JPH08312300A - Following truck of shield excavator - Google Patents

Following truck of shield excavator

Info

Publication number
JPH08312300A
JPH08312300A JP11989295A JP11989295A JPH08312300A JP H08312300 A JPH08312300 A JP H08312300A JP 11989295 A JP11989295 A JP 11989295A JP 11989295 A JP11989295 A JP 11989295A JP H08312300 A JPH08312300 A JP H08312300A
Authority
JP
Japan
Prior art keywords
truck
towing
rail
shield excavator
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11989295A
Other languages
Japanese (ja)
Other versions
JP3140659B2 (en
Inventor
Koichi Yoshimoto
幸一 吉本
Masaharu Kobayashi
正治 小林
Junichi Aikawa
潤一 相川
Jun Naito
潤 内藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Mitsubishi Heavy Industries Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Mitsubishi Heavy Industries Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Mitsubishi Heavy Industries Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP07119892A priority Critical patent/JP3140659B2/en
Publication of JPH08312300A publication Critical patent/JPH08312300A/en
Application granted granted Critical
Publication of JP3140659B2 publication Critical patent/JP3140659B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE: To enable a following truck to be safely operated without being towed by a shield excavator main body by placing a towing truck and a brake truck at the front and rear of a following truck main body, respectively, the trucks each having a rail clamp. CONSTITUTION: A towing truck 2 and a brake truck 3 which are placed, respectively, in front of and behind a following truck main body 1 located behind a shield excavator main body, are provided with rail clamps 9, 9. When the shield excavator main body advances, a rail is clamped by the rail clamp 9 of the towing truck 2, and a towing jack 4 is operated to advance the following truck main body 1. Next, the rail is clamped by the rail clamp 9 of the brake truck 3, the rail clamp 9 of the towing truck 2 is released, and the towing jack 4 is operated to advance the towing truck 2. Therefore, the need for towing the towing truck by the shield excavator main body is eliminated, and the following truck can be operated safely even on gradients and curves.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はシールド掘削機の後続台
車に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a trailing truck for a shield excavator.

【0002】[0002]

【従来の技術】従来シールド掘削機本体の後続のトンネ
ル内に組立てられたセグメント上のレールに沿って走行
する後続台車は、例えば図8に示すように後続台車本体
01にシールド掘削機本体02から後方に延びる左右2
本のけん引用ワイヤロープ03をターンバックル04で
連結し、シールド掘削機本体02が掘進すると後続台車
本体01はけん引用ワイヤロープ03により引っ張られ
てシールド掘削機本体02後方のセグメント05内に敷
設されるレール06上をシールド掘削機本体02ととも
に前進するようにするか或は図9に示すように後続台車
本体01に後続台車移動用ジャッキ07を盛替ジャッキ
08を介して取付け、移動用ジャッキ07の先端部に取
付けた係合部09をセグメント05に形成した接続部0
10に係合し、次いで移動用ジャッキ07を縮み方向に
作動して後続台車本体01を前進するようにしている。
2. Description of the Related Art A trailing truck that travels along a rail on a segment assembled in a tunnel following a shield excavating machine body has been known, for example, as shown in FIG. Left and right extending to the rear 2
When the tow wire rope 03 of the book is connected by the turnbuckle 04 and the shield excavator main body 02 digs, the trailing carriage body 01 is pulled by the tow wire rope 03 and laid in the segment 05 behind the shield excavator main body 02. 9 to move forward with the shield excavator main body 02, or as shown in FIG. 9, attach the following truck moving jack 07 to the following truck body 01 via the rearrangement jack 08, and move the jack 07. Connecting part 0 in which the engaging part 09 attached to the tip of the
10, the moving jack 07 is then actuated in the contracting direction to move the trailing carriage body 01 forward.

【0003】[0003]

【発明が解決しようとする課題】しかし前者のロープ方
式ではトンネル施工個所が下り勾配の場合、後続台車本
体がシールド掘削機本体側へ走行する危険があり、また
上り勾配の場合は後続台車本体の自重で後方に力がかか
りワイヤロープが切れるという危険性があり、更にシー
ルド掘削機本体と後続台車本体を繋いでいるワイヤロー
プが邪魔になりシールド掘削機本体内での作業がしにく
いという問題があり、又後者のセグメントを掴持して前
進するタイプの後続台車本体は、接続部のあるスチール
セグメントでは対応出来るが、コンクリートセグメント
の場合は接続部がないため対応することができず、更に
勾配がある場合の盛替作業を行う場合後続台車本体が暴
走する危険性がある。
However, in the former rope system, there is a risk that the trailing trolley body will travel to the shield excavator body side when the tunnel construction site has a downward slope, and in the case of an upward slope, the trailing trolley body There is a risk that the wire rope will break due to the force behind it and the wire rope connecting the shield excavator body and the succeeding bogie body will be an obstacle, making it difficult to work inside the shield excavator body. Yes, and the latter trolley body of the type that grips the latter segment and moves forward can be handled with the steel segment with the connection part, but it can not be dealt with in the case of the concrete segment because there is no connection part. There is a risk that the succeeding trolley body may run out of control when carrying out the reassembling work.

【0004】本発明は、かかる問題点に対処するため開
発されたものであって後続台車本体の暴走防止と自重に
よる抵抗をなくすことを目的とする。
The present invention was developed to address such problems, and it is an object of the present invention to prevent the runaway of the succeeding carriage body and to eliminate the resistance due to its own weight.

【0005】[0005]

【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成はシールド掘削機本体の後方に位置す
る後続台車本体の前後に、それぞれレールクランプ装置
を備えた牽引台車とブレーキ台車とを配置したことを特
徴とする。
The structure of the present invention for achieving the above-mentioned object is a tow truck and a brake truck, each of which is provided with a rail clamp device in front of and behind a trailing truck body located behind a shield excavator body. It is characterized by arranging and.

【0006】[0006]

【作用】そして本発明は上記の手段により後続台車本体
は、シールド掘削機本体が前進する場合、その前部の牽
引台車のレールクランプ装置でレールを掴持し、牽引ジ
ャッキを作動させて後続台車本体を前進させ、次いでそ
の後部のブレーキ台車のレールクランプ装置でレールを
掴持し、牽引台車のクランプ装置を解除して牽引ジャッ
キを作動させて牽引台車を前進させる。
According to the present invention, when the shield excavator main body moves forward, the trailing carriage main body grips the rail by the rail clamp device of the towing carriage in front of the trailing carriage main body and operates the towing jack to operate the trailing carriage. The main body is moved forward, and then the rail is clamped by the rail clamp device of the rear brake truck, the clamp device of the tow truck is released, the tow jack is operated, and the tow truck is moved forward.

【0007】[0007]

【実施例】以下本発明の一実施例を図1及び図2に基づ
いて説明すると1は後続台車本体を示し、該後続台車本
体1には牽引台車2とブレーキ台車3とを前後に配置
し、牽引台車2は後続台車本体1の下部に設けた牽引ジ
ャッキ4とクレビス金物5を介して取付けた牽引ロッド
6の一端を連結ピン7で連結することにより後続台車本
体1の前部に配置し、又ブレーキ台車3は、その前部を
連続ピン8で後続台車本体1に連結するすることにより
後続台車本体1の後部に配置した。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. 1 and 2. Reference numeral 1 denotes a body of a trailing carriage, on which a towing carriage 2 and a brake carriage 3 are arranged in front and rear. The tow truck 2 is arranged at the front of the following truck body 1 by connecting one end of a towing jack 4 provided at the lower portion of the following truck body 1 and a towing rod 6 attached via a clevis hardware 5 with a connecting pin 7. Further, the brake carriage 3 is arranged at the rear portion of the succeeding carriage body 1 by connecting the front portion thereof to the succeeding carriage body 1 with the continuous pin 8.

【0008】そしてこれら牽引台車2とブレーキ台車3
とにはそれぞれレールクランプ装置9が備えられ、該レ
ールクランプ装置9はクランプ装置取付フレーム10に
対象にとりつけた取付板11に取付ピン12を介して取
付けられる第1クランプアーム13と、該第1クランプ
アーム13に固定ピン14を介して中間部を固定され、
且つ一端をクランプ駆動ジャッキ15に連結ピン16を
介して連結されるS字型の第2クランプアーム17とか
ら形成され、該クランプ装置9を作動する場合はクラン
プ駆動ジャッキ15を縮めると第2クランプアーム17
が固定ピン14を支点としてレール側に移動して第1ク
ランプアーム13と共動してレール18をクランプし、
又該クランプ装置9を解除する場合はクランプ駆動ジャ
ッキ15を伸長させることにより第2クランプアーム1
7が固定ピン14を支点としてレール解除側に移動して
第1クランプアーム13と共動してレール18から解除
される。図中19は車輪、20は操作盤を示す。
[0008] And these tow truck 2 and brake truck 3
Each of the rail clamp devices 9 is provided with a rail clamp device 9, and the rail clamp device 9 includes a first clamp arm 13 that is mounted via a mounting pin 12 to a mounting plate 11 that is mounted on a clamp device mounting frame 10. The middle part is fixed to the clamp arm 13 via the fixing pin 14,
And an S-shaped second clamp arm 17 whose one end is connected to the clamp drive jack 15 via a connecting pin 16, and when the clamp device 9 is operated, the clamp drive jack 15 is contracted to produce a second clamp. Arm 17
Moves to the rail side with the fixing pin 14 as a fulcrum and cooperates with the first clamp arm 13 to clamp the rail 18.
When the clamp device 9 is released, the clamp driving jack 15 is extended so that the second clamp arm 1 is released.
7 moves to the rail release side with the fixed pin 14 as a fulcrum, and cooperates with the first clamp arm 13 to be released from the rail 18. In the figure, 19 is a wheel and 20 is an operation panel.

【0009】次に後続台車本体1の移動を図3〜図6に
基づいて説明すると図3及び図4に示すように牽引ジャ
ッキ4を伸長した状態で牽引台車2のレールクランプ装
置9でレールを掴持すると共にブレーキ台車3のレール
クランプ装置9を解除して、シールド掘削機の推進ジャ
ッキの伸長速度と同速度で牽引ジャッキ4を縮ませて図
5及び図6に示すように後続台車本体1をシールド掘削
機本体側に前進させる。図6に示すように牽引ジャッキ
4が最縮時にはシールド掘削機本体の推進ジャッキも伸
びきった状態なので現場の作業工程はセグメント組み立
て作業に入るので、この間にブレーキ台車3のレールク
ランプ装置9でレールを掴持してブレーキ台車3をレー
ル18に固定し牽引台車2のレールクランプ装置9を解
除してその牽引ジャッキ4を伸長すると牽引台車2はシ
ールド掘削機本体側に前進する。
Next, the movement of the succeeding truck main body 1 will be described with reference to FIGS. 3 to 6. As shown in FIGS. 3 and 4, the rail clamp device 9 of the towing truck 2 holds the rail while the towing jack 4 is extended. While grasping and releasing the rail clamp device 9 of the brake carriage 3, the towing jack 4 is contracted at the same speed as the extension speed of the propulsion jack of the shield excavator, and as shown in FIGS. To the shield excavator body side. As shown in FIG. 6, when the towing jack 4 is at its minimum contraction, the propulsion jack of the shield excavator body is also fully extended, so the site work process starts segment assembly work. When the brake truck 3 is fixed to the rail 18 and the rail clamp device 9 of the tow truck 2 is released to extend the tow jack 4, the tow truck 2 advances to the shield excavator body side.

【0010】図7はそのフローチャートを示し、自動操
作スイッチ「入」にした時を、スタートとしステップ1
において牽引ジャッキ4は伸長し、ステップ2において
牽引台車2のレールクランプ装置9をロックしステップ
3においてブレーキ台車3のレールクランプ装置9を解
除し、ステップ4において牽引ジャッキ4を縮ませ、ス
テップ5において牽引ジャッキ4を最縮させ、ステップ
6においてセグメント組立作業に入る。セグメント組立
作業中ステップ7において牽引台車2のレールクランプ
装置9を解除し、ステップ8においてブレーキ台車3の
レールクランプ装置9をロックし、ステップ9において
牽引ジャッキ4を伸長させ、ステップ10において牽引
ジャッキ4を最伸長させることにより牽引台車2がシー
ルド掘削機本体側に前進してスタート待機状態となる。
FIG. 7 shows the flow chart thereof, and when the automatic operation switch is turned "on", the start is defined as step 1
In step 2, the tow jack 4 extends, the rail clamp device 9 of the tow truck 2 is locked in step 2, the rail clamp device 9 of the brake truck 3 is released in step 3, the tow jack 4 is contracted in step 4, and The tow jack 4 is contracted to the maximum, and the segment assembly work is started in step 6. During the segment assembly work, the rail clamp device 9 of the tow truck 2 is released in step 7, the rail clamp device 9 of the brake truck 3 is locked in step 8, the tow jack 4 is extended in step 9, and the tow jack 4 in step 10. To the maximum extent, the tow truck 2 advances to the shield excavator body side and is in the start standby state.

【0011】[0011]

【発明の効果】以上説明したように本発明によるときは
後続台車本体にレールクランプ装置を備えた牽引台車と
ブレーキ台車とを前後に配置したものであるから、これ
ら牽引台車とブレーキ台車とのレールクランプ装置によ
るレールの掴持及び解除によって後続台車本体は移動で
き上述した従来例のようにシールド掘削機本体と後続台
車本体との間にワイヤロープが不要となるためシールド
掘削機本体内での作業が効率良く且つ安全に出来ると共
にセグメントの種類に関係なく後続台車本体を安全に運
行することができ、而もトンネルの施工地形が上り勾
配、下り勾配、あるいは左右にカーブする状態であって
も後続台車本体を安全に運行することができる等の効果
を有する。
As described above, according to the present invention, since the trailing carriage body is provided with the tow truck and the brake truck, which are provided with the rail clamp device, at the front and rear, the rails of the tow truck and the brake truck are arranged. The trailing trolley body can be moved by gripping and releasing the rail by the clamp device, so that no wire rope is required between the shield digging machine body and the succeeding trolley body as in the conventional example described above, so work inside the shield digging machine body is possible. Can be operated efficiently and safely, and the following bogie main body can be safely operated regardless of the type of segment, and even if the construction topography of the tunnel is uphill, downhill, or curved to the left or right It has the effect that the trolley body can be operated safely.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示す側面図である。FIG. 1 is a side view showing an embodiment of the present invention.

【図2】(a)は図1のA矢視断面図、(b)は図1の
B矢視断面図である。
2A is a sectional view taken along arrow A in FIG. 1, and FIG. 2B is a sectional view taken along arrow B in FIG.

【図3】スタート時の側面図である。FIG. 3 is a side view at the time of starting.

【図4】スタート時の平面図である。FIG. 4 is a plan view at the start.

【図5】移動中の平面図である。FIG. 5 is a plan view during movement.

【図6】移動終了時の平面図である。FIG. 6 is a plan view at the end of movement.

【図7】フローチャート図である。FIG. 7 is a flow chart diagram.

【図8】従来例の側面図である。FIG. 8 is a side view of a conventional example.

【図9】従来例の他の側面図である。FIG. 9 is another side view of the conventional example.

【符号の説明】[Explanation of symbols]

1 後続台車本体 2 牽引台車 3 ブレーキ台車 9 レールクランプ装置 1 Subsequent bogie body 2 Traction bogie 3 Brake bogie 9 Rail clamp device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 相川 潤一 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 内藤 潤 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Junichi Aikawa 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Jun Naito 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Within the corporation

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 シールド掘削機本体の後方に位置する後
続台車本体の前後に、それぞれレールクランプ装置を備
えた牽引台車とブレーキ台車とを配置したことを特徴と
するシールド掘削機の後続台車。
1. A trailing truck for a shield excavator, comprising a towing truck and a brake truck, each of which has a rail clamp device, disposed in front of and behind a trailing truck body located behind the shield excavator body.
JP07119892A 1995-05-18 1995-05-18 Trailer bogie of shield excavator Expired - Fee Related JP3140659B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07119892A JP3140659B2 (en) 1995-05-18 1995-05-18 Trailer bogie of shield excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07119892A JP3140659B2 (en) 1995-05-18 1995-05-18 Trailer bogie of shield excavator

Publications (2)

Publication Number Publication Date
JPH08312300A true JPH08312300A (en) 1996-11-26
JP3140659B2 JP3140659B2 (en) 2001-03-05

Family

ID=14772816

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07119892A Expired - Fee Related JP3140659B2 (en) 1995-05-18 1995-05-18 Trailer bogie of shield excavator

Country Status (1)

Country Link
JP (1) JP3140659B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098886A (en) * 1999-10-01 2001-04-10 Kumagai Gumi Co Ltd Recovery method and equipment for shield machine main unit
JP2010053653A (en) * 2008-08-29 2010-03-11 Ihi Corp Segment-conveying apparatus
CN103016051A (en) * 2012-12-14 2013-04-03 龙口矿业集团有限公司 Delivery chute barrier device
JP2014163034A (en) * 2013-02-21 2014-09-08 Kajima Corp Grounding method in tunnel construction
CN104564131A (en) * 2013-10-12 2015-04-29 北京中矿金岳能源科技有限公司 Mechanical carrying device of fully mechanized excavation face
CN112343612A (en) * 2020-09-23 2021-02-09 辽宁三三工业有限公司 Trolley wheel structure, track and trolley for enabling shield tunneling machine trolley to move along shield tunneling machine track

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098886A (en) * 1999-10-01 2001-04-10 Kumagai Gumi Co Ltd Recovery method and equipment for shield machine main unit
JP2010053653A (en) * 2008-08-29 2010-03-11 Ihi Corp Segment-conveying apparatus
CN103016051A (en) * 2012-12-14 2013-04-03 龙口矿业集团有限公司 Delivery chute barrier device
CN103016051B (en) * 2012-12-14 2016-06-22 龙口矿业集团有限公司 Delivery chute barrier device
JP2014163034A (en) * 2013-02-21 2014-09-08 Kajima Corp Grounding method in tunnel construction
CN104564131A (en) * 2013-10-12 2015-04-29 北京中矿金岳能源科技有限公司 Mechanical carrying device of fully mechanized excavation face
CN112343612A (en) * 2020-09-23 2021-02-09 辽宁三三工业有限公司 Trolley wheel structure, track and trolley for enabling shield tunneling machine trolley to move along shield tunneling machine track

Also Published As

Publication number Publication date
JP3140659B2 (en) 2001-03-05

Similar Documents

Publication Publication Date Title
JPH08312300A (en) Following truck of shield excavator
JP2857858B2 (en) Support mechanism for snowbrush device
US11518295B2 (en) Traction assist apparatus and method for a work machine
US2808160A (en) Vehicle hoisting and towing dolly
US2572636A (en) Self-propelled logging arch
US2506930A (en) Wagon loading mechanism
FI109669B (en) A method of detaching a tool to be retrieved from a replifier and a release member
JP3226471B2 (en) Vehicles
US3754505A (en) Method and apparatus for replacing a pair of rails
CN110834599B (en) Fault traction method for dump truck
JP3948195B2 (en) Test vehicle offset frontal collision test method and skater used to implement this method
JPH11107677A (en) Succeeding facility towing apparatus for tunnel driving machine
US3229644A (en) Railway car moving apparatus
CN210946941U (en) Novel sand pushing machine
JPH0524464A (en) Installation of railway trolley wire
SU1649098A1 (en) Arrangement for hauling rock from tunneling shield
CN107055263B (en) A kind of control method of the multi-angle oblique elevator with whole section of polygamy weight structure
JP3657320B2 (en) Inclined artificial ground creation device
JPH10218591A (en) Battery car for inserting new pipe in underground pipe
JPS5947762B2 (en) Prestressed bridge construction equipment
JPS6212665Y2 (en)
JPS6122953Y2 (en)
JP2004036693A (en) Method of laying conduit on slope, method of removing conduit from slope, and incline facility
KR100748298B1 (en) Landmine Avoidance Device and Principles
JPH0731544U (en) Single track carrier

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20001114

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees