JPH08231056A - Heavy weight carrying in/out device in continuous unloader - Google Patents
Heavy weight carrying in/out device in continuous unloaderInfo
- Publication number
- JPH08231056A JPH08231056A JP6507995A JP6507995A JPH08231056A JP H08231056 A JPH08231056 A JP H08231056A JP 6507995 A JP6507995 A JP 6507995A JP 6507995 A JP6507995 A JP 6507995A JP H08231056 A JPH08231056 A JP H08231056A
- Authority
- JP
- Japan
- Prior art keywords
- rope
- heavy
- ropes
- bulldozer
- carrying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Ship Loading And Unloading (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は連続式アンローダにおけ
る重量物搬出入装置に関する。例えば、バケットエレベ
ータを使用した連続式アンローダによる船艙内の石炭や
鉱石等のばら物を陸揚げする荷役作業は、アンローダの
掻取り部でバケットを連続駆動することにより行ってい
るが、ばら物の層厚が薄くなった場合や、船艙内の隅部
にばら物が残留した場合は、船艙内にブルドーザを搬入
して、このブルドーザでばら物を掻き寄せてからアンロ
ーダで荷揚げしている。そして、ブルドーザを船艙内に
搬入したり搬出するのも連続式アンローダを用いてい
る。また、船艙側壁の補強材等にばら物が付着した場
合、前記と同様に、船艙壁の付着ばら物を掻き落すため
の重機や、放水によって船艙壁の付着ばら物を洗い落す
重機を船艙内に搬入する必要がある。さらに、前記した
重機以外でも種々の重機材を船艙内に搬入したり搬出し
たりする必要がある。本発明はかかる場合に用いられる
重量物搬出入装置に関する。なお、本明細書において、
「重量物」とは、ブルドーザや前記重機、またその他の
重機材をいう。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a heavy load / unload device for a continuous unloader. For example, loading and unloading coal, ore, and other bulk materials in a boat by a continuous unloader that uses a bucket elevator is performed by continuously driving the bucket at the scraper of the unloader. When the thickness becomes thin, or when the bulk material remains in the corner of the ship's hold, a bulldozer is carried into the ship's hold, the bulk is scraped by the bulldozer, and then unloaded by an unloader. And, the continuous unloader is also used for loading and unloading the bulldozer into the ship's hold. Also, if loose material adheres to the reinforcing material on the side wall of the ship's side, similar to the above, a heavy machine for scraping off the loose material on the side of the ship's wall and a heavy machine for washing off the adhered bulk on the side of the ship's wall by spraying water inside the ship's side It is necessary to carry in. Further, in addition to the above-mentioned heavy equipment, various heavy equipment needs to be carried in and out of the ship's hold. The present invention relates to a heavy load / unload device used in such a case. In the present specification,
"Heavy goods" refers to bulldozers, heavy equipment, and other heavy equipment.
【0002】[0002]
【従来の技術】連続式アンローダによってブルドーザ等
を搬出入する場合の従来の重量物搬出入装置を図9に基
づき説明する。同図において、5は連続式アンローダUL
の掻取り部で、その適所に吊りピース51が取付けられ、
この吊りピース51にブルドーザ吊上用の玉掛けワイヤロ
ープ(以下、玉掛けワイヤ52という)を4本連結して、
ブルドーザBを昇降させるようにしていた。2. Description of the Related Art A conventional heavy goods loading / unloading apparatus for loading / unloading a bulldozer or the like by a continuous unloader will be described with reference to FIG. In the figure, 5 is a continuous unloader UL
With the scraping part of, the hanging piece 51 is attached at the appropriate place,
Connect four sling wire ropes (henceforth sled wires 52) for hanging the bulldozer to this suspension piece 51,
Bulldozer B was going up and down.
【0003】[0003]
【発明が解決しようとする課題】ところが前記従来例で
は、つぎのような欠点がある。すなわち、玉掛けワイヤ
52を人力によって運びブルドーザBと吊りピース51に連
結する必要があるが、アンローダULが大型化すると玉掛
けワイヤ52も長くなり重量が重くなるばかりか、吊りピ
ース51側の吊り点が高くなり地上(船底)から直接取付
けることが不可能となる。このため玉掛けワイヤ52の取
付に特殊な機器設備を用いなければならないが、用いた
としても、操作性は劣るし、労力はやはり多大である。
しかも、ブルドーザは通常複数台を使用するため、その
つど岸壁上と船艙内で玉掛けワイヤ52の付け替えをしな
ければならないので、その労力は相当多大なものであっ
た。However, the conventional example has the following drawbacks. Ie sling wire
It is necessary to manually transport 52 to the bulldozer B and the hanging piece 51, but if the unloader UL becomes large, not only the sling wire 52 becomes longer and heavier, but also the hanging point on the hanging piece 51 side becomes higher and the ground ( It will not be possible to install it directly from the bottom. For this reason, it is necessary to use a special equipment for mounting the sling wire 52, but even if it is used, the operability is poor and the labor is enormous.
Moreover, since a plurality of bulldozers are usually used, it is necessary to replace the sling wires 52 on the quay and inside the boat each time, so the labor is considerably large.
【0004】本発明はかかる事情に鑑み、ブルドーザや
その他の重機等の重量物を搬入搬出するための玉掛け作
業の労力を大幅に軽減し、短時間で、安全に作業でき、
かつ特別な機器設備を用いる必要をなくした連続式アン
ローダにおける重量物搬出入装置を提供することを目的
とする。In view of such circumstances, the present invention greatly reduces the labor of slinging work for loading and unloading heavy objects such as bulldozers and other heavy machinery, and enables safe work in a short time.
It is also an object of the present invention to provide a heavy load carrying-in / out apparatus for a continuous unloader that does not require the use of special equipment.
【0005】[0005]
【課題を解決するための手段】本発明の連続式アンロー
ダにおける重量物搬出入装置は、ブームの先端にばら物
を垂直搬送する垂直搬送部を有し、該垂直搬送部の下端
にばら物の掻取り部が設けられた連続式アンローダにお
いて、前記掻取り部の適所に基端を連結した重量物吊下
げ用ロープと、該重量物吊下げ用ロープの先端に下端が
連結自在なシージングワイヤロープと、該シージングワ
イヤロープの上端が連結され、かつ該シージングワイヤ
ロープを巻取り繰出し自在であり、前記垂直搬送部の適
所に設置された巻取機とからなることを特徴とする。上
記本発明においては、前記重量物吊下げ用ロープを4本
と、前記シージングワイヤロープを2本備え、前記掻取
り部の左右両側面に前記重量物吊下げ用ロープを2本ず
つ連結し、前記垂直搬送部の左右両側部に1台ずつ巻取
機を設置し、右側の巻取機に連結した右側の1本のシー
ジングワイヤロープを右側の2本の重量物吊下げ用ロー
プに連結するようにし、左側の巻取機に連結した左側の
1本のシージングワイヤロープを左側の2本の重量物吊
下げ用ロープに連結するようにするのが好ましい。A heavy load carrying-in / out apparatus for a continuous unloader according to the present invention has a vertical transport unit for vertically transporting a bulk substance at the tip of a boom, and the bulk transport unit at the lower end of the vertical transport unit. In a continuous unloader provided with a scraping unit, a rope for suspending heavy objects, the base end of which is connected to an appropriate position of the scraping unit, and a lowering end of the rope for suspending heavy objects, whose lower end is freely connectable And the upper end of the sheathing wire rope is connected, and the sheathing wire rope can be wound and unwound freely, and the winder is installed at an appropriate position of the vertical transport unit. In the above-mentioned present invention, four ropes for suspending heavy objects and two ropes for sheathing wire are provided, and two ropes for suspending heavy objects are connected to both left and right side surfaces of the scraping unit, One winder is installed on each of the right and left sides of the vertical transport unit, and one right sheathing wire rope connected to the right winder is connected to two right heavy ropes. Thus, it is preferable that one left sheathing wire rope connected to the left winder is connected to two left heavy load ropes.
【0006】[0006]
【作用】本発明においては連続式アンローダの荷役作業
中は、シージングワイヤーロープの下端に重量物吊り下
げ用ロープの先端を連結しておき巻取機でシージングワ
イヤーロープを巻き上げておけば重量物吊下げ用ロープ
は掻取り部での掻取り作業に邪魔にならない高い位置に
吊上げておくことができる。重量物を吊下げるときは、
巻取機によってシージングワイヤーロープを繰り出す
と、重量物吊下げ用ロープを地上あるいは船底上に垂れ
下がらせることができ、そこで重量物吊下げ用ロープの
先端をシージングワイヤーロープ下端から外して、重量
物の吊鐶に連結すればよい。その状態で連続式アンロー
ダのブームを起伏、旋回させれば、重量物の搬入搬出が
行える。本発明では、人力作業は地上面(船底面)に降
りてきた重量物吊下げ用ロープを低い位置にある重量物
の吊鐶に連結するだけであり、ワイヤロープを地上や船
艙内で運搬する必要がないので労力が大幅に軽減され、
かつワイヤロープの連結箇所も少ないので玉掛け時間と
重量物の搬入・搬出時間を短縮することができる。ま
た、重量物吊下げ用ロープを左右2本ずつ配置した構成
によると、重量物をバランスよく吊上げるので安定した
状態で搬入搬出が可能となる。In the present invention, during the loading and unloading work of the continuous unloader, if the tip of the rope for suspending heavy objects is connected to the lower end of the sheathing wire rope and the sheathing wire rope is wound up by the winder, the heavy object can be suspended. The hanging rope can be hung up at a high position that does not interfere with the scraping work at the scraping section. When suspending heavy objects,
When the winding wire rope is unwound by the winder, the rope for suspending heavy objects can be hung down on the ground or on the bottom of the ship, where the tip of the rope for suspending heavy objects is removed from the lower end of the rope for suspending heavy objects. It can be connected to the suspension bar. In this state, if the boom of the continuous unloader is raised and lowered and turned, heavy goods can be loaded and unloaded. In the present invention, the manual work is performed only by connecting the heavy object hanging rope that has come down to the ground surface (bottom surface) to the heavy object hanging rope at a low position, and transports the wire rope on the ground or in the ship's hold. Since it is not necessary, the labor is greatly reduced,
Moreover, since there are few wire rope connection points, it is possible to reduce slinging time and loading / unloading time of heavy objects. Further, according to the configuration in which the two ropes for suspending the heavy object are arranged on the right and left sides, the heavy object is hoisted in a balanced manner, so that it is possible to carry in and out in a stable state.
【0007】[0007]
【実施例】つぎに、本発明の実施例を図面に基づき説明
する。図1は本発明の一実施例に係わる重量物搬出入装
置10の側面図、図2は同正面図、図3は同拡大図、図4
は本発明が適用される連続式アンローダULの説明図であ
る。Embodiments of the present invention will now be described with reference to the drawings. FIG. 1 is a side view of a heavy load carrying-in / out apparatus 10 according to an embodiment of the present invention, FIG. 2 is a front view thereof, FIG. 3 is an enlarged view thereof, and FIG.
FIG. 3 is an explanatory diagram of a continuous unloader UL to which the present invention is applied.
【0008】まず本発明が適用される連続式アンローダ
ULを図4に基づき説明すると、1は走行フレーム、2は
旋回台、3は起伏自在なブーム、4はばら物を垂直に搬
送する垂直搬送部(実施例はバケットエレベータ式連続
アンローダであり、以下、バケットエレベータと称す
る)、5は掻取り部、6はエレベータケーシングであ
り、これらは公知の構成である。本発明の搬出入装置10
は掻取り部5とエレベータケーシング6を利用して取付
けられる。First, a continuous unloader to which the present invention is applied
The UL will be described with reference to FIG. 4. 1 is a traveling frame, 2 is a swivel base, 3 is a boom that can be raised and lowered, and 4 is a vertical transport unit that vertically transports loose objects (an example is a bucket elevator continuous unloader, Hereinafter, referred to as a bucket elevator) 5 is a scraping portion, 6 is an elevator casing, and these are known configurations. Loading / unloading device 10 of the present invention
Is attached using the scraping part 5 and the elevator casing 6.
【0009】前記搬出入装置Aの構成を図1〜3に基づ
き説明する。7は掻取り部5の掻取りフレームである。
掻取りフレーム7の左右両側には、それぞれ2本づつの
重量物吊りロープ11(重量物吊下げ用ロープをいう。以
下同じ)の基端がシャックル等で連結されており、合計
4本の重量物吊りロープ11が用意されている。そして、
この重量物吊りロープ11の先端には、シージングロープ
17(シージングワイヤーロープをいう。以下同じ)と連
結したり、ブルドーザBの吊鐶と連結するためのシャッ
クル12が取付けられている。The structure of the loading / unloading device A will be described with reference to FIGS. Reference numeral 7 is a scraping frame of the scraping unit 5.
On each of the left and right sides of the scraping frame 7, two bases of heavy-weight suspension ropes 11 (referred to as heavy-weight suspension ropes; hereinafter the same) are connected by shackles, etc., and a total of four weights are attached. Suspended rope 11 is prepared. And
At the tip of this heavy object rope 11,
A shackle 12 for connecting with 17 (referred to as a sheathing wire rope; the same applies hereinafter) and for connecting with the suspension bar of the bulldozer B is attached.
【0010】一方、エレベータケーシング6の適所には
取付床8が形成されており、その取付床8の左右両側に
それぞれ巻取機13が設置されている。この巻取機13は、
モータ14と減速機15とドラム16からなる公知のものでよ
い。それぞれの巻取機13の巻取ドラム16にはシージング
ロープ17の上端が連結され、その途中部分が巻取られて
おり、シージングロープ17の下端には連結金具18が取付
けられている。この連結金具18はシャックル12のボルト
を通す孔を形成した鉄板状の金具でもよく、前記シャッ
クル12と同様のシャックルでもよい。なお、シージング
ロープ17を通すガイド20を設け、このガイド20をエレベ
ータケーシング6または掻取り部5の適所に取付けても
よい。On the other hand, a mounting floor 8 is formed at an appropriate position of the elevator casing 6, and a winding machine 13 is installed on each of the left and right sides of the mounting floor 8. This winder 13
A known device including a motor 14, a speed reducer 15 and a drum 16 may be used. An upper end of a sheathing rope 17 is connected to the winding drum 16 of each winding machine 13, and an intermediate portion thereof is wound up, and a connecting fitting 18 is attached to a lower end of the sheathing rope 17. The connecting fitting 18 may be an iron plate-like fitting in which a hole for the bolt of the shackle 12 is formed, or the same shackle as the shackle 12. A guide 20 for passing the sheathing rope 17 may be provided, and the guide 20 may be attached to the elevator casing 6 or the scraping section 5 at an appropriate position.
【0011】つぎに、本実施例によるブルドーザの吊上
げ搬送作業を説明するが、その作業は図5〜8の順で行
われる。図5(I) の実線図示の状態は、重量物吊りロー
プ11をシージングロープ17を介して上方に吊り上げてい
る状態で、アンローダULによる掻取り作業はこの状態で
行われる。巻取機13を駆動してシージングロープ17を降
すと、点線図示のように重量物吊りロープ11が地上(ま
たは船底)まで降りる。図5(II)は重量物吊りロープ11
のシャックル12をシージングロープ17から外し、シージ
ングロープ17を巻上げる状態を示している。これにより
重量物吊りロープ11のみが地上に残される。ついで、図
6(III) に示すように、ブームを起伏旋回させ掻取り部
5を上昇させてブルドーザBの直下に移動させるか、あ
るいは、ブームを起伏させて掻取部5を上昇させ、その
掻取部5の下にブルドーザBを移動させ、重量物吊りロ
ープ11のシャックル12をフルドーザBの吊鐶に連結す
る。この作業は、重量物吊りロープ11の先端がブルドー
ザBの吊鐶まで降りているので軽い力で行え、しかも一
切の吊り具類を運搬する必要もないので、労力は少なく
てすむ。Next, the hoisting and carrying work of the bulldozer according to this embodiment will be described. The work is carried out in the order of FIGS. The state shown by the solid line in FIG. 5 (I) is a state in which the heavy object lifting rope 11 is lifted up through the sheathing rope 17, and the scraping work by the unloader UL is performed in this state. When the winding machine 13 is driven and the sheathing rope 17 is lowered, the heavy object hanging rope 11 is lowered to the ground (or the bottom of the ship) as shown by the dotted line. Figure 5 (II) shows a heavy lifting rope 11
The shackle 12 is removed from the sheathing rope 17 and the sheathing rope 17 is wound up. This leaves only the heavy load rope 11 on the ground. Then, as shown in FIG. 6 (III), the boom is hoisted and swung to raise the scraping unit 5 to move it directly below the bulldozer B, or the boom is hoisted to raise the scraping unit 5 and The bulldozer B is moved below the scraping unit 5, and the shackle 12 of the heavy load rope 11 is connected to the suspension bar of the full dozer B. This work can be performed with a light force because the tip of the heavy load rope 11 is down to the suspension bar of the bulldozer B, and since it is not necessary to carry any suspension equipment, the labor is small.
【0012】図6(IV)は、アンローダULのブームを起伏
させてブルドーザBを吊上げ、旋回させ、地上(岸壁)
から船底へ、またその逆に移動させる状態を示してい
る。この場合、ブルドーザBは4本の重量物吊りロープ
11で4点支持されているので、安定して吊上げることが
でき、搬送作業は安全である。図7(V)に示すよう
に、船底あるいは岸壁上の目標位置へブルドーザBを降
ろし、重量物吊りロープ11を少したるませて、シャック
ル12を外す。ついで、巻取機13を駆動してシージングロ
ープ17を降ろす。図7(VI)に示すように、ブームを起
伏旋回させて掻取り部5を移動させるか、あるいはブル
ドーザBを移動させ、重量物吊りロープ11をシージング
ロープ17に連結する。図8(VII )に示すように、巻取
機13によってシージングロープ17を巻き上げ、重量物吊
りロープ11を元の高い位置へ吊上げて収納しておく。こ
れにより、図5(I)に状態に戻る。In FIG. 6 (IV), the boom of the unloader UL is raised and lowered, the bulldozer B is lifted and swung, and the ground (berth) is shown.
It shows the state of moving from to the bottom of the ship and vice versa. In this case, bulldozer B has four heavy lifting ropes.
Since it is supported by 11 points at 4 points, it can be stably lifted and the transportation work is safe. As shown in FIG. 7 (V), the bulldozer B is lowered to the target position on the ship bottom or the quay, the heavy load rope 11 is slightly slackened, and the shackle 12 is removed. Then, the winder 13 is driven to lower the sheathing rope 17. As shown in FIG. 7 (VI), the boom is hoisted and swung to move the scraping unit 5 or the bulldozer B, and the heavy load rope 11 is connected to the seeping rope 17. As shown in FIG. 8 (VII), the winding rope 13 is used to wind up the sheathing rope 17, and the heavy object lifting rope 11 is lifted up to its original position and stored. As a result, the state returns to FIG.
【0013】以上のごとく、本実施例によれば、アンロ
ーダULに重量物吊りロープ11を常時備えることにより、
重量物吊りロープ11の地上および船内での搬送がなくな
り、重量のある重量物吊りロープ11を高所にあるアンロ
ーダ側の吊りピースに取付ける必要が無くなるので、労
力が大幅に軽減され、重量物吊りロープ11の連結個所が
減って玉掛け時間を短縮でき作業能率が向上する。As described above, according to this embodiment, the unloader UL is always provided with the heavy load rope 11,
Since there is no need to transport the heavy lifting rope 11 on the ground or onboard, it is no longer necessary to attach the heavy lifting rope 11 to the lifting piece on the unloader side at a high place. The number of connecting points of the rope 11 is reduced and the slinging time can be shortened and the work efficiency is improved.
【0014】なお、前記実施例ではブルドーザBの搬出
入について説明したが、ブルドーザB以外の重機および
その他の重機材等の重量物についても、同じ手順で行う
ことができる。また、前記実施例は、本発明をバケット
エレベータ式アンローダに適用した例を示したが、垂直
搬送部が2重ベルト挟み式、スクリューコンベヤ式の連
続式アンローダに適用することもできる。Although the carrying-in / out of the bulldozer B has been described in the above embodiment, the same procedure can be applied to heavy equipment such as heavy equipment other than the bulldozer B and other heavy equipment. Further, in the above-mentioned embodiments, the present invention is applied to the bucket elevator unloader, but the present invention can also be applied to a continuous unloader in which the vertical conveyor is a double belt sandwich type or a screw conveyor type.
【0015】[0015]
【発明の効果】本発明によれば、人力作業は地上面(船
底面)に降りてきた重量物吊下げ用ロープを低い位置に
ある重量物の吊鐶に連結するだけであり、ワイヤロープ
を地上や船艙内で運搬する必要がないので労力が大幅に
軽減され、かつワイヤロープの連結箇所も少ないので玉
掛け時間と重量物の搬入・搬出時間を短縮することがで
きる。したがって、連続式アンローダによる重量物の地
上と船底間の搬入搬出を、少ない労力で、短時間で、安
全に行うことができる。According to the present invention, in the manual work, the rope for suspending heavy objects that has come down to the ground surface (bottom surface of the ship) is simply connected to the suspending rope for heavy objects at a low position, and the wire rope is connected. Since it does not need to be transported on the ground or on the boat, labor is greatly reduced, and since there are few wire rope connection points, slinging time and loading / unloading time of heavy goods can be shortened. Therefore, the loading and unloading of heavy objects between the ground and the bottom of the ship by the continuous unloader can be safely performed in a short time with a small amount of labor.
【図1】本発明の一実施例に係わる重量物搬出入装置10
の側面図である。FIG. 1 is a diagram showing an apparatus 10 for carrying in and out a heavy load according to an embodiment of the present invention.
FIG.
【図2】同搬出入装置10の正面図である。FIG. 2 is a front view of the loading / unloading device 10.
【図3】同搬出入装置10の拡大図であり、(A) 図は側面
図、(B) 図は片側の正面図である。3A and 3B are enlarged views of the carry-in / carry-out device 10, wherein FIG. 3A is a side view and FIG. 3B is a front view of one side.
【図4】本発明の搬出入装置10が取付けられた連続式ア
ンローダULの説明図である。FIG. 4 is an explanatory diagram of a continuous unloader UL to which the loading / unloading device 10 of the present invention is attached.
【図5】(I)図および(II)図はブルドーザBの搬送
作業の説明図である。5 (I) and FIG. 5 (II) are explanatory views of the work of carrying the bulldozer B. FIG.
【図6】(III )図および(IV)図はブルドーザBの搬
送作業の説明図である。6 (III) and FIG. 6 (IV) are explanatory views of the work of carrying the bulldozer B. FIG.
【図7】(V)図および(VI)図はブルドーザBの搬送
作業の説明図である。7 (V) and FIG. 7 (VI) are explanatory views of the carrying work of the bulldozer B. FIG.
【図8】(VII )図はブルドーザBの搬送作業の説明図
である。FIG. 8 (VII) is an explanatory diagram of a work for carrying the bulldozer B.
【図9】従来の重量物搬出入装置の説明図である。FIG. 9 is an explanatory diagram of a conventional heavy goods loading / unloading device.
5 掻取り部 6 エレベータケ
ーシング 7 掻取りフレーム 10 搬出入装置 12 シャックル 11 重量物吊りロ
ープ 17 シージングロープ 13 巻取機 UL 連続式アンローダ B ブルドーザ
(重量物)5 Scraping part 6 Elevator casing 7 Scraping frame 10 Loading / unloading device 12 Shackle 11 Heavy lifting rope 17 Ceasing rope 13 Winder UL Continuous unloader B Bulldozer (heavy load)
フロントページの続き (72)発明者 本庄 等 愛媛県新居浜市惣開町5番2号 住友重機 械工業株式会社新居浜製造所内 (72)発明者 野村 澄弘 愛媛県新居浜市惣開町5番2号 住友重機 械工業株式会社新居浜製造所内 (72)発明者 井田 傑 岡山県倉敷市水島川崎通1丁目(番地な し) 川崎製鉄株式会社水島製鉄所内 (72)発明者 藤田 昌男 岡山県倉敷市水島川崎通1丁目(番地な し) 川崎製鉄株式会社水島製鉄所内 (72)発明者 石川 知己 岡山県倉敷市水島川崎通1丁目(番地な し) 川崎製鉄株式会社水島製鉄所内 (72)発明者 石川 裕昭 岡山県倉敷市水島川崎通1丁目(番地な し) 川崎製鉄株式会社水島製鉄所内 (72)発明者 兼田 経博 岡山県倉敷市水島川崎通1丁目(番地な し) 川崎製鉄株式会社水島製鉄所内 (72)発明者 大神 正通 岡山県倉敷市水島川崎通1丁目(番地な し) 川崎製鉄株式会社水島製鉄所内 (72)発明者 細見 和夫 岡山県倉敷市水島川崎通1丁目(番地な し) 川崎製鉄株式会社水島製鉄所内 (72)発明者 林岡 卓己 岡山県倉敷市水島川崎通1丁目(番地な し) 川鉄物流株式会社水島支社内 (72)発明者 小田上 徹 岡山県倉敷市水島川崎通1丁目(番地な し) 川鉄物流株式会社水島支社内Front page continued (72) Inventor Honjo and others 5-2 Sokai-cho, Niihama-shi, Ehime Sumitomo Heavy Industries, Ltd. Niihama Works (72) Inventor Sumihiro Nomura 5-2 Sokai-cho, Niihama-shi, Ehime Sumitomo Heavy Industries Machinery Industrial Co., Ltd. Niihama Works (72) Inventor Jie Ida 1-chome, Mizushima Kawasaki-dori, Kurashiki-shi, Okayama Prefecture (no address) Kawasaki Steel Co., Ltd. Mizushima Works, Ltd. (72) In-house Masao Fujita 1-chome, Mizushima-kawasaki-dori, Kurashiki-shi, Okayama Prefecture (No street number) Inside Kawashima Steel Co., Ltd. Mizushima Steel Works (72) Inventor Tomoki Ishikawa 1-chome, Mizushima Kawasaki Dori, Kurashiki City, Okayama Prefecture (No street number) Inside Kawashima Steel Co., Ltd. Mizushima Steel Works (72) Hiroaki Ishikawa Kurashiki Okayama Prefecture 1-chome, Mizushima Kawasaki Dori, Mizushima City, Mizushima Works, Kawasaki Steel Co., Ltd. (72) Nobuhiro Kaneda, 1-chome, Mizushima Kawasaki Dori, Kurashiki City, Okayama Prefecture (72, Mizushima Works, Ltd.) Inventor Masamichi Ogami Mizushima River, Kurashiki City, Okayama Prefecture Kawasaki Steel Co., Ltd. Mizushima Steel Works (72) Inventor Kazuo Hosomi Kazuo Hosomi Mizushima Kawasaki Road, Kurashiki City, Okayama Prefecture (No.) Kawasaki Steel Co., Ltd. Mizushima Steel Works (72) Inventor Hayashi Takami Oka 1-chome, Mizushima Kawasaki-dori, Kurashiki-shi, Okayama (No.) Kawashima Logistics Co., Ltd. Mizushima Branch Office (72) Inventor Toru Odaue 1-chome, Mizushima-Kawasaki-dori, Kurashiki-shi, Okayama (No.) Mizutetsu Logistics Co., Ltd. Branch office
Claims (2)
搬送部を有し、該垂直搬送部の下端にばら物の掻取り部
が設けられた連続式アンローダにおいて、前記掻取り部
の適所に基端を連結した重量物吊下げ用ロープと、該重
量物吊下げ用ロープの先端に下端が連結自在なシージン
グワイヤロープと、該シージングワイヤロープの上端が
連結され、かつ該シージングワイヤロープを巻取り繰出
し自在とする、前記垂直搬送部の適所に設置された巻取
機とからなることを特徴とする連続式アンローダにおけ
る重量物搬出入装置。1. A continuous unloader having a vertical transport section for vertically transporting bulk material at the tip of a boom, and a scrap removal section for the bulk material provided at the lower end of the vertical transport section. A rope for suspending heavy objects having a proximal end connected to the rope, a lower end of the rope for suspending heavy objects that can be freely connected to the rope, and an upper end of the rope for connecting the sheathing wire connected to the rope. A heavy object loading / unloading device for a continuous unloader, comprising: a winder installed at an appropriate position in the vertical transport section so as to be able to wind and unwind.
シージングワイヤロープを2本備え、前記掻取り部の左
右両側面に前記重量物吊下げ用ロープを2本ずつ連結
し、前記垂直搬送部の左右両側部に1台ずつ巻取機を設
置し、右側の巻取機に連結した右側の1本のシージング
ワイヤロープを右側の2本の重量物吊下げ用ロープに連
結するようにし、左側の巻取機に連結した左側の1本の
シージングワイヤロープを左側の2本の重量物吊下げ用
ロープに連結するようにしたことを特徴とする請求項1
記載の重量物搬出入装置。2. The four ropes for suspending heavy objects and the two ropes for sheathing wire are provided, and two ropes for suspending heavy objects are connected to the left and right side surfaces of the scraping unit, two ropes for suspending heavy objects. One winder is installed on each of the left and right sides of the vertical conveyor, and one right sheathing wire rope connected to the right winder is connected to the two heavy ropes on the right side. The one left sheathing wire rope connected to the left winder is connected to two left heavy ropes for suspending heavy objects.
The heavy load / unload device described.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP06507995A JP3463068B2 (en) | 1995-02-27 | 1995-02-27 | Heavy object loading / unloading device in continuous unloader |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP06507995A JP3463068B2 (en) | 1995-02-27 | 1995-02-27 | Heavy object loading / unloading device in continuous unloader |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08231056A true JPH08231056A (en) | 1996-09-10 |
JP3463068B2 JP3463068B2 (en) | 2003-11-05 |
Family
ID=13276595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP06507995A Expired - Lifetime JP3463068B2 (en) | 1995-02-27 | 1995-02-27 | Heavy object loading / unloading device in continuous unloader |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3463068B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013100159A (en) * | 2011-11-08 | 2013-05-23 | Ihi Transport Machinery Co Ltd | Continuous unloader |
CN111268457A (en) * | 2020-03-20 | 2020-06-12 | 大连华锐重工集团股份有限公司 | Quick overhead hoist of machine of clearing storehouse |
-
1995
- 1995-02-27 JP JP06507995A patent/JP3463068B2/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013100159A (en) * | 2011-11-08 | 2013-05-23 | Ihi Transport Machinery Co Ltd | Continuous unloader |
CN111268457A (en) * | 2020-03-20 | 2020-06-12 | 大连华锐重工集团股份有限公司 | Quick overhead hoist of machine of clearing storehouse |
CN111268457B (en) * | 2020-03-20 | 2023-08-04 | 大连华锐重工集团股份有限公司 | Quick overhead hoist of storehouse machine |
Also Published As
Publication number | Publication date |
---|---|
JP3463068B2 (en) | 2003-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3057085B2 (en) | Deep sea descent device | |
JP3463068B2 (en) | Heavy object loading / unloading device in continuous unloader | |
JP6223888B2 (en) | Bridge crane | |
JPH03159897A (en) | Heavy cargo loading device for vessel | |
JPS61143290A (en) | Dredger | |
CN212893590U (en) | Hoisting accessory for engineering construction | |
US2358688A (en) | Timber hauling vehicle and hoist | |
JP2545905Y2 (en) | Ship storage water landing equipment | |
JP3013772B2 (en) | Multipurpose crane | |
JP2649204B2 (en) | Rain-proof equipment for loading bridge-type cranes | |
JP3383796B2 (en) | Fender construction scaffolding equipment | |
JP3399090B2 (en) | Continuous unloader | |
JPS58207225A (en) | Bridge unloader | |
JP2011037627A (en) | Straw basket type cargo handling device | |
JPH0958974A (en) | Quay crane device | |
JP2548657B2 (en) | Unloading device for irregularly shaped cargo loaded in the hold | |
JP2015193466A (en) | bridge crane | |
JP2007099402A (en) | Sling unit for lengthy material | |
JP2858263B2 (en) | Vertical drifting device | |
JPH01317995A (en) | Container delivery method and apparatus in container crane | |
SU1201514A1 (en) | Mounted load-handling machine | |
KR20010016693A (en) | A Rubber Tired Gantry Type Mobile Harbor Crane | |
JP3495477B2 (en) | Handling control method for continuous unloader | |
JPS6320651Y2 (en) | ||
JPH1149483A (en) | Movable crane for underground construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080822 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080822 Year of fee payment: 5 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080822 Year of fee payment: 5 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080822 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090822 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090822 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100822 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100822 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110822 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110822 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120822 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130822 Year of fee payment: 10 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |