Concrete for tunnel secondary lining and concrete material transport method and its device

Info

Publication number
JPH08135388A
JPH08135388A JP6269729A JP26972994A JPH08135388A JP H08135388 A JPH08135388 A JP H08135388A JP 6269729 A JP6269729 A JP 6269729A JP 26972994 A JP26972994 A JP 26972994A JP H08135388 A JPH08135388 A JP H08135388A
Authority
JP
Japan
Prior art keywords
concrete
capsule
mud pipe
pipe
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6269729A
Other languages
Japanese (ja)
Other versions
JP2836807B2 (en
Inventor
Sanai Kosugi
佐内 小杉
Masahiko Yamamoto
征彦 山本
Kunio Takeda
邦夫 武田
Kenji Tomoishi
研二 友石
Yusaku Kanayama
裕策 金山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Nippon Steel Corp
Kumagai Gumi Co Ltd
Original Assignee
Obayashi Corp
Sumitomo Metal Industries Ltd
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Sumitomo Metal Industries Ltd, Kumagai Gumi Co Ltd filed Critical Obayashi Corp
Priority to JP6269729A priority Critical patent/JP2836807B2/en
Publication of JPH08135388A publication Critical patent/JPH08135388A/en
Application granted granted Critical
Publication of JP2836807B2 publication Critical patent/JP2836807B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE: To capsule transport a concrete and a concrete material by utilizing the existing mud transport pipe and mud discharge pipe, to make unnecessary a process of laying a duct, and to reduce the cost of the secondary lining process and the construction term. CONSTITUTION: A concrete and a concrete material for the secondary lining are capsule transported by utilizing a mud transport pipe 2 and a mud exhaust pipe 3 left in a tunnel which was used in an excavation work and the primary lining was applied. In an unloading station facing the secondary lining concrete placing site, a capsule brake and stop member 60, an unloading member 30, a line converting member 50, and an empty capsule extruding blower 57 are provided.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はトンネル2次覆工用コン
クリート・コンクリート材料輸送方法及び装置に関す
る。なお、2次覆工用コンクリートは主に生コン(生コ
ンクリート)、2次覆工用コンクリート材料は主にセメ
ント、砂、砂利を指し、これらをまとめてコンクリート
・コンクリート材料と呼称する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for transporting concrete / concrete material for secondary tunnel lining. The secondary lining concrete mainly refers to ready-mixed concrete (green concrete), and the secondary lining concrete material mainly refers to cement, sand, and gravel, and these are collectively referred to as concrete / concrete materials.

【0002】[0002]

【従来の技術】近年、シールド掘進機でトンネルを掘る
ことが主流となっている。前記掘進機はカッタの付いた
回転盤を回転しつつ油圧等で押し出すことで円形のトン
ネルを形成する。この際に、削り出された土砂をずりま
たは排土といい、この排土をトラックや台車で排出す
る、又は排泥管を介して排出するようにしている。
2. Description of the Related Art In recent years, it has become mainstream to dig a tunnel with a shield machine. The excavator forms a circular tunnel by rotating a turntable with a cutter and pushing out with hydraulic pressure or the like. At this time, the excavated earth and sand is referred to as "sliding" or "discharging", and this discharging is discharged by a truck or a truck or discharged through a mud pipe.

【0003】図9(a)〜(c)は従来のトンネル施工
の説明図であり、(a)は掘削直後の掘削孔101を示
し、この掘削孔101の内面に直ちにセグメント102
で覆って崩れを防止する((b)参照)。この覆工作業
を1次覆工という。そして、セグメント102の内面を
十分に厚いコンクリート103で覆ってトンネルを完成
する((c)参照)。この覆工作業を2次覆工という。
9 (a) to 9 (c) are explanatory views of a conventional tunnel construction. FIG. 9 (a) shows a drill hole 101 immediately after excavation, and a segment 102 is immediately formed on the inner surface of the drill hole 101.
To prevent collapse (see (b)). This lining work is called primary lining. Then, the inner surface of the segment 102 is covered with sufficiently thick concrete 103 to complete the tunnel (see (c)). This lining work is called secondary lining.

【0004】2次覆工はいわゆる仕上覆工であるから、
前記掘進機や排泥管(及び送泥管)を撤去した後に実施
する。そして、2次覆工のためのコンクリート・コンク
リート材料はトラックや台車で覆工現場まで輸送され
る。
Since the secondary lining is a so-called finishing lining,
It is carried out after removing the excavator and mud pipe (and mud pipe). Then, the concrete and concrete materials for the secondary lining are transported to the lining site by trucks or trucks.

【0005】[0005]

【発明が解決しようとする課題】しかし、近年、覆工作
業の合理化の観点から前記トラックや台車の輸送方法を
他の輸送方法に切換えて省力化を図るという要求があ
る。また、近年トンネルの施工延長は増々長くなり、こ
れにともなってコンクリート・コンクリート材料の運搬
距離が長くなることからトラックや台車では運搬速度が
遅いためコンクリート・コンクリート材料の良い品質を
確保することが難かしく問題がある。
However, in recent years, from the viewpoint of rationalizing the lining work, there is a demand for switching the transportation method of the truck or the trolley to another transportation method to save labor. In addition, the construction length of tunnels has become longer and longer in recent years, and the transport distance of concrete / concrete materials has become longer, which makes it difficult to secure good quality of concrete / concrete materials due to the slow transport speed of trucks and trucks. There is a problem.

【0006】そこで、パイプを利用した輸送法としての
空気輸送、スラリー輸送も広く使用され、特に粉体の飛
散防止技術としてのカプセル輸送(粉体をカプセルに詰
め、このカプセルをパイプ内移動させる。)も注目を浴
びている。カプセル輸送を行なうことにより運搬速度が
早くなってコンクリート・コンクリート材料の良い品質
を確保することができる。しかし、空気輸送、スラリー
輸送、カプセル輸送のいずれにおいても長大なパイプラ
インを敷設しなければならないので、設備費は嵩む。
Therefore, pneumatic transportation as a transportation method using a pipe and slurry transportation are also widely used. Particularly, capsule transportation as a technique for preventing powder scattering (powder is packed in a capsule, and the capsule is moved in a pipe. ) Is also in the spotlight. By carrying out capsule transportation, the transportation speed becomes faster and good quality of concrete and concrete material can be secured. However, in any of air transportation, slurry transportation, and capsule transportation, a long pipeline must be installed, which increases equipment costs.

【0007】[0007]

【課題を解決するための手段】そこで、本発明者等はト
ラック輸送等の従来の2次覆工用コンクリート輸送法に
代る技術を鋭意研究し、掘進時にのみ使用していた小径
の送泥管及び排泥管の再使用と、小径のカプセルの採用
とにより、廉価な2次覆工用コンクリート輸送法を確立
することに成功した。具体的には、掘削工事に使用され
1次覆工されたトンネル内に残された送泥管及び排泥管
と、これら送泥管及び排泥管内部を流通するコンクリー
ト・コンクリート材料を詰めるためのカプセルと、2次
覆工コンクリート打設現場に臨む前記送泥管及び排泥管
の一端に設置したカプセル制動・停車部,荷下ろし部,
ライン切換え部並びに空カプセル押出し用ブロアと、前
記送泥管及び排泥管の他端に設置したカプセル制動・停
車部,積込部,ライン切換え部並びにカプセル押出し用
ブロアとからトンネル2次覆工用コンクリート・コンク
リート材料輸送装置を構成する。
[Means for Solving the Problems] Therefore, the inventors of the present invention have diligently studied a technique for replacing the conventional concrete transporting method for secondary lining such as truck transportation, and have carried out a small-diameter mud feeding which is used only during excavation. By reusing pipes and sludge pipes and adopting small diameter capsules, we succeeded in establishing an inexpensive concrete transportation method for secondary lining. Specifically, to fill the mud pipes and mud pipes left in the tunnel that was used for excavation work and the primary lining and the concrete and concrete materials that flow inside these mud pipes and mud pipes. Capsules, a braking / stopping unit and an unloading unit of capsules installed at one end of the mud pipe and the mud pipe facing the secondary lining concrete pouring site,
Secondary lining of the tunnel from the line switching unit and the empty capsule pushing blower, and the capsule braking / stopping unit, loading unit, line switching unit and capsule pushing blower installed at the other end of the mud feeding pipe and the mud discharging pipe. Conveying concrete and concrete material transportation equipment.

【0008】[0008]

【作用】掘進機で掘削したトンネル内面をセグメントで
1次覆工した後、掘削工事に使用した送泥管及び排泥管
を残した状態で前記送泥管及び排泥管をカプセルの輸送
路とし、送泥管と排泥管の一方を利用して2次覆工用コ
ンクリート・コンクリート材料を詰めたカプセルを2次
覆工コンクリート打設現場まで送給し、送泥管と排泥管
の他方を利用して空のカプセルを回収することを特徴と
する。
[Function] After the inner surface of the tunnel excavated by the excavator is firstly lined with segments, the mud pipe and the mud pipe used for the excavation work are left in the state where the mud pipe and the mud pipe are transferred to the capsule. Then, by using one of the mud pipe and the mud pipe, the capsule filled with the concrete / concrete material for the secondary lining is fed to the concrete lining site for the secondary lining, and the mud pipe and the mud pipe are The other feature is that empty capsules are collected.

【0009】[0009]

【実施例】本発明の実施例を添付図に基づいて以下に説
明する。なお、図面は符号の向きに見るものとする。図
1は本発明に係るカプセルの斜視図であり、カプセル1
0は無蓋貨車形式の台車であり、円筒の一部を切り取っ
て形成した荷台11と、この荷台11の前後を塞ぐ円板
12,12と、これら円板12,12に各々取付けられ
たガイド輪13…(…は複数個を示す。以下同様。)
と、先端金物14,14(後方の先端金物は陰で見えな
い)とからなる。
Embodiments of the present invention will be described below with reference to the accompanying drawings. The drawings should be viewed in the direction of reference numerals. FIG. 1 is a perspective view of a capsule according to the present invention.
Reference numeral 0 denotes an open-ended wagon type cart, a loading platform 11 formed by cutting out a part of a cylinder, discs 12 and 12 for closing the front and back of the loading platform 11, and guide wheels attached to these discs 12 and 12, respectively. 13 ... (... indicates a plurality. The same applies hereinafter.)
And tip hardware 14, 14 (rear hardware is not visible in the shadow).

【0010】前記円板12は当該パイプPの内面から一
定の隙間を確保する程度の径のディスクであり、「ヨッ
トの帆」の役割、即ち空気圧を受けるところの受圧面に
なる。ガイド輪13は自由回転するゴムタイヤが好適で
あり、パイプPの内面に当接して回転する。少なくとも
3個のガイド輪13…を1セットとしているためカプセ
ル10の心をパイプPの心に合わせることができる。従
って、荷台11や円板12がパイプPに接触する心配は
ない。先端金具14は複数のカプセル10…同士を連結
するときの連結金具、若しくは前後のカプセル10,1
0の衝突を防止する金具としての役割をなす。
The disk 12 is a disk having a diameter such that a certain clearance is secured from the inner surface of the pipe P, and serves as a "yacht sail", that is, a pressure receiving surface for receiving air pressure. The guide wheel 13 is preferably a rubber tire that rotates freely, and contacts the inner surface of the pipe P to rotate. Since at least three guide wheels 13 ... Are set as one set, the center of the capsule 10 can be aligned with the center of the pipe P. Therefore, there is no concern that the loading platform 11 and the disc 12 contact the pipe P. The tip fitting 14 is a fitting for joining a plurality of capsules 10 ... Or the front and rear capsules 10, 1.
It acts as a metal fitting to prevent 0 collision.

【0011】図において一方の円板12に空気圧を作用
するとカプセル10は押されて前進する。空気流れは円
板12とパイプPとの間の隙間を通って流れるので、当
該カプセル10の前方のカプセル10も空気圧を受けて
前進する。この様に、1本のパイプPで複数個のカプセ
ル10…を同時に走らせることができる。
In the figure, when air pressure is applied to one of the disks 12, the capsule 10 is pushed and moved forward. Since the air flow flows through the gap between the disc 12 and the pipe P, the capsule 10 in front of the capsule 10 also receives air pressure and moves forward. In this way, a single pipe P can simultaneously run a plurality of capsules 10.

【0012】図2は本発明に係る積込部の説明図であ
り、積込部20では例えばパイプP1に上部開口21を
設け、この開口21を通じてコンクリート・コンクリー
ト材料Wを積込むことができる。図3は本発明に係る荷
下ろし部の説明図であり、荷下ろし部30では例えばパ
イプP2に開口31、リングギア32を設け、リングギ
ア32をモータ33及びピニオン34で回動することで
パイプP2ごとカプセル10を180゜反転してコンク
リート・コンクリート材料Wをホッパ35へ下ろすこと
ができる。
FIG. 2 is an explanatory view of the loading section according to the present invention. In the loading section 20, for example, an upper opening 21 is provided in the pipe P1, and concrete / concrete material W can be loaded through this opening 21. FIG. 3 is an explanatory view of the unloading unit according to the present invention. In the unloading unit 30, for example, an opening 31 and a ring gear 32 are provided in the pipe P2, and the ring gear 32 is rotated by a motor 33 and a pinion 34 so that the pipe is It is possible to invert the capsule 10 by 180 degrees together with P2 and lower the concrete / concrete material W into the hopper 35.

【0013】図4は本発明に係るライン切換え部の説明
図であり、積込みステーション側ライン切換え部40は
カプセル10を収納するパイプP3、このパイプP3を
横引きするための台車41、レール42、シリンダ43
及びパイプP3の一端に付設した第1締切板44とから
なる。図中、46は第2締切板、47はカプセル押出し
用ブロア、48は第1バルブ、49は第2バルブであ
る。
FIG. 4 is an explanatory view of a line switching unit according to the present invention. The loading station side line switching unit 40 is a pipe P3 for accommodating the capsule 10, a truck 41 for horizontally pulling the pipe P3, a rail 42, Cylinder 43
And a first shutoff plate 44 attached to one end of the pipe P3. In the figure, 46 is a second shut-off plate, 47 is a capsule pushing blower, 48 is a first valve, and 49 is a second valve.

【0014】図において、第1バルブ48を「閉」、第
2バルブ49を「開」とする。カプセル10を収納した
パイプP3を、台車41及びシリンダ43にて移動す
る。図5は本発明に係るライン切換え部の作用図であ
り、パイプP3が別のラインに切換わったので、第2バ
ルブ49を「閉」とし第1バルブ48を「開」とし、カ
プセル10を矢印方向へ押出す。このライン切換えの際
に、常に第1・第2締切り板48,49がパイプ端を塞
いでいるのでブロア47から圧送した空気が直接的に外
部に漏れるのを抑えることができる。
In the figure, the first valve 48 is "closed" and the second valve 49 is "open". The pipe P3 accommodating the capsule 10 is moved by the carriage 41 and the cylinder 43. FIG. 5 is an operation diagram of the line switching unit according to the present invention. Since the pipe P3 is switched to another line, the second valve 49 is “closed” and the first valve 48 is “open”, and the capsule 10 is opened. Push in the direction of the arrow. At the time of this line switching, the first and second shutoff plates 48, 49 always block the pipe ends, so it is possible to prevent the air pressure-fed from the blower 47 from directly leaking to the outside.

【0015】荷下ろしステーション側ライン切換え部5
0は前記積込みステーション側ライン切換え部40の対
称形装置であり、図7に示す通り50番代の符号を付す
ことで機構の詳しい説明は省略する。
Unloading station side line switching unit 5
Reference numeral 0 designates a symmetrical device of the line switching unit 40 on the loading station side, and as shown in FIG.

【0016】作図の都合で、本発明装置を図6と図7と
に分割表示した。図6は本発明のトンネル2次覆工用コ
ンクリート・コンクリート材料輸送装置の積込みステー
ションの原理図、図7は本発明のトンネル2次覆工用コ
ンクリート・コンクリート材料輸送装置の荷下ろしステ
ーションの原理図である。トンネル2次覆工用コンクリ
ート・コンクリート材料輸送装置1は、掘削工事に使用
され1次覆工されたトンネル内に残された送泥管2及び
排泥管3と、これら送泥管2及び排泥管3内部を流通す
るコンクリート・コンクリート材料を詰めるためのカプ
セル10…(図1参照)と、図7に示す2次覆工コンク
リート打設現場に臨むカプセル制動・停車部60,荷下
ろし部30(図3参照),ライン切換え部50(図4参
照)並びに空カプセル押出し用ブロア57と、図6に示
すカプセル制動・停車部60,積込部20(図2参
照),ライン切換え部(図4参照)40並びにカプセル
押出し用ブロア47とからなる。
For the convenience of drawing, the device of the present invention is divided into FIG. 6 and FIG. FIG. 6 is a principle diagram of a loading station of the concrete / concrete material transport device for secondary tunnel lining of the present invention, and FIG. 7 is a principle diagram of an unloading station of the concrete / concrete material transport device for secondary tunnel lining of the present invention. Is. The tunnel secondary lining concrete / concrete material transport device 1 is used for excavation work, and the mud pipe 2 and the mud pipe 3 left in the tunnel that has undergone the primary lining and the mud pipe 2 and the mud pipe Capsule 10 for filling concrete / concrete material flowing inside mud pipe 3 (see FIG. 1) and capsule braking / stopping unit 60 and unloading unit 30 facing the secondary lining concrete placing site shown in FIG. (See FIG. 3), line switching unit 50 (see FIG. 4) and empty capsule pushing blower 57, capsule braking / stopping unit 60 shown in FIG. 6, loading unit 20 (see FIG. 2), line switching unit (see FIG. 3). 4) 40 and a capsule-extruding blower 47.

【0017】送泥管2及び排泥管3は例えば径が250
mmで長さが6mのものをチューブクランプ4…にて直
列に繋いだもので、数百mから数十kmにわたるパイプ
ラインである。カプセル制動・停車部60は空気抜き機
構(バルブ61、サイレンサ62などからなる。)を備
え、この空気抜き機構60でパイプP4から空気を抽出
することでパイプP4内の空気流れを無くし、カプセル
10を制動する作用をなす。そののちカプセル10は摩
擦抵抗作用などにより自然に停止する。
The mud pipe 2 and the mud pipe 3 have a diameter of 250, for example.
A pipe having a length of 100 mm and a length of 6 m is connected in series by a tube clamp 4 ... A pipeline extending from several hundred m to several tens km. The capsule braking / stopping unit 60 has an air bleeding mechanism (comprising a valve 61, a silencer 62, etc.), and the air bleeding mechanism 60 extracts air from the pipe P4 to eliminate the air flow in the pipe P4 and brake the capsule 10. To act. After that, the capsule 10 naturally stops due to a frictional resistance effect or the like.

【0018】なお、図6の71はコンクリート・コンク
リート材料投入機、72はシフト台車である。シフト台
車72で適宜カプセル10を入れ替えることができる。
従って、汚れたカプセル10をライン外へ移して洗浄す
ることや故障したカプセル10をラインから取出し、別
のカプセル10をラインへ投入することが自在に行なえ
る。
Reference numeral 71 in FIG. 6 is a concrete / concrete material charging machine, and 72 is a shift carriage. The capsule 10 can be appropriately replaced by the shift cart 72.
Therefore, it is possible to freely transfer the dirty capsule 10 to the outside of the line for washing, take out the defective capsule 10 from the line, and put another capsule 10 into the line.

【0019】以上に述べたトンネル2次覆工用コンクリ
ート・コンクリート材料輸送装置の作用を次に説明す
る。図9(a),(b)で述べた要領でトンネルを掘削
し、直ちにセグメントで覆う。この際に使用した送泥管
2及び排泥管3を1次覆工後に撤去しないことを特徴と
する。図8は本発明に係る送泥管及び排泥管を含むトン
ネルの断面図であり、セグメント102の内側に送泥管
2及び排泥管3が残されていることを示す。そして、図
6に示す縦坑73に積込みステーションを配置し、図7
に示す荷下ろしステーションを配置する。すなわち、長
大な送泥管2及び排泥管3の端部に積込みステーション
と荷下ろしステーションとを各配置する。
The operation of the concrete / concrete material transport device for the secondary tunnel lining described above will be described below. The tunnel is excavated as described in FIGS. 9A and 9B, and immediately covered with the segment. It is characterized in that the mud pipe 2 and the mud pipe 3 used at this time are not removed after the primary lining. FIG. 8 is a sectional view of a tunnel including a mud pipe and a mud pipe according to the present invention, and shows that the mud pipe 2 and the mud pipe 3 are left inside the segment 102. Then, the loading station is arranged in the vertical shaft 73 shown in FIG.
Place the unloading station shown in. That is, a loading station and an unloading station are arranged at the ends of the long mud pipe 2 and the long mud pipe 3.

【0020】そして、図6にて積込部20でコンクリー
ト・コンクリート材料を図示せぬカプセル10に積込
み、ライン切換え部40でカプセル10を下段の排泥管
3へ移し、排泥管3内を走行させる。図7の制動・停止
部60でカプセル10を止め、荷下ろし部30でコンク
リート・コンクリート材料を荷下ろしし、空になったカ
プセル10をライン切換え部50にて送泥管2へライン
換えする。引続き空カプセル10は上段の送泥管2を通
じて積込みステーションに戻される。
Then, in FIG. 6, concrete / concrete material is loaded into the capsule 10 (not shown) at the loading section 20, the capsule 10 is moved to the lower mud pipe 3 at the line switching section 40, and the inside of the mud pipe 3 is moved. Let it run. The capsule 10 is stopped by the braking / stopping unit 60 of FIG. 7, the concrete / concrete material is unloaded by the unloading unit 30, and the emptied capsule 10 is line-changed to the mud pipe 2 by the line switching unit 50. Then, the empty capsule 10 is returned to the loading station through the upper mud pipe 2.

【0021】2次覆工にともなって、覆工現場は移動す
る。本実施例では最先部分から縦抗73へ覆工を進める
ことにする。そこで、2次覆工にともなって図7の最先
の送泥管2及び排泥管3を撤去して荷下ろしステーショ
ンを積込みステーション寄りに移動すればよい。
The lining site moves along with the secondary lining. In this embodiment, the lining is advanced from the frontmost portion to the vertical pit 73. Therefore, along with the secondary lining, the earliest mud pipe 2 and mud pipe 3 in FIG. 7 may be removed and the unloading station moved to the loading station side.

【0022】尚、実施例で示した積込部20、荷下ろし
部30、ライン切換え部40,50の構成及び機構は一
例を示すもので、本発明は本実施例に限るものではな
い。また、本実施例では送泥管を空カプセルの返送用
管、排泥管を積カプセルの搬送用管としたが逆にしても
効果は変わらない。
The configuration and mechanism of the loading section 20, the unloading section 30, and the line switching sections 40 and 50 shown in the embodiment are merely examples, and the present invention is not limited to this embodiment. Further, in the present embodiment, the mud feeding pipe was used as a return pipe for empty capsules and the mud feeding pipe was used as a transportation pipe for laminating capsules.

【0023】[0023]

【発明の効果】本発明は上記構成により次の効果を発揮
する。請求項1の2次覆工用コンクリート・コンクリー
ト材料輸送方法は、既設の送泥管と排泥管とを流用して
コンクリート・コンクリート材料をカプセル輸送するも
のであるから、管路敷設の工数が不要となり、2次覆工
費用および工期を短縮することができる。
The present invention has the following effects due to the above configuration. In the method for transporting concrete / concrete material for secondary lining according to claim 1, since the concrete / concrete material is capsule-transported by diverting the existing mud pipe and drainage pipe, the number of man-hours for laying the pipeline is reduced. It becomes unnecessary, and the secondary lining cost and construction period can be shortened.

【0024】請求項2の2次覆工用コンクリート・コン
クリート材料輸送装置は、既設の送泥管と排泥管との端
部に積込みステーションと荷下ろしステーションを設け
るだけでカプセル輸送装置が完成するから、管路の材料
費、敷設費が発生せず、設備費の削減が図れる。
In the concrete / concrete material transporting device for secondary lining according to claim 2, the capsule transporting device is completed only by providing the loading station and the unloading station at the ends of the existing mud pipe and drain pipe. Therefore, the material cost and the installation cost of the pipeline are not generated, and the equipment cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るカプセルの斜視図FIG. 1 is a perspective view of a capsule according to the present invention.

【図2】本発明に係る積込部の説明図FIG. 2 is an explanatory view of a loading section according to the present invention.

【図3】本発明に係る荷下ろし部の説明図FIG. 3 is an explanatory view of an unloading section according to the present invention.

【図4】本発明に係るライン切換え部の説明図FIG. 4 is an explanatory diagram of a line switching unit according to the present invention.

【図5】本発明に係るライン切換え部の作用図FIG. 5 is an operation diagram of a line switching unit according to the present invention.

【図6】本発明のトンネル2次覆工用コンクリート・コ
ンクリート材料輸送装置の積込みステーションの原理図
FIG. 6 is a principle diagram of a loading station of the concrete / concrete material transport device for secondary tunnel lining of the present invention.

【図7】本発明のトンネル2次覆工用コンクリート・コ
ンクリート材料輸送装置の荷下ろしステーションの原理
FIG. 7: Principle diagram of the unloading station of the concrete / concrete material transportation device for the secondary lining of the tunnel of the present invention

【図8】本発明に係る送泥管及び排泥管を含むトンネル
の断面図
FIG. 8 is a sectional view of a tunnel including a mud pipe and a mud pipe according to the present invention.

【図9】従来のトンネル施工の説明図[Figure 9] Illustration of conventional tunnel construction

【符号の説明】[Explanation of symbols]

1…トンネル2次覆工用コンクリート・コンクリート材
料輸送装置、2…送泥管、3…排泥管、4…チューブク
ランプ、10…カプセル、11…荷台、12…円板、1
3…ガイド輪、20…積込部、21…開口、30…荷下
ろし部、31…開口、40…積込みステーション側ライ
ン切換え部、50…荷下ろしステーション側ライン切換
え部、60…カプセル制動・停止部、73…縦抗、10
2…セグメント、103…コンクリート、P,P1〜P
4…パイプ、W…コンクリート・コンクリート材料。
DESCRIPTION OF SYMBOLS 1 ... Concrete / concrete material transport device for secondary lining of tunnel, 2 ... Mud pipe, 3 ... Mud pipe, 4 ... Tube clamp, 10 ... Capsule, 11 ... Loading platform, 12 ... Disc, 1
3 ... Guide wheel, 20 ... Loading section, 21 ... Opening, 30 ... Unloading section, 31 ... Opening, 40 ... Loading station side line switching section, 50 ... Unloading station side line switching section, 60 ... Capsule braking / stopping Part, 73 ... Vertical resistance, 10
2 ... Segment, 103 ... Concrete, P, P1-P
4 ... Pipe, W ... Concrete / concrete material.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山本 征彦 東京都新宿区津久戸町2番1号 株式会社 熊谷組東京本社内 (72)発明者 武田 邦夫 東京都千代田区神田司町2丁目三番地 株 式会社大林組東京本社内 (72)発明者 友石 研二 東京都千代田区神田司町2丁目三番地 株 式会社大林組東京本社内 (72)発明者 金山 裕策 東京都千代田区神田司町2丁目三番地 株 式会社大林組東京本社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Masahiko Yamamoto 2-1, Tsukudocho, Shinjuku-ku, Tokyo Kumagai Gumi Co., Ltd. Tokyo headquarters (72) Inventor Kunio Takeda 2-3 chome, Kandaji-cho, Chiyoda-ku, Tokyo Ceremony Company Obayashi Tokyo Main Office (72) Inventor Kenji Tomoishi 2-3, Kandaji-cho, Chiyoda-ku, Tokyo Stock Company Obayashi Corporation Tokyo Main Office (72) Inventor Yusaku Kanayama 2-3 Kandaji-cho, Chiyoda-ku, Tokyo Address House Obayashi Gumi Tokyo Head Office

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 掘進機で掘削したトンネル内面をセグメ
ントで1次覆工した後、掘削工事に使用した送泥管及び
排泥管を残した状態で前記送泥管及び排泥管をカプセル
の輸送路とし、送泥管と排泥管の一方を利用して2次覆
工用コンクリート・コンクリート材料を詰めたカプセル
を2次覆工コンクリート打設現場まで送給し、送泥管と
排泥管の他方を利用して空のカプセルを回収することを
特徴としたトンネル2次覆工用コンクリート・コンクリ
ート材料輸送方法。
1. After the inner surface of the tunnel excavated by an excavator is firstly lined with segments, the mud pipe and the mud pipe used for the excavation work are left in a state of capsules. As a transportation route, one of the mud pipe and the mud pipe is used to send a capsule filled with concrete / concrete material for secondary lining to the secondary lining concrete pouring site, and the mud pipe and mud A method for transporting concrete / concrete material for secondary tunnel lining, characterized by recovering empty capsules using the other of the pipes.
【請求項2】 掘削工事に使用され1次覆工されたトン
ネル内に残された送泥管及び排泥管と、これら送泥管及
び排泥管内部を流通するコンクリート・コンクリート材
料を詰めるためのカプセルと、2次覆工コンクリート打
設現場に臨む前記送泥管及び排泥管の一端に設置したカ
プセル制動・停車部,荷下ろし部,ライン切換え部並び
に空カプセル押出し用ブロアと、前記送泥管及び排泥管
の他端に設置したカプセル制動・停車部,積込部,ライ
ン切換え部並びにカプセル押出し用ブロアとからなるト
ンネル2次覆工用コンクリート・コンクリート材料輸送
装置。
2. To fill the mud pipe and the mud pipe left in the tunnel which was used for the excavation work and the primary lining and the concrete / concrete material flowing inside the mud pipe and the mud pipe. Capsule, a capsule braking / stopping unit, an unloading unit, a line switching unit, and an empty capsule pushing blower installed at one end of the mud pipe and the mud pipe facing the secondary lining concrete pouring site; A concrete / concrete material transport device for secondary lining of a tunnel consisting of a capsule braking / stopping unit, a loading unit, a line switching unit, and a capsule pushing blower installed at the other end of the mud pipe and drainage pipe.
JP6269729A 1994-11-02 1994-11-02 Method and apparatus for transporting concrete / concrete material for secondary lining of tunnel Expired - Fee Related JP2836807B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6269729A JP2836807B2 (en) 1994-11-02 1994-11-02 Method and apparatus for transporting concrete / concrete material for secondary lining of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6269729A JP2836807B2 (en) 1994-11-02 1994-11-02 Method and apparatus for transporting concrete / concrete material for secondary lining of tunnel

Publications (2)

Publication Number Publication Date
JPH08135388A true JPH08135388A (en) 1996-05-28
JP2836807B2 JP2836807B2 (en) 1998-12-14

Family

ID=17476359

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6269729A Expired - Fee Related JP2836807B2 (en) 1994-11-02 1994-11-02 Method and apparatus for transporting concrete / concrete material for secondary lining of tunnel

Country Status (1)

Country Link
JP (1) JP2836807B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604584A (en) * 2015-12-30 2016-05-25 天津市海岸带工程有限公司 Rapid shield tunneling machine tube piece lifting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604584A (en) * 2015-12-30 2016-05-25 天津市海岸带工程有限公司 Rapid shield tunneling machine tube piece lifting device

Also Published As

Publication number Publication date
JP2836807B2 (en) 1998-12-14

Similar Documents

Publication Publication Date Title
JP2012052289A (en) Construction method for shield tunnel
JP2014055509A (en) Construction method for shield tunnel
JPH08135388A (en) Concrete for tunnel secondary lining and concrete material transport method and its device
CN210289786U (en) Split starting matching device applied to minimum starting well
KR100351270B1 (en) 3 dimensional multi phase tunneling mathod and apparatus corresponding same
JP2002004796A (en) Carrying system in tunnel and load carry out and carry in method
CN107269286A (en) A kind of pipe arrangement stretch system for tunnel piercing
JP4759695B2 (en) Shield method
JP2837602B2 (en) Sediment transport system for shield method
CN212075506U (en) Earth and stone square conveying device
JP3689227B2 (en) Method of replacing soil removal means in tunnel excavator and tunnel excavator
CN216785117U (en) Underground waste bin
CN216588616U (en) Material conveying device of tunnel boring equipment
KR102144301B1 (en) Muck transporting vehicle for tunnel construction
JP2023138064A (en) Installation method for earth removal equipment of shield excavator and earth removal pump that constitutes it
JPH0613833B2 (en) Method and device for discharging soil in tunnel excavation
JP3026075B2 (en) Transport device for tunnel waste and transport method using the same
CN115628070A (en) Method for starting TBM lateral shaft
JP2691645B2 (en) Slipper carry-out device for tunnel excavation work
JPH0527595Y2 (en)
JPH0613834B2 (en) Method and device for discharging soil in tunnel excavation
JPH0978988A (en) Piping construction method in tunnel
JP2001115781A (en) Pipe arrangement extending method in shield tunneling method
JP2001040748A (en) Non-cut and cover tunneling method ad slurry solidification apparatus
JPH116397A (en) Method and device for carrying out excavated muck

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980925

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees