JPH083583Y2 - Temporary fixing device for construction work - Google Patents

Temporary fixing device for construction work

Info

Publication number
JPH083583Y2
JPH083583Y2 JP4811293U JP4811293U JPH083583Y2 JP H083583 Y2 JPH083583 Y2 JP H083583Y2 JP 4811293 U JP4811293 U JP 4811293U JP 4811293 U JP4811293 U JP 4811293U JP H083583 Y2 JPH083583 Y2 JP H083583Y2
Authority
JP
Japan
Prior art keywords
base
anchor
hole
concrete
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP4811293U
Other languages
Japanese (ja)
Other versions
JPH0710228U (en
Inventor
晃浩 四釜
Original Assignee
株式会社アンカー商事
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社アンカー商事 filed Critical 株式会社アンカー商事
Priority to JP4811293U priority Critical patent/JPH083583Y2/en
Publication of JPH0710228U publication Critical patent/JPH0710228U/en
Application granted granted Critical
Publication of JPH083583Y2 publication Critical patent/JPH083583Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】この考案は、建設現場等におい
て、手摺、足場、作業用部材等、建設工事に必要な部材
を躯体コンクリートに仮止するための建設工事用仮止装
置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary construction device for construction work for temporarily fixing construction materials such as handrails, scaffolds, work members, etc. necessary for construction work to concrete concrete. .

【0002】[0002]

【従来の技術】建設現場等においては、建設工事中の作
業員の安全を保つための手摺や、高所作業のための足
場、作業用部材の支持具等が取り付けられる。これらの
手摺や足場、支持具等は建設工事が完了すると全て撤去
される。
2. Description of the Related Art At a construction site or the like, handrails for maintaining the safety of workers during construction work, scaffolds for work at high places, support members for working members, etc. are attached. All of these handrails, scaffolds, supports, etc. will be removed when the construction work is completed.

【0003】図6はこのような建設現場等において使用
される手摺の一例を示す斜視図であって、水平の躯体コ
ンクリート1に四角形の板状のベース2をスパイク3等
によって固定し、ベース2の中央には鉛直方向にしたパ
イプ材4の下端を次に説明するように取り付け、パイプ
材4の上端に水平方向のパイプ材5を直交型のクランプ
6で固定して手摺としたものである。
FIG. 6 is a perspective view showing an example of a handrail used at such a construction site. A square plate-shaped base 2 is fixed to a horizontal skeleton concrete 1 with spikes 3 and the like, and the base 2 is fixed. The lower end of the vertically oriented pipe member 4 is attached to the center of the pipe as described below, and the horizontal pipe member 5 is fixed to the upper end of the pipe member 4 with an orthogonal type clamp 6 to form a handrail. .

【0004】図7は手摺の他の例の縦断正面図であっ
て、向き合った壁を形成している1対の躯体コンクリー
ト7,7にベース2をスパイク3によって固定し、ベー
ス2の中央には水平方向にしたパイプ材4,4の端部を
次に説明するように取り付け、パイプ材4,4をクラン
プ8で結束して手摺としたものである。
FIG. 7 is a vertical sectional front view of another example of a handrail, in which a base 2 is fixed by a spike 3 to a pair of skeleton concrete 7, 7 forming facing walls, and the base 2 is attached to the center of the base 2. Is a handrail in which the end portions of the pipe members 4 and 4 in the horizontal direction are attached as described below, and the pipe members 4 and 4 are bound by a clamp 8 to form a handrail.

【0005】図8は上述したベース2及び鉛直方向にし
たパイプ材4の下端を拡大して示した斜視図であって、
四角形の板状のベース2の隅には丸穴9が穿設されてお
り、ベース2の表面中央には、パイプ材4の内径にほぼ
等しい外径になっている円筒状のパイプ嵌合部10が垂
直に固定されていて、パイプ嵌合部10の上端には、1
対のL字型切欠溝11,11が設けられている。
FIG. 8 is an enlarged perspective view showing the base 2 and the lower end of the pipe member 4 in the vertical direction.
A round hole 9 is bored in a corner of the quadrangular plate-shaped base 2, and a cylindrical pipe fitting portion having an outer diameter substantially equal to the inner diameter of the pipe material 4 is formed in the center of the surface of the base 2. 10 is fixed vertically, and 1 is attached to the upper end of the pipe fitting portion 10.
A pair of L-shaped notch grooves 11 and 11 are provided.

【0006】一方、パイプ材4の端部近くには直径方向
に杆12が固定してあって、杆12はL字型切欠溝11
に嵌めることができる太さになっている。
On the other hand, a rod 12 is fixed in the diametrical direction near the end of the pipe member 4, and the rod 12 has an L-shaped cutout groove 11.
It is thick enough to fit in.

【0007】パイプ材4の端部をベース2の中央に取り
付ける場合には、パイプ材4の端部をベース2中央のパ
イプ嵌合部10外側に嵌め、杆12がL字型切欠溝11
に嵌まるようにしてパイプ材4をパイプ嵌合部10に押
し込み、パイプ材4を回して杆12がL字型切欠溝11
の水平部分の奥に達するようにしてパイプ材4がパイプ
嵌合部10から抜け出ないようにする。
When the end portion of the pipe material 4 is attached to the center of the base 2, the end portion of the pipe material 4 is fitted to the outside of the pipe fitting portion 10 at the center of the base 2, and the rod 12 has an L-shaped notch groove 11.
The pipe material 4 is pushed into the pipe fitting portion 10 so that the rod 12 is fitted into the L-shaped notch groove 11
The pipe member 4 is prevented from coming out of the pipe fitting portion 10 by reaching the inner part of the horizontal portion of the pipe member 4.

【0008】ベース2をコンクリート面に固定するため
に従来は、図9に示すように躯体コンクリート1のベー
ス2を固定しようとする場所に、丸穴9の穿設位置に合
わせた穴13をドリルで穿設し、その上にベース2を置
いた後、ベース2の上方からベース2の丸穴9を通して
躯体コンクリート1の穴13にアンカー14を図9の左
側に示すように差し込む。
In order to fix the base 2 to the concrete surface, conventionally, as shown in FIG. 9, a hole 13 corresponding to the drilling position of the round hole 9 is drilled at the position where the base 2 of the frame concrete 1 is to be fixed. After placing the base 2 on it, the anchor 14 is inserted into the hole 13 of the skeleton concrete 1 from above the base 2 through the round hole 9 of the base 2 as shown on the left side of FIG.

【0009】アンカー14は円柱状のもので、アンカー
14外周の上半部にはナット15を螺合するための雌ね
じ16が刻設されており、アンカー14の中心には上方
からスパイク3を差し込むためのスパイク差込穴17が
設けられており、アンカー14の下部には、アンカー1
4の長手方向に切れ目18が切り込まれているものであ
る。
The anchor 14 has a cylindrical shape, and an internal thread 16 for screwing a nut 15 is engraved on the upper half of the outer periphery of the anchor 14, and the spike 3 is inserted into the center of the anchor 14 from above. There is a spike insertion hole 17 for the anchor 1, and at the bottom of the anchor 14, the anchor 1
A cut 18 is cut in the longitudinal direction of No. 4.

【0010】このようなアンカー14は、雌ねじ16に
ナット15を螺合してベース2の上方から丸穴9を通し
て躯体コンクリート1の穴13に差し込んだ後、スパイ
ク差込穴17に上方からスパイク3を差し込む。そして
スパイク3をスパイク差込穴17に叩き込むと、図9の
右側に示すようにスパイク3の下端はスパイク差込穴1
7の底を貫通して切れ目18を押し開くことになる。こ
のためアンカー14の裾は躯体コンクリート1の穴13
の側壁に強く押し付けられ、躯体コンクリート1から抜
け出なくなる。そこでナット15を締め付ければ、ベー
ス2は躯体コンクリート1に固定されることになる。
In such an anchor 14, a nut 15 is screwed into a female screw 16 and inserted into a hole 13 of a skeleton concrete 1 through a round hole 9 from above the base 2, and then a spike 3 is inserted into a spike insertion hole 17 from above. Plug in. When the spike 3 is tapped into the spike insertion hole 17, the lower end of the spike 3 is at the spike insertion hole 1 as shown on the right side of FIG.
It will penetrate the bottom of 7 and push open the break 18. For this reason, the hem of the anchor 14 is the hole 13 of the building concrete 1.
It is strongly pressed against the side wall of the building and cannot get out of the skeleton concrete 1. Then, if the nut 15 is tightened, the base 2 will be fixed to the skeleton concrete 1.

【0011】ベース2を躯体コンクリート1に固定する
ために従来から行なわれている別の方法として、図10
の左側に示すようにベース2の丸穴9の上にワッシャ1
9を置いて、コンクリート釘20を差し込み、コンクリ
ート釘20を図10の右側に示すように打ち込むことも
行なわれている。
As another conventional method for fixing the base 2 to the skeleton concrete 1, as shown in FIG.
Place the washer 1 over the round hole 9 in the base 2 as shown on the left side of
It is also practiced to put 9 and insert the concrete nail 20 and drive the concrete nail 20 as shown on the right side of FIG.

【0012】このようにしてベース2を図6に示す躯体
コンクリート1あるいは図7に示す躯体コンクリート7
に固定して、パイプ材4の端部をベース2の中央に取り
付けることにより、図6、図7に示すような手摺を建築
現場に作ることができる。図6において鉛直方向にした
パイプ材4を多数並設すると共にパイプ材4を上方に継
ぎ足して、足場を作ることもできる。
In this way, the base 2 is replaced by the skeleton concrete 1 shown in FIG. 6 or the skeleton concrete 7 shown in FIG.
Then, the handrail as shown in FIGS. 6 and 7 can be made on the construction site by fixing the end portion of the pipe member 4 to the center of the base 2 by fixing it to. In FIG. 6, a large number of vertically arranged pipe members 4 may be arranged in parallel and the pipe members 4 may be added upward to form a scaffold.

【0013】[0013]

【考案が解決しようとする課題】従来、図9に示すよう
に躯体コンクリート1に複数の穴13をあける場合に、
全部の穴13が正確にベース2の丸穴9の位置と一致す
るとは限らず、ベース2の丸穴9を通して1つの穴13
にしかアンカー14を差し込めなくて、ベース2を1箇
所でしか躯体コンクリート1に固定できず、ベース2の
固定が不安定になることがあった。
[Problems to be Solved by the Invention] Conventionally, when a plurality of holes 13 are formed in a skeleton concrete 1 as shown in FIG.
Not all the holes 13 are exactly aligned with the positions of the round holes 9 of the base 2, and one hole 13 is inserted through the round holes 9 of the base 2.
In some cases, the anchor 14 could only be inserted, and the base 2 could be fixed to the skeleton concrete 1 at only one location, which made the fixation of the base 2 unstable.

【0014】このようなことがないようにするために従
来は、躯体コンクリート1上のベース2を固定すべき場
所に一旦ベース2を置いて、ベース2の丸穴9を通して
躯体コンクリート1上に塗料のスプレーを吹き付け、躯
体コンクリート1上に丸穴9の位置を塗料でマークした
後ベース2をどけてマークの位置にドリルで穴13をあ
け、複数の穴13が全て丸穴9の位置と一致するように
してベース2を躯体コンクリート1に強固に固定するよ
うにしていたが、手数が掛かる上、コンクリートには砂
利が入っているのでその影響を受け、ドリルが砂利にあ
たって穴13の位置がずれてしまう欠点があった。
In order to prevent such a situation, conventionally, the base 2 is once placed on the skeleton concrete 1 at a position where the base 2 is to be fixed, and a paint is applied on the skeleton concrete 1 through the round hole 9 of the base 2. After spraying the spray, mark the position of the round hole 9 on the skeleton concrete 1 with paint, remove the base 2 and drill a hole 13 at the position of the mark, and the plurality of holes 13 all match the position of the round hole 9. In this way, the base 2 was firmly fixed to the skeleton concrete 1, but it was troublesome and the concrete contained gravel, which was affected, and the position of the hole 13 on the gravel was displaced by the drill. There was a drawback that

【0015】また建設工事が完了して手摺、足場を全て
撤去するに際して、パイプ材4、ナット15、ベース2
を取り外しても、アンカー14、スパイク3の上部が躯
体コンクリート1から突出した状態で残ってしまうの
で、アンカー14及びスパイク3の突出部分をカッター
等で切断してその跡を補修し、モルタルを塗って仕上げ
面を手直しする手間が掛かる欠点があった。
When the construction work is completed and all of the handrails and scaffolds are removed, the pipe material 4, nuts 15 and base 2 are removed.
Even if the anchor is removed, the upper part of the anchor 14 and the spike 3 remains in a state of protruding from the skeleton concrete 1. Therefore, the protruding part of the anchor 14 and the spike 3 is cut with a cutter or the like to repair the mark, and mortar is applied. There is a drawback that it takes time and effort to rework the finished surface.

【0016】さらに図10のコンクリート釘20を打ち
込む方法は、建築工事が完了して手摺、足場を全て撤去
する際にコンクリート釘20を無理に抜いてベース2を
取り外すことになるので、コンクリート釘20を無理に
抜いた時に躯体コンクリート1が破壊されるため、やは
りモルタルを塗って補修の手間を要する欠点があった。
Further, in the method of driving the concrete nail 20 shown in FIG. 10, when the construction work is completed and the handrail and scaffolding are all removed, the concrete nail 20 is forcibly pulled out and the base 2 is removed. Since the skeleton concrete 1 is destroyed when it is forcibly pulled out, there is a drawback that mortar is also applied and repair work is required.

【0017】この考案はこのような従来の欠点を除去
し、躯体コンクリートにあけた複数の穴の位置とベース
の複数の穴の位置とが簡単に一致し、建築工事が完了し
て手摺、足場を全て撤去するに際にベースを取り外した
跡の処置も簡単にできるようにしたパイプ材の仮止装置
を提供することを目的とするものである。
The present invention eliminates the above-mentioned conventional defects, and the positions of a plurality of holes formed in the skeleton concrete and the positions of a plurality of holes in the base are easily matched, and the construction work is completed and the handrails and scaffolding are completed. It is an object of the present invention to provide a temporary fixing device for a pipe material, which can easily perform a treatment of a trace of removing the base when all of the pipes are removed.

【0018】[0018]

【課題を解決するための手段】この考案の建設工事用仮
止装置は、仮止めすべき部材を固定する板状のベース
と、該ベースの隅の近傍に対角方向に長く穿設された長
穴と、躯体コンクリートに穿設した穴に挿入する筒状の
アンカーと、該アンカーの内孔下端部に形成された下方
が縮径している傾斜面と、前記アンカーの下端部に長手
方向に設けた切れ目と、前記アンカーの内孔上部に刻設
された雌ねじと、前記アンカーの内孔に上方から挿入さ
れ前記傾斜面に当接する打込み駒と、中心に縦孔を有し
前記ベースの長穴を通して前記雌ねじに螺合されるボル
トと、該ボルトの縦孔に挿入し前記打込み駒を下方に打
込む打込み具と、を備えたことを特徴とするものであ
る。
DISCLOSURE OF THE INVENTION A temporary fixing device for construction work according to the present invention comprises a plate-shaped base for fixing members to be temporarily fixed, and a long hole provided diagonally in the vicinity of a corner of the base. A long hole, a tubular anchor to be inserted into a hole drilled in the concrete frame, an inclined surface formed at the lower end of the inner hole of the anchor and having a reduced diameter, and a longitudinal direction at the lower end of the anchor. A cut provided on the base, an internal thread engraved in the upper part of the inner hole of the anchor, a driving piece inserted into the inner hole of the anchor from above and contacting the inclined surface, and a vertical hole at the center of the base. It is characterized by comprising a bolt screwed into the female screw through the elongated hole, and a driving tool which is inserted into the vertical hole of the bolt and drives the driving piece downward.

【0019】[0019]

【作用】ベースの長穴にボルトを差し込んで、ボルトを
アンカーの雌ねじに螺合し、ボルトをベースの長穴に沿
って移動することにより、ボルトに螺合してあるアンカ
ーの位置を躯体コンクリートの穴に一致するように調節
することが可能であり、アンカーを躯体コンクリートの
穴に挿入してボルトの縦孔に打込み具を挿入して打込み
具をたたくと、打込み具はアンカーの内孔に沿って下降
し、内孔下端部の傾斜面を押し広げてアンカーの外周下
端を躯体コンクリートの穴に押し付けてアンカーを躯体
コンクリートの穴から抜け出ないようにし、ベースを躯
体コンクリートに固定する。
[Operation] By inserting the bolt into the elongated hole of the base, screwing the bolt into the female thread of the anchor, and moving the bolt along the elongated hole of the base, the position of the anchor screwed into the bolt is adjusted to the frame concrete. It is possible to adjust it so that it matches the hole of the anchor, insert the anchor into the hole of the concrete structure and insert the driving tool into the vertical hole of the bolt and hit the driving tool, the driving tool will fit into the inner hole of the anchor. It descends along and pushes the inclined surface of the lower end of the inner hole to push the outer peripheral lower end of the anchor into the hole of the structural concrete so that the anchor does not come out from the hole of the structural concrete, and the base is fixed to the structural concrete.

【0020】建設工事が完了して手摺、足場、作業用部
材等、建設工事に必要な部材を全て撤去する際には、ボ
ルトを回してアンカーから除き、ベースを取り外して躯
体コンクリート面の穴にモルタルを充填してアンカーを
埋め込むだけでよい。
When the construction work is completed and all the necessary members such as handrails, scaffolds, work members, etc. are removed, turn the bolts to remove them from the anchors and remove the base to make holes in the concrete surface of the frame. Simply fill the mortar and embed the anchor.

【0021】[0021]

【実施例】次にこの考案の実施例を、建設工事に必要な
部材として手摺に適用した場合を説明する。
[Embodiment] Next, an embodiment of the present invention will be described when applied to a handrail as a member necessary for construction work.

【0022】図1は、この考案の一実施例の使用状態を
示す縦断面図、図2はこの考案の一実施例のベースの平
面図であって、四角形の板状のベース21の表面中央に
は、従来と同様にパイプ材4の内径にほぼ等しい外径に
なっている円筒状のパイプ嵌合部10が垂直に固定され
ていて、パイプ嵌合部10の上端には、1対のL字型切
欠溝11,11が設けられている。
FIG. 1 is a vertical cross-sectional view showing a usage state of an embodiment of the present invention, and FIG. 2 is a plan view of a base of the embodiment of the present invention, in which the center of the surface of a square plate-shaped base 21. A cylindrical pipe fitting portion 10 having an outer diameter substantially equal to the inner diameter of the pipe material 4 is vertically fixed to the upper end of the pipe material 4, and a pair of pipe fitting portions 10 are provided at the upper end of the pipe fitting portion 10. L-shaped notch grooves 11, 11 are provided.

【0023】四角形の板状のベース21の対角方向の1
対の隅22の近傍には、対角方向に長くなっている1対
の長孔23が穿設されている。また四角形の板状のベー
ス21の他の対角方向の1対の隅24の近傍にも、対角
方向に長くなっている1対の長孔25が穿設されてい
る。長孔23の長さと長孔25の長さとは必ずしも同一
寸法でなく、一方の対の長孔が他方の長孔よりも長い寸
法であっても良い。さらに1対の長孔23と他の1対の
長孔25のうち、いずれか一方の対の長孔を穿設するだ
けでもよい。
1 in the diagonal direction of the rectangular plate-shaped base 21
In the vicinity of the pair of corners 22, a pair of long holes 23 that are diagonally long are formed. In addition, a pair of long holes 25 extending in the diagonal direction are also formed in the vicinity of another pair of diagonal corners 24 of the rectangular plate-shaped base 21. The length of the long holes 23 and the length of the long holes 25 are not necessarily the same size, and one pair of long holes may be longer than the other long hole. Further, only one of the pair of long holes 23 and the other pair of long holes 25 may be provided.

【0024】上述したベース21を躯体コンクリート1
に固定するためには、図3に示す装置を使用する。図3
に示す装置は、筒状のアンカー26と、打込み駒27
と、ボルト28と、スプリングワッシャ29と、ワッシ
ャ30と、打込み具31とを備えている。
The above-mentioned base 21 is used as the skeleton concrete 1
The device shown in FIG. 3 is used for fixing to. FIG.
The device shown in FIG. 1 has a cylindrical anchor 26 and a driving piece 27.
A bolt 28, a spring washer 29, a washer 30, and a driving tool 31.

【0025】筒状のアンカー26の内孔32の下端部に
は、下方が縮径している傾斜面33が形成されており、
内孔32の上部には雌ねじ34が刻設されている。また
アンカー26の下端部には、アンカー26の長手方向に
複数の切れ目35が設けられると共に、外周下端は傾斜
した面取り部36が形成されている。
At the lower end of the inner hole 32 of the tubular anchor 26, an inclined surface 33 whose diameter is reduced downward is formed.
A female screw 34 is engraved on the upper portion of the inner hole 32. Further, a plurality of cuts 35 are provided in the lower end portion of the anchor 26 in the longitudinal direction of the anchor 26, and a chamfered portion 36 that is inclined is formed at the lower end of the outer periphery.

【0026】打込み駒27は、アンカー26の内孔32
の内径よりやや小さい寸法の外径になっていて、アンカ
ー26の内孔32に上方から挿入されるものであって、
打込み駒27の上面には、円形の凹部37が設けられて
いる。
The driving piece 27 has an inner hole 32 of the anchor 26.
Has an outer diameter slightly smaller than the inner diameter of, and is inserted into the inner hole 32 of the anchor 26 from above,
A circular recess 37 is provided on the upper surface of the driving piece 27.

【0027】ボルト28は、アンカー26の内孔32に
刻設されている雌ねじ34に螺合されるもので、ボルト
28の中心には円形の縦孔38が貫通している。ボルト
28を雌ねじ34に螺合する際には、スプリングワッシ
ャ29とワッシャ30とを嵌めることになる。
The bolt 28 is screwed into a female screw 34 formed in the inner hole 32 of the anchor 26, and a circular vertical hole 38 penetrates through the center of the bolt 28. When the bolt 28 is screwed into the female screw 34, the spring washer 29 and the washer 30 are fitted.

【0028】打込み具31は、ボルト28の縦孔38に
挿入できる杆状のもので、縦孔38に挿入すると下端は
打込み駒27の凹部37に嵌まるようになっており、打
込み具31の上端には、太い円柱状の叩打部39が一体
に取り付けられている。
The driving tool 31 is a rod-shaped member which can be inserted into the vertical hole 38 of the bolt 28. When the driving tool 31 is inserted into the vertical hole 38, the lower end of the driving tool 31 fits into the recess 37 of the driving tool 27. A thick cylindrical hitting portion 39 is integrally attached to the upper end.

【0029】ベース21を躯体コンクリート1に固定し
ようとする場合には、躯体コンクリート1のベース21
を固定しようとする場所に、長孔23,25の位置にほ
ぼ合うようにして、図4に示すような穴13を従来と同
様にドリルであけて、穴13の中を掃除する。穴13の
水平断面の大きさは、図3で説明した筒状のアンカー2
6を若干の余裕をもって入れることができる程度の寸法
とし、穴13の深さは、アンカー26の長さよりも大き
な寸法の適宜な深さでよい。
When the base 21 is to be fixed to the skeleton concrete 1, the base 21 of the skeleton concrete 1 is to be fixed.
The holes 13 as shown in FIG. 4 are drilled in the same manner as in the conventional case so that the holes 13 and 25 are approximately aligned with the positions where the holes are to be fixed, and the inside of the holes 13 is cleaned. The size of the horizontal cross section of the hole 13 is the same as that of the tubular anchor 2 described in FIG.
The size of the hole 13 may be a size larger than the length of the anchor 26, and the depth of the hole 13 may be an appropriate depth.

【0030】穴13は必ずしも4個穿設せずに、ベース
21の一方の対角方向の1対の長孔23の穿設位置にほ
ぼ合わせた1対の穴13であってもよく、あるいはベー
ス21の他の対角方向の1対の長孔25の穿設位置にほ
ぼ合わせた1対の穴13であってもよい。
The four holes 13 are not necessarily required to be provided, and a pair of holes 13 may be formed so as to be substantially aligned with the positions of the pair of diagonally elongated holes 23 of the base 21. It may be a pair of holes 13 that are substantially aligned with the positions of the other diagonally elongated holes 25 of the base 21.

【0031】一方、図3の打込み具31は取り除き、ボ
ルト28はアンカー26の内孔32の雌ねじ34から抜
き取って、図5の左側に示すようにアンカー26は内孔
32の中に打込み駒27を挿入した状態でベース21の
下側から長孔23,25の位置に手で保持し、ボルト2
8はスプリングワッシャ29とワッシャ30とを嵌めた
状態でベース21の上側から長孔23,25に差し込む
ようにする。
On the other hand, the driving tool 31 of FIG. 3 is removed, the bolt 28 is pulled out from the female screw 34 of the inner hole 32 of the anchor 26, and the anchor 26 is driven into the inner hole 32 as shown in the left side of FIG. With the bolt inserted, hold it from the lower side of the base 21 in the long holes 23 and 25 by hand, and
8 is a state in which the spring washer 29 and the washer 30 are fitted and inserted into the elongated holes 23 and 25 from the upper side of the base 21.

【0032】そして図5の右側に示すように、ボルト2
8を長孔23,25に通してアンカー26の雌ねじ34
に螺合すると、アンカー26はボルト28によってベー
ス21の長孔23,25の下に吊り下げられた状態にな
る。
Then, as shown on the right side of FIG.
8 through the long holes 23 and 25, and the female screw 34 of the anchor 26.
When the screw 26 is screwed into the anchor 26, the anchor 26 is suspended by the bolt 28 under the long holes 23 and 25 of the base 21.

【0033】このように長孔23,25の下にアンカー
26を吊り下げた状態でベース21を躯体コンクリート
1の穴13の上方に運び、図1に示すようにアンカー2
6を穴13の中に挿入する。この際、ボルト28を長孔
23,25に沿って移動すると共に、ベース21の位置
を調整することによりアンカー26の位置を穴13に合
わせ、穴13を4個穿設した場合であっても少なくとも
3個のアンカー26を穴13に挿入することができるこ
とになる。アンカー26の外周下端に形成してある面取
り部36(図3参照)は、アンカー26を穴13に容易
に挿入させる働きをする。
In this way, the base 21 is carried above the hole 13 of the skeleton concrete 1 in a state where the anchor 26 is suspended under the long holes 23 and 25, and as shown in FIG.
Insert 6 into hole 13. At this time, even when the bolt 28 is moved along the long holes 23 and 25 and the position of the base 21 is adjusted to align the position of the anchor 26 with the hole 13 and four holes 13 are drilled. At least three anchors 26 will be able to be inserted into the holes 13. The chamfered portion 36 (see FIG. 3) formed on the lower end of the outer periphery of the anchor 26 serves to easily insert the anchor 26 into the hole 13.

【0034】アンカー26を躯体コンクリート1の穴1
3に挿入した後、ボルト28の縦孔38に打込み具31
を挿入し、打込み具31の上端に一体になっている叩打
部39をハンマー等によって叩くと、打込み具31の下
端は打込み駒27の凹部37に嵌まつてハンマー等によ
る打撃力を打込み駒27に伝えることになる。
The anchor 26 is attached to the hole 1 of the building concrete 1.
3 is inserted into the vertical hole 38 of the bolt 28.
When the tapping portion 39 that is integrated with the upper end of the driving tool 31 is hit with a hammer or the like, the lower end of the driving tool 31 is fitted into the recess 37 of the driving piece 27, and the striking force of the hammer or the like is applied to the driving piece 27. I will tell you.

【0035】打撃力を受けた打込み駒27はアンカー2
6の内孔32下端部に形成されている傾斜面33を強い
力で側方に押し、図1の右側に示すように複数の切れ目
35を押し開き、アンカー26の外周下端を穴13の側
壁に強く押し付けるため、アンカー26は穴13から抜
け出なくなる。そこでボルト28を締め付ければ、スプ
リングワッシャ29、ワッシャ30を介してベース21
は躯体コンクリート1に固定されることになる。打込み
具31は1個のもので順次打込み駒27を打ち込めばよ
い。
The driving piece 27 which receives the striking force is the anchor 2
6, the inclined surface 33 formed at the lower end of the inner hole 32 is pushed laterally with a strong force, and a plurality of cuts 35 are pushed open as shown in the right side of FIG. The anchor 26 does not come out of the hole 13 because it is strongly pressed against. Then, if the bolt 28 is tightened, the base 21 is inserted through the spring washer 29 and the washer 30.
Will be fixed to the skeleton concrete 1. The driving tool 31 is one, and the driving pieces 27 may be driven sequentially.

【0036】打込み具31の長さを打込み駒27の打込
み深さとほぼ同じ寸法にしておけば、叩打部39を叩い
た際に叩打部39の下面がボルト28の上面に接するこ
とにより、打込み駒27を必要以上に下方へ押出して打
込み駒27がアンカー26の下に抜けてしまうようなこ
とはなくなる。
If the length of the driving tool 31 is set to be approximately the same as the driving depth of the driving piece 27, when the tapping portion 39 is hit, the lower surface of the hitting portion 39 contacts the upper surface of the bolt 28, so that the driving piece 31 is driven. It does not happen that the driving piece 27 is pushed downward more than necessary and the driving piece 27 is pulled out below the anchor 26.

【0037】このようにしてベース21を躯体コンクリ
ート1に固定した後は、図8において説明した従来のも
のと同様に、パイプ材4の端部をベース21中央のパイ
プ嵌合部10外側に嵌め、杆12がL字型切欠溝11に
嵌まるようにしてパイプ材4をパイプ嵌合部10に押し
込み、パイプ材4を回して杆12がL字型切欠溝11の
水平部分の奥に達するようにしてパイプ材4がパイプ嵌
合部10から抜け出ないようにする。
After fixing the base 21 to the concrete body 1 in this way, the end portion of the pipe material 4 is fitted to the outside of the pipe fitting portion 10 at the center of the base 21 as in the conventional one described in FIG. , The pipe member 4 is pushed into the pipe fitting portion 10 so that the rod 12 fits in the L-shaped notch groove 11, and the pipe member 4 is rotated so that the rod 12 reaches the inner part of the horizontal portion of the L-shaped notch groove 11. In this way, the pipe material 4 is prevented from coming out of the pipe fitting portion 10.

【0038】上述の説明は、水平な躯体コンクリート1
にベース21を固定する場合について述べたが、図7の
ように向き合った壁を形成している1対の躯体コンクリ
ート7,7にベース21を固定する場合も、向きが90
度変わるだけで同様に固定することができる。
[0038] The above description is for the horizontal frame concrete 1
Although the case where the base 21 is fixed is described above, when the base 21 is fixed to the pair of skeleton concretes 7 and 7 forming the facing walls as shown in FIG.
It can be fixed in the same way only by changing it.

【0039】ベース21を躯体コンクリート1,7に固
定して、パイプ材4の端部をベース21の中央に取り付
けることにより、従来と同様に手摺や足場を建築現場に
作ることができる。
By fixing the base 21 to the concrete structures 1 and 7 and attaching the end portion of the pipe material 4 to the center of the base 21, it is possible to make a handrail or a scaffold on the construction site as in the conventional case.

【0040】建築工事が完了して手摺、足場を全て撤去
するに際には、図1のボルト28をアンカー26の雌ね
じ34(図3参照)から抜き取り、スプリングワッシャ
29、ワッシャ30、パイプ材4、ベース21を撤去す
ると、工事が完了した現場には、穴13の中に固定され
ているアンカー26と打込み駒27とが残されることに
なるが、穴13の中にモルタルを充填するだけで、躯体
コンクリート1を平滑な仕上げ面にすることができる。
When all the handrails and scaffolds are removed after the construction work is completed, the bolt 28 of FIG. 1 is extracted from the female screw 34 (see FIG. 3) of the anchor 26, and the spring washer 29, washer 30, and pipe member 4 are removed. , When the base 21 is removed, the anchor 26 and the driving piece 27 fixed in the hole 13 are left at the site where the construction is completed, but it is only necessary to fill the hole 13 with mortar. The skeleton concrete 1 can have a smooth finished surface.

【0041】以上説明した実施例は、手摺を建設工事現
場に仮止めした場合について説明したが、建設工事に必
要な他の部材の仮止めをする場合、例えば壁面にベース
を固定し、ベースに資材を吊すための丸還を固着してお
く場合には、ベースとしてパイプ嵌合部10の無い平板
状のものを使用し、このベースに丸還を溶接しておけば
よい。
In the above-described embodiment, the handrail is temporarily fixed to the construction site, but when temporarily fixing other members necessary for the construction work, for example, the base is fixed to the wall surface and the base is fixed to the base. In the case where the rolling contact for suspending the material is fixed, a flat plate without the pipe fitting portion 10 may be used as the base, and the rolling contact may be welded to the base.

【0042】[0042]

【考案の効果】この考案は、板状のベース21の隅の近
傍に、対角方向に長い長孔23,25を穿設したので、
ベース21を固定するために躯体コンクリート1に穿設
する穴13を、厳密な位置合わせをせず楽に穿設するこ
とができる効果がある。
According to the present invention, since the long holes 23 and 25 which are diagonally long are formed near the corners of the plate-like base 21,
There is an effect that the hole 13 to be drilled in the frame concrete 1 for fixing the base 21 can be easily drilled without strict alignment.

【0043】そして躯体コンクリート1に穿設する穴1
3の深さは、アンカー26の長さよりも深ければよく、
正確な寸法測定をする必要がない。
Then, a hole 1 to be bored in the skeleton concrete 1
The depth of 3 may be deeper than the length of the anchor 26,
There is no need to make accurate dimensional measurements.

【0044】さらにアンカー26ごとにスパイク3を必
要とせず、1個の打込み具31で全てのアンカー26を
躯体コンクリート1の穴13に固定することができるた
め、素材の節約と経費の削減とをすることができる効果
がある。
Further, since the spikes 3 are not required for each anchor 26, all the anchors 26 can be fixed to the holes 13 of the skeleton concrete 1 with one driving tool 31, so that the material and the cost can be saved. There is an effect that can be.

【0045】また建設工事が完了して手摺、足場等の建
設工事に必要な部材を全て撤去するに際には、ボルト2
8をアンカー26から抜き取り、建設工事に必要な部材
と共にベース21を撤去して、躯体コンクリート1に穿
設してある穴13にモルタルを充填するだけの簡単な作
業で、躯体コンクリート1を平滑な仕上げ面にすること
ができる効果がある。
In addition, when the construction work is completed and all the members necessary for the construction work such as handrails and scaffolds are removed, the bolt 2
8 is pulled out from the anchor 26, the base 21 is removed together with the members necessary for the construction work, and the mortar is filled in the holes 13 formed in the skeleton concrete 1 to make the skeleton concrete 1 smooth. There is an effect that it can be a finished surface.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案の一実施例の固定状態を示す縦断面図
である。
FIG. 1 is a vertical sectional view showing a fixed state of an embodiment of the present invention.

【図2】この考案の一実施例のベースの平面図である。FIG. 2 is a plan view of a base according to an embodiment of the present invention.

【図3】この考案の一実施例の拡大縦断面図である。FIG. 3 is an enlarged vertical sectional view of an embodiment of the present invention.

【図4】躯体コンクリートに穴を穿設した状態の縦断面
図である。
FIG. 4 is a vertical cross-sectional view showing a state in which holes are bored in the skeleton concrete.

【図5】ベースにアンカーを取り付ける状態を示す縦断
面図である。
FIG. 5 is a vertical cross-sectional view showing a state in which an anchor is attached to a base.

【図6】手摺の一例を示す斜視図である。FIG. 6 is a perspective view showing an example of a handrail.

【図7】手摺の他の例の縦断面図である。FIG. 7 is a vertical cross-sectional view of another example of a handrail.

【図8】従来のパイプ材の仮止装置の斜視図である。FIG. 8 is a perspective view of a conventional temporary fixing device for a pipe material.

【図9】従来のパイプ材の仮止装置の固定状態を示す縦
断正面図である。
FIG. 9 is a vertical sectional front view showing a fixed state of a conventional pipe material temporary fixing device.

【図10】従来のパイプ材の仮止装置の他の固定状態を
示す縦断正面図である。
FIG. 10 is a vertical cross-sectional front view showing another fixed state of the conventional temporary fixing device for a pipe material.

【符号の説明】[Explanation of symbols]

1 躯体コンクリート 21 ベース 23 長孔 25 長孔 26 アンカー 27 打込み駒 28 ボルト 31 打込み具 32 内孔 33 傾斜面 34 雌ねじ 35 切れ目 1 Frame concrete 21 Base 23 Long hole 25 Long hole 26 Anchor 27 Driving piece 28 Bolt 31 Driving tool 32 Inner hole 33 Inclined surface 34 Female screw 35 Cut

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 仮止めすべき部材を固定する板状のベー
スと、該ベースの隅の近傍に対角方向に長く穿設された
長穴と、躯体コンクリートに穿設した穴に挿入する筒状
のアンカーと、該アンカーの内孔下端部に形成された下
方が縮径している傾斜面と、前記アンカーの下端部に長
手方向に設けた切れ目と、前記アンカーの内孔上部に刻
設された雌ねじと、前記アンカーの内孔に上方から挿入
され前記傾斜面に当接する打込み駒と、中心に縦孔を有
し前記ベースの長穴を通して前記雌ねじに螺合されるボ
ルトと、該ボルトの縦孔に挿入し前記打込み駒を下方に
打込む打込み具と、を備えたことを特徴とす建設工事用
仮止装置。
1. A plate-shaped base for fixing a member to be temporarily fixed, a long hole diagonally elongated near a corner of the base, and a cylinder inserted into a hole drilled in a skeleton concrete. -Shaped anchor, an inclined surface formed in the lower end of the inner hole of the anchor and having a reduced diameter, a slit formed in the lower end of the anchor in the longitudinal direction, and an engraved upper part of the inner hole of the anchor. Female screw, a driving piece inserted into the inner hole of the anchor from above and contacting the inclined surface, a bolt having a vertical hole at the center and screwed into the female screw through the elongated hole of the base, and the bolt. And a driving tool which is inserted into a vertical hole of the driving tool and drives the driving piece downward, a temporary fixing device for construction work.
JP4811293U 1993-07-06 1993-07-06 Temporary fixing device for construction work Expired - Lifetime JPH083583Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4811293U JPH083583Y2 (en) 1993-07-06 1993-07-06 Temporary fixing device for construction work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4811293U JPH083583Y2 (en) 1993-07-06 1993-07-06 Temporary fixing device for construction work

Publications (2)

Publication Number Publication Date
JPH0710228U JPH0710228U (en) 1995-02-14
JPH083583Y2 true JPH083583Y2 (en) 1996-01-31

Family

ID=12794239

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4811293U Expired - Lifetime JPH083583Y2 (en) 1993-07-06 1993-07-06 Temporary fixing device for construction work

Country Status (1)

Country Link
JP (1) JPH083583Y2 (en)

Also Published As

Publication number Publication date
JPH0710228U (en) 1995-02-14

Similar Documents

Publication Publication Date Title
US7284746B2 (en) Clamping apparatus and apparatus for use in erecting temporary guard rails
US20190032693A1 (en) Expansion Anchor Setting Tool
US20090183451A1 (en) Linearly extendible impact anchor driving pole and anchor system
JPH083583Y2 (en) Temporary fixing device for construction work
RU173404U9 (en) TILE LEVELING DEVICE
US5228262A (en) Anchor assembly
JPH0656403U (en) Temporary fixing device for pipe material
EP1765533B1 (en) Clamping apparatus and apparatus for use in erecting temporary guard rails
KR20100093805A (en) Stone panel fixation device
JPS6347246Y2 (en)
KR100723261B1 (en) insert for a subsidiary materials instruction
JP3838727B2 (en) Joint fitting of joist and flooring material in wooden floor structure and laying method of wooden flooring material
JPH0645554Y2 (en) Jigs for pipe piping in concrete structures
JPH0714556Y2 (en) Scaffold connection strengthening hardware and scaffold connection device
KR200307614Y1 (en) Underground revetment molding tie-bolt
JP3000041U (en) Positioning plate for anchor bolts for building foundations
JP3733111B2 (en) Foundation level adjusting device and foundation level adjusting method on foundation slab having uneven top
JP3382194B2 (en) Construction inserts
KR20180076402A (en) Hitting device for slab form fixing pin
JPS60199120A (en) Steel foundation having fixing function
JP3077815U (en) Adjustment fittings for mounting hole-down hardware
KR200262845Y1 (en) anchor
JPH076363Y2 (en) Fixture for concrete formwork
JPH019886Y2 (en)
KR200340955Y1 (en) An apparatus for marking the bracket of fitting in the concret