従来技術に係る機器据付基礎及
び機器据付工法は、排熱回収ボイラー等の機器の据え付
けに対し工程等の配慮がなされていなかった。Further, such a conventional equipment installation foundation and its construction method require an early construction because it requires a long period of time for the earthwork construction. However, it is necessary to install the equipment like an equipment such as an exhaust heat recovery boiler. It is often difficult to install the equipment installation foundation after the large-scale transporter loaded with the exhaust heat recovery boiler has passed over the installation foundation of the high-pressure water supply pump. Since the foundation bolts of the water supply pump will obstruct the passage of the large-sized carrier, the large-scale carrier will be forced to undertake the foundation work after it has passed, which may be a major obstacle to the overall equipment installation process. there were. As described above, in the equipment installation foundation and the equipment installation construction method according to the prior art, no consideration was given to the process and the like when installing equipment such as an exhaust heat recovery boiler.
【0008】本発明の目的は、従来の問題点を解消すべ
くなされたもので、機器の据付基礎を施工した後でも機
器の搬入が容易で速やかに据付が行なえ、土建工事と据
付工事の干渉が回避出来ると共に、機器据付工程の短縮
を図ることの出来る機器据付基礎及び機器据付工法を提
供することである。The object of the present invention is to solve the problems of the prior art. Even after the installation foundation of the equipment has been constructed, the equipment can be carried in easily and can be installed quickly, and the construction work and the installation work will not interfere with each other. It is an object of the present invention to provide an equipment installation foundation and an equipment installation construction method that can avoid the above problems and can shorten the equipment installation process.
【0009】[0009]
【課題を解決するための手段】本発明は、施工の途中段
階までは基礎ボルト自体を設定しない状態で基礎コンク
リートを打設し、機器据付時に基礎ボルトを基礎フレー
ムに組み込み、機器を据付出来ることを特徴とした機器
据付基礎である。即ち、機器を基礎コンクリートに固定
する基礎ボルトと、この基礎ボルトを内部に挿通する案
内筒と、この案内筒の一端に固定され基礎ボルトの機器
の据付側と反対の一端側を係止する係止部材とを備えた
機器据付基礎において、案内筒の他端は、基礎コンクリ
ートの上面又はこの上面から内側に位置させ、基礎ボル
トの一端側と係止部材とを係脱可能にすることにより上
記目的は達成される。According to the present invention, it is possible to install equipment by placing foundation concrete in a state where the foundation bolt itself is not set until the intermediate stage of construction and incorporating the foundation bolt into the foundation frame at the time of equipment installation. Is the equipment installation foundation. That is, a foundation bolt for fixing the equipment to the foundation concrete, a guide tube through which the foundation bolt is inserted, and a lock for fixing one end side of the foundation bolt that is fixed to one end of the guide bolt and is opposite to the installation side of the equipment. In the equipment installation foundation including a stop member, the other end of the guide cylinder is located at the upper surface of the foundation concrete or inside from the upper surface, and one end side of the foundation bolt and the locking member can be engaged and disengaged. The purpose is achieved.
【0010】更に上記発明において、基礎ボルトの一端
側は、縦長の縦長部材が固定され、係止部材は、縦長の
縦長孔が形成され、この縦長孔と縦長部材とは、互いに
縦長方向同士で挿通可能なものである。Further, in the above invention, a vertically elongated member is fixed to one end side of the foundation bolt, and a vertically elongated hole is formed in the locking member. The vertically elongated hole and the vertically elongated member are arranged in the vertically elongated directions. It can be inserted.
【0011】更に上記目的は、機器を基礎コンクリート
に固定する基礎ボルトを備えた機器据付基礎において、
基礎ボルトの機器の据付側の他端は、基礎コンクリート
の上面又はこの上面から内側に位置したことによっても
達成される。Further, the above object is to provide an equipment installation foundation provided with foundation bolts for fixing the equipment to foundation concrete,
The other end of the foundation bolt on the equipment installation side is also achieved by being located at the top of the foundation concrete or inside from this top.
【0012】又、機器を基礎コンクリートに固定する基
礎ボルトを挿通する案内筒の一端に、基礎ボルトの機器
の据付側と反対の一端側を係止する係止部材を固定し、
案内筒に基礎ボルトを挿通し、この基礎ボルトの一端側
を係止部材に係止し、この基礎ボルトの他端側を機器に
固定した後、案内筒の内外に基礎コンクリートを打設す
る機器据付工法において、基礎ボルトの一端側に縦長の
縦長部材を固定し、係止部材にはこの縦長部材を互いに
縦長方向同士で挿通可能な縦長の縦長孔を形成し、この
縦長孔に基礎ボルトの縦長部材を挿通した後、基礎ボル
ト及び縦長部材を所定の角度回転し、係止部材に基礎ボ
ルトの縦長部材を係止して、機器を基礎コンクリートに
固定することにより達成される。Further, a locking member for locking one end side of the foundation bolt opposite to the installation side of the equipment is fixed to one end of a guide tube through which a foundation bolt for fixing the equipment to the foundation concrete is inserted,
A device that inserts a foundation bolt into a guide cylinder, locks one end side of this foundation bolt to a locking member, fixes the other end side of this foundation bolt to the equipment, and then places foundation concrete inside and outside the guide cylinder. In the installation method, a vertically long member is fixed to one end side of the foundation bolt, and vertically long holes are formed in the locking member so that the vertically elongated members can be inserted into each other in the vertically long direction. This is accomplished by rotating the base bolt and the vertical member by a predetermined angle after inserting the vertical member, locking the vertical member of the base bolt to the locking member, and fixing the device to the base concrete.
【0013】[0013]
【作用】案内筒の他端は、基礎コンクリートの上面又は
この上面から内側に位置するものであるので、排熱回収
ボイラ等の機器を搬入するに際しても、前もって施工し
ておいた機器の基礎コンクリート上を容易に移動出来
る。そして基礎ボルトの一端側と案内筒の一端の係止部
材とは、係脱可能なものであるので、上記排熱回収ボイ
ラ等の機器を搬入した後に、この基礎ボルトを係止、設
定することが出来、これによって上記排熱回収ボイラ等
の機器の搬入が、この基礎ボルトに妨害されることがな
く、且つ基礎ボルトは上記機器の搬入によって損傷を受
けることもない。更に、上記排熱回収ボイラ等の機器の
搬入後、直ちに機器の据え付けを行なうことが出来るの
で、土建工事と据付工事の干渉が回避出来ると共に、排
熱回収ボイラや高圧給水ポンプ等の機器の工程短縮を図
ることが出来る。[Operation] Since the other end of the guide cylinder is located on the upper surface of the basic concrete or inside from the upper surface, the basic concrete of the equipment that has been constructed in advance when carrying in equipment such as the exhaust heat recovery boiler You can easily move up. Since the one end side of the base bolt and the locking member at one end of the guide tube are detachable, lock and set the base bolt after carrying in the equipment such as the exhaust heat recovery boiler. As a result, the loading of equipment such as the exhaust heat recovery boiler is not obstructed by the foundation bolt, and the foundation bolt is not damaged by the loading of the equipment. Further, since the equipment can be installed immediately after the equipment such as the exhaust heat recovery boiler is brought in, the interference between the earthwork construction and the installation work can be avoided, and the equipment process such as the exhaust heat recovery boiler and the high-pressure water supply pump can be processed. It can be shortened.
【0014】更に上記発明において、基礎ボルトの一端
側は、縦長の縦長部材が固定され、係止部材は、縦長の
縦長孔が形成され、この縦長孔と縦長部材とは、互いに
縦長方向同士で挿通可能なものであるので、上記発明の
作用に加え、機器の据え付け時の基礎ボルトの位置決め
設定が容易であると共に、基礎ボルトとこれを係止する
部材の製作が容易で経済的である。Further, in the above invention, a vertically elongated member is fixed to one end side of the foundation bolt, and a vertically elongated hole is formed in the locking member, and the vertically elongated hole and the vertically elongated member are arranged in the vertically elongated directions. Since it can be inserted, in addition to the effects of the above-described invention, the positioning and setting of the base bolt when the device is installed is easy, and the base bolt and the member that locks the base bolt are easy and economical to manufacture.
【0015】更に上記目的は、機器を基礎コンクリート
に固定する基礎ボルトを備えた機器据付基礎において、
基礎ボルトの機器の据付側の他端は、基礎コンクリート
の上面又はこの上面から内側に位置したものであるの
で、排熱回収ボイラ等の機器を搬入するに際して、基礎
ボルトが障害になることがなく基礎コンクリート上を容
易に移動出来る。且つ、基礎ボルトは上記機器の搬入に
よって損傷を受けることもない。更に、上記排熱回収ボ
イラ等の機器の搬入後、直ちに機器の据え付けを行なう
ことが出来、土建工事と据付工事の干渉が回避出来ると
共に、排熱回収ボイラや高圧給水ポンプ等の機器の工程
短縮を図ることが出来る。Further, the above object is to provide an equipment installation foundation having foundation bolts for fixing the equipment to foundation concrete,
Since the other end of the foundation bolt on the installation side of the equipment is located on the top surface of the foundation concrete or inside from this top surface, the foundation bolt does not become an obstacle when carrying in equipment such as an exhaust heat recovery boiler. Can be easily moved on basic concrete. In addition, the foundation bolt is not damaged by the loading of the above equipment. Furthermore, after the equipment such as the exhaust heat recovery boiler is brought in, the equipment can be installed immediately, and the interference between the earthwork and the installation work can be avoided, and the process steps of the equipment such as the exhaust heat recovery boiler and the high-pressure feed pump can be shortened. Can be planned.
【0016】又、基礎ボルトの一端側に縦長の縦長部材
を固定し、係止部材には縦長部材を互いに縦長方向同士
で挿通可能な縦長の縦長孔を形成し、この縦長孔に縦長
部材を挿通した後、基礎ボルト及び縦長部材を所定の角
度回転し、係止部材に縦長部材を係止することであるの
で、他の機器等の搬入が容易に出来ると共に、基礎ボル
トの位置決め設定が容易で確実に機器の据え付けが行な
える。Further, a vertically long member is fixed to one end side of the foundation bolt, and vertically long holes are formed in the locking member so that the vertically long members can be inserted into each other in the vertically long direction, and the vertically long member is inserted in the vertically long hole. After inserting, the base bolt and the vertical member are rotated by a predetermined angle and the vertical member is locked to the locking member, so that it is easy to carry in other equipment, etc., and the positioning setting of the basic bolt is easy. You can surely install the equipment.
【0017】[0017]
【実施例】以下、本発明に係る機器据付基礎及び機器据
付工法の実施例を図面に基づいて詳細に説明する。図1
は本発明に係る機器据付基礎及び機器据付工法の実施例
を説明する図で、(A)は鍔付アンカーボルトの挿通前
の状態の断面図、(B)は(A)の平面図、(C)は鍔
付アンカーボルトの挿通後の状態の断面図、(D)は鍔
付アンカーボルトの他端側平断面図、(E)は鍔付アン
カーボルトの挿通後、係止した状態の断面図、図2は図
1の実施例を示す一部破砕断面斜視図、図3は図2に示
した実施例の機器据付基礎にバッカーを設けた状態の一
部破砕断面斜視図、図4は図3に示したバッカーの上に
機器ベースフレームを設置した状態の一部破砕断面斜視
図、図5は本発明に係る機器据付基礎の他の実施例を示
す斜視図、を各々示す。Embodiments of the equipment installation foundation and equipment installation construction method according to the present invention will now be described in detail with reference to the drawings. FIG.
FIG. 3 is a diagram for explaining an embodiment of a device installation foundation and a device installation construction method according to the present invention, (A) is a cross-sectional view of a state before insertion of a flanged anchor bolt, (B) is a plan view of (A), C) is a cross-sectional view of the collar-attached anchor bolt after it is inserted, (D) is a cross-sectional plan view of the other end of the collar-attached anchor bolt, and (E) is a cross-section of the collar-attached anchor bolt that is locked after it is inserted. FIG. 2 is a partially crushed sectional perspective view showing the embodiment of FIG. 1, FIG. 3 is a partially crushed sectional perspective view of a state in which a backer is provided on the equipment installation foundation of the embodiment shown in FIG. 2, and FIG. 3 is a partially fragmented sectional perspective view showing a state in which the equipment base frame is installed on the backer shown in FIG. 3, and FIG. 5 is a perspective view showing another embodiment of the equipment installation base according to the present invention.
【0018】図1、2に示すように、本実施例の機器据
付基礎1は、機器を基礎コンクリート38に固定する基
礎ボルトである鍔付アンカーボルト3と、この鍔付アン
カーボルト3を内部に挿通する縦長の案内筒であるパイ
プスリーブ12と、このパイプスリーブ12の一端14
に固定され鍔付アンカーボルト3の機器の据付側と反対
の一端側4を係止する係止部材である溝付エンドプレー
ト17とを備えた機器据付基礎であって、パイプスリー
ブ12の他端15は、基礎コンクリート38の上面又は
この上面から内側に位置し、鍔付アンカーボルト3の一
端側4と溝付エンドプレート17とは、係脱可能なもの
である。As shown in FIGS. 1 and 2, the equipment installation foundation 1 of this embodiment has a flanged anchor bolt 3 which is a foundation bolt for fixing the equipment to the foundation concrete 38, and the flanged anchor bolt 3 inside. A pipe sleeve 12 which is a vertically long guide tube to be inserted, and an end 14 of the pipe sleeve 12.
A base for equipment installation comprising a grooved end plate 17, which is a locking member that is fixed to the end of the flanged anchor bolt 3 for locking one end side 4 opposite to the equipment installation side of the equipment, and the other end of the pipe sleeve 12. 15 is located on the upper surface of the basic concrete 38 or inside from the upper surface, and the one end side 4 of the flanged anchor bolt 3 and the grooved end plate 17 are detachable.
【0019】更に、鍔付アンカーボルト3の一端側4
は、縦長の縦長部材9が固定され、溝付エンドプレート
17は、縦長の縦長孔18が形成され、この縦長孔18
と縦長部材9とは、互いに縦長方向同士で挿通可能なも
のである。そして、溝付エンドプレート17は、縦長孔
18に延設して縦長部材9が係止可能な凹部17aが設
けられている。Furthermore, the one end side 4 of the collared anchor bolt 3
Has a vertically long member 9 fixed thereto, and the grooved end plate 17 has a vertically long hole 18 formed therein.
The longitudinal member 9 and the longitudinal member 9 can be inserted into each other in the longitudinal directions. The grooved end plate 17 is provided with a recess 17a extending in the vertically elongated hole 18 so that the vertically elongated member 9 can be locked.
【0020】従来技術の所で説明した様に、機器据付基
礎1の基礎工事は所定の場所の土砂を掘削し、捨コンク
リート42を打設し、強固になった表面上に機器のアン
カーフレーム28を設置する。図2に示すように、アン
カーフレーム28の設置は、プレート32を配置した後
アンカーフレーム28に固定したレグ29に設けたナッ
ト31にアジャストボルト30を螺合し、アジャストボ
ルト30の回転調節により、アンカーフレーム28のレ
ベル出し及び芯出しを行なう。又、パイプスリーブ12
の上端寄りには、このパイプスリーブ12を支える補強
用プレート26及び補強用サポート27、27′が設け
られ、補強用プレート26及び補強用サポート27はパ
イプスリーブ12に溶接されている。尚、参照番号22
は下部スリーブを示し、鍔付アンカーボルト3、縦長部
材9及び下端ナット11を保護している。As explained in the section of the prior art, in the foundation work of the equipment installation foundation 1, the earth and sand in a predetermined place are excavated, the waste concrete 42 is placed, and the anchor frame 28 of the equipment is mounted on the solid surface. Set up. As shown in FIG. 2, the anchor frame 28 is installed by screwing the adjusting bolt 30 into the nut 31 provided on the leg 29 fixed to the anchor frame 28 after the plate 32 is arranged, and adjusting the rotation of the adjusting bolt 30. The anchor frame 28 is leveled and centered. Also, the pipe sleeve 12
A reinforcing plate 26 for supporting the pipe sleeve 12 and reinforcing supports 27, 27 ′ are provided near the upper end of, and the reinforcing plate 26 and the reinforcing support 27 are welded to the pipe sleeve 12. Incidentally, reference numeral 22
Indicates a lower sleeve, which protects the collared anchor bolt 3, the longitudinal member 9 and the lower end nut 11.
【0021】図3は、図1に示した実施例の機器据付基
礎1に複数個のバッカー23を設けた状態の一部破砕断
面斜視図である。アンカーフレーム28、パイプスリー
ブ12、補強用サポート27等の基礎フレームに基礎コ
ンクリート38を打設後馴染みを良くするために基礎コ
ンクリート38の表面をチッピングしてチッピング面4
1を作りレベリング用のパッカー23を設定したもので
ある。その他の構造部分で図1、2と同じ構造部分には
同一の参照番号を付けてその説明を省略する。FIG. 3 is a partially fragmented sectional perspective view showing a state in which a plurality of backers 23 are provided on the equipment installation base 1 of the embodiment shown in FIG. After placing the concrete foundation 38 on the foundation frame such as the anchor frame 28, the pipe sleeve 12, the reinforcing support 27, etc., the surface of the foundation concrete 38 is chipped to improve the familiarity.
1 and the packer 23 for leveling is set. Of the other structural parts, the same structural parts as those in FIGS. 1 and 2 are designated by the same reference numerals, and the description thereof will be omitted.
【0022】図4は、図3に示した複数個のバッカー2
3の上に機器ベースフレーム24を設置した状態の一部
破砕断面斜視図である。その他の構造部分で図1、2と
同じ構造部分には同一の参照番号を付けてその説明を省
略する。FIG. 4 shows a plurality of backers 2 shown in FIG.
3 is a partially crushed cross-sectional perspective view of the apparatus base frame 24 installed on top of FIG. Of the other structural parts, the same structural parts as those in FIGS. 1 and 2 are designated by the same reference numerals, and the description thereof will be omitted.
【0023】以上の構成を有する本実施例の機器据付基
礎1は、次のように作用する。即ち、パイプスリーブ1
2の他端15は、基礎コンクリート38の上面39又は
この上面39から内側に位置するものであるので、排熱
回収ボイラ等の機器を搬入するに際しても、前もって施
工した機器の基礎コンクリート38上を容易に移動出来
る。そして鍔付アンカーボルト3の一端側4とパイプス
リーブ12の一端14の溝付エンドプレート17とは、
係脱可能なものであるので、上記排熱回収ボイラ等の機
器を搬入した後に、この鍔付アンカーボルト3を設定す
ることが出来、これによって上記排熱回収ボイラ等の機
器の搬入において、この鍔付アンカーボルト3に妨害さ
れることがなく、且つ鍔付アンカーボルト3は上記機器
の搬入によって損傷を受けない。更に、上記排熱回収ボ
イラ等の機器の搬入後、直ちに機器の据え付けを行なう
ことが出来るので、土建工事と機器据付工事の干渉が回
避出来ると共に、排熱回収ボイラや高圧給水ポンプ等の
機器の据付工事の工程短縮を図ることが出来る。The equipment installation base 1 of the present embodiment having the above-mentioned configuration operates as follows. That is, the pipe sleeve 1
Since the other end 15 of 2 is located on the upper surface 39 of the basic concrete 38 or inside from the upper surface 39, when carrying in equipment such as a heat recovery steam generator, the other end 15 of the equipment must be installed on the basic concrete 38 of equipment that has been constructed in advance. Easy to move. The one end side 4 of the anchor bolt 3 with a collar and the grooved end plate 17 of the one end 14 of the pipe sleeve 12 are
Since it can be engaged and disengaged, the flanged anchor bolt 3 can be set after the equipment such as the exhaust heat recovery boiler has been carried in, and when the equipment such as the exhaust heat recovery boiler is carried in, It is not disturbed by the collared anchor bolt 3, and the collared anchor bolt 3 is not damaged by the loading of the above equipment. Further, since the equipment can be installed immediately after the equipment such as the exhaust heat recovery boiler is brought in, the interference between the earthwork and the equipment installation work can be avoided, and the equipment such as the exhaust heat recovery boiler and the high-pressure water supply pump can be installed. The process of installation work can be shortened.
【0024】更に上記発明において、鍔付アンカーボル
ト3の一端側4は、長方形の縦長部材9が固定され、溝
付エンドプレート17は、長方形の縦長孔18とこれに
延設して長方形の縦長部材9が係止する長方形の凹部1
7aが90度回転した方向に形成され、且つこの縦長孔
18と縦長部材9とは、互いに縦長方向同士で挿通可能
なもので、長方形の凹部17aに縦長部材9が係止する
ので、上記発明の作用に加え、機器の据え付け時の鍔付
アンカーボルト3の位置決め設定が容易であると共に、
鍔付アンカーボルト3及び溝付エンドプレート17の製
作が容易で経済的である。Further, in the above-mentioned invention, a rectangular elongated member 9 is fixed to one end side 4 of the flanged anchor bolt 3, and the grooved end plate 17 is provided with a rectangular elongated hole 18 and a rectangular elongated member extending therethrough. Rectangular recess 1 with which member 9 is locked
7a is formed in a direction rotated by 90 degrees, and the vertically elongated hole 18 and the vertically elongated member 9 can be inserted into each other in the vertically elongated direction, and the vertically elongated member 9 is locked in the rectangular recess 17a. In addition to the function of, the positioning setting of the flanged anchor bolt 3 at the time of equipment installation is easy, and
The flanged anchor bolt 3 and the grooved end plate 17 are easy and economical to manufacture.
【0025】図5は、本発明に係る機器据付基礎の他の
実施例を示す斜視図である。本実施例の機器据付基礎1
は、機器を基礎コンクリート38に固定する基礎ボルト
6を備えたものであって、基礎ボルト6の機器の据付側
の他端6aは、基礎コンクリート38の上面39又は上
面39から内側に位置したものである。本実施例は、基
礎ボルト6の他端6aを基礎コンクリート38の上面3
9より低い位置に設定し、機器搬入時はピット34に砂
35等を充填して表面を平坦にし、更に鉄板36を敷い
て搬送機を通過させる。通過後養生の鉄板36やピット
34の砂35等を除去し速やかに機器の据付けを行なう
ことが出来る。FIG. 5 is a perspective view showing another embodiment of the equipment installation foundation according to the present invention. Equipment installation base 1 of this embodiment
Is provided with a foundation bolt 6 for fixing the equipment to the foundation concrete 38, and the other end 6a of the foundation bolt 6 on the equipment installation side is located inside the upper surface 39 or the upper surface 39 of the foundation concrete 38. Is. In this embodiment, the other end 6a of the foundation bolt 6 is connected to the upper surface 3 of the foundation concrete 38.
It is set to a position lower than 9, and when the equipment is carried in, the pit 34 is filled with sand 35 or the like to make the surface flat, and an iron plate 36 is further laid down to pass the carrier. After passing, the cured iron plate 36 and the sand 35 in the pit 34 can be removed, and the equipment can be quickly installed.
【0026】このように、排熱回収ボイラ等の機器を搬
入するに際して、基礎ボルト6が障害になることがな
く、搬送機は基礎コンクリート38の上面39を容易に
移動出来る。且つ、基礎ボルト6は上記機器の搬入によ
って損傷を受けることもない。更に、上記排熱回収ボイ
ラ等の機器の搬入後、直ちに当該基礎に据え付ける機器
の据え付けを行なうことが出来、土建工事と据付工事の
干渉が回避出来ると共に、排熱回収ボイラや高圧給水ポ
ンプ等の機器の工程短縮を図ることが出来る。As described above, when the equipment such as the exhaust heat recovery boiler is carried in, the foundation bolt 6 does not become an obstacle and the carrier can easily move on the upper surface 39 of the foundation concrete 38. Moreover, the foundation bolt 6 is not damaged by the loading of the above equipment. Furthermore, after the equipment such as the exhaust heat recovery boiler is brought in, the equipment to be installed on the foundation can be installed immediately, the interference between the earthwork and the installation work can be avoided, and the exhaust heat recovery boiler and the high-pressure water supply pump can be installed. The equipment process can be shortened.
【0027】又、本実施例の機器据付工法は、図1、2
において、機器を基礎コンクリート38に固定する基礎
ボルトである鍔付アンカーボルト3を挿通する案内筒で
あるパイプスリーブ12の一端14に、鍔付アンカーボ
ルト3の機器の据付側と反対の一端側4を係止する係止
部材である溝付エンドプレート17を固定し、パイプス
リーブ12に鍔付アンカーボルト3を挿通し、この鍔付
アンカーボルト3の一端側4を溝付エンドプレート17
に係止し、この鍔付アンカーボルト3の他端5側を機器
に固定した後、パイプスリーブ12の内外に基礎コンク
リートを打設する機器据付工法であって、鍔付アンカー
ボルト3の一端側4は、長方形の縦長部材9が固定さ
れ、溝付エンドプレート17は、長方形の縦長孔18と
これに延設して長方形の縦長部材9が係止する長方形の
凹部17aが90度回転した方向に形成され、且つこの
縦長孔18と縦長部材9とは、互いに縦長方向同士で挿
通可能なものである。The equipment installation method of this embodiment is shown in FIGS.
At one end 14 of the pipe sleeve 12 which is a guide tube through which the anchor bolt 3 with a collar which is a foundation bolt for fixing the device to the concrete concrete 38 is attached, one end side 4 opposite to the installation side of the equipment of the anchor bolt 3 with a flange is attached. The grooved end plate 17 which is a locking member for locking the collar is fixed, the flanged anchor bolt 3 is inserted into the pipe sleeve 12, and one end side 4 of the flanged anchor bolt 3 is attached to the grooved end plate 17
It is a device installation method in which the other end 5 side of the flanged anchor bolt 3 is fixed to the device, and then the concrete foundation is placed inside and outside the pipe sleeve 12, which is one end side of the anchored bolt 3 with a flange. 4, the rectangular elongated member 9 is fixed, and the grooved end plate 17 has a rectangular elongated hole 18 and a direction in which the rectangular recess 17a extended to this and the rectangular elongated member 9 is locked are rotated by 90 degrees. The vertically elongated hole 18 and the vertically elongated member 9 can be inserted into each other in the vertically elongated directions.
【0028】故に、溝付エンドプレート17の縦長孔1
8に鍔付アンカーボルト3の縦長部材9を挿通した後、
鍔付アンカーボルト3を所定の角度、例えば90度回転
し、溝付エンドプレート17の長方形の凹部17aに鍔
付アンカーボルト3の縦長部材9を係止して、機器を基
礎コンクリート38に固定することが出来るものであ
り、機器の据え付け時の鍔付アンカーボルト3の位置決
め設定が容易であると共に、鍔付アンカーボルト3及び
溝付エンドプレート17の製作が容易で経済的である。
尚、パイプスリーブ12と溝付エンドプレート17、鍔
付アンカーボルト3と縦長の長方形の縦長部材9及びナ
ット11とは互いに溶接固定されている。Therefore, the vertically elongated hole 1 of the grooved end plate 17
After inserting the vertically long member 9 of the flanged anchor bolt 3 into 8,
The flanged anchor bolt 3 is rotated by a predetermined angle, for example, 90 degrees, and the elongated member 9 of the flanged anchor bolt 3 is locked in the rectangular recess 17a of the grooved end plate 17 to fix the equipment to the foundation concrete 38. Since it is possible to easily set the position of the flanged anchor bolt 3 when the device is installed, the flanged anchor bolt 3 and the grooved end plate 17 can be manufactured easily and economically.
The pipe sleeve 12, the grooved end plate 17, the flanged anchor bolt 3, the vertically long rectangular member 9 and the nut 11 are welded and fixed to each other.
【0029】以上この発明を図示の実施例について詳し
く説明したが、それを以ってこの発明をそれらの実施例
のみに限定するものではなく、この発明の精神を逸脱せ
ずして種々改変を加えて多種多様の変形をなし得ること
は云うまでもない。Although the present invention has been described in detail with reference to the embodiments shown in the drawings, the present invention is not limited only to those embodiments by that, and various modifications can be made without departing from the spirit of the present invention. In addition, it goes without saying that various modifications can be made.
【0030】[0030]
【発明の効果】案内筒の他端は、基礎コンクリートの上
面又はこの上面から内側に位置するものであるので、排
熱回収ボイラ等の機器を搬入するに際しても、前もって
施工した機器の基礎コンクリート上を容易に移動出来
る。そして基礎ボルトの一端側と案内筒の一端の係止部
材とは、係脱可能なものであるので、上記排熱回収ボイ
ラ等の機器を搬入した後、基礎ボルトを係止することが
出来、これによって上記排熱回収ボイラ等の機器の搬入
において、この基礎ボルトに妨害されることがなく、且
つ基礎ボルトは上記機器の搬入によって損傷を受けな
い。更に、上記排熱回収ボイラ等の機器の搬入後、直ち
に機器の据え付けを行なうことが出来るので、土建工事
と据付工事の干渉が回避出来ると共に、排熱回収ボイラ
や高圧給水ポンプ等の機器の基礎工事及び据付工事の工
程短縮を図ることが出来る。Since the other end of the guide tube is located on the upper surface of the basic concrete or inside from this upper surface, even when the equipment such as the exhaust heat recovery boiler is carried in, it is on the basic concrete of the equipment that has been constructed in advance. Can be easily moved. Since the one end side of the base bolt and the locking member at one end of the guide tube are detachable, the base bolt can be locked after the equipment such as the exhaust heat recovery boiler is carried in. As a result, when the equipment such as the exhaust heat recovery boiler is carried in, the foundation bolt is not obstructed and the foundation bolt is not damaged by the equipment carried in. Furthermore, since the equipment can be installed immediately after the equipment such as the exhaust heat recovery boiler is brought in, it is possible to avoid the interference between the earthwork and the installation work, and the foundation of the equipment such as the exhaust heat recovery boiler and the high-pressure water pump. The work and installation work process can be shortened.
【0031】更に上記発明において、基礎ボルトの一端
側は、縦長の縦長部材が固定され、係止部材は、縦長の
縦長孔が形成され、この縦長孔と縦長部材とは、互いに
縦長方向同士で挿通可能なものであるので、上記発明の
効果に加え、機器の据え付け時の基礎ボルトの位置決め
設定が容易であると共に、基礎ボルト及び係止部材の製
作が容易で経済的である。Further, in the above invention, a vertically long member is fixed to one end side of the foundation bolt, and a vertically long hole is formed in the locking member, and the vertically long hole and the vertically long member are arranged in the vertical direction with respect to each other. Since it can be inserted, in addition to the effects of the invention described above, the positioning and setting of the base bolt when the device is installed is easy, and the base bolt and the locking member are easy to manufacture and economical.
【0032】更に、基礎ボルトの機器の据付側の他端
は、基礎コンクリートの上面又はこの上面から内側に位
置したものであるので、排熱回収ボイラ等の機器を搬入
するに際して、基礎ボルトが障害になることがなく基礎
コンクリート上を容易に移動出来る。且つ、基礎ボルト
は上記機器の搬入によって損傷を受けることもない。更
に、上記排熱回収ボイラ等の機器の搬入後、直ちに機器
の据え付けを行なうことが出来、土建工事と据付工事の
干渉が回避出来ると共に、排熱回収ボイラや高圧給水ポ
ンプ等の機器の基礎工事及び据付工事の工程短縮を図る
ことが出来る。Further, since the other end of the foundation bolt on the equipment installation side is located on the top surface of the concrete foundation or inside from this top surface, the foundation bolt is obstructed when carrying equipment such as an exhaust heat recovery boiler. It can be moved easily on the foundation concrete without becoming. In addition, the foundation bolt is not damaged by the loading of the above equipment. Furthermore, after the equipment such as the exhaust heat recovery boiler is brought in, the equipment can be installed immediately, and the interference between the earthwork and the installation work can be avoided, and the basic construction of the equipment such as the exhaust heat recovery boiler and the high-pressure water supply pump. Also, the process of installation work can be shortened.
【0033】又、本発明の機器据付工法によれば、機器
の据付基礎の施工後においても機器の搬入が容易に出来
て土建工事と据付工事の干渉が回避出来ると共に、基礎
ボルトの位置決め設定が容易で確実に速やかに機器の据
え付けが行なえる。そして本発明は、基礎ボルトの無い
平坦な表面を有する基礎コンクリートを構成することが
出来る機器据付工法で、据付工期の短縮と突起物が地表
面に出ないことから安全面での効果は非常に大きい。Further, according to the equipment installation method of the present invention, the equipment can be easily carried in even after the installation foundation of the equipment is installed, the interference between the earthwork and the installation work can be avoided, and the positioning of the foundation bolt can be set. The equipment can be installed easily and surely and quickly. And the present invention is an equipment installation method capable of forming a basic concrete having a flat surface without a foundation bolt, and the effect of safety is very high because the installation period is shortened and the protrusions do not appear on the ground surface. large.
【図1】本発明に係る機器据付基礎及び機器据付工法の
実施例を説明する図で、(A)は鍔付アンカーボルトの
挿通前の状態の断面図、(B)は(A)の平面図、
(C)は鍔付アンカーボルトの挿通後の状態の断面図、
(D)は鍔付アンカーボルトの他端側平断面図、(E)
は鍔付アンカーボルトの挿通後、係止した状態の断面
図、をそれぞれ示す。FIG. 1 is a diagram illustrating an example of a device installation foundation and a device installation construction method according to the present invention, where (A) is a cross-sectional view of a state before insertion of a flanged anchor bolt, and (B) is a plan view of (A). Figure,
(C) is a sectional view of the state after the anchor bolt with a collar is inserted,
(D) is a flat cross-sectional view of the other end of the flanged anchor bolt, (E)
FIG. 4B is a cross-sectional view showing a state in which the collared anchor bolt is inserted and then locked.
【図2】図1の実施例を示す一部破砕断面斜視図であ
る。FIG. 2 is a partially crushed sectional perspective view showing the embodiment of FIG.
【図3】図2に示した実施例の機器据付基礎にバッカー
を設けた状態の一部破砕断面斜視図である。FIG. 3 is a partially fragmented sectional perspective view showing a state in which a backer is provided on the equipment installation foundation of the embodiment shown in FIG.
【図4】図3に示したバッカーの上に機器ベースフレー
ムを設置した状態の一部破砕断面斜視図である。FIG. 4 is a partially fragmentary sectional perspective view showing a state in which a device base frame is installed on the backer shown in FIG.
【図5】本発明に係る機器据付基礎の他の実施例を示す
斜視図である。FIG. 5 is a perspective view showing another embodiment of the equipment installation foundation according to the present invention.
【図6】従来技術に係る機器据付基礎の一部破砕断面斜
視図である。FIG. 6 is a partially crushed sectional perspective view of a device installation foundation according to a conventional technique.
【図7】図6の要部詳細図で、(A)は図6のアンカー
ボルト及びパイプスリーブを中心に示した縦断面図、
(B)はアンカーフレームのレグ部分の側面図である。7 is a detailed view of an essential part of FIG. 6, (A) is a vertical cross-sectional view mainly showing the anchor bolt and the pipe sleeve of FIG. 6,
(B) is a side view of a leg portion of the anchor frame.
【図8】図6に示した機器据付基礎にバッカーを設けた
状態の一部破砕断面斜視図である。8 is a partially crushed cross-sectional perspective view of the equipment installation foundation shown in FIG. 6 with a backer provided.
【図9】図8のバッカーの上に機器ベースフレームを設
置した状態の一部破砕断面斜視図である。9 is a partially crushed sectional perspective view showing a state in which an equipment base frame is installed on the backer of FIG.
1 機器据付基礎 3 鍔付アンカーボルト(基礎ボルト) 4 一端側 5 他端 6 基礎ボルト 9 縦長部材 12 パイプスリーブ(案内筒) 14 一端 15 他端 17 溝付エンドプレート(係止部材) 18 縦長孔 38 基礎コンクリート 39 上面 1 Equipment installation base 3 Anchor bolt with a collar (foundation bolt) 4 One end side 5 The other end 6 Foundation bolt 9 Vertical member 12 Pipe sleeve (guide cylinder) 14 One end 15 The other end 17 Groove end plate (locking member) 18 Vertical hole 38 Foundation concrete 39 Upper surface
Claims (4)
ボルトと、該基礎ボルトを内部に挿通する縦長の案内筒
と、該案内筒の一端に固定され前記基礎ボルトの前記機
器の据付側と反対の一端側を係止する係止部材とを備え
た機器据付基礎において、前記案内筒の他端は、前記基
礎コンクリートの上面又は該上面から内側に位置し、前
記基礎ボルトの一端側と前記係止部材とは、係脱可能な
ものであることを特徴とする機器据付基礎。1. A foundation bolt for fixing a device to a foundation concrete, a vertically elongated guide tube through which the foundation bolt is inserted, and a base bolt fixed to one end of the guide cylinder opposite to the installation side of the device of the foundation bolt. In an equipment installation foundation including a locking member that locks one end side, the other end of the guide cylinder is located on the upper surface of the foundation concrete or inside from the upper surface, and the one end side of the foundation bolt and the locking. A member is a device installation foundation characterized by being detachable.
端側は、縦長の縦長部材が固定され、前記係止部材は、
縦長の縦長孔が形成され、該縦長孔と前記縦長部材と
は、互いに縦長方向同士で挿通可能なものであることを
特徴とする機器据付基礎。2. The vertically long member is fixed to one end side of the foundation bolt according to claim 1, and the locking member is
A vertically long hole is formed, and the vertically long hole and the vertically long member can be inserted into each other in a vertically long direction.
ボルトを備えた機器据付基礎において、前記基礎ボルト
の前記機器の据付側の他端は、前記基礎コンクリートの
上面又は該上面から内側に位置したことを特徴とする機
器据付基礎。3. An equipment installation foundation comprising a foundation bolt for fixing an equipment to foundation concrete, wherein the other end of the equipment installation side of the foundation bolt is located on the upper surface of the foundation concrete or inside from the upper surface. Equipment installation foundation characterized by.
ボルトを挿通する案内筒の一端に、前記基礎ボルトの前
記機器の据付側と反対の一端側を係止する係止部材を固
定し、前記案内筒に前記基礎ボルトを挿通し、該基礎ボ
ルトの一端側を前記係止部材に係止し、該基礎ボルトの
他端側を前記機器に固定した後、前記案内筒の内外に基
礎コンクリートを打設する機器据付工法において、前記
基礎ボルトの一端側に縦長の縦長部材を固定し、前記係
止部材には該縦長部材を互いに縦長方向同士で挿通可能
な縦長の縦長孔を形成し、該縦長孔に前記基礎ボルトの
縦長部材を挿通した後、前記基礎ボルト及び縦長部材を
所定の角度回転し、前記係止部材に前記基礎ボルトの縦
長部材を係止して、前記機器を前記基礎コンクリートに
固定することを特徴とする機器据付工法。4. A guide member is fixed to one end of a guide tube through which a foundation bolt for fixing the equipment to the foundation concrete is inserted, and the guide member is fixed to one end side of the foundation bolt opposite to the installation side of the equipment. The foundation bolt is inserted into the cylinder, one end side of the foundation bolt is locked to the locking member, the other end side of the foundation bolt is fixed to the device, and then the concrete foundation is cast inside and outside the guide cylinder. In the equipment installation method to be installed, a vertically long member is fixed to one end side of the foundation bolt, and vertically long holes are formed in the locking member so that the vertically elongated members can be inserted into each other in the vertically long direction. After inserting the vertically elongated member of the foundation bolt into the hole, the foundation bolt and the vertically elongated member are rotated by a predetermined angle, and the vertically elongated member of the foundation bolt is locked to the locking member, and the device is added to the basic concrete. Characterized by fixing Equipment installation method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18822494A JPH0849246A (en) | 1994-08-10 | 1994-08-10 | Equipment installing base and method for installation work of the equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18822494A JPH0849246A (en) | 1994-08-10 | 1994-08-10 | Equipment installing base and method for installation work of the equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0849246A true JPH0849246A (en) | 1996-02-20 |
Family
ID=16219954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP18822494A Pending JPH0849246A (en) | 1994-08-10 | 1994-08-10 | Equipment installing base and method for installation work of the equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0849246A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493643A (en) * | 2011-12-15 | 2012-06-13 | 中国一冶集团有限公司 | Method for constructing circular hole of anchor bolt reserved by equipment foundation |
CN102535509A (en) * | 2010-12-28 | 2012-07-04 | 贵阳铝镁设计研究院有限公司 | Construction method of high-flatness equipment foundation and adjusting structure thereof |
CN103953065A (en) * | 2014-05-22 | 2014-07-30 | 赵东京 | Power equipment base fastening device and fixing method |
CN104612175A (en) * | 2014-12-30 | 2015-05-13 | 武汉一冶建筑安装工程有限责任公司 | Device and method used for guaranteeing levelness of installation plane of precise equipment |
CN105401591B (en) * | 2014-09-03 | 2017-11-28 | 五冶集团上海有限公司 | Pre-embedded bolt corrugated sleeve installation method |
JP2021085270A (en) * | 2019-11-29 | 2021-06-03 | 株式会社竹中工務店 | Construction method of wall panel |
-
1994
- 1994-08-10 JP JP18822494A patent/JPH0849246A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102535509A (en) * | 2010-12-28 | 2012-07-04 | 贵阳铝镁设计研究院有限公司 | Construction method of high-flatness equipment foundation and adjusting structure thereof |
CN102493643A (en) * | 2011-12-15 | 2012-06-13 | 中国一冶集团有限公司 | Method for constructing circular hole of anchor bolt reserved by equipment foundation |
CN102493643B (en) * | 2011-12-15 | 2013-12-11 | 中国一冶集团有限公司 | Method for constructing circular hole of anchor bolt reserved by equipment foundation |
CN103953065A (en) * | 2014-05-22 | 2014-07-30 | 赵东京 | Power equipment base fastening device and fixing method |
CN103953065B (en) * | 2014-05-22 | 2015-11-18 | 赵东京 | A kind of power-equipment pedestal fastener and fixing means |
CN105401591B (en) * | 2014-09-03 | 2017-11-28 | 五冶集团上海有限公司 | Pre-embedded bolt corrugated sleeve installation method |
CN104612175A (en) * | 2014-12-30 | 2015-05-13 | 武汉一冶建筑安装工程有限责任公司 | Device and method used for guaranteeing levelness of installation plane of precise equipment |
JP2021085270A (en) * | 2019-11-29 | 2021-06-03 | 株式会社竹中工務店 | Construction method of wall panel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088148B (en) | Pipe gallery template and its application | |
JP7059618B2 (en) | Main landing gear installation method and anchor frame installation jig | |
KR100629437B1 (en) | Casing structure for constructing column and column construction method using the same | |
JP2005299215A (en) | Simplified foundation and assembly thereof | |
JPH0849246A (en) | Equipment installing base and method for installation work of the equipment | |
JP2013103553A (en) | Platform fence infrastructure and method for constructing the same | |
US5806262A (en) | Post and method of emplacing a post | |
KR100642326B1 (en) | A temporary apparatus for constructing girder by top-down style construction method | |
JP2006299660A (en) | Temporary receiving construction method and temporary receiving structure | |
JP3436104B2 (en) | Steel pipe construction method | |
JP3612600B2 (en) | Unit anchor and structural steel foundation beam | |
JPH10317371A (en) | Method for erecting pile-column in building using pile as column, and pile-column support band for use therein | |
CN113846858A (en) | Protection system for horizontal hole in building construction process and construction method | |
JPH08170366A (en) | Temporary stopper for column/beam joint member | |
US10138626B1 (en) | Method and apparatus for repairing a tilt wall construction | |
JP3731975B2 (en) | Method and apparatus for positioning a steel pipe column when installing a plug-in type steel pipe column | |
JP3413751B2 (en) | Restoration support gantry repair method and apparatus | |
JP2957114B2 (en) | Horizontal hole drilling equipment for shafts | |
JP2005240430A (en) | Building foundation and construction method therefor | |
KR20200011683A (en) | Road digging apparatus for repairing manhole | |
CN114523556B (en) | Open caisson peripheral retractable well wall template and construction method thereof | |
JPH09125415A (en) | Foundation base for equipment devices | |
JPH1113306A (en) | Building supporting method at installation of vibration isolation device | |
JP2917328B2 (en) | How to build a new building that can operate existing structures | |
JP3005885B2 (en) | How to build the foundation of a structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Effective date: 20040224 Free format text: JAPANESE INTERMEDIATE CODE: A02 |