JPH0781845A - Doffing method of take-up motion making stepped winding - Google Patents

Doffing method of take-up motion making stepped winding

Info

Publication number
JPH0781845A
JPH0781845A JP25222893A JP25222893A JPH0781845A JP H0781845 A JPH0781845 A JP H0781845A JP 25222893 A JP25222893 A JP 25222893A JP 25222893 A JP25222893 A JP 25222893A JP H0781845 A JPH0781845 A JP H0781845A
Authority
JP
Japan
Prior art keywords
doffing
bobbin
pan
bobbins
spindle shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25222893A
Other languages
Japanese (ja)
Other versions
JP2580978B2 (en
Inventor
Nobuo Umeda
信夫 梅田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Priority to JP5252228A priority Critical patent/JP2580978B2/en
Publication of JPH0781845A publication Critical patent/JPH0781845A/en
Application granted granted Critical
Publication of JP2580978B2 publication Critical patent/JP2580978B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)

Abstract

PURPOSE:To provide a method of doffing bobbins stacked in a plurality of steps, which allows easy automation through a simple doffing process even if the plural steps of actual bobbins like pirns are wound on one spindle. CONSTITUTION:In a method of doffing in which a conveyor unit 12 from which a bobbin holder 26 for holding bobbins 22 is projected downwards is moved up and down with respect to a take-up motion which stacks the bobbins 22 on an upwardly projected spindle 14 and winds packages 16, 17 around each bobbin 22, the actual bobbins on the spindle shaft 14, other than those on the upper stages, are raised to an upper-stage position for doffing, and doffing is performed by the same action of the conveyor unit 12.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、パーン等の実ボビンを
複数段積み重ねて巻き形成するスピンドル軸の多数が上
向きに突設されたパーンワインダ等の巻取装置に対する
玉揚を自動的に行うための玉揚方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention automatically performs doffing for a winding device such as a pan winder in which a large number of spindle shafts for stacking and forming a plurality of real bobbins such as pans are formed to project upward. For doffing method for.

【0002】[0002]

【従来の技術】例えばパーンワインダでは、フィラメン
ト糸がチーズ形状等に巻き形成されたパッケージをパー
ン形状のパッケージに巻き返して、フィラメント用ダブ
ルツイスターに供給することが行われる。そして、フィ
ラメント用ダブルツイスターでは、パーンから解舒され
る糸に2回撚りを施して、再びチーズ形状のパッケージ
を巻き形成する。
2. Description of the Related Art For example, in a bun winder, a package in which filament yarn is wound in a cheese shape or the like is rewound into a bun shape package and supplied to a double twister for filament. Then, in the double twister for filaments, the yarn unwound from the pan is twisted twice, and the cheese-shaped package is wound again.

【0003】このようなパーンワインダは、巻き量が多
い大きなパッケージを巻き量が少ない小さなパーンに巻
き返すものであり、1本のスピドル軸で一個のパーンを
巻き形成する構造にすると、スピンドル軸ばかりが多く
てバランスの悪い機械になる。そこで、一本のスピンド
ル軸に上下2段のようにボビンを複数段積み重ねて一度
に複数のパーンを巻き形成するものがある。
Such a pan winder is for rewinding a large package with a large winding amount into a small pan with a small winding amount. It becomes a machine with a lot of imbalances. Therefore, there is a method in which a plurality of bobbins are stacked on one spindle shaft in a two-stage structure to form a plurality of buns at one time.

【0004】ところが、一本のスピンドル軸に対する実
ボビンとしての上下2段のパーンを自動的に玉揚しよう
とすると、上段のパーンはそのボビンに拡縮自在なチャ
ックを挿入して抜き出すことができるが、下段のパーン
は玉揚のための高さ位置が変わるだけではなく、スピン
ドル軸がボビンから突出しているため拡縮自在なチャッ
クを挿入できず、例えばボビン端の外周をチャックで把
持するようにチャックの形式を変える必要がある。
However, if the upper and lower tiers of the upper and lower tiers as the actual bobbin for one spindle shaft are to be automatically doffed, the upper tier can be pulled out by inserting an expandable / contractible chuck into the bobbin. , The lower part of the pan does not only change the height position for doffing, but also the spindle shaft protrudes from the bobbin, so a expandable and contractible chuck cannot be inserted. It is necessary to change the form of.

【0005】[0005]

【発明が解決しようとする課題】このように、一本のス
ピンドル軸に対して上下2段のパーンを巻き形成する
と、チャック形式や玉揚位置が異なる等のように上段の
パーンの玉揚動作と下段のパーンの玉揚動作が異なった
ものとなり、複雑な玉揚装置が必要となって、自動玉揚
の実現の妨げになっているという問題点を有していた。
As described above, when the upper and lower tiers of the pan are wound around the one spindle shaft, the doffing operation of the upper tier is different due to different chuck types and doffing positions. There was a problem that the doffing operation of the lower pan was different and a complicated doffing device was required, which hindered the realization of automatic doffing.

【0006】本発明は、従来の技術の有するこのような
問題点に鑑みてなされたものであり、その目的とすると
ころは、一本のスピンドル軸に複数段のパーンの如き実
ボビンを巻き形成する場合であっても、簡単な玉揚工程
で自動化が容易な複数段積み重ね実ボビンの玉揚方法を
提供する。
The present invention has been made in view of the above problems of the prior art, and an object thereof is to form an actual bobbin such as a plurality of stages of a bobbin around one spindle shaft. Even in the case of doing so, it is possible to provide a doffing method for a plurality of stacked real bobbins which is easy to automate with a simple doffing process.

【0007】[0007]

【課題を解決するための手段】上記目的を解決するため
に、本発明の段巻きを行う巻取装置の玉揚方法は、上向
きに突設されたスピンドル軸にボビンを積み重ねて各ボ
ビンにパッケージを巻き形成する巻取装置に対し、ボビ
ンを保持するボビン保持具が下向きに突設された搬送ユ
ニットを上下させて行う玉揚方法であって、前記スピン
ドル軸における上段以外の実ボビンを上段位置まで持ち
上げて玉揚を行うことを要旨とするものである。
In order to solve the above-mentioned problems, a doffing method of a winding device for carrying out step winding of the present invention is a bobbin stacked on a spindle shaft projecting upward and packaged on each bobbin. A bobbin holding tool for holding the bobbin, the doffing method is performed by moving up and down a conveying unit provided downwardly projecting, and an actual bobbin other than the upper stage on the spindle shaft is located at the upper stage position. The main idea is to lift up to and do the doffing.

【0008】[0008]

【作用】巻取装置側に、スピンドル軸における上段以外
の実ボビンを上段位置まで持ち上げる機構を設けておく
と、玉揚装置側は同じ高さ位置で同じボビン保持具を用
いて積み重ねた実ボビンの玉揚動作を行えるようにな
る。
When a mechanism for lifting the actual bobbin other than the upper stage on the spindle shaft to the upper stage position is provided on the winding device side, the doffing device side stacks the actual bobbin using the same bobbin holder at the same height position. You will be able to do the doffing operation.

【0009】[0009]

【実施例】以下、本発明の実施例を図面を参照しつつ説
明する。図1は本発明の玉揚方法が適用される巻取装置
の要部を示す正面図、図2は本発明の玉揚方法が適用さ
れる巻取装置の要部の側面図、図3はスピンドル軸のボ
ビン保持機構を示す断面図、図4は搬送ユニットの構造
図である。
Embodiments of the present invention will be described below with reference to the drawings. 1 is a front view showing a main part of a winding device to which a doffing method of the present invention is applied, FIG. 2 is a side view of a main part of a winding device to which a doffing method of the present invention is applied, and FIG. FIG. 4 is a sectional view showing the bobbin holding mechanism of the spindle shaft, and FIG. 4 is a structural view of the transport unit.

【0010】図1及び図2において、11はパーンワン
ダのスピンドル部分、12は搬送ユニットを示してお
り、図示例はスピンドル部分から搬送ユニットへの玉揚
状態を示している。
In FIG. 1 and FIG. 2, 11 is a spindle part of the wandering tool, 12 is a carrying unit, and the illustrated example shows a doffing state from the spindle part to the carrying unit.

【0011】スピンドル部分11は、横枠13にスピン
ドル軸14を所定ピッチP毎に上向きに突設したもので
ある。スピンドル軸14は図示されない軸受で回転自在
であり、タンジェンシャルベルト15に転接して一斉に
回転する。このスピンドル軸14には、図示のように、
上下2段にボビン22が挿入され、保持機構18,19
でボビン22の回転方向の滑りを止めている。そして、
スピンドル軸14の回転により各ボビン22に糸が巻き
取られて、巻取パッケージとのしてのパーン(実ボビ
ン)16,17が形成される。ここで、図3にあるよう
に、保持機構18,19は3つの円弧状ピース20と、
三角おむすび形状のカム21とからなっている。円弧状
ピース20の内周にはカム21の先端と係合する突起2
0aが設けられており、カム21が軸22と共に矢印a
方向に回転すると、カム21の先端が突起20aを押し
広げて、図3(b)のように、ピース20が径方向に移
動し、図示されないボビン内径を保持する。
The spindle portion 11 comprises a horizontal frame 13 and a spindle shaft 14 projecting upward at a predetermined pitch P. The spindle shaft 14 is rotatable by a bearing (not shown), and is in contact with the tangential belt 15 to rotate all at once. On the spindle shaft 14, as shown in the figure,
The bobbins 22 are inserted in the upper and lower two stages, and the holding mechanisms 18, 19
Prevents the bobbin 22 from slipping in the rotation direction. And
The yarn is wound on each bobbin 22 by the rotation of the spindle shaft 14, and the buns (actual bobbins) 16 and 17 as a winding package are formed. Here, as shown in FIG. 3, the holding mechanisms 18 and 19 include three arc-shaped pieces 20,
The cam 21 has a triangular rice ball shape. A protrusion 2 that engages with the tip of the cam 21 is provided on the inner circumference of the arc-shaped piece 20.
0a is provided, and the cam 21 and the shaft 22 together with the arrow a
When rotated in the direction, the tip of the cam 21 spreads the protrusion 20a, and the piece 20 moves in the radial direction as shown in FIG. 3B to hold the bobbin inner diameter not shown.

【0012】搬送ユニット12は、細長い走行板25に
所定ピッチP毎にボビン保持具としてのチャック26を
下向きに突設したものである。チャック26は、ボビン
22内に挿入される拡縮部26aと、拡縮部26aを作
動させる基部26bとを有している。基部26b又は拡
縮部26aの軸先端がボビン22の端等で押されると、
拡縮部26bが縮小から拡大又は拡大から縮小へと交互
に切り換わるタイプのものであり、縮小状態の拡縮部2
6aをボビン22内に挿入し、基部26aがボビン22
の端で押されると、拡縮部26aが拡大状態に切り換わ
り、ボビン22を吊り上げることができる。
The transport unit 12 comprises a slender traveling plate 25 having chucks 26 as bobbin holders which project downward at predetermined pitches P. The chuck 26 has an expansion / contraction part 26a inserted into the bobbin 22 and a base part 26b for operating the expansion / contraction part 26a. When the shaft tip of the base portion 26b or the expansion / contraction portion 26a is pushed by the end of the bobbin 22 or the like,
The enlargement / reduction unit 26b is of a type that alternately switches from reduction to enlargement or enlargement to reduction, and the enlargement / reduction unit 2 in the reduced state.
6a is inserted into the bobbin 22 and the base portion 26a is
When pushed at the end of, the expansion / contraction part 26a switches to the expanded state, and the bobbin 22 can be lifted.

【0013】図4に示されるように、走行板25は例え
ば8個のチャック26を突設しており、連結板27で多
数の走行板25を連結することで、一度に数多くのパー
ン16,17を搬送できる。この走行板25の両側には
ローラ28,28が旋回自在に設けられ、このローラ2
8,28がレール29内を走行する。また、走行板25
の側面には駆動ゴムローラ30,30がレール29に一
定間隔で設けられており、走行板25は駆動ゴムローラ
30,30に挟まれて走行する。そして、このレール2
9の全体を矢印b方向に昇降させると、チャック26を
パーン16,17に挿入させることができる。
As shown in FIG. 4, the traveling plate 25 has, for example, eight chucks 26 projecting from it. By connecting a large number of traveling plates 25 with a connecting plate 27, a large number of pans 16, 17 can be transported. Rollers 28, 28 are rotatably provided on both sides of the traveling plate 25.
8 and 28 run in the rail 29. In addition, the traveling plate 25
Driving rubber rollers 30, 30 are provided on the rails 29 at regular intervals on the side surface of the traveling plate 25, and the traveling plate 25 travels while being sandwiched by the driving rubber rollers 30, 30. And this rail 2
When the whole 9 is moved up and down in the direction of arrow b, the chuck 26 can be inserted into the pans 16 and 17.

【0014】図1において、便宜的に、Aポビションの
スピンドル軸は上パーン17の玉揚状態を示し、Bポジ
ションのスピンドル軸は下パーン18の玉揚状態を示し
ている。Aポジションの上パーン17を一斉に玉揚する
ためには、搬送ユニット12を図示の状態から下降さ
せ、拡縮部26aをボビン22内に挿入する。そして、
基部26aをボビン22の上端に押し当てて拡縮部26
aを拡大させ、搬送ユニット12を上昇させると、上パ
ーン17は一斉に玉揚される。この時、スピンドル軸1
4の上端はボビン22の中程までしかなく、チャック2
6と干渉しない。しかし、残された下パーン18はスピ
ンドル軸14がボビン22から突出した状態で残り、チ
ャック26を挿入できない。
In FIG. 1, for convenience, the spindle shaft of the A povition shows the doffing state of the upper pan 17, and the spindle shaft of the B position shows the doffing state of the lower pan 18. In order to doff the upper pans 17 in the A position all at once, the transport unit 12 is lowered from the illustrated state, and the expansion / contraction part 26a is inserted into the bobbin 22. And
The base portion 26a is pressed against the upper end of the bobbin 22, and the expansion / contraction portion 26
When a is enlarged and the transport unit 12 is raised, the upper pans 17 are doffed all at once. At this time, spindle shaft 1
The upper end of 4 is only up to the middle of bobbin 22, and chuck 2
Does not interfere with 6. However, the remaining lower pan 18 remains with the spindle shaft 14 protruding from the bobbin 22, and the chuck 26 cannot be inserted.

【0015】そのため、つぎに詳述する玉揚補助装置
(ボビン昇降手段)10によって、下パーン16をBポ
ジションのように、上パーン17があった位置まで持ち
上げる。すると、搬送ユニット12はAポジションの上
パーン17と全く同じ工程で玉揚できる。
Therefore, the doffing auxiliary device (bobbin raising / lowering device) 10, which will be described in detail below, lifts the lower pan 16 to the position where the upper pan 17 was, like the B position. Then, the transport unit 12 can doffing in exactly the same process as the upper pan 17 of the A position.

【0016】このような玉揚補助装置10を図1及び図
2により説明する。この玉揚補助装置10は、ボビン2
2の端に設けられた180°等分配置で下端開放のU字
状切り欠き31と、この切り欠き31に係合する開閉自
在な爪部材32と、この爪32部材を取り付け、多数の
スピンドル軸14に沿って設けられたリフトテーブル3
3と、このリフトテーブル33を昇降させるための昇降
手段としてのリンク機構34とを主要部分としてなって
いる。
The doffing assisting device 10 will be described with reference to FIGS. 1 and 2. This doffing assisting device 10 is a bobbin 2
A U-shaped notch 31 is provided at the end of 2 and is opened at the lower end in a 180 ° equidistant arrangement, an openable / closable claw member 32 that engages with this notch 31, and this claw 32 member are attached to a large number of spindles. Lift table 3 provided along the shaft 14
3 and a link mechanism 34 as an elevating means for elevating and lowering the lift table 33 are the main parts.

【0017】リフトテーブル33はサイドフレーム35
内側に取り付けられたスライドバー36に沿って走行す
るスライド体37に横架されており、平行姿勢を保った
まま上下にスライド移動できる。リンク機構34は、サ
イドフレーム35間に設けられた押し引き用のバー38
に金具39を取り付け、リフトテーブル33の支点軸4
0と金具39の支点軸41の間に第1リンク42を設
け、更に第1リンク41中程の支点軸43と固定の横枠
13の延長部44の支点軸45と間に第2リンク46を
設けて構成されている。バー38を押し込み装置46で
実線位置まで押し込むと、リフトテーブル33は実線の
下限位置となる。押し込み装置47を解放状態にしてバ
ー38をスプリンング47で引き込むと、第1リンク4
2と第2リンク46とは立ち上がった状態になり、リフ
トテーブル33は二点鎖線の上限位置となる。
The lift table 33 is a side frame 35.
It is horizontally mounted on a slide body 37 that runs along a slide bar 36 attached inside, and can slide up and down while maintaining a parallel posture. The link mechanism 34 includes a push-pull bar 38 provided between the side frames 35.
Attach the metal fitting 39 to the fulcrum shaft 4 of the lift table 33.
0 and the fulcrum shaft 41 of the metal fitting 39, the first link 42 is provided, and the second link 46 is further provided between the fulcrum shaft 43 in the middle of the first link 41 and the fulcrum shaft 45 of the extension portion 44 of the fixed horizontal frame 13. Is provided. When the pushing device 46 pushes the bar 38 to the position indicated by the solid line, the lift table 33 reaches the lower limit position indicated by the solid line. When the pushing device 47 is released and the bar 38 is pulled in by the spring 47, the first link 4
2 and the second link 46 are in a standing state, and the lift table 33 is at the upper limit position of the chain double-dashed line.

【0018】リフトテーブル33に取り付けられた爪部
材32は、一対の左右対象形状の爪51,51を軸52
につる巻きバネ53を介して先端取付のピン54が閉じ
る方向に付勢された状態で軸支して構成されている。こ
の爪51,51の下向き折り曲げ部は、共同でU字状の
突起55を形成している。そして、固定の横枠13に
は、このU字状の突起55が挟まれる2個のローラ56
を軸支するガイド57が固設されている。突起55がロ
ーラ56,56で挟まれている状態では、爪51,51
は開いている。リフトテーブル33が上昇し、突起55
がローラ56,56から離れると、つる巻きバネ53の
付勢力で爪51,51は閉じようとし、先端取付のピン
54が切り欠き31内に嵌まって係合状態になる。な
お、ピン54が切り欠き31を係合させるために、スピ
ンドル軸14をゆっくりと逆回転させておくと、図3の
保持機構は弛み、ピン54が切り欠き31に嵌まるとス
ピンドル軸14は空回りする。そして、リフトテーブル
33の上昇と共に、下パーン16が持ち上げられ、上パ
ーン17が位置していた高さで停止する。
The claw member 32 attached to the lift table 33 has a pair of left and right symmetrically shaped claws 51, 51.
The pin 54 attached to the tip end is axially supported by a spiral spring 53 in a state of being biased in a closing direction. The downwardly bent portions of the claws 51, 51 jointly form a U-shaped projection 55. The fixed horizontal frame 13 has two rollers 56 on which the U-shaped projection 55 is sandwiched.
A guide 57 that pivotally supports is fixedly installed. When the protrusion 55 is sandwiched between the rollers 56, 56, the claws 51, 51
Is open. The lift table 33 rises and the projection 55
When is separated from the rollers 56, 56, the pawls 51, 51 tend to close due to the urging force of the spiral spring 53, and the pin 54 attached to the tip end is fitted into the notch 31 to be in the engaged state. When the spindle 54 is slowly rotated in the reverse direction in order for the pin 54 to engage the notch 31, the holding mechanism of FIG. 3 is loosened, and when the pin 54 fits in the notch 31, the spindle shaft 14 is Spin idle. Then, as the lift table 33 rises, the lower pan 16 is lifted and stopped at the height where the upper pan 17 was located.

【0019】つぎに、上述した玉揚補助装置10と搬送
ユニット12による玉揚方法を図1により説明する。通
常リンク機構34のバー38は押し込み装置47が解放
状態でありスプリング47の付勢力で押し込まれてお
り、リフトテーブル33は実線位置にあり、爪部材32
は開いており、スピンドル軸14の回転によるパーン1
6,17の巻き形成に支障がない。パーン16,17が
巻き形成されると、スピンドル軸14は停止する。そし
て、図示の位置に待機している搬送ユニット26が下降
してチャック26がAポジションの状態にある上パーン
17のボビン22内に入って、上パーン17のボビン2
2を内側から把持する。この時、必要に応じて、スピン
ドル軸14をタンジョンシャルベルト15の逆走行で逆
回転させ、保持機構19を弛める。そして、搬送ユニッ
ト26が上昇して上パーン17を一斉に玉揚する。
Next, a doffing method using the doffing auxiliary device 10 and the transport unit 12 described above will be described with reference to FIG. Normally, the bar 38 of the link mechanism 34 is pushed in by the urging force of the spring 47 with the pushing device 47 in the released state, the lift table 33 is in the solid line position, and the claw member 32 is present.
Is open, and the pan 1 due to the rotation of the spindle shaft 14
There is no hindrance to the winding formation of 6,17. When the pans 16 and 17 are wound and formed, the spindle shaft 14 stops. Then, the transport unit 26 standing by at the position shown in the figure descends and the chuck 26 enters the bobbin 22 of the upper pan 17 in the A position, and the bobbin 2 of the upper pan 17 moves.
Hold 2 from the inside. At this time, if necessary, the spindle shaft 14 is reversely rotated by the reverse traveling of the tangential belt 15 to loosen the holding mechanism 19. Then, the transport unit 26 ascends and lifts the upper pan 17 all at once.

【0020】搬送ユニット26が上パーン17を搬送し
た後に、空の搬送ユニット26が図示の位置まで走行し
ている。それまでに、押し引き装置47がバー38を引
っ込め、リンク機構34によってリフトテーブル33は
図示の実線位置から上昇し始める。同時に、スピンドル
軸14をゆっくり逆回転さておく。やがて、爪部材5
1,51のU字状の突起55がローラ56,56から離
れ、つる巻きバネ53の付勢力で爪部材51,51が閉
じ、先端のピン54がボビン22の表面に当たる。ボビ
ン22はスピンドル軸14と共に回転しているので、ピ
ン54が切り欠き31に嵌まって係合する。すると、リ
フトテーブル33の上昇と共に、下パーン16が持ち上
げられ、Bポジションに図示されるような上パーン17
のあった位置に下パーン16が位置する状態になる。そ
して、搬送ユニット12が上述したのと同様の手順で下
パーン16の一斉玉揚を行う。このように、ワインダ側
に玉揚補助装置10を設けると、搬送ユニットの動作が
全く同じのまま、上下パーン16,17を玉揚すること
ができる。
After the transport unit 26 has transported the upper pan 17, the empty transport unit 26 is traveling to the position shown in the figure. By then, the push-pull device 47 retracts the bar 38, and the link mechanism 34 causes the lift table 33 to start rising from the solid line position shown. At the same time, the spindle shaft 14 is slowly rotated in the reverse direction. Eventually, the claw member 5
The U-shaped protrusions 55 of 1, 51 are separated from the rollers 56, 56, the pawl members 51, 51 are closed by the urging force of the spiral spring 53, and the pin 54 at the tip comes into contact with the surface of the bobbin 22. Since the bobbin 22 is rotating together with the spindle shaft 14, the pin 54 fits into the notch 31 and engages with it. Then, as the lift table 33 rises, the lower pan 16 is lifted, and the upper pan 17 as shown in the B position is shown.
The lower pan 16 will be located at the position where there was. Then, the transport unit 12 carries out simultaneous doffing of the lower pan 16 in the same procedure as described above. As described above, when the doffing auxiliary device 10 is provided on the winder side, the upper and lower pans 16 and 17 can be doffed while the operation of the transport unit remains the same.

【0021】なお、上述した玉揚補助装置10の昇降手
段はリンク機構に限らず、空圧シリンダによる昇降にし
てもよい。また、爪部材をボビンの切り欠きに係合させ
る開閉機構もリフトテーブル33の昇降と連動するもの
に限らず、別途のミニチュアシリンダで開閉させるもの
でもよい。
The lifting means of the doffing auxiliary device 10 is not limited to the link mechanism, but may be lifted by a pneumatic cylinder. Further, the opening / closing mechanism for engaging the claw member with the notch of the bobbin is not limited to the one that interlocks with the lifting and lowering of the lift table 33, and may be opened / closed by a separate miniature cylinder.

【0022】更に、この玉揚補助装置10の昇降手段は
実ボビンの玉揚のみならず、空ボビンの装着にも利用で
きる。搬送ユニット12が空ボビンをチャック26して
搬送し、スピンドル軸14の真上まで走行する。この時
玉揚補助装置10は上昇位置にあり、搬送ユニット12
が下降すると、空ボビンの下端が爪51に当たりチャッ
ク26が押し付けられて縮小し、空ボビンを離す。そし
て、玉揚補助装置10が下降し、空ボビンがスピンドル
14の下段位置に収まる。つぎに、搬送ユニット12が
次の空ボビンをチャックしてスピンドル軸14の真上ま
で走行し下降すると、下段の空ボビンに上段の空ボビン
が当たり、チャック26が押し付けられて縮小し、空ボ
ビンを離すと上段の所定位置になる。この上下のボビン
の装着に際しては、実ボビンと違ってスピンドル軸14
の回転は不要である。このように、搬送ユニットの動作
が全く同じのまま、上下の空ボビンも装着できる。
Further, the lifting means of the doffing auxiliary device 10 can be used not only for doffing the actual bobbin but also for mounting an empty bobbin. The transport unit 12 transports the empty bobbin with the chuck 26, and travels right above the spindle shaft 14. At this time, the doffing auxiliary device 10 is in the raised position, and the transport unit 12
When is lowered, the lower end of the empty bobbin hits the claw 51, the chuck 26 is pressed and contracted, and the empty bobbin is released. Then, the doffing auxiliary device 10 descends, and the empty bobbin is set at the lower position of the spindle 14. Next, when the transport unit 12 chucks the next empty bobbin and travels right above the spindle shaft 14 and descends, the upper empty bobbin hits the lower empty bobbin, and the chuck 26 is pressed to reduce the empty bobbin. When is released, the upper position is reached. When mounting the upper and lower bobbins, unlike the actual bobbin, the spindle shaft 14
No rotation is required. In this way, the upper and lower empty bobbins can be mounted while the operation of the transport unit remains the same.

【0023】さらに、上述した玉揚装置による玉揚方法
が適用されるパーンワインダの全体を図5により説明す
る。図示のパーンワインダ1は背中合わせに各錘が配設
させ、一錘毎に2個の給糸パッケージ60,61が機台
62の奥方向にずらされて設置されている。この給糸パ
ッケージ60,61から解舒される各糸はテンサ63,
64を経てトラバーサ65の上下の糸ガイド66,67
を経て上下パーン16,17に至る。図1で説明したス
ピンドル部分11は高速回転しており、図5のトラバー
サ65は徐々に狭くなる区間Lの間で往復動しているた
め、図示の上下パーン16,17が巻き形成される。サ
イドフレーム35にはスライドガイド68が設けられ、
このスライドガイド68に沿って昇降するスライド体6
9に図2のレール29が取り付けられいる。そして、図
5の巻揚装置70で左右のレール29,29は同期的に
昇降し、チャック26が上パーン17を玉揚できる高さ
と、レール29,29が固定の循環レール3に接続され
る高さの間の切り換えができる。玉揚後の搬送ユニット
12(図4参照)は循環レール3に沿って搬送される。
Further, the entire pan winder to which the doffing method by the above-mentioned doffing device is applied will be described with reference to FIG. The pan winder 1 shown in the figure has weights arranged back to back, and two yarn feeding packages 60, 61 are installed in the back direction of the machine base 62 for each weight. Each yarn unwound from the yarn supplying package 60, 61 is a tenser 63,
Thread guides 66, 67 above and below the traverser 65
After that, it reaches the upper and lower pans 16 and 17. Since the spindle portion 11 described in FIG. 1 rotates at a high speed and the traverser 65 in FIG. 5 reciprocates between the gradually narrowing sections L, the upper and lower pans 16 and 17 shown in the drawing are wound. A slide guide 68 is provided on the side frame 35,
The slide body 6 that moves up and down along the slide guide 68
The rail 29 shown in FIG. Then, in the hoisting device 70 of FIG. 5, the left and right rails 29, 29 are synchronously moved up and down, the chuck 26 can lift the upper pan 17, and the rails 29, 29 are connected to the fixed circulation rail 3. You can switch between heights. The transfer unit 12 (see FIG. 4) after the doffing is transferred along the circulation rail 3.

【0024】図6は上述した循環レール3による搬送ユ
ニットの走行ライン図である。図6において、1はパー
ンワインダ、2はダブルツイスターであり、両者は図4
のような搬送ユニットが走行する循環レール3で接続さ
れている。29は図5の昇降自在なレールであり、71
はダブルツイスター2に対して昇降自在なレールであ
る。また、循環レール3は、搬送ユニットを止めておく
レール4,5,6を有している。レール4にはダブルツ
イスター2のスピンドルに装着されるテンサーを着脱す
る搬送ユニットが止まっており、レール5には図4の如
き空のチャックを有する搬送ユニットが止まっており、
レール6にはダブルツイスター2上がりのパッケージに
対するハンガーを有する搬送ユニットが止まっている。
FIG. 6 is a travel line diagram of the transfer unit using the circulation rail 3 described above. In FIG. 6, 1 is a pan winder, 2 is a double twister, and both are shown in FIG.
These are connected by a circulation rail 3 on which a transport unit such as the above travels. Reference numeral 29 is a rail that can be raised and lowered as shown in FIG.
Is a rail that can be raised and lowered with respect to the double twister 2. The circulation rail 3 has rails 4, 5 and 6 for holding the transport unit. A transport unit for attaching / detaching a tensor attached to the spindle of the double twister 2 is stopped on the rail 4, and a transport unit having an empty chuck as shown in FIG. 4 is stopped on the rail 5.
On the rail 6, a transfer unit having a hanger for the package of the double twister 2 is stopped.

【0025】ダブルツイスター2で巻き上げられたパッ
ケージが玉揚時期に至ると、レール4の搬送ユニットが
昇降レール71に入り、スピンドルのテンサを保持して
元のレール4に戻る。つぎに、レール6からの搬送ユニ
ットが紙管を保持して昇降レール71に至り、自動又は
マニュアルでダブルツイスター2上がりの玉揚に対して
満管と紙管の交換が行われる。そして、レール4のテン
サを保持した搬送ユニットが昇降レール71に入ってテ
ンサを装着する。
When the package wound by the double twister 2 reaches the doffing time, the transport unit of the rail 4 enters the elevating rail 71, holds the spindle tenser, and returns to the original rail 4. Next, the transport unit from the rail 6 holds the paper tube and reaches the elevating rail 71, and the full tube and the paper tube are exchanged automatically or manually for doffing the double twister 2. Then, the transport unit holding the tensor of the rail 4 enters the elevating rail 71 and mounts the tensor.

【0026】また、レール5の空のチャックを有する搬
送ユニットはダブルツイスター2の昇降レール71に入
って空パーン(ボビン)を保持し、パーンワインダ1の
入口で待機している。また、パーンワインダ1のレール
29,29に空のチャックを有する搬送ユニットが入っ
ており、図1で説明した手順で上下パーンの玉揚を行
う。パーンを保持した搬送ユニットは昇降レール71に
入って、パーンをダブルツイスター2に移載する。そし
て、パーンワインダ1のレール29,29には空パーン
(ボビン)を保持する搬送ユニットが入って空パーンを
図1のスピンドル軸14に挿入する。このように、搬送
ユニットが循環するレールによりパーンワインダとダブ
ルツイスターを接続すると、パーンワインダの玉揚と、
ダブルツイスターへのパーン供給を自動的に行うことが
できる。
The transport unit having an empty chuck on the rail 5 enters the lifting rail 71 of the double twister 2 to hold an empty pan (bobbin) and waits at the entrance of the pan winder 1. Further, the rails 29, 29 of the pan winder 1 include a transport unit having an empty chuck, and the upper and lower pans are lifted according to the procedure described in FIG. The transport unit holding the pan enters the elevating rail 71 and transfers the pan to the double twister 2. Then, the rail 29, 29 of the pan winder 1 has a carrying unit for holding an empty pan (bobbin), and the empty pan is inserted into the spindle shaft 14 of FIG. In this way, by connecting the pan winder and the double twister by the rail that the transport unit circulates, the pan winder doffing and
It is possible to automatically supply the pan to the double twister.

【0027】なお、図1及び図2の玉揚装置による玉揚
方法は、パーンワインダに限らず、スピンドル軸に複数
の実ボビンを積み重ね状態で巻き形成するワインダを有
するものであれば、種々の紡績機械に適用できる。
The doffing method using the doffing device shown in FIGS. 1 and 2 is not limited to the pan winder, and may be any one as long as it has a winder for winding a plurality of actual bobbins on the spindle shaft in a stacked state. Applicable to spinning machines.

【0028】[0028]

【発明の効果】本発明の段巻きを行う巻取装置の玉揚方
法は、スピンドル軸における上段以外の実ボビンを上段
位置まで持ち上げて玉揚を行うことを要旨とするもので
あり、玉揚装置側は同じ高さ位置で同じボビン保持具を
用いて積み重ねた実ボビンの玉揚動作を行えるようにし
たので、ボビン内に挿入されるボビン保持具であるチャ
ックが下向きに突設された搬送ユニットを昇降自在に設
置するという簡単な玉揚装置で自動的な玉揚ができると
いう効果を奏する。
The doffing method of the winding device for carrying out the step winding of the present invention is characterized in that the actual bobbins other than the upper step on the spindle shaft are lifted to the upper step position for doffing. Since the machine side was able to do the doffing operation of the actual bobbins stacked using the same bobbin holder at the same height position, the chuck which is the bobbin holder inserted into the bobbin is conveyed downwardly. This has the effect of being able to automatically doff with a simple doffing device that installs the unit so that it can be raised and lowered.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の玉揚方法が適用される装置の正面図で
ある。
FIG. 1 is a front view of an apparatus to which a doffing method of the present invention is applied.

【図2】本発明の玉揚方法が適用される装置の側面図で
ある。
FIG. 2 is a side view of an apparatus to which the doffing method of the present invention is applied.

【図3】スピンドル軸の保持機構の断面図である。FIG. 3 is a cross-sectional view of a spindle shaft holding mechanism.

【図4】搬送ユニットの構造図である。FIG. 4 is a structural diagram of a transport unit.

【図5】パーンワインダの側面図である。FIG. 5 is a side view of a pan winder.

【図6】搬送ユニットの走行ライン図である。FIG. 6 is a travel line diagram of the transport unit.

【符号の説明】[Explanation of symbols]

1 パーンワインダ 10 玉揚補助装置 11 スピンドル部分 12 搬送ユニット 14 スピンドル軸 16,17 パーン(実ボビン) 1 Pane Winder 10 Doffing Aid 11 Spindle Part 12 Transport Unit 14 Spindle Shaft 16,17 Pane (Actual Bobbin)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 上向きに突設されたスピンドル軸にボビ
ンを積み重ねて各ボビンにパッケージを巻き形成する巻
取装置に対し、ボビンを保持するボビン保持具が下向き
に突設された搬送ユニットを上下させて行う玉揚方法で
あって、前記スピンドル軸における上段以外の実ボビン
を上段位置まで持ち上げて玉揚を行うことを特徴とする
段巻きを行う巻取装置の玉揚方法。
1. A winding device for stacking bobbins on a spindle shaft projecting upward to wind a package around each bobbin, and a bobbin holding tool for holding the bobbin vertically moving a transport unit. A doffing method of a winding device for performing a multi-winding, wherein the doffing method is performed by lifting an actual bobbin other than the upper stage on the spindle shaft to an upper position and performing doffing.
JP5252228A 1993-09-13 1993-09-13 Doffing method of winding device that performs step winding Expired - Lifetime JP2580978B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5252228A JP2580978B2 (en) 1993-09-13 1993-09-13 Doffing method of winding device that performs step winding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5252228A JP2580978B2 (en) 1993-09-13 1993-09-13 Doffing method of winding device that performs step winding

Publications (2)

Publication Number Publication Date
JPH0781845A true JPH0781845A (en) 1995-03-28
JP2580978B2 JP2580978B2 (en) 1997-02-12

Family

ID=17234303

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5252228A Expired - Lifetime JP2580978B2 (en) 1993-09-13 1993-09-13 Doffing method of winding device that performs step winding

Country Status (1)

Country Link
JP (1) JP2580978B2 (en)

Also Published As

Publication number Publication date
JP2580978B2 (en) 1997-02-12

Similar Documents

Publication Publication Date Title
US3946884A (en) Method for transporting textile yarn packages
US4630435A (en) System for automatically changing spools of a spinning machine
CS207569B2 (en) Machine unit
JPH0364534A (en) Method and apparatus for automatically exchanging yarn package adapter equipped with empty tube with yarn package adapter equipped with full tube yarn package adapter in area of yarn processing position of textile machine
EP0109000B1 (en) Method of and apparatus for exchanging bobbins in a flyer frame
JPH0781845A (en) Doffing method of take-up motion making stepped winding
US3344593A (en) Doffing machine
JPH0781846A (en) Take-up motion making stepped winding
US5113645A (en) Textile machine service unit having a roving end extending apparatus
JP2888818B1 (en) Terminal processing device for wire winding bobbin
US4062439A (en) Apparatus for transporting yarn packages produced by a textile machine
US5253817A (en) Bunch winding processing apparatus
JPH07118954A (en) Coupling system of double twister and pirn winder
IT9048313A1 (en) WIRE FEEDING DEVICE FOR AUTOMATIC WINDER.
JPS6257951A (en) Circulation apparatus of bobbin and lift apparatus of full cop
JPH0819576B2 (en) Bobbin transfer device for spinning machine etc.
JPH0226944Y2 (en)
JP2580961B2 (en) How to change traveler
JPH0320490B2 (en)
JP2546359B2 (en) How to replace the spinning machine
JPH0523586Y2 (en)
JPH0523587Y2 (en)
JPS6342146Y2 (en)
JPH0236695B2 (en) BOKINIOKERUMANBOBINNOHANSHUTSUSOCHI
JPH0236694B2 (en) SOBOKINIOKERUKARABOBINNOKYOKYUSOCHI