Roof panel with eaves edge flashing and work execution method of roof using it

Info

Publication number
JPH08209842A
JPH08209842A JP7020809A JP2080995A JPH08209842A JP H08209842 A JPH08209842 A JP H08209842A JP 7020809 A JP7020809 A JP 7020809A JP 2080995 A JP2080995 A JP 2080995A JP H08209842 A JPH08209842 A JP H08209842A
Authority
JP
Japan
Prior art keywords
eaves
roof
roof panel
drainer
eaves edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7020809A
Other languages
Japanese (ja)
Inventor
Shigeru Tsukamoto
茂 塚本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP7020809A priority Critical patent/JPH08209842A/en
Publication of JPH08209842A publication Critical patent/JPH08209842A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To simply arrange an eaves edge flashing on a straight line in the direction of the eaves edge of a roof at laying roof panels. CONSTITUTION: A hanging down wall 5c is formed on the underside of an eaves edge flashing 5 fitted on the eaves edge side of a roof panel 1 so as to be spaced from the eaves end face of the roof panel by a fixed space, and after laying the fixed number of roof panels P with eaves edge flashings on the upper part of a building frame, an eaves edge adjusting material 20 is inserted between the hanging down wall 5c of the eaves edge flashing and the eaves edge face of the roof panel. By bringing the hanging down wall 5c into contact with the eaves edge adjusting material 20 and fixing, the eaves edge flashing 5 is arranged on a straight line in the direction of the eaves edge of the roof along the eaves edge adjusting material 20.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、互いに接合されて建物
の屋根を構成する屋根パネルに係り、特に、屋根に必要
な部材である軒先水切りが工場等で予め取付けられた軒
先水切り付き屋根パネルおよびそれを用いた屋根の施工
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a roof panel which is joined to each other to form a roof of a building, and more particularly, a roof panel with an eaves drainer which is a member necessary for the roof and which is pre-installed in a factory or the like. And a method of constructing a roof using the same.

【0002】[0002]

【従来の技術】近年、住宅の構築についてはその工業化
が進み、例えば壁や床、屋根といった構成要素を予め工
場にてパネル化しておき、施工現場でこれらのパネルを
組み立てることにより、住宅を構築するといったパネル
工法が一部に採用されている。このようなパネル工法に
用いられるパネルとして、例えば屋根パネルとしては、
縦芯材と横芯材とを矩形状に組み立てるとともに、この
矩形枠の内部に補強芯材を縦横に組み付けて枠体を構成
し、この枠体の一方の面に合板等の面材が貼着されたも
のが一般的である。
2. Description of the Related Art In recent years, the construction of houses has been industrialized. For example, the components such as walls, floors, and roofs have been made into panels at the factory in advance, and these panels have been assembled at the construction site to build houses. Part of the panel construction method is to use. As a panel used in such a panel construction method, for example, as a roof panel,
The vertical core member and the horizontal core member are assembled into a rectangular shape, and the reinforcing core member is vertically and horizontally assembled inside the rectangular frame to form a frame body, and a face material such as plywood is attached to one surface of the frame body. The one worn is generally.

【0003】そして、上記屋根パネルを用いて屋根を施
工するには、躯体上に複数の屋根パネルを順次敷き込む
とともにこれら屋根パネルどうしを接合して屋根面を形
成した後、当該屋根面にルーフィングを施すとともに屋
根材を取付ける一方、軒先側に軒先水切り等を取付ける
ようにしている。
In order to construct a roof using the above roof panel, a plurality of roof panels are sequentially laid on a frame, the roof panels are joined together to form a roof surface, and then the roofing is performed on the roof surface. The roof material is installed and the eaves side drainer is installed on the eaves side.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上述し
たような屋根の施工方法では、軒先水切りの取付けが現
場施工となってしまうことから、これが工業化を損なう
要因の一つとなっていた。そこで、工場等において予め
軒先水切りを屋根パネルに取付けておくことが考えられ
るが、この場合、屋根パネル敷き込む際に、各屋根パネ
ルに取付けられた軒先水切りを、屋根の軒先方向に一直
線上に配置するのが困難であり、このため軒先水切りど
うしの接合が困難になるという問題がある。
However, in the method of constructing a roof as described above, the installation of the effervescent drainer is done on-site, which is one of the factors impairing industrialization. Therefore, it is conceivable to install the eaves drainer on the roof panel in advance in factories, etc. In this case, when installing the roof panel, align the eaves drainer attached to each roof panel in a straight line toward the eaves of the roof. It is difficult to arrange them, which makes it difficult to join the eaves drainers together.

【0005】本発明は上記事情に鑑みてなされたもの
で、軒先水切りを予め屋根パネルに取付けても、屋根パ
ネル敷き込みの際に軒先水切りを簡単に屋根の軒先方向
に一直線上に配置することができる軒先水切り付き屋根
パネルおよびこれを用いた屋根の施工方法を提供するこ
とを目的としている。
The present invention has been made in view of the above circumstances. Even if the eaves drainer is attached to the roof panel in advance, the eaves drainer can be easily arranged in a straight line toward the eaves of the roof when the roof panel is installed. It is an object of the present invention to provide a roof panel with an eaves drainer that can be used and a roof construction method using the roof panel.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に、本発明の請求項1の軒先水切り付き屋根パネルは、
屋根パネルの軒先側に取付けられた軒先水切りの下面側
に、垂下壁を屋根パネルの軒先端面との間に所定間隔を
隔てて形成してなるものである。
In order to achieve the above object, the roof panel with eaves drainer according to claim 1 of the present invention comprises:
A hanging wall is formed on the lower surface side of the eaves drainer attached to the eaves side of the roof panel, with a predetermined distance from the eaves tip surface of the roof panel.

【0007】請求項2の軒先水切り付き屋根パネルは、
請求項1において、前記屋根パネルの軒先端面に、軒先
水切り付き屋根パネルを躯体に敷き込んだ際において、
下面が水平となるような調整材を固定したものである。
The roof panel with eaves drainage of claim 2 is
In Claim 1, at the time of laying the roof panel with eaves drainage on the frame on the eaves tip surface of the roof panel,
The adjustment material is fixed so that the lower surface is horizontal.

【0008】請求項3の軒先水切り付き屋根パネルは、
請求項1または2において、前記屋根パネルの上面に、
ルーフィングを施したものである。
The roof panel with eaves drainage of claim 3 is
The upper surface of the roof panel according to claim 1 or 2,
It has been roofed.

【0009】請求項4の屋根の施工方法は、請求項1か
ら3のいずれかに記載の軒先水切り付き屋根パネルを所
定枚数躯体の上部に敷き込んだ後、前記軒先水切りの垂
下壁と屋根パネルの軒先端面との間に、軒先調整材を挿
入しこの軒先調整材に前記垂下壁を当接固定することを
特徴としている。
According to a fourth aspect of the construction method of the roof, after a predetermined number of roof panels with eaves drainer according to any one of the first to third aspects are laid on the upper part of the frame, the hanging wall and roof panel of the eaves edge drainer are provided. The eaves tip adjusting material is inserted between the eaves tip surface and the eaves tip adjusting material, and the hanging wall is abutted and fixed to the eaves tip adjusting material.

【0010】[0010]

【作用】請求項1の軒先水切り付き屋根パネルにあって
は、各屋根パネルに取付けられた軒先水切りの下面側
に、垂下壁が屋根パネルの軒先端面との間に所定間隔を
隔てて形成されているので、屋根パネルを所定枚数躯体
の上部に敷き込んだ後、前記垂下壁と屋根パネルの軒先
端面との間に、軒先調整材を挿入しこの軒先調整材に前
記垂下壁を当接することにより、軒先水切りは軒先調整
材に沿って屋根の軒先方向に一直線に配置される。
In the roof panel with eaves drainer according to claim 1, a hanging wall is formed on the lower surface side of the eaves drainer attached to each roof panel at a predetermined interval from the eaves tip surface of the roof panel. Therefore, after laying a predetermined number of roof panels on the upper part of the frame, insert the eaves adjustment material between the hanging wall and the eaves tip surface of the roof panel and contact the hanging wall with the eaves adjustment material. As a result, the eaves drainer is arranged along the eaves adjustment material in a straight line toward the eaves of the roof.

【0011】請求項2の軒先水切り付き屋根パネルにあ
っては、軒先水切り付き屋根パネルを躯体に敷き込んだ
際において、調整材の下面が水平となるので、この下面
に軒天材を固定することにより、当該軒天材を水平に設
けることができる。
In the roof panel with eaves drainer according to claim 2, when the roof panel with eaves drainer is laid on the body, the lower surface of the adjusting material is horizontal, so that the eave roofing material is fixed to this lower surface. Thus, the eaves roofing material can be installed horizontally.

【0012】請求項3の軒先水切り付き屋根パネルにあ
っては、屋根パネルの上面に、工場等において予めルー
フィングを施したので、現場での屋根施工の際に、ルー
フィングを敷設作業が必要なく、よって屋根施工を迅速
に行なうことができる。
In the roof panel with the eaves drainer according to claim 3, since the roof panel is pre-roofed on the upper surface of the roof panel in a factory or the like, there is no need to install the roofing at the time of roof construction on site. Therefore, roof construction can be performed quickly.

【0013】請求項4の屋根の施工方法にあっては、軒
先水切り付き屋根パネルを所定枚数躯体の上部に敷き込
んだ後、軒先水切りの垂下壁と屋根パネルの軒先端面と
の間に、軒先調整材を挿入しこの軒先調整材に前記垂下
壁を当接固定することにより、軒先水切りが軒先調整材
に沿って屋根の軒先方向に一直線に配置される。
In the roof construction method of claim 4, after a predetermined number of roof panels with eaves drainers are laid on the upper part of the frame, the eaves edge is provided between the hanging wall of the eaves drainer and the eaves tip surface of the roof panel. By inserting the adjusting material and fixing the hanging wall to the eaves adjusting material, the eaves drainer is arranged in a straight line along the eaves adjusting material in the eaves direction of the roof.

【0014】[0014]

【実施例】以下、図面を参照して本発明の実施例を説明
する。図1〜図4は本実施例の軒先水切り付き屋根パネ
ルPを示すもので、これらの図において符号1は屋根パ
ネルを示す。この屋根パネル1は2枚の単位屋根パネル
2,2をその長手方向の端面を互いに接合してなるもの
である。前記単位屋根パネル2は、縦芯材2aと横芯材
2bとを矩形状に組み立てるとともに、この矩形枠の内
部に、図示しない補強芯材を縦横に組み付けて枠体を構
成し、この枠体の一方の面(上面)に合板等の面材3を
貼着したものである。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 4 show a roof panel P with an eaves drainer according to the present embodiment. In these drawings, reference numeral 1 denotes a roof panel. This roof panel 1 is formed by joining two unit roof panels 2 and 2 to each other at their longitudinal end faces. In the unit roof panel 2, a vertical core member 2a and a horizontal core member 2b are assembled in a rectangular shape, and a reinforcing core member (not shown) is vertically and horizontally assembled inside the rectangular frame to form a frame body. A surface material 3 such as plywood is attached to one surface (upper surface) of the above.

【0015】前記屋根パネル1の軒先側端面には断面三
角形状をなし、屋根パネル1の軒先方向に延びる調整材
4が固定されている。この調整材4は木製のものでその
下面4aが、屋根パネル1を躯体上に敷き込んだ際にお
いて、水平になるようにして屋根パネル1の軒先側の横
芯材2bに固定されている。
An adjustment member 4 having a triangular cross section and extending in the eaves direction of the roof panel 1 is fixed to the eaves side end surface of the roof panel 1. The adjusting material 4 is made of wood, and the lower surface 4a thereof is fixed to the horizontal core material 2b on the eaves side of the roof panel 1 so as to be horizontal when the roof panel 1 is laid on the body.

【0016】また、前記屋根パネル1の軒先側上面には
軒先水切り5が固定されている。この軒先水切り5は、
帯状をなす鉄板等の金属板を折曲することにより形成さ
れたもので、屋根パネル1の軒先方向に延在せしめられ
ている。前記軒先水切り5の基端部には、屋根パネル1
の軒先側に折り返されてなる返し部5aが形成されてお
り、一方、先端部には下方に折り曲げられてなる折曲部
5bが形成されている。さらに、軒先水切り5の下面側
には垂下壁5cが形成されている。この垂下壁5cは前
記折曲部5bから軒先水切り5の下面側に延びた部分を
下方に折曲することにより形成されたもので、屋根パネ
ル1の軒先端面に固定された調整材4の前面4bとの間
に所定間隔を隔てて、かつ該前面4bと平行に形成され
ている。また、垂下壁5cの裏面側には、当該垂下壁5
cの下端部から上方に折り返されその先端部を内側に折
曲してなる突起5dが形成されている。
Further, an eaves drainer 5 is fixed to the upper surface of the roof panel 1 on the eaves side. This eaves drainer 5
It is formed by bending a metal plate such as a strip-shaped iron plate and extends in the eaves direction of the roof panel 1. At the base end of the eaves drainer 5, the roof panel 1
A folded-back portion 5a formed by folding back is formed on the eaves side, while a bent portion 5b formed by bending downward is formed at the tip portion. Further, a hanging wall 5c is formed on the lower surface side of the eaves drainer 5. The hanging wall 5c is formed by bending downward a portion extending from the bent portion 5b to the lower surface side of the eaves drainer 5, and the front surface of the adjusting member 4 fixed to the eaves tip surface of the roof panel 1. It is formed at a predetermined distance from the front surface 4b and parallel to the front surface 4b. Further, on the back side of the hanging wall 5c, the hanging wall 5
A protrusion 5d is formed by folding back from the lower end of c and bending the front end inward.

【0017】また、前記屋根パネル1の面材3の軒先側
における上面と、前記軒先水切り5の上面とには、帯状
をなす防水シート6が屋根パネル1の軒先方向に延びる
ようにして貼着されている。この防水シート6は上下両
面に接着剤が塗布された両面テープのごときもので、具
体的には防水シート75(商品名:宇部興産社製)から
なるものである。
A belt-shaped waterproof sheet 6 is attached to the upper surface of the roof panel 1 on the side of the eaves and the upper surface of the eaves drainer 5 so as to extend in the eaves direction of the roof panel 1. Has been done. The waterproof sheet 6 is, for example, a double-sided tape in which an adhesive is applied on both upper and lower surfaces, and specifically, a waterproof sheet 75 (trade name: manufactured by Ube Industries).

【0018】さらに、前記屋根パネル1の面材3の上面
には、アスファルトルーフィング7が敷設されている。
このアスファルトルーフィング7は、その軒先側の先端
部を前記防水シート6の上面に貼着するとともに、基端
部を屋根パネル1の棟側の端部との間に若干の隙間をも
たせて配置し、さらに両縁部を屋根屋根パネル1の長手
方向に沿うそれぞれの縁部に合わせて配置したうえで、
所定の位置にステープ8…を打ち込むことによって固定
されている。このように、前記アスファルトルーフィン
グ7は、防水シート6を介して軒先水切り5に貼着され
ているので、アスファルトルーフィング7と軒先水切り
5との間からの水の侵入を確実に防止することができ
る。
Further, an asphalt roofing 7 is laid on the upper surface of the face material 3 of the roof panel 1.
The asphalt roofing 7 has its tip end on the eaves side attached to the upper surface of the waterproof sheet 6, and its base end is arranged with a slight gap between it and the ridge-side end of the roof panel 1. , Furthermore, after arranging both edges to each edge along the longitudinal direction of the roof panel 1,
It is fixed by driving the staple 8 into a predetermined position. Thus, the asphalt roofing 7 is attached to the eaves roof drainer 5 via the waterproof sheet 6, so that it is possible to reliably prevent water from entering between the asphalt roofing 7 and the eaves roof drainer 5. .

【0019】また、アスファルトルーフィング7は、屋
根パネル1の長手方向に帯状に延びる2枚のルーフィン
グ片7a,7aを接合することにより構成されている。
ルーフィング片7a,7aを接合する場合、互いに接合
すべきルーフィング片の長手方向に沿う縁部を互いにラ
ップさせて上下に重ね合わせたうえで、この重ね合わせ
た部分に防水テープ9を貼着することにより行なう。こ
の防水テープ9は下面に接着剤が塗布された片面テープ
のごときもので、具体的にはウルトラシーラー75(商
品名:宇部興産社製)からなるものである。
The asphalt roofing 7 is formed by joining two roofing pieces 7a, 7a extending in a strip shape in the longitudinal direction of the roof panel 1.
When joining the roofing pieces 7a, 7a, the edges along the longitudinal direction of the roofing pieces to be joined should be overlapped with each other, and the waterproof tape 9 should be attached to the overlapped portions. By. The waterproof tape 9 is a one-sided tape whose lower surface is coated with an adhesive, and is specifically composed of an ultra sealer 75 (trade name: Ube Industries, Ltd.).

【0020】次に、上記構成の軒先水切り付き屋根パネ
ルPを用いた屋根の施工方法について説明する。まず、
図5に示すように、躯体K上の軒先側に、前記軒先水切
り付き屋根パネルPを順次吊り上げて敷き込み、躯体K
に固定する。軒先水切り付き屋根パネルPを吊り上げる
場合、該軒先水切り付き屋根パネルPの先端部(軒先
部)と基端部とにそれぞれ吊り治具10,10とパネル
フッカー11,11を取付け、これら吊り治具10,1
0とパネルフッカー11,11にクレーンのワイヤ12
を係止して、軒先水切り付き屋根パネルPを所定の勾配
に保持しながら吊り上げる。なお、軒先水切り付き屋根
パネルPどうしの接合は、屋根締結ボルト13を用いて
行なう。なお、この接合はルーフィング7を捲ってスク
リュー釘を斜め打ちすることによって行ってもよい。ま
た、軒先水切り付き屋根パネルPを躯体Kに固定するに
は、軒先水切り付き屋根パネルPに予め取付けられた図
示しないフック金物を躯体Kに固定することにより行な
う。さらに、隣接する軒先水切り付き屋根パネルP,P
の軒先側においては、図10に示すように、互いに隣接
する軒先水切り5,5の接合部に、上面側から軒先水切
用ジョイントピース14を取付ける(図10参照)。
Next, a method of constructing a roof using the roof panel P with the effervescent drainage constructed as described above will be described. First,
As shown in FIG. 5, on the eaves side of the skeleton K, the roof panel P with the eaves side drainer is sequentially hung and laid,
Fixed to. When hoisting the roof panel P with effervescent water, the hanging jigs 10 and 10 and the panel hookers 11 and 11 are attached to the tip (eave part) and the base end of the roof panel P with effervescent water, respectively, and these hoisting jigs are attached. 10, 1
0 and the panel hooker 11, 11, the wire 12 of the crane
And the roof panel P with the eaves drainer is lifted while being held at a predetermined slope. Note that the roof fastening bolts 13 are used to join the roof panels P with the eaves drainer. Note that this joining may be performed by turning the roofing 7 and diagonally driving the screw nail. Further, the roof panel P with the eaves drainer is fixed to the frame K by fixing a hook metal fitting (not shown) previously attached to the roof panel P with the eaves drainer to the frame K. In addition, adjacent roof panels P, P with drainage
On the eaves side of the eaves, as shown in FIG. 10, the eaves side draining joint piece 14 is attached to the joint between the eaves side drainers 5 and 5 adjacent to each other from the upper surface side (see FIG. 10).

【0021】次に、図6に示すように、躯体Kの棟側
に、結合棟木15が予め工場等で取付けられた屋根パネ
ルP1を上記と同様にして順次吊り上げて敷き込む。こ
の屋根パネルP1は、2枚の前記単位屋根パネル2,2
を接合するとともに、その棟側の端面に結合棟木15を
取付けたもので、屋根パネルP1の上面には、2枚のル
ーフィング片7a,7aの縁部を重ね合わせて接合する
ことにより構成されたアスファルトルーフィング7が敷
設されている。なお、ルーフィング片7a,7aの接合
部には、前記防水テープ9が貼着され、さらに、アスフ
ァルトルーフィング7の先端部は屋根パネルP1の先端
部から所定長さだけ延出されている。また、前記屋根パ
ネルP1を敷き込む際には、該屋根パネルP1の棟側を
躯体Kにスクリューボルト16…により固定するととも
に、屋根パネルP1に予め取付けられた図示しないフッ
ク金物を躯体Kに固定し、また、屋根パネルP1と前記
既に敷き込まれた軒先水切り付き屋根パネルPとをルー
フプレート17とスクリューボルト16とによって接合
するとともに躯体Kに固定する。さらに、ルーフプレー
ト17とスクリューボルト16を取付けた後、屋根の傾
斜方向に隣接する屋根パネルP,P1どうしの接合部に
おいては、棟側に位置する屋根パネルPのルーフィング
7の下端部を、軒側に位置する屋根パネルPのルーフィ
ング7の上端部に上方から重ね合わせる。これによっ
て、屋根の傾斜方向に隣接するルーフィング7,7どう
しの継ぎ目の雨仕舞が良好になる。
Next, as shown in FIG. 6, a roof panel P1 to which a joint purlin 15 is attached in advance at a factory or the like is sequentially hung and laid on the ridge side of the frame K in the same manner as described above. This roof panel P1 includes two unit roof panels 2,2
And the joint purlin 15 is attached to the end face on the ridge side, and is constructed by overlapping and joining the edges of the two roofing pieces 7a, 7a on the upper surface of the roof panel P1. Asphalt roofing 7 is laid. The waterproof tape 9 is attached to the joint between the roofing pieces 7a, 7a, and the tip of the asphalt roofing 7 extends from the tip of the roof panel P1 by a predetermined length. Further, when the roof panel P1 is laid, the ridge side of the roof panel P1 is fixed to the frame K with the screw bolts 16 ... And the hook metal fitting (not shown) previously attached to the roof panel P1 is fixed to the frame K. Then, the roof panel P1 and the roof panel P with eaves drainer that has already been laid are joined by the roof plate 17 and the screw bolts 16 and fixed to the skeleton K. Further, after attaching the roof plate 17 and the screw bolts 16, at the joint between the roof panels P and P1 adjacent to each other in the inclination direction of the roof, the lower end of the roofing 7 of the roof panel P located on the ridge side is moved to the eaves. The roof panel P located on the side is overlapped with the upper end of the roofing 7 from above. As a result, the rain finish at the joint between the roofing members 7 and 7 adjacent to each other in the direction of inclination of the roof is improved.

【0022】上記のようにして、躯体K上に、軒先水切
り付き屋根パネルPと屋根パネルP1とを敷き込んだ
後、図7に示すように、互いに隣接する軒先水切り付き
屋根パネルP,Pどうしおよび互いに隣接する屋根パネ
ルP1,P1どうしの接合部においては、アスファルト
ルーフィング7,7を突き合わせ、この突き合わせた部
分に前記防水テープ9を貼着することにより、接合部に
おけるアスファルトルーフィング7,7の防水を行な
う。なお、軒先水切り付き屋根パネルPおよび屋根パネ
ルP1のそれぞれのけらば側においては、アスファルト
ルーフィング7の縁部に防水テープ9を貼りまわすとと
もに、この防水テープ9をけらば側に90°曲げて貼着
する。また、棟部においては、図8および図10に示す
ように、突き合わされたアスファルトルーフィング7,
7の縁部に防水テープ9を棟の長さ方向に沿って貼着
し、さらに、この防水テープ9上に耐水シート18を貼
着する。
As described above, after the roof panel P with the effervescent drainage panel P and the roof panel P1 are laid on the frame K, as shown in FIG. At the joint between the roof panels P1 and P1 adjacent to each other, the asphalt roofing 7, 7 is butted, and the waterproof tape 9 is adhered to the butted portion, so that the asphalt roofing 7, 7 at the joined portion is waterproofed. Do. In addition, the waterproof tape 9 is applied to the edges of the asphalt roofing 7 on the fluff side of the roof panel P with the eaves drainage and the roof panel P1 respectively, and the waterproof tape 9 is bent 90 ° to the flutter side. To wear. Further, in the ridge, as shown in FIGS. 8 and 10, the asphalt roofing 7,
A waterproof tape 9 is adhered to the edge of 7 along the length direction of the ridge, and a water resistant sheet 18 is further adhered to the waterproof tape 9.

【0023】次に、図9に示すように、躯体K上に敷き
込まれて接合された軒先水切り付き屋根パネルP…にお
いて、それぞれの軒先水切り5の垂下壁5cと調整材4
との間に、屋根の軒先方向に延びる軒先調整材20を挿
入して、この軒先調整材20に各垂下壁5cを釘21…
によって固定する。したがって、各軒先水切り付き屋根
パネルPのそれぞれの軒先水切り5は軒先調整材20に
沿って屋根の軒先方向に一直線に配置されるので、軒先
水切り5,5どうしの接合が容易であり、施工性が向上
する。
Next, as shown in FIG. 9, in the roof panel P with eaves drainer which is laid on and joined to the frame K, the hanging wall 5c and the adjusting member 4 of each eaves drainer 5 are provided.
The eaves edge adjusting member 20 extending in the eaves edge direction of the roof is inserted between the and, and each hanging wall 5c is nailed to the eaves edge adjusting member 20 ...
Fixed by. Therefore, since the eaves drainer 5 of each roof panel P with the eaves drainer is arranged in a straight line along the eaves adjusting member 20 in the eaves direction of the roof, the eaves drainers 5 and 5 can be easily joined to each other, and the workability can be improved. Is improved.

【0024】軒先調整材20を挿入固定したならば、図
4に示すように、鼻隠し22を、その上部を前記垂下壁
5cと軒先調整材20との間に挿入して、上端部を前記
突起5dに突き当てるようにして取付ける。この鼻隠し
22は、鉄板等の金属板を折曲して形成されたもので、
軒先調整材20の前面から下方に延び、所定部位で上方
に折曲され、その端部をさらに水平に折曲して、この部
位を前記調整材4の下面4aに釘23…によって固定さ
れている。前記鼻隠し22には、前記調整材4の直下に
おいて、凹溝22aが形成され、この凹溝22aに軒天
材25を嵌め込みむことにより、当該軒天材25が水平
に取付けられる。前記調整材4はその下面4aが水平に
なるように、屋根パネル1に取付けられているので、こ
の下面に4aに軒天材25を上記のように鼻隠し22の
凹溝22aを介して固定することにより、当該軒天材2
5を水平に設けることができる。
After the eaves edge adjusting material 20 is inserted and fixed, as shown in FIG. 4, the nose cover 22 is inserted between the hanging wall 5c and the eaves edge adjusting material 20, and the upper end portion is aforesaid. Attach it so that it abuts the protrusion 5d. The nose cover 22 is formed by bending a metal plate such as an iron plate.
It extends downward from the front surface of the eaves adjusting member 20, is bent upward at a predetermined portion, and its end is further bent horizontally, and this portion is fixed to the lower surface 4a of the adjusting member 4 by nails 23. There is. A recess groove 22a is formed in the nose cover 22 just below the adjusting member 4, and the eaves roofing member 25 is fitted in the recessed groove 22a, whereby the eaves roofing member 25 is horizontally attached. Since the adjusting member 4 is attached to the roof panel 1 so that the lower surface 4a thereof becomes horizontal, the eaves roofing material 25 is fixed to the lower surface 4a via the concave groove 22a of the nasal concealment 22 as described above. By doing, the eaves material 2
5 can be provided horizontally.

【0025】また、上記実施例では、軒先水切り付き屋
根パネルPには、予め工場等において、軒先水切り、ア
スファルトルーフィング7等が取付けられ、棟側の屋根
パネルP1には、結合棟木15、アスファルトルーフィ
ング7等が取付けられているので、現場における屋根施
工を従来に比べて迅速に行なうことができる。また、ア
スファルトルーフィング7上に屋根材を予め艤装してお
けば、現場における屋根施工をさらに迅速に行うことが
できる。
Further, in the above embodiment, the roof panel P with the eaves drainer is preliminarily attached with the eaves drainer, the asphalt roofing 7, etc. in the factory etc., and the roof panel P1 on the ridge side has the combined purlins 15, the asphalt roofing. Since 7 etc. are attached, roof construction on site can be performed more quickly than in the past. Further, if the roofing material is installed on the asphalt roofing 7 in advance, the roof construction on the site can be performed more quickly.

【0026】なお、上記実施例では、軒先水切り付き屋
根パネルPの軒先側の納まりについては、前記アスファ
ルトルーフィング7を、防水シート6を介して軒先水切
り5に貼着したが、これとは別に、図11に示すよう
に、耐水シート27を面材3上に貼着し、その上に軒先
水切り5、アスファルトルーフィング7を順次取付けて
もよい。
In addition, in the above embodiment, the asphalt roofing 7 is attached to the eaves drainer 5 through the waterproof sheet 6 for the accommodation of the roof panel P with the eaves drainage on the eaves side. As shown in FIG. 11, a water resistant sheet 27 may be attached to the face material 3, and the eaves drainer 5 and the asphalt roofing 7 may be sequentially mounted thereon.

【0027】[0027]

【発明の効果】以上説明したように、本発明の請求項1
の軒先水切り付き屋根パネルによれば、各屋根パネルに
取付けられた軒先水切りの下面側に、垂下壁が屋根パネ
ルの軒先端面との間に所定間隔を隔てて形成されている
ので、屋根パネルを所定枚数躯体の上部に敷き込んだ
後、前記垂下壁と屋根パネルの軒先端面との間に、軒先
調整材を挿入しこの軒先調整材に前記垂下壁を当接する
ことにより、軒先水切りは軒先調整材に沿って屋根の軒
先方向に一直線に配置される。したがって、予め屋根パ
ネルに軒先水切りを取付けてなる軒先水切り付き屋根パ
ネルを複数躯体上に敷き込む際において、軒先水切りど
うしの接合が容易であり、屋根の施工性が向上する。
As described above, according to the first aspect of the present invention.
According to the roof panel with eaves drainer, since the hanging wall is formed at a predetermined distance from the eaves tip surface of the roof panel on the lower surface side of the eaves drainer attached to each roof panel, After laying a specified number of sheets on the upper part of the frame, insert the eaves adjustment material between the hanging wall and the eaves tip surface of the roof panel and abut the hanging wall to the eaves adjustment material to adjust the eaves drainage. It is arranged in a straight line along the timber toward the eaves of the roof. Therefore, when laying a roof panel with an eaves drainer on the roof panel in which the eaves drainer is attached to the roof panel in advance, it is easy to join the eaves drainers to each other, and the workability of the roof is improved.

【0028】請求項2の軒先水切り付き屋根パネルによ
れば、屋根パネルの軒先端面に、軒先水切り付き屋根パ
ネルを躯体に敷き込んだ際において、下面が水平となる
ような調整材を固定したので、この下面に軒天材を固定
することにより、当該軒天材を確実かつ容易に水平に設
けることができる。
According to the roof panel with eaves drainage of claim 2, since the roof panel with the effervescent roof panel is laid on the frame, the adjusting material is fixed to the tip end surface of the roof panel so that the lower surface becomes horizontal. By fixing the eaves roof material to this lower surface, the eaves roof material can be reliably and easily provided horizontally.

【0029】請求項3の軒先水切り付き屋根パネルによ
れば、屋根パネルの上面に、工場等において予めルーフ
ィングを施したので、現場での屋根施工の際に、ルーフ
ィングを張る作業が必要なく、よって屋根施工を迅速に
行なうことができる。
According to the roof panel with eaves drainage of claim 3, since the roof panel is roofed in advance in a factory or the like, there is no need to perform roofing work at the time of roof construction on the site. Roof construction can be done quickly.

【0030】請求項4の屋根の施工方法によれば、軒先
水切り付き屋根パネルを所定枚数躯体の上部に敷き込ん
だ後、軒先水切りの垂下壁と屋根パネルの軒先端面との
間に、軒先調整材を挿入しこの軒先調整材に前記垂下壁
を当接固定することにより、軒先水切りが軒先調整材に
沿って屋根の軒先方向に一直線に配置される。したがっ
て、前記軒先水切り付き屋根パネルを複数躯体上に敷き
込む際において、軒先水切りどうしの接合が容易であ
り、屋根の施工性が向上する。
According to the roof construction method of claim 4, after laying a predetermined number of roof panels with eaves drainage on the upper part of the frame, the eaves adjustment is performed between the hanging wall of the eaves drainer and the eaves tip surface of the roof panel. By inserting a member and fixing the hanging wall to the eaves adjusting member by abutment, the eaves drainer is arranged in a straight line along the eaves adjusting member in the eaves direction of the roof. Therefore, when laying the roof panel with the eaves drainer on a plurality of frames, it is easy to join the eaves drainers, and the workability of the roof is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の軒先水切り付き屋根パネルの一実施例
を示す平面図である。
FIG. 1 is a plan view showing an embodiment of a roof panel with an eaves drainer according to the present invention.

【図2】図1におけるA−A線視断面図である。FIG. 2 is a sectional view taken along line AA in FIG.

【図3】図1におけるB−B線視断面図である。FIG. 3 is a sectional view taken along line BB in FIG.

【図4】図2に示す軒先水切り付き屋根パネルに、鼻隠
しを取付けた状態を示す側断面図である。
FIG. 4 is a side sectional view showing a state in which a nasal cover is attached to the roof panel with eaves drainer shown in FIG. 2.

【図5】本発明の軒先水切り付き屋根パネルを用いて屋
根を施工する方法を説明するためのもので、軒先水切り
付き屋根パネルを躯体上に敷き込んでいる状態を示す斜
視図である。
FIG. 5 is a perspective view for explaining a method of constructing a roof using the roof panel with eaves drainer according to the present invention, and is a perspective view showing a state in which the roof panel with eaves drainer is laid on a skeleton.

【図6】同、棟側に屋根パネルを敷き込んでいる状態を
示す斜視図である。
FIG. 6 is a perspective view showing a state in which a roof panel is laid on the ridge side.

【図7】同、アスファルトルーフィングどうしの接合部
に防水テープを貼着している状態を示す斜視図である。
FIG. 7 is a perspective view showing a state in which a waterproof tape is attached to a joint portion between asphalt roofings.

【図8】同、棟部に耐水シートと防水テープを貼着して
いる状態を示す斜視図である。
FIG. 8 is a perspective view showing a state in which a water resistant sheet and a waterproof tape are attached to the ridge portion.

【図9】同、軒先水切り付き屋根パネルに軒先調整材を
挿入している状態を示す斜視図である。
FIG. 9 is a perspective view showing a state in which an eaves adjusting material is inserted into the roof panel with a effervescent drainer.

【図10】同、躯体上に屋根を施工した状態を示す斜視
図である。
FIG. 10 is a perspective view showing a state in which a roof is constructed on the body.

【図11】軒先側の納まりの他の例を示す側断面図であ
る。
FIG. 11 is a side cross-sectional view showing another example of the accommodation on the eaves side.

【符号の説明】[Explanation of symbols]

P 軒先水切り付き屋根パネル 1 屋根パネル 2 単位屋根パネル 4 調整材 5 軒先水切り 5c 垂下壁 7 アスファルトルーフィング 20 軒先調整材 25 軒天材 P Roof panel with eaves drainer 1 Roof panel 2 Unit roof panel 4 Adjustment material 5 Eaves edge drainer 5c Hanging wall 7 Asphalt roofing 20 Elevator roofing material 25 eaves roofing material

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 屋根パネルの軒先側に、軒先から突出す
る軒先水切りが取付けられてなり、前記軒先水切りの下
面側には、垂下壁が屋根パネルの軒先端面との間に所定
間隔を隔てて形成されていることを特徴とする軒先水切
り付き屋根パネル。
1. An eaves side drainer protruding from the eaves side is attached to the eaves side of the roof panel, and a hanging wall is provided on the lower surface side of the eaves side drainer at a predetermined interval from the eaves tip surface of the roof panel. A roof panel with eaves drainage characterized by being formed.
【請求項2】 請求項1記載の軒先水切り付き屋根パネ
ルにおいて、前記屋根パネルの軒先端面には、軒先水切
り付き屋根パネルを躯体に敷き込んだ際において、下面
が水平となるような調整材が固定されていることを特徴
とする軒先水切り付き屋根パネル。
2. The roof panel with eaves drainer according to claim 1, wherein an adjusting material is provided at a tip end surface of the roof panel such that a bottom surface of the roof panel becomes horizontal when the roof panel with eaves drainage is laid on a frame. Roof panel with eaves drainage characterized by being fixed.
【請求項3】 請求項1または2記載の軒先水切り付き
屋根パネルにおいて、前記屋根パネルの上面にはルーフ
ィングが施されていることを特徴とする軒先水切り付き
屋根パネル。
3. The roof panel with eaves drainer according to claim 1 or 2, wherein a roofing is provided on an upper surface of the roof panel.
【請求項4】 請求項1から3のいずれかに記載の軒先
水切り付き屋根パネルを複数枚用いて屋根を施工する方
法であって、 前記複数の軒先水切り付き屋根パネルを躯体の上部に敷
き込んだ後、前記軒先水切りの垂下壁と屋根パネルの軒
先端面との間に、軒先調整材を挿入しこの軒先調整材に
前記垂下壁を当接固定することを特徴とする屋根の施工
方法。
4. A method for constructing a roof by using a plurality of roof panels with eaves drainers according to any one of claims 1 to 3, wherein the plurality of roof panels with eaves drainers are laid on an upper part of a frame. After that, a method for constructing a roof is characterized in that an eaves adjusting material is inserted between the drooping wall of the eaves drainer and the eaves tip surface of the roof panel, and the hanging wall is abutted and fixed to the eaves adjusting material.
JP7020809A 1995-02-08 1995-02-08 Roof panel with eaves edge flashing and work execution method of roof using it Pending JPH08209842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7020809A JPH08209842A (en) 1995-02-08 1995-02-08 Roof panel with eaves edge flashing and work execution method of roof using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7020809A JPH08209842A (en) 1995-02-08 1995-02-08 Roof panel with eaves edge flashing and work execution method of roof using it

Publications (1)

Publication Number Publication Date
JPH08209842A true JPH08209842A (en) 1996-08-13

Family

ID=12037374

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7020809A Pending JPH08209842A (en) 1995-02-08 1995-02-08 Roof panel with eaves edge flashing and work execution method of roof using it

Country Status (1)

Country Link
JP (1) JPH08209842A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012158888A (en) * 2011-01-31 2012-08-23 Gantan Beauty Ind Co Ltd Heat insulation panel and connection structure thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012158888A (en) * 2011-01-31 2012-08-23 Gantan Beauty Ind Co Ltd Heat insulation panel and connection structure thereof

Similar Documents

Publication Publication Date Title
JPH08209842A (en) Roof panel with eaves edge flashing and work execution method of roof using it
JPH0334413Y2 (en)
JPS59233060A (en) Traverse roofing roof
JPS642894Y2 (en)
JPH08209844A (en) Roof panel with roofing and work execution method of roof using it
JP3403524B2 (en) Member joining structure for ties and roof
JPS63284344A (en) Roof panel
JP2665430B2 (en) Roof panel connection structure
JP2507539Y2 (en) Roof panel connection structure
JPH031931Y2 (en)
JPH0120416Y2 (en)
JPH08209843A (en) Roof panel with hook metallic fixture and work execution method of roof using it
JP2582104Y2 (en) Roof structure
JP2608360B2 (en) Roof panel
JPH0673851A (en) Roof structure with rain gutter
JPH0531616B2 (en)
JPH1144034A (en) Eaves structure and roof construction method
JPH0194141A (en) Roofing member and roof construction method
JPH09279747A (en) Binding metal fitting for roofing wooden building
JPH06229056A (en) Assembly method for roof eaves edge of prefabricated building and roof panel for eaves edge
JP2001020479A (en) Purlin at eaves edge
JPH06322906A (en) Waterproof structure between roof panels
JPH08209872A (en) Eaves edge throating and throating structure using it
JPH0244973B2 (en)
JPH0797841A (en) Roof structure

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041214

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050209

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050412

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050610

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050802