JPH08184164A - Wiring/connection device housing double floor structure - Google Patents

Wiring/connection device housing double floor structure

Info

Publication number
JPH08184164A
JPH08184164A JP6339238A JP33923894A JPH08184164A JP H08184164 A JPH08184164 A JP H08184164A JP 6339238 A JP6339238 A JP 6339238A JP 33923894 A JP33923894 A JP 33923894A JP H08184164 A JPH08184164 A JP H08184164A
Authority
JP
Japan
Prior art keywords
wiring
connecting device
floor structure
loading member
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP6339238A
Other languages
Japanese (ja)
Inventor
Yosuke Nakanishi
洋介 仲西
Mikiyoshi Sato
幹義 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyodo Ky Tec Corp
Original Assignee
Kyodo Ky Tec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyodo Ky Tec Corp filed Critical Kyodo Ky Tec Corp
Priority to JP6339238A priority Critical patent/JPH08184164A/en
Publication of JPH08184164A publication Critical patent/JPH08184164A/en
Withdrawn legal-status Critical Current

Links

Abstract

PURPOSE: To increase the degree of freedom of installation, and to facilitate new installation, transer, and extension by installing a wiring passage space on a lower floor part by using supporting members, and by arranging a wiring/ connection device storing member for positioning and lockedly retaining. CONSTITUTION: A wiring/connection device storing member 10 is detachably fixed so as to be easily positioned in an arbitrary position inside the floor between at least two opposing supporting members 18 making a reference of the supporting members 18. Further, it is enabled to constitute a junction part for facilitating wiring and connection in an arbitrary position. Then, various wiring/connection devices are installed in the wiring passage space of a double floor structure while dispensing with large constitution and installation work, and the supporting function of the upper floor part is stabilized by the installation part. Thus, the introduction of a communication network system to a small-scale office room and the additional work of juction part to an existing system or the like can be enhanced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、各種の配線・接続機器
を二重床構造の配線路空間内に収納するようにした配線
・接続機器収納二重床構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wiring / connecting device housing double floor structure in which various wiring / connecting devices are housed in a wiring path space having a double floor structure.

【0002】[0002]

【従来の技術】近年、大量かつ迅速な情報通信の必要性
を背景として、企業内通信ネットワークシステムが広く
利用されてきている。例えば、LAN(Local Area Net
work)システムなどが周知であり、コンピュータなどの
OA機器及び通信機器などを核としてこれらを光ファイ
バーや同軸ケーブル、ツィストペアケーブルなどの配線
手段で結び付け、ビル内などの企業エリアの情報を効率
的に通信できるようにしている。かかるシステムを導入
するためには、主要幹線や各種機器等との効率的な接続
を行うために配線・接続機器をオフィスルーム内に設置
することが必要となる。
2. Description of the Related Art In recent years, corporate communication network systems have been widely used due to the necessity of large-volume and quick information communication. For example, LAN (Local Area Net)
work systems are well known, and OA devices such as computers and communication devices are connected as the core with wiring means such as optical fibers, coaxial cables, twisted pair cables, etc., and information in corporate areas such as buildings can be efficiently I am able to communicate. In order to introduce such a system, it is necessary to install wiring / connecting equipment in the office room for efficient connection with the main trunk line and various equipment.

【0003】一方、近年におけるオフィス内のOA化に
より、各種電気機器を多数設置する必要性から、配線コ
ードを床内部に収納設置する二重床構造による配線シス
テムも広く利用され、配線マネージメントの効率化が図
られている。そして、このような二重床構造の配線シス
テムを上述の企業内通信ネットワークシステムの配線に
応用することも提案されている。
On the other hand, due to the necessity of installing a large number of various electric devices due to office automation in offices in recent years, a wiring system having a double floor structure in which wiring cords are housed and installed inside a floor is also widely used, and the efficiency of wiring management is improved. Is being promoted. It has also been proposed to apply such a double floor structure wiring system to the wiring of the above-mentioned intra-company communication network system.

【0004】図9は、例えばLANシステムを二重床構
造のオフィスに導入した従来例が示されている。図示の
ように中継部を構成する管理盤110がオフィスルーム
の壁部112に設置されており、そこから各種電気機器
114に二重床構造の配線空間内を通して配線がなされ
ている。
FIG. 9 shows a conventional example in which a LAN system is installed in an office having a double floor structure. As shown in the figure, a control panel 110 that constitutes a relay section is installed on a wall section 112 of an office room, and from there, various electric devices 114 are wired through a wiring space of a double floor structure.

【0005】図10は、このようなLANシステムにお
ける配線・接続機器のシステム構成を示している。図示
のように、配線・接続を行う中継部を構成する管理盤1
10は、各種電気機器を接続可能な複数のモジュラージ
ャック116並びにこれらモジュラージャック116と
システムの主要幹線118との間を繋ぐハブ(集線部)
120を備えている。ハブ120は、各モジュラージャ
ック116に接続された各種電気機器を選択または分配
している。各モジュラージャック16には複数の接続用
ジャックが設けられており、利用者は各種電気機器の移
設の際に、この接続ジャックの接続を変更することによ
り各種電気機器の変更などに簡単に対応することができ
る。図示のように、各種電気機器としては例えば、電話
機122、EDP端末124、LANパソコン126、
親局127など、幅広い通信機器あるいは情報交換機器
などである。
FIG. 10 shows a system configuration of wiring / connecting equipment in such a LAN system. As shown in the figure, a management board 1 that constitutes a relay unit for wiring and connection
Reference numeral 10 denotes a plurality of modular jacks 116 to which various electric devices can be connected, and a hub (concentrator) that connects the modular jacks 116 and the main trunk 118 of the system.
It is equipped with 120. The hub 120 selects or distributes various electric devices connected to the modular jacks 116. Each modular jack 16 is provided with a plurality of connection jacks, and the user can easily change various electric devices by changing the connection of these connection jacks when moving various electric devices. be able to. As shown in the figure, examples of various electric devices include a telephone 122, an EDP terminal 124, a LAN personal computer 126,
It is a wide range of communication equipment or information exchange equipment such as the parent station 127.

【0006】[0006]

【発明が解決しようとする課題】上記従来のオフィスへ
の通信ネットワークシステムの導入では、配線・接続機
器としての管理盤110は、上記図6に示したように壁
部112に比較的大きく、構造が複雑なボックスなどに
収められて設置されている。従って、二重床構造を用い
て床に配線を行う場合でもその設置された壁部の反対側
の壁部に近い領域の電気機器に配線を行う場合、配線距
離が非常に長くなってしまうという問題や、着脱可能に
移増設ができないなどの問題がある。
In the introduction of the above-mentioned conventional communication network system into an office, the control panel 110 as a wiring / connecting device has a relatively large wall 112 as shown in FIG. Is installed in a complicated box. Therefore, even if wiring is performed on the floor using the double floor structure, if wiring is performed to an electric device in a region close to the wall on the opposite side of the installed wall, the wiring distance becomes very long. There are problems, such as being unable to removably add or remove.

【0007】また、上記のように配線距離が長くなると
配線作業や配線の変更作業などが非常に繁雑となりいわ
ゆる配線マネージメントが難しくなってしまうという実
情があり、更に、この種の壁部設置式の管理盤は、壁面
の強度によって設置位置に制約を受ける。従って、その
管理盤等の中継部は、必ずしも各種通信機器のレイアウ
トに応じた最適位置に設置されてはいないのが現状であ
り、設置された壁面スペースはデッドスペースとなり、
スペース効率を低下させている。
Further, as described above, when the wiring distance becomes long, the wiring work and the wiring change work become very complicated, and the so-called wiring management becomes difficult. The installation position of the control panel is restricted by the strength of the wall surface. Therefore, the relay section such as the management panel is not always installed at the optimum position according to the layout of various communication devices, and the installed wall space becomes dead space.
Space efficiency is reduced.

【0008】更に、種々の企業内通信ネットワークシス
テムの導入に際しては、情報の秘密保持という要請もあ
るが、上記のように中継部110を壁部112に設置し
ている場合には、その存在が容易に外部から認知され、
秘密保持上の安全性管理向上の面で不安がある。また、
従来、二重床構造の内部空間に電気機器に関連する部材
を設置する場合、下側床部にその部材を固定するための
構成と固定作業が必要となり、取付け構造の付加の必要
性並びに設置作業の煩雑化を招いていた。
Further, when introducing various intra-company communication network systems, there is a demand for confidentiality of information. However, if the relay section 110 is installed on the wall section 112 as described above, the existence of the relay section 110 exists. Easily recognized from the outside,
I am worried about improving security management for confidentiality. Also,
Conventionally, when a member related to an electric device is installed in the internal space of a double floor structure, a structure and a fixing work for fixing the member to the lower floor part are required, and it is necessary to add a mounting structure and the installation. The work was complicated.

【0009】本願人は、上記課題を解決すべく平成6年
11月29日付にて通信ネットワークシステムの構成部
材収納二重床構造についての特許出願を行い、上述の通
信ネットワークシステムに用いられる配線・接続機器を
一括して二重床構造の所定領域に設置する構成の提案を
行っている。
In order to solve the above-mentioned problems, the present applicant filed a patent application on November 29, 1994 regarding the double floor structure for storing the components of the communication network system, and the wiring and wiring used in the above-mentioned communication network system. We are proposing a configuration in which all connected devices are installed in a predetermined area of a double floor structure.

【0010】本願発明は、上記先の出願と同様に二重床
構造の機能を生かした配線・接続機器の設置並びにそれ
に関する配線マネージメントの容易化を図ると共に配線
・接続機器の設置箇所の秘密化とセキュリティーシステ
ム機能の向上を図り、さらに配線・接続機器の移増設や
小規模領域における通信ネットワークシステム関連配線
・接続機器の床内任意位置への設置、収納構造の簡単
化、小型軽量、低コスト加等を達成することのできる配
線・接続機器収納二重床構造を提供することを目的とし
ている。
The present invention facilitates the installation of wiring / connecting equipment utilizing the function of the double-floor structure and the wiring management related to the same as in the above-mentioned application, and makes the installation location of the wiring / connecting equipment secret. In addition to improving the security system function, wiring / connecting equipment is relocated and expanded, and communication network system related wiring / connecting equipment in a small area can be installed at any position on the floor, the storage structure is simple, small and lightweight, and low cost. It is an object of the present invention to provide a double-floor structure for storing wiring / connecting equipment, which can achieve additional effects.

【0011】[0011]

【課題を解決するための手段】上記目的を達成するた
め、請求項1に係る配線・接続機器収納二重床構造は、
下側床部と、該下側床部上に配置された支持部材と、該
支持部材上に設置された上側床部とを有し、前記下側床
部と上側床部との間を配線路空間とすると共に該空間に
配線・接続機器を収納するようにした二重床構造におい
て、前記下側床部上に設置され、前記支持部材に対し係
止可能な係止手段と、前記配線・接続機器を係止保持可
能な保持部と、を有している。
In order to achieve the above object, the wiring / connecting equipment storing double floor structure according to claim 1 is
A lower floor, a support member disposed on the lower floor, and an upper floor installed on the support, and wiring between the lower floor and the upper floor In a double-floor structure which is used as a road space and accommodates wiring / connecting equipment in the space, locking means installed on the lower floor and capable of locking to the support member, and the wiring -Has a holding part that can hold the connected device.

【0012】請求項2に係る配線・接続機器収納二重床
構造は、前記配線・接続機器装填部材の係止手段が、前
記配線・接続機器装填部材の端部に設けられた対向する
2つの突出部にて構成され、該突出部により前記支持部
材を挟持可能としている。
According to a second aspect of the present invention, there is provided a wiring / connecting equipment storing double floor structure in which two locking means for the wiring / connecting equipment loading member are provided at the end of the wiring / connecting equipment loading member and face each other. It is configured by a protruding portion, and the supporting member can be held by the protruding portion.

【0013】請求項3に係る配線・接続機器収納二重床
構造は、前記配線・接続機器装填部材が、前記設置状態
で前記上側床部を下方から支持可能な高さを有してい
る。
In the wiring / connecting device storage double floor structure according to a third aspect of the present invention, the wiring / connecting device loading member has a height capable of supporting the upper floor portion from below in the installed state.

【0014】請求項4に係る配線・接続機器収納二重床
構造は、前記配線・接続機器装填部材が、前記設置状態
で内部に空間を有する構成とされ、前記保持部が、前記
配線・接続機器装填部材の側部に貫通口を設けて構成さ
れ、該貫通口の一部には、この貫通口の縁部から前記側
部の端縁部まで切り欠いた切欠部が設けられている。
According to a fourth aspect of the present invention, there is provided a wiring / connecting device storage double floor structure, wherein the wiring / connecting device loading member has a space inside thereof in the installed state, and the holding portion is the wiring / connecting device. The equipment loading member is formed with a through hole on a side portion thereof, and a part of the through hole is provided with a cutout portion cut out from an edge portion of the through hole to an end edge portion of the side portion.

【0015】請求項5に係る配線・接続機器収納二重床
構造は、少なくとも側部及び天井部を有し、前記天井部
は側部に対し着脱可能な構成を有し、前記天井部には前
記側部に装着された状態で前記保持された配線・接続機
器から延びる線材を下方へ押圧するための押圧突部が設
けられている。
According to a fifth aspect of the present invention, there is provided a wiring / connecting equipment storage double floor structure having at least a side portion and a ceiling portion, and the ceiling portion has a structure detachable from the side portion. A pressing protrusion is provided for pressing downward the wire rod extending from the held wiring / connecting device while being attached to the side portion.

【0016】請求項6に係る配線・接続機器収納二重床
構造は、前記配線・接続機器装填部材に付加され、前記
保持された配線・接続機器から延びる線材を導き、方向
付ける通路を内部に有する配線補助部を有している。
According to a sixth aspect of the present invention, there is provided a wiring / connecting device storing double floor structure, which is added to the wiring / connecting device loading member, and which has a passage for guiding and directing a wire rod extending from the held wiring / connecting device. It has a wiring auxiliary section.

【0017】[0017]

【作用】請求項1に係る配線・接続機器収納二重床構造
によれば、配線・接続機器装填部材は、二重床構造の支
持部材に対して位置決め係止させるための係止手段を有
している。従って、所定の支持部材への設置に際し係止
手段を支持部材に係止させることによって位置決めした
状態で安定設置することが可能である。その状態で、配
線・接続機器を保持部にて係止保持することができる。
According to the double floor structure for storing wiring / connecting equipment according to the first aspect, the wiring / connecting equipment loading member has locking means for positioning and locking the supporting member of the double floor structure. are doing. Therefore, it is possible to perform stable installation in a positioned state by engaging the engaging means with the support member when installing on a predetermined support member. In that state, the wiring / connecting device can be locked and held by the holding portion.

【0018】従って、配線・接続機器を二重床構造内に
新たに設置しあるいは増設を行う場合に、任意の位置に
て簡単な設置作業で設置を行うことができる。すなわ
ち、配線・接続機器装填部材は、支持部材に係止手段を
係止させた状態でそれら支持部材に対して位置的に安定
して設置されるので、別途下側床部への固定作業などを
行う必要がない。これにより、下側床部上に配置された
支持部材を任意に選択し、これに係止させた状態で簡単
に配線・接続機器を設置することが可能となり、二重床
構造への中継部等の配置作業の自由度及び容易化を向上
させることができる。
Therefore, when the wiring / connecting device is newly installed or expanded in the double floor structure, the installation can be performed at a desired position by a simple installation work. That is, since the wiring / connecting device loading member is installed in a positionally stable manner with respect to the support members in a state where the locking means is locked to the support members, a separate fixing work to the lower floor portion, etc. You don't have to. This makes it possible to arbitrarily select the support member placed on the lower floor and install the wiring / connecting device easily while it is locked to the support member. It is possible to improve the degree of freedom and ease of arrangement work such as.

【0019】次に、請求項2に係る配線・接続機器収納
二重床構造によれば、上記配線・接続機器装填部材の係
止手段を構成する2つの対向する突出部により、支持部
材を挟持することができる構成としたので、支持部材の
種々の形態、特にサイズに対応して常に良好な係止状態
を得ることができる。
Next, according to the double floor structure for housing wiring / connecting equipment according to claim 2, the supporting member is sandwiched by the two opposing projecting portions which constitute the locking means of the wiring / connecting equipment loading member. Since such a structure can be adopted, it is possible to always obtain a good locked state in accordance with various forms of the supporting member, particularly the size.

【0020】請求項3に係る配線・接続機器収納二重床
構造によれば、配線・接続機器装填部材は、下側床部上
に設置された状態で下方から上側床部を支持する機能を
有する。従って、この配線・接続機器装填部材は配線・
接続機器を保持するだけでなくそれが設置された範囲で
の上側床部の支持作用の低下を有効に防止することが可
能である。また、この作用により、上記請求項1におけ
る配線・接続機器装填部材の設置の自由度の向上作用を
より高めることが可能である。
According to the double floor structure for storing wiring / connecting equipment according to the third aspect, the wiring / connecting equipment loading member has a function of supporting the upper floor from below in a state of being installed on the lower floor. Have. Therefore, this wiring / connecting device loading member
It is possible to not only hold the connected device but also effectively prevent the lowering of the supporting action of the upper floor in the area where it is installed. Further, due to this action, it is possible to further enhance the action of improving the degree of freedom in installing the wiring / connection device loading member in the above-mentioned claim 1.

【0021】また、請求項4に係る配線・接続機器収納
二重床構造によれば、配線・接続機器装填部材は、設置
された状態で内部空間を有する構成とされ、かつ上記保
持部は、側部に貫通口を設けることによって構成されて
いる。従って、モジュラージャックなどの配線・接続機
器はこの貫通口に装着することにより簡単に係止保持さ
れる。係る構成とすることにより配線・接続機器装填部
材の構成は極めてシンプルなものとなる。更に、貫通口
の部分に形成した切欠部の存在により、貫通口への配線
・接続機器の着脱の際に、その切欠部の部分から配線・
接続機器に直接力を加えることができるので、着脱動作
は非常に容易なものとなる。
According to the wiring / connecting equipment housing double floor structure of the fourth aspect, the wiring / connecting equipment loading member has an internal space in the installed state, and the holding portion is It is configured by providing a through hole on the side portion. Therefore, a wiring / connecting device such as a modular jack can be easily retained by being attached to the through hole. With such a configuration, the configuration of the wiring / connecting device loading member becomes extremely simple. Further, due to the presence of the cutout portion formed in the through hole portion, when connecting / disconnecting the wiring / connecting device to / from the through hole portion, the wiring
Since the force can be directly applied to the connected device, the attaching / detaching operation becomes very easy.

【0022】請求項5に係る配線・接続機器収納二重床
構造によれば、配線・接続機器装填部材は、別体の側部
と天井部とを有しており、その天井部は側部に対し着脱
可能な構成となっている。従って、配線・接続機器装填
部材自体を取り外すことなく天井部のみを取り外して内
部状況の確認や配線の修正等を行うことが可能である。
さらに、天井部には押圧突部が設けられており、天井部
部材が装着された状態でこの押圧突部により配線・接続
機器から延びる線材を下方へ押圧することができる。こ
れにより、配線された線材をその位置で安定設置してお
くことができ、例えば、線材の末端部を引っ張り動作し
たような場合にもこの押圧部で制止することができ、配
線状態の安定化が図られる。
According to the double floor structure for storing wiring / connecting equipment according to the fifth aspect, the wiring / connecting equipment loading member has separate side portions and a ceiling portion, and the ceiling portion is a side portion. It has a removable structure. Therefore, without removing the wiring / connecting device loading member itself, it is possible to remove only the ceiling portion to check the internal condition and correct the wiring.
Further, the ceiling is provided with a pressing protrusion, and the wire extending from the wiring / connecting device can be pressed downward by the pressing protrusion with the ceiling member mounted. As a result, it is possible to stably install the wired wire at that position, and for example, even when the end portion of the wire is pulled, it can be stopped by this pressing part, and the wiring condition is stabilized. Is planned.

【0023】また、請求項6に係る配線・接続機器収納
二重床構造によれば、配線・接続機器装填部材には、こ
れに係止されて設置される配線補助部材が付加されてい
る。この配線補助部材の内部の通路により、保持された
配線・接続機器から延びる線材は所定の方向付けがなさ
れて導かれる。従って、配線・接続機器装填部材で保持
された機器から延びる線材が、他の二重床構造内に配さ
れた線材と接触したり絡んだりすることが有効に防止さ
れる。
Further, according to the double floor structure for storing wiring / connecting equipment according to the sixth aspect, the wiring / connecting equipment loading member is additionally provided with a wiring auxiliary member which is locked and installed. The wire extending from the held wiring / connection device is guided in a predetermined direction by the passage inside the wiring auxiliary member. Therefore, it is possible to effectively prevent the wire rod extending from the device held by the wiring / connecting device loading member from coming into contact with or entangled with the wire rod arranged in another double floor structure.

【0024】[0024]

【実施例】以下、図面に基づいて本発明の実施例につい
て詳細に説明する。図1(A)には、本発明の特徴的構
成要素である配線・接続機器装填部材10の基本的構成
例が示されている。本実施例では、配線・接続機器装填
部材10は、所定の剛性を有する金属板を屈曲して構成
している。他の部材として樹脂を用いることも可能であ
る。基本構成は、側面部12a、12b、12c及び天
井部14であり、側面部12aには配線・接続機器を係
止保持するための保持部である貫通口16が複数個整列
して形成されている。この貫通口16には、後述する切
欠部17が形成されている。
Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1A shows a basic configuration example of a wiring / connection device loading member 10, which is a characteristic component of the present invention. In this embodiment, the wiring / connection device loading member 10 is formed by bending a metal plate having a predetermined rigidity. It is also possible to use resin as the other member. The basic configuration is the side surfaces 12a, 12b, 12c and the ceiling portion 14, and the side surface portion 12a is formed with a plurality of through-holes 16 which are holding portions for locking and holding wiring / connecting devices. There is. A cutout portion 17 described later is formed in the through hole 16.

【0025】更に、配線・接続機器装填部材10の両端
部には、図上破線で示した支持部材18に位置決め係止
させるための係止手段として、対向する突出片20a、
20bがそれぞれ設けられてる。この対向する突出片2
0a、20bが支持部材18にその両側から係止される
ものである。従って、配線・接続機器装填部材10の幅
Wは、支持部材18に対応するサイズに設定される。な
お、上記貫通口16に保持される配線・接続機器として
は、例えば図示したようなモジュラージャック22、そ
の他配線器具類などである。
Further, at both ends of the wiring / connecting device loading member 10, opposing projecting pieces 20a are provided as locking means for positioning and locking the supporting member 18 shown by broken lines in the figure.
20b are provided respectively. This opposing protruding piece 2
0a and 20b are locked to the support member 18 from both sides thereof. Therefore, the width W of the wiring / connection device loading member 10 is set to a size corresponding to the support member 18. The wiring / connecting device held in the through hole 16 is, for example, the modular jack 22 as shown in the figure, or other wiring equipment.

【0026】同図(B)は、幅Wを広げ、支持部材18
が2つ並んだ状態の部分に設置するための構成例であ
る。その他の構成は上記図1(A)と同様である。この
ように、配線・接続機器装填部材10は、対向する少な
くとも2つの支持部材18間に簡単に設置することがで
きる。すなわち、上方から下降させ、また持ち上げるこ
とによって簡単に着脱を行うことができる。従って、小
規模のオフィスルームなどに通信ネットワークシステム
を導入する場合に、壁部への大掛りな中継部の設置作業
を行うことなく、二重床構造内の支持部材間にこの配線
・接続機器装填部材10を設置することにより簡単に中
継部としての配線・接続機器の設置が行われる。
In FIG. 3B, the width W is widened and the support member 18
Is an example of a configuration for installing in a part where two are aligned. The other structure is similar to that of FIG. In this way, the wiring / connecting device loading member 10 can be easily installed between at least two opposing support members 18. That is, the attachment / detachment can be easily performed by lowering from the top and lifting. Therefore, when installing a communication network system in a small office room, etc., this wiring / connecting device can be installed between the support members in the double floor structure without installing a large relay section on the wall. By installing the loading member 10, wiring / connecting equipment as a relay unit can be easily installed.

【0027】また、更に、支持部材18が等間隔に配置
された二重床構造の場合には、殆ど任意の位置、方向に
配線・接続機器装填部材10を設置することが可能であ
り、その配置を床上の電気機器のレイアウト配置に対応
させて行うことも可能となる。例えば、レイアウト配置
状態に応じたそれぞれの電気機器の近くに分散させて収
納することもできる。これにより、ケーブルの配線・接
続を機器の配置から視覚的に区別することができ、配線
作業の容易化に貢献できる。
Further, in the case of the double floor structure in which the support members 18 are arranged at equal intervals, the wiring / connection device loading member 10 can be installed at almost any position and direction. It is also possible to make the arrangement corresponding to the layout arrangement of the electric devices on the floor. For example, it is also possible to disperse and store the electric devices near the respective electric devices according to the layout arrangement state. As a result, the wiring and connection of the cable can be visually distinguished from the arrangement of the devices, which contributes to the ease of the wiring work.

【0028】更に、本実施例では、配線・接続機器装填
部材10は、支持部材18とほぼ共通の高さHを有して
おり、設置された範囲での上側床部の下方からの支持機
能を有効に奏する。従って、この配線・接続機器装填部
材10を設置するためのスペース確保のために支持部材
18の設置領域が減少してもその部分の二重床構造の強
度が劣化する恐れはない。
Further, in the present embodiment, the wiring / connecting equipment loading member 10 has a height H that is substantially common to that of the supporting member 18, and the supporting function from below the upper floor portion in the installed range. Play effectively. Therefore, even if the installation area of the support member 18 is reduced in order to secure a space for installing the wiring / connection device loading member 10, there is no fear that the strength of the double-floor structure in that part will deteriorate.

【0029】図2は、同じく本発明の特徴的構成要素で
ある配線・接続機器装填部材10の他の構成例並びにそ
れに付加設置される配線補助部材24の構成例が示され
ている。本実施例では、幅Wを変更調整可能な構成が採
用されており、配線・接続機器装填部材10の本体を設
置状態で一部が重合する2つの本体部材10a、10b
から構成している。そして、それぞれの本体部材10
a、10bの両端部に突出片20a、20a及び20
b、20bを設けている。したがって、これら2つの部
材10a、10bの重合範囲を変更調整(図上矢印10
0方向)に調整することにより対向する2つの突出片2
0aと20bの相対位置を変更し、その間隔を調整する
ことができる。
FIG. 2 shows another structural example of the wiring / connecting device loading member 10 which is also a characteristic component of the present invention, and a structural example of the wiring auxiliary member 24 additionally installed thereto. In this embodiment, a configuration in which the width W can be changed and adjusted is adopted, and two main body members 10a and 10b that partially overlap each other in the installed state of the main body of the wiring / connection device loading member 10.
It consists of. And each body member 10
Projecting pieces 20a, 20a and 20 on both ends of a, 10b.
b and 20b are provided. Therefore, the overlapping range of these two members 10a and 10b is changed and adjusted (see arrow 10 in the figure).
Two protruding pieces 2 facing each other by adjusting in the 0 direction)
The relative position of 0a and 20b can be changed and the interval can be adjusted.

【0030】一方の本体部材10aの天井部14aに
は、締結部材を挿通するための貫通口26が形成され、
他方の本体部材10bの天井部14bには、その貫通口
26に対応する位置に長穴28が形成されている。すな
わち、幅Wの調整を行った後貫通口26及び長穴28に
締結部材30を挿通しこれを固定することにより調整し
た幅の配線・接続機器装填部材10を完成させることが
できる。このように幅調整可能な構成としたことによ
り、2つの本体部材10a、10bの相対移動範囲にお
いてサイズの異なる支持部材18に対応させ常にしっか
りとした係止状態を保つことができる。すなわち、支持
部材18を突出片20a、20bにて良好に挟持した状
態で係止させることが可能となる。
A through hole 26 for inserting a fastening member is formed in the ceiling portion 14a of one body member 10a.
An elongated hole 28 is formed in a position corresponding to the through hole 26 in the ceiling portion 14b of the other main body member 10b. That is, after the width W is adjusted, the fastening member 30 is inserted into the through hole 26 and the elongated hole 28 and fixed to the wiring / connection device loading member 10 having the adjusted width. With such a structure in which the width can be adjusted, it is possible to always maintain a firm locking state in correspondence with the support members 18 having different sizes in the relative movement range of the two main body members 10a and 10b. That is, it becomes possible to lock the support member 18 in a state where it is satisfactorily sandwiched by the projecting pieces 20a and 20b.

【0031】次に、配線補助部材24について説明す
る。この配線補助部材24は、本体部材10と同じく所
定の剛性を有する金属板を屈曲して形成している。本実
施例では、2つの脚部24a、24bによって配線・接
続機器装填部材10の突出片20b、20bに係止させ
て設置するように構成している。そして、脚部24aと
24bとの間は線材を通過させ所定方向に振分けたり、
導き出せるように開放部24cとされている。
Next, the wiring auxiliary member 24 will be described. The wiring auxiliary member 24 is formed by bending a metal plate having a predetermined rigidity like the main body member 10. In this embodiment, the two leg portions 24a and 24b are configured to be engaged with the protruding pieces 20b and 20b of the wiring / connection device loading member 10 for installation. Then, a wire is passed between the leg portions 24a and 24b and distributed in a predetermined direction,
It is an open portion 24c so that it can be led out.

【0032】すなわち、例えばモジュラージャック22
が貫通口16に取り付けられ、そのモジュラージャック
22から引き出されるコード32は、開放部24cを通
り配線補助部材24内の配線路空間200を通って振り
分けられる。このように、配線・接続機器から引き出さ
れたコードは配線補助部材24によってカバーされた状
態で所定方向に引き出される。従って、二重床構造内に
配線された他の線材と配線・接続機器からの線材とが絡
んだり接触したりすることを有効に防止することができ
る。なお、この配線補助部材24は、必ずしも配線・接
続機器装填部材10と別体に構成する必要はなく一体構
成とすることもできる。
That is, for example, the modular jack 22
The cord 32 attached to the through hole 16 and pulled out from the modular jack 22 is distributed through the open portion 24c and the wiring path space 200 in the wiring auxiliary member 24. In this way, the cord pulled out from the wiring / connection device is pulled out in the predetermined direction while being covered by the wiring auxiliary member 24. Therefore, it is possible to effectively prevent other wire rods wired in the double-floor structure from being entangled with or coming into contact with the wire rods from the wiring / connecting device. The wiring auxiliary member 24 does not necessarily have to be formed separately from the wiring / connection device loading member 10 and may be integrally formed.

【0033】更に、配線補助部材24は、配線・接続機
器装填部材10と同様に支持部材18とほぼ共通の高さ
を有し、下方から上側床部をしっかりと支持することが
できる構成となっている。従って、二重床構造の強度劣
化を防止する機能も有している。
Further, the wiring auxiliary member 24 has substantially the same height as the supporting member 18 similarly to the wiring / connecting device loading member 10, and has a structure capable of firmly supporting the upper floor portion from below. ing. Therefore, it also has a function of preventing strength deterioration of the double floor structure.

【0034】なお、図3(A)及び(B)は、上述した
配線・接続機器装填部材10の幅調整のための締結固定
部分の概略断面図を示している。同図(A)は図2の実
施例で用いた貫通口26と長穴28を用いた構成であ
り、図示のようにビス30が上方から挿通され、長穴2
8側でナット34に螺入され、更にビス30の先端部が
かしめられることによりしっかりと固定される。同図
(B)は、他の締結固定構成例が示されており、図示の
ように本体部材10b側の貫通口を長穴とせず所定位置
(本実施例では2カ所)にビス30を螺入させることの
できるねじ穴36a、36bを設けている。この構成で
は、配線・接続機器装填部材10の幅Wを2通りに調整
可能であり、支持部材18が2種類のサイズでほぼ整え
られている場合には、このような構成による幅調整で対
応することができる。
3 (A) and 3 (B) are schematic cross-sectional views of the fastening / fixing portion for adjusting the width of the wiring / connecting device loading member 10 described above. 2A shows a structure using the through hole 26 and the elongated hole 28 used in the embodiment of FIG. 2, and the screw 30 is inserted from above as shown in FIG.
It is screwed into the nut 34 on the 8th side, and the tip of the screw 30 is further caulked to be firmly fixed. In the same figure (B), another fastening and fixing configuration example is shown. As shown in the figure, the screw 30 is screwed into a predetermined position (two places in this embodiment) without forming the through hole on the body member 10b side as an elongated hole. Screw holes 36a and 36b that can be inserted are provided. With this configuration, the width W of the wiring / connecting device loading member 10 can be adjusted in two ways, and when the support member 18 is prepared in two sizes, the width adjustment by such a configuration can be used. can do.

【0035】なお、本実施例ではこの貫通口16の下端
側には切欠部17がそれぞれ形成されている。この切欠
部17を設けたことにより、貫通口16に係止させる配
線機器の着脱が極めて容易になる。例えば、図7(A)
及び(B)に示したように、モジュラージャック22
は、上下に突起23a、23bを有し、突起23bは所
定範囲で撓むアーム部25に形成されている。そして、
このアーム部25を例えば、手指で上下方向にやや撓ま
せることによりしっかりと貫通口16に固定させるよう
にしている。
In this embodiment, notches 17 are formed on the lower end side of the through hole 16. By providing the cutout portion 17, it is extremely easy to attach and detach the wiring device to be locked in the through hole 16. For example, FIG. 7 (A)
And the modular jack 22 as shown in (B).
Has upper and lower protrusions 23a and 23b, and the protrusion 23b is formed on the arm portion 25 that bends within a predetermined range. And
The arm portion 25 is firmly fixed to the through-hole 16 by slightly bending in the vertical direction with fingers.

【0036】従って、これを取り外す場合には、アーム
25を更に上方に撓ませ突起23bを貫通口16に対し
非係止状態として取り外すこととなるが、切欠部17が
設けられていない場合には、少しの隙間にマイナスドラ
イバーなどを差し入れその状態で力を加えて取り外すな
どの作業を行う必要があるが、この切欠17を設けるこ
とにより、その切り欠いた空間から図上矢印400で示
したように直接アーム部25に例えば手指で力を加える
ことができるので簡単にこれを撓ませ突起23bを離脱
させることができる。
Therefore, when removing this, the arm 25 is bent further upward so that the projection 23b is unlocked with respect to the through hole 16, but when the cutout 17 is not provided. It is necessary to insert a flat-blade screwdriver, etc. into a small gap and apply force in that state to remove it, but by providing this notch 17, from the space cut out, as shown by arrow 400 in the figure. Since a force can be directly applied to the arm portion 25 by, for example, a finger, the arm portion 25 can be easily bent and the protrusion 23b can be detached.

【0037】図4は、配線・接続機器装填部材10の更
に他の構成例を示している。本実施例に係る配線・接続
機器装填部材40は、側壁部を有する側壁部材40aと
天井部を構成する天井部材40bとから構成されてい
る。そして、天井部材40bは側壁部材40aに対し着
脱可能な構成となっている。本実施例では、天井部材4
0bの両端部に軸突起42a、42bを設け、側壁部材
40aの対応位置に軸受凹部44a、44bを形成して
いる。そして、軸突起42a、42bをそれぞれ軸受凹
部44a、44bに差し入れ矢印300方向に天井部材
40bを回動させてその設置がなされる。
FIG. 4 shows still another configuration example of the wiring / connection device loading member 10. The wiring / connecting device loading member 40 according to the present embodiment includes a side wall member 40a having a side wall portion and a ceiling member 40b forming a ceiling portion. The ceiling member 40b is detachable from the side wall member 40a. In this embodiment, the ceiling member 4
Shaft protrusions 42a, 42b are provided at both ends of the shaft 0b, and bearing recesses 44a, 44b are formed at corresponding positions of the side wall member 40a. Then, the shaft protrusions 42a and 42b are inserted into the bearing recesses 44a and 44b, respectively, and the ceiling member 40b is rotated in the direction of the arrow 300 for installation.

【0038】そして、天井部材40bの内側面には線材
押圧用の突部46が形成されている。本実施例では、天
井面を形成する部分に連続した屈曲部をもって構成して
いる。従って、上記300方向に回動させて設置させた
状態で、突部46は保持された配線・接続機器から延び
る線材48、50などを上方からしっかりと押圧する。
従って、各線材48、50はその位置で位置設定され、
その先行配線状態並びに保持された配線・接続機器の設
置状態はより安定したものとなり、図4に示すように、
これら各線材は、整列配置される。すなわち、線材の末
端部で引っ張り動作などが行われた場合でも突部46に
よる押圧動作によりその部分で制止されその配線状態は
安定した状態が保たれるものである。
A protrusion 46 for pressing the wire rod is formed on the inner surface of the ceiling member 40b. In this embodiment, the portion forming the ceiling surface has a continuous bent portion. Therefore, in the state of being installed by rotating in the above 300 direction, the protrusion 46 firmly presses the wire rods 48, 50 extending from the held wiring / connecting device from above.
Therefore, each wire 48, 50 is positioned at that position,
The preceding wiring state and the installed state of the held wiring / connecting equipment become more stable, and as shown in FIG.
Each of these wire rods is aligned. That is, even when a pulling operation or the like is performed at the end portion of the wire, the pressing operation by the protrusion 46 prevents the wire from being held at that portion, and the wiring state is kept stable.

【0039】なお、本実施例では保持される接続機器と
して先行配線用ケーブルプラグ52が例示されている。
このようなケーブルプラグ52の場合、配線・接続機器
装填部材40の側壁に複数形成された保持部は、それら
の線材48、50を保持するための構成とされ、図示の
ように側壁部に開口凹部54を形成しそれらに対向する
2つの爪部56を有する絶縁ブッシング58を取り付け
て構成している。この爪部56間に線材48、50を通
してその内側でそれら線材が保持される。
In the present embodiment, the preceding wiring cable plug 52 is exemplified as the connected device to be held.
In the case of such a cable plug 52, a plurality of holding portions formed on the side wall of the wiring / connecting device loading member 40 are configured to hold the wire rods 48 and 50, and are opened in the side wall portion as illustrated. An insulating bushing 58 having a concave portion 54 and two claw portions 56 facing the concave portion 54 is attached. The wire rods 48, 50 are passed between the claw portions 56, and the wire rods are held inside thereof.

【0040】図5は、天井部材40bを閉じた状態でケ
ーブルが押えられている状態を示している。図示のよう
に、天井部材40bを300方向に回動して被せると、
突部46も同方向に回動し、ケーブルプラグ52から引
き出された線材50は、その突部46により下方に押圧
され突部46と下側床部あるいは存在する場合には配線
・接続機器装填部材40の底面部材との間でしっかりと
位置設定される。なお、本実施例の場合も装着時の天井
部材40b上面の高さは、支持部材18とほぼ共通の高
さとされ、上側床部を下方から支持する機能を奏するこ
とは同様である。
FIG. 5 shows a state in which the cable is pressed while the ceiling member 40b is closed. As shown in the drawing, when the ceiling member 40b is rotated in the 300 direction and covered,
The protrusion 46 also rotates in the same direction, and the wire rod 50 pulled out from the cable plug 52 is pressed downward by the protrusion 46 and the lower floor portion of the protrusion 46 or wiring / connection device loading if present. Firmly positioned with respect to the bottom member of member 40. In addition, also in the case of the present embodiment, the height of the upper surface of the ceiling member 40b at the time of mounting is substantially the same as the height of the supporting member 18, and the same function of supporting the upper floor portion from below is achieved.

【0041】また、天井部40bは、上記の様に着脱可
能で且つ線材48、50を押圧して側壁部40aを覆う
構造であればたの構成をとることも可能である。更に、
図5に示されている様に、その外側端部はケーブルプラ
グ52は覆うことのできるサイズに形成されているの
で、配線・接続機器装填部材10内にほこりやゴミ等が
侵入するのを防ぐことが可能である。また更に、天井部
40bの表面や裏面にはケーブルプラグ52の接続箇所
や接続機器の種別を示すラベルなどを貼りつけることも
可能であり、使用者の使い勝手も向上し、移増設時の配
線マネジメントの容易化が図られる。
Further, the ceiling 40b may have any structure as long as it is detachable as described above and presses the wires 48, 50 to cover the side wall 40a. Furthermore,
As shown in FIG. 5, since the outer end portion thereof is formed to have a size capable of covering the cable plug 52, dust and dirt are prevented from entering the wiring / connection device loading member 10. It is possible. Furthermore, it is also possible to attach a label or the like indicating the connection location of the cable plug 52 and the type of the connected device to the front surface or the back surface of the ceiling portion 40b, which improves the usability of the user and manages the wiring at the time of transfer and expansion. Is facilitated.

【0042】次に図6は、上述したような配線・接続機
器装填部材10を実際に二重床構造の一部として装着し
た状態が示されている。図示のように、各配線・接続機
器装填部材10は、対向する支持部材18間に突出片2
0a、20bにてそれら支持部材18を挟持した状態で
安定設置されており、その状態で上側床部60を下方か
ら支持できる状態となっている。また、配線補助部材2
4も他の配線ケーブル60と配線・接続機器から延びる
線材64とを隔離した状態とする機能を奏していること
が理解される。
Next, FIG. 6 shows a state in which the wiring / connection device loading member 10 as described above is actually mounted as a part of the double floor structure. As illustrated, each wiring / connecting device loading member 10 has a protruding piece 2 between the supporting members 18 facing each other.
The support member 18 is sandwiched between 0a and 20b, and is stably installed. In this state, the upper floor 60 can be supported from below. In addition, the wiring auxiliary member 2
It is understood that 4 also has a function of separating the other wiring cable 60 and the wire 64 extending from the wiring / connection device.

【0043】このように、本実施例に係る配線・接続機
器装填部材10は、少なくとも対向する2つの支持部材
18間にその支持部材18を基準として床内の任意位置
に着脱可能に簡単に位置決め固定することができる。従
って、複雑な構成の部材や面倒な設置作業を伴う必要が
ない。所定間隔で対向する支持部材18が存在すれば任
意の位置に簡単に配線・接続のための中継部を構成する
ことができるものである。従って、小規模のオフィスル
ームへの通信ネットワークシステムの導入や既に設置さ
れたシステムへの中継部の付加作業等において特に優れ
た機能を発揮する。
As described above, the wiring / connecting equipment loading member 10 according to this embodiment is easily positioned between at least two opposing support members 18 so as to be attachable / detachable at any position on the floor with reference to the support members 18. Can be fixed. Therefore, there is no need for complicated members and troublesome installation work. If there are supporting members 18 facing each other at a predetermined interval, it is possible to easily form a relay portion for wiring / connection at any position. Therefore, it exhibits a particularly excellent function in introducing a communication network system into a small office room or adding a relay section to an already installed system.

【0044】なお、本発明は上記各実施例の構成に限定
されるものではなく、発明の要旨の範囲内で種々の変形
が可能である。例えば、上記各実施例では配線・接続機
器装填部材10又は40の支持部材18に対する係止手
段は突出片20a、20bをもって構成したが、このよ
うな構成に限られるものではなく、何らかの手段で支持
部材に位置決め係止可能な構成であれば足りる。例えば
図8(A)、(B)及び(C)に示したように支持部材
の形状に合せてその支持部材に係止させあるいは挿通さ
せるための凹部70や貫通孔72を形成した水平突出部
74を設けることによって構成することも可能である。
尚、図8(B)では、貫通孔72に代え、凹部70を用
いても良い。
The present invention is not limited to the configuration of each of the above embodiments, and various modifications can be made within the scope of the gist of the invention. For example, in each of the above-described embodiments, the locking means for the supporting member 18 of the wiring / connecting equipment loading member 10 or 40 is constituted by the projecting pieces 20a, 20b. However, the locking means is not limited to such a configuration, and is supported by some means. It is sufficient if the member can be positioned and locked to the member. For example, as shown in FIGS. 8A, 8B, and 8C, a horizontal protrusion having a recess 70 and a through hole 72 for locking or inserting the support member according to the shape of the support member. It is also possible to configure by providing 74.
In FIG. 8B, the recess 70 may be used instead of the through hole 72.

【0045】また、上記各実施例では、配線・接続機器
装填部材10の両端部に係止手段を設けたが、上記図8
(B)及び(C)のような貫通孔により係止させる場合
には一方の端部のみ、或いは端部ではなく途中位置にこ
れを設けることにより、係止手段としての機能を奏せし
めることも可能である。更に、上記各実施例では、配線
・接続機器装填部材10の高さを支持部材18の高さと
ほぼ等しい高さとしたが、必ずしもかかる構成は必要で
はなく、支持機能が不要であれば支持部材18よりも低
い構成としても良い。また、二重床構造として、いわゆ
る支柱凸型パネル又はマットを例に挙げたが、この様な
構造に限定されずいわゆる支柱一体型、或いは分離型、
溝配線型パネルなど種々の二重床構造への応用も可能で
ある。
Further, in each of the above-described embodiments, the locking means is provided at both ends of the wiring / connecting device loading member 10.
In the case of locking with a through hole as in (B) and (C), the function as the locking means may be provided by providing this at only one end or at an intermediate position instead of the end. It is possible. Further, in each of the above-described embodiments, the height of the wiring / connecting device loading member 10 is set to be substantially equal to the height of the supporting member 18, but such a configuration is not necessarily required, and the supporting member 18 is not necessary if the supporting function is not required. It may be a lower configuration. Further, as the double floor structure, a so-called strut convex panel or mat is given as an example, but the present invention is not limited to such a structure, a so-called strut integrated type, or a separable type.
It is also applicable to various double floor structures such as groove wiring type panels.

【0046】[0046]

【発明の効果】以上説明したように、本発明に係る配線
・接続機器収納二重床構造によれば、大掛りな構成や設
置作業を伴うことなく各種配線・接続機器を二重床構造
の配線路空間に設置することができ、その設置した部分
での上側床部の支持機能も安定して奏することができ
る。さらに、二重床構造の支持部材相互間に簡単に設置
することができるので、二重床構造内の様々な位置に設
置することができ、配線マネージメントの容易化にも十
分に貢献することができる。
As described above, according to the wiring / connecting device storage double floor structure according to the present invention, various wiring / connecting devices can be installed in a double floor structure without a large-scale configuration or installation work. It can be installed in the wiring path space, and the function of supporting the upper floor portion at the installed part can be stably achieved. Furthermore, since it can be easily installed between the support members of the double floor structure, it can be installed at various positions in the double floor structure, which contributes to the ease of wiring management. it can.

【図面の簡単な説明】[Brief description of drawings]

【図1】(A)及び(B)は本発明の特徴的構成要素で
ある配線・接続機器装填部材の基本構成を示す概略斜視
図である。
FIG. 1A and FIG. 1B are schematic perspective views showing a basic configuration of a wiring / connection device loading member which is a characteristic component of the present invention.

【図2】配線・接続機器装填部材の他の構成例及び配線
補助部材の構成例を示す概略斜視図である。
FIG. 2 is a schematic perspective view showing another configuration example of a wiring / connection device loading member and a configuration example of a wiring auxiliary member.

【図3】(A)及び(B)は図2に示した配線・接続機
器装填部材の幅調整部の締結固定構造の例を示す概略断
面図である。
3A and 3B are schematic cross-sectional views showing an example of the fastening and fixing structure of the width adjusting unit of the wiring / connecting device loading member shown in FIG.

【図4】側壁部と天井部とを別体に構成した配線・接続
機器装填部材の構成例を示す概略斜視図である。
FIG. 4 is a schematic perspective view showing a configuration example of a wiring / connection device loading member in which a side wall portion and a ceiling portion are separately configured.

【図5】図4の実施例の動作説明図である。FIG. 5 is an operation explanatory diagram of the embodiment in FIG.

【図6】実施例に係る配線・接続機器装填部材の二重床
構造への実際の設置例を示す概略斜視図である。
FIG. 6 is a schematic perspective view showing an actual installation example of the wiring / connection device loading member according to the embodiment in the double floor structure.

【図7】(A)及び(B)は保持部への配線・接続機器
の装着状態並びに着脱動作説明図である。
7 (A) and 7 (B) are diagrams for explaining a mounting state and a mounting / dismounting operation of the wiring / connecting device to the holding portion.

【図8】(A)、(B)及び(C)は係止手段の他の構
成例を示す概略斜視図である。
8 (A), (B) and (C) are schematic perspective views showing another configuration example of the locking means.

【図9】従来のシステム設置状態説明図である。FIG. 9 is an explanatory diagram of a conventional system installation state.

【図10】LANシステムの一般的システム構成図であ
る。
FIG. 10 is a general system configuration diagram of a LAN system.

【符号の説明】 10,40 配線・接続機器装填部材 16 貫通口 17 切欠部 20 突出片 24 配線補助部材 46 突部[Explanation of Codes] 10, 40 Wiring / Connecting Device Loading Member 16 Through Port 17 Notch 20 Projecting Piece 24 Wiring Assisting Member 46 Projection

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 下側床部と、該下側床部上に配置された
支持部材と、該支持部材上に設置された上側床部とを有
し、前記下側床部と上側床部との間を配線路空間とする
と共に該空間に配線・接続機器を収納するようにした二
重床構造において、 前記下側床部上に設置され、 前記支持部材に対し位置決め係止可能な係止手段と、 前記配線・接続機器を係止保持可能な保持部と、 を有する配線・接続機器装填部材を備えたことを特徴と
する配線・接続機器収納二重床構造。
1. A lower floor portion, a support member arranged on the lower floor portion, and an upper floor portion installed on the support member, wherein the lower floor portion and the upper floor portion are provided. In a double-floor structure in which a wiring path space is provided between and a wiring / connecting device is housed in the space, a member installed on the lower floor part and capable of positioning and locking with respect to the support member A wiring / connecting device storage double-floor structure comprising a wiring / connecting device loading member having a stop means and a holding portion capable of locking and holding the wiring / connecting device.
【請求項2】 前記配線・接続機器装填部材の係止手段
は、 前記配線・接続機器装填部材の端部に設けられた対向す
る2つの突出部にて構成され、 該突出部により前記支持部材を挟持可能としたことを特
徴とする請求項1に記載の配線・接続機器収納二重床構
造。
2. The wiring / connecting device loading member locking means is composed of two opposing projecting portions provided at an end of the wiring / connecting device loading member, and the supporting member is provided by the projecting portions. The double-floor structure for storing wiring / connecting equipment according to claim 1, wherein the double floor structure can be held.
【請求項3】 前記配線・接続機器装填部材は、 前記設置状態で前記上側床部を下方から支持可能な高
さ、 を有することを特徴とする1又は2に記載の配線・接続
機器収納二重床構造。
3. The wiring / connecting device storage member according to claim 1, wherein the wiring / connecting device loading member has a height capable of supporting the upper floor portion from below in the installed state. Heavy floor structure.
【請求項4】 前記配線・接続機器装填部材は、 前記設置状態で内部に空間を有する構成とされ、 前記保持部は、前記配線・接続機器装填部材の側壁部に
貫通口を設けて構成され、 該貫通口の一部には、この貫通口の縁部から前記側壁部
の端縁部まで切り欠いた切欠部が設けられたことを特徴
とする請求項1〜3に記載の配線・接続機器収納二重床
構造。
4. The wiring / connecting device loading member is configured to have a space inside in the installed state, and the holding unit is configured by providing a through hole in a side wall of the wiring / connecting device loading member. The wiring / connection according to any one of claims 1 to 3, wherein a part of the through hole is provided with a notch portion cut out from an edge portion of the through hole to an end edge portion of the side wall portion. Equipment storage double floor structure.
【請求項5】 前記配線・接続機器装填部材は、 少なくとも側部及び天井部を有し、 前記天井部は側部に対し着脱可能な構成を有し、 前記天井部には前記側部に装着された状態で前記保持さ
れた配線・接続機器から延びる線材を下方へ押圧するた
めの押圧突部が設けられたことを特徴とする請求項1〜
4に記載の配線・接続機器収納二重床構造。
5. The wiring / connecting device loading member has at least a side portion and a ceiling portion, the ceiling portion being configured to be attachable to and detachable from the side portion, and the ceiling portion being attached to the side portion. The pressing protrusion for pressing downward the wire rod extending from the held wiring / connecting device in a held state is provided.
Wiring / connecting equipment storage double floor structure described in 4.
【請求項6】 前記配線・接続機器装填部材に付加さ
れ、前記保持された配線・接続機器から延びる線材を導
き、方向付ける通路を内部に有する配線補助部を有する
ことを特徴とする請求項1〜5に記載の配線・接続機器
収納二重床構造。
6. A wiring auxiliary portion, which is added to the wiring / connection device loading member, has therein a passage for guiding and directing a wire rod extending from the held wiring / connection device. Wiring / connecting equipment storage double-floor structure described in ~ 5.
JP6339238A 1994-12-29 1994-12-29 Wiring/connection device housing double floor structure Withdrawn JPH08184164A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6339238A JPH08184164A (en) 1994-12-29 1994-12-29 Wiring/connection device housing double floor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6339238A JPH08184164A (en) 1994-12-29 1994-12-29 Wiring/connection device housing double floor structure

Publications (1)

Publication Number Publication Date
JPH08184164A true JPH08184164A (en) 1996-07-16

Family

ID=18325563

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6339238A Withdrawn JPH08184164A (en) 1994-12-29 1994-12-29 Wiring/connection device housing double floor structure

Country Status (1)

Country Link
JP (1) JPH08184164A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102152366A (en) * 2010-12-03 2011-08-17 湖州新峰木塑复合材料有限公司 Manufacturing process of raised floor and raise floor manufactured by process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102152366A (en) * 2010-12-03 2011-08-17 湖州新峰木塑复合材料有限公司 Manufacturing process of raised floor and raise floor manufactured by process

Similar Documents

Publication Publication Date Title
US5778612A (en) Partition panel containing data processing or communications equipment
US5214889A (en) Electrified wall panel system
US5013252A (en) Electrified wall panel system
US7979985B2 (en) Multi-port mounting bracket and method
US5913787A (en) Communications conduit connector mounting device
US20090194647A1 (en) Cable Management System for Moveable Communication Panels
US6591563B2 (en) Panel system
US5479747A (en) Conduit connecting mechanism for a screen panel
US5112240A (en) Electrified wall panel system
US20090301774A1 (en) Electrical floor access module system
WO2006055287B1 (en) Secure cable system
US7563117B2 (en) Electrical system assembly with mounting bracket
US5116235A (en) Power panel structure
US6201687B1 (en) Modular furniture wall system and method for telecommunications equipment and wire management in an open office architecture
JPH08184164A (en) Wiring/connection device housing double floor structure
JP2008092666A (en) Wiring duct and method for manufacturing wiring duct
JP2010097916A (en) Wiring system for information device
KR200215435Y1 (en) Rack assembly for Electronic communication equipment installation
US7331829B2 (en) Snap-in mounting bracket-terminal block
CN212935444U (en) Cable bridge
CN113883707B (en) Wiring device and air conditioning equipment
JP2747259B2 (en) Partition for OA equipment
KR970000842Y1 (en) Junction box
CA2213601C (en) Communications conduit connector mounting device
JP2923232B2 (en) Desk equipped with a wiring system

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20020305