JPH08209711A - Support structure for column base - Google Patents

Support structure for column base

Info

Publication number
JPH08209711A
JPH08209711A JP1688195A JP1688195A JPH08209711A JP H08209711 A JPH08209711 A JP H08209711A JP 1688195 A JP1688195 A JP 1688195A JP 1688195 A JP1688195 A JP 1688195A JP H08209711 A JPH08209711 A JP H08209711A
Authority
JP
Japan
Prior art keywords
anchor bolts
frame
installation
column base
support structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1688195A
Other languages
Japanese (ja)
Inventor
Masami Sakai
正美 坂井
Osamu Kojima
修 小島
Shinji Suzuki
伸二 鈴木
Keiji Endo
啓治 遠藤
Toshiaki Miyao
俊明 宮尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Chuzo Co Ltd
JFE Engineering Corp
Original Assignee
Nippon Chuzo Co Ltd
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Chuzo Co Ltd, NKK Corp, Nippon Kokan Ltd filed Critical Nippon Chuzo Co Ltd
Priority to JP1688195A priority Critical patent/JPH08209711A/en
Publication of JPH08209711A publication Critical patent/JPH08209711A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE: To provide a simple support structure for calum base having a sufficient horizontal yield strength for an installation frame constructed of anchor bolts erected in a frame form by arranging bracing members between adjoining anchor bolts. CONSTITUTION: An installation frame F is constructed of a plurality of anchor bolts 4, 4 that are erected perpendicularly in parallel with one another in a frame form. Threads are provided at each of the anchor bolts 4 at its upper and lower parts, and the anchor bolts are connected integrally at points near the upper thread with a splice plate 6 on installation. In a support structure fro a column base equipped with such installation frame F, bracing members 5, 5 are provided between the adjoining anchor bolts 4 of the installation frame F. Therefore, tilt and twist in the vertical direction are corrected automatically as the installation frame F is erected. As rigidity in the horizontal direction is applied on installation, swing in the horizontal direction can be eliminated and dislocation can be prevented even though external force is applied.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、アンカーボルトを用い
て柱脚を支持する露出型の柱脚部の支持構造に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an exposed type column base support structure for supporting a column base using anchor bolts.

【0002】[0002]

【従来の技術】図9は従来の柱脚部の支持構造の構成説
明図である。図9において、2は捨てコンクリート、3
は支持枠、4は異形鉄筋からなる複数のアンカーボル
ト、7は基礎コンクリートである。8はベースプレー
ト、9は柱脚、10はナットである。アンカーボルト4
の据付に当たっては、アンカーボルト4の上部にベース
プレート8に対応する添プレート(図示されていない)
が取り付けられる。
2. Description of the Related Art FIG. 9 is a structural explanatory view of a conventional support structure for a column base. In FIG. 9, 2 is discarded concrete, 3
Is a support frame, 4 is a plurality of anchor bolts made of deformed bars, and 7 is basic concrete. Reference numeral 8 is a base plate, 9 is a column base, and 10 is a nut. Anchor bolt 4
At the time of installation, an attachment plate (not shown) corresponding to the base plate 8 is provided on the upper portion of the anchor bolt 4.
Is attached.

【0003】そして、四隅のアンカーボルト4が支持枠
3の角枠部31に挿入されて、締付けネジ32で途中が
固定される。この据付枠を形成した状態で地中梁用の配
筋等を実施してから、基礎コンクリート7が打設され
る。その後、基礎コンクリート7が固ってから、図示の
ように各アンカーボルト4の上部にベースプレート8を
載せる。アンカーボルト4の上部ネジにナット10を螺
合して、ベースプレート8を締付けて柱脚9が基盤上に
立設される。
Then, the anchor bolts 4 at the four corners are inserted into the corner frame portions 31 of the support frame 3 and fixed part way by the tightening screws 32. After the installation frame is formed, reinforcement of the underground beams and the like are performed, and then the foundation concrete 7 is poured. Then, after the foundation concrete 7 is hardened, the base plate 8 is placed on the upper portion of each anchor bolt 4 as shown in the drawing. The nut 10 is screwed into the upper screw of the anchor bolt 4, the base plate 8 is tightened, and the column base 9 is erected on the base.

【0004】[0004]

【発明が解決しようとする課題】従来の柱脚部の支持構
造は上述のように、据付時に上部を添プレートで相互に
連結した長いアンカーボルト4が途中で支持枠3により
支持されるようになっていた。したがって、アンカーボ
ルト4の据付枠の水平方向の剛性が柔かく、配筋時に捩
じれや傾きで位置ヅレが生じることが多い。
As described above, the conventional support structure for the column base is such that the long anchor bolts 4 whose upper portions are connected to each other by the attachment plates are supported by the support frame 3 midway during the installation. Was becoming. Therefore, the rigidity of the installation frame of the anchor bolt 4 in the horizontal direction is soft, and the positional deviation often occurs due to twisting or inclination when arranging.

【0005】一方、据付枠の水平方向の剛性を高めるた
めに、全てのアンカーボルト4を囲むフープ筋を配筋す
ることも考えられる。しかしながら、細かい間隔のフー
プ配筋を実施すると、手作業を伴う配筋が繁雑でそれだ
け作業工数も増加する等の問題点があった。
On the other hand, in order to increase the rigidity of the installation frame in the horizontal direction, it is conceivable to arrange the hoop muscles surrounding all the anchor bolts 4. However, when the hoop reinforcement with a fine interval is performed, there is a problem that the reinforcement with manual work is complicated and the work man-hour increases accordingly.

【0006】本発明は、従来の柱脚部の支持構造におけ
る上記のような問題点を解消するためになされたもの
で、据付枠が安定していて水平方向の位置ズレがなく、
しかも資材の運搬が容易で現場施工に適する等の種々の
特徴のあるアンカーボルトを用いた柱脚部の支持構造を
実現することを目的とするものである。
The present invention has been made in order to solve the above-mentioned problems in the conventional support structure for the column base, and the installation frame is stable and there is no positional deviation in the horizontal direction.
Moreover, it is an object of the present invention to realize a support structure for a column base using anchor bolts, which has various characteristics such as easy transportation of materials and suitable for on-site construction.

【0007】[0007]

【課題を解決するための手段】この発明は、上部と下部
にネジを形成し据付時に上部のネジ付近が添プレートに
より一体に連結され、支持枠に垂直方向に併設された複
数本のアンカーボルトを枠型に組み付けた据付枠を備え
た柱脚部の支持構造において、据付枠における隣接した
アンカーボルトに筋違部材を設けた柱脚部の支持構造を
構成したものである。
SUMMARY OF THE INVENTION According to the present invention, a plurality of anchor bolts are formed in the upper and lower portions, the upper screw and its vicinity are integrally connected by an addition plate during installation, and are vertically attached to a support frame. In a support structure for a column base provided with an installation frame assembled in a frame shape, a support structure for the column base is provided in which a bracing member is provided on an adjacent anchor bolt in the installation frame.

【0008】また、この発明は、据付時に上部が添プレ
ートにより一体に連結され、支持枠に垂直方向に併設さ
れたネジ鉄筋からなる複数本のアンカーボルトを枠型に
組み付けた据付枠を備えた柱脚部の支持構造において、
据付枠における隣接したアンカーボルトに筋違部材を設
けた柱脚部の支持構造を構成したものである。また、筋
違部材の筋違部を金属ワイヤで構成した柱脚部の支持構
造を構成したものである。さらに、筋違部材の連結部を
金属の薄板で構成した柱脚部の支持構造を構成したもの
である。
Further, according to the present invention, there is provided an installation frame in which a plurality of anchor bolts made of screw reinforcing bars, which are vertically connected to the support frame, are integrally connected to each other at the time of installation and are assembled in a frame shape. In the support structure of the column base,
This is a structure for supporting the column base in which the bracing members are provided on the adjacent anchor bolts in the installation frame. Further, the supporting structure for the column base portion is formed by forming the bracing portion of the bracing member with a metal wire. Further, the supporting structure of the column base portion is formed by forming the connecting portion of the brace members with a thin metal plate.

【0009】[0009]

【作用】筋違を2個取り出して、重ね合わせて現場の地
面に並べる。並べられた2個の筋違の固定部の雌ネジ
に、アンカーボルトを下側から螺合させる。アンカーボ
ルトは、ほぼ上下の螺合部分に相当する長さまで螺合さ
れる。同様にして、全部のアンカーボルトに、2つの筋
違を螺合して組付ける。組付けらた2個の筋違を約90
度開いて隣同志の下部の固定部を互いに重ね合わせて、
各アンカーボルトを支持枠の定着部の上に載置する。
[Operation] Take out two braces, stack them and place them on the ground. Anchor bolts are screwed from the lower side to the female screws of the two bracing fixing parts arranged side by side. The anchor bolts are screwed to each other to a length substantially corresponding to the upper and lower screwed portions. Similarly, two braces are screwed and assembled to all the anchor bolts. Approximately 90 assembled two braces
Open it once and overlap the fixed parts at the bottom of the neighbors with each other,
Place each anchor bolt on the fixing part of the support frame.

【0010】90度開かれた筋違の重ねられた固定部と
定着部の雌ネジ或いはナットに、アンカーボルトの下部
側のネジを一体に捩じ込む。そして、次々に螺合される
4本のアンカーボルトは、それぞれ等しい長さの筋違に
より相互的に垂直方向に自動的に矯正されながら支持枠
に立設される。
The screw on the lower side of the anchor bolt is integrally screwed into the female screw or nut of the fixing portion and the fixing portion, which are opened 90 degrees and overlap each other. Then, the four anchor bolts screwed one after the other are erected on the support frame while being automatically corrected in the vertical direction mutually due to the brace of the same length.

【0011】[0011]

【実施例】【Example】

実施例1.以下、本発明の実施例を、図面を用いて説明
する。図1はこの発明の実施例1の構成説明図、図2は
図1のa−a断面図である。本発明実施例で従来構造に
対応する部分に同一符号が付されていて一部説明が重複
するが、構成が相違するのでやや詳しく説明する。
Example 1. Embodiments of the present invention will be described below with reference to the drawings. 1 is a configuration explanatory view of a first embodiment of the present invention, and FIG. 2 is a sectional view taken along the line aa of FIG. In the embodiment of the present invention, portions corresponding to those of the conventional structure are designated by the same reference numerals and the description thereof is partially duplicated, but the configuration is different and will be described in some detail.

【0012】2は捨てコンクリート、3は支持枠、4は
複数本のアンカーボルトである。捨てコンクリート2は
建築物の建設予定地の掘削地面(根切り底)上に打設さ
れ、この捨てコンクリート2に埋設された捨てコンアン
カー21により支持枠3が定着されている。33は支持
枠3のフレームベース、34はフレームポスト、35は
雌ネジを設けた水平方向の定着部である。
Reference numeral 2 is waste concrete, 3 is a support frame, and 4 is a plurality of anchor bolts. The discarded concrete 2 is placed on the excavated ground (root cutting bottom) of the construction site of the building, and the support frame 3 is fixed by the discarded con anchor 21 embedded in the discarded concrete 2. Reference numeral 33 is a frame base of the support frame 3, 34 is a frame post, and 35 is a horizontal fixing portion provided with a female screw.

【0013】アンカーボルト4はここではネジ鉄筋が用
いられ、支持枠3上に立設されている。5はほぼS字状
の筋違、6は添プレートである。筋違5の構造が、図3
に示されている。51は筋違5の筋違部、52は筋違部
51の上下の両端に形成された固定部である。固定部5
2は角板状で、中央に雌ネジ53が穿設されて四角ナッ
トを構成している。固定部52の雌ネジ53には、アン
カーボルト4が螺合されるようになっている。筋違5の
筋違部51の長さLや雌ネジ53のピッチ等は、標準的
なアンカーボルト4に対応して選択されている。
Here, the anchor bolt 4 is made of a screw rebar and is erected on the support frame 3. Reference numeral 5 is a substantially S-shaped brace, and 6 is an attachment plate. The structure of Brace 5 is shown in Fig. 3.
Is shown in. Reference numeral 51 denotes a bracing portion of the bracing portion 5, and 52 denotes fixing portions formed at both upper and lower ends of the bracing portion 51. Fixed part 5
Reference numeral 2 denotes a square plate, and a female nut 53 is bored in the center to form a square nut. The anchor bolt 4 is screwed into the female screw 53 of the fixing portion 52. The length L of the brace portion 51 of the brace 5 and the pitch of the female screw 53 are selected corresponding to the standard anchor bolt 4.

【0014】また、添プレート6は詳しくは図示されて
いないが、ほぼ正方形の金属板で構成されている。そし
て、添プレート6の四隅には挿通孔が設けられて、4本
のアンカーボルト4が挿通されて一体に連結されてい
る。8はベースプレート、9は柱脚、10はナットであ
る。このほか、図1,2には全てが示されていないが、
1は地面、7はコンクリート基礎、Fは据付時に組み付
けられる据付枠である。
Although not shown in detail, the additional plate 6 is made of a substantially square metal plate. Insertion holes are provided at the four corners of the additional plate 6, and the four anchor bolts 4 are inserted and integrally connected. Reference numeral 8 is a base plate, 9 is a column base, and 10 is a nut. Besides, although not all are shown in FIGS.
Reference numeral 1 is the ground, 7 is a concrete foundation, and F is an installation frame to be assembled at the time of installation.

【0015】上述のような構成の本発明実施例の動作
を、次に説明する。建築物の建設予定地に、建築規模に
応じた深さの根切り地業が行われる。そして、根切り底
に並べられた栗石に目潰し砂利が散布されて、捨てコン
アンカー21を埋めた捨てコンクリート2が打設され
る。養生期を過ぎで平滑仕上げされた捨てコンクリート
2の表面には、通し墨による柱芯等が明示される。
The operation of the embodiment of the present invention having the above construction will be described below. At the planned construction site of the building, root cutting will be carried out to a depth according to the scale of the building. Then, crushed gravel is sprinkled on the stones arranged on the root cutting bottom, and the discarded concrete 2 in which the discarded con anchor 21 is filled is placed. On the surface of the discarded concrete 2 which has been smoothed after the curing period, a pillar core or the like made of a tattoo is clearly indicated.

【0016】一方、支持枠3,アンカーボルト4,筋違
5,添プレート6等からなる据付枠Fの構成資材が予め
準備され、施工現場に運び込まれる。添プレート6を含
むこれらの資材は実質的に全て平積みが可能で、工場組
立て現物搬入方式に比較して運搬効率が極めて高い。こ
こで、据付枠Fの組付けが開始される。先ず、支持枠3
を組んだ後、筋違5を2個取り出し、図4の(a) に示さ
れたように重ね合わせて現場の地面に並べる。筋違5の
並べられた固定部52の雌ネジ53に、アンカーボルト
4を下側から螺合させる。このとき、アンカーボルト4
の螺合長さを、ほぼ上下の螺合部分に相当する長さまで
固定部52に螺合しておく。同様にして、全部のアンカ
ーボルト4に、それぞれ2つの筋違5を螺合して組付け
る。
On the other hand, the constituent materials of the installation frame F including the support frame 3, the anchor bolts 4, the braces 5, the attachment plates 6 and the like are prepared in advance and carried to the construction site. Substantially all of these materials including the attachment plate 6 can be stacked flatly, and the transportation efficiency is extremely high compared to the factory assembled physical delivery method. Here, the assembling of the installation frame F is started. First, the support frame 3
After assembling, take out two struts 5, stack them as shown in Fig. 4 (a) and line them up on the ground. The anchor bolt 4 is screwed into the female screw 53 of the fixing portion 52 in which the braces 5 are arranged from below. At this time, the anchor bolt 4
The screwing length of is screwed to the fixing portion 52 to a length substantially corresponding to the upper and lower screwing portions. Similarly, two braces 5 are screwed and assembled to all the anchor bolts 4.

【0017】次に、組付けらた2個の筋違5を約90度
開いて、各アンカーボルト4を支持枠3の四隅に設けら
れた定着部35の上に載置する。この場合、90度開か
れた筋違5の隣同志の下部の固定部52を互いに重ね合
わせる。重ねられた固定部52と定着部35の雌ネジ5
3,35に、(b) 図のようにアンカーボルト4の下部側
のネジを一体に捩じ込む。次々に螺合される4本のアン
カーボルト4は、それぞれ等しい長さの筋違5により相
互的に垂直方向に自動的に矯正されながら支持枠3上に
立設されることになる。
Next, the two assembled braces 5 are opened about 90 degrees, and the anchor bolts 4 are placed on the fixing portions 35 provided at the four corners of the support frame 3. In this case, the fixing parts 52 at the bottoms of the adjacent members of the brace 5 opened 90 degrees are overlapped with each other. Female screw 5 of fixed part 52 and fixing part 35 that are overlapped
As shown in (b), the screws on the lower side of the anchor bolt 4 are integrally screwed into the screws 3, 35. The four anchor bolts 4, which are screwed one after another, are erected on the support frame 3 while being automatically corrected in mutually vertical directions by the brace 5 having the same length.

【0018】筋違5により支持枠3上に立設された4本
のアンカーボルト4の上部には、添プレート6が取り付
けられて連結される。添プレート6を取り付けた据付枠
Fが、図5に半截図で示されている。各アンカーボルト
4は、筋違5により相互に歪みが抑制されて強固に連結
される。このとき必要があれば、据付枠Fの垂直度や水
平度がチェックされる。その後、地中梁や基礎立ち上が
りの配筋を施して、コンクリート打設・硬化で柱脚の基
礎工事が終了する。基礎工事が終了すると、型枠が外さ
れて根切りが埋め戻される。
An attachment plate 6 is attached and connected to the upper portions of the four anchor bolts 4 erected on the support frame 3 by the brace 5. The installation frame F to which the attachment plate 6 is attached is shown in a semi-cut view in FIG. The respective anchor bolts 4 are restrained from being mutually distorted by the struts 5 and are firmly connected. At this time, if necessary, the verticality and horizontality of the installation frame F are checked. After that, the foundation work of the column base is completed by placing the concrete beams and reinforcing the foundation, and placing and hardening the concrete. When the foundation work is completed, the formwork is removed and the root cutting is backfilled.

【0019】コンクリート打設後は、添プレート6が取
り除かれる。そして、モルタル(通称饅頭)で水平レベ
ルを出して、クレーンで運ばれた柱脚9のベースプレー
ト8の孔をアンカーボルト4に挿入する。孔から露出し
たアンカーボルト4にナット10を螺合して、ベースプ
レート8を締め付ける。ベースプレート8が桟木で囲わ
れて底面の空隙に、グラウトモルタルが注入されて、柱
脚9を用いた鉄骨建方が完了する。
After the concrete is poured, the attachment plate 6 is removed. Then, the mortar (commonly known as bun) is brought out to a horizontal level, and the holes of the base plate 8 of the column base 9 carried by the crane are inserted into the anchor bolts 4. The nut 10 is screwed into the anchor bolt 4 exposed from the hole, and the base plate 8 is tightened. The base plate 8 is surrounded by a pier, and grout mortar is injected into the space on the bottom surface, and the steel frame erection using the column base 9 is completed.

【0020】図6は筋違5の変形例の説明図である。図
6において、54はやや厚い板材に雌ネジ53を設けた
四角ナット、55は簡単に折り曲げられるような薄い金
属板を打ち抜いた連結板である。55a は連結板55の
両端の固定部、55b は固定部55a に設けられたバカ
孔、55c は連結部である。固定部55a は四角ナット
54と同形に作られ、連結部55c 幅は固定部55a の
幅以下に形成されている。連結板55の両端の固定部5
5a に、四角ナット54が溶接等で一体に固定される。
FIG. 6 is an explanatory view of a modified example of the brace 5. In FIG. 6, reference numeral 54 is a square nut provided with a female screw 53 on a slightly thick plate, and 55 is a connecting plate made by punching out a thin metal plate that can be easily bent. Reference numeral 55a is a fixing portion at both ends of the connecting plate 55, 55b is a fool hole provided in the fixing portion 55a, and 55c is a connecting portion. The fixed portion 55a is formed in the same shape as the square nut 54, and the width of the connecting portion 55c is formed to be less than the width of the fixed portion 55a. Fixed parts 5 at both ends of the connecting plate 55
A square nut 54 is integrally fixed to 5a by welding or the like.

【0021】この変形例においても、上述の実施例1の
組み立て動作で据付フレームFを組み立てることができ
る。特に、連結板55が薄い金属板で偏平に作られてい
るので、建設現場で連結板55を折り曲げてアンカーボ
ルト4に結合することができる。また、実施例1より平
積が小容積になり、保管や運搬が一層便利になる利点も
ある。
Also in this modification, the installation frame F can be assembled by the assembling operation of the first embodiment described above. In particular, since the connecting plate 55 is made of a thin metal plate and is flat, the connecting plate 55 can be bent and connected to the anchor bolt 4 at a construction site. In addition, the flat volume is smaller than that of the first embodiment, and there is an advantage that storage and transportation are more convenient.

【0022】実施例2 図7は本発明実施例2の構成説明図である。図7におい
て、56a と56b は上,下2個の中間ナットである。
この外、実施例2では図8の(a) ,(b) に示されたよう
な筋違5が用いられる。図(a) の57は金属帯で、両端
にフック部57a が形成されている。また、(b) の58
は可撓性を有するワイヤロープで、両端にリング部58
a が形成されている。この実施例2でも長さLは、規定
に沿って作られている。
Embodiment 2 FIG. 7 is an explanatory diagram of the configuration of Embodiment 2 of the present invention. In FIG. 7, 56a and 56b are upper and lower intermediate nuts.
Besides, in the second embodiment, the braces 5 as shown in FIGS. 8 (a) and 8 (b) are used. Reference numeral 57 in FIG. 3A is a metal band, and hook portions 57a are formed at both ends. In addition, 58 of (b)
Is a flexible wire rope and has ring portions 58 at both ends.
a is formed. Also in this Example 2, the length L is made in accordance with the regulation.

【0023】実施例2の筋違5を構成する隣接した金属
帯57とワイヤロープ58の下端のフック部57a とリ
ング部58a は、定着部35の雌ネジと下部中間ナット
56a に挟着されて固定される。また、上端のフック部
57a とリング部58a は、上部中間ナット56b とナ
ット10により添プレート6を介してアンカーボルト4
の先端に挟着される。そして、前述とほぼ同様の動作で
金属帯57とワイヤロープ58の筋違5が、隣接したア
ンカーボルト4を相互的にしっかり連結するようになっ
ている。
Adjacent metal strips 57 and hook portions 57a and ring portions 58a at the lower end of the wire rope 58, which constitute the brace 5 of the second embodiment, are sandwiched between the female screw of the fixing portion 35 and the lower intermediate nut 56a. Fixed. Further, the hook portion 57a and the ring portion 58a at the upper end are connected to the anchor bolt 4 by the upper intermediate nut 56b and the nut 10 via the attachment plate 6.
Is pinched at the tip of the. The braces 5 between the metal band 57 and the wire rope 58 are configured to connect the adjacent anchor bolts 4 firmly to each other by the substantially same operation as described above.

【0024】なお、上述の実施例では、添プレート6を
取り外して柱脚9を固定した場合で説明したが、添プレ
ート6を取付けたまま柱脚9を固定してもよい。
In the above-described embodiment, the case where the addition plate 6 is removed and the column base 9 is fixed has been described, but the column base 9 may be fixed while the addition plate 6 is attached.

【0025】[0025]

【発明の効果】この発明は、上部と下部にネジを形成し
据付時に上部のネジ付近が添プレートにより一体に連結
され、支持枠に垂直方向に併設された複数本のアンカー
ボルトを枠型に組み付けた据付枠を備えた柱脚部の支持
構造において、据付枠における隣接したアンカーボルト
に筋違部材を設けた柱脚部の支持構造を構成した。
According to the present invention, a screw is formed on the upper and lower parts, and the upper screw and its vicinity are integrally connected by an adder plate during installation, and a plurality of anchor bolts vertically attached to a support frame are frame-shaped. In the support structure of the column base provided with the assembled installation frame, the support structure of the column base is provided in which the bracing members are provided on the adjacent anchor bolts in the installation frame.

【0026】また、この発明は、据付時に上部が添プレ
ートにより一体に連結され、支持枠に垂直方向に併設さ
れたネジ鉄筋からなる複数本のアンカーボルトを枠型に
組み付けた据付枠を備えた柱脚部の支持構造において、
据付枠における隣接したアンカーボルトに筋違部材を設
けた柱脚部の支持構造を構成した。また、筋違部材の筋
違部を金属ワイヤで構成した柱脚部の支持構造を構成し
た。さらに、筋違部材の連結部を金属の薄板で構成した
柱脚部の支持構造を構成した。
Further, according to the present invention, there is provided an installation frame in which a plurality of anchor bolts, each of which is composed of screw reinforcing bars and which are vertically connected to the support frame, are assembled in a frame shape, the upper portion of which is integrally connected by an addition plate during installation. In the support structure of the column base,
A support structure for the column base was constructed by providing bracing members on the adjacent anchor bolts in the installation frame. In addition, a supporting structure for the column base portion is configured in which the bracing portion of the bracing member is made of a metal wire. Further, a supporting structure for the column base portion is constructed in which the connecting portion of the brace members is made of a thin metal plate.

【0027】この結果、据付枠を組み付けると、自動的
に垂直方向の傾きや捩じれが矯正される。したがって、
添プレートの使用を、省略することも可能になる。ま
た、据付枠に水平方向の剛性が加えられるので、水平方
向の揺れが皆無になり配筋時等で外力が加えられても歪
んで位置ズレを生じるようなことがない。さらに、コン
クリートの硬化後には柱脚からの水平剪断力を筋違部材
が負担するので、立上り筋外周に取付けるフープ筋を減
らすこともできる。しかも、アンカーボルトや筋違等の
資材の運搬時等の平積みが可能で、梱包が小さくなり保
管と運搬の効率を高くすることができる。
As a result, when the installation frame is assembled, the vertical inclination and twist are automatically corrected. Therefore,
It is possible to omit the use of the additional plate. Further, since the mounting frame is added with the rigidity in the horizontal direction, there is no shaking in the horizontal direction, and even if an external force is applied at the time of bar arrangement or the like, the distortion does not occur and the position is not displaced. Furthermore, since the brace member bears the horizontal shearing force from the column base after hardening of the concrete, it is possible to reduce the number of hoop muscles attached to the outer periphery of the rising muscle. In addition, the anchor bolts and materials such as braces can be stacked flat during transportation, and the packaging can be reduced to improve the efficiency of storage and transportation.

【0028】よって、本発明によれば、簡単な構成で強
固な水平耐力を備えるばかりか、現場組み立てに好適な
アンカーボルトを用いた柱脚部の支持構造を提供するこ
とができる。
Therefore, according to the present invention, it is possible to provide a support structure for a column base portion using an anchor bolt suitable for on-site assembly, as well as having a simple structure and a strong horizontal proof stress.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例1の構成説明図である。FIG. 1 is a configuration explanatory diagram of a first embodiment of the present invention.

【図2】図1のa−a断面図である。FIG. 2 is a sectional view taken along line aa of FIG.

【図3】図1の筋違の斜視図である。FIG. 3 is a perspective view of the braces of FIG. 1.

【図4】この発明の実施例1の動作を説明する斜視図で
ある。
FIG. 4 is a perspective view illustrating the operation of the first embodiment of the present invention.

【図5】この発明の実施例1の動作を説明する側面半截
図である。
FIG. 5 is a side half cross-sectional view explaining the operation of the first embodiment of the present invention.

【図6】この発明の実施例1の別の筋違の構成説明図で
ある。
FIG. 6 is a diagram for explaining another configuration of the brace according to the first embodiment of the present invention.

【図7】この発明の実施例2の構成を示す側面半截図で
ある。
FIG. 7 is a side view showing a configuration of a second embodiment of the present invention.

【図8】この発明の実施例2の2つの筋違の平面図であ
る。
FIG. 8 is a plan view of two braces according to the second embodiment of the present invention.

【図9】従来のアンカーボルトの説明図である。FIG. 9 is an explanatory view of a conventional anchor bolt.

【符号の説明】[Explanation of symbols]

3 支持枠 4 アンカーボルト 5 筋違 6 添プレート 7 コンクリート基礎 8 ベースプレート 9 柱脚 35 定着部 51 筋違部 52 固定部 F 据付枠 56a 中間ナット 56b 中間ナット 57 金属帯 58 ワイヤロープ 3 Support Frame 4 Anchor Bolt 5 Bracing 6 Addition Plate 7 Concrete Foundation 8 Base Plate 9 Pillar 35 Fixing Part 51 Bracing Part 52 Fixing Part F Installation Frame 56a Intermediate Nut 56b Intermediate Nut 57 Metal Band 58 Wire Rope

───────────────────────────────────────────────────── フロントページの続き (72)発明者 鈴木 伸二 神奈川県川崎市川崎区白石町2番1号 日 本鋳造株式会社内 (72)発明者 遠藤 啓治 神奈川県川崎市川崎区白石町2番1号 日 本鋳造株式会社内 (72)発明者 宮尾 俊明 東京都千代田区丸の内一丁目1番2号 日 本鋼管株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Shinji Suzuki 2-1, Shiraishi-cho, Kawasaki-ku, Kawasaki Kanagawa Nihon Foundry Co., Ltd. (72) Keiji Endo 2-1-1, Shiraishi-cho, Kawasaki-ku, Kawasaki-shi, Kanagawa No. Nihon Foundry Co., Ltd. (72) Inventor Toshiaki Miyao 1-2-2 Marunouchi, Chiyoda-ku, Tokyo Nihon Steel Tube Co., Ltd.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 上部と下部にネジを形成し据付時に前記
上部のネジ付近が添プレートにより一体に連結され、支
持枠に垂直方向に併設された複数本のアンカーボルトを
枠型に組み付けた据付枠を備えた柱脚部の支持構造にお
いて、 前記据付枠における隣接したアンカーボルトに筋違部材
を設けたことを特徴とする柱脚部の支持構造。
1. An installation in which a screw is formed in an upper part and a lower part, and the vicinity of the screw of the upper part is integrally connected by an attachment plate at the time of installation, and a plurality of anchor bolts vertically attached to a support frame are assembled in a frame shape. A support structure for a column base, comprising a frame, wherein a bracing member is provided on an adjacent anchor bolt in the installation frame.
【請求項2】 据付時に上部が添プレートにより一体に
連結され、支持枠に垂直方向に併設されたネジ鉄筋から
なる複数本のアンカーボルトを枠型に組み付けた据付枠
を備えた柱脚部の支持構造において、 前記据付枠における隣接したアンカーボルトに筋違部材
を設けたことを特徴とする柱脚部の支持構造。
2. A column base having a mounting frame in which a plurality of anchor bolts, which are integrally connected to each other by an addition plate at the time of installation and are vertically attached to a support frame, are assembled in a frame shape. In the support structure, a bracing member is provided on the anchor bolts adjacent to each other in the installation frame, and the support structure for the column base.
【請求項3】 前記筋違部材の筋違部を金属ワイヤで構
成したことを特徴とする請求項2記載の柱脚部の支持構
造。
3. The support structure for a column base according to claim 2, wherein the bracing portion of the bracing member is made of a metal wire.
【請求項4】 前記筋違部材の連結部を金属の薄板で構
成したことを特徴とする請求項2記載の柱脚部の支持構
造。
4. The support structure for a column base according to claim 2, wherein the connecting portion of the brace members is made of a thin metal plate.
JP1688195A 1995-02-03 1995-02-03 Support structure for column base Pending JPH08209711A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1688195A JPH08209711A (en) 1995-02-03 1995-02-03 Support structure for column base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1688195A JPH08209711A (en) 1995-02-03 1995-02-03 Support structure for column base

Publications (1)

Publication Number Publication Date
JPH08209711A true JPH08209711A (en) 1996-08-13

Family

ID=11928525

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1688195A Pending JPH08209711A (en) 1995-02-03 1995-02-03 Support structure for column base

Country Status (1)

Country Link
JP (1) JPH08209711A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003268780A (en) * 2002-03-19 2003-09-25 Hitachi Metals Techno Ltd Anchor bolt arranging structure
JP2018150692A (en) * 2017-03-10 2018-09-27 株式会社奥村組 Exposed column base structure of steel column and method for construction of the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003268780A (en) * 2002-03-19 2003-09-25 Hitachi Metals Techno Ltd Anchor bolt arranging structure
JP2018150692A (en) * 2017-03-10 2018-09-27 株式会社奥村組 Exposed column base structure of steel column and method for construction of the same

Similar Documents

Publication Publication Date Title
JPH08170340A (en) Pedestal structure and method of pedestal construction
US10106973B1 (en) Precast concrete building elements and assemblies thereof, and related methods
JP4284056B2 (en) Non-embedded column base construction method and non-embedded column base structure
JP2003055984A (en) Column base connecting structure
JPH09209451A (en) Joint construction of up and down columns with beam and joint method
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JPH08209711A (en) Support structure for column base
JPH02164931A (en) Foundation construction method for building
JP5325709B2 (en) Method of constructing steel exposed column base structure
JPH0232417B2 (en)
JPH09151463A (en) Column-integrated column base anchoring foundation structire and work execution method therefor
JPH10311041A (en) Column base foundation of precast concrete column
JP2002194748A (en) Foundation constructing method and building foundation structure
JP2000160687A (en) Construction method for composite structure and precast concrete column
JPH0384119A (en) Construction of column erection of structure
JPH0784764B2 (en) A cage formwork for removing the box of the steel column base fixing part in the SRC building
JPH0327072Y2 (en)
JPH01315525A (en) Snowslide preventing and slope stabilizing structure
JP3792276B2 (en) Building foundations and construction methods
JPH0988082A (en) Fixing method and structure of building material
JP2831514B2 (en) Joining method for hollow PC members on upper and lower floors
JP2615344B2 (en) Foundation using expanded polystyrene and its construction method
JP2811211B2 (en) Flat slab construction method
JP2760247B2 (en) Hardware for building a ramen structure using wood
JPH01203522A (en) Exposed type fixed column base