JPH0788977A - Manufacture of flexible tube for unwinding sprinkler facility pipeline - Google Patents

Manufacture of flexible tube for unwinding sprinkler facility pipeline

Info

Publication number
JPH0788977A
JPH0788977A JP26190693A JP26190693A JPH0788977A JP H0788977 A JPH0788977 A JP H0788977A JP 26190693 A JP26190693 A JP 26190693A JP 26190693 A JP26190693 A JP 26190693A JP H0788977 A JPH0788977 A JP H0788977A
Authority
JP
Japan
Prior art keywords
flexible tube
blade
unwinding
hollow ring
reducer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26190693A
Other languages
Japanese (ja)
Other versions
JP3124877B2 (en
Inventor
Takayuki Tsuda
貴之 津田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Morita Miyata Corp
Original Assignee
Miyata Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miyata Industry Co Ltd filed Critical Miyata Industry Co Ltd
Priority to JP05261906A priority Critical patent/JP3124877B2/en
Publication of JPH0788977A publication Critical patent/JPH0788977A/en
Application granted granted Critical
Publication of JP3124877B2 publication Critical patent/JP3124877B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

PURPOSE:To increase the strength of a flexible tube and reduce the cost of the same by a method wherein both ends of the flexible tube and a blade as well as the connecting terminal of a reducer and/or a nipple are screwed into a ring through curing agent, having bonding effect, under a condition that both of them are abutted against each other, and the curing agent is hardened. CONSTITUTION:The title manufacturing method is constituted of the inserting process of both ends of a flexible tube 7 and a blade 8, covering the outside of the flexible tube 7, into a hollow ring from one side through curing agent, another process, screwing the connecting terminal of a reducer 9 or a nipple for mounting a sprinkler head into a hollow ring from the opposite side through the same curing agent to abut the tip end thereof against the tip end of the flexible tube 7, and the other process of curing the curing agent by heating it thereafter. According to this method, the flexible tube 7 for unwinding a sprinkler facility pipeline, which will never be affected by welding heat and which is highly accurate, durable and low in cost, can be obtained.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、配管とスプリンクラー
のヘッドとの間に接続されるスプリンクラー設備配管巻
出し用フレキシブルチューブの改良に関し、フレキシブ
ルチューブの耐久性と強度、ならびにシール性の向上を
はかるとともに、製造コストの低減化をはかるようにす
ることを目的とする。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement of a flexible tube for unwinding a sprinkler equipment pipe connected between a pipe and a head of a sprinkler. The durability and strength of the flexible tube and the sealing property thereof are improved. At the same time, the purpose is to reduce the manufacturing cost.

【0002】[0002]

【従来の技術】従来のスプリンクラー設備配管巻出し用
フレキシブルチューブは、フレキシブルチューブとブレ
ードと接続ネジとを、それぞれの端部において共付け溶
接したもの(実開昭60−10662号)や、フレキシ
ブルチューブの両端部に口金を外嵌せしめ、且つフレキ
シブルチューブに被覆させたブレードの両端を前記口金
の外周に嵌合させたうえで、該ブレードの両端をリング
にて固定するようにした、所謂塑性加工を施したもの
(実公昭58−46835号)などが知られている。
2. Description of the Related Art A conventional flexible tube for unwinding a sprinkler equipment pipe includes a flexible tube, a blade and a connecting screw, which are welded together at their respective ends (Actual No. 60-10662), and a flexible tube. The outer ends of the base are fitted with the caps, and both ends of the blade covered with the flexible tube are fitted to the outer periphery of the cap, and the both ends of the blades are fixed by rings, so-called plastic working Those which have been subjected to (Jitsuko Sho 58-46835) and the like are known.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、前者の
ものにあっては溶接部にピンホールがあきやすいばかり
でなく、溶接部に大きな加熱応力がかかって腐食しやす
くなるために、漏水の大きな原因となる。 また後者の
ものにあっても、塑性加工部分の残留応力が腐食を促進
し、やはり破壊や漏水の可能性が大きくなる。
However, in the former case, not only pinholes are easily formed in the welded portion, but also a large heating stress is applied to the welded portion, which easily causes corrosion, which is a major cause of water leakage. Becomes Also in the latter case, the residual stress in the plastically worked portion promotes corrosion, which also increases the possibility of breakage and water leakage.

【0004】[0004]

【課題を解決するための手段】そこで本発明にあって
は、上記した従来技術における種々の課題を解決し、腐
食の原因を減少させることにより破壊や漏水の発生を防
ぎ、しかも高シール性と高い引っ張り強度を確保するこ
とにより耐久性を向上させるとともに、製造コストの低
減化をはかるようにしたものであって、具体的にはフレ
キシブルチューブおよびその外側を被覆するブレードの
両端部を、硬化材を介して中空状リングの片側より内部
に装入させる工程と、スプリンクラーヘッドを取り付け
るためのレジューサーまたはニップルの接続端部を、同
じく硬化材を介して前記した中空状リングの反対側より
内部にねじ込むことにより、先端を前記したフレキシブ
ルチューブの先端部に突き合わせてこれを圧潰させる工
程と、その後加熱して硬化材を硬化させる工程とからな
るスプリンクラー設備配管巻出し用フレキシブルチュー
ブの製造方法に関する。
Therefore, in the present invention, various problems in the above-mentioned prior art are solved, and the cause of corrosion is reduced to prevent destruction and leakage of water, and to achieve high sealability. The durability is improved by ensuring high tensile strength, and the manufacturing cost is reduced. Specifically, both ends of the flexible tube and the blade covering the outer side of the flexible tube are hardened with a hardening material. And the connecting end of the reducer or nipple for attaching the sprinkler head to the inside from the opposite side of the hollow ring through a hardening material. The step of screwing the tip of the flexible tube into the tip of the flexible tube and crushing it, and then heating The method for manufacturing a sprinkler flexible tube for Piping unwinding comprising a step of curing the cured material.

【0005】また本発明は、フレキシブルチューブおよ
びその外側を被覆するブレードの両端部と中空状リング
との間、ならびにレジューサーまたはニップルの接続端
部と中空状リングとの間に介在される硬化材は、硬化型
樹脂を用いるものであるところのスプリンクラー設備配
管巻出し用フレキシブルチューブの製造方法にも関す
る。
The present invention also provides a hardening material interposed between both ends of the flexible tube and the blade covering the outside thereof and the hollow ring, and between the connecting end of the reducer or nipple and the hollow ring. Also relates to a method of manufacturing a flexible tube for unwinding a sprinkler facility pipe, which uses a curable resin.

【0006】さらに本発明は、スプリンクラーヘッドを
取り付けるためのレジューサーまたはニップルの接続端
部を、硬化材を介して中空状リングの反対側より内部に
ねじ込んで先端を前記したフレキシブルチューブの先端
部に突き合わせる場合において、フレキシブルチューブ
の先端部に突き合わせた後、さらにねじ込んでフレキシ
ブルチューブの先端部を圧潰させるようにしたところの
スプリンクラー設備配管巻出し用フレキシブルチューブ
の製造方法にも関する。
Further, according to the present invention, a connecting end of a reducer or a nipple for attaching a sprinkler head is screwed into the inside from the opposite side of the hollow ring through a hardening material so that the tip is connected to the tip of the flexible tube. The invention also relates to a method for manufacturing a flexible tube for unwinding a sprinkler equipment pipe, in which, in the case of butting, the tip of the flexible tube is butted and further screwed to crush the tip of the flexible tube.

【0007】さらに本発明は、フレキシブルチューブお
よびその外側を被覆するブレードの両端部を、硬化材を
介して中空状リングの片側より内部に装入させる工程
は、中空状リングの内面に施された螺子状の溝内にねじ
込むようにしたスプリンクラー設備配管巻出し用フレキ
シブルチューブの製造方法にも関する。
Further, according to the present invention, the step of inserting both ends of the flexible tube and the blade covering the outside thereof into the inside from one side of the hollow ring via the hardening material is performed on the inner surface of the hollow ring. The present invention also relates to a method for manufacturing a flexible tube for unwinding a sprinkler equipment pipe which is screwed into a screw-shaped groove.

【0008】さらに本発明は、フレキシブルチューブ
と、その外側を被覆するブレードとの端部に外被させた
リングの自由端を、ブレードの外周面に当接する程度に
内側にカシメつけてなるスプリンクラー設備配管巻出し
用フレキシブルチューブの製造方法にも関する。
Furthermore, the present invention is a sprinkler facility in which the free end of a ring covering the end of a flexible tube and the blade covering the outside thereof is caulked inward to the extent that it abuts the outer peripheral surface of the blade. It also relates to a method of manufacturing a flexible tube for unwinding a pipe.

【0009】[0009]

【作用】フレキシブルチューブおよびその外側を被覆す
るブレードの両端部を、硬化材を介して中空状リングの
片側より内部に装入させた後、スプリンクラーヘッドを
取り付けるためのレジューサーまたはニップルの接続端
部を、同じく硬化材を介して前記した中空状リングの反
対側より内部にねじ込んで先端を前記したフレキシブル
チューブの先端部に突き合わせ、かつフレキシブルチュ
ーブの先端部を圧潰させ、その後加熱して内部の硬化材
を硬化させることによりフレキシブルチューブおよびそ
の外側を被覆するブレード、およびレジューサーまたは
ニップルのそれぞれの接続端部とリングとが一体化結合
される。
Operation: After inserting both ends of the flexible tube and the blade covering the outside thereof from one side of the hollow ring through the hardening material, the connecting end of the reducer or nipple for attaching the sprinkler head. Is also screwed in from the opposite side of the above-mentioned hollow ring through a hardening material to bring the tip into contact with the tip of the flexible tube described above, and crush the tip of the flexible tube, and then heat to cure the inside. By curing the material, the flexible tube and the blade covering the outer side of the flexible tube, and the connecting end and the ring of the reducer or the nipple are integrally combined.

【0010】[0010]

【実施例】以下において本発明の具体的な内容を図1の
実施例をもとに説明すると、1は中空状のリング、7は
フレキシブルチューブ、8はフレキシブルチューブ7の
外側を被覆するブレード、9はスプリンクラーヘッドを
取り付けるためのレジューサーをあらわす。 フレキシ
ブルチューブ7はステンレスの筒状体を蛇腹状に順次長
さ方向に向けて構成することにより、柔軟に折り曲げが
可能にされ、またブレード8は同じくステンレスの細い
多数のワイヤを縦横に編み組みして筒状体となし、フレ
キシブルチューブ7の外側周面を被覆補強するように構
成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The concrete contents of the present invention will be described below with reference to the embodiment shown in FIG. 1. 1 is a hollow ring, 7 is a flexible tube, 8 is a blade for coating the outside of the flexible tube 7, Reference numeral 9 represents a reducer for mounting the sprinkler head. The flexible tube 7 can be flexibly bent by constructing a stainless steel tubular body in the lengthwise direction one after another in a bellows shape, and the blade 8 also has a large number of thin stainless wires braided vertically and horizontally. To form a tubular body, and is configured to cover and reinforce the outer peripheral surface of the flexible tube 7.

【0011】またレジューサー9は、その取り付け端縁
の外周面に螺旋状の雄ねじ部10が形成されているとと
もに、該取り付け端縁より先端軸方向に向けて比較的薄
肉の延長部11が形成されている。 さらにリング1は
ステンレスまたは鉄あるいは真鍮、鋳物などの材質から
なり、内部中空の筒状体をなし、フレキシブルチューブ
7とブレード8の両部材の端部に外被することができる
大きさに成型され、しかもその一方の開口部1aの縁部
をテーパー状の薄肉に構成して軸芯方向に延びるフラン
ジ4を形成するとともに、その内奥部であって中央より
開口部1a寄りの位置に、前記したフレキシブルチュー
ブ7の蛇腹状突出部が入り込むことができる程度のねじ
溝2、ならびに硬化材Pを受け入れる溝3が形成され
る。
Further, the reducer 9 has a spiral male screw portion 10 formed on the outer peripheral surface of its mounting end edge, and a relatively thin-walled extension portion 11 formed from the mounting end edge in the axial direction of the tip end. Has been done. Further, the ring 1 is made of a material such as stainless steel, iron, brass, or cast metal, has a hollow inner cylindrical body, and is molded to a size capable of covering the ends of both the flexible tube 7 and the blade 8. Moreover, the edge portion of the one opening 1a is formed into a tapered thin wall to form the flange 4 extending in the axial direction, and at the inner depth of the opening 4a closer to the opening 1a than the center. The thread groove 2 and the groove 3 for receiving the hardened material P are formed to such an extent that the bellows-shaped protrusion of the flexible tube 7 can be inserted.

【0012】さらにリング1の中央部より他方の開口部
1b側寄りには、レジューサー9の雄ねじ部10に対応
する雌ねじ部5、および硬化材Pを受け入れる溝6が形
成されている。 つぎにフレキシブルチューブ7および
ブレード8とレジューサー9をリング1に一体化させる
工程について説明すると、まずリング1の、ねじ溝2、
溝3フランジ4、雌ねじ部5、溝6をそれぞれ含めた内
周面の全面にわたり硬化材Pを塗布しておき、さらにフ
レキシブルチューブ7の接続端部外周面に硬化材Pを塗
布して、これをリング1の一方の開口部1aより内部に
装入させ、かつフレキシブルチューブ7の外周面をリン
グ1のねじ溝2に沿って先端が突き当たるまで螺入させ
る。
Further, a female screw portion 5 corresponding to the male screw portion 10 of the reducer 9 and a groove 6 for receiving the hardened material P are formed in the ring 1 closer to the other opening 1b side. Next, the process of integrating the flexible tube 7 and the blade 8 and the reducer 9 into the ring 1 will be described. First, the thread groove 2 of the ring 1
The hardening material P is applied to the entire inner peripheral surface including the groove 3, the flange 4, the female screw portion 5, and the groove 6, respectively, and further, the hardening material P is applied to the outer peripheral surface of the connection end portion of the flexible tube 7. Is inserted inside one opening 1a of the ring 1, and the outer peripheral surface of the flexible tube 7 is screwed along the thread groove 2 of the ring 1 until the tip abuts.

【0013】なおこの場合、必要に応じてフレキシブル
チューブ7ばかりでなく、フレキシブルチューブ7の外
側を被覆するブレード8をも含めて、両部材の端部にわ
たり硬化材Pを塗布してこれをリング1に装入結合させ
るようにすると、結合強度が一層向上する。 つぎにレ
ジューサー9の接続端部外周面に、同じく硬化材Pを塗
布して前記したリング1の他方の開口部1bより、延長
部11を先頭に内部にねじ込んで先端を前記したフレキ
シブルチューブ7の先端部に突き合わせ、さらにねじ込
んでフレキシブルチューブ7の先端部を圧潰させる(図
2参照)。 なおこの場合において、レジューサー9の
先端延長部11がフレキシブルチューブ7の内周側に入
り込んで、上記突き合わせ部分からの硬化材Pの内部は
み出しを防ぐ。
In this case, if necessary, not only the flexible tube 7 but also the blade 8 for covering the outer side of the flexible tube 7 is coated with the hardening material P over the end portions of both members, and this is applied to the ring 1. If it is inserted into and bonded to the substrate, the bonding strength is further improved. Next, the hardening material P is similarly applied to the outer peripheral surface of the connecting end portion of the reducer 9, and the extension portion 11 is screwed inward from the other opening portion 1b of the ring 1 described above, and the flexible tube 7 whose tip is described above is screwed inward. The tip end of the flexible tube 7 is crushed by abutting the tip end of the flexible tube 7 (see FIG. 2). In this case, the tip extension 11 of the reducer 9 enters the inner peripheral side of the flexible tube 7 to prevent the hardened material P from protruding from the abutting portion.

【0014】その後フレキシブルチューブ7およびブレ
ード8、レジューサー9とリング1との結合部全体を所
定の温度にて加熱して内部の硬化材を硬化させることに
よりフレキシブルチューブ7ブレード8、およびレジュ
ーサー9のそれぞれの接続端部とリング1とが一体化結
合される。
Thereafter, the flexible tube 7 and the blade 8 and the reducer 9 and the ring 1 are entirely heated at a predetermined temperature to cure the hardening material therein, whereby the flexible tube 7 and the blade 8 and the reducer 9 are cured. And the ring 1 is integrally connected to each of the connection ends.

【0015】なお本発明において使用される硬化材Pと
しては、ゴム系またはアクリル系その他の一液型熱硬化
性樹脂、あるいはエポキシ系その他の二液型常温硬化性
樹脂、ABSやPBT等の高温液化常温硬化型成型用樹
脂、または一液型エポキシ樹脂など広い範囲の接着性の
ある材料の中から選択が可能である。
The curing material P used in the present invention is a rubber or acrylic one-component thermosetting resin or an epoxy or other two-component room temperature curable resin, or a high temperature material such as ABS or PBT. It is possible to select from a wide range of adhesive materials such as liquefied room temperature curing molding resin and one-pack type epoxy resin.

【0016】さらに必要に応じてリング1のフランジ4
をブレード8の外周面に当接する程度に内側にカシメつ
けてブレード8とフレキシブルチューブ7とを固定させ
ると強度を一層増すことができる。 この場合には二つ
割り可能なカシメ型(図示省略)を用い、このカシメ型
の径小部を台座にはめ込むとともに、硬化材Pを充填し
たフレキシブルチューブ7を、ブレード8側を先頭にし
てカシメ型の開口部より差し込み、リング1のフランジ
4を内面傾斜部に突き当てるとともに、カシメ型の開口
部側よりプレスヘッドによりリング1のフランジ4をカ
シメ型内に圧入させて、上記フランジ4を内面傾斜部に
沿って変形させることにより内側にカシメつけるように
するとよい。
Further, if necessary, the flange 4 of the ring 1
If the blade 8 and the flexible tube 7 are fixed to each other by crimping the blade 8 to the inside so as to contact the outer peripheral surface of the blade 8, the strength can be further increased. In this case, a caulking type (not shown) that can be split into two is used, the small diameter part of the caulking type is fitted into the pedestal, and the flexible tube 7 filled with the hardening material P is swung with the blade 8 side at the top. The flange 4 of the ring 1 is abutted against the inner sloped portion, and the flange 4 of the ring 1 is press-fitted into the swaged mold by the press head from the side of the opening of the crimping mold to press the flange 4 into the slanted inner face. It is good to crimp inside by deforming along.

【0017】[0017]

【発明の効果】本発明は上記した通り、フレキシブルチ
ューブおよびその外側を被覆するブレードの両端部を、
硬化材を介して中空状リングの片側より内部に装入させ
る工程と、スプリンクラーヘッドを取り付けるためのレ
ジューサーまたはニップルの接続端部を、同じく硬化材
を介して前記した中空状リングの反対側より内部にねじ
込むことにより、先端を前記したフレキシブルチューブ
の先端部に突き合わせてこれを圧潰させる工程と、その
後加熱して硬化材を硬化させる工程とからなるものであ
るために、従来のような溶接等の面倒で、しかも多くの
熟練を要する工程を必要とせず、コストの低減をはかる
ことができる。
According to the present invention, as described above, both ends of the flexible tube and the blade covering the flexible tube are
The step of inserting the hollow ring from one side through the hardening material and the connecting end of the reducer or nipple for mounting the sprinkler head from the opposite side of the hollow ring also through the hardening material. Since it consists of a step of collapsing the tip of the flexible tube into the tip portion of the flexible tube by screwing it into the inside and a step of subsequently heating to cure the hardened material, conventional welding etc. It is possible to reduce the cost because it is troublesome and does not require many skillful steps.

【0018】また溶接熱によるピンホールや腐食発生の
おそれがなく、しかも漏水の危険がなくなること、また
塑性加工による残留応力も全くなく、したがってシール
性がよく、破壊や漏水のおそれのない耐久性の高い高強
度のスプリンクラー設備配管巻出し用フレキシブルチュ
ーブを得ることができる。
Further, there is no risk of pinholes or corrosion due to welding heat, and there is no risk of water leakage, and there is no residual stress due to plastic working. Therefore, the sealability is good and there is no risk of damage or water leakage. It is possible to obtain a flexible tube for unwinding a high-strength and high-strength sprinkler equipment pipe.

【0019】またスプリンクラーヘッドを取り付けるた
めのレジューサーまたはニップルの接続端部を、硬化材
を介して中空状リングの反対側より内部にねじ込んで先
端を前記したフレキシブルチューブの先端部に突き合わ
せる場合において、フレキシブルチューブの先端部に突
き合わせた後、さらにねじ込んでフレキシブルチューブ
の先端部を圧潰させるようにした場合においては、シー
ル性が一層完全で、しかも高強度のスプリンクラー設備
配管巻出し用フレキシブルチューブを得ることができ
る。
Further, in the case where the connecting end of the reducer or nipple for mounting the sprinkler head is screwed into the inside from the opposite side of the hollow ring through a hardening material and the tip is made to abut the tip of the flexible tube described above. , If the end of the flexible tube is crushed by further screwing the end after abutting against the end of the flexible tube, a flexible tube for unwinding the sprinkler equipment pipe with more complete sealing property and high strength is obtained. be able to.

【0020】またフレキシブルチューブおよびその外側
を被覆するブレードの両端部を、硬化材を介して中空状
リングの片側より内部に装入させる場合に、中空状リン
グの内面に施された螺子状の溝内にねじ込むようにした
ときは、フレキシブルチューブとリングとの結合が一層
強固になり、強度が一段と向上する。
When both ends of the flexible tube and the blade covering the outside of the flexible tube are loaded into the inside from one side of the hollow ring via a hardening material, a screw-shaped groove formed on the inner surface of the hollow ring. When it is screwed in, the connection between the flexible tube and the ring becomes stronger and the strength is further improved.

【0021】さらにフレキシブルチューブと、その外側
を被覆するブレードとの端部に外被させたリングの自由
端(フランジ)を、ブレードの外周面に当接する程度に
内側にカシメつけるようにした場合には、全体の結合強
度を一層向上させることができる。
Further, in the case where the free end (flange) of the ring covering the end of the flexible tube and the blade covering the outer side of the flexible tube is crimped to the inside so as to contact the outer peripheral surface of the blade. Can further improve the overall bonding strength.

【0022】さらにレジューサーの先端に延長部を形成
し、これを結合させたフレキシブルチューブの内周側に
入り込むように形成すると、レジューサーとフレキシブ
ルチューブとの突き合わせ部分からの硬化材の内部はみ
出しを防ぐことができ、高品質のスプリンクラー設備配
管巻出し用フレキシブルチューブを得ることができる。
Further, when an extension portion is formed at the tip of the reducer so as to be inserted into the inner peripheral side of the flexible tube to which the extension portion is joined, the inside of the hardened material is extruded from the abutting portion of the reducer and the flexible tube. Therefore, a flexible tube for unwinding the sprinkler equipment pipe can be obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例であるスプリンクラー設備配
管巻出し用フレキシブルチューブを構成する各部品の組
み立て要領をあらわすところの要部を分解した半裁断面
図。
FIG. 1 is a half-cut sectional view showing a disassembled main part showing an assembling procedure of each component constituting a flexible tube for unwinding a sprinkler facility pipe according to an embodiment of the present invention.

【図2】図1の状態から各部品を結合させた状態の要部
拡大半裁断面図。
FIG. 2 is an enlarged half-cut sectional view of essential parts in a state where respective parts are joined together from the state of FIG.

【符号の説明】[Explanation of symbols]

1 リング 1a 開口部 1b 開口部 2 ねじ溝 3 溝 4 フランジ 5 雌ねじ部 6 溝 7 フレキシブルチューブ 8 ブレード 9 レジューサー 10 雄ねじ部 11 延長部 P 硬化材 1 ring 1a opening part 1b opening part 2 screw groove 3 groove 4 flange 5 female screw part 6 groove 7 flexible tube 8 blade 9 reducer 10 male screw part 11 extension part P hardening material

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】フレキシブルチューブおよびその外側を被
覆するブレードの両端部を、硬化材を介して中空状リン
グの片側より内部に装入させる工程と、スプリンクラー
ヘッドを取り付けるためのレジューサーまたはニップル
の接続端部を、同じく硬化材を介して前記した中空状リ
ングの反対側より内部にねじ込んで先端を前記したフレ
キシブルチューブの先端部に突き合わせる工程と、その
後加熱して硬化材を硬化させる工程とからなるスプリン
クラー設備配管巻出し用フレキシブルチューブの製造方
法。
1. A step of loading both ends of a flexible tube and a blade covering the flexible tube into the inside from one side of a hollow ring through a hardening material, and connecting a reducer or a nipple for mounting a sprinkler head. From the step of screwing the end portion into the inside from the opposite side of the above-mentioned hollow ring through the same hardening material and bringing the tip into contact with the tip portion of the above flexible tube, and then heating to cure the hardening material. Method for manufacturing flexible tube for unwinding sprinkler equipment pipe.
【請求項2】フレキシブルチューブおよびその外側を被
覆するブレードの両端部と中空状リングとの間、ならび
にレジューサーまたはニップルの接続端部と中空状リン
グとの間に介在される硬化材は、硬化型樹脂を用いるも
のであるところの請求項1に記載のスプリンクラー設備
配管巻出し用フレキシブルチューブの製造方法。
2. A hardening material interposed between both ends of the flexible tube and the blade covering the flexible tube and the hollow ring, and between the connecting end of the reducer or nipple and the hollow ring is hardened. The method for producing a flexible tube for unwinding a sprinkler equipment pipe according to claim 1, wherein a mold resin is used.
【請求項3】スプリンクラーヘッドを取り付けるための
レジューサーまたはニップルの接続端部を、硬化材を介
して中空状リングの反対側より内部にねじ込んで先端を
前記したフレキシブルチューブの先端部に突き合わせる
場合において、フレキシブルチューブの先端部に突き合
わせた後、さらにねじ込んでフレキシブルチューブの先
端部を圧潰させるようにしたところの請求項1に記載の
スプリンクラー設備配管巻出し用フレキシブルチューブ
の製造方法。
3. A case where a connecting end of a reducer or a nipple for mounting a sprinkler head is screwed into the inside from the opposite side of a hollow ring through a hardening material so that the tip is abutted with the tip of the flexible tube. 2. The method for manufacturing a flexible tube for unwinding a sprinkler equipment pipe according to claim 1, wherein the flexible tube is unwound further after being abutted against the distal end of the flexible tube to crush the distal end of the flexible tube.
【請求項4】フレキシブルチューブおよびその外側を被
覆するブレードの両端部を、硬化材を介して中空状リン
グの片側より内部に装入させる工程は、中空状リングの
内面に施された螺子状の溝内にねじ込むようにした請求
項1に記載のスプリンクラー設備配管巻出し用フレキシ
ブルチューブの製造方法。
4. The step of loading both ends of the flexible tube and the blade covering the outside thereof into the inside from one side of the hollow ring via a hardening material is a screw-shaped step applied to the inner surface of the hollow ring. The method for producing a flexible tube for unwinding a sprinkler facility pipe according to claim 1, wherein the flexible tube is screwed into the groove.
【請求項5】フレキシブルチューブと、その外側を被覆
するブレードとの端部に外被させたリングの自由端を、
ブレードの外周面に当接する程度に内側にカシメつけて
なる請求項1に記載のスプリンクラー設備配管巻出し用
フレキシブルチューブの製造方法。
5. A flexible tube and a free end of a ring covering the ends of a blade covering the flexible tube,
The method for producing a flexible tube for unwinding a sprinkler equipment pipe according to claim 1, wherein the blade is crimped inside so as to come into contact with the outer peripheral surface of the blade.
JP05261906A 1993-09-24 1993-09-24 Manufacturing method of flexible tube for unwinding sprinkler equipment piping. Expired - Fee Related JP3124877B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05261906A JP3124877B2 (en) 1993-09-24 1993-09-24 Manufacturing method of flexible tube for unwinding sprinkler equipment piping.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP05261906A JP3124877B2 (en) 1993-09-24 1993-09-24 Manufacturing method of flexible tube for unwinding sprinkler equipment piping.

Publications (2)

Publication Number Publication Date
JPH0788977A true JPH0788977A (en) 1995-04-04
JP3124877B2 JP3124877B2 (en) 2001-01-15

Family

ID=17368395

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05261906A Expired - Fee Related JP3124877B2 (en) 1993-09-24 1993-09-24 Manufacturing method of flexible tube for unwinding sprinkler equipment piping.

Country Status (1)

Country Link
JP (1) JP3124877B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100594479B1 (en) * 2004-11-23 2006-07-03 상주대학교산학협력단 Underground Water Supply System

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100594479B1 (en) * 2004-11-23 2006-07-03 상주대학교산학협력단 Underground Water Supply System

Also Published As

Publication number Publication date
JP3124877B2 (en) 2001-01-15

Similar Documents

Publication Publication Date Title
US5901987A (en) Method of making an endpiece, an endpiece and a connector made by the method, and a circuit including such a connector
EP1475218A1 (en) Fusion-worked product of resin members and production method therefor and method of fusing resin members
US4613168A (en) Method of making branches in hoses
US7520042B2 (en) Flexible connectors and methods of manufacturing same
JPH0788977A (en) Manufacture of flexible tube for unwinding sprinkler facility pipeline
EP0188028A1 (en) Method for manufacturing a pipe part from fibre-reinforced thermosetting synthetic material and mandrel for manufacturing such a pipe part
US5890748A (en) Composite male hose coupler
KR930004733B1 (en) Connector for small diameter pipe
KR20170124178A (en) Pipe connection structure air conditioning system
JPH0678686U (en) Flexible tube for sprinkler mounting
EP0692367B1 (en) Method of fabricating a tank and method of fabricating a tank connector therefor
JPH11153274A (en) Tubular joint
JPH09153315A (en) Composite insulating tube and manufacture of composite insulating tube
JPH06174171A (en) Connecting structure for resin tube and connecting method thereof
JPS61216821A (en) Fixing method of thin plate and pipelike member
JPH05126286A (en) Metal fitting for hose
JPH04145294A (en) Transfer coupling between resin tube and metal tube
JPH085417Y2 (en) Bellows made of synthetic resin
JPH0425583Y2 (en)
JPH04366089A (en) Manufacture of union socket for plastic pipe
JPH04341681A (en) Hose coupling
JPH09189383A (en) Sealing device of conversion coupler of resin pipe and metal pipe
JPH02199305A (en) Two member coupling tool
JPS606713Y2 (en) Metal pipe fitting device
JP2864507B2 (en) Plastic pipe fusion joints

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees