JPH08274839A - Data reception regulating method for communication system overload - Google Patents

Data reception regulating method for communication system overload

Info

Publication number
JPH08274839A
JPH08274839A JP7071142A JP7114295A JPH08274839A JP H08274839 A JPH08274839 A JP H08274839A JP 7071142 A JP7071142 A JP 7071142A JP 7114295 A JP7114295 A JP 7114295A JP H08274839 A JPH08274839 A JP H08274839A
Authority
JP
Japan
Prior art keywords
overload
reception
communication system
state
control module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7071142A
Other languages
Japanese (ja)
Inventor
Sanae Hasegawa
早苗 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP7071142A priority Critical patent/JPH08274839A/en
Publication of JPH08274839A publication Critical patent/JPH08274839A/en
Pending legal-status Critical Current

Links

Landscapes

  • Communication Control (AREA)
  • Maintenance And Management Of Digital Transmission (AREA)

Abstract

PURPOSE: To prevent connection from being cut off by the overload state monitor time-out of an opposite connected station when the overload state of a present system is continued in a communication system provided with an overload detecting mechanism. CONSTITUTION: In the communication system provided with an overload control part 1 for performing the overload detection and overload control of the system, the overload control part 1 is provided with a temporary reception regulation cancel control module 3 for monitoring the time of overload continuation during the overload state of the system and when the overload state is continued for a long time, the reception regulation is temporarily canceled. Thus, the connection is prevented from being cut off by the overload state monitor time-out of the opposite connected station.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、過負荷検出機構を持つ
通信システムが、過負荷を通知する方法に関し、特に過
負荷状態監視タイムアウトによるコネクション切断を回
避するのに好適な通信システム過負荷時のデータ受信規
制方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of notifying an overload in a communication system having an overload detection mechanism, and particularly when a communication system overload is suitable for avoiding disconnection due to an overload state monitoring timeout. Data reception regulation method.

【0002】[0002]

【従来の技術】処理集中などにより通信システムがある
一定の過負荷状態になると、新たなデータ受信によって
さらに過負荷とならないように、全接続相手局に対して
各回線の手順に従った受信拒否通知を送信していた。例
えば国際電信電話諮問委員会(CCITT)勧告X.2
5では、パケット網との接続の過負荷時の動作として受
信可能状態となるまでRNRパケットを送信する事が規
定されている。従来の方式では、過負荷状態から回復す
るまでは受信不可能として受信拒否通知を送信してい
た。
2. Description of the Related Art When a certain amount of overload occurs in a communication system due to processing concentration or the like, reception is rejected according to the procedure of each line for all connected partner stations so as not to be overloaded by new data reception. I was sending a notification. For example, International Telegraph and Telephone Consultative Committee (CCITT) Recommendation X.2
In No. 5, it is stipulated that an RNR packet is transmitted until a receivable state is reached as an operation when the connection with the packet network is overloaded. In the conventional method, a reception refusal notification is transmitted as unreceivable until the overloaded state is recovered.

【0003】[0003]

【発明が解決しようとする課題】上記の従来技術は、通
信システムの過負荷状態から回復するまで相手局に対し
て受信可能通知を送信しないため、過負荷状態が長時間
継続した場合、過負荷状態監視機能を持つ接続相手局に
て過負荷状態監視タイムアウトが検知され、コネクショ
ンが切断されるという課題があった。本発明の目的は、
自システムの過負荷状態発生時にコネクション切断を回
避することにある。
In the above-mentioned prior art, since the receivable notification is not transmitted to the partner station until the overloaded state of the communication system is recovered, when the overloaded state continues for a long time, the overloaded state is overloaded. There was a problem that the connection partner station with the status monitoring function detected the overload status monitoring timeout and disconnected the connection. The purpose of the present invention is to
This is to avoid disconnection when the overload condition of the local system occurs.

【0004】[0004]

【課題を解決するための手段】上記の目的は、システム
の過負荷を検出する手段(図1の2、4)と、過負荷時
に受信規制する手段(図1の2、5)と、システムの過
負荷状態(受信規制)の継続時間を監視し受信規制を継
続/解除する手段(図1の3、5)とを備え、システム
の過負荷状態が長時間継続したとき、接続相手局で過負
荷状態監視タイムアウトが発生する前に相手局に対して
一時的に受信可能通知を送信することによって達成され
る。
Means for Solving the Problems The above-mentioned object is to provide means for detecting system overload (2, 4 in FIG. 1), means for restricting reception when overloaded (2, 5 in FIG. 1), and system. Means for monitoring the duration of the overload state (reception regulation) and continuing / releasing the reception regulation (3, 5 in FIG. 1), and when the system overload state continues for a long time, This is achieved by temporarily transmitting a receivable notification to the partner station before the overload state monitoring timeout occurs.

【0005】[0005]

【作用】本発明においては、過負荷制御モジュールは、
タイマ供給モジュールからの割り込みにより所定の周期
でシステム負荷を計算して受信処理部へ受信規制「開
始」あるいは「終了」指示を行うとともに、今回過負荷
状態になったと判断すると、一時受信規制解除制御モジ
ュールへ過負荷開始通知を行い、また前回に続いて過負
荷状態であると判断すると過負荷継続通知を行い、さら
に今回過負荷状態が回復したと判断するとその旨を通知
する。一方、一時受信規制解除制御モジュールは、受信
規制継続時間および受信規制解除継続時間を計測するた
めのタイマを有し、過負荷開始通知を受けるとタイマ起
動して一時受信規制「解除前」に設定し、また過負荷継
続通知を受けるとタイムアウトをチェックして受信処理
部へ受信規制「終了」あるいは「開始」指示を行うとと
もにタイマ起動して一時受信規制「解除中」あるいは
「解除前」に設定し、さらに過負荷回復通知を受けると
タイマ停止して「非過負荷状態」に設定する。こうし
て、自システムの負荷状態を正確に把握するとともに、
適切な受信規制を行うことができる。特に、自システム
の過負荷状態が長時間継続した場合、接続相手局の過負
荷状態監視タイムアウトによるコネクション切断を回避
できる。
In the present invention, the overload control module is
The system load is calculated at a predetermined cycle by an interrupt from the timer supply module, and the reception processing section is instructed to "start" or "end" the reception restriction, and if it is judged that the overload condition has occurred this time, the temporary reception restriction release control The overload start notification is sent to the module, and if it is determined that the overload state is continued after the previous time, the overload continuation notification is given, and if it is determined that the overload state is recovered this time, the fact is notified. On the other hand, the temporary reception regulation release control module has a timer for measuring the reception regulation duration time and the reception regulation release duration time, and when receiving the overload start notification, the timer is activated and the temporary reception regulation is set to “before cancellation”. In addition, when the overload continuation notification is received, the timeout is checked, the reception restriction “end” or “start” is instructed to the reception processing unit, and the timer is activated and the temporary reception restriction is set to “during release” or “before release”. When the overload recovery notification is received, the timer is stopped and the "non-overload state" is set. In this way, while accurately understanding the load status of the own system,
Appropriate reception restrictions can be made. In particular, when the overloaded state of the local system continues for a long time, it is possible to avoid disconnection due to the overloaded state monitoring timeout of the connected station.

【0006】[0006]

【実施例】本発明の一実施例を図1、図2、図3に示
す。図1は、過負荷検出機構をもつ通信システムの概要
図であって、システム内の過負荷制御部および受信処理
部のモジュール構造を示すものである。過負荷制御部1
は、一定期間ごとに通信システムの負荷の計算を行ない
過負荷か否かをチェックして受信規制開始、解除の制御
を行なう過負荷制御モジュール2、その過負荷制御モジ
ュール2に一定期間ごとにタイマ割り込みを供給するタ
イマ供給モジュール4、通信システム過負荷時に一時受
信規制解除の開始、終了の制御を行なう一時受信規制解
除制御モジュール3から成る。受信処理部5は、過負荷
制御モジュール2および一時受信規制解除制御モジュー
ル3からの指示を受けて回線に受信拒否通知および受信
可能通知を送信する。一時受信規制解除制御モジュール
3では、過負荷状態となってから一時受信規制解除する
までの監視を行なうタイマAと、一時受信規制解除して
から再び受信規制を開始するまでの監視を行なうタイマ
Bの二つのタイマを持ち、一時受信規制解除の開始、終
了の制御を行なう。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment of the present invention is shown in FIGS. FIG. 1 is a schematic diagram of a communication system having an overload detection mechanism, and shows a module structure of an overload control unit and a reception processing unit in the system. Overload control unit 1
Is an overload control module 2 that calculates the load of the communication system at regular intervals to check whether there is an overload and controls reception regulation start and cancellation, and a timer for the overload control module 2 at regular intervals. The timer supply module 4 for supplying an interrupt and the temporary reception restriction release control module 3 for controlling the start and end of the temporary reception restriction release when the communication system is overloaded. The reception processing unit 5 receives an instruction from the overload control module 2 and the temporary reception restriction release control module 3 and transmits a reception refusal notification and a reception enable notification to the line. In the temporary reception regulation release control module 3, a timer A that monitors from the overload state until the temporary reception regulation is released and a timer B that monitors from the temporary reception regulation release to the start of the reception regulation again. It has two timers, and controls the start and end of temporary reception restriction release.

【0007】このような通信システムの過負荷制御部1
における実施例について、過負荷制御モジュール2およ
び一時受信規制解除制御モジュール3の制御手順を図
2、図3のフローチャートを用いて説明する。まず、通
信システムの負荷の計算および過負荷か否かをチェック
して受信規制開始、解除の制御を行なう過負荷制御モジ
ュール2の処理を図2を用いて説明する。 S1…過負荷制御モジュール2は、タイマ供給モジュー
ル4からのタイマ割り込みにより一定期間毎に起動さ
れ、一定期間内の通信システム稼働時間を用いて通信シ
ステムの負荷を計算する。 S2、S3、S6…前回のタイマ割り込み時の過負荷状
態と今回のタイマ割り込み時の過負荷状態を比べて、通
信システムが過負荷状態に陥ったか過負荷状態から回復
したか過負荷状態のままかをチェックする。 S4、S5…通信システムが過負荷状態に陥った場合、
回線に受信拒否通知を送信するため受信処理部5に対し
て受信規制開始指示を出す。また、一時受信規制解除制
御モジュール3を起動して過負荷開始通知を出す。 S7、S8…通信システムが過負荷状態から回復した場
合、回線に受信可能通知を送信するため受信処理部5に
対して受信規制終了指示を出す。また、一時受信規制解
除制御モジュール3を起動して過負荷回復通知を出す。 S9…通信システムが過負荷状態のままであった場合、
一時受信規制解除制御モジュール3を起動して過負荷継
続通知を出す。 S10… 現在の通信システムの過負荷状態を覚えて、
過負荷制御モジュール2の処理を終了する。
Overload control unit 1 of such a communication system
The control procedure of the overload control module 2 and the temporary reception restriction release control module 3 will be described with reference to the flowcharts of FIGS. 2 and 3. First, the processing of the overload control module 2 for calculating the load of the communication system and checking whether or not there is an overload and controlling reception regulation start and cancellation will be described with reference to FIG. S1 ... The overload control module 2 is activated at regular intervals by a timer interrupt from the timer supply module 4, and calculates the load of the communication system using the communication system operating time within the constant period. S2, S3, S6 ... Compares the overload state at the time of the previous timer interrupt and the overload state at the time of this timer interrupt, and the communication system falls into the overload state, recovers from the overload state, or remains in the overload state. I will check. S4, S5 ... When the communication system is overloaded,
In order to transmit the reception refusal notification to the line, a reception regulation start instruction is issued to the reception processing unit 5. Further, the temporary reception restriction release control module 3 is activated to issue an overload start notification. S7, S8 ... When the communication system recovers from the overloaded state, a reception regulation end instruction is issued to the reception processing unit 5 in order to transmit a receivable notification to the line. Also, the temporary reception restriction release control module 3 is activated to issue an overload recovery notification. S9 ... If the communication system is still overloaded,
The temporary reception restriction release control module 3 is activated to issue the overload continuation notification. S10 ... Remember the current overloaded state of the communication system,
The processing of the overload control module 2 ends.

【0008】次に、通信システムの過負荷時に一時受信
規制解除の開始、終了の制御を行なう一時受信規制解除
制御モジュール3の処理を図3を用いて説明する。 S11…一時受信規制解除制御モジュール3は、通信シ
ステムの過負荷状態時に過負荷制御モジュール2により
一定期間毎に起動され、過負荷開始通知、過負荷継続通
知、過負荷回復通知を通知される。 S12…過負荷制御モジュール2からの通知が過負荷開
始通知の場合、タイマAを起動して一時的に受信規制を
解除するのを監視する。タイマAの値はシステムに接続
する相手局ごとに変更でき事前に設定されている。タイ
マAを起動後、過負荷制御モジュール2から過負荷継続
通知を受けるたびにタイムアウトしたかをチェックす
る。 S13…現在の一時受信規制解除状態が解除前であるこ
とを覚えて、処理を終了する。 S14、S15…過負荷制御モジュール2からの通知が
過負荷継続通知で、かつ現在の一時受信規制解除状態が
解除前の場合、タイマAがタイムアウトしたかをチェッ
クして、一時受信規制解除を開始するか否かをチェック
する。タイマAがタイムアウトしていない場合は、処理
を終了して引き続き受信規制解除を監視する。 S16…タイマAがタイムアウトした場合、一時的に受
信規制を解除するため、受信処理部5に対して受信規制
終了指示を出す。 S17…その後再び受信規制を開始するのを監視するた
めタイマBを起動する。タイマBの値はシステムに接続
する相手局ごとに変更でき事前に設定されている。タイ
マBを起動後、タイマAと同様に過負荷制御モジュール
2から過負荷継続通知を受けるたびにタイムアウトした
かをチェックする。 S18…現在の一時受信規制解除状態が解除中であるこ
とを覚えて、処理を終了する。 S14、S19…過負荷制御モジュール2からの通知が
過負荷継続通知で、かつ現在の一時受信規制解除状態が
解除中の場合、タイマBがタイムアウトしたかをチェッ
クして、再び受信規制を開始するか否かをチェックす
る。タイマBがタイムアウトしていない場合は、処理を
終了して引き続き受信規制開始を監視する。 S20…タイマBがタイムアウトした場合、一時受信規
制解除を終了させ再び受信規制を行うため、受信処理部
5に対して受信規制開始指示を出す。 S21…その後再度タイマAを起動して再び一時受信規
制解除するまでを監視する。 S22…現在の一時受信規制解除状態を解除前に戻し
て、処理を終了する。 S23、S24…過負荷制御モジュール2からの通知が
過負荷回復通知の場合、一時受信規制解除の開始、終了
を監視しているタイマAおよびタイマBを停止する。 S25…現在の通信システムの過負荷状態が非過負荷状
態であることを覚えて、処理を終了する。
Next, the processing of the temporary reception restriction release control module 3 which controls the start and end of the temporary reception restriction release when the communication system is overloaded will be described with reference to FIG. S11 ... The temporary reception restriction release control module 3 is activated by the overload control module 2 at regular intervals when the communication system is overloaded, and is notified of an overload start notification, an overload continuation notification, and an overload recovery notification. S12 ... When the notification from the overload control module 2 is an overload start notification, the timer A is started to monitor whether the reception restriction is temporarily released. The value of the timer A can be changed for each partner station connected to the system and is preset. After starting the timer A, each time it receives the overload continuation notification from the overload control module 2, it is checked whether it has timed out. S13 ... The process is terminated by remembering that the current temporary reception restriction release state is before release. S14, S15 ... If the notification from the overload control module 2 is an overload continuation notification and the current temporary reception restriction release state is before release, it is checked whether the timer A has timed out and the temporary reception restriction release is started. Check whether to do or not. If the timer A has not timed out, the processing is terminated and the reception restriction release is continuously monitored. S16 ... When the timer A times out, a reception restriction end instruction is issued to the reception processing unit 5 to temporarily cancel the reception restriction. S17 ... Then, the timer B is activated to monitor the start of the reception regulation again. The value of the timer B can be changed for each partner station connected to the system and is preset. After starting the timer B, like the timer A, each time it receives the overload continuation notification from the overload control module 2, it is checked whether a time-out has occurred. S18 ... The process is ended by remembering that the current temporary reception restriction release state is being released. S14, S19 ... When the notification from the overload control module 2 is the overload continuation notification and the current temporary reception restriction release state is being released, it is checked whether the timer B has timed out and the reception restriction is started again. Check whether or not. If the timer B has not timed out, the processing is terminated and the reception regulation start is continuously monitored. S20 ... When the timer B times out, the reception restriction start instruction is issued to the reception processing unit 5 in order to end the temporary reception restriction release and perform the reception restriction again. S21 ... Then, the timer A is started again, and the process until the temporary reception restriction release is monitored again. S22 ... The current temporary reception restriction release state is returned to the state before the release, and the process ends. S23, S24 ... When the notification from the overload control module 2 is an overload recovery notification, the timer A and the timer B that monitor the start and end of the temporary reception restriction release are stopped. S25 ... Remember that the current overloaded state of the communication system is the non-overloaded state, and the process ends.

【0009】[0009]

【発明の効果】以上述べたように、過負荷検出機構を持
つ通信システムにおいて、自システムの過負荷状態継続
時に、接続相手局の過負荷状態監視タイムアウトによる
コネクション切断を回避できる。
As described above, in the communication system having the overload detection mechanism, it is possible to avoid the disconnection due to the overload state monitoring time-out of the connection partner station when the overload state of the own system continues.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例における過負荷検出機構をも
つ通信システムの概要図である。
FIG. 1 is a schematic diagram of a communication system having an overload detection mechanism according to an embodiment of the present invention.

【図2】本発明の一実施例における過負荷制御モジュー
ルの処理を示すフローチャートである。
FIG. 2 is a flowchart showing processing of an overload control module according to an embodiment of the present invention.

【図3】本発明の一実施例における一時受信規制解除制
御モジュールの処理を示すフローチャートである。
FIG. 3 is a flowchart showing a process of a temporary reception restriction release control module according to an embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1…過負荷制御部、2…過負荷制御モジュール、3…一
時受信規制解除制御モジュール、4…タイマ供給モジュ
ール、5…受信処理部。
DESCRIPTION OF SYMBOLS 1 ... Overload control part, 2 ... Overload control module, 3 ... Temporary reception regulation release control module, 4 ... Timer supply module, 5 ... Reception processing part.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 システムの過負荷を検出する手段と、過
負荷時に受信規制する手段とを備えた通信システムのデ
ータ受信規制方法において、 システムの過負荷の継続時間を監視する手段を設け、 システムの過負荷を検出した場合は受信規制を行うとと
もに過負荷継続時間を監視し、過負荷が一定時間継続し
た場合には、受信規制を一時解除し相手局に対して受信
可能通知を送信することを特徴とする通信システム過負
荷時のデータ受信規制方法。
1. A data reception regulation method for a communication system comprising means for detecting system overload and means for regulating reception when the system is overloaded, and means for monitoring the duration of system overload is provided. If an overload is detected, the reception restriction is performed and the overload duration time is monitored. If the overload continues for a certain period of time, the reception restriction is temporarily released and a receivable notification is sent to the partner station. A method for regulating data reception when a communication system is overloaded.
JP7071142A 1995-03-29 1995-03-29 Data reception regulating method for communication system overload Pending JPH08274839A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7071142A JPH08274839A (en) 1995-03-29 1995-03-29 Data reception regulating method for communication system overload

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7071142A JPH08274839A (en) 1995-03-29 1995-03-29 Data reception regulating method for communication system overload

Publications (1)

Publication Number Publication Date
JPH08274839A true JPH08274839A (en) 1996-10-18

Family

ID=13452055

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7071142A Pending JPH08274839A (en) 1995-03-29 1995-03-29 Data reception regulating method for communication system overload

Country Status (1)

Country Link
JP (1) JPH08274839A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100385137B1 (en) * 1999-11-05 2003-05-22 엘지전자 주식회사 apparatus and method for overload control between call control agent and gateway in network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100385137B1 (en) * 1999-11-05 2003-05-22 엘지전자 주식회사 apparatus and method for overload control between call control agent and gateway in network

Similar Documents

Publication Publication Date Title
JPH098804A (en) Terminal management method, management terminal equipment and communication terminal equipment
JPH08274839A (en) Data reception regulating method for communication system overload
JPS63159785A (en) Time correcting method for terminal equipment
JP3651883B2 (en) Simultaneous command control device
JPH05160866A (en) Portable isdn communication terminal equipment
JPH0369226A (en) Special traffic treatment in communication processor
JPH09172436A (en) Line control system
JP2922364B2 (en) Packet switching system
JPH07273762A (en) Communication equipment
JP2964970B2 (en) Circuit release method and apparatus for DAMA satellite communication system
JP3162204B2 (en) Error recovery method for local network system
JP2656655B2 (en) Data transmission equipment
JPH04255166A (en) Communication equipment
JPS62213457A (en) Recalling control device for communication equipment
JP3100464B2 (en) Packet switch
JPH06120985A (en) Packet line backup system
JPH03117945A (en) Communication equipment using hdlc procedure
JPH0364225A (en) Communication controller using high level data link control procedure
JP3650942B2 (en) Facsimile device
JPH08317463A (en) Voice and data radio communication equipment
JP2569075B2 (en) Subscriber line termination device and terminal state control method
JP2828130B2 (en) Facsimile adapter device
JPS6313385B2 (en)
JP2595130B2 (en) Remote monitoring and control system
JP2972633B2 (en) Communication terminal device