JPH08209895A - Wall surface construction work method - Google Patents

Wall surface construction work method

Info

Publication number
JPH08209895A
JPH08209895A JP4233595A JP4233595A JPH08209895A JP H08209895 A JPH08209895 A JP H08209895A JP 4233595 A JP4233595 A JP 4233595A JP 4233595 A JP4233595 A JP 4233595A JP H08209895 A JPH08209895 A JP H08209895A
Authority
JP
Japan
Prior art keywords
building material
large building
wall surface
metal fitting
recess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4233595A
Other languages
Japanese (ja)
Inventor
Toshizumi Fujii
銛純 藤井
Keisuke Katayama
敬介 片山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inax Corp
Original Assignee
Inax Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inax Corp filed Critical Inax Corp
Priority to JP4233595A priority Critical patent/JPH08209895A/en
Publication of JPH08209895A publication Critical patent/JPH08209895A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To prevent transmission of contraction stress on the backing wall surface side to a large building material. CONSTITUTION: Recessed parts 1 are formed on a backing wall surface W, and metal fittings 3 insertable into the recessed parts 1 are protrusively arranged on the reverse of a large building material 2 such as a tile and stone. In a condition where mortar or an adhesive 6 is filled in the recessed parts 1, the metal fittings 3 are inserted into and installed in the recessed parts 1, and the large building material 2 is fixedly arranged on a surface of the backing wall surface W by hardening of the mortar or the adhesive 6.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、下地壁面の表面に大
型建材を固設する壁面施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wall construction method for fixing a large building material on the surface of a base wall.

【0002】[0002]

【従来の技術及びその課題】従来、湿式工法でコンクリ
ート壁面或いはコンクリート壁面に下地モルタルを施し
た壁面にモルタルで直接タイルを貼付施工する方法が採
用されているが、このようにモルタルで直接タイルを壁
面に貼着すると、壁面が収縮することにより、壁面から
応力がタイルに加わり、応力に起因してタイルにクラッ
クが入りタイルが割れてしまうという問題点があった。
2. Description of the Related Art Conventionally, a method of directly attaching a tile with mortar to a concrete wall surface or a wall surface obtained by applying a base mortar to a concrete wall by a wet method has been adopted. When it is attached to a wall surface, the wall surface contracts, stress is applied to the tile, and the tile is cracked due to the stress and the tile is broken.

【0003】[0003]

【課題を解決するための手段】本発明は上記従来の問題
点に鑑み案出したものであって、タイル等の割れの生じ
ない壁面施工方法を提供せんことを目的とし、その第1
の要旨は、下地壁面に凹部を形成するとともに、タイ
ル,石材等の大型建材の裏面には、前記凹部内へ挿入可
能な突起を形成した金具を突設し、前記凹部内にモルタ
ルまたは接着剤を充填した状態で前記金具を凹部内に挿
着させて前記モルタルまたは接着剤の硬化により前記下
地壁面の表面に前記大型建材を固設することである。
SUMMARY OF THE INVENTION The present invention was devised in view of the above-mentioned problems of the prior art, and an object thereof is to provide a wall surface construction method which does not cause cracks in tiles and the like.
The main point of the above is to form a recess in the wall surface of the base, and to project a metal fitting having a protrusion that can be inserted into the recess on the back surface of a large building material such as tile or stone, and to provide mortar or adhesive in the recess. That is, the metal fitting is inserted into the concave portion in a state of being filled, and the large building material is fixedly mounted on the surface of the base wall surface by hardening the mortar or the adhesive.

【0004】また、第2の要旨は、前記下地壁面と前記
大型建材の裏面は接着させることなく施工することであ
る。
The second gist is that the base wall surface and the back surface of the large building material are constructed without being adhered.

【0005】また、第3の要旨は、前記下地壁面と大型
建材の裏面間に、前記下地壁面から前記大型建材に加わ
る応力を絶縁する弾性シートを貼設したことである。
The third gist is that an elastic sheet is attached between the base wall surface and the back surface of the large building material to insulate the stress applied to the large building material from the base wall surface.

【0006】また、第4の要旨は、前記下地壁面と大型
建材の裏面間を弾性接着剤で接着したことである。
The fourth gist is that the base wall surface and the back surface of the large building material are bonded by an elastic adhesive.

【0007】また、第5の要旨は、前記下地壁面と大型
建材の裏面間を弱接着したことである。
The fifth gist is that the base wall surface and the back surface of the large building material are weakly bonded.

【0008】また、第6の要旨は、前記下地壁面に、前
記大型建材の下端を支持するL金具を配設することであ
る。
A sixth gist is to dispose an L metal fitting for supporting the lower end of the large building material on the base wall surface.

【0009】また、第7の要旨は、前記金具は、大型建
材の裏面に凹部を設けて該凹部内で先端部を拡径させて
大型建材に固定状に突設されていることである。
The seventh gist is that the metal fitting is provided in a fixed shape on the large building material by providing a recess on the back surface of the large building material and enlarging the diameter of the tip in the recess.

【0010】また、第8の要旨は、前記大型建材の裏面
の凹部は蟻穴であり、該蟻穴は、前記拡径した金具先端
部より広く形成されていることである。
An eighth gist is that the recess on the back surface of the large building material is a dovetail hole, and the dovetail hole is formed wider than the tip end portion of the metal fitting having the increased diameter.

【0011】[0011]

【作用】前記第1の要旨において、タイル,石材等の大
型建材の裏面から突設した金具を下地壁面側の凹部内に
モルタルまたは接着剤を介し固設させることにより、下
地壁面に直接大型建材を貼り付けることなく下地壁面の
表面に大型建材を固設することができ、下地壁面からの
収縮等による応力の大型建材への伝わりをなくし、大型
建材の割れ等を良好に防ぐことができる。また、金具は
小さく、従来のレールを使う施工等に比べてコストダウ
ンとなり、金具は金属で可塑性及び弾力性を有するので
歪みを吸収できるものとなる。また、金具の下地壁面側
には突起が存在するため、抜けにくくなる。
In the first aspect of the present invention, a metal fitting projecting from the back surface of a large building material such as a tile or a stone is fixed in the recess on the wall surface side of the base material with mortar or an adhesive to directly mount the large building material wall. A large building material can be fixed on the surface of the base wall surface without sticking, the stress due to contraction from the base wall surface is not transmitted to the large building material, and cracking of the large building material can be favorably prevented. Further, the metal fittings are small, resulting in cost reduction as compared with the conventional construction using rails, and since the metal fittings have plasticity and elasticity, the distortion can be absorbed. Further, since there is a protrusion on the base wall surface side of the metal fitting, it is difficult to come off.

【0012】また、前記第2の要旨において、大型建材
の裏面と下地壁面間は接着されることなく隙間等が形成
されるため、下地壁面の収縮変形や熱膨張率の差による
応力を大型建材に伝えないので、大型建材の破損が良好
に防止される。
Further, in the second aspect, since a gap or the like is formed between the back surface of the large building material and the base wall surface without being adhered, stress due to contraction deformation of the base wall surface or difference in coefficient of thermal expansion is applied to the large building material. Therefore, damage to large building materials can be effectively prevented.

【0013】また、前記第3の要旨において、下地壁面
と大型建材の裏面間に弾性シートを貼設したことによ
り、弾性シートにより下地壁面側からの応力が吸収され
て、大型建材に応力が伝わることが良好に防止される。
さらに、大型建材の表面に力が加わったときに、弾性シ
ートにより大型建材が支えられ、大型建材の破損が防が
れる。
In the third aspect, since the elastic sheet is attached between the base wall surface and the back surface of the large building material, the elastic sheet absorbs the stress from the base wall surface side, and the stress is transmitted to the large building material. Is well prevented.
Further, when a force is applied to the surface of the large building material, the elastic sheet supports the large building material and prevents the large building material from being damaged.

【0014】また、前記第4の要旨において、下地壁面
と大型建材の裏面間を弾性接着剤で接着したことによ
り、下地壁面側からの応力が吸収されて、大型建材に応
力が伝わることが良好に防止される。さらに、大型建材
の表面に力が加わったときに、弾性接着剤により大型建
材が支えられ、大型建材の破損が防がれる。
Further, in the fourth aspect, since the base wall surface and the back surface of the large building material are bonded with an elastic adhesive, the stress from the base wall surface side is absorbed and the stress is preferably transmitted to the large building material. To be prevented. Furthermore, when a force is applied to the surface of the large building material, the large building material is supported by the elastic adhesive and damage to the large building material is prevented.

【0015】また、前記第5の要旨において、下地壁面
と大型建材の裏面間を弱接着したことにより、下地壁面
の収縮変形や熱膨張率の差による応力を大型建材に伝え
ないので、大型建材の破損が良好に防止される。
Further, in the fifth aspect, since the base wall surface and the back surface of the large building material are weakly adhered, the stress due to the contraction deformation of the base wall surface and the difference in the coefficient of thermal expansion is not transmitted to the large building material. Is effectively prevented from being damaged.

【0016】また、前記第6の要旨において、下地壁面
に、前記大型建材の下端を支持するL金具を配設するこ
とにより、このL金具で大型建材の下端を支持するた
め、凹部内でモルタルまたは接着剤が硬化するまでに大
型建材が下方へズレることがなく、正確な位置に大型建
材を固設することが可能となる。
Further, in the sixth aspect, by disposing an L metal fitting for supporting a lower end of the large building material on the base wall surface, the L metal fitting supports the lower end of the large building material. Alternatively, the large building material does not shift downward until the adhesive hardens, and the large building material can be fixed at an accurate position.

【0017】また、前記第7の要旨において、金具は、
大型建材の裏面に凹部を設けて該凹部内で先端部を拡径
させて大型建材に固定状に突設されていることにより、
金具が抜けず、大型建材の裏面に確実に金具を突設させ
ることができる。
In the seventh aspect, the metal fitting is
By providing a concave portion on the back surface of the large building material and expanding the diameter of the tip in the concave portion so as to be fixedly provided on the large building material,
The metal fitting does not come off, and the metal fitting can be reliably projected on the back surface of the large building material.

【0018】また、前記第8の要旨において、大型建材
の裏面の凹部は蟻穴であり、該蟻穴は、前記拡径した金
具先端部より広く形成されていることにより、金具が抜
けず、かつガタを持たせることができ、施工時に金具の
位置と下地壁面の凹部の位置にズレがあっても対応でき
るものとなる。
Further, in the eighth aspect, the recess on the back surface of the large building material is a dovetail hole, and since the dovetail hole is formed wider than the tip end portion of the metal fitting having the increased diameter, the metal fitting does not come off. In addition, it is possible to add backlash, and it is possible to cope with a deviation between the position of the metal fitting and the position of the recess on the base wall surface during construction.

【0019】[0019]

【実施例】以下、本発明の実施例を図面に基づいて説明
する。図1は、一辺が30cm以上の方形状等に形成され
たタイル,石材等からなる大型建材2の裏面に固定され
る金具3を分解図で示すものであり、大型建材2の裏面
には凹み状に凹部2aを形成させ、この凹部2aの奥側
にはさらに拡径した拡径穴2bを形成させておき、裏面
側より凹部2a内に金具3の先端拡径部3cを挿入する
のであるが、金具3は、先端拡径部3cを先端に有し他
端側に外側に突出する突起3aを有する外管3bと、こ
の外管3b内に圧入される内管3dとにより構成されて
おり、図2に示すように、凹部2a内に金具3の先端拡
径部3cを挿入させた状態で、図3に示すように、内管
3dを外管3b内に圧入させることにより、内管3dに
より先端拡径部3cは外側へ拡径されて前記凹部2a内
に抜止された状態で金具3が固定されるものであり、大
型建材2の裏面の所定位置に凹部2aを形成させておけ
ば、容易に金具3を大型建材2の裏面に突出状に取り付
けることができる。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is an exploded view showing a metal fitting 3 fixed to the back surface of a large building material 2 made of tiles, stones, etc., each side of which has a square shape of 30 cm or more. The recessed portion 2a is formed in the shape of a circle, the expanded diameter hole 2b having a further enlarged diameter is formed on the inner side of the recessed portion 2a, and the tip end enlarged diameter portion 3c of the metal fitting 3 is inserted into the recessed portion 2a from the back surface side. However, the metal fitting 3 is composed of an outer pipe 3b having a tip enlarged diameter portion 3c at the tip and a protrusion 3a protruding outward at the other end, and an inner pipe 3d press-fitted into the outer pipe 3b. As shown in FIG. 2, by inserting the inner pipe 3d into the outer pipe 3b as shown in FIG. 3 in a state where the tip enlarged diameter portion 3c of the metal fitting 3 is inserted into the recess 2a, The tip expanded diameter portion 3c is expanded to the outside by the pipe 3d and is retained in the recessed portion 2a so as not to be disassembled. There is intended to be fixed, if to form a recess 2a at a predetermined position on the back side of a large building materials 2, easily can be attached to shell 3 to protrude on the back of a large building materials 2.

【0020】なお、図3に示すように、前記金具3の外
管3bの先端に外側へ突出状に鍔突起3eを一体形成さ
せておくこともでき、この鍔突起3e及び前記突起3a
が後述する壁面側に形成された凹部1内に抜止された状
態で固定されるのである。なお、図3の状態において凹
部2aの内周面と前記先端拡径部3cの外周面間に抜け
が生じない程度のガタつきを形成させておけば、このガ
タつきにより、金具3と後述する壁面の凹部1との位置
にズレが生じていても良好に対応させて、凹部1内に良
好に金具3を挿着できるものとなる。
As shown in FIG. 3, a flange projection 3e may be integrally formed on the tip of the outer tube 3b of the metal fitting 3 so as to project outward, and the flange projection 3e and the projection 3a may be formed.
Is fixed in the recessed portion 1 formed on the wall surface side, which will be described later, in a state in which it is prevented from coming off. It should be noted that, in the state of FIG. 3, if the rattling is formed between the inner peripheral surface of the concave portion 2a and the outer peripheral surface of the tip enlarged diameter portion 3c to the extent that no slip-out occurs, the rattling will be described later as the metal fitting 3 due to this rattling. Even if the position of the wall surface is different from that of the recessed portion 1, the metal fitting 3 can be properly inserted into the recessed portion 1 in a well-matched manner.

【0021】次に、図4は形状の異なる金具3を用いた
大型建材を壁面に固設した状態の断面構成図であり、コ
ンクリートまたはALC(軽量気泡コンクリート)また
は押出セメント板等で構成された壁面Wには、予め凹部
1を形成しておき、この凹部1の奥側は拡径した拡径部
1aとなっており、このような凹部1は壁面Wに後発的
にドリルを用いて盲穴状に形成させても良く、また、予
めコンクリート型枠に突起を設けておき、壁面Wを型枠
内で形成させる際に突起を介しこのような凹部1を形成
させたものでも良い。なお、凹部1は丸穴状であって
も、また、溝状に形成したものであっても良い。
Next, FIG. 4 is a cross-sectional structural view showing a state in which a large building material using metal fittings 3 having different shapes is fixedly mounted on the wall surface, and is made of concrete, ALC (lightweight cellular concrete), extruded cement board or the like. A concave portion 1 is formed in advance on the wall surface W, and the inner side of the concave portion 1 is an expanded diameter portion 1a having an enlarged diameter. Such a concave portion 1 is blindly formed on the wall surface W later by using a drill. It may be formed in a hole shape, or the concrete formwork may be provided with protrusions in advance, and such a recess 1 may be formed via the protrusions when the wall surface W is formed in the formwork. The recess 1 may have a round hole shape or a groove shape.

【0022】一方、壁面Wの表面に固設する大型建材2
は一辺が30cm以上のタイル,その他石材等で構成され
ており、大型建材2の裏面側には予め四隅側の四カ所程
度に奥側が拡径した蟻穴2a,2a(凹部)が形成され
ており、この各蟻穴2a,2a(凹部)内には金具3の
先端側が挿着されて、蟻穴2a(凹部)から抜止された
状態で金具3は大型建材2の裏面から外方に突出されて
おり、金具3の他端側にはフランジ状に突起3aが形成
されたものとなっている。
On the other hand, a large building material 2 fixed on the surface of the wall surface W
Is composed of tiles with a side of 30 cm or more, and other stone materials, etc., and the back side of the large building material 2 has dovetail holes 2a, 2a (recesses) with the inner diameter expanded in advance at four locations on the four corner sides. The tip side of the metal fitting 3 is inserted into each of the dovetail holes 2a, 2a (recess), and the metal fitting 3 projects outward from the back surface of the large building material 2 in a state where the metal fitting 3 is retained from the dovetail hole 2a (recess). The metal fitting 3 has a flange-like projection 3a formed on the other end thereof.

【0023】予め大型建材2の裏面に、このように四本
程度の金具3,3を突出させておき、各金具3にはワッ
シャ5をそれぞれ嵌め込んでおき、この状態で前記壁面
W側の凹部1内にはモルタルまたは接着剤6を充填させ
ておき、この充填されたモルタルまたは接着剤6内に表
側より前記金具3,3をそれぞれ挿入させて、モルタル
または接着剤6を硬化させることにより金具3を凹部1
内に固定させることができ、金具3は突起3aを介し抜
止された状態で強固に凹部1内で固定されるため、この
状態で大型建材2は壁面Wの表面に固定状態となり、前
記ワッシャ5の分だけ壁面Wと大型建材2の裏面間に隙
間Sが形成されることとなる。
In this way, about four metal fittings 3, 3 are projected on the back surface of the large building material 2 in advance, and washers 5 are fitted into the respective metal fittings 3, respectively. By filling the mortar or the adhesive 6 in the recess 1 and inserting the metal fittings 3 in the filled mortar or the adhesive 6 from the front side, respectively, to cure the mortar or the adhesive 6. Metal fitting 3 is recessed 1
Since the metal fitting 3 is firmly fixed in the recess 1 while being prevented from being pulled out through the protrusion 3a, the large building material 2 is fixed to the surface of the wall surface W in this state, and the washer 5 The gap S is formed between the wall surface W and the back surface of the large building material 2 by the amount of.

【0024】なお、ワッシャ5により凹部1の開口が塞
がれ、接着剤6のはみ出しが防がれる。なお、はみ出し
を防ぐ目的で凹部1の開口にガムテープを貼っても良
い。なお、特に凹部1内に充填する接着剤6として膨張
セメントを用いると、この膨張セメントは収縮防止材が
混入されているため硬化時に収縮することがなく、従っ
て金具3をより強固に凹部1内に固定させることができ
るものとなる。
The washer 5 closes the opening of the recess 1 to prevent the adhesive 6 from protruding. A gum tape may be attached to the opening of the recess 1 for the purpose of preventing the protrusion. In particular, when expansion cement is used as the adhesive 6 to be filled in the concave portion 1, the expansion cement does not shrink when cured because the expansion preventing agent is mixed therein. It can be fixed to.

【0025】なお、本例では、予め壁面Wの表面に前記
大型建材2の下端を支持することのできるL金具4を固
設したものを例示しており、このL金具4は壁面Wの表
面に当接状に固定される垂直片4aと、水平方向に突出
する水平片4bからなり、水平片4bの上面に大型建材
2が載置されて、大型建材2が所定位置に保持されるも
のであり、モルタルまたは接着剤6の硬化前に大型建材
2が下方へズレることがなく、大型建材2を所定位置に
正確に配置させることができる。なお、図中7は大型建
材2,2間に充填される目地用のモルタルである。
In this example, an L metal fitting 4 capable of supporting the lower end of the large building material 2 is fixedly installed on the surface of the wall surface W in advance. The L metal fitting 4 is the surface of the wall surface W. Consisting of a vertical piece 4a fixed in abutting contact with the horizontal piece 4b and a horizontal piece 4b protruding in the horizontal direction, the large building material 2 is placed on the upper surface of the horizontal piece 4b, and the large building material 2 is held at a predetermined position. Therefore, the large building material 2 is not displaced downward before the mortar or the adhesive 6 is cured, and the large building material 2 can be accurately arranged at a predetermined position. In the figure, 7 is a mortar for joints filled between the large building materials 2 and 2.

【0026】このように凹部1内に充填したモルタルま
たは接着剤6を介し金具3が固定されて、この金具3に
支持されて大型建材2が所定位置に固定されるため、大
型建材2と壁面W間には隙間Sが形成され、この隙間S
により、壁面Wが収縮等して、壁面W側に収縮応力が発
生した場合にも応力は直接大型建材2には伝わることが
なく、そのため大型建材2に従来のようにクラックが生
ずることがなく、大型建材2は割れることなく良好な状
態を維持することができるものとなる。
Since the metal fitting 3 is fixed via the mortar or the adhesive 6 thus filled in the recess 1 and the large building material 2 is fixed to the predetermined position by being supported by the metal fitting 3, the large building material 2 and the wall surface are fixed. A gap S is formed between W, and this gap S
As a result, even when the wall surface W shrinks and contraction stress occurs on the wall surface W side, the stress is not directly transmitted to the large building material 2, and therefore the large building material 2 is not cracked as in the conventional case. Therefore, the large building material 2 can be maintained in a good state without cracking.

【0027】なお、前記大型建材2に形成した蟻穴2a
と金具3との嵌合状態を多少ガタつきを生ずる程度の関
係寸法に予め設定しておけば、壁面W側に収縮応力が生
じた場合にも、金具3と蟻穴2aの内周間のガタによ
り、より良好に収縮応力の大型建材2への伝わりを防ぐ
ことができ、より確実に大型建材2の割れを防ぐことが
できるものとなる。施工時に金具の位置と下地壁面の凹
部の位置にズレがあっても対応できるものとなる。
The dovetail hole 2a formed in the large building material 2
If the fitting state between the metal fitting 3 and the metal fitting 3 is set in advance to a relational dimension that causes some rattling, even when contraction stress occurs on the wall surface W side, the metal material 3 and the inner circumference of the dovetail hole 2a are The looseness can more effectively prevent the contraction stress from being transmitted to the large-sized building material 2, and more reliably prevent the large-sized building material 2 from cracking. Even if there is a gap between the position of the metal fitting and the position of the recess on the base wall surface during construction, it is possible to deal with it.

【0028】なお、本例では、ワッシャ5を介し壁面W
と大型建材2の裏面間に隙間Sを形成させた場合を例示
したが、この隙間S内に弾性シートを貼設しても良く、
そのような場合にはワッシャ5を用いることなく、予め
壁面Wに弾性シートを貼着しておき、その表面に大型建
材2を固設することができ、弾性シートを介し壁面W側
からの応力を遮断して、応力が大型建材2に伝わらない
構造とすることができる。さらに、大型建材2の表面に
力が加わったときに、弾性シートにより大型建材2が支
えられ、大型建材2の破損が防がれる。
In this example, the wall surface W is inserted through the washer 5.
The case where the gap S is formed between the back surface of the large building material 2 and the large building material 2 has been exemplified, but an elastic sheet may be stuck in the gap S,
In such a case, an elastic sheet may be attached to the wall surface W in advance without using the washer 5, and the large building material 2 can be fixedly mounted on the surface, and the stress from the wall surface W side can be applied via the elastic sheet. Can be blocked, and a structure in which stress is not transmitted to the large building material 2 can be obtained. Furthermore, when a force is applied to the surface of the large building material 2, the large building material 2 is supported by the elastic sheet, and damage to the large building material 2 is prevented.

【0029】尚、隙間S内に弾性接着剤を用い、弾性接
着剤で壁面Wと大型建材2の裏面間を接着しても良く、
壁面W側からの応力が吸収されて、大型建材2に応力が
伝わることが良好に防止される。さらに、大型建材2の
表面に力が加わったときに、弾性接着剤により大型建材
2が支えられ、大型建材2の破損が防がれる。
An elastic adhesive may be used in the gap S, and the wall surface W and the back surface of the large building material 2 may be bonded by the elastic adhesive.
The stress from the wall surface W side is absorbed and the stress is effectively prevented from being transmitted to the large building material 2. Furthermore, when a force is applied to the surface of the large building material 2, the large building material 2 is supported by the elastic adhesive, and damage to the large building material 2 is prevented.

【0030】さらに、壁面Wと大型建材2の裏面間を、
セメントの割合を極端に少なくした貧調合モルタルで弱
接着しても良く、弱接着では、壁面Wの収縮変形や熱膨
張率の差による応力を大型建材2に伝えないので、大型
建材2の破損が良好に防止される。
Further, between the wall surface W and the back surface of the large building material 2,
Weak bonding may be performed with poorly mixed mortar with an extremely small proportion of cement. In weak bonding, stress due to shrinkage deformation of the wall surface W and the difference in coefficient of thermal expansion is not transmitted to the large building material 2, so the large building material 2 is damaged. Is satisfactorily prevented.

【0031】なお、図7には前記金具3の別例を示す
が、先端側に突起3aを有する金具3にはネジが切られ
ており、この金具3の他端側に外嵌状に筒状のカラー1
0を挿着しておき、このカラー10は、金具ピン3が挿
通する筒状の基部10aと、この基部10aから延出す
るスリット10c,10c,10cにより縦方向に割ら
れた複数の拡径片部10b,10b,10bを有してお
り、さらにこのカラー10の拡径片部10b,10b内
に挿着される埋設ナット11は、軸部11aの先端に先
端側へ拡径する円錐部11bが延出形成されており、軸
部11aから円錐部11bに亘り内周側には金具3が螺
合する雌ネジ11cが形成されたものとなっている。
FIG. 7 shows another example of the metal fitting 3. The metal fitting 3 having the projection 3a on the tip side is threaded, and the other end of the metal fitting 3 is fitted with a cylinder. Color 1
0 is inserted and the collar 10 has a cylindrical base portion 10a through which the metal fitting pin 3 is inserted, and a plurality of expanded diameters vertically divided by slits 10c, 10c, 10c extending from the base portion 10a. The embedded nut 11 that has the pieces 10b, 10b, 10b and is inserted into the diameter-expanding pieces 10b, 10b of the collar 10 has a conical portion that expands toward the tip side of the shaft 11a. 11b is formed to extend, and a female screw 11c with which the metal fitting 3 is screwed is formed on the inner peripheral side from the shaft portion 11a to the conical portion 11b.

【0032】このような埋設ナット11の外周に前記カ
ラー10を嵌め込み、さらにカラー10内に金具3を挿
入して、金具3を埋設ナット11の雌ネジ11cに螺合
させた状態で、前述した大型建材2に形成した蟻穴2a
内に埋設ナット11とカラー10の部分を挿入し、この
状態で金具3を外側へ引っ張ると、埋設ナット11がカ
ラー10の拡径片部10b内に圧入されてゆき、これに
より拡径片部10bが外側に拡径して蟻穴2a内に抜止
された状態でカラー10と埋設ナット11が固定される
ものであり、このような構造の金具3を用いることによ
り容易に大型建材2の蟻穴2aから突出状に金具3を形
成させることができるものである。
The collar 10 is fitted on the outer periphery of the embedded nut 11, and the metal fitting 3 is inserted into the collar 10 so that the metal fitting 3 is screwed into the female screw 11c of the embedded nut 11. Dovetail 2a formed in large building material 2
When the embedded nut 11 and the collar 10 are inserted into the inside and the metal fitting 3 is pulled outward in this state, the embedded nut 11 is press-fitted into the diameter-increasing piece portion 10b of the collar 10 and thereby the diameter-increasing piece portion. The collar 10 and the embedded nut 11 are fixed in a state where the diameter 10b is expanded to the outside and is retained inside the dovetail hole 2a. By using the metal fitting 3 having such a structure, the dovetail of the large building material 2 can be easily carried out. The metal fitting 3 can be formed so as to project from the hole 2a.

【0033】次に、図5は変更例を示すものであり、本
例においては、前記蟻穴2a,2aを下方側に下傾した
傾斜状に形成させておき、各蟻穴2a内にそれぞれ傾斜
状に金具3を固定させておき、同様に壁面W側の凹部1
も開口側から奥側へ向かって下傾する傾斜状に形成した
ものであり、このような構造においては、傾斜状の凹部
1内に充填したモルタルまたは接着剤6内に落とし込み
状に金具3,3を挿着することができ、金具3の凹部1
内への挿着が安定的に行なわれて、L金具4が存在しな
い場合にも大型建材2の下方へのズレ落ちが極めて少な
く、正確な位置に大型建材2を固定させることができる
ものとなる。また、大型建材2が面外方向へズレて落ち
るのが防がれる。
Next, FIG. 5 shows a modified example. In this example, the dovetail holes 2a, 2a are formed in a slanting shape which is inclined downward and the dovetail holes 2a are respectively formed in the dovetail holes 2a. The metal fitting 3 is fixed in an inclined shape, and the concave portion 1 on the wall surface W side is similarly formed.
Is also formed in an inclined shape that inclines downward from the opening side to the rear side. In such a structure, the metal fitting 3 is dropped into the mortar or adhesive 6 filled in the inclined concave portion 1. 3 can be attached, and the recess 1 of the metal fitting 3
It can be stably inserted into the inside, and even if the L metal fitting 4 does not exist, the downward displacement of the large building material 2 is extremely small, and the large building material 2 can be fixed at an accurate position. Become. In addition, the large building material 2 is prevented from slipping out of the plane and falling.

【0034】次に、図6は更なる変更例を示すものであ
り、本例においては、凹部1を直穴状とし、図4または
図5に示すような拡径部1aを省略したものであり、こ
のような構造では凹部1の形成が容易なものとなる。
Next, FIG. 6 shows a further modified example. In this example, the concave portion 1 has a straight hole shape, and the expanded diameter portion 1a as shown in FIG. 4 or 5 is omitted. With such a structure, the recess 1 can be easily formed.

【0035】[0035]

【発明の効果】本発明は、下地壁面に凹部を形成すると
ともに、タイル,石材等の大型建材の裏面には、前記凹
部内へ挿入可能な突起を形成した金具を突設し、前記凹
部内にモルタルまたは接着剤を充填した状態で前記金具
を凹部内に挿着させて前記モルタルまたは接着剤の硬化
により前記下地壁面の表面に前記大型建材を固設するこ
ととしたため、下地壁面に直接大型建材を貼り付けるこ
となく下地壁面の表面に大型建材を固設することがで
き、下地壁面からの収縮等による応力の大型建材への伝
わりをなくし、大型建材の割れ等を良好に防ぐことがで
きる。また、金具は小さく、従来のレールを使う施工等
に比べてコストダウンとなり、金具は金属で可塑性及び
弾力性を有するので歪みを吸収できるものとなる。ま
た、金具の下地壁面側には突起が存在するため、抜けに
くくなる。
According to the present invention, in addition to forming a concave portion on a base wall surface, a metal fitting having a protrusion that can be inserted into the concave portion is provided on the back surface of a large building material such as a tile or a stone, and Since the metal fittings are inserted into the recesses with the mortar or adhesive filled in and the large building material is fixed on the surface of the base wall by curing the mortar or adhesive, it A large building material can be fixed on the surface of the base wall without attaching the building material, and the stress due to contraction from the base wall can be prevented from being transmitted to the large building material, and cracking of the large building material can be prevented satisfactorily. . Further, the metal fittings are small, resulting in cost reduction as compared with the conventional construction using rails, and since the metal fittings have plasticity and elasticity, the distortion can be absorbed. Further, since there is a protrusion on the base wall surface side of the metal fitting, it is difficult to come off.

【0036】また、前記下地壁面と前記大型建材の裏面
は接着させることなく施工することにより、大型建材の
裏面と下地壁面間は接着されることなく隙間等が形成さ
れるため、下地壁面の収縮変形や熱膨張率の差による応
力を大型建材に伝えないので、大型建材の破損が良好に
防止される。
Further, by performing the construction without adhering the base wall surface and the back surface of the large building material, a gap or the like is formed between the back surface of the large building material and the base wall surface without adhering, so that the contraction of the base wall surface occurs. Since the stress due to the deformation or the difference in the coefficient of thermal expansion is not transmitted to the large building material, the large building material is effectively prevented from being damaged.

【0037】また、前記下地壁面と大型建材の裏面間
に、前記下地壁面から前記大型建材に加わる応力を絶縁
する弾性シートを貼設したことにより、弾性シートによ
り下地壁面側からの応力が吸収されて、大型建材に応力
が伝わることが良好に防止される。さらに、大型建材の
表面に力が加わったときに、弾性シートにより大型建材
が支えられ、大型建材の破損が防がれる。
Further, since the elastic sheet for insulating the stress applied to the large building material from the base wall surface is pasted between the base wall surface and the back surface of the large building material, the elastic sheet absorbs the stress from the base wall surface side. Therefore, it is possible to favorably prevent the stress from being transmitted to the large building material. Further, when a force is applied to the surface of the large building material, the elastic sheet supports the large building material and prevents the large building material from being damaged.

【0038】また、前記下地壁面と大型建材の裏面間を
弾性接着剤で接着したことにより、弾性接着剤で下地壁
面側からの応力が吸収されて、大型建材に応力が伝わる
ことが良好に防止される。さらに、大型建材の表面に力
が加わったときに、弾性接着剤により大型建材が支えら
れ、大型建材の破損が防がれる。
Further, since the base wall surface and the back surface of the large building material are adhered to each other with the elastic adhesive, the elastic adhesive absorbs the stress from the base wall surface side and prevents the stress from being transmitted to the large building material. To be done. Furthermore, when a force is applied to the surface of the large building material, the large building material is supported by the elastic adhesive and damage to the large building material is prevented.

【0039】また、前記下地壁面と大型建材の裏面間を
弱接着したことにより、下地壁面の収縮変形や熱膨張率
の差による応力を大型建材に伝えないので、大型建材の
破損が良好に防止される。
Further, since the base wall surface and the back surface of the large building material are weakly adhered, stress due to shrinkage deformation of the base wall surface and difference in coefficient of thermal expansion is not transmitted to the large building material, so that damage to the large building material is prevented satisfactorily. To be done.

【0040】また、前記下地壁面に、前記大型建材の下
端を支持するL金具を配設することにより、このL金具
で大型建材の下端を支持するため、凹部内でモルタルま
たは接着剤が硬化するまでに大型建材が下方へズレるこ
とがなく、正確な位置に大型建材を固設することが可能
となる。
By disposing an L metal fitting for supporting the lower end of the large building material on the base wall surface, the L metal fitting supports the lower end of the large building material, so that the mortar or the adhesive is hardened in the recess. By this time, the large building material will not be displaced downward, and it will be possible to fix the large building material in an accurate position.

【0041】また、前記金具は、大型建材の裏面に凹部
を設けて該凹部内で先端部を拡径させて大型建材に固定
状に突設されていることにより、金具が抜けず、大型建
材の裏面に確実に金具を突設させることができる。
Further, since the metal fitting is provided with a concave portion on the back surface of the large building material, and the tip portion is expanded in the concave portion so as to be fixedly projected to the large building material, the metal fitting does not come off and the large building material The metal fittings can be reliably provided on the back surface of the.

【0042】また、前記大型建材の裏面の凹部は蟻穴で
あり、該蟻穴は、前記拡径した金具先端部より広く形成
されていることにより、金具が抜けず、かつガタを持た
せることができ、施工時に金具の位置と下地壁面の凹部
の位置にズレがあっても対応できるものとなる。
Further, the recess on the back surface of the large building material is a dovetail hole, and the dovetail hole is formed wider than the tip end portion of the expanded metal fitting so that the metal fitting does not come off and has play. Therefore, even if there is a deviation between the position of the metal fitting and the position of the concave portion of the base wall surface during construction, it is possible to cope with it.

【図面の簡単な説明】[Brief description of drawings]

【図1】大型建材の裏面に形成した凹部内に固設される
金具の断面構成図である。
FIG. 1 is a cross-sectional configuration diagram of a metal fitting fixed in a recess formed on the back surface of a large building material.

【図2】凹部内に金具の先端拡径部を挿入した状態の断
面構成図である。
FIG. 2 is a cross-sectional configuration diagram showing a state in which a tip enlarged diameter portion of a metal fitting is inserted into a recess.

【図3】さらに先端拡径部を凹部内に固定させて大型建
材に金具を固定した状態の断面構成図である。
FIG. 3 is a cross-sectional configuration diagram showing a state in which the tip diameter-expanded portion is further fixed in the recess and the metal fitting is fixed to the large building material.

【図4】壁面構造を示す断面構成図である。FIG. 4 is a cross-sectional configuration diagram showing a wall surface structure.

【図5】変更例の壁面構造を示す断面構成図である。FIG. 5 is a cross-sectional configuration diagram showing a wall surface structure of a modified example.

【図6】変更例の壁面構造を示す断面構成図である。FIG. 6 is a cross-sectional configuration diagram showing a wall surface structure of a modified example.

【図7】大型建材の裏面に突設される金具の構成部材の
分解斜視図である。
FIG. 7 is an exploded perspective view of constituent members of a metal fitting projecting from the back surface of a large building material.

【符号の説明】[Explanation of symbols]

W 壁面 1 凹部 1a 拡径部 2 大型建材 2a 蟻穴 3 金具 3a 突起 3b 外管 3c 先端拡径部 3d 内管 3e 鍔突起 4 L金具 5 ワッシャ 6 モルタルまたは接着剤 W Wall surface 1 Recess 1a Expanded part 2 Large building material 2a Dovetail 3 Metal fitting 3a Projection 3b Outer tube 3c Tip expanded part 3d Inner tube 3e Collar projection 4 L metal fitting 5 Washer 6 Mortar or adhesive

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 下地壁面に凹部を形成するとともに、タ
イル,石材等の大型建材の裏面には、前記凹部内へ挿入
可能な突起を形成した金具を突設し、前記凹部内にモル
タルまたは接着剤を充填した状態で前記金具を凹部内に
挿着させて前記モルタルまたは接着剤の硬化により前記
下地壁面の表面に前記大型建材を固設することを特徴と
する壁面施工方法。
1. A recess is formed on a base wall surface, and a metal fitting having a protrusion that can be inserted into the recess is provided on the back surface of a large building material such as a tile or a stone, and mortar or adhesive is applied to the recess. A wall construction method, characterized in that the metal fitting is inserted into the recess in a state of being filled with the agent, and the large-scale building material is fixedly mounted on the surface of the base wall surface by curing the mortar or the adhesive.
【請求項2】 前記下地壁面と前記大型建材の裏面は接
着させることなく施工することを特徴とする請求項1に
記載の壁面施工方法。
2. The wall surface construction method according to claim 1, wherein construction is performed without adhering the base wall surface and the back surface of the large building material.
【請求項3】 前記下地壁面と大型建材の裏面間に、前
記下地壁面から前記大型建材に加わる応力を絶縁する弾
性シートを貼設したことを特徴とする請求項1に記載の
壁面施工方法。
3. The wall surface construction method according to claim 1, wherein an elastic sheet that insulates a stress applied from the ground wall surface to the large building material is pasted between the ground wall surface and the back surface of the large building material.
【請求項4】 前記下地壁面と大型建材の裏面間を弾性
接着剤で接着したことを特徴とする請求項1に記載の壁
面施工方法。
4. The wall surface construction method according to claim 1, wherein the base wall surface and the back surface of the large building material are bonded together with an elastic adhesive.
【請求項5】 前記下地壁面と大型建材の裏面間を弱接
着したことを特徴とする請求項1に記載の壁面施工方
法。
5. The wall construction method according to claim 1, wherein the base wall and the back surface of the large building material are weakly bonded.
【請求項6】 前記下地壁面に、前記大型建材の下端を
支持するL金具を配設することを特徴とする請求項1〜
請求項5に記載の壁面施工方法。
6. An L fitting for supporting a lower end of the large building material is arranged on the base wall surface.
The wall surface construction method according to claim 5.
【請求項7】 前記金具は、大型建材の裏面に凹部を設
けて該凹部内で先端部を拡径させて大型建材に固定状に
突設されていることを特徴とする請求項1〜請求項6に
記載の壁面施工方法。
7. The metal fitting is characterized in that a recess is provided on the back surface of a large building material, and a tip portion of the metal fitting is enlarged in diameter in the recess so as to be fixedly projected on the large building material. Item 6. The wall construction method according to Item 6.
【請求項8】 前記大型建材の裏面の凹部は蟻穴であ
り、該蟻穴は、前記拡径した金具先端部より広く形成さ
れていることを特徴とする請求項7に記載の壁面施工方
法。
8. The wall construction method according to claim 7, wherein the recess on the back surface of the large building material is a dovetail hole, and the dovetail hole is formed wider than the tip end portion of the metal fitting having the increased diameter. .
JP4233595A 1995-02-06 1995-02-06 Wall surface construction work method Pending JPH08209895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4233595A JPH08209895A (en) 1995-02-06 1995-02-06 Wall surface construction work method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4233595A JPH08209895A (en) 1995-02-06 1995-02-06 Wall surface construction work method

Publications (1)

Publication Number Publication Date
JPH08209895A true JPH08209895A (en) 1996-08-13

Family

ID=12633149

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4233595A Pending JPH08209895A (en) 1995-02-06 1995-02-06 Wall surface construction work method

Country Status (1)

Country Link
JP (1) JPH08209895A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787709A (en) * 2012-08-16 2012-11-21 广州市九臻建材科技有限公司 Construction method of decorating plate dry hanging system and decorating plate dry hanging system manufactured by same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787709A (en) * 2012-08-16 2012-11-21 广州市九臻建材科技有限公司 Construction method of decorating plate dry hanging system and decorating plate dry hanging system manufactured by same

Similar Documents

Publication Publication Date Title
JPH08209895A (en) Wall surface construction work method
JPH11350732A (en) Fixing structure of synthetic resin foamed form
JP2986936B2 (en) Filled steel pipe concrete member
JP3686593B2 (en) Resin combined anchor device
JPS6316769Y2 (en)
JP2606067Y2 (en) Mounting structure of fixtures for plate-like building materials
JP2648899B2 (en) Surface materials for structures and mounting methods
JP2599549Y2 (en) Embedded ring and embedded shaft for fixing using the ring
JPH0734109Y2 (en) Reinforcing joint sleeve fixing jig
JPH10131489A (en) Separator and fitting construction thereof
JPH026163Y2 (en)
JP4495490B2 (en) Foundation construction method
JPH06207462A (en) Shaft end coated sleeve for concrete mold and concrete placing method using the same
JP2505815Y2 (en) Post-installation anchor device
JP4249467B2 (en) Piping support device and piping support method
JP2886128B2 (en) Anticorrosion insert device body and method of manufacturing the same
JP3750094B2 (en) Formwork fixture for concrete placement
JPH0722437Y2 (en) Makeup mold assembly fittings
JPS6028740Y2 (en) Tile attachment position regulating member for exterior tile attachment method
KR20190006645A (en) The mold of groove and It using method for cuntinuous construction concrete
JPH0667690U (en) Auxiliary tool for concrete formwork separator
JPS636262Y2 (en)
JPH05118044A (en) Positioning jig for sheathing pipe
JPH0666024A (en) Supporting fixture for concrete wall work and concrete wall work method using the same
JP2004084264A (en) Exterior wall fitting tool and exterior wall construction method