JPH08254096A - Tail seal replacing method for shield machine - Google Patents

Tail seal replacing method for shield machine

Info

Publication number
JPH08254096A
JPH08254096A JP7056357A JP5635795A JPH08254096A JP H08254096 A JPH08254096 A JP H08254096A JP 7056357 A JP7056357 A JP 7056357A JP 5635795 A JP5635795 A JP 5635795A JP H08254096 A JPH08254096 A JP H08254096A
Authority
JP
Japan
Prior art keywords
ground
tail seal
tail
shield excavator
segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP7056357A
Other languages
Japanese (ja)
Inventor
Hiroyuki Kawaguchi
博行 川口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP7056357A priority Critical patent/JPH08254096A/en
Publication of JPH08254096A publication Critical patent/JPH08254096A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

PURPOSE: To replace tail seals safely without any restriction on the position for tail seal replacement. CONSTITUTION: Prior to replacement of tail seals 7, 7..., seal replacing segments 10, 10... equipped with opening 10a leading from the inside to outside are installed over the whole peripheral circumference. After this is exposed to the surrounding ground G2 situated behind with progress of a shield machine 1, a liquid is infected from infection pipes 12, 12... installed on the segments 10, 10... so that, the surrounding ground G2 is improved in a specified range. Then the tail seals 7, 7... are replaced with new ones.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、シールド掘削機で、例
えば地下鉄や下水等、長距離にわたるトンネルを築造す
るに際して用いて好適なシールド掘削機のテールシール
交換方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a shield excavator tail seal exchanging method suitable for use in constructing a tunnel over a long distance such as a subway or sewage.

【0002】[0002]

【従来の技術】周知のように、シールド工法を用いてト
ンネルを築造するときには、シールド掘削機で地盤を掘
進しつつ、シールド掘削機の外殻をなすスキンプレート
内でセグメントを所定形状に組み立てることによって、
シールド掘削機の後方にトンネルを築造している。
2. Description of the Related Art As is well known, when constructing a tunnel by using a shield construction method, a segment is assembled into a predetermined shape in a skin plate forming an outer shell of the shield excavator while excavating the ground with the shield excavator. By
A tunnel is built behind the shield excavator.

【0003】このようなシールド掘削機は、組み立てた
セグメントの外周面とスキンプレートの内周面との間隙
から、地下水や土砂がシールド掘削機内に流入するのを
防止するため、スキンプレートの後端部にテールシール
を具備している。このテールシールは、例えば地下鉄用
や下水用等、特に長距離にわたってトンネルを築造する
場合に傷むことがあり、テールシールが傷んだ場合には
これを交換する必要があった。
In such a shield excavator, in order to prevent ground water and earth and sand from flowing into the shield excavator from the gap between the outer peripheral surface of the assembled segment and the inner peripheral surface of the skin plate, the rear end of the skin excavator is prevented. Part is equipped with a tail seal. This tail seal may be damaged especially when constructing a tunnel over a long distance, for example, for subways or sewage, and if the tail seal is damaged, it needs to be replaced.

【0004】従来、テールシールを交換するには、その
交換作業時に地下水や土砂が前記間隙からシールド掘削
機内に流入しないよう、周囲地盤に薬液を注入する等し
て地盤改良を行って安全を確保した後に、シールド掘削
機内からテールシールを交換していた。
Conventionally, in order to replace the tail seal, the ground is improved by, for example, injecting a chemical solution into the surrounding ground so that groundwater and earth and sand do not flow into the shield excavator from the gap during the replacement work to ensure safety. After that, I was replacing the tail seal from inside the shield excavator.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上述し
たような従来のシールド掘削機のテールシール交換方法
には、以下のような問題が存在する。まず、テールシー
ルを交換するためにシールド掘削機の周囲地盤の改良を
行うには、地表面から薬液を注入しなければならないた
め、トンネルへの土被りが大きい場合には、地盤改良の
施工精度が問題となる。この問題は、周囲地盤からの土
圧、地下水圧が高い場所においても同様である。このよ
うな場所において十分な地盤改良を行うには、地盤改良
にかかるコストが多大なものとなってしまう。このよう
な理由から、現状では、テールシールの交換作業は、土
被りが浅く、土圧,地下水圧の低い場所でしか行うこと
ができず、これによってテールシールの交換場所に制約
を受けているという問題があった。また、シールド掘削
機が停止した位置でテールシールを交換する必要がある
場合には、特にシールド掘削機の下側の地盤改良を十分
に行うことができないために、作業の安全性に問題があ
った。本発明は、以上のような点を考慮してなされたも
ので、テールシールの交換位置に制約を受けることな
く、安全にテールシールの交換を行うことのできるシー
ルド掘削機のテールシール交換方法を提供することを目
的とする。
However, there are the following problems in the conventional tail seal exchanging method for a shield excavator as described above. First of all, in order to improve the ground around the shield excavator in order to replace the tail seal, it is necessary to inject a chemical solution from the ground surface. Is a problem. This problem is the same in places where soil pressure and groundwater pressure from the surrounding ground are high. In order to perform sufficient ground improvement in such a place, the cost required for ground improvement will be great. For this reason, at present, the replacement work of the tail seal can be performed only in a place where the soil cover is shallow and the earth pressure and the groundwater pressure are low, which restricts the place of the tail seal replacement. There was a problem. In addition, when the tail seal needs to be replaced at the position where the shield excavator is stopped, there is a problem in work safety because the ground improvement under the shield excavator cannot be sufficiently performed. It was The present invention has been made in view of the above points, and provides a tail seal replacement method for a shield excavator that can safely replace the tail seal without being restricted by the replacement position of the tail seal. The purpose is to provide.

【0006】[0006]

【課題を解決するための手段】請求項1に係る発明は、
シールド掘削機で前方の地盤を掘進しつつ、該シールド
掘削機の外郭をなす略円筒状のスキンプレート内でセグ
メントを組み立てることによってその後方側にトンネル
を築造していくときに、組み立てた前記セグメントの外
周面と前記スキンプレートの内周面との間隙を塞ぐため
に前記スキンプレートのテール部に具備したテールシー
ルを交換するに先立ち、内外を連通する開孔を備えたテ
ールシール交換用セグメントを、先に組み立てた前記セ
グメントに連続して組み付け、さらに掘進を続行して前
記シールド掘削機を前進させることによってその後方の
地盤中に前記テールシール交換用セグメントを露出させ
た後、地盤固化手段によりトンネル内から前記テールシ
ール交換用セグメントの前記開孔を通して周囲地盤を固
化させ、しかる後に前記シールド掘削機内で前記テール
シールを交換することを特徴としている。
The invention according to claim 1 is
While excavating the ground in front with a shield excavator, when the tunnel is built behind the segment by assembling the segments in the substantially cylindrical skin plate that forms the outer shell of the shield excavator, the assembled segment Prior to replacing the tail seal provided in the tail portion of the skin plate to close the gap between the outer peripheral surface of the skin plate and the inner peripheral surface of the skin plate, a tail seal replacement segment having an opening communicating the inside and the outside, After continuously assembling the previously assembled segment, the excavation is continued to advance the shield excavator to expose the tail seal replacement segment in the ground behind the tunnel, and then the tunnel is solidified by the ground solidification means. From the inside, solidify the surrounding ground through the opening of the tail seal replacement segment, and then It is characterized by replacing the tail seal in the shield excavating machine.

【0007】請求項2に係る発明は、請求項1記載のシ
ールド掘削機のテールシール交換方法において、前記地
盤固化手段を、前記テールシール交換用セグメントの開
孔に薬液注入管を挿入し、該薬液注入管から周囲地盤中
に薬液を注入して地盤を改良する構成とすることを特徴
としている。
According to a second aspect of the present invention, in the tail seal exchanging method for a shield excavator according to the first aspect, the ground solidifying means is inserted into the opening of the tail seal exchanging segment, and a chemical liquid injection pipe is inserted, It is characterized in that the ground is improved by injecting the liquid medicine into the surrounding ground from the liquid medicine injection pipe.

【0008】請求項3に係る発明は、請求項1記載のシ
ールド掘削機のテールシール交換方法において、前記地
盤固化手段を、前記テールシール交換用セグメントの開
孔に凍結管を挿入し、該凍結管によって周囲地盤を凍結
させる構成とすることを特徴としている。
According to a third aspect of the present invention, in the tail seal exchanging method for a shield excavator according to the first aspect, the ground solidifying means is inserted into a hole of the tail seal exchanging segment, and a freezing pipe is inserted into the freezing pipe. The feature is that the surrounding ground is frozen by a pipe.

【0009】[0009]

【作用】請求項1記載の発明では、テールシールを交換
するに先立ち、内外を連通する開孔を備えたテールシー
ル交換用セグメントを組み付け、シールド機の前進によ
りその後方の地盤中にテールシール交換用セグメントを
露出させた後に、地盤固化手段でトンネル内からテール
シール交換用セグメントの開孔を通して周囲地盤を固化
させ、しかる後にテールシールを交換する構成とした。
このようにして、テールシール交換用セグメントを組み
付けて周囲地盤を固化することによって、周囲地盤を、
地表面からではなくトンネル内から固化することができ
る。このとき、テールシール交換用セグメントをトンネ
ルの全周にわたって組み付けることによって、周囲地盤
を全周にわたって固化することができる。
According to the first aspect of the present invention, prior to the replacement of the tail seal, a tail seal replacement segment having an opening communicating with the inside and outside is assembled, and the tail seal is replaced in the ground behind the shield machine by advancing the shield machine. After exposing the use segment, the surrounding solid is solidified from the inside of the tunnel through the opening of the tail seal replacement segment by the ground solidifying means, and then the tail seal is replaced.
In this way, by mounting the tail seal replacement segment and solidifying the surrounding ground,
It can solidify from within the tunnel rather than from the ground surface. At this time, by mounting the tail seal replacement segment over the entire circumference of the tunnel, the surrounding ground can be solidified over the entire circumference.

【0010】請求項2記載の発明では、地盤固化手段
を、テールシール交換用セグメントの開孔に薬液注入管
を挿入し、この薬液注入管から周囲地盤中に薬液を注入
する構成とした。これにより、注入した薬液によって周
囲地盤を改良して固化することができる。
According to the second aspect of the present invention, the ground solidifying means is configured such that the chemical solution injection pipe is inserted into the opening of the tail seal replacement segment, and the chemical solution is injected into the surrounding ground from the chemical solution injection pipe. Thereby, the surrounding ground can be improved and solidified by the injected chemical solution.

【0011】請求項3記載の発明では、テールシール交
換用セグメントの開孔に凍結管を挿入し、凍結管によっ
て周囲地盤を凍結させる構成とした。これにより、周囲
地盤や地下水を固化させることができる。
According to the third aspect of the invention, a freezing pipe is inserted into the opening of the tail seal replacement segment, and the surrounding ground is frozen by the freezing pipe. As a result, the surrounding ground and groundwater can be solidified.

【0012】[0012]

【実施例】以下、本発明を図面に示す第一および第二実
施例を参照して説明する。
The present invention will be described below with reference to the first and second embodiments shown in the drawings.

【0013】[第一実施例]まず、ここでは、本発明に
かかるシールド掘削機のテールシール交換方法を適用し
てテールシールを交換するときに、周囲地盤を薬液注入
によって改良する場合の第一実施例を用いて説明する。
図1は、築造中のトンネルTを示すものである。この図
に示すように、トンネルTを築造するためのシールド掘
削機1は、断面視外形円筒状で、掘進方向前方の地盤G
1を掘削するための略円盤状の掘削部2が備えられ、そ
の後方側に、その外殻をなす円筒状のスキンプレート3
が備えられた概略構成となっている。このスキンプレー
ト3内には、掘削部2をその軸線回りに回転駆動させる
ための駆動装置4、掘削したズリを後方に排出するズリ
搬出装置5、築造すべきトンネルTを構成する鉄筋コン
クリート造のセグメントSを所定の形状に組み立てるセ
グメント組立装置(図示なし)、組み立てたセグメント
Sに反力を得てシールド掘削機1を前進させるための油
圧ジャッキ6等が備えられている。
[First Embodiment] First, here, in the case where the tail seal is replaced by applying the tail seal replacement method of the shield excavator according to the present invention, a first case in which the surrounding ground is improved by chemical injection An example will be described.
FIG. 1 shows the tunnel T under construction. As shown in this figure, a shield excavator 1 for constructing a tunnel T has a cylindrical outer shape in cross section and has a ground G in front of the excavation direction.
A substantially disk-shaped excavating portion 2 for excavating 1 is provided, and a cylindrical skin plate 3 forming an outer shell thereof is provided on the rear side thereof.
It has a schematic configuration including. Inside this skin plate 3, a drive device 4 for driving the excavation portion 2 to rotate about its axis, a slip-out device 5 for discharging the excavated slit backward, and a segment of reinforced concrete structure that constitutes a tunnel T to be built. A segment assembly device (not shown) for assembling S into a predetermined shape, a hydraulic jack 6 for advancing the shield excavator 1 by obtaining a reaction force to the assembled segment S, and the like are provided.

【0014】スキンプレート3のテール部3aの内周面
には、組み立てたセグメントS,S,…の外周面と、該
テール部3aの内周面の間隙から、周囲地盤G2の地下
水や土砂が流れ込んでくるのを防止するため、複数枚の
テールシール7,7,…が設けられている。
On the inner peripheral surface of the tail portion 3a of the skin plate 3, ground water or earth and sand of the surrounding ground G2 is discharged from the gap between the outer peripheral surface of the assembled segments S, S, ... And the inner peripheral surface of the tail portion 3a. In order to prevent it from flowing in, a plurality of tail seals 7, 7, ... Are provided.

【0015】このようなシールド掘削機1では、従来と
同様に、掘削部2を駆動装置4で回転駆動させることに
より前方の地盤G1を掘削しつつ、スキンプレート3内
においてセグメント組立装置(図示なし)でセグメント
S,S,…を所定の形状に組み上げている。そして、油
圧ジャッキ6を伸長させて組み上げたセグメントS,
S,…の前端部に反力を得て、シールド掘削機1を図中
矢印(イ)方向に前進させることによって、その後方側
にトンネルTを築造していくようになっている。
In the shield excavator 1 as described above, the excavation part 2 is rotated by the drive device 4 to excavate the front ground G1 as in the conventional case, and the segment assembly device (not shown) is provided in the skin plate 3. ), The segments S, S, ... Are assembled into a predetermined shape. Then, the segment S, which is assembled by extending the hydraulic jack 6,
A tunnel T is constructed on the rear side of the shield excavator 1 by advancing the shield excavator 1 in the direction of the arrow (a) in the figure by obtaining a reaction force at the front end of S, ....

【0016】次に、シールド掘削機1のテールシール
7,7,…が傷んだときに、これを交換する方法につい
て説明する。これには、まず、テールシール7,7,…
を交換する位置Pを決める。そして、トンネルTを築造
していき、この交換位置Pよりも所定寸法手前において
は、鉄筋コンクリート製のセグメントSに替えて、テー
ルシール交換用セグメント10,10,…を用いて、こ
れらを、スキンプレート3内のセグメント組立装置(図
示なし)で、先に組み立てた通常のセグメントS,S,
…に連続させて、トンネルTの全周にわたって組み立て
る。各テールシール交換用セグメント10は、鋼製で、
その周面の所定位置には、内外に連通する開孔10aが
形成された構成となっている。
Next, a method of replacing the tail seals 7, 7, ... Of the shield excavator 1 when they are damaged will be described. First, the tail seals 7, 7, ...
The position P for exchanging is determined. Then, the tunnel T is built, and before the exchange position P by a predetermined size, the segment S made of reinforced concrete is used instead of the segment S made of reinforced concrete to replace these with the skin plate. With the segment assembling device (not shown) in 3, the ordinary segments S, S,
Assemble the entire circumference of the tunnel T in succession to. Each tail seal replacement segment 10 is made of steel,
An opening 10a that communicates with the inside and outside is formed at a predetermined position on the peripheral surface.

【0017】そして、テールシール交換用セグメント1
0,10,…を、例えばトンネルTの長さ方向に2リン
グ分組み立てた後、シールド掘削機1による前方の地盤
G1の掘進を続行し、通常のセグメントSを組み立てて
トンネルTを延長築造する。この後、シールド掘削機1
の前進により、先に組み立てたテールシール交換用セグ
メント10,10,…が、スキンプレート3のテール部
3aよりも後方の周囲地盤G2中に露出した時点で、シ
ールド掘削機1の掘進を一旦停止させる(図1に示した
状態)。
Then, the tail seal replacement segment 1
After assembling 0, 10, ... For 2 rings in the length direction of the tunnel T, for example, the excavation of the ground G1 in the front by the shield excavator 1 is continued, and the normal segment S is assembled to extend and build the tunnel T. . After this, shield excavator 1
When the tail seal replacement segments 10, 10, ... Assembled earlier are exposed to the surrounding ground G2 behind the tail portion 3a of the skin plate 3 by the forward movement of the shield excavator 1, the excavation of the shield excavator 1 is temporarily stopped. (State shown in FIG. 1).

【0018】続いて、各テールシール交換用セグメント
10の開孔10aにパッカー11を取り付けた後、薬液
注入管(地盤固化手段)12,12,…を、トンネルT
の内側から、各パッカー11を通して周囲地盤G2中に
差し込む。このとき、所定範囲の周囲地盤G2’が改良
されるように、各薬液注入管12の差し込み角度、差し
込み長さを設定する。
Subsequently, after the packer 11 is attached to the opening 10a of each tail seal replacement segment 10, the chemical solution injection pipes (ground solidifying means) 12, 12, ...
From inside of, through each packer 11, insert into the surrounding ground G2. At this time, the insertion angle and the insertion length of each chemical solution injection pipe 12 are set so that the surrounding ground G2 'within a predetermined range is improved.

【0019】トンネルTの全周にわたって薬液注入管1
2,12,…の設置が完了した後、図示しない薬液注入
装置から地盤改良用の薬液を薬液注入管12,12,…
に送り込み、これを周囲地盤G2中に注入する。そし
て、所定量の薬液を注入することによって、所定範囲の
周囲地盤G2’が改良されて固化し、テールシール7,
7,…からの漏水が防止されるとともに、地下水の流動
がなくなる。なお、この薬液の注入量は、所定範囲の周
囲地盤G2’が確実に改良されるよう、土質、地下水量
等に応じて設定するのは言うまでもない。
A chemical injection pipe 1 is provided all around the tunnel T.
After the installation of 2, 12, ... Is completed, a chemical solution for ground improvement is supplied from a chemical solution injection device (not shown) to the chemical solution injection pipes 12, 12 ,.
And inject it into the surrounding ground G2. Then, by injecting a predetermined amount of the chemical liquid, the surrounding ground G2 'in a predetermined range is improved and solidified, and the tail seal 7,
Leakage from 7, ... will be prevented and groundwater will not flow. Needless to say, the injection amount of this chemical solution is set according to the soil quality, the amount of groundwater, etc. so that the surrounding ground G2 'within a predetermined range is surely improved.

【0020】このようにして所定範囲の周囲地盤G2’
が十分に改良された後、テールシール交換用セグメント
10,10,…の前方側に組み付けたセグメントS’,
S’,…を取り外して、交換すべきテールシール7,
7,…を露出させる。続いて、これらテールシール7,
7,…を取り外し、これに替えて、新しいテールシール
7,7,…を取り付ける。
In this way, the surrounding ground G2 'within the predetermined range
, The segment S ', which is assembled to the front side of the tail seal replacement segments 10, 10 ,.
The tail seal 7, which should be replaced by removing S '...
Expose 7, ... Then, these tail seals 7,
Remove 7 ... and replace it with a new tail seal 7, 7.

【0021】テールシール7,7,…の交換作業の完了
後は、取り外した前記セグメントS’,S’,…を再び
組み付ける。また、これとともに、テールシール交換用
セグメント10,10,…に差し込んだ薬液注入管1
2,12,…を取り外す。
After the replacement work of the tail seals 7, 7, ... Is completed, the removed segments S ', S' ,. Along with this, the chemical liquid injection pipe 1 inserted in the tail seal replacement segments 10, 10 ,.
Remove 2, 12, ...

【0022】そして、この後は、通常と同様にして、シ
ールド掘削機1の掘削部2で前方の地盤G1を掘進しつ
つ、セグメントS,S,…を組み立てていくことによっ
て、トンネルTを築造していく。
Then, in the same manner as usual, the tunnel T is constructed by assembling the segments S, S, ... While excavating the ground G1 in front of the excavation section 2 of the shield excavator 1. I will do it.

【0023】上述したシールド掘削機1のテールシール
7,7,…の交換方法では、テールシール7,7,…を
交換するに先立ち、内外を連通する開孔10aを備えた
テールシール交換用セグメント10,10,…を全周に
わたって組み付け、これがシールド掘削機1の前進によ
り後方の周囲地盤G2中に露出した後に、テールシール
交換用セグメント10,10,…に取り付けた薬液注入
管12,12,…から薬液を注入することによって所定
範囲の周囲地盤G2’を改良して固化させ、しかる後に
テールシール7,7,…を交換する構成とした。このよ
うにして、地表面からではなくトンネルT内から所定範
囲の周囲地盤G2’を改良することができるので、その
深度、場所等にかかわらず、トンネルTの周囲を全周に
わたって十分に地盤改良することができる。したがっ
て、テールシール7,7,…の交換位置Pについて制約
を受けることなく、大深度あるいは土圧や地下水圧が高
い場所など、トンネルTの任意の位置において、テール
シール7,7,…の交換作業を安全に行うことが可能と
なる。また、地表面からではなくトンネルT内から所定
範囲の周囲地盤G2’を改良することによって、使用す
る薬液の量を削減することができ、地盤改良コストを抑
さえることが可能となる。
In the method of replacing the tail seals 7, 7, ... Of the shield excavator 1 described above, the tail seal replacement segment having the opening 10a for communicating the inside and outside is exchanged before the tail seals 7, 7 ,. ... are assembled over the entire circumference, and after this is exposed in the surrounding ground G2 behind by the advance of the shield excavator 1, the chemical liquid injection pipes 12, 12, attached to the tail seal replacement segments 10, 10 ,. By injecting a chemical solution from the ..., the surrounding ground G2 'in a predetermined range is improved and solidified, and then the tail seals 7, 7, ... are replaced. In this way, it is possible to improve the surrounding ground G2 'within a predetermined range from inside the tunnel T, not from the ground surface, so that the ground is sufficiently improved around the entire circumference of the tunnel T regardless of its depth, location, etc. can do. Therefore, the tail seals 7, 7, ... Are exchanged at any position of the tunnel T, such as at a large depth or in a place where earth pressure or groundwater pressure is high, without being restricted by the replacement position P of the tail seals 7, 7 ,. Work can be performed safely. Further, by improving the surrounding ground G2 'within a predetermined range from inside the tunnel T, not from the ground surface, it is possible to reduce the amount of chemical liquid used and suppress the ground improvement cost.

【0024】[第二実施例]次に、本発明にかかるシー
ルド掘削機のテールシール交換方法を適用して、薬液注
入のみの地盤改良では不十分で、凍結工法が必要とな
り、かつ地下水流があり凍土の成長が阻害される恐れの
ある地盤中において、テールシールを交換するときに、
薬液注入とともに周囲地盤を凍結させることによって地
盤を固化させる場合の第二実施例を用いて説明する。周
囲地盤G2が、薬液注入のみの地盤改良では不十分で、
凍結工法が必要となり、かつ地下水流があり凍土の成長
が阻害される恐れのある地盤である場合には、まず、前
記第一実施例と同様にして、テールシール7,7,…を
交換すべき位置Pの手前で、テールシール交換用セグメ
ント10,10,…を組み付け、これがシールド掘削機
1の前進により後方の周囲地盤G2中に露出した後に、
薬液注入管12,12,…から所定量の薬液を注入す
る。
[Second Embodiment] Next, applying the tail seal exchanging method of the shield excavator according to the present invention, the ground improvement only by injecting the chemical liquid is not sufficient, the freezing method is required, and the groundwater flow is reduced. Yes When replacing the tail seal in the ground where the growth of frozen soil may be hindered,
A second embodiment in which the ground is solidified by freezing the surrounding ground together with the injection of the chemical liquid will be described. The surrounding ground G2 is not enough to improve the ground only by injecting chemicals,
In the case of the ground where the freezing method is required and there is a possibility that the growth of frozen soil may be hindered due to the groundwater flow, first, the tail seals 7, 7, ... Are replaced in the same manner as the first embodiment. Before the power position P, the tail seal replacement segments 10, 10, ... Are assembled, and after this is exposed to the rear surrounding ground G2 by the advance of the shield excavator 1,
A predetermined amount of drug solution is injected from the drug solution injection pipes 12, 12, ....

【0025】さらに、薬液の注入後に、テールシール交
換用セグメント10,10,…から薬液注入管12,1
2,…を引き抜き、これに替えて、凍結管(地盤固化手
段)13,13,…を挿入する。そして、図示しない凍
結装置によって、凍結管13,13,…を冷却して所定
範囲の周囲地盤G2’中の地下水を凍結させる。
Further, after the chemical solution is injected, the tail seal replacement segments 10, 10, ...
2 are pulled out, and in place of this, a freezing pipe (ground solidifying means) 13, 13, ... Is inserted. Then, the freezing device (not shown) cools the freezing pipes 13, 13, ... And freezes the groundwater in the surrounding ground G2 'within a predetermined range.

【0026】そして、このようにして所定範囲の周囲地
盤G2’を固化した後に、前記第一実施例と同様にし
て、テールシール7,7,…の交換作業を行う。
After solidifying the surrounding ground G2 'within the predetermined range in this manner, the tail seals 7, 7, ... Are replaced in the same manner as in the first embodiment.

【0027】上述したシールド掘削機1のテールシール
7,7,…の交換方法では、周囲地盤G2中が、薬液注
入のみの地盤改良では不十分で、凍結工法が必要とな
り、かつ地下水流があり凍土の成長が阻害される恐れの
ある地盤であっても、テールシール7,7,…の交換に
先立ち、薬液を注入するとともに、凍結管13,13,
…で所定範囲の周囲地盤G2’中の地下水を凍結させる
構成とした。これによって、トンネルTの周囲を全周に
わたって十分に固化させることができるので、前記第一
実施例と同様に、テールシール7,7,…の交換作業
を、その交換位置Pに制約を受けることなく、安全に行
うことが可能となる。
In the method of replacing the tail seals 7, 7, ... Of the shield excavator 1 described above, it is not sufficient to improve the ground in the surrounding ground G2 only by injecting a chemical solution, a freezing method is required, and there is groundwater flow. Even in the ground where the growth of frozen soil may be hindered, before the replacement of the tail seals 7, 7, ...
The ground water in the surrounding ground G2 'within a predetermined range is frozen. As a result, the circumference of the tunnel T can be sufficiently solidified over the entire circumference, so that the replacement work of the tail seals 7, 7, ... Is restricted by the replacement position P as in the first embodiment. Without it, it can be done safely.

【0028】なお、上記第一および第二実施例では、周
囲地盤G2を、薬液注入、または薬液注入と凍結の併用
によって固化する例を用いたが、もちろん、十分な地盤
改良が行えるのであれば、凍結管13,13,…で凍結
させるのみとしてもよい。また、シールド掘削機1の各
部については、その構成を限定するものではなく、いか
なる形式のシールド掘削機にも上記構成を適用すること
ができる。
In the first and second embodiments, the surrounding ground G2 is solidified by the chemical solution injection or the combined use of the chemical solution injection and the freezing, but of course, if sufficient ground improvement can be performed. , May be frozen only by the freezing tubes 13, 13, .... Further, the configuration of each part of the shield excavator 1 is not limited, and the above configuration can be applied to any type of shield excavator.

【0029】[0029]

【発明の効果】以上説明したように、請求項1に係るシ
ールド掘削機のテールシール交換方法によれば、テール
シールを交換するに先立ち、内外を連通する開孔を備え
たテールシール交換用セグメントを組み付け、シールド
機の前進によりその後方の地盤中にテールシール交換用
セグメントを露出させた後に、地盤固化手段でトンネル
内からテールシール交換用セグメントの開孔を通して周
囲地盤を固化させ、しかる後にテールシールを交換する
構成とした。このようにして、テールシール交換用セグ
メントを組み付けて地盤固化手段で周囲地盤を固化する
ことによって、周囲地盤を、地表面からではなくトンネ
ル内から十分に固化することができる。このとき、テー
ルシール交換用セグメントをトンネルの全周にわたって
組み付けることによって、周囲地盤を全周にわたって固
化することができる。したがって、テールシールの交換
作業を、その交換位置に制約を受けることなく、安全に
行うことが可能となる。
As described above, according to the tail seal exchanging method for a shield excavator according to the first aspect of the invention, the tail seal exchanging segment having the opening communicating the inside and the outside is communicated with the tail seal before exchanging the tail seal. After exposing the tail seal replacement segment in the ground behind it by advancing the shield machine, solidify the surrounding ground through the opening of the tail seal replacement segment from inside the tunnel with the ground solidification means, and then the tail. The seal was replaced. In this way, by mounting the tail seal replacement segment and solidifying the surrounding ground by the ground solidifying means, the surrounding ground can be sufficiently solidified not from the ground surface but from inside the tunnel. At this time, by mounting the tail seal replacement segment over the entire circumference of the tunnel, the surrounding ground can be solidified over the entire circumference. Therefore, the replacement work of the tail seal can be safely performed without being restricted by the replacement position.

【0030】請求項2に係るシールド掘削機のテールシ
ール交換方法によれば、地盤固化手段を、テールシール
交換用セグメントの開孔に薬液注入管を挿入し、この薬
液注入管から周囲地盤中に薬液を注入する構成とした。
これにより、注入した薬液によって周囲地盤を改良して
固化することができる。また、このようにして、地表面
からではなくトンネル内から周囲地盤を改良することに
よって、使用する薬液の量を削減することができ、地盤
改良コストを抑さえることが可能となる。
According to the tail seal exchanging method of the shield excavator of the second aspect, the ground solidifying means inserts the chemical liquid injection pipe into the opening of the tail seal exchanging segment, and from this chemical liquid injection pipe into the surrounding ground. It was configured to inject a chemical solution.
Thereby, the surrounding ground can be improved and solidified by the injected chemical solution. Further, in this way, by improving the surrounding ground not from the ground surface but from inside the tunnel, it is possible to reduce the amount of the chemical liquid used and suppress the ground improvement cost.

【0031】請求項3に係るシールド掘削機のテールシ
ール交換方法によれば、テールシール交換用セグメント
の開孔に凍結管を挿入し、凍結管によって周囲地盤を凍
結させる構成とした。これにより、周囲地盤や地下水を
固化させることができ、薬液注入のみの地盤改良では不
十分で、凍結工法が必要となり、かつ地下水流があり凍
土の成長が阻害される恐れのある地盤中であっても、テ
ールシールの交換作業を安全に行うことが可能となる。
According to the tail seal exchanging method of the shield excavator of the third aspect, the freezing pipe is inserted into the opening of the tail seal exchanging segment, and the surrounding ground is frozen by the freezing pipe. As a result, the surrounding ground and groundwater can be solidified, ground improvement only by injecting a chemical solution is not sufficient, a freezing method is required, and there is groundwater flow, which may hinder the growth of frozen soil. Even if the tail seal is replaced, the work can be safely performed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るシールド掘削機のテールシール交
換方法の一例を示す立断面図である。
FIG. 1 is a vertical sectional view showing an example of a tail seal replacement method for a shield excavator according to the present invention.

【符号の説明】[Explanation of symbols]

1 シールド掘削機 3 スキンプレート 10 テールシール交換用セグメント 10a 開孔 12 薬液注入管(地盤固化手段) 13 凍結管(地盤固化手段) S セグメント T トンネル G1 地盤 G2 周囲地盤 1 Shield excavator 3 Skin plate 10 Tail seal replacement segment 10a Open hole 12 Chemical injection pipe (ground solidification means) 13 Freezing pipe (ground solidification means) S Segment T Tunnel G1 Ground G2 Surrounding ground

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 シールド掘削機で前方の地盤を掘進しつ
つ、該シールド掘削機の外郭をなす略円筒状のスキンプ
レート内でセグメントを組み立てることによってその後
方側にトンネルを築造していくときに、 組み立てた前記セグメントの外周面と前記スキンプレー
トの内周面との間隙を塞ぐために前記スキンプレートの
テール部に具備したテールシールを交換するに先立ち、 内外を連通する開孔を備えたテールシール交換用セグメ
ントを、先に組み立てた前記セグメントに連続して組み
付け、さらに掘進を続行して前記シールド掘削機を前進
させることによってその後方の地盤中に前記テールシー
ル交換用セグメントを露出させた後、地盤固化手段によ
りトンネル内から前記テールシール交換用セグメントの
前記開孔を通して周囲地盤を固化させ、 しかる後に前記シールド掘削機内で前記テールシールを
交換することを特徴とするシールド掘削機のテールシー
ル交換方法。
1. When a tunnel is built on the rear side of the shield excavator by excavating the front ground by assembling the segments in a substantially cylindrical skin plate forming the outer shell of the shield excavator. Prior to replacing the tail seal provided in the tail portion of the skin plate for closing the gap between the outer peripheral surface of the assembled segment and the inner peripheral surface of the skin plate, a tail seal having an opening communicating the inside and the outside A replacement segment is continuously assembled to the previously assembled segment, and after the tail seal replacement segment is exposed in the ground behind it by advancing the shield excavator by further advancing the excavation, Solidify the surrounding ground from inside the tunnel through the opening of the tail seal replacement segment by ground solidification means So, tail seal replacing the shield excavator, which comprises exchanging the tail seal in the shield excavating machine thereafter.
【請求項2】 請求項1記載のシールド掘削機のテール
シール交換方法において、前記地盤固化手段を、前記テ
ールシール交換用セグメントの開孔に薬液注入管を挿入
し、該薬液注入管から周囲地盤中に薬液を注入して地盤
を改良する構成とすることを特徴とするシールド掘削機
のテールシール交換方法。
2. The method of replacing a tail seal of a shield excavator according to claim 1, wherein the ground solidifying means inserts a chemical solution injection pipe into an opening of the tail seal replacement segment, and the surrounding ground is formed from the chemical solution injection tube. A tail seal exchanging method for a shield excavator, characterized in that a chemical solution is injected into the ground to improve the ground.
【請求項3】 請求項1記載のシールド掘削機のテール
シール交換方法において、前記地盤固化手段を、前記テ
ールシール交換用セグメントの開孔に凍結管を挿入し、
該凍結管によって周囲地盤を凍結させる構成とすること
を特徴とするシールド掘削機のテールシール交換方法。
3. The method for exchanging tail seals of a shield excavator according to claim 1, wherein the ground solidifying means inserts a freezing pipe into an opening of the segment for exchanging tail seals.
A tail seal replacement method for a shield excavator, characterized in that the surrounding ground is frozen by the freezing pipe.
JP7056357A 1995-03-15 1995-03-15 Tail seal replacing method for shield machine Withdrawn JPH08254096A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7056357A JPH08254096A (en) 1995-03-15 1995-03-15 Tail seal replacing method for shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7056357A JPH08254096A (en) 1995-03-15 1995-03-15 Tail seal replacing method for shield machine

Publications (1)

Publication Number Publication Date
JPH08254096A true JPH08254096A (en) 1996-10-01

Family

ID=13025003

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7056357A Withdrawn JPH08254096A (en) 1995-03-15 1995-03-15 Tail seal replacing method for shield machine

Country Status (1)

Country Link
JP (1) JPH08254096A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169881A (en) * 2005-12-19 2007-07-05 Shimizu Corp Grouting method
JP2009046809A (en) * 2007-08-13 2009-03-05 Kajima Corp Method and equipment for maintaining tail seal of shield machine
CN112360520A (en) * 2020-10-22 2021-02-12 中铁隧道局集团有限公司 Station construction system and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169881A (en) * 2005-12-19 2007-07-05 Shimizu Corp Grouting method
JP4660820B2 (en) * 2005-12-19 2011-03-30 清水建設株式会社 Grouting method
JP2009046809A (en) * 2007-08-13 2009-03-05 Kajima Corp Method and equipment for maintaining tail seal of shield machine
CN112360520A (en) * 2020-10-22 2021-02-12 中铁隧道局集团有限公司 Station construction system and construction method thereof
CN112360520B (en) * 2020-10-22 2021-05-25 中铁隧道局集团有限公司 Station construction system and construction method thereof

Similar Documents

Publication Publication Date Title
JPH08254096A (en) Tail seal replacing method for shield machine
JP3031596B2 (en) Branch shield method
JP3590429B2 (en) How to assemble a segment with a cutter
JP3171459B2 (en) Shield method
JP4051790B2 (en) How to replace a shield machine bit
JP3422557B2 (en) Underground propulsion method
JP3454442B2 (en) Excavation method and device for large section underground space
JP2681511B2 (en) Vertical shaft structure of shield machine starting part, its construction method, and start / arrival method of shield machine using the structure
JP2986462B1 (en) Cutter equipment for shield machine
JP2002194988A (en) Receiving method of tunnel excavator to arrival shaft and facility for it
JPH066865B2 (en) Shield tunnel underground docking method
JP4211362B2 (en) Connecting method of shield tunneling machine
JPH0978981A (en) Tunnel outside lining method
JPH04277292A (en) Replacing method for bit in shield tunneling method
JP3108735B2 (en) Reconstruction method of large diameter sewer
JP4133898B2 (en) How to reach the excavator
JP4037237B2 (en) Underground welding shield machine
JP2007002560A (en) Tunnel widening method
JP4260238B2 (en) Shield machine
JPH0437916B2 (en)
JP2607915B2 (en) Starter construction structure of shield machine
JPH01304295A (en) Method of constructing tunnel
JPH02272112A (en) Method of chemical grouting construction to peripheral ground of tunnel
JP3721460B2 (en) How to start a shield machine
JP2006022496A (en) Tunnel construction method

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20020604