JPH08269960A - Elevation device for working platform for pile constructing machine - Google Patents

Elevation device for working platform for pile constructing machine

Info

Publication number
JPH08269960A
JPH08269960A JP7672995A JP7672995A JPH08269960A JP H08269960 A JPH08269960 A JP H08269960A JP 7672995 A JP7672995 A JP 7672995A JP 7672995 A JP7672995 A JP 7672995A JP H08269960 A JPH08269960 A JP H08269960A
Authority
JP
Japan
Prior art keywords
arm member
workbench
platform
guide rail
drive mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7672995A
Other languages
Japanese (ja)
Inventor
Tatsuo Ito
達雄 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP7672995A priority Critical patent/JPH08269960A/en
Publication of JPH08269960A publication Critical patent/JPH08269960A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: To improve the easiness in executing works or performing operations in a narrow place. CONSTITUTION: An auger driving mechanism is installed in engagement in such a way as elevating and sinking along the first guide rails 8, 10 furnished on a leader 2 installed in upright attitude. The arrangement further includes a working platform 70 equipped with a moving table 42 supported movably along the second guide rails 36, 38 furnished on the leader 2 parallel with the first guide rails 8, 10, an arm 60 supported rotatably on the moving table 42, and a table 64 which is supported on the arm 60 rotatably. Wires 48, 50 are fastened to the moving table 42 and hung down by a winch.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、オーガ駆動機構やハン
マ機構等の施工機構による杭施工時の補助作業や、施工
機構の保守・点検作業等に用いられる作業台を昇降する
杭施工機用作業台昇降装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is for a pile construction machine for raising and lowering a workbench used for auxiliary work when constructing a pile by a construction mechanism such as an auger drive mechanism and a hammer mechanism, and for maintenance and inspection work of the construction mechanism. The present invention relates to a workbench elevator.

【0002】[0002]

【従来の技術】従来より、実公昭57−26926号公
報にあるように、リーダに沿って設けた断面六角のガイ
ド軸に作業台を昇降自在に装着し、作業台をウインチに
より吊下げると共に、ガイド軸を回転させる機構を備え
たものが知られている。
2. Description of the Related Art Conventionally, as disclosed in Japanese Utility Model Publication No. 57-26926, a workbench is vertically mounted on a guide shaft having a hexagonal cross section provided along a leader, and the workbench is suspended by a winch. A device having a mechanism for rotating a guide shaft is known.

【0003】また、特開平5−331855号公報にあ
るように、リーダに設けられたガイドフレームに沿って
作業台を昇降可能に支持し、作業台に一端を締結したワ
イヤをシーブに巻回した後、車体上のドラムに巻取り、
作業台を昇降させると共に、リーダを傾けたときには、
作業台の床面を傾斜させることができるように構成した
ものが知られている。
As disclosed in Japanese Patent Laid-Open No. 5-331855, a workbench is supported so that it can be raised and lowered along a guide frame provided on a leader, and a wire having one end fastened to the workbench is wound around a sheave. After that, wind it up on the drum on the car body,
When raising and lowering the workbench and tilting the leader,
It is known that the floor of the workbench can be tilted.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、こうし
た従来のものでは、オーガ駆動機構やハンマ機構等の施
工機構とオーガドリルや杭との接続等をする補助作業、
施工機構の保守・点検作業等をしやすくするために、作
業台を大きくすると、実公昭57−26926号公報に
あるように、作業台をガイド軸の廻りに旋回させた場
合、旋回のための広い空間を必要とする。その為、杭施
工場所が狭いと、作業台が隣の建物の壁に当たったりし
て、作業台を大きくするにも限界があった。また、作業
性の点からは、作業台は施工機構に接近して形成するの
がよいが、特開平5−331855号公報にあるよう
に、作業台が旋回しないものでは、施工機構の昇降の際
に、施工機構と作業台とが干渉してしまい、施工機構を
昇降させる毎に、作業台を外さなければならなくなり、
この点からも作業台を大きくするには限界があるという
問題があった。
However, in such a conventional one, an auxiliary work for connecting a construction mechanism such as an auger drive mechanism or a hammer mechanism to an auger drill or a pile,
When the workbench is enlarged to facilitate the maintenance and inspection work of the construction mechanism, the workbench is rotated around the guide shaft as described in Japanese Utility Model Publication No. 57-26926. It requires a large space. Therefore, if the pile construction site is small, the work table hits the wall of the adjacent building, and there is a limit to making the work table large. Further, from the viewpoint of workability, it is preferable that the workbench be formed close to the construction mechanism, but as described in JP-A-5-331855, when the workbench is not swivel, the construction mechanism is lifted or lowered. At that time, the construction mechanism interferes with the workbench, and the workbench has to be removed every time the construction mechanism is moved up and down.
From this point as well, there is a problem that there is a limit to how large the workbench can be.

【0005】そこで本発明は上記の課題を解決すること
を目的とし、狭い場所での施工や作業性の改善を図った
杭施工機用作業台昇降装置を提供することにある。
SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a work platform elevating / lowering device for a pile construction machine, which aims to solve the above-mentioned problems and to improve the workability and the workability in a narrow place.

【0006】[0006]

【課題を解決するための手段】かかる目的を達成すべ
く、本発明は課題を解決するための手段として次の構成
を取った。即ち、立設されるリーダに設けられた第1ガ
イドレールに沿って施工機構を昇降させる杭施工機にお
いて、前記第1ガイドレールと平行に前記リーダに設け
られた第2ガイドレールに沿って移動可能に支持された
移動台と、該移動台に回転可能に支持されたアーム部材
と、該アーム部材に回転可能に支持された搭乗台とを有
する作業台を設け、該作業台を昇降させる駆動機構を備
えたことを特徴とする杭施工機用作業台昇降装置の構成
がそれである。
In order to achieve such an object, the present invention has the following constitution as means for solving the problem. That is, in a pile construction machine that raises and lowers a construction mechanism along a first guide rail provided on a standing leader, moves along a second guide rail provided on the leader in parallel with the first guide rail. A worktable having a movable table supported movably, an arm member rotatably supported by the movable table, and a platform rotatably supported by the arm member, and a drive for raising and lowering the work table This is the structure of a work platform lifting device for a pile construction machine, which is equipped with a mechanism.

【0007】また、前記駆動機構はウインチで、該ウイ
ンチからのワイヤを前記移動台に締結して前記作業台を
吊下げた構成としてもよい。あるいは、前記アーム部材
は前記移動台に前記第2ガイドレールと平行な軸の廻り
に回転可能に支持されると共に、前記搭乗台は前記アー
ム部材に前記第2ガイドレールと平行な軸の廻りに回転
可能に支持された構成としてもよい。
The drive mechanism may be a winch, and a wire from the winch may be fastened to the movable table to suspend the work table. Alternatively, the arm member is rotatably supported on the movable base about an axis parallel to the second guide rail, and the mount base is mounted on the arm member about an axis parallel to the second guide rail. It may be rotatably supported.

【0008】更に、前記アーム部材は前記移動台に前記
第2ガイドレールと直交する軸の廻りに回転可能に支持
されると共に、前記搭乗台は前記アーム部材に前記第2
ガイドレールと直交する軸の廻りに回転可能に支持さ
れ、かつ、前記搭乗台を水平に保ちながら移動させる駆
動機構を備えた構成としてもよい。
Further, the arm member is rotatably supported by the movable base about an axis orthogonal to the second guide rail, and the mount base is mounted on the arm member by the second arm.
It may be configured to include a drive mechanism that is rotatably supported around an axis orthogonal to the guide rail and that moves the platform while keeping the platform horizontal.

【0009】前記駆動機構は、前記移動台に前記第2ガ
イドレールと直交して取り付けられ前記アーム部材を回
転可能に支持する第1固定軸に固定した第1スプロケッ
トと、前記搭乗台に前記第2ガイドレールと直交して取
り付けられ前記アーム部材に回転可能に挿入された第2
固定軸に固定した第2スプロケットと、前記両スプロケ
ット間に張設されたチェーンとを備え、前記アーム部材
に固定したモータの回転軸を前記第2固定軸に連結した
構成としてもよい。
The driving mechanism includes a first sprocket fixed to a first fixed shaft that is attached to the moving base orthogonally to the second guide rail and rotatably supports the arm member, and the first mounting sprocket to the mounting base. 2nd which is attached orthogonally to 2 guide rails and is rotatably inserted in said arm member
A configuration may be adopted in which a second sprocket fixed to a fixed shaft and a chain stretched between the two sprockets are provided, and a rotation shaft of a motor fixed to the arm member is connected to the second fixed shaft.

【0010】[0010]

【作用】前記構成を有する杭施工機用作業台昇降装置
は、駆動機構により作業台を第2ガイドレールに沿って
昇降させ、搭乗台を移動させて施工機構に接近させる。
また、移動台にウインチからのワイヤを締結したもので
は、ウインチにより移動台を介して作業台を昇降させ
る。更に、アーム部材と搭乗台とを第2ガイドレールと
平行な軸の廻りに回転可能に支持したものでは、アーム
部材と搭乗台とを第2ガイドレールと平行な軸の廻りに
回転させて、搭乗台を移動し施工機構に接近させる。
In the work platform elevating / lowering device for pile construction machine having the above-described structure, the work platform is moved up and down along the second guide rail by the drive mechanism, and the boarding platform is moved to approach the construction system.
Further, in the case where the wire from the winch is fastened to the moving table, the winch raises and lowers the work table via the moving table. Furthermore, in the case where the arm member and the platform are rotatably supported around an axis parallel to the second guide rail, the arm member and the platform are rotated around an axis parallel to the second guide rail, Move the boarding platform to approach the construction mechanism.

【0011】あるいは、アーム部材と搭乗台とを第2ガ
イドレールと直交する軸の廻りに回転可能に支持したも
のでは、駆動機構が搭乗台を水平を保ちながら移動させ
て施工機構に接近させる。駆動機構がスプロケット間に
チェーンを張設したものでは、モータの回転により搭乗
台を水平を保ちながら移動させて施工機構に接近させ
る。
Alternatively, in the case where the arm member and the platform are rotatably supported about an axis orthogonal to the second guide rail, the drive mechanism moves the platform while keeping the platform horizontal to approach the construction mechanism. In the case where the drive mechanism has a chain stretched between sprockets, rotation of the motor moves the boarding platform while keeping it horizontal to approach the construction mechanism.

【0012】[0012]

【実施例】以下本発明の実施例を図面に基づいて詳細に
説明する。図1,図2に示すように、1はクローラによ
る自走式の杭施工機本体で、リーダ2が一対のステー4
及びキャッチングホーク6によって起倒自在に支持され
ると共に、リーダ2をその軸の廻りに旋回させることが
できるように支持されている。
Embodiments of the present invention will now be described in detail with reference to the drawings. As shown in FIGS. 1 and 2, reference numeral 1 is a self-propelled pile construction machine main body using a crawler, and a leader 2 is a pair of stays 4
The catching hawk 6 supports the leader 2 so that the leader 2 can be swung up and down, and the leader 2 can be swung around its axis.

【0013】リーダ2にはその長手方向に沿って断面円
形の長尺状の2本の第1ガイドレール8,10が敷設さ
れており(図3参照)、第1ガイドレール8,10に
は、オーガ駆動機構12が複数のガイドギブ14を介し
て、第1ガイドレール8,10に沿って摺動可能に係合
されている。オーガ駆動機構12は、後述する回転軸7
2に取り付けられるオーガドリル16を回転駆動するよ
うに構成されている。
Two long first guide rails 8 and 10 having a circular cross section are laid along the longitudinal direction of the leader 2 (see FIG. 3). The first guide rails 8 and 10 are provided on the first guide rails 8 and 10. The auger drive mechanism 12 is slidably engaged with the first guide rails 8 and 10 via a plurality of guide gibs 14. The auger drive mechanism 12 includes a rotary shaft 7 described later.
It is configured to rotationally drive the auger drill 16 attached to the No. 2.

【0014】また、オーガ駆動機構12に連結された押
込機構18が、第1ガイドレール8,10に複数のガイ
ドギブ20を介して、第1ガイドレール8,10に沿っ
て摺動可能に係合されている。押込機構18は、杭71
に軸方向押込力を付与する構成のものである。
Further, the pushing mechanism 18 connected to the auger drive mechanism 12 is slidably engaged with the first guide rails 8 and 10 through the plurality of guide gibs 20 along the first guide rails 8 and 10. Has been done. The pushing mechanism 18 is a pile 71.
It is configured such that an axial pushing force is applied to the.

【0015】オーガ駆動機構12には、吊りシーブ22
が回転可能に支持されており、ワイヤ24の一端は、リ
ーダ2の上端に止結されると共に、複数枚の吊りシーブ
22とリーダ2の上端に回転可能に支持された複数枚の
シーブ26とに巻き掛けられた後、リーダ2の上端に回
転可能に支持されたシーブ28に掛け渡されている。
The auger drive mechanism 12 includes a hanging sheave 22.
Is rotatably supported, one end of the wire 24 is fastened to the upper end of the leader 2, and a plurality of hanging sheaves 22 and a plurality of sheaves 26 rotatably supported on the upper end of the leader 2. After being wrapped around, the sheave 28 is rotatably supported on the upper end of the leader 2.

【0016】更に、ワイヤ24は、リーダ2の中間に回
転可能に支持されたシーブ30を介して、杭施工機本体
1に設けられた主ウインチ32の回転ドラム34に巻回
され、主ウインチ32の駆動によりオーガ駆動機構1
2、押込機構18を昇降させることができるように構成
されている。
Further, the wire 24 is wound around a rotary drum 34 of a main winch 32 provided in the pile construction machine main body 1 via a sheave 30 rotatably supported in the middle of the leader 2, and the main winch 32 is provided. Driven by auger drive mechanism 1
2. The pushing mechanism 18 can be moved up and down.

【0017】また、リーダ2には、図3に示すように、
第1ガイドレール8,10と平行に断面円形の第2ガイ
ドレール36,38が敷設されており、第2ガイドレー
ル36,38には、複数のガイドギブ40を介して、移
動台42が第2ガイドレール36,38に沿って摺動可
能に係合されている。
Further, as shown in FIG.
Second guide rails 36 and 38 having a circular cross section are laid parallel to the first guide rails 8 and 10. The second guide rails 36 and 38 are provided with a movable table 42 secondly via a plurality of guide gibs 40. It is slidably engaged along the guide rails 36 and 38.

【0018】この移動台42には、2本のワイヤ48,
50の一端が締結されており、ワイヤ48,50は、リ
ーダ2の上端に回転可能に支持された一対のシーブ5
2,54に掛け渡されて、リーダ2の下端側面に取り付
けられた作業台用ウインチ56のドラム58に巻回され
ている。
This moving table 42 has two wires 48,
One end of 50 is fastened, and the wires 48 and 50 are rotatably supported on the upper end of the reader 2 by a pair of sheaves 5.
2, 54, and is wound around a drum 58 of a workbench winch 56 attached to the lower end side surface of the leader 2.

【0019】移動台42には、図4に示すように、アー
ム部材60が第2ガイドレール36,38と平行な支持
軸62により、支持軸62の廻りに回転可能に支持され
ている。支持軸62は、移動台42のオーガ駆動機構1
2側の端に、配置されている。また、アーム部材60の
先端には、搭乗台64が同じく第2ガイドレール36,
38と平行な支持軸66により、支持軸66の廻りに回
転可能に支持されている。
As shown in FIG. 4, an arm member 60 is supported on the movable table 42 by a support shaft 62 parallel to the second guide rails 36 and 38 so as to be rotatable around the support shaft 62. The support shaft 62 is the auger drive mechanism 1 of the movable table 42.
It is arranged at the end on the second side. In addition, at the tip of the arm member 60, the boarding platform 64 is also provided with the second guide rails 36,
A support shaft 66 parallel to the shaft 38 rotatably supports the support shaft 66.

【0020】搭乗台64は、作業者が搭乗できる平坦な
床68と床68の四囲を囲う柵部材69とを備え、少な
くとも作業者一人が搭乗できる広さの床面積があればよ
い。アーム部材60は、本実施例では、略[L」字状に
形成されており、図4に実線で示すように、アーム部材
60の先端が搭乗台64の端に支持軸66により支持さ
れている。
The boarding platform 64 includes a flat floor 68 on which an operator can board and a fence member 69 that surrounds the four floors of the floor 68, and has a floor area large enough for at least one operator to board. In the present embodiment, the arm member 60 is formed in a substantially [L] shape, and the tip end of the arm member 60 is supported by the support shaft 66 at the end of the platform 64 as shown by the solid line in FIG. There is.

【0021】支持軸66の廻りに回転させると、搭乗台
64をアーム部材60の内側に抱え込み、搭乗台64及
びアーム部材60がコンパクトに折り畳まれた格納位置
に移動されるように構成されている。しかも、この格納
位置にあるときに、オーガ駆動機構12及び押込機構1
8を昇降させても、作業台70とオーガ駆動機構12及
び押込機構18とが干渉することがないように構成され
ている。逆方向に回転させたときには、搭乗台64がリ
ーダ2から大きく張り出すように構成されている。
When rotated around the support shaft 66, the platform 64 is held inside the arm member 60, and the platform 64 and the arm member 60 are moved to a compactly folded storage position. . Moreover, when in the storage position, the auger drive mechanism 12 and the pushing mechanism 1
The workbench 70 does not interfere with the auger drive mechanism 12 and the pushing mechanism 18 even when the work piece 8 is moved up and down. When rotated in the opposite direction, the boarding platform 64 is configured to largely project from the reader 2.

【0022】また、アーム部材60を支持軸62の廻り
に回転させると、図5に示すように、アーム部材60が
オーガ駆動機構12、押込機構18の側面を廻り込むよ
うにして、搭乗台64がオーガ駆動機構12、押込機構
18のほぼ正面側の作業位置に移動させることができる
ように構成されている。
When the arm member 60 is rotated around the support shaft 62, as shown in FIG. 5, the arm member 60 wraps around the side surfaces of the auger drive mechanism 12 and the pushing mechanism 18, so that the platform 64 is augered. The drive mechanism 12 and the push-in mechanism 18 are configured so that they can be moved to a work position substantially on the front side.

【0023】尚、本実施例では、ガイドギブ40、移動
台42、アーム部材60、搭乗台64により作業台70
が構成されている。また、各支持軸62,66にモータ
を取り付けてモータの回転によりアーム部材60及び搭
乗台64をそれぞれ各支持軸62,66の廻りに回転さ
せることができるように構成してもよい。更に、アーム
部材60は、第1アーム部材と第2アーム部材とを前記
支持軸62,66と平行な別の支持軸により回転可能に
連結した2本のアーム部材から構成されるものであって
も実施可能である。アーム部材60の形状は、略「L」
字状に限られるものではなく、施工機構としてのオーガ
駆動機構12と押込機構18との外形形状や、移動台4
2等に応じて、コンパクトに折り畳まれた格納位置とオ
ーガ駆動機構12と押込機構18とに接近した作業位置
との間で搭乗台64を移動することができる形状であれ
ばよい。尚、押込機構18は、中掘り杭工法の際に用い
られるもので、必要に応じて設ければよい。
In this embodiment, the workbench 70 is composed of the guide gib 40, the moving table 42, the arm member 60, and the board 64.
Is configured. A motor may be attached to each of the support shafts 62 and 66 so that the arm member 60 and the platform 64 can be rotated around each of the support shafts 62 and 66 by the rotation of the motor. Further, the arm member 60 is composed of two arm members in which the first arm member and the second arm member are rotatably connected by another supporting shaft parallel to the supporting shafts 62 and 66. Can also be implemented. The shape of the arm member 60 is substantially “L”.
The shape is not limited to the letter shape, and the outer shapes of the auger drive mechanism 12 and the pushing mechanism 18 as the construction mechanism and the moving table 4 are not limited thereto.
The shape may be such that the loading platform 64 can be moved between the compactly folded storage position and the working position close to the auger drive mechanism 12 and the push-in mechanism 18 in accordance with 2 or the like. The push-in mechanism 18 is used in the case of the underground digging pile construction method, and may be provided as necessary.

【0024】次に、前述した本実施例の杭施工機用作業
台昇降装置の作動について、中掘り杭工法による施工を
例に説明する。オーガ駆動機構12により、杭71の中
空内部に挿入したオーガドリル16を回転させながら、
押込機構18により軸方向に押圧力を付与して杭71を
建て込む。そして、所定深さに建込むと、オーガ駆動機
構12と押込機構18とを主ウインチ32を駆動して第
1ガイドレール8,10に沿って上昇させる。次に、新
たな杭71を継ぎ足すと共に、オーガドリル16同士を
接続する。
Next, the operation of the work platform elevating / lowering device for the pile construction machine according to the present embodiment described above will be described by taking an example of construction by the hollow digging pile construction method. While rotating the auger drill 16 inserted into the hollow inside of the pile 71 by the auger drive mechanism 12,
A pushing force is applied in the axial direction by the pushing mechanism 18 to build the pile 71. Then, when it is installed to a predetermined depth, the auger drive mechanism 12 and the push-in mechanism 18 drive the main winch 32 to raise it along the first guide rails 8 and 10. Next, a new pile 71 is added and the auger drills 16 are connected to each other.

【0025】そして、リーダ2の下端にまで下降され、
格納位置にある搭乗台64に作業者が搭乗し、作業台用
ウインチ56を駆動して、作業台70を第2ガイドレー
ル36,38に沿ってオーガドリル16の先端近傍にま
で上昇させる。このとき、地上側の別の作業者が、作業
台70上の作業者の指示にしたがって、作業台用ウイン
チ56を操作してもよく、あるいは、作業台70上の作
業者が、作業台70上で遠隔操作してもよい。
Then, the reader 2 is lowered to the lower end,
An operator rides on the platform 64 at the storage position, drives the platform winch 56, and raises the platform 70 near the tip of the auger drill 16 along the second guide rails 36 and 38. At this time, another worker on the ground may operate the workbench winch 56 according to the instruction of the worker on the workbench 70, or the worker on the workbench 70 may operate the workbench 70. It may be operated remotely on the above.

【0026】次に、作業台70上の作業者が、地上側の
別の作業者に指示して主ウインチ32を操作させ、オー
ガ駆動機構12を下降させる。その際、作業台70上の
作業者は、まず、格納位置から支持軸66の廻りに搭乗
台64を回転させ、図4に二点鎖線で示すように、搭乗
台64を外側に張り出す。そして、支持軸62の廻りに
アーム部材60を回転させ、図5に実線で示すように、
搭乗台64を移動してオーガ駆動機構12の正面側に廻
り込むようにして、オーガ駆動機構12に接近した作業
位置に移動させる。
Next, the operator on the workbench 70 instructs another operator on the ground side to operate the main winch 32 and lower the auger drive mechanism 12. At this time, the worker on the workbench 70 first rotates the boarding platform 64 from the storage position around the support shaft 66, and projects the boarding platform 64 to the outside as shown by the chain double-dashed line in FIG. Then, the arm member 60 is rotated around the support shaft 62, and as shown by the solid line in FIG.
The platform 64 is moved to wrap around the front side of the auger drive mechanism 12, and is moved to a work position close to the auger drive mechanism 12.

【0027】例えば、接続作業では、オーガ駆動機構1
2の回転軸72に形成された6角孔にオーガドリル16
の先端の6角軸を挿入するので、回転軸72とオーガド
リル16との位相を合わせて接続する必要がある。その
とき、作業者は、地上の作業者に回転軸72のインチン
グ操作を指示しながら、位相が合うように、オーガドリ
ル16を動かしたりして芯を合わせる。オーガドリル1
6を挿入した後、作業台70上の作業者は、回転軸72
のピン挿入孔74に連結ピン76をハンマー等で打ち込
み挿入する。
For example, in connection work, the auger drive mechanism 1
The auger drill 16 is inserted in the hexagonal hole formed in the rotary shaft 72 of
Since the hexagonal shaft at the tip of is inserted, the rotary shaft 72 and the auger drill 16 must be connected in phase with each other. At that time, the operator instructs the operator on the ground to perform an inching operation of the rotary shaft 72, and moves the auger drill 16 or the like so that the phases are aligned with each other. Auger drill 1
After inserting 6, the operator on the workbench 70 moves the rotary shaft 72
The connecting pin 76 is inserted into the pin insertion hole 74 by hammering or the like.

【0028】次に、接続作業終了後は、支持軸62の廻
りにアーム部材60を回転させ、図5に二点鎖線で示す
ように、搭乗台64をオーガ駆動機構12から遠ざけ
て、オーガ駆動機構12の側面側に移動させる。更に、
図4に実線で示すように、支持軸66の廻りに搭乗台6
4を回転させ、搭乗台64をアーム部材60の内側の格
納位置に移動させて、作業台70を格納してから、作業
台用ウインチ56を駆動して、作業台70を降下させ
る。
After the connection work is completed, the arm member 60 is rotated around the support shaft 62 to move the platform 64 away from the auger drive mechanism 12 and drive the auger as shown by the chain double-dashed line in FIG. The mechanism 12 is moved to the side surface side. Furthermore,
As shown by the solid line in FIG. 4, the platform 6 is mounted around the support shaft 66.
4 is rotated to move the boarding platform 64 to the storage position inside the arm member 60 to store the workbench 70, and then the workbench winch 56 is driven to lower the workbench 70.

【0029】そして、前述したようにオーガ駆動機構1
2を駆動してオーガドリル16を回転させながら、杭7
1を建て込む。オーガ駆動機構12を下降させても、オ
ーガ駆動機構12が作業台70に干渉することがなく、
第2ガイドレール36,38に作業台70を支持した状
態のままでも、オーガ駆動機構12を所定の位置にまで
支障なく下降させることができる。
Then, as described above, the auger drive mechanism 1
While driving 2 to rotate the auger drill 16, pile 7
Build 1. Even if the auger drive mechanism 12 is lowered, the auger drive mechanism 12 does not interfere with the workbench 70,
Even with the worktable 70 supported on the second guide rails 36 and 38, the auger drive mechanism 12 can be lowered to a predetermined position without any trouble.

【0030】このように、作業者は、搭乗台64を移動
させてオーガ駆動機構12に接近させ、オーガ駆動機構
12の回転軸72とオーガドリル16との接続作業やオ
ーガ駆動機構12及び押込機構18の保守・点検作業等
を容易に効率よく行うことができる。しかも、搭乗台6
4を移動させて格納すると、オーガ駆動機構12及び押
込機構18を昇降させても、干渉することがなく、杭施
工作業に支障が生じることはない。
In this way, the operator moves the platform 64 to approach the auger drive mechanism 12, connects the rotary shaft 72 of the auger drive mechanism 12 and the auger drill 16, and the auger drive mechanism 12 and the pushing mechanism. It is possible to easily and efficiently perform the maintenance and inspection work of 18. Moreover, boarding platform 6
When 4 is moved and stored, even if the auger drive mechanism 12 and the pushing mechanism 18 are moved up and down, there is no interference and no hindrance to the pile construction work.

【0031】また、搭乗台64は、1人が搭乗できる小
型のものでよく、両支持軸62,66の廻りに回転させ
て、搭乗台64ごと広い範囲で移動できる。しかも、格
納位置に移動すると、コンパクトに格納され、狭い場所
での施工も可能となる。更に、ワイヤ48,50は移動
台42に締結されているので、搭乗台64を移動させて
も、ワイヤ48,50の位置は動かないので、ワイヤ4
8,50が揺れ動いて他の部材やワイヤに絡んだり、擦
れたりすることがない。
The board 64 may be a small one that can be boarded by a single person, and can rotate around the support shafts 62 and 66 to move in a wide range together with the board 64. Moreover, when it is moved to the storage position, it is stored compactly and construction in a narrow space becomes possible. Further, since the wires 48 and 50 are fastened to the moving table 42, the positions of the wires 48 and 50 do not move even if the boarding table 64 is moved.
8 and 50 do not sway and entangle or rub against other members or wires.

【0032】次に前述した作業台70と異なる第2実施
例の作業台について、図6、図7によって説明する。
尚、前述した実施例と同じ部材については、同一番号を
付して詳細な説明を省略する。移動台42には支持部材
80が立設されており、支持部材80の先端には、第2
ガイドレール36,38と直交する第1固定軸82が固
定されている。第1固定軸82には、アーム部材84が
回転可能に支承されており、また、第1スプロケット8
6が固定されている。
Next, a workbench of the second embodiment different from the workbench 70 described above will be described with reference to FIGS. 6 and 7.
The same members as those in the above-described embodiment are designated by the same reference numerals and detailed description thereof will be omitted. A support member 80 is erected on the movable table 42, and a second member is provided at the tip of the support member 80.
A first fixed shaft 82 orthogonal to the guide rails 36 and 38 is fixed. An arm member 84 is rotatably supported on the first fixed shaft 82, and the first sprocket 8 is also supported.
6 is fixed.

【0033】アーム部材84には、第1固定軸82と平
行な第2固定軸88が回転可能に挿入されており、第2
固定軸88には、第2スプロケット90が固定されると
共に、接続部材92が取り付けられている。接続部材9
2には、搭乗台94が第2ガイドレール36,38と平
行な支持軸96により、支持軸96の廻りに回転可能に
支持されている。支持軸96を備えることなく、接続部
材92と搭乗台94とを一体としても実施可能である
が、支持軸96を備えることにより、後述する接近性が
より向上する。
A second fixed shaft 88, which is parallel to the first fixed shaft 82, is rotatably inserted into the arm member 84.
The second sprocket 90 is fixed to the fixed shaft 88, and the connecting member 92 is attached to the fixed shaft 88. Connection member 9
A boarding base 94 is rotatably supported around the support shaft 96 by a support shaft 96 parallel to the second guide rails 36 and 38. The connection member 92 and the boarding base 94 can be integrated without the support shaft 96, but the support shaft 96 improves the accessibility described later.

【0034】第1スプロケット86と第2スプロケット
90との歯数は同数であり、両スプロケット86,90
間には、チェーン98が張設されている。また、アーム
部材84にはブレーキ付きモータ100のフレームが固
定されており、モータ100の回転軸は第2固定軸88
に接続されている。尚、第2実施例では、ガイドギブ4
0、移動台42、支持部材80、第1固定軸82、第1
スプロケット86、アーム部材84、第2固定軸88、
第2スプロケット90、チェーン98、モータ100に
より作業台102が構成されている。
The first sprocket 86 and the second sprocket 90 have the same number of teeth, and both sprockets 86, 90 have the same number of teeth.
A chain 98 is stretched between them. The frame of the motor 100 with a brake is fixed to the arm member 84, and the rotation shaft of the motor 100 is the second fixed shaft 88.
It is connected to the. Incidentally, in the second embodiment, the guide give 4
0, movable table 42, support member 80, first fixed shaft 82, first
Sprocket 86, arm member 84, second fixed shaft 88,
A workbench 102 is constituted by the second sprocket 90, the chain 98, and the motor 100.

【0035】この第2実施例では、まず、図7に二点鎖
線で示すように、搭乗台94はオーガ駆動機構12から
離れた杭施工機本体1側によったリーダ2の側面側の格
納位置に移動されており、格納位置は、オーガ駆動機構
12や押込機構18から離れた位置に選定され、オーガ
駆動機構12や押込機構18を昇降させても、オーガ駆
動機構12や押込機構18と干渉しない。この格納位置
からモータ100を駆動して、アーム部材84を約18
0度回転させた搭乗位置に搭乗台94を移動する。
In the second embodiment, first, as shown by the chain double-dashed line in FIG. 7, the platform 94 is stored on the side of the leader 2 by the pile construction machine body 1 side away from the auger drive mechanism 12. It is moved to the position and the storage position is selected at a position away from the auger drive mechanism 12 and the pushing mechanism 18, and even if the auger drive mechanism 12 and the pushing mechanism 18 are moved up and down, Do not interfere. The motor 100 is driven from this retracted position to move the arm member 84 to about 18
The boarding base 94 is moved to the boarding position rotated by 0 degrees.

【0036】第2スプロケット90を1回転させると、
アーム部材84は第1固定軸82の廻りに1回転する関
係にあるので、モータ100を駆動すると、搭乗台94
は水平を保ちながら移動する。搭乗位置に移動して、搭
乗台94を下げることにより、作業者が搭乗しやすくな
り、その後、作業者が搭乗台94に搭乗し、前記第1実
施例と同様に、作業台用ウインチ56を駆動して、作業
台102を第2ガイドレール36,38に沿ってオーガ
ドリル16の先端近傍にまで上昇させる。
When the second sprocket 90 is rotated once,
Since the arm member 84 has a relationship of making one rotation around the first fixed shaft 82, when the motor 100 is driven, the platform 94 is
Moves while keeping horizontal. By moving to the boarding position and lowering the board 94, it becomes easier for the worker to board. After that, the worker boards the board 94, and as in the first embodiment, the work table winch 56 is removed. By driving, the workbench 102 is raised along the second guide rails 36 and 38 to the vicinity of the tip of the auger drill 16.

【0037】そして、モータ100を駆動して搭乗台9
4を引き上げてオーガ駆動機構12に接近させた作業位
置にすると共に、図6に実線で示すように、支持軸96
の廻りに搭乗台94を回転させて更にオーガ駆動機構1
2に接近させる。これにより、作業者はオーガ駆動機構
12や押込機構18に接近して、接続作業や保守・点検
作業を容易に効率よく行うことができる。しかも、搭乗
台94は1人が乗れる程度の大きさでも、十分な接近性
が得られ、搭乗台94は、第1固定軸82を中心に回転
するので、水平面上の必要回転領域は小さく、狭い場所
でも回転できる。
Then, the motor 100 is driven to drive the boarding platform 9
4 is pulled up to the working position in which the auger drive mechanism 12 is approached, and as shown by the solid line in FIG.
The auger drive mechanism 1 is rotated by rotating the board 94 around the
Get closer to 2. As a result, the worker can approach the auger drive mechanism 12 and the pushing mechanism 18 and easily and efficiently perform the connecting work and the maintenance / inspection work. Moreover, even if the platform 94 is large enough for one person to ride, sufficient accessibility is obtained, and since the platform 94 rotates about the first fixed shaft 82, the required rotation area on the horizontal plane is small, Can be rotated even in a narrow space.

【0038】また、作業終了後は、作業台用ウインチ5
6により作業台102を下降させ、モータ10を駆動し
て搭乗台94を搭乗位置に移動して作業者を降ろした
後、モータ10を駆動して搭乗台94を格納位置に移動
する。そして、オーガ駆動機構12を駆動してオーガド
リル16を回転させると共に、主ウインチ32によりオ
ーガ駆動機構12を下降させて杭71を建て込む。その
際、搭乗台94は格納位置にあるので、オーガ駆動機構
12や押込機構18と干渉することはない。
After the work is finished, the winch 5 for the workbench is used.
The workbench 102 is lowered by 6 to drive the motor 10 to move the boarding platform 94 to the boarding position to lower the worker, and then the motor 10 is driven to move the boarding platform 94 to the storage position. Then, the auger driving mechanism 12 is driven to rotate the auger drill 16, and the main winch 32 lowers the auger driving mechanism 12 to build the pile 71. At that time, since the boarding base 94 is in the storage position, it does not interfere with the auger drive mechanism 12 and the pushing mechanism 18.

【0039】次に第3実施例の作業台について、図9に
よって説明する。この第3実施例では、第2実施例と異
なり、移動台42と接続部材92とに、それぞれ2本の
同じ長さのリンク部材110,112の両端が回転可能
に連結されて、いわゆる平行リンク機構が形成されてい
る。図示しないモータ等によりリンク部材110,11
2を揺動させることができるように構成されている。こ
れにより、前述したと同様に作業位置と格納位置とに搭
乗台94を移動できる。但し、この場合、移動角度はほ
ぼ90度以内に限られる。
Next, the workbench of the third embodiment will be described with reference to FIG. In the third embodiment, unlike the second embodiment, two ends of two link members 110 and 112 of the same length are rotatably connected to the moving base 42 and the connecting member 92, respectively, so-called parallel links. The mechanism is formed. The link members 110, 11 by a motor or the like (not shown)
2 is configured to be able to swing. As a result, the boarding base 94 can be moved to the work position and the storage position as described above. However, in this case, the movement angle is limited to approximately 90 degrees or less.

【0040】また、駆動機構は、作業台用ウインチ56
に限らず、リーダ2に第2ガイドレール36,38に沿
ってラック114を敷設し、移動台42に取り付けたモ
ータの回転軸に取り付けたピニオン歯車116,118
をラック114に噛合させて、モータの回転により作業
台60を昇降させる機構であっても実施可能である。
The drive mechanism is a work table winch 56.
Not limited to this, the rack 114 is laid on the leader 2 along the second guide rails 36 and 38, and the pinion gears 116 and 118 attached to the rotation shaft of the motor attached to the moving table 42.
It is also possible to implement a mechanism in which the rack is engaged with the rack 114 and the workbench 60 is raised and lowered by the rotation of the motor.

【0041】以上本発明はこの様な実施例に何等限定さ
れるものではなく、本発明の要旨を逸脱しない範囲にお
いて種々なる態様で実施し得る。
The present invention is not limited to the embodiments as described above, and can be carried out in various modes without departing from the gist of the present invention.

【0042】[0042]

【発明の効果】以上詳述したように本発明の杭施工機用
作業台昇降装置は、アーム部材と搭乗台とを回転させて
移動するので、搭乗台が小型であっても十分な接近性が
得られると共に、狭い場所での施工も可能となるという
効果を奏する。また、移動台にワイヤを締結すると、搭
乗台を移動させても、ワイヤは移動しないので、ワイヤ
が絡まったり、擦れあったりするのを防ぐことができ
る。
As described above in detail, the workbench lifting device for pile construction machines according to the present invention moves by rotating the arm member and the boarding platform, so that even if the boarding platform is small, sufficient accessibility is achieved. In addition to being obtained, it is possible to perform construction in a narrow place. Further, when the wire is fastened to the moving table, the wire does not move even if the boarding table is moved, so that the wires can be prevented from being entangled or rubbed with each other.

【0043】更に、第2ガイドレールと平行な軸の廻り
に回転可能に支持したものでは、水平面内の広い範囲で
搭乗台を移動させることができ、第2ガイドレールと垂
直な軸の廻りに回転可能に支持したものでは、移動のた
めに必要とする水平面上の回転領域が小さくてよいの
で、特に、狭い場所での施工に適する。
Further, in the case of being rotatably supported around an axis parallel to the second guide rail, the platform can be moved in a wide range in the horizontal plane, and the platform can be moved around the axis perpendicular to the second guide rail. The rotatably supported one is particularly suitable for construction in a narrow place because the rotation area on the horizontal plane required for movement may be small.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例としての杭施工機用作業台昇
降装置を備えた杭施工機の正面図である。
FIG. 1 is a front view of a pile construction machine equipped with a work platform lifting device for a pile construction machine as an embodiment of the present invention.

【図2】本実施例の杭施工機用作業台昇降装置を備えた
杭施工機の側面図である。
FIG. 2 is a side view of a pile construction machine equipped with the work platform lifting device for a pile construction machine according to the present embodiment.

【図3】本実施例の杭施工機用作業台昇降装置の作業台
の拡大斜視図である。
FIG. 3 is an enlarged perspective view of a workbench of the workbench lifting device for a pile construction machine according to the present embodiment.

【図4】本実施例の杭施工機用作業台昇降装置の作業台
が格納位置にあるときの平面図である。
FIG. 4 is a plan view when the workbench of the workbench lifting device for the pile construction machine according to the present embodiment is in the retracted position.

【図5】本実施例の杭施工機用作業台昇降装置の作業台
が作業位置にあるときの平面図である。
FIG. 5 is a plan view when the workbench of the workbench lifting device for the pile construction machine according to the present embodiment is in the work position.

【図6】第2実施例の杭施工機用作業台昇降装置の作業
台の平面図である。
FIG. 6 is a plan view of a workbench of a workbench lifting device for a pile construction machine according to a second embodiment.

【図7】第2実施例の杭施工機用作業台昇降装置の作業
台の側面図である。
FIG. 7 is a side view of a workbench of the workbench lifting device for a pile construction machine according to the second embodiment.

【図8】第3実施例の杭施工機用作業台昇降装置の作業
台の側面図である。
FIG. 8 is a side view of a workbench of a workbench lifting device for a pile construction machine according to a third embodiment.

【符号の説明】[Explanation of symbols]

1…杭施工機本体 2…リーダ 8,10…第1ガイドレール 12…オーガ駆動機構 16…オーガドリル 36,38…第2ガイドレール 48,50…ワイヤ 56…作業台用ウインチ 62,66…支持軸 60,84…アーム部材 64…搭乗台 70,102…作業台 71…杭 82…第1固定軸 86…第1スプロケット 88…第2固定軸 90…第2スプロケット 94…搭乗台 96…支持軸 1 ... Pile construction machine main body 2 ... Leader 8, 10 ... First guide rail 12 ... Auger drive mechanism 16 ... Auger drill 36, 38 ... Second guide rail 48, 50 ... Wire 56 ... Workbench winch 62, 66 ... Support Shaft 60, 84 ... Arm member 64 ... Board 70, 102 ... Work table 71 ... Pile 82 ... First fixed shaft 86 ... First sprocket 88 ... Second fixed shaft 90 ... Second sprocket 94 ... Board 96 ... Support shaft

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 立設されるリーダに設けられた第1ガイ
ドレールに沿って施工機構を昇降させる杭施工機におい
て、 前記第1ガイドレールと平行に前記リーダに設けられた
第2ガイドレールに沿って移動可能に支持された移動台
と、該移動台に回転可能に支持されたアーム部材と、該
アーム部材に回転可能に支持された搭乗台とを有する作
業台を設け、該作業台を昇降させる駆動機構を備えたこ
とを特徴とする杭施工機用作業台昇降装置。
1. A pile construction machine for elevating and lowering a construction mechanism along a first guide rail provided on an upright leader, comprising: a second guide rail provided on the leader in parallel with the first guide rail. A work table having a movable table movably supported along the movable table, an arm member rotatably supported by the movable table, and a mounting table rotatably supported by the arm member is provided, and the work table is A workbench lifting device for a pile construction machine, which is equipped with a drive mechanism for lifting and lowering.
【請求項2】 前記駆動機構はウインチで、該ウインチ
からのワイヤを前記移動台に締結して前記作業台を吊下
げたことを特徴とする請求項1記載の杭施工機用作業台
昇降装置。
2. The workbench lifting device for a pile construction machine according to claim 1, wherein the drive mechanism is a winch, and a wire from the winch is fastened to the moving base to suspend the workbench. .
【請求項3】 前記アーム部材は前記移動台に前記第2
ガイドレールと平行な軸の廻りに回転可能に支持される
と共に、前記搭乗台は前記アーム部材に前記第2ガイド
レールと平行な軸の廻りに回転可能に支持されたことを
特徴とする請求項1又は請求項2記載の杭施工機用作業
台昇降装置。
3. The arm member is provided on the moving base with the second arm.
The pedestal is rotatably supported around an axis parallel to the guide rail, and the platform is rotatably supported by the arm member around an axis parallel to the second guide rail. The workbench lifting device for a pile construction machine according to claim 1 or 2.
【請求項4】 前記アーム部材は前記移動台に前記第2
ガイドレールと直交する軸の廻りに回転可能に支持され
ると共に、前記搭乗台は前記アーム部材に前記第2ガイ
ドレールと直交する軸の廻りに回転可能に支持され、か
つ、前記搭乗台を水平に保ちながら移動させる駆動機構
を備えたことを特徴とする請求項1又は請求項2記載の
杭施工機用作業台昇降装置。
4. The arm member is provided on the moving table with the second member.
The platform is rotatably supported around an axis orthogonal to the guide rail, the platform is rotatably supported by the arm member around an axis orthogonal to the second guide rail, and the platform is horizontal. The workbench lifting device for a pile construction machine according to claim 1 or 2, further comprising a drive mechanism that moves the workbench while keeping the work.
【請求項5】 前記駆動機構は、前記移動台に前記第2
ガイドレールと直交して取り付けられ前記アーム部材を
回転可能に支持する第1固定軸に固定した第1スプロケ
ットと、前記搭乗台に前記第2ガイドレールと直交して
取り付けられ前記アーム部材に回転可能に挿入された第
2固定軸に固定した第2スプロケットと、前記両スプロ
ケット間に張設されたチェーンとを備え、前記アーム部
材に固定したモータの回転軸を前記第2固定軸に連結し
たことを特徴とする請求項4記載の杭施工機用作業台昇
降装置。
5. The drive mechanism includes the second base on the movable base.
A first sprocket mounted orthogonal to a guide rail and fixed to a first fixed shaft that rotatably supports the arm member; and a first sprocket mounted orthogonally to the second guide rail on the platform and rotatable on the arm member A second sprocket fixed to a second fixed shaft inserted into the shaft, and a chain stretched between the two sprockets, and a rotation shaft of a motor fixed to the arm member is connected to the second fixed shaft. The workbench lifting device for a pile construction machine according to claim 4.
JP7672995A 1995-03-31 1995-03-31 Elevation device for working platform for pile constructing machine Pending JPH08269960A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7672995A JPH08269960A (en) 1995-03-31 1995-03-31 Elevation device for working platform for pile constructing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7672995A JPH08269960A (en) 1995-03-31 1995-03-31 Elevation device for working platform for pile constructing machine

Publications (1)

Publication Number Publication Date
JPH08269960A true JPH08269960A (en) 1996-10-15

Family

ID=13613672

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7672995A Pending JPH08269960A (en) 1995-03-31 1995-03-31 Elevation device for working platform for pile constructing machine

Country Status (1)

Country Link
JP (1) JPH08269960A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102795579A (en) * 2012-08-15 2012-11-28 上海工程机械厂有限公司 Pile frame lifting operation mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102795579A (en) * 2012-08-15 2012-11-28 上海工程机械厂有限公司 Pile frame lifting operation mechanism

Similar Documents

Publication Publication Date Title
CN109798136A (en) Tunnel support vehicle
JPH08269960A (en) Elevation device for working platform for pile constructing machine
JP3310241B2 (en) Pile driver leader standing method and apparatus
JPH11293679A (en) Slope frame lifting device, slope frame lifting type drilling machine, protection frame for slide used in them, and drilling method in slope frame crossing point part using them
JP2999724B2 (en) Workbench elevating device for pile construction machine
JPH08269959A (en) Elevation device for working platform for pile constructing machine
JP2017137171A (en) Crane and method for mounting boom of crane
JP4804144B2 (en) Top sheave device in climbing method for construction elevators
JP3167247B2 (en) Hydraulic excavator equipped with ground hardness measurement device
JP2002030654A (en) Transporting and erecting machine for cage
KR960016781B1 (en) Cable hanger apparatus
JPH08269961A (en) Elevation device for working platform for pile constructing machine
JP4855067B2 (en) Welding device suspension
JP2006125032A (en) Pile construction machine
JP2954866B2 (en) Workbench elevating device for pile construction machine
JP2951261B2 (en) Workbench elevating device for pile construction machine
KR960016780B1 (en) Cable hanger apparatus
JPS61266724A (en) Borer for pile driving
JP2545152B2 (en) Floor material holding device for crane
JPH1096386A (en) Method for drilling vertical hole
JP3817345B2 (en) Hanger equipment for construction machinery
JPH0314512Y2 (en)
JP3732316B2 (en) Steel pipe pile rotary press-fitting device
JPH05118037A (en) Excavator
JP2023043532A (en) pile driver